An automated processing equipment for upstream processes of industrial reverse osmosis membrane elements
By designing automated processing equipment, the automated processing of materials such as membrane sheets, concentrate nets, and water-conducting cloth has been realized, solving the problem of low automation in the processing of industrial reverse osmosis membrane elements and improving production efficiency and finished product quality.
Patent Information
- Application Number
- CN202410533774.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2044-04-29
AI Technical Summary
The current industrial reverse osmosis membrane element manufacturing process suffers from low automation and difficulty in manual transfer, resulting in low production efficiency and easy damage to finished elements, which affects filtration performance and pass rate.
An automated processing equipment was designed, comprising a folding and cutting mechanism, a central tube feeding and film-applying mechanism, and an automatic film-winding mechanism. This equipment enables the automatic feeding, cutting, welding, folding, and winding of materials such as membrane sheets, concentrate nets, and water-guiding cloths. Multiple drive devices work together to complete the previous processing steps.
It improves processing accuracy and production efficiency, reduces labor costs, ensures the quality and efficiency of finished components, and reduces the risk of damage caused by manual handling.
Smart Images

Figure CN118217822B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of water filtration technology, specifically to an automated processing equipment for the upstream stage of industrial reverse osmosis membrane elements. Background Technology
[0002] Reverse osmosis (RO) membranes are a highly efficient water separation technology widely used in both domestic and industrial applications. In domestic use, RO membranes are primarily used to purify tap water, removing impurities such as iron, copper, cadmium, chromium, and lead to provide high-quality drinking and cooking water. They can also be used to purify concrete floors and swimming pool water. In industrial applications, RO membranes are widely used in water treatment, beverage manufacturing, electronics manufacturing, chemical processing, and food processing to transform wastewater, seawater, and groundwater into high-quality purified water. The main differences between domestic and industrial RO membranes lie in their application scenarios, filtration performance, and structural design. Domestic RO membranes are characterized by their miniaturization, lightweight design, ease of installation, and ease of maintenance. Their filtration precision is typically 0.0001 microns, removing most impurities and bacteria, but they struggle with pathogenic viruses and chemical pollutants. Industrial reverse osmosis membranes are used in large-scale water treatment systems. Their filtration precision is typically 0.00001 microns, which can effectively remove bacteria, viruses, solvents, heavy metals, radioactive elements, etc. from water, providing high-quality pure water that can be used in various industrial production scenarios.
[0003] Currently, the cutting, folding, and rolling processes of materials such as membrane sheets and water guide nets in industrial reverse osmosis membrane elements are handled by different equipment, and then manually transferred to another piece of equipment for the next process. On the one hand, the need for manual intervention during the transfer process reduces production efficiency, increases production costs, and results in low levels of automation and intelligence. On the other hand, industrial reverse osmosis membrane elements are large in size, making manual transfer difficult, and the process can lead to scratches and damage to the elements, significantly impacting the filtration performance of the finished product and increasing the defect rate.
[0004] With the development of society and the progress of science and technology, people are paying more and more attention to environmental protection and health. The demand and requirements for industrial reverse osmosis membrane elements are getting higher and higher, and higher requirements are being placed on the precision and output of industrial reverse osmosis membrane elements. Therefore, there is an urgent need for a high-precision, highly automated, and highly efficient industrial reverse osmosis membrane element processing equipment. Summary of the Invention
[0005] The purpose of this application is to provide an automated processing equipment for industrial reverse osmosis membrane elements with high precision, high degree of automation, and high production efficiency, so as to solve the problems existing in the background art.
[0006] The embodiments of this application can be implemented through the following technical solutions:
[0007] An automated processing equipment for upstream processes of industrial reverse osmosis membrane elements includes a frame for fixing and mounting other mechanisms.
[0008] The automated processing equipment also includes a folding and cutting mechanism, a central tube feeding and film-applying mechanism, and an automatic film-winding mechanism.
[0009] The folding and cutting mechanism includes a concentrate net cutting and transferring device, a first welding device, a membrane cutting and transferring device, a crease hot pressing device, a water-guiding cloth feeding device, and a first driving device. The first driving device provides power to the concentrate net cutting and transferring device, the first welding device, the membrane cutting and transferring device, the crease hot pressing device, and the water-guiding cloth feeding device. The concentrate net cutting and transferring device is used to feed, convey, and cut the concentrate net. The first welding device is used to weld the concentrate net to the membrane. The membrane cutting and transferring device is used to feed, convey, cut, and fold the membrane. The crease hot pressing device is used to hot press the creases of the membrane. After the membrane is welded to the concentrate net and folded, the first membrane material can be prepared. The water-guiding cloth feeding device is used to feed, convey, cut, and weld the intermediate water-guiding cloth to the first membrane material to prepare the second membrane material.
[0010] The central tube feeding and film-applying mechanism includes a central tube feeding device, a bottom water-guiding cloth cutting and transfer device, a third welding device, and a sixth driving device. The sixth driving device provides power to the central tube feeding device, the bottom water-guiding cloth cutting and transfer device, and the third welding device. The central tube feeding device is used to convey the central tube to a designated device. The bottom water-guiding cloth cutting and transfer device is used to realize the feeding, conveying, and cutting of the bottom water-guiding cloth. The third welding device is used to realize the welding of the central tube and the bottom water-guiding cloth to realize the preparation of the tube material bottom cloth.
[0011] The automatic film winding mechanism includes a film winding station, a dispensing device, a film winding device, a tape wrapping device, a film material transfer device, a material unloading device, and an eighth driving device. The second driving device provides power to the dispensing device, the film winding device, the tape wrapping device, the film material transfer device, and the material unloading device. The film material transfer device conveys the first / second film material prepared by the folding and cutting mechanism to the dispensing device for dispensing. After dispensing, the first / second film material is wound around the outside of the bottom / middle water-wicking fabric under the action of the film winding device. After the wound second film material reaches a set number of layers, the tape wrapping device wraps tape around the outside of the last layer of second film material for fixation. Then, the material unloading device conveys the wound finished industrial film out of the automated processing equipment.
[0012] Furthermore, the concentrate screen cutting and transfer device includes a concentrate screen feeding roller, a concentrate screen conveying roller, a concentrate screen conveying section, a concentrate screen pressing plate, a concentrate screen cutting section, and a first platform. The concentrate screen feeding roller, the concentrate screen conveying roller, the concentrate screen pressing plate, and the concentrate screen cutting section are arranged along the Y direction, and the concentrate screen cutting section is located below the concentrate screen pressing plate.
[0013] The concentrated mesh, unfurled by the concentrated mesh feeding roller, passes through the concentrated mesh conveying roller and is moved along the X direction on the first platform under the traction of the concentrated mesh conveying part. When the length of the concentrated mesh on the first platform reaches the preset length, the concentrated mesh pressing plate presses down on the concentrated mesh, and the concentrated mesh cutting part cuts the concentrated mesh along the Y direction.
[0014] Furthermore, the first welding device is arranged along the X direction and includes a spot welding beam, a first displacement module, and two first welding heads. The spot welding beam has a U-shaped structure and is installed above the first platform with its opening facing the first platform. The first welding heads are installed at both ends of the spot welding beam along the Y direction. The first displacement module is arranged on both sides of the bottom of the first platform along the X direction. The two ends of the length of the spot welding beam are slidably connected to the first displacement module, and the first displacement module can drive the first welding heads to move along the X direction.
[0015] Furthermore, the folding and cutting mechanism also includes a tape applicator, which can apply tape to the middle of the diaphragm.
[0016] The tape applicator includes a first unwinding section, a first anti-detachment conveying section, a first cutting section, a transverse guide rail, and a first fixed bracket. The transverse guide rail is arranged along the Y direction. The first fixed bracket is slidably connected to the transverse guide rail. The first unwinding section, the first anti-detachment conveying section, and the first cutting section are installed on the same side of the first fixed bracket. The first unwinding section is fitted with tape and is movably connected to the tape. The tape output from the first unwinding section can be conveyed and transitioned through the first anti-detachment conveying section and output to the first platform. After the tape is applied, the first cutting section can cut the tape.
[0017] Furthermore, the film cutting and transfer device includes a film feeding roller, a film conveying roller, a film conveying section, a film pressing section, a film cutting section, a second platform, and a second driving device. The second driving device can provide power to the film feeding roller, the film conveying roller, the film conveying section, the film pressing section, and the film cutting section. The film feeding roller, the film conveying roller, the film pressing section, and the film cutting section are arranged along the Y direction.
[0018] The membrane, unfolded by the membrane feeding roller, passes through the membrane conveying roller and is moved along the X direction on the first platform and the second platform under the traction of the membrane conveying unit. When the length of the membrane on the first platform reaches the preset length, the first welding device welds the initial end of the concentrate mesh to the membrane to fix the relative position of the membrane and the concentrate mesh. When the welding position moves to the membrane pressing part, the membrane pressing part presses down from both ends of the length at the crease position. The membrane conveying unit then drives the initial end of the membrane to move along the direction close to the membrane feeding roller. When the initial end of the membrane moves to one end of the second platform close to the membrane feeding roller, the membrane conveying unit stops moving. The crease hot pressing device moves along the X direction to the crease position and hot presses the crease. The membrane cutting part is located at one end of the second platform close to the membrane feeding roller and can cut the membrane along the Y direction.
[0019] Furthermore, the crease hot pressing device includes a heating part, a first film material conveying part, and a pressing part. The heating part and the pressing part are arranged along the Y direction. The pressing part is installed below the first film material conveying part. The first film material conveying part can drive the pressing part to move along the X direction. The heating part is arranged on the top plane of the film pressing part. When the pressing part moves above the film pressing part, the pressing part can move vertically downward. The pressing part and the film pressing part press and heat the crease from the vertical direction of the crease position. At this point, the first film material has been prepared.
[0020] Furthermore, the water-guiding cloth feeding device includes a water-guiding cloth feeding roller, a water-guiding cloth conveying roller, a water-guiding cloth conveying section, a water-guiding cloth pressing plate, an intermediate water-guiding cloth cutting section, a third platform, a second welding device, and a third driving device. The third driving device can provide power to the water-guiding cloth feeding roller, the water-guiding cloth conveying roller, the water-guiding cloth conveying section, the water-guiding cloth pressing plate, and the intermediate water-guiding cloth cutting section. The water-guiding cloth feeding roller, the water-guiding cloth conveying roller, the water-guiding cloth pressing plate, the intermediate water-guiding cloth cutting section, and the second welding device are arranged along the Y direction.
[0021] The intermediate water-guiding cloth, which is spread out by the water-guiding cloth feeding roller, passes through the water-guiding cloth conveying roller and is moved along the X direction on the third platform under the traction of the water-guiding cloth conveying part. When the length of the intermediate water-guiding cloth on the third platform reaches the preset length, the water-guiding cloth pressing plate presses down on the intermediate water-guiding cloth, and the intermediate water-guiding cloth cutting part cuts the intermediate water-guiding cloth along the Y direction.
[0022] Preferably, the folding and cutting mechanism further includes a film defect detection device, which is used to detect defects in the film and is located between the film feeding roller and the film conveying roller.
[0023] Preferably, the automated processing equipment further includes a waiting station, which is located between the folding and cutting mechanism, the central tube feeding and film-applying mechanism, and the automatic film-winding mechanism.
[0024] Preferably, the waiting station includes a first waiting station and a second waiting station. The first waiting station is located on the side of the water-guiding cloth feeding device along the Y direction, and the second waiting station is located on the side of the first waiting station along the X direction.
[0025] Furthermore, the central tube feeding and film-applying mechanism includes a central tube feeding device, a bottom water-guiding cloth cutting and transfer device, a third welding device, and a sixth driving device. The sixth driving device is used to provide power to the central tube feeding device, the bottom water-guiding cloth cutting and transfer device, and the third welding device.
[0026] The central tube feeding device is used to convey the central tube to a designated position, the bottom water-guiding cloth cutting and transfer device is used to realize the feeding, conveying and cutting of the bottom water-guiding cloth, and the third welding device is used to realize the welding of the central tube and the bottom water-guiding cloth.
[0027] The central tube feeding device includes a central tube hopper, a vertical feeding section, and a horizontal conveying section. The central tube hopper stores central tubes and can automatically output them. The vertical feeding section can move the central tubes output from the central tube hopper along the Z direction to a preset highest position. The horizontal conveying section can move the central tubes at the preset highest position along the X direction to the film winding station.
[0028] Furthermore, the bottom water-guiding fabric cutting and transfer device includes a bottom water-guiding fabric feeding roller, a bottom water-guiding fabric conveying roller, a bottom water-guiding fabric conveying and pressing part, a bottom water-guiding fabric cutting part, a sixth platform, and a seventh driving device. The seventh driving device can provide power to the bottom water-guiding fabric feeding roller, the bottom water-guiding fabric conveying roller, the bottom water-guiding fabric conveying and pressing part, and the bottom water-guiding fabric cutting part. The bottom water-guiding fabric feeding roller, the bottom water-guiding fabric conveying roller, the bottom water-guiding fabric conveying and pressing part, and the bottom water-guiding fabric cutting part are arranged along the Y direction.
[0029] The bottom water-guiding cloth, which is spread out by the bottom water-guiding cloth feeding roller, passes through the bottom water-guiding cloth conveying roller and is moved along the X direction on the sixth platform under the traction of the bottom water-guiding cloth conveying pressing part. When the length of the bottom water-guiding cloth on the sixth platform reaches the preset length, the bottom water-guiding cloth is pressed down by the bottom water-guiding cloth conveying pressing part, and the bottom water-guiding cloth cutting part cuts the bottom water-guiding cloth along the Y direction.
[0030] Furthermore, the third welding device includes a second welding head, a welding platform, and a third welding head. The welding platform is arranged along the Y direction and located on the side of the bottom water-guiding cloth cutting device near the bottom water-guiding cloth conveying roller. The second welding head is installed on the top of the welding platform along the Y direction, and the bottom water-guiding cloth can pass over the welding platform. The second welding head can realize the welding of the bottom water-guiding cloth and the central tube. The third welding head is arranged on the side of the second welding head near the bottom water-guiding cloth conveying roller, and can realize the welding of the first film material and the bottom water-guiding cloth.
[0031] Preferably, the central tube feeding device further includes a steel core transfer section, which can be aligned with the vertical feeding section along the Y direction. The steel core transfer section is used to transfer the steel core inside the central tube of the prepared finished industrial film to the central tube being fed by the vertical feeding section.
[0032] Furthermore, the film material transfer device includes a receiving section, a transfer section, a seventh platform, and a fifth conveying beam. Two fifth conveying beams are arranged parallel to each other above the seventh platform along the X direction. The receiving section and the transfer section are arranged along the Y direction and installed at both ends of the fifth conveying beams along the X direction. The seventh platform is aligned with the fifth platform. The receiving section is located on the side away from the fifth platform, and the transfer section is located on the side closer to the fifth platform. The transfer section and the receiving section can be displaced relative to the fifth platform and the seventh platform along the X direction.
[0033] Furthermore, the dispensing device includes a dispensing plate, a dispensing machine, and an application section. The dispensing plate cooperates with the receiving section to ensure that the first film material / second film material is pressed down and does not move during dispensing. The adhesive prepared by the dispensing machine can be applied to the three sides of the upper surface of the first film material / second film material through the application section.
[0034] Furthermore, the film winding device is located at the film winding station. The film winding device includes a film winding tip and a winding bracket corresponding to the film winding tip. There are two film winding tips, which are arranged opposite each other along the Y direction. The winding bracket is installed on the outside of the film winding tip along the Y direction. The film winding tip is rotatably connected to the winding bracket and can be displaced relative to the winding bracket along the Y direction. The film winding tip can extend into the central tube from both axial sides of the central tube and rotate circumferentially synchronously with the central tube.
[0035] Furthermore, the tape wrapping device includes a second unwinding section, a second anti-detachment conveying section, a second cutting section, and a second fixed bracket. The second unwinding section, the second anti-detachment conveying section, and the second cutting section are mounted on the second fixed bracket. The second unwinding section is fitted with tape and is movably connected to the tape. The tape output from the second unwinding section can be conveyed and transitioned through the second anti-detachment conveying section and output to the film material. After the tape is applied, the second cutting section can cut the tape.
[0036] Furthermore, the feeding device includes a fifth fixed bracket, an eleventh gripper, a second lifting part, and a thirteenth guide rail. The eleventh gripper and the second lifting part are mounted on the fifth fixed bracket along the Y direction, with the gripper opening of the eleventh gripper facing upward. At least two of the eleventh grippers are mounted between at least two of the second lifting parts. The outermost distance between the two outermost second lifting parts is not greater than the width of the film. The thirteenth guide rail is mounted on the inner side below the film winding device along the X direction. One end of the thirteenth guide rail along the X direction corresponds to the initial position of the film winding device. The bottom end of the fifth fixed bracket is slidably connected to the thirteenth guide rail.
[0037] Preferably, the automatic film winding mechanism further includes a clamping device located on one side of the film winding device along the X direction, which can clamp the first and second film materials outside the central tube during the film winding process of the film winding device to achieve tight winding.
[0038] Preferably, the automatic film winding mechanism further includes a tapping device, which is arranged along the Y direction and can tap the outside of the film material after winding.
[0039] The embodiments of this application provide an automated pre-processing equipment for industrial reverse osmosis membrane elements, which has at least the following beneficial effects:
[0040] In this application, a folding and cutting mechanism is used to realize the feeding, conveying, cutting, pressing, hot pressing, and folding of the membrane sheet, as well as the feeding, conveying, cutting, and welding of the membrane sheet to the concentrate mesh. After the membrane sheet is welded to the concentrate mesh and folded, the first membrane material can be prepared. The folding and cutting mechanism can also realize the feeding, conveying, and welding of the intermediate water-guiding cloth to the first membrane material, thereby realizing the preparation of the second membrane material. The central tube feeding and membrane-applying mechanism is used to realize the feeding and conveying of the central tube and the bottom water-guiding cloth, and can realize... The welding of the central tube and the bottom water-guiding cloth enables the preparation of the tube material bottom cloth. The automatic film winding mechanism is used to realize the conveying, dispensing, and winding of the first film material with the tube material bottom cloth, as well as the conveying, dispensing, and winding of the second film material with the first film material or the upper layer of the second film material. After winding, the film is fixed and shaped by tape, thereby realizing the automated production of industrial membranes. The automated processing equipment in this application can automatically complete the pre-processing steps of industrial membranes, with the advantages of high precision and high production efficiency, and significantly reducing labor costs. Attached Figure Description
[0041] Figure 1 This is an overall structural diagram of the automated processing equipment for the upstream stage of industrial reverse osmosis membrane elements in this application;
[0042] Figure 2 This is a structural diagram of the automated processing equipment for the upstream stage of the industrial reverse osmosis membrane element in this application after removing the frame;
[0043] Figure 3 This is an overall structural diagram showing the connection between the concentrated water cutting and transferring device, the first welding device, and the tape application device in this application.
[0044] Figure 4 This is an overall structural diagram showing the connection between the membrane cutting and transfer device, the crease hot pressing device, and the water-guiding cloth feeding device in this application.
[0045] Figure 5 A structural diagram showing the connection between the water-guiding cloth feeding roller, the water-guiding cloth conveying roller, the water-guiding cloth pressing plate, and the intermediate water-guiding cloth cutting section.
[0046] Figure 6 This is a structural diagram of the tape application device;
[0047] Figure 7 This is an overall structural diagram showing the connection between the bottom water-guiding cloth conveying roller, the first water-guiding cloth feeding roller, and the waiting station in this application.
[0048] Figure 8 This is an overall structural diagram showing the connection between the dispensing device and the film transfer device in this application;
[0049] Figure 9This is an overall structural diagram showing the connection between the central tube feeding device, the third welding device, the film winding device, the tape wrapping device, the unloading device, the extrusion device, and the tapping device in this application.
[0050] Figure 10 This is an overall structural diagram of the connection between the central tube feeding device, the third welding device, the film winding device, the tape wrapping device, the unloading device, the extrusion device, and the tapping device in this application from another angle.
[0051] Figure 11 This is an overall structural diagram of the tape wrapping device in this application.
[0052] Figure label:
[0053] 1. Frame; 2. Folding and cutting mechanism; 21. Concentrate screen cutting and transfer device; 211. Concentrate screen feeding roller; 212. Concentrate screen conveying roller; 213. Concentrate screen conveying section; 2131. First lead screw; 2132. First conveying beam; 2133. First guide rail; 2134. First conveying support; 2135. First gripper; 214. Concentrate screen pressing plate; 215. Concentrate screen cutting section; 216. First platform; 22. First welding device; 221. Spot welding beam; 222. First welding head; 223. First displacement module; 2231. Fourth guide rail; 2232. Fourth displacement slider; 23. Diaphragm cutting and transfer device; 231. Diaphragm feeding roller; 232. Diaphragm conveying roller; 233. Diaphragm conveying section 2331. Second lead screw; 2332. Second conveying beam; 2333. Second guide rail; 2334. Second conveying support; 2335. Second gripper; 234. Diaphragm pressing part; 2341. Diaphragm pressing beam; 2342. Pressing hand; 2343. Second displacement module; 23431. Third guide rail; 23432. Second displacement slider; 235. Diaphragm cutting part; 2351. Lifting roller; 236. Second platform; 237. Diaphragm cutting and pressing part; 24. Crease hot pressing device; 241. Heating part; 242. First membrane material conveying part; 2421. Third conveying beam; 2422. Third conveying support; 2423. Third gripper; 243. Pressing part; 25. Water-guiding cloth feeding device; 251. 252. Water-guiding cloth feeding roller; 253. Water-guiding cloth conveying roller; 254. Water-guiding cloth conveying section; 2551. Fourth gripper; 2552. Linkage bracket; 256. Water-guiding cloth pressing plate; 257. Third platform; 258. Second welding device; 29. Film defect detection device; 2003. Adhesive tape application device; 201. First unwinding section; 202. First anti-detachment conveying section; 203. First cutting section; 204. Horizontal guide rail; 205. First fixed bracket; 206. Fourth conveying bracket; 3004. Central tube feeding and film application mechanism; 31. Central tube feeding device; 311. Central tube material box; 312. Vertical feeding section; 3121. Seventh gripper; 3122. Seventh conveying bracket; 313. Horizontal conveying section; 3131. Eighth gripper. 3132. Eighth conveyor support; 32. Bottom water-guiding cloth cutting and transfer device; 321. Bottom water-guiding cloth feeding roller; 322. Bottom water-guiding cloth conveyor roller; 325. Sixth platform; 33. Third welding device; 331. Second welding head; 332. Welding platform; 333. Third welding head; 34. Steel core transfer unit; 4. Automatic film winding mechanism; 41. Film winding station; 42. Glue dispensing device; 421. Glue dispensing pressure plate; 4211. Twelfth conveyor support; 4212. Pressure plate; 4213. First lifting unit; 422. Glue dispensing machine; 423. Glue application unit; 4231. Glue application head; 4232. Thirteenth conveyor support; 4233. Seventh guide rail; 4234. Eighth guide rail; 4235. Ninth guide rail; 43. Film winding device.431. Film winding tip, 432. Winding support, 433. Eighth platform, 434. Tenth guide rail, 44. Tape winding device, 441. Second unwinding section, 442. Second anti-detachment conveying section, 443. Second cutting section, 444. Second fixing support, 445. Eleventh guide rail, 446. Twelfth guide rail, 45. Film material transfer device, 451. Receiving section, 4511. Ninth gripper, 4512. Ninth conveying support, 452. Transfer section, 4521. Tenth gripper, 4522. Tenth conveying support, 4523. Fifth guide rail, 4524. Eleventh conveying support, 4525. Sixth guide rail, 453. Seventh platform, 454. 5. Conveyor beam; 46. Feeding device; 461. Fifth fixed support; 462. Eleventh gripper; 463. Second lifting part; 464. Thirteenth guide rail; 47. Compacting device; 471. Compacting roller; 472. Third fixed support; 473. Ninth platform; 48. Beating device; 481. Fourth fixed support; 482. Active part; 483. Transmission part; 484. Beating part; 4841. Beating rod; 4842. Connecting rod; 5. Waiting station; 51. First waiting station; 511. Fourth platform; 513. Fifth gripper; 52. Second waiting station; 521. Fifth platform; 522. Sixth conveyor support; 523. Sixth gripper. Detailed Implementation
[0054] The present application will now be further described based on preferred embodiments and with reference to the accompanying drawings.
[0055] The vocabulary used in this specification is for illustrative purposes and is not intended to limit the scope of this application. Unless otherwise expressly specified and limited, the terms "set," "connected," and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection, a direct connection, or an indirect connection via an intermediate medium; or they can refer to the internal communication between two components. Those skilled in the art will understand the specific meaning of these terms in this application.
[0056] Furthermore, in the description of the embodiments of this application, various components on the drawings have been enlarged or reduced for ease of understanding, but this is not intended to limit the scope of protection of this application.
[0057] For clarity, the spatial orientation of the automated processing equipment for the upstream stage of an industrial reverse osmosis membrane element (hereinafter referred to as "automated processing equipment") in this application is defined as the X, Y, and Z directions, with the height of the automated processing equipment as the Z direction, its length as the X direction, and its width as the Y direction. Please refer to [reference needed] for details. Figure 1 Directional indicators in the text.
[0058] Specifically, Figure 1 An overall structural diagram of the automated processing equipment in this application is shown, such as... Figure 1 As shown, the automated processing equipment includes a frame 1, a folding and cutting mechanism 2, a central tube feeding and film-applying mechanism 3, and an automatic film-winding mechanism 4. The frame 1 is used to fix and install other mechanisms. The folding and cutting mechanism 2 is used to realize the feeding, conveying, cutting, pressing, hot-pressing, and folding of the membrane sheet, as well as the feeding, conveying, cutting, and welding of the concentrate mesh to the concentrate mesh. After the membrane sheet is welded to the concentrate mesh and folded, the first membrane material can be prepared. The folding and cutting mechanism 2 can also realize the feeding and conveying of the intermediate water-guiding cloth. The process includes welding the intermediate water-guiding cloth to the first membrane material to prepare the second membrane material; the central tube feeding and film-applying mechanism 3 is used to feed and convey the central tube and the bottom water-guiding cloth, and can also weld the central tube to the bottom water-guiding cloth to prepare the tube material bottom cloth; the automatic film-winding mechanism 4 is used to convey the first membrane material, apply glue, and wind it with the tube material bottom cloth, as well as to convey the second membrane material, apply glue, and wind it with the first membrane material or the upper layer of the second membrane material, and fix and shape it with tape after winding.
[0059] The overall structure of the folding and cutting mechanism 2 will be described in detail below, such as... Figure 2 As shown, the folding and cutting mechanism 2 includes a concentrate net cutting and transferring device 21, a first welding device 22, a membrane cutting and transferring device 23, a crease hot pressing device 24, a water-guiding cloth feeding device 25, and a first driving device. The concentrate net cutting and transferring device 21 is used to realize the feeding, conveying, and cutting of the concentrate net. The first welding device 22 is used to realize the welding of the concentrate net and the membrane. The membrane cutting and transferring device 23 is used to realize the feeding, conveying, cutting, and folding of the membrane. The crease hot pressing device 24 is used to realize the hot pressing of the membrane crease. The water-guiding cloth feeding device 25 is used to realize the feeding, conveying, cutting, and welding of the intermediate water-guiding cloth to the first membrane material. The first driving device is used to provide power to the concentrate net cutting and transferring device 21, the first welding device 22, the membrane cutting and transferring device 23, the crease hot pressing device 24, and the water-guiding cloth feeding device 25.
[0060] Specifically, such as Figure 2 and Figure 3 As shown, the concentrate net cutting and transfer device 21 includes a concentrate net feeding roller 211, a concentrate net conveying roller 212, a concentrate net conveying section 213, a concentrate net pressing plate 214, a concentrate net cutting section 215, and a first platform 216. The concentrate net extended by the concentrate net feeding roller 211 passes through the concentrate net conveying roller 212 and is moved along the X direction on the first platform 216 under the traction of the concentrate net conveying section 213. When the length of the concentrate net on the first platform 216 reaches the preset length, the concentrate net pressing plate 214 presses down on the concentrate net, and the concentrate net cutting section 215 cuts the concentrate net along the Y direction.
[0061] Furthermore, the concentrate feed roller 211 is arranged along the Y direction and has a concentrate mesh wound on it. It rotates under the drive of the first drive device to realize the unfolding of the concentrate mesh.
[0062] Furthermore, the concentrate conveying roller 212 is arranged along the Y direction. The concentrate conveying roller 212 can raise the concentrate and provide a transition for the concentrate conveying section 213 to convey the concentrate, preventing direct conveying from damaging the concentrate.
[0063] Furthermore, the concentrate conveying unit 213 includes a first lead screw 2131, a first conveying beam 2132, a first guide rail 2133, a first conveying bracket 2134, and a first gripper 2135. The first lead screw 2131 and the first guide rail 2133 are arranged parallel to each other along the X direction. There are two first guide rails 2133. The first lead screw 2131 is located between the two first guide rails 2133. The first conveying beam 2132 is arranged along the Y direction and its two ends are slidably connected to the first guide rails 2133. The first gripper 2135 is installed at the bottom of the first conveying beam 2132 and the first conveying bracket 2134 is installed at the top. The first lead screw 2131 passes through the first conveying bracket 2135 along the X direction and is screw-driven connected to the first conveying bracket 2134. When the first gripper 2135 clamps the concentrate net, the first conveying bracket 2135 moves in a spiral motion along the first lead screw 2131 under the drive of the first driving device, thereby driving the first conveying beam 2132 to slide along the first guide rail 2133, and then driving the first gripper 2135 and the initial end of the concentrate net to move horizontally away from the concentrate net conveying roller 212, until the length of the concentrate net between the concentrate net conveying roller 212 and the first gripper 2135 reaches the preset length.
[0064] Because the concentrate mesh is very thin and full of holes, there is a risk that the first gripper 2135 may fall off during the gripping process. Therefore, in some preferred embodiments of this application, the first gripper 2135 is provided with a suction cup and an oblique fine needle, which can simultaneously suck and hook the concentrate mesh to ensure the stability of the concentrate mesh gripping.
[0065] Furthermore, the number of first grippers 2135 is at least two to achieve stable clamping of the concentrate net. It is conceivable that the number of first grippers 2135 can be adjusted according to requirements in practical applications.
[0066] Furthermore, the concentrate screen pressing plate 214 is arranged along the Y direction and located at the output end of the concentrate screen conveyor roller 212. When the first gripper 2135 drives the concentrate screen to move along the X direction, the concentrate screen pressing plate 214 is in the open state, and the concentrate screen can pass through the concentrate screen pressing plate 214. When the length of the concentrate screen reaches the preset length, the first conveyor bracket 2135 stops moving, and the concentrate screen pressing plate 214 switches to the closed state. On the one hand, the concentrate screen pressing plate 214 can ensure the flatness of the concentrate screen cut by the concentrate screen cutting part 215, and prevent the concentrate screen from moving and being damaged during the cutting process; on the other hand, the concentrate screen pressing plate 214 can ensure that the cut concentrate screen will not detach from the output end of the concentrate screen conveyor roller 212, thus affecting the next process and ensuring production efficiency.
[0067] Furthermore, the concentrate screen cutting section 215 is arranged along the Y direction and located below the concentrate screen pressing plate 214, including a first slider, a first blade mounted thereon, and a first slide rail arranged along the X direction. The first slider can drive the first blade to slide along the X direction on the first slide rail, thereby realizing the cutting of the concentrate screen.
[0068] It should be further clarified that the first driving device is not a single driving device, but a collection of multiple driving devices. Since the multiple devices within the folding and cutting mechanism 2 often need to cooperate and move independently, the driving device for each device is not labeled. Furthermore, the configuration of the driving devices is a conventional arrangement in the art; therefore, the location and number of these devices are not described in detail in this text. For example, driving the feeding roller, pressing plate, slider, gripper, etc., via a cylinder or motor is a conventional arrangement in the art and is not limited here. This description also applies to the following text.
[0069] Specifically, such as Figure 3 As shown, the first welding device 22 is arranged along the X direction and includes a spot welding beam 221 and two first welding heads 222. The spot welding beam 221 has a U-shaped structure and is installed above the first platform 216 with its opening facing the first platform 216. The first welding heads 222 are installed at both ends of the spot welding beam 221 along the Y direction. When the initial end of the concentrate network is displaced to the middle position of the membrane on the first platform 216, the first welding heads 221 can weld from both ends of the membrane and the concentrate network along the Y direction, thereby fixing the position of the membrane and the concentrate network.
[0070] In some preferred embodiments of this application, to adapt to different concentrated water network sizes, the first welding device 22 further includes a first displacement module 223. The first displacement module 223 is disposed on both sides of the bottom of the first platform 216 along the X direction. The two ends of the length of the spot welding beam 221 are slidably connected to the first displacement module 223. The first displacement module 223 can drive the first welding head 221 to move along the X direction. In addition, the first displacement module 223 and the first platform 216 are spaced a certain distance in the vertical and horizontal directions to prevent interference between the spot welding beam 221 and the first platform 216 during the displacement process.
[0071] Furthermore, the first displacement module 223 includes a fourth guide rail 2231 and a fourth displacement slider 2232. The two fourth guide rails 2231 are arranged parallel to each other along the X direction, and the two fourth displacement sliders 2232 are installed at the bottom of the open end of the spot welding beam 221. The fourth displacement sliders 2232 can drive the spot welding part 223 to move horizontally along the X direction on the fourth guide rail 2231 to adapt to different concentrated water mesh sizes, thereby improving production efficiency, production accuracy and versatility.
[0072] Specifically, the film cutting and transfer device 23 includes a film feeding roller 231, a film conveying roller 232, a film conveying section 233, a film pressing section 234, a film cutting section 235, a second platform 236, and a second driving device. The second driving device provides power to the film cutting section 235, the film feeding roller 231, the film conveying section 233, and the film pressing section 234. The film unfolded by the film feeding roller 231 passes through the film conveying roller 232 and is displaced along the X direction on the first platform 216 and the second platform 236 under the traction of the film conveying section 233. When the length of the film on the first platform 216 reaches a preset length, the first welding device... 22. The initial end of the concentrate mesh is welded to the membrane to fix the relative position of the membrane and the concentrate mesh. When the welding position moves to the membrane pressing part 234, the membrane pressing part 234 presses down from both ends of the length of the fold position. The membrane conveying part 233 then drives the initial end of the membrane to move along the direction close to the membrane feeding roller 231. When the initial end of the membrane moves to one end of the second platform 236 close to the membrane feeding roller 231, the membrane conveying part 233 stops moving. The fold hot pressing device 24 moves along the X direction to the fold position and hot presses the fold. The membrane cutting part 235 is located at one end of the second platform 236 close to the membrane feeding roller 231 and can cut the membrane along the Y direction.
[0073] Furthermore, such as Figure 2 As shown, the film feeding roller 231 is arranged along the Y direction and a film is wound on it. Under the drive of the second driving device, the film is unfolded.
[0074] Furthermore, such as Figure 4As shown, the diaphragm conveying roller 232 is arranged along the Y direction. The diaphragm conveying roller 232 can raise the diaphragm and provide a transition for the diaphragm conveying section 233 to convey the diaphragm, preventing direct conveying from damaging the diaphragm.
[0075] Furthermore, the diaphragm conveying unit 233 includes a second lead screw 2331, a second conveying beam 2332, a second guide rail 2333, a second conveying bracket 2334, and a second gripper 2335. The second lead screw 2331 and the second guide rail 2333 are arranged parallel to each other along the X direction. There are two second guide rails 2333. The second lead screw 2335 is located between the two second guide rails 2333. The second conveying beam 2332 is arranged along the Y direction and its two ends are slidably connected to the second guide rails 2333. The second gripper 2335 is installed at the bottom of the second conveying beam 2332 and the second conveying bracket 2334 is installed at the top. The second lead screw 2331 passes through the second conveying bracket 2334 along the X direction and is screw-driven connected to the second conveying bracket 2334. When the second gripper 2335 grips the diaphragm, the second conveying bracket 2334 moves in a spiral motion along the second lead screw 2331 under the drive of the second driving device, thereby driving the second conveying beam 2332 to slide along the second guide rail 2333, and then driving the second gripper 2335 and the initial end of the diaphragm to move horizontally away from or closer to the diaphragm drive roller 232.
[0076] Furthermore, the number of second grippers 2335 is at least two, which can achieve stable clamping of the diaphragm.
[0077] In some preferred embodiments of this application, such as Figure 2 As shown, there are four second grippers 2335. It is conceivable that the number of second grippers 2335 can be adjusted according to requirements in practical applications.
[0078] Furthermore, the diaphragm pressing part 234 is arranged along the Y direction and includes a diaphragm pressing crossbeam 2341 and a pressing hand 2342. The diaphragm pressing crossbeam 2341 has a U-shaped structure and is installed above the second platform 236 with its open end facing the second platform 236. The pressing hand 2342 is installed at both ends of the diaphragm pressing crossbeam 2341 along the Y direction. When the crease position is aligned with the diaphragm pressing crossbeam 2341, the pressing hand 2342 moves downward and cooperates with the diaphragm pressing crossbeam 2341 to press the crease position.
[0079] In some preferred embodiments of this application, to accommodate different diaphragm sizes, the diaphragm pressing part 234 further includes a second displacement module 2343. The second displacement module 2343 is disposed on both sides of the bottom of the second platform 236 along the X direction. The two ends of the length of the diaphragm pressing beam 2341 are slidably connected to the second displacement module 2343. The second displacement module 2343 can drive the diaphragm pressing part 234 to move along the X direction. In addition, the second displacement module 2343 and the second platform 236 are spaced a certain distance in the vertical and horizontal directions to prevent interference between the diaphragm pressing beam 2341 and the second platform 236 during the displacement process.
[0080] In some specific embodiments of this application, the second displacement module 2343 includes a third guide rail 23431 and a second displacement slider 23432. The two third guide rails 23431 are arranged parallel to each other along the X direction, and the two second displacement sliders 23432 are installed at the bottom of the opening end of the diaphragm pressing beam 2341. The second displacement sliders 23432 can drive the diaphragm pressing part 234 to move horizontally along the X direction on the third guide rail 23431 to adapt to different diaphragm sizes, thereby improving production efficiency, production accuracy and versatility.
[0081] Furthermore, the film cutting section 235 is arranged along the Y direction and located at one end of the second platform 236 near the film feeding roller 231. It includes a second slider, a second blade mounted thereon, and a second slide rail arranged along the Y direction. The second slider can drive the second blade to slide along the Y direction on the second slide rail, thereby realizing the cutting of the film.
[0082] In some preferred embodiments of this application, such as Figure 3 As shown, a lifting roller 2351 is provided on the diaphragm cutting section 235. The lifting roller 2351 is arranged along the Y direction. The diaphragm can pass over the lifting roller 2351. The lifting roller 2351 can raise the height of the diaphragm during the diaphragm transfer process. On the one hand, it can avoid the diaphragm from directly contacting the platform and damaging the diaphragm. On the other hand, the surface of the lifting roller 2351 is smooth, which can also play a good protective role for the diaphragm.
[0083] In some preferred embodiments of this application, the diaphragm cutting and transferring device 23 further includes a diaphragm cutting and pressing part 237, which is arranged along the Y direction and can press the diaphragm during the process of the diaphragm cutting part 235 cutting the diaphragm to prevent the diaphragm from shifting.
[0084] Furthermore, such as Figure 4As shown, the crease hot pressing device 24 includes a heating part 241, a first film material conveying part 242, and a pressing part 243. The heating part 241 and the pressing part 243 are arranged along the Y direction. The pressing part 243 is installed below the first film material conveying part 242. The first film material conveying part 242 can drive the pressing part 243 to move along the X direction. The heating part 241 is arranged on the top plane of the film pressing beam 2341. When the pressing part 243 moves above the film pressing beam 2341, the pressing part 243 moves vertically downward under the drive of the second driving device. The pressing part 243 and the film pressing beam 2341 press and heat the crease from the vertical direction of the crease position, thereby realizing the hot pressing of the film crease. At this point, the first film material has been prepared. After the hot pressing is completed, the pressing part 243 is lifted under the drive of the second drive device, the second gripper 2335 releases the membrane, and the first membrane material conveying part 242 pulls the first membrane material to move along the X direction to the water guide cloth feeding device 25.
[0085] Furthermore, the first film material conveying unit 242 includes a third conveying beam 2421, a third conveying bracket 2422, and a third gripper 2423. The third conveying beam 2421 is arranged along the Y direction and its two ends are slidably connected to the second guide rail 2333. The pressing part 243 is equipped with the third gripper 2423 at both ends along the Y direction. The third gripper 2423 can clamp the first film material from both sides of the width of the film. The third conveying bracket 2422 is installed on the top. The second lead screw 2331 passes through the third conveying bracket 2422 along the X direction and is spirally conveyed to the third conveying bracket 2422.
[0086] It should be further explained that, in this application, the first film material conveying unit 242 and the film conveying unit 233 move in the same direction. Therefore, in this application, the first film material conveying unit 242 and the film conveying unit 233 share the second lead screw 2331 and the second guide rail 2333. The second conveying bracket 2334 and the third conveying bracket 2422 can move separately under their respective driving devices without interfering with each other. It is conceivable that the first film material conveying unit 242 and the film conveying unit 233 may not share a set of lead screws and guide rails, and may have separate lead screws and guide rails.
[0087] Furthermore, such as Figure 4As shown, the water-guiding cloth feeding device 25 includes a water-guiding cloth feeding roller 251, a water-guiding cloth conveying roller 252, a water-guiding cloth conveying section 253, a water-guiding cloth pressing plate 254, an intermediate water-guiding cloth cutting section, a third platform 256, a second welding device 257, and a third driving device. The third driving device can provide power to the water-guiding cloth feeding roller 251, the water-guiding cloth conveying roller 252, the water-guiding cloth conveying section 253, the water-guiding cloth pressing plate 254, and the intermediate water-guiding cloth cutting section. The intermediate water-guiding cloth extended by the water-guiding cloth feeding roller 251 passes through the water-guiding cloth conveying roller 252 and is displaced along the X direction on the third platform 256 under the traction of the water-guiding cloth conveying section 253. When the length of the intermediate water-guiding cloth on the third platform 256 reaches the preset length, the water-guiding cloth pressing plate 254 presses down on the intermediate water-guiding cloth, and the intermediate water-guiding cloth cutting section cuts the intermediate water-guiding cloth along the Y direction.
[0088] Furthermore, such as Figure 5 As shown, the water-guiding cloth feeding roller 251 is arranged along the Y direction and has an intermediate water-guiding cloth wound on it. It rotates under the drive of the third driving device to realize the unfolding of the intermediate water-guiding cloth.
[0089] Furthermore, the water-guiding cloth conveying roller 252 is arranged along the Y direction. The water-guiding cloth conveying roller 252 can raise the intermediate water-guiding cloth and provide a transition for the water-guiding cloth conveying section 253 to convey the intermediate water-guiding cloth, preventing direct conveying from damaging the intermediate water-guiding cloth.
[0090] Furthermore, since the first membrane material conveying unit 242 can be displaced along the X direction to the third platform 256, in order to prevent interference between the conveying of the first membrane material and the conveying of the intermediate water-guiding cloth, the water-guiding cloth conveying unit 253 is installed at the bottom of the third platform 256 and can be displaced along the X direction.
[0091] Specifically, such as Figure 4 As shown, the water-guiding cloth conveying unit 253 includes a fourth gripper 2531 and a linkage bracket 2532. The linkage bracket 2532 is disposed at the bottom of the third platform 256 along the Y direction, and multiple fourth grippers 2531 are mounted on its top. The gripping height of the fourth grippers 2531 is higher than the upper surface of the third platform 256. The third platform 256 has elongated holes that correspond one-to-one with the fourth grippers 2531, extending along the X direction and penetrating along the Z direction. The linkage bracket 2532 can drive the fourth grippers 2531 to move within the elongated holes, thereby driving the intermediate water-guiding cloth to move along the X direction on the third platform 256. The fourth grippers 2531 can grip the initial end of the intermediate water-guiding cloth and move it horizontally away from the water-guiding cloth feeding roller 251 until the length of the intermediate water-guiding cloth between the water-guiding cloth conveying roller 252 and the fourth grippers 2531 reaches a preset length.
[0092] Furthermore, such as Figure 5As shown, the water-guiding cloth pressing plate 254 is arranged along the Y direction and located at the output end of the water-guiding cloth conveying roller 252. When the fourth gripper 2531 drives the intermediate water-guiding cloth to move along the X direction, the water-guiding cloth pressing plate 254 is in the open state, and the intermediate water-guiding cloth can pass through the water-guiding cloth pressing plate 254. When the length of the intermediate water-guiding cloth reaches the preset length, the linkage bracket 2532 stops displacement, and the water-guiding cloth pressing plate 254 switches to the closed state. On the one hand, the water-guiding cloth pressing plate 254 can ensure the flatness of the intermediate water-guiding cloth cutting part and prevent the intermediate water-guiding cloth from moving and being damaged during the cutting process; on the other hand, the water-guiding cloth pressing plate 254 can ensure that the cut intermediate water-guiding cloth will not detach from the output end of the water-guiding cloth conveying roller 252, thus affecting the next process and ensuring production efficiency.
[0093] Furthermore, the intermediate water-guiding cloth cutting section is arranged along the Y direction and located below the water-guiding net pressing plate 254, including a third slider, a third blade mounted thereon, and a third slide rail arranged along the X direction. The third slider can drive the third blade to slide along the X direction on the third slide rail, thereby realizing the cutting of the intermediate water-guiding cloth.
[0094] Furthermore, such as Figure 4 As shown, there are two second welding devices 257, which are installed at both ends of the third platform 256 along the Y direction. They can spot weld the first membrane material and the intermediate water-guiding cloth in the width direction to complete the fixation of the first membrane material and the intermediate water-guiding cloth.
[0095] In some preferred embodiments of this application, the second welding device 257 is provided with a displacement module, which can adjust the position of the welding head along the X direction to adapt to different sizes of first film materials, thereby improving production efficiency, production accuracy, and versatility. The specific structures of several displacement modules have been described above and will not be repeated here.
[0096] In summary, before the first membrane material conveying unit 242 moves above the third platform 256, that is, before the crease hot pressing device 24 heats the membrane, the water-guiding cloth feeding device 25 needs to cut the intermediate water-guiding cloth so that the intermediate water-guiding cloth is laid flat on the third platform 256. After the crease hot pressing device 24 heats the membrane, the first membrane material conveying unit 242 drives the first membrane material to move above the third platform 256. When the first membrane material conveying unit 242 moves to the far end of the third platform 256, the third gripper 2423 releases the first membrane material, and the second welding device 256 spot welds the first membrane material and the intermediate water-guiding cloth below. At this point, the preparation of the second membrane material is completed.
[0097] In some preferred embodiments of this application, to further ensure the desalination rate of the finished membrane, such as... Figure 2As shown, the folding and cutting mechanism 2 in this application also includes a film defect detection device 26. The film defect detection device 26 is located between the film feeding roller 231 and the film conveying roller 232. The films laid out by the film feeding roller 231 can all pass through the film defect detection device 26 to realize the defect detection of the film.
[0098] In some specific embodiments of this application, the film defect detection device 26 is a light inspection or a CCD inspection. Both of these detection methods are existing technologies, and their specific structures will not be described in detail here.
[0099] In practical applications, the desalination rate of household reverse osmosis membranes is 95%–96%, while the desalination rate of industrial reverse osmosis membranes needs to reach 99.5%–99.6% to meet industrial standards. Therefore, the processing of industrial reverse osmosis membranes must prevent damage to each membrane element. Thus, the folding and cutting mechanism 2 in this application also includes a tape-applying device 27, which is used to apply tape to the middle of the membrane sheet. This prevents the edges of the concentrate mesh from puncturing the membrane sheet during movement and also prevents the edges of the concentrate mesh from damaging the folding position of the membrane sheet, thereby ensuring the production precision and efficiency of industrial reverse osmosis membranes to achieve the industrial standard desalination rate.
[0100] Specifically, such as Figure 6 As shown, the tape application device 27 includes a first unwinding section 271, a first anti-detachment conveying section 272, a first cutting section 273, a transverse guide rail 274, and a first fixed bracket 275. The transverse guide rail 274 is arranged along the Y direction. The first fixed bracket 275 is slidably connected to the transverse guide rail 274. The first unwinding section 271, the first anti-detachment conveying section 272, and the first cutting section 273 are installed on the same side of the first fixed bracket 275. The first unwinding section 271 is fitted with tape and is movably connected to the tape. The tape output from the first unwinding section 271 can be conveyed and transitioned through the first anti-detachment conveying section 272 and output to the first platform 216. After the tape is applied, the first cutting section 273 can cut the tape. That is, when the length of the diaphragm on the first platform 216 reaches the preset length, the tape application device 27 is located at the middle position of the diaphragm length. After the initial end of the tape is bonded to one side of the diaphragm width, during the Y-direction displacement of the first fixed bracket 275 along the transverse guide rail 274, the first unwinding section 271 can continuously output tape outward through the first anti-detachment conveying section 272 until the tape reaches the other side of the diaphragm width. Then, the first cutting section 273 cuts the tape at the output end of the first anti-detachment conveying section 272. In addition, due to the existence of the first anti-detachment conveying section 272, the tape on the first anti-detachment conveying section after cutting will not retract to the first unwinding section 271, avoiding the situation where the tape retracts to the first unwinding section 271 and requires manual feeding of the initial end of the tape to the first anti-detachment conveying section 272, thus ensuring the continuity of the next tape application process.
[0101] In some specific embodiments of this application, such as Figure 2 and Figure 3 As shown, since both the tape applicator 27 and the first welding device 22 need to operate in the middle of the diaphragm, in order to prevent the tape applicator 27 and the first welding device 22 from interfering with each other in the vertical direction, the transverse guide rail 274 and the fourth guide rail 2231 need to be set on both sides of the first platform 216 in the vertical direction. Since the tape applicator 27 will occupy a certain space in the vertical direction, the transverse guide rail 274 in this application is set above the first platform 216, the fourth guide rail 2231 is set below the first platform 216, and the top of the first fixed bracket 275 is slidably connected to the transverse guide rail 274.
[0102] In some preferred embodiments of this application, since the middle positions of membranes of different sizes are not completely consistent, in order to adapt to different membrane sizes, such as Figure 6 As shown, the tape application device 27 also includes a fourth conveying bracket 276, which is installed on the top of the first fixed bracket 275. The first lead screw 2131 passes through the fourth conveying bracket 276 and is spirally connected to the fourth conveying bracket 276. It can be displaced in the X direction to adjust the tape application position and thus adapt to different film types.
[0103] It should be further noted that the tape applicator 27 and the concentrate conveyor 213 in this application move in the same direction, therefore, as Figure 3 As shown, the tape-applying device 27 and the concentrate conveying unit 213 in this application share the first lead screw 2131 and the first guide rail 2133. The first conveying bracket 2134 and the fourth conveying bracket 276 can move independently under their respective driving devices without interfering with each other. It is conceivable that the tape-applying device 27 and the concentrate conveying unit 213 may not share a set of lead screws and guide rails, and may have separate lead screws and guide rails.
[0104] In some preferred embodiments of this application, to prevent interference between the prepared second film material and the second film material during the film winding operation, such as... Figure 2 As shown, the automated processing equipment also includes a waiting station 5, which is located between the folding and cutting mechanism 2, the central tube feeding and film-applying mechanism 3, and the automatic film-rolling mechanism 4.
[0105] Furthermore, the waiting station 5 includes a first waiting station 51 and a second waiting station 52. The first waiting station 51 is located on the side of the third platform 256 along the Y direction, and the second waiting station 52 is located on the side of the first waiting station 51 along the X direction. The second film material prepared by the water-guiding cloth feeding device 25 can be moved along the Y direction on the first waiting station 51. When the position of the second film material on the first waiting station 51 is aligned with the second waiting station 52, the second film material can be moved along the X direction on the second waiting station 52 so that the automatic film winding mechanism 4 can complete other processes.
[0106] Specifically, such as Figure 7 As shown, the first waiting station 51 includes a fourth platform 511, a fifth conveying bracket, a fifth gripper 513, and a fourth driving device. The fourth driving device can provide displacement power for the fifth conveying bracket, and the fifth conveying bracket can drive the fifth gripper 513 to clamp the second film material and move it along the Y direction on the fourth platform 511, thereby realizing the initial transfer waiting of the second film material.
[0107] In some specific embodiments of this application, in order to prevent the fifth gripper 513 from interfering with the crease hot pressing device 24, the fifth transmission bracket is installed at the bottom of the fourth platform 511. The fourth platform 511 has an elongated hole extending in the Y direction and penetrating in the Z direction. The fifth gripper 513 is installed at the top of the fifth transmission bracket and extends out of the fourth platform 511 through the elongated hole. The fourth driving device can drive the fifth transmission bracket to move the fifth gripper 513 in the Y direction.
[0108] Specifically, the second waiting platform 52 includes a fifth platform 521, a sixth conveying bracket 522, a sixth gripper 523, and a fifth driving device. The fifth driving device can provide displacement power for the sixth conveying bracket 522. The sixth conveying bracket 522 can drive the sixth gripper 523 to hold the second film material conveyed by the fifth gripper 513 to the fifth platform 521 and move it along the X direction on the fifth platform 521, thereby realizing the second film material to be transferred and waited again.
[0109] In some specific embodiments of this application, the sixth conveying bracket 522 and the fifth driving device are installed above the fifth platform 521, and the sixth gripper 523 is installed at both ends of the bottom of the sixth conveying bracket 522. The fifth driving device can drive the sixth conveying bracket 522 to move the sixth gripper 523 along the X direction.
[0110] In some preferred embodiments of this application, since the central tube feeding and film-applying mechanism 3 and the automatic film-winding mechanism 4 are both located on one side of the waiting station 5 along the Y direction, in order to adapt to the height of the automatic film-winding mechanism 4, the side of the fifth platform 521 near the fourth platform 511 in this application is a slope, and the side near the automatic film-winding mechanism 4 is a plane.
[0111] The overall structure of the central tube feeding and film-applying mechanism 3 will be described in detail below, such as... Figure 2 As shown, the central tube feeding and film-applying mechanism 3 includes a central tube feeding device 31, a bottom water-guiding cloth cutting and transfer device 32, a third welding device 33, and a sixth driving device. The central tube feeding device 31 is used to convey the central tube to a designated position. The bottom water-guiding cloth cutting and transfer device 32 is used to realize the feeding, conveying, and cutting of the bottom water-guiding cloth. The third welding device 33 is used to realize the welding of the central tube and the bottom water-guiding cloth. The sixth driving device is used to provide power to the central tube feeding device 31, the bottom water-guiding cloth cutting and transfer device 32, and the third welding device 33.
[0112] Furthermore, such as Figure 9 and Figure 10 As shown, the central tube feeding device 31 includes a central tube material box 311, a vertical feeding part 312, and a horizontal conveying part 313. The central tube material box 311 stores central tubes and can automatically output them. The vertical feeding part 312 can move the central tubes output from the central tube material box 311 along the Z direction to a preset highest position. The horizontal conveying part 313 can move the central tubes at the preset highest position along the X direction to the film winding station 41. At the film winding station 41, the central tubes can complete the welding process with the bottom water-guiding cloth to complete the preparation of the tube material bottom cloth. At the film winding station 41, the tube material bottom cloth can be wound and shaped with the first film material or the second film material.
[0113] Specifically, the central tube box 311 has a box structure with a sloping bottom. The bottom of the slope does not contact the sides, allowing one central tube to be transferred by the vertical feeding part 312. The next central tube can roll down the slope to the bottom under its own gravity.
[0114] Furthermore, to prevent the next central tube from sliding directly out from the bottom of the slope during the conveying process of the vertical feeding section 312, the bottom of the slope in this application is a trough-shaped structure, and the side near the vertical feeding section 312 can block the central tube.
[0115] Furthermore, in order to ensure that the vertical feeding section 312 can contact the central tube to realize the transfer of the central tube, a notch structure is provided at the bottom of the slope to provide contact space for the vertical feeding section 312 to transfer the central tube.
[0116] Furthermore, the vertical feeding section 312 includes a seventh gripper 3121 and a seventh conveying bracket 3122. The seventh conveying bracket 3122 is arranged along the Y direction, and the seventh gripper 3121 is installed on the side of the seventh conveying bracket 3122 facing the central tube material box 311. The seventh conveying bracket 3122 can drive the seventh gripper 3121 to move along the Z direction to a preset highest position under the drive of the sixth driving device. After the horizontal conveying section 313 clamps the central tube, the seventh gripper 3121 releases the central tube and retracts to the position of the central tube material box 311.
[0117] Furthermore, the horizontal conveying unit 313 includes an eighth gripper 3131 and an eighth conveying bracket 3132. The eighth conveying bracket 3132 is arranged along the Y direction, and the eighth gripper 3131 is installed on the side of the eighth conveying bracket 3132 facing the preset highest position. The eighth conveying bracket 3132 can drive the eighth gripper 3131 to move along the X direction to the film winding station 41 under the drive of the sixth driving device. After the horizontal conveying unit 313 delivers the center tube to the film winding station 41, the horizontal conveying unit 313 needs to retract to the preset highest position. To prevent interference between the horizontal conveying unit 313 and the center tube placed in the film winding station 41 during retraction, the horizontal conveying unit 313 in this application can also be moved along the Z direction under the drive of the sixth driving device.
[0118] Furthermore, such as Figure 7 As shown, the bottom water-guiding cloth cutting and transfer device 32 includes a bottom water-guiding cloth feeding roller 321, a bottom water-guiding cloth conveying roller 322, a bottom water-guiding cloth conveying and pressing part, a bottom water-guiding cloth cutting part, a sixth platform 325, and a seventh driving device. The seventh driving device can provide power to the bottom water-guiding cloth feeding roller 321, the bottom water-guiding cloth conveying roller 322, the bottom water-guiding cloth conveying and pressing part, and the bottom water-guiding cloth cutting part. The bottom water-guiding cloth extended by the bottom water-guiding cloth feeding roller 321 passes through the bottom water-guiding cloth conveying roller 322 and is displaced along the X direction on the sixth platform 325 under the traction of the bottom water-guiding cloth conveying and pressing part. When the length of the bottom water-guiding cloth on the sixth platform 325 reaches the preset length, the bottom water-guiding cloth cutting part cuts the bottom water-guiding cloth along the Y direction while the bottom water-guiding cloth conveying and pressing part presses the bottom water-guiding cloth.
[0119] Furthermore, the bottom water-guiding cloth feeding roller 321 is arranged along the Y direction and the bottom water-guiding cloth is wound on it. It rotates under the drive of the seventh driving device to realize the unfolding of the bottom water-guiding cloth.
[0120] Furthermore, the bottom water-guiding cloth conveying roller 322 is arranged along the Y direction. The bottom water-guiding cloth conveying roller 322 can raise the bottom water-guiding cloth and provide a transition for the bottom water-guiding cloth feeding roller 321 to convey the bottom water-guiding cloth, preventing direct conveying from damaging the bottom water-guiding cloth.
[0121] Furthermore, the bottom water-guiding cloth conveying and pressing part includes a fourth conveying beam and a twelfth gripper. The fourth conveying beam is arranged along the Y direction and the twelfth gripper is installed at both ends. The fourth conveying beam is displaced along the X direction under the drive of the seventh drive device, thereby driving the initial end of the bottom water-guiding cloth held by the twelfth gripper to move horizontally away from or towards the bottom water-guiding cloth conveying roller 322.
[0122] Furthermore, there are two twelfth grippers to achieve stable clamping of the bottom water-guiding cloth.
[0123] Furthermore, the bottom water-guiding cloth cutting section is arranged along the Y direction, including a fourth slider, a fourth blade mounted thereon, and a fourth slide rail arranged along the Y direction. The fourth slider slides along the Y direction under the drive of the seventh driving device, thereby realizing the cutting of the bottom water-guiding cloth.
[0124] Furthermore, such as Figure 9 As shown, the third welding device 33 includes a second welding head 331 and a welding platform 332. The welding platform 332 is arranged along the Y direction and located on the side of the bottom water-guiding cloth cutting device 324 near the bottom water-guiding cloth conveying roller 322. The second welding head 331 is installed on the welding platform 332. The bottom water-guiding cloth can pass over the welding platform 332. The second welding head 331 can weld from the bottom of the bottom water-guiding cloth and the center tube to fix the position of the bottom water-guiding cloth and the center tube.
[0125] In some specific embodiments of this application, the second welding head 331 is disposed on top of the welding platform 332 along the Y direction.
[0126] Furthermore, the third welding device 33 also includes a third welding head 333, which is located on the side of the second welding head 331 near the bottom water-guiding cloth conveying roller 322. It can realize the welding of the first film material and the bottom water-guiding cloth. This is because in the preparation process of the finished industrial film, it is necessary to ensure that there is a layer of film and a layer of intermediate water-guiding cloth. The bottom water-guiding cloth is welded on the central tube. Therefore, the film near the bottom water-guiding cloth is the first film material, not the second film material. Therefore, the third welding head 333 is needed to weld the bottom water-guiding cloth to the first film material near the bottom water-guiding cloth.
[0127] In some specific embodiments of this application, there are two third welding heads 333, which can be spot welded from both sides of the width of the bottom water-guiding cloth.
[0128] In some preferred embodiments of this application, the third welding device 33 further includes a displacement module connected to the third welding head, which can adjust the distance between the two third welding heads 333 along the Y direction to adapt to different bottom water guide cloth sizes.
[0129] In some preferred embodiments of this application, since the industrial membrane is large in size and wide, when multiple layers of intermediate water-guiding cloth and first membrane material / second membrane material are wrapped around the outside of the central tube, the central tube may be not strong enough and may be prone to bending and deformation. Therefore, in this application, a steel core is inserted into the central tube during the feeding process to ensure the strength of the central tube.
[0130] It is conceivable that the storage, feeding, and insertion of the steel core can be achieved through a device similar to the central tube feeding device 31. However, setting up a separate device to realize the storage and feeding of the steel core would increase the size, weight, and cost of the equipment. Moreover, the finished industrial membrane sold at the end does not contain the steel core, and the steel core must be removed manually or by other devices after preparation, which would reduce work efficiency.
[0131] In some preferred embodiments of this application, such as Figure 9 As shown, the central tube feeding device 31 also includes a steel core transfer unit 34. The steel core transfer unit 34 is used to transfer the steel core inside the central tube of the prepared finished industrial film to the central tube being fed in the central tube of the central tube feeding device 31. During the feeding process of the central tube feeding device 31, the steel core is inserted into the feeding central tube. Through the steel core transfer unit 34, the strength of the central tube is enhanced, and the need for additional devices to complete the storage and feeding of the steel core is avoided, reducing the size, weight and cost of the equipment, and improving production efficiency.
[0132] Specifically, when the vertical feeding part 312 and the steel core transfer part 34 are aligned in the Y direction, the output end of the steel core transfer part 34 extends into the center tube of the finished industrial film and moves in the Y direction, thereby moving the steel core in the center tube of the finished industrial film into the center tube held by the seventh gripper 3121, thereby realizing the transfer of the steel core.
[0133] In some preferred embodiments of this application, the bottom water-guiding fabric cutting and transfer device 32 further includes a displacement module connected to the sixth platform 325. The displacement module can adjust the position of the sixth platform 325 along the X direction, thereby turning the sixth platform 325 into a movable platform. On the one hand, during film winding, the sixth platform 325 can avoid or give way, reducing the possibility of interference and providing sufficient space for winding; on the other hand, it can adapt to different film types, improving the production efficiency, production accuracy, and versatility of the equipment; on the other hand, when applying adhesive to the surface of the first or second film material, the sixth platform 325 is close to the dispensing machine along the X direction to provide sufficient dispensing space and ensure the dispensing effect.
[0134] The overall structure of the automatic film winding mechanism 4 will be described in detail below, such as... Figure 9 and Figure 10As shown, the automatic film winding mechanism 4 includes a film winding station 41, a dispensing device 42, a film winding device 43, a tape wrapping device 44, a film material transfer device 45, a feeding device 46, and an eighth drive device. The eighth drive device can provide power to the dispensing device 42, the film winding device 43, the tape wrapping device 44, the film material transfer device 45, and the feeding device 46. The film material transfer device 45 delivers the first or second film material from the fifth platform 521 to the dispensing device 42 for dispensing. After dispensing, the first or second film material is wound around the outer side of the bottom or middle water-wicking cloth under the action of the film winding device 43. After the wound second film material reaches the set number of layers, the tape wrapping device 44 wraps tape around the outer side of the last layer of the second film material for fixation. Then, the feeding device 46 conveys the wound finished industrial film out of the previous automated processing equipment.
[0135] Furthermore, the film material transfer device 45 includes a receiving section 451, a transfer section 452, a seventh platform 453, and a fifth conveying beam 454. Two fifth conveying beams 454 are arranged parallel to each other above the seventh platform 453 along the X direction. The receiving section 451 and the transfer section 452 are arranged along the Y direction and installed at both ends of the fifth conveying beams 454 along the X direction. The seventh platform 457 is aligned with the fifth platform 521. The receiving section 451 is located on the side away from the fifth platform 521, and the transfer section 452 is located on the side closer to the fifth platform 521. The transfer section 452 and the receiving section 451 can be displaced relative to the fifth platform 521 and the seventh platform 453 along the X direction. The transfer section 452 can receive the first / second film material from the fifth platform 521 and transfer it to the receiving section 451. The receiving section 451 cooperates with the dispensing device 42 to dispense the first / second film material. By setting up the receiving part 451 and the transfer part 452, the dispensing device 42 does not need to waste time waiting for the next film material, ensuring the smooth operation of the dispensing action and improving the film material transfer efficiency and dispensing efficiency.
[0136] Furthermore, such as Figure 8 As shown, the receiving part 451 includes a ninth gripper 4511 and a ninth conveying bracket 4512. The ninth conveying bracket 4512 is arranged along the Y direction, and the ninth gripper 4511 is mounted on the ninth conveying bracket 4512 along the Y direction. The ninth gripper 4511 is arranged towards the dispensing device 42 to achieve cooperation with the dispensing device.
[0137] Furthermore, the transfer unit 452 includes a tenth gripper 4521, a tenth transfer bracket 4522, and a fifth guide rail 4523. The two fifth guide rails 4523 are arranged parallel to each other along the X direction on both sides of the seventh platform 453 along the Y direction. The tenth transfer bracket 4522 is arranged along the Y direction and its two ends along the Y direction are slidably connected to the fifth guide rails 4523. The tenth gripper 4521 is mounted on the tenth transfer bracket 4522 along the Y direction and is arranged facing the fifth platform 521 to transfer the first film material / second film material from the fifth platform 521.
[0138] In some preferred embodiments of this application, the transfer unit 452 further includes an eleventh transfer bracket 4524 and a sixth guide rail 4525. The two sixth guide rails 4525 are arranged parallel to each other on the top of the fifth transfer beam 454 along the X direction. The two ends of the tenth transfer bracket 4522 along the Y direction are slidably connected to the fifth transfer beam 454 through the sixth guide rails. The eleventh transfer bracket 4524 is installed between the fifth transfer beams 454 along the Y direction. The eleventh transfer bracket 4524 and the tenth transfer bracket 4522 are connected by a driving device. Under the drive of the driving device, the tenth transfer bracket 4522 can drive the tenth gripper 4521 to move along the X direction, ensuring that the transfer unit 452 can dynamically adjust the distance relative to the fifth platform 521 to adapt to different membrane sizes.
[0139] Furthermore, such as Figure 2 and Figure 8 As shown, the dispensing device 42 includes a dispensing plate 421, a dispensing machine 422, and an adhesive coating section 423. The dispensing plate 421 cooperates with the receiving section 451 to ensure that the first film material / second film material is pressed down and does not move during dispensing. The adhesive liquid prepared by the dispensing machine 422 can be applied to the upper surface of the first film material / second film material through the adhesive coating section 423 to three sides, leaving one side for water permeability.
[0140] Specifically, there are two dispensing pressure plates 421, which are arranged opposite to each other. They can press the first film / second film from both sides along the X direction. Each dispensing pressure plate 421 includes a twelfth conveying bracket 4211, a pressure plate 4212, and a first lifting part 4213. The pressure plate 4212 is arranged along the Y direction. The pressure plate 4212 and the first lifting part 4213 are mounted on the twelfth conveying bracket 4211 along the Y direction. The first lifting part 4213 can abut against the bottom of the first film / second film, and the pressure plate 4212 can abut against the top of the first film / second film, thereby achieving the effect of pressing the first film / second film.
[0141] In some specific embodiments of this application, there are two first lifting parts 4213 located at both ends of the twelfth conveying bracket 4211 along the Y direction, and the pressure plate 4212 is located between the two first lifting parts 4213. It is conceivable that the pressure plate 4212 can also be installed at both ends of the twelfth conveying bracket 4211 along the Y direction, and the first lifting parts 4213 can be installed between the two pressure plates 4212. Regardless of the arrangement, as long as the first lifting parts 4213 and the pressure plate 4212 cooperate to press down the first film material / second film material, it is acceptable.
[0142] In some specific embodiments of this application, the first lifting part 4213 and the pressure plate 4212 are L-shaped structures, with the vertical side used to connect with the twelfth conveying bracket 4211 and the horizontal side used to abut against the first film material / second film material.
[0143] Furthermore, the first lifting part 4213 and the pressure plate 4212 are connected to the twelfth conveying bracket 4211 through a driving device. The driving device can change the vertical height of the first lifting part 4213 and the pressure plate 4212 relative to the twelfth conveying bracket 4211 to realize the insertion and clamping of the first film material / second film material.
[0144] Furthermore, one of the dispensing pressure plates 421 is installed on one end of the seventh platform 453 near the receiving part 451, and the pressure plate 4212 of the dispensing pressure plate 421 is set away from the seventh platform 453.
[0145] In some preferred embodiments of this application, the film transfer device 45 further includes a displacement module connected to the seventh platform 453, which can adjust the position of the seventh platform along the X direction, thereby turning the seventh platform 453 into a movable platform, thereby realizing the adjustment of the glue application position to adapt to different film types.
[0146] Furthermore, the adhesive coating section 423 is located above the adhesive dispensing plate 421, and can dispense adhesive onto the film material from above the first film material / second film material.
[0147] Specifically, the glue application section 423 includes a glue application head 4231, a thirteenth conveyor bracket 4232, a seventh guide rail 4233, an eighth guide rail 4234, and a ninth guide rail 4235. The two eighth guide rails 4234 are arranged parallel to each other along the X direction. The thirteenth conveyor bracket 4232 is arranged between the two eighth guide rails 4234 along the Y direction and its two ends along the Y direction are slidably connected to the eighth guide rails 4234. The seventh guide rail 4233 is arranged between the two eighth guide rails 4234 along the Y direction and is connected to one side of the thirteenth conveyor bracket 4232 along the X direction. The ninth guide rail 4235 is arranged along the Z direction and is slidably connected to one end of the seventh guide rail 4233 along the X direction. The glue application head 4231 is slidably connected to one end of the ninth guide rail 4235 along the X direction. Driven by the eighth drive device, the thirteenth conveyor bracket 4232 can drive the seventh guide rail 4233, the ninth guide rail 4235 and the glue applicator head 4231 to move horizontally along the X direction on the eighth guide rail 4234 to achieve glue dispensing in the length direction of the first film material / second film material; driven by the eighth drive device, the ninth guide rail 4235 can drive the glue applicator head 4231 to move along the Y direction on the seventh guide rail 4233 to achieve glue dispensing in the width direction of the first film material / second film material; driven by the eighth drive device, the glue applicator head 4231 moves along the Z direction on the ninth guide rail 4235 to achieve adjustment of the vertical distance between the glue applicator head 4231 and the first film material / second film material. When glue is to be applied, the glue applicator head 4231 approaches the first film material / second film material. After the glue is applied, the glue applicator head 4231 rises vertically away from the first film material / second film material. In addition, during the operation of the glue coating section 423, the pressure plate 4212 and the first lifting section 4213 are in a state of pressing the first film material / second film material. After the first film material / second film material is glued, the pressure plate 4212 is lifted, and the next second film material is conveyed above the previous first film material / second film material. The pressure plate 4212 then presses it down to apply glue. This process is repeated until the last second film material is glued. The pressure plate 4212 then presses down on the film material, and the film winding device 43 cooperates with one end of the film material to complete the film winding process.
[0148] It is conceivable that the film winding process can also be achieved through a single-entry method. That is, after the glue coating section 423 applies glue to a first film material / second film material, the film winding device 43 cooperates with one end of the first film material / second film material to stick the first film material / second film material onto the film material at the film winding station 41. The pressure plate 4212 is raised, and the next second film material is conveyed to the glue coating section 423. Then the pressure plate 4212 is lowered, and the glue coating section 423 applies glue again. Then the second film material is cooperated with the film winding device 43 to stick the second film material onto the film material at the film winding station 41. This process is repeated until the last second film material is glued. The pressure plate 4212 still presses down on the film material, and the film winding device 43 cooperates with one end of the last second film material to complete the film winding process.
[0149] Furthermore, such as Figure 9 As shown, the film winding device 43 is located at the film winding station 41. The film winding device 43 includes a film winding tip 431 and a winding bracket 432 corresponding to the film winding tip 431. There are two film winding tips 431, which are arranged opposite each other along the Y direction. The winding bracket 432 is installed on the outside of the film winding tip 431 along the Y direction. The film winding tip 431 is rotatably connected to the winding bracket 432 and can be displaced relative to the winding bracket 432 along the Y direction. The film winding tip 431 can extend into the central tube from both sides of the central tube and rotate circumferentially synchronously with the central tube.
[0150] Furthermore, in order to enable the top tip 431 of the film winding to be displaced along the Y direction, the film winding device 43 in this application also includes a displacement module corresponding to the winding bracket 432. The displacement module can drive the winding bracket 432 to be displaced along the Y direction to adjust the distance between the two winding brackets 432, thereby realizing the fixed positioning of the central tube and the release of the finished film. In addition, it can also be adapted to the length of the central tube of different film types.
[0151] In some preferred embodiments of this application, in order to achieve the cooperation between the film winding device 43 and the dispensing device 42, the third welding device 33 and the bottom water-guiding cloth cutting and transfer device 32, the film winding device 43 further includes an eighth platform 433 and a tenth guide rail 434. The two tenth guide rails 434 are arranged parallel to each other along the X direction and are slidably connected to the eighth platform 433. The winding bracket 432 is connected to the eighth platform 433 through a corresponding displacement module. Therefore, under the drive of the eighth driving device, the eighth platform 433 can drive the film winding tip 431 and the winding bracket 432 to move along the X direction, thereby realizing the position adjustment of the film material with the central tube. When winding the film, it can be moved to one side along the X direction and avoid other equipment, providing sufficient space for film winding.
[0152] Furthermore, such as Figure 9 and Figure 11 As shown, the tape wrapping device 44 includes a second unwinding section 441, a second anti-detachment conveying section 442, a second cutting section 443, and a second fixed bracket 444. The second unwinding section 441, the second anti-detachment conveying section 442, and the second cutting section 443 are mounted on the second fixed bracket 444. The second unwinding section 441 is fitted with tape and is movably connected to the tape. The tape output from the second unwinding section 441 can be conveyed and transitioned through the second anti-detachment conveying section 442 and output to the film material. After the tape is applied, the second cutting section 443 can cut the tape.
[0153] In some preferred embodiments of this application, industrial films have more diverse sizes compared to household films. If each size requires a different tape size for winding, there are problems such as high production costs, low production efficiency, and poor versatility. Therefore, the tape winding device 44 in this application also includes an eleventh guide rail 445 and a twelfth guide rail 446. The eleventh guide rail 445 is arranged along the Y direction, and the twelfth guide rail 446 is arranged along the Z direction and located below the tenth guide rail 434. The second fixed bracket 444 is slidably connected to the twelfth guide rail 446 and is slidably connected to the eleventh guide rail through the twelfth guide rail 446. Therefore, under the drive of the eighth driving device, the second fixed bracket 444 and the twelfth guide rail 446 can be displaced along the Y direction on the eleventh guide rail 445, and the second fixed bracket 444 can be displaced along the Z direction on the twelfth guide rail 446. When the tape wrapping device 44 is working, the film winding device 43 approaches the tape wrapping device 44, the second fixed bracket 444 moves upward, and the tape output from the second anti-detachment conveyor 442 can be pasted onto the outside of the central tube with the film material. Then, while the top part 431 of the film winding device rotates, the second fixed bracket 444 moves along the Y direction, so that the tape is tilted and wrapped around the outside of the central tube, so that film materials of any size can be wrapped with tape by the tape wrapping device 44 in this application.
[0154] In some preferred embodiments of this application, such as Figure 9 As shown, the automatic film winding mechanism 4 also includes a clamping device 47, which is located on one side of the film winding device 43 along the X direction. The clamping device 47 can clamp the first and second film materials outside the central tube during the film winding process of the film winding device 43 to achieve tight winding.
[0155] Specifically, the extrusion device 47 includes an extrusion roller 471, a third fixed bracket 472, and a ninth platform 473. The ninth platform 473 is arranged along the Y direction and connected to the eighth platform 433 to achieve synchronous displacement of the extrusion device 47 and the film winding device 43. The third fixed bracket 472 is connected above the ninth platform 473. The third fixed bracket 472 is arranged along the Y direction and has a U-shaped structure. Its open end is rotatably connected to both ends of the axial direction of the extrusion roller 471. Under the drive of the eighth driving device, the extrusion roller 471 can rotate circumferentially to squeeze the first film material and the second film material wound on the outside of the central tube during the rotation of the top tip of the film winding device 431.
[0156] In some preferred embodiments of this application, the extrusion device 47 further includes a displacement module connected to the third fixed bracket 472. The displacement module is arranged along the X direction and can drive the third fixed bracket 472 to move along the X direction to adjust the distance between the extrusion roller 471 and the central tube axis on the top tip of the film roll 431, thereby achieving the best extrusion effect.
[0157] In some preferred embodiments of this application, such as Figure 9 As shown, the automatic film winding mechanism 4 also includes a tapping device 48, which is arranged along the Y direction. The tapping device 48 can tap the outside of the film material after winding. Because during the film winding process, friction and excessively wide film may prevent the film from being straightened. The tapping device 48 can be used to tap and smooth out the wrinkles.
[0158] Specifically, the beating device 48 includes a fourth fixed bracket 481, an active part 482, a transmission part 483, and a beating part 484. The fourth fixed bracket 481 has a U-shaped structure with its open end facing the top. The active part 482, the transmission part 483, and the beating part 484 are mounted on it. Under the drive of the eighth driving device, the active part 482 drives the beating part 484 to rotate circumferentially through the transmission part 483, so that the beating part 484 can cyclically beat the outer side of the film material after the roll.
[0159] In some preferred embodiments of this application, the tapping part 484 includes at least two tapping rods 4841 arranged along the Y direction and a connecting rod 4842 connected between the tapping rods 4841. The tapping rods 4841 are connected to the conveying part 483 through the connecting rod 4842. Compared with tapping with a single tapping rod 4841, multiple tapping rods 4841 can improve the tapping efficiency.
[0160] In some preferred embodiments of this application, the tapping device 48 further includes a displacement module connected to the fourth fixed bracket 481. The displacement module can drive the fourth fixed bracket 481 to move along the Z direction to adjust the tapping position. This can adapt to different film types and ensure that the outer side of the film material after winding is tapped evenly and fully, thus ensuring tapping efficiency and quality. After tapping, the film material is moved to the tape wrapping device 44 for tape wrapping and fixing. After the tape is wrapped, it is cut, and the top tip 431 of the film roll is displaced from the central tube. At this point, the finished film is detached from the film roll device 44 and caught by the unloading device 46 and transported out of the previous automated processing equipment.
[0161] Furthermore, the feeding device 46 includes a fifth fixed bracket 461, an eleventh gripper 462, a second lifting part 463, and a thirteenth guide rail 464. The eleventh gripper 462 and the second lifting part 463 are mounted on the fifth fixed bracket 461 along the Y direction, with the gripper opening of the eleventh gripper 462 facing upward. At least two eleventh grippers 462 are mounted between at least two second lifting parts 463. The outermost distance between the two outermost second lifting parts 463 is not greater than the width of the film. The thirteenth guide rail 464 is mounted on the inner side below the tenth guide rail 434 along the X direction. The initial position of the film winding device 43 at one end of the thirteenth guide rail 464 along the X direction corresponds to the initial position of the film winding device 43. The bottom end of the fifth fixed bracket 461 is slidably connected to the thirteenth guide rail 464. When the finished film falls off, the eleventh gripper 462 is located at one end of the thirteenth guide rail 464 along the X direction, so that it can catch and clamp the falling finished film. Under the drive of the eighth drive device, the fifth fixed bracket 461 can move along the X direction on the thirteenth guide rail 464 to realize the transfer of the finished film. When the center tube of the finished film held by the eleventh gripper 462 is aligned with the center tube held by the center tube feeding device 31, the steel core transfer part 34 transfers the steel core in the center tube of the finished film held by the eleventh gripper 462 to the center tube held by the center tube feeding device 31. Then the eleventh gripper 462 opens its gripper, and under the drive of the eighth drive device, the second lifting part 463 moves upward to lift the finished film from the eleventh gripper 462. The second lifting part 463 is provided with a conveyor belt or other conveying device on one side along the X direction, which can transport the finished film lifted by the second lifting part 463 out of the previous automated processing equipment.
[0162] It should be further explained that the initial position of the film winding device 43 is the position where the film winding device 43 is located when the central tube feeding device 31 feeds the central tube to the film winding device 43.
[0163] In some preferred embodiments of this application, such as Figure 1 As shown, in order to improve production efficiency, multiple folding and cutting mechanisms 2 and a first waiting station 51 are arranged side by side in parallel.
[0164] In some preferred embodiments of this application, the bottom of the concentrate feed roller 211, the membrane feed roller 231, the water guide cloth feed roller 251, and the bottom water guide cloth feed roller 321 are equipped with a correction device, which can adjust the position of the corresponding feed roller along the Y direction to achieve connection and cooperation with other equipment. The correction device is a prior art design and will not be described further here.
[0165] The specific embodiments of this application have been described in detail above. For those skilled in the art, several improvements and modifications can be made to this application without departing from the principle of this application, and these improvements and modifications also fall within the protection scope of the claims of this application.
Claims
1. An automated processing equipment for upstream processes of industrial reverse osmosis membrane elements, comprising a frame (1) for fixing and installing other mechanisms, characterized in that: The automated processing equipment also includes a folding and cutting mechanism (2), a central tube feeding and film-applying mechanism (3), and an automatic film-winding mechanism (4). The folding and cutting mechanism (2) includes a concentrate web cutting and transferring device (21), a first welding device (22), a diaphragm cutting and transferring device (23), a crease hot pressing device (24), a water-guiding cloth feeding device (25), and a first driving device. The first driving device provides power to the concentrate web cutting and transferring device (21), the first welding device (22), the diaphragm cutting and transferring device (23), the crease hot pressing device (24), and the water-guiding cloth feeding device (25). The concentrate web cutting and transferring device (21) is used for... The process includes feeding, conveying, and cutting the concentrate mesh; the first welding device (22) is used to weld the concentrate mesh to the membrane; the membrane cutting and transfer device (23) is used to feed, convey, cut, and fold the membrane; the crease hot pressing device (24) is used to hot press the membrane crease; after the membrane is welded to the concentrate mesh and folded, the first membrane material can be prepared; and the water-guiding cloth feeding device (25) is used to feed, convey, cut, and weld the intermediate water-guiding cloth to the first membrane material to prepare the second membrane material. The central tube feeding and film-applying mechanism (3) includes a central tube feeding device (31), a bottom water-guiding cloth cutting and transfer device (32), a third welding device (33), and a sixth driving device. The sixth driving device is used to provide power to the central tube feeding device (31), the bottom water-guiding cloth cutting and transfer device (32), and the third welding device (33). The central tube feeding device (31) is used to convey the central tube to a designated device. The bottom water-guiding cloth cutting and transfer device (32) is used to realize the feeding, conveying, and cutting of the bottom water-guiding cloth. The third welding device (33) is used to realize the welding of the central tube and the bottom water-guiding cloth to realize the preparation of the tube material bottom cloth. The automatic film winding mechanism (4) includes a film winding station (41), a dispensing device (42), a film winding device (43), a tape wrapping device (44), a film material transfer device (45), a material unloading device (46), and an eighth driving device. The eighth driving device is used to provide power to the dispensing device (42), the film winding device (43), the tape wrapping device (44), the film material transfer device (45), and the material unloading device (46). The film material transfer device (45) transfers the first film material / second film material prepared by the folding and cutting mechanism (2) to the dispensing device (42) for dispensing. After dispensing, the first film material / second film material is wound around the outside of the bottom water-conducting cloth / middle water-conducting cloth under the action of the film winding device (43). After the wound second film material reaches the set number of layers, the tape wrapping device (44) wraps tape around the outside of the last layer of second film material for fixation. Then, the material unloading device (46) transports the wound finished industrial film out of the automated processing equipment. The concentrate net cutting and transfer device (21) includes a concentrate net feeding roller (211), a concentrate net conveying roller (212), a concentrate net conveying section (213), a concentrate net pressing plate (214), a concentrate net cutting section (215), and a first platform (216). The concentrate net feeding roller (211), the concentrate net conveying roller (212), the concentrate net pressing plate (214), and the concentrate net cutting section (215) are arranged along the Y direction. The concentrate net cutting section (215) is located below the concentrate net pressing plate (214). The concentrated mesh extended by the concentrated mesh feeding roller (211) passes through the concentrated mesh conveying roller (212) and is moved along the X direction on the first platform (216) under the traction of the concentrated mesh conveying part (213). When the length of the concentrated mesh on the first platform (216) reaches the preset length, the concentrated mesh pressing plate (214) presses down on the concentrated mesh, and the concentrated mesh cutting part (215) cuts the concentrated mesh along the Y direction.
2. The automated processing equipment for upstream processes of industrial reverse osmosis membrane elements according to claim 1, characterized in that: The first welding device (22) is arranged along the X direction and includes a spot welding beam (221), a first displacement module (223) and two first welding heads (222). The spot welding beam (221) is a U-shaped structure. The spot welding beam (221) is installed above the first platform (216) and its opening faces the first platform (216). The first welding heads (222) are installed at both ends of the spot welding beam (221) along the Y direction. The first displacement module (223) is arranged on both sides of the bottom of the first platform (216) along the X direction. The two ends of the length of the spot welding beam (221) are slidably connected to the first displacement module (223). The first displacement module (223) can drive the first welding heads (222) to move along the X direction.
3. The automated processing equipment for upstream processes of industrial reverse osmosis membrane elements according to claim 2, characterized in that: The folding and cutting mechanism (2) also includes a film defect detection device (26), which is used to detect defects in the film.
4. The automated processing equipment for upstream processes of industrial reverse osmosis membrane elements according to claim 1, characterized in that: The automated processing equipment also includes a waiting station (5), which is located between the folding and cutting mechanism (2), the central tube feeding and film-applying mechanism (3), and the automatic film-rolling mechanism (4).
5. The automated processing equipment for upstream processes of industrial reverse osmosis membrane elements according to claim 4, characterized in that: The waiting station (5) includes a first waiting station (51) and a second waiting station (52). The first waiting station (51) is located on the side of the water-guiding cloth feeding device (25) along the Y direction, and the second waiting station (52) is located on the side of the first waiting station (51) along the X direction.
6. The automated processing equipment for upstream processes of industrial reverse osmosis membrane elements according to claim 1, characterized in that: The central tube feeding device (31) includes a central tube hopper (311), a vertical feeding section (312), and a horizontal conveying section (313). The central tube hopper (311) stores central tubes and can automatically output them. The vertical feeding section (312) can move the central tubes output from the central tube hopper (311) along the Z direction to a preset highest position. The horizontal conveying section (313) can move the central tubes at the preset highest position along the X direction to the film winding station (41).
7. The automated processing equipment for upstream processes of industrial reverse osmosis membrane elements according to claim 6, characterized in that: The central tube feeding device (31) further includes a steel core transfer part (34), which can be aligned with the vertical feeding part (312) along the Y direction. The steel core transfer part (34) is used to transfer the steel core in the central tube of the finished industrial film to the central tube being fed by the vertical feeding part (312).
8. The automated processing equipment for upstream processes of industrial reverse osmosis membrane elements according to claim 1, characterized in that: The automatic film winding mechanism (4) also includes a squeezing device (47), which is located on one side of the film winding device (43) along the X direction. It can squeeze the first and second film materials outside the central tube during the film winding process of the film winding device (43) to achieve tight winding.
9. The automated processing equipment for upstream processes of industrial reverse osmosis membrane elements according to claim 1, characterized in that: The automatic film winding mechanism (4) also includes a tapping device (48), which is arranged along the Y direction and can tap the outside of the film material after winding.
Citation Information
Patent Citations
Front-pass automatic processing equipment and method for reverse osmosis membrane element
CN115155325A
Full-automatic industrial membrane element preparation system and use method thereof
CN116688764A
