Finite element model updating method and system for railway bridge based on particle swarm algorithm
The particle swarm algorithm is used to correct the finite element model of the heavy-haul railway bridge, which solves the problems of low correction efficiency and accuracy in the existing technology, achieves more efficient and accurate model correction, and reduces the experimental cost.
Patent Information
- Application Number
- CN202410624031.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-20
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-05-20
AI Technical Summary
The correction efficiency and accuracy of existing finite element model correction methods for heavy-duty railway bridges are low, making it difficult to meet the specific needs of heavy-duty railway bridges.
A method based on the particle swarm algorithm is used to correct the finite element model parameters by establishing a solid finite element model, sensitivity analysis and particle swarm optimization to improve the accuracy and efficiency of model correction.
It significantly improves the accuracy and efficiency of model parameter correction, reduces calculation time and consumption of manpower and material resources, provides more accurate finite element simulation results, and reduces experimental costs.
Smart Images

Figure CN118211459B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of finite element model correction of heavy-duty railway bridges, and in particular to a finite element model correction method and system for railway bridges based on a particle swarm algorithm. Background Art
[0002] The heavy load of railway bridges is of great significance to the transportation system. Heavy-load railway bridges carry important goods and personnel, connect different regions and cities, promote economic development and social exchanges, and effectively share the pressure of road transportation, reducing traffic congestion and traffic accidents. In addition, despite the great importance of heavy-load railway bridges, there are still few studies on them, and even fewer in the field of model correction. At the same time, the experience based on the correction of general railway models can be used as a reference, but due to the characteristics of heavy-load railways with large axles and large traction, the field of model parameter correction still needs further exploration.
[0003] The exploration of bridge models is basically mature. Some people have used the Kriging response surface method to predict the actual stiffness of existing bridges, selected typical continuous variable cross-section rigid frame bridges as the research object, and used the bridge dynamic load test results to correct the initial design parameters, and then proposed a low-cost, low-impact on traffic and high-safety solution. In order to reduce the error between the predicted data and the measured data, some people have proposed a finite element model correction method based on bridge influence lines and alternative model technology. Finally, the practicality and effectiveness of the proposed method in actual engineering were verified through the application example of a large-span suspension bridge. The above scheme has great particularity and can only be used as a reference for heavy-duty railway bridges, and cannot be directly used. Therefore, the parameter correction of the finite model of heavy-duty railways still needs further exploration. Summary of the invention
[0004] The purpose of the present invention is to provide a method for correcting a finite element model of a heavy-duty railway bridge, which can effectively solve the problems existing in the prior art, especially the problems of low correction efficiency and correction accuracy of the existing finite element model correction method for heavy-duty railway bridges.
[0005] In order to achieve the above object, the present invention adopts the following technical scheme:
[0006] A finite element model correction method for a heavy-duty railway bridge based on a particle swarm algorithm comprises the following steps:
[0007] S1, establish a solid finite element model of the target bridge;
[0008] S2, based on step S1, a finite element solid model is established to perform sensitivity analysis on parameters affecting the model;
[0009] S3, according to the high sensitivity parameters in step S2, a particle swarm optimization method (PSO) is used to modify the parameters of the finite element model;
[0010] S4, modifying the model according to the parameters in step S3 to complete the heavy-haul railway finite element model correction.
[0011] Furthermore, in step S1, the finite element model method established by ABAQUS includes the following steps:
[0012] S21, based on the ABAQUS component module function and physical engineering data, establish a train component model, which includes: a rigid body, two rigid wheels, two rigid bogies, an elastic main suspension system, an elastic secondary suspension system, and two linear spring components; establish a bridge-track elastic component model, and the model component module includes: bridge, track, sleeper, and filler between sleeper and track;
[0013] S22, according to the ABAQUS property module function, define the material properties (elastic modulus, Poisson's ratio, density, damping) of the corresponding component in step S21 and assign them to the component;
[0014] S23, using actual engineering basic data to complete the setting of analysis steps and wheel-rail constraints;
[0015] S24, complete the division of bridge mesh by combining the basic knowledge of finite element method.
[0016] Furthermore, in step S2, the sensitivity analysis of the parameters affecting the model includes the following steps:
[0017] S31, selecting target parameters: elastic modulus E1 of the primary suspension system, elastic modulus E2 of the secondary suspension system, elastic modulus E3 of the bridge model, elastic modulus E5 of the track, Poisson's ratio μ1 of the bridge material, Poisson's ratio μ2 of the track material, bridge density ρ1, and track density ρ2;
[0018] S32, according to the experimental single variable principle and the reasonable property range of the material, one of the parameters is changed and the other parameters remain unchanged, and the ABAQUS built-in solver is used to solve the first The natural frequency f of the finite element experimental model of the secondary bridge.
[0019] S33, establish a formula for determining sensitivity targets:
[0020] Formula 1
[0021] in For the The natural frequency of the finite element experimental model of the bridge, is the actual measured bridge natural frequency
[0022] S34, based on step S33, select the first three high-sensitivity parameter variables.
[0023] Furthermore, in step S3, the particle swarm optimization method (PSO) step:
[0024] S41, setting particle swarm parameters, including: particle swarm number, particle dimension, number of iterations, inertia weight, learning factor, and iteration step range;
[0025] S42, randomly initialize the velocity and position of each particle;
[0026] S43, judging whether the termination condition is met, otherwise proceeding according to the following steps;
[0027] S44, calculating the fitness value of each particle, and determining whether to update the historical optimal fitness value and position of the individual particle;
[0028] S45, selecting the historical optimal fitness value and position of the particles in the group according to step S44, and determining whether to update the optimal fitness value and position of the group;
[0029] S46, determine whether the optimal fitness value and position of the group meet the termination condition, otherwise jump to step S42.
[0030] Furthermore, in step S42, the velocity and position formula of the particle is:
[0031] Formula 2
[0032] in is the position formula, Reference dimension Particles in +1 iteration speed, is the weight, Reference dimension Particles in The speed in the iterations, Refers to individual learning factors, Refers to the group learning factor, Refers to a random value between 0 and 1. Reference dimension Particles in the The historical best position in the iteration, Reference The group in The historical best position in iterations.
[0033] Formula 3
[0034] in and They are dimension Particles in +1, Iteration displacement position, Reference dimension Particles in +1 iteration for speed.
[0035] Furthermore, in step S42, the fitness value calculation formula of the particle is:
[0036] Formula 4
[0037] in is the fitness value, Refers to the actual measured natural frequency of the bridge, yes dimension Particles in Iteration displacement position.
[0038] Further, in step S42, The nonlinear weight formula is:
[0039] Formula 5
[0040] in Reference The weights at the iteration Reference The maximum weight in the iteration, Reference The minimum weight in the iteration, Refers to the current iteration number, Refers to the total number of iterations when setting parameters.
[0041] Furthermore, in step S5, the model parameters are corrected according to the optimal solution of the parameters in S43 to complete the correction of the heavy-haul railway finite element model.
[0042] Based on the above purpose, this application also proposes a railway bridge finite element model correction system based on particle swarm algorithm, including:
[0043] A modeling module, used to establish a solid finite element model of the target bridge;
[0044] A sensitivity analysis module, which performs sensitivity analysis on parameters affecting the model based on the solid finite element model to obtain highly sensitive parameters;
[0045] A particle swarm optimization module, used for modifying parameters of the solid finite element model using a particle swarm optimization method according to the highly sensitive parameters;
[0046] A model correction module is used to modify the solid finite element model according to the corrected parameters.
[0047] In general, the advantages of this application and the experience it brings to users are: the present invention is a method for correcting the finite element model of a heavy-duty railway bridge based on a particle swarm algorithm, and the model parameter correction is completed based on the sensitivity analysis method and the particle swarm optimization method. Based on the sensitivity analysis method, the number of target parameters is reduced, the calculation time is greatly reduced, and the error between the model parameters and the actual parameters is greatly improved in combination with the particle swarm optimization method. In addition, the method avoids the error between the actual project and the model established by the ABAQUS software, so that the experiment based on the bridge can be accurately simulated by finite elements, reducing a large amount of manpower and material consumption, and greatly improving the economic effect of the experiment. At the same time, it also provides some reference significance in the field of model correction. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In the accompanying drawings, unless otherwise specified, the same reference numerals throughout the multiple drawings represent the same or similar parts or elements. These drawings are not necessarily drawn to scale. It should be understood that these drawings only depict some embodiments disclosed in the present application and should not be regarded as limiting the scope of the present application.
[0049] Figure 1 A flow chart of a railway bridge finite element model correction method based on a particle swarm algorithm according to an embodiment of the present application is shown.
[0050] Figure 2 A flow chart of a particle swarm optimization method according to an embodiment of the present application is shown.
[0051] Figure 3 A sensitivity analysis method flow chart according to an embodiment of the present application is shown.
[0052] Figure 4 A diagram showing the structure of a railway bridge finite element model correction system based on a particle swarm algorithm according to an embodiment of the present application.
[0053] Figure 5 A schematic structural diagram of an electronic device provided in one embodiment of the present application is shown.
[0054] Figure 6 A schematic diagram of a storage medium provided in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0055] The present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant invention, rather than to limit the invention. It is also necessary to explain that, for ease of description, only the parts related to the relevant invention are shown in the accompanying drawings.
[0056] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0057] like Figure 1 As shown, a finite element model correction method for a heavy-duty railway bridge based on a particle swarm algorithm comprises the following steps:
[0058] S1, establishing a solid finite element model of the target bridge; S2, based on the finite element solid model established in step S1, performing sensitivity analysis on parameters affecting the model;
[0059] S3, according to the high sensitivity parameters in step S2, a particle swarm optimization method (PSO) is used to modify the parameters of the finite element model;
[0060] S4, modifying the model according to the parameters in step S3 to complete the heavy-haul railway finite element model correction.
[0061] Furthermore, in step S1, the finite element model method established by ABAQUS includes the following steps:
[0062] S21, based on the ABAQUS component module function and physical engineering data, establish a train component model, which includes: a rigid body, two rigid wheels, two rigid bogies, an elastic main suspension system, an elastic secondary suspension system, and two linear spring components; establish a bridge-track elastic component model, which includes: bridge, track, sleepers, and fillers between sleepers and tracks;
[0063] S22, according to the ABAQUS property module function, define the material properties (elastic modulus, Poisson's ratio, density, damping) of the corresponding component in step S21 and assign them to the component;
[0064] S23, using actual engineering basic data to complete the setting of analysis steps and wheel-rail constraints;
[0065] S24, complete the division of bridge mesh by combining the basic knowledge of finite element method.
[0066] Further, in step S2, if Figure 3 As shown, the sensitivity analysis of the model parameters includes the following steps:
[0067] S31, selecting target parameters: elastic modulus E1 of the primary suspension system, elastic modulus E2 of the secondary suspension system, elastic modulus E3 of the bridge model, elastic modulus E5 of the track, Poisson's ratio μ1 of the bridge material, Poisson's ratio μ2 of the track material, bridge density ρ1, and track density ρ2;
[0068] S32, according to the experimental single variable principle and the reasonable property range of the material, one of the parameters is changed and the other parameters remain unchanged, and the ABAQUS built-in solver is used to solve the first Natural frequency of the finite element experimental model of the secondary bridge .
[0069] S33, establish a formula for determining sensitivity targets:
[0070] Formula 1
[0071] in For the The natural frequency of the finite element experimental model of the bridge, is the actual measured natural frequency of the bridge.
[0072] S34, based on step S33, select the first three high-sensitivity parameter variables.
[0073] Further, in step S3, if Figure 2 As shown, the particle swarm optimization method (PSO) steps are:
[0074] S41, setting particle swarm parameters, including: particle swarm number, particle dimension, number of iterations, inertia weight, learning factor, and iteration step range;
[0075] S42, randomly initialize the velocity and position of each particle;
[0076] S43, judging whether the termination condition is met, otherwise proceeding according to the following steps;
[0077] S44, calculating the fitness value of each particle, and determining whether to update the historical optimal fitness value and position of the individual particle;
[0078] S45, selecting the historical optimal fitness value and position of the particles in the group according to step S44, and determining whether to update the optimal fitness value and position of the group;
[0079] S46, determine whether the optimal fitness value and position of the group meet the termination condition, otherwise jump to step S42.
[0080] Furthermore, in step S42, the velocity and position formula of the particle is:
[0081] Formula 2
[0082] in is the position formula, Reference dimension Particles in +1 iteration speed, is the weight, Reference dimension Particles in The speed in the iterations, Refers to individual learning factors, Refers to the group learning factor, Refers to a random value between 0 and 1. Reference dimension Particles in the The historical best position in the iteration, Reference The group in The historical best position in iterations.
[0083] Formula 3
[0084] in and They are dimension Particles in +1, Iteration displacement position, Reference dimension Particles in +1 iteration for speed.
[0085] Furthermore, in step S42, the fitness value calculation formula of the particle is:
[0086] Formula 4
[0087] in is the fitness value, Refers to the actual measured natural frequency of the bridge, yes dimension Particles in Iteration displacement position.
[0088] Further, in step S42, The nonlinear weight formula is:
[0089] Formula 5
[0090] in Reference The weights at the iteration Reference The maximum weight in the iteration, Reference The minimum weight in the iteration, Refers to the current iteration number, Refers to the total number of iterations when setting parameters.
[0091] Furthermore, in step S5, the model parameters are corrected according to the optimal solution of the parameters in S43 to complete the correction of the heavy-haul railway finite element model.
[0092] The embodiment of the application provides a railway bridge finite element model correction system based on a particle swarm algorithm, and the system is used to execute the railway bridge finite element model correction method based on a particle swarm algorithm described in the above embodiment, such as Figure 4 As shown, the system includes:
[0093] A modeling module 401 is used to establish a solid finite element model of a target bridge;
[0094] A sensitivity analysis module 402 performs sensitivity analysis on parameters affecting the model based on the solid finite element model to obtain highly sensitive parameters;
[0095] A particle swarm optimization module 403 is used to modify the parameters of the solid finite element model using a particle swarm optimization method according to the highly sensitive parameters;
[0096] The model correction module 404 is used to modify the solid finite element model according to the corrected parameters.
[0097] The railway bridge finite element model correction system based on particle swarm algorithm provided in the above-mentioned embodiments of the present application and the railway bridge finite element model correction method based on particle swarm algorithm provided in the embodiments of the present application are based on the same inventive concept and have the same beneficial effects as the methods adopted, run or implemented by the application programs stored therein.
[0098] The embodiment of the present application also provides an electronic device corresponding to the railway bridge finite element model correction method based on particle swarm algorithm provided in the above embodiment, so as to execute the railway bridge finite element model correction method based on particle swarm algorithm. The embodiment of the present application is not limited.
[0099] Please refer to Figure 5 , which shows a schematic diagram of an electronic device provided by some embodiments of the present application. Figure 5As shown, the electronic device 20 includes: a processor 200, a memory 201, a bus 202 and a communication interface 203, and the processor 200, the communication interface 203 and the memory 201 are connected via the bus 202; the memory 201 stores a computer program that can be run on the processor 200, and when the processor 200 runs the computer program, the railway bridge finite element model correction method based on the particle swarm algorithm provided in any of the aforementioned embodiments of the present application is executed.
[0100] The memory 201 may include a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk memory. The communication connection between the system network element and at least one other network element is realized through at least one communication interface 203 (which may be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. may be used.
[0101] The bus 202 may be an ISA bus, a PCI bus, or an EISA bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The memory 201 is used to store a program, and the processor 200 executes the program after receiving an execution instruction. The railway bridge finite element model correction method based on a particle swarm algorithm disclosed in any implementation of the aforementioned embodiment of the present application may be applied to the processor 200, or implemented by the processor 200.
[0102] The processor 200 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 200. The above processor 200 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a readily available programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present application can be implemented or executed. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiments of the present application can be directly embodied as a hardware decoding processor to be executed, or the hardware and software modules in the decoding processor can be executed. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 201, and the processor 200 reads the information in the memory 201 and completes the steps of the above method in combination with its hardware.
[0103] The electronic device provided in the embodiment of the present application and the railway bridge finite element model correction method based on the particle swarm algorithm provided in the embodiment of the present application are based on the same inventive concept and have the same beneficial effects as the methods adopted, operated or implemented therein.
[0104] The present application also provides a computer-readable storage medium corresponding to the railway bridge finite element model correction method based on particle swarm algorithm provided in the above embodiment. Figure 6 The computer-readable storage medium shown is a CD 30 on which a computer program (i.e., a program product) is stored. When the computer program is run by a processor, it will execute the railway bridge finite element model correction method based on the particle swarm algorithm provided in any of the aforementioned embodiments.
[0105] It should be noted that examples of the computer-readable storage medium may also include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other optical or magnetic storage media, which are not listed here one by one.
[0106] The computer-readable storage medium provided in the above-mentioned embodiments of the present application and the railway bridge finite element model correction method based on particle swarm algorithm provided in the embodiments of the present application are based on the same inventive concept and have the same beneficial effects as the methods adopted, run or implemented by the application programs stored therein.
[0107] It should be noted that:
[0108] The algorithms and displays provided herein are not inherently related to any particular computer, virtual system or other device. Various general purpose systems may also be used together with the teachings based thereon. It is apparent from the above description that the structure required for constructing such systems is not intended for any particular programming language. In addition, the present application is not intended for any particular programming language either. It should be understood that the content of the present application described herein may be implemented using various programming languages, and the description of the particular language above is intended to disclose the best mode of implementation of the present application.
[0109] In the description provided herein, a large number of specific details are described. However, it is understood that the embodiments of the present application can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.
[0110] Similarly, it should be understood that in order to streamline the present application and help understand one or more of the various inventive aspects, in the above description of the exemplary embodiments of the present application, the various features of the present application are sometimes grouped together into a single embodiment, figure, or description thereof. However, the disclosed method should not be interpreted as reflecting the following intention: the claimed application requires more features than the features clearly stated in each claim. More specifically, as reflected in the claims below, the inventive aspects are less than all the features of the single embodiment disclosed above. Therefore, the claims following the specific embodiment are hereby expressly incorporated into the specific embodiment, wherein each claim itself serves as a separate embodiment of the present application.
[0111] Those skilled in the art will appreciate that the modules in the devices in the embodiments may be adaptively changed and arranged in one or more devices different from the embodiments. The modules or units or components in the embodiments may be combined into one module or unit or component, and in addition they may be divided into a plurality of submodules or subunits or subcomponents. Except that at least some of such features and / or processes or units are mutually exclusive, all features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all processes or units of any method or device disclosed in this manner may be combined in any combination. Unless otherwise expressly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) may be replaced by an alternative feature providing the same, equivalent or similar purpose.
[0112] In addition, those skilled in the art will appreciate that, although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present application and form different embodiments. For example, in the claims below, any one of the claimed embodiments may be used in any combination.
[0113] The various component embodiments of the present application can be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. It should be understood by those skilled in the art that a microprocessor or digital signal processor (DSP) can be used in practice to implement some or all functions of some or all components in the creation system of the virtual machine according to the embodiment of the present application. The present application can also be implemented as a device or system program (e.g., computer program and computer program product) for executing part or all of the methods described herein. Such a program implementing the present application can be stored on a computer-readable medium, or can have the form of one or more signals. Such a signal can be downloaded from an Internet website, or provided on a carrier signal, or provided in any other form.
[0114] It should be noted that the above embodiments illustrate the present application rather than limit the present application, and that those skilled in the art may design alternative embodiments without departing from the scope of the appended claims. In the claims, any reference symbol between brackets should not be constructed as a limitation to the claims. The word "comprising" does not exclude the presence of elements or steps not listed in the claims. The word "one" or "an" preceding an element does not exclude the presence of multiple such elements. The present application may be implemented by means of hardware including several different elements and by means of appropriately programmed computers. In a unit claim that lists several systems, several of these systems may be embodied by the same hardware item. The use of the words first, second, and third, etc. does not indicate any order. These words may be interpreted as names.
[0115] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A railway bridge finite element model correction method based on particle swarm algorithm, characterized in that: The following steps are involved: S1, establish a solid finite element model of the target bridge; S2, performing sensitivity analysis on parameters affecting the model based on the solid finite element model to obtain sensitivity parameters; S3, according to the sensitivity parameters, using a particle swarm optimization method to modify parameters of the solid finite element model; S4, modifying the solid finite element model according to the modified parameters; Step S2 includes the following steps: S31, selecting target parameters: elastic modulus E1 of the primary suspension system, elastic modulus E2 of the secondary suspension system, elastic modulus E3 of the bridge model, elastic modulus E5 of the track, Poisson's ratio μ1 of the bridge material, Poisson's ratio μ2 of the track material, bridge density ρ1, and track density ρ2; S32, according to the experimental single variable principle and the reasonable property range of the material, one of the parameters is changed, while the other parameters remain unchanged, and the natural frequency of the a-th bridge finite element experimental model is solved using the ABAQUS built-in solver ; S33, establish the target formula for judging sensitivity H: Formula 1 in is the natural frequency of the a-th bridge finite element experimental model, f is the actual measured natural frequency of the bridge; S34, selecting the first three sensitivity parameter variables based on step S33; In the particle swarm optimization method, the fitness value calculation formula of the particle is: Formula 4 Where G is the fitness value, Refers to the actual measured natural frequency of the bridge, is the displacement position of particle i in dimension d after k iterations.
2. The method for updating the finite element model of a railway bridge based on a particle swarm algorithm according to claim 1 is characterized in that: Step S1 includes the following steps: S21, based on the ABAQUS component module function and physical engineering data, establish a train component model, which includes: a rigid body, two rigid wheels, two rigid bogies, an elastic main suspension system, an elastic secondary suspension system, and two linear spring components; establish a bridge-track elastic component model, the components of which include: bridge, track, sleepers, and filler between sleepers and tracks; S22, according to the function of the ABAQUS property module, define the material properties for the corresponding component in step S21 and assign them to the component; S23, using actual engineering basic data to complete the setting of analysis steps and wheel-rail constraints; S24, complete the division of bridge mesh by combining the basic knowledge of finite element method.
3. The method for updating the finite element model of a railway bridge based on a particle swarm algorithm according to claim 1 is characterized in that: In step S3, the particle swarm optimization method steps are: S41, setting particle swarm parameters, including: particle swarm number, particle dimension, number of iterations, inertia weight, learning factor, and iteration step range; S42, randomly initialize the velocity and position of each particle; S43, judging whether the termination condition is met, otherwise proceeding according to the following steps; S44, calculating the fitness value of each particle, and determining whether to update the historical optimal fitness value and position of the individual particle; S45, selecting the historical optimal fitness value and position of the particles in the group according to step S44, and determining whether to update the optimal fitness value and position of the group; S46, determine whether the optimal fitness value and position of the group meet the termination condition, otherwise jump to step S42.
4. The method for updating the finite element model of a railway bridge based on a particle swarm algorithm according to claim 3 is characterized in that: In step S42, the velocity and position formula of the particle is: Formula 2 in is the position formula, Refers to the speed of particle i in dimension d in the k+1 iteration, is the weight, Refers to the speed of particle i in d dimension in k iterations, Refers to individual learning factors, Refers to the group learning factor, , Refers to a random value between 0 and 1. Refers to the historical optimal position of the d-dimensional i particle in the kth iteration, Refers to the historical optimal position of the d-dimensional population in the kth iteration; Formula 3 in and They are the displacement positions of the d-dimensional i particle at k+1 and k iterations, Refers to the velocity of particle i in dimension d in the k+1th iteration.
5. The method for updating the finite element model of a railway bridge based on a particle swarm algorithm according to claim 4 is characterized in that: The nonlinear weight formula is: Formula 5 in Refers to the weight at k iterations, refers to the maximum weight in k iterations, Refers to the minimum weight in k iterations, refers to the current number of iterations, and K refers to the total number of iterations when setting parameters.
6. A railway bridge finite element model correction system based on particle swarm algorithm, using the method described in any one of claims 1 to 5, characterized in that: include: A modeling module, used to establish a solid finite element model of the target bridge; A sensitivity analysis module performs sensitivity analysis on parameters affecting the model based on the solid finite element model to obtain sensitivity parameters; A particle swarm optimization module, used for modifying parameters of the solid finite element model using a particle swarm optimization method according to the sensitivity parameters; A model correction module is used to modify the solid finite element model according to the corrected parameters.
7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: The processor runs the computer program to implement the method according to any one of claims 1 to 5.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: The program is executed by a processor to implement the method according to any one of claims 1 to 5.