A high-efficiency molding production line and molding process for reinforced and toughened PVC edge banding

By punching holes, filling and filming on the automated production line of PVC edge seal strips, the problem of insufficient strength and toughness of edge seal strips is solved, the production efficiency and yield are improved, and higher strength and decorative effects are achieved.

CN118219598BActive Publication Date: 2024-12-06浙江欧德雅装饰材料有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410602185.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2024-12-06
Estimated Expiration
2044-05-15

AI Technical Summary

Technical Problem

The existing PVC edge sealing strips reduce deformation ability when improving connection stability and facilitating the filling of the internal filling layer, resulting in low strength and toughness, short service life, low production efficiency and low yield.

Method used

Adopt an automated production line, including conveying mechanism, punching mechanism, filling mechanism and film sticking mechanism, by punching holes on the edge strip and filling reinforcement support, and use reinforcement positioning and filling layer support during film sticking to improve connection The strength and decorative effect of teeth.

Benefits of technology

It improves the strength and toughness of the edge sealing strip, reduces production difficulty and waste, improves the yield rate, and achieves efficient and automated production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118219598B_ABST
    Figure CN118219598B_ABST
Patent Text Reader

Abstract

The present invention relates to an efficient molding production line for reinforced and toughened PVC edge banding strips, comprising a conveying mechanism, a molding mechanism, a punching mechanism, a filling mechanism and a film pasting mechanism sequentially arranged along the conveying direction of the conveying mechanism, and the molding mechanism is used to mold the body of the edge banding strip and the filling groove and connecting teeth on the body, the punching mechanism is used to punch a plurality of through holes on the body and a plurality of mounting holes on the connecting teeth, the filling mechanism is used to fill the reinforcing member support filling groove in the through hole and then fill the filling layer in the filling groove, and the film pasting mechanism is used to cooperate with the positioning of the reinforcing member to install the reinforcing member in the mounting hole through the notch on the filling layer after pasting the film on the outer wall of the body; in addition, the present application also provides a molding process based on the production line, including a molding process, a punching process, a filling process and a film pasting process. The present invention solves the problems that the existing edge banding strips have low strength and toughness when in use, are difficult to produce during production, and have a low yield rate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of edge banding strips, and in particular to an efficient molding production line and molding process for reinforced and toughened PVC edge banding strips. Background Art

[0002] The main function of edge banding is to seal the cross section of the board to protect it from damage by adverse factors (mainly moisture) in the environment and during use and to prevent the volatilization of formaldehyde inside the board, while achieving a decorative effect. Currently, PVC materials are widely used for their low cost and good appearance. The main component of PVC edge banding is polyvinyl chloride, with the addition of plasticizers, stabilizers, lubricants, dyes and other additives, and is made through mixing, calendering, vacuum forming and other processes. The products are widely used in furniture, office, kitchen utensils, etc.

[0003] The patent document with patent number CN216416522U discloses a PVC decorative edge banding with sound insulation function, including an edge banding body, a first through hole and a second through hole are arranged in the edge banding body, and a first pressure relief groove and a second pressure relief groove are symmetrically arranged on both sides of the edge banding body; the upper surface of the edge banding body is an arc structure protruding upward, and a plurality of ventilation holes are arranged on the upper surface of the edge banding body, and the plurality of ventilation holes penetrate the edge banding body and are connected with the first through hole; a sound insulation filler is arranged in the second through hole; fasteners extending downward and inward in parallel are arranged on both sides of the lower surface of the edge banding body; when the sealing strip is squeezed, the air in the first through hole is discharged through the ventilation holes, which plays a role of buffering pressure and avoids damage to furniture and articles due to excessive impact force; by arranging the sound insulation filler in the second through hole, a sound insulation effect is achieved and the performance of the sealing strip is improved.

[0004] However, during actual use, the inventors found that in order to improve the stability of the connection and facilitate the filling of the internal filling layer, the existing edge banding strips reduce their own deformation ability, resulting in lower strength and toughness and a shorter service life; in addition, during the production of the existing edge banding strips, the internal filling layer is prone to breakage and is difficult to fill, which increases the difficulty of production, reduces production efficiency, and has a low product yield. Summary of the invention

[0005] The purpose of the present invention is to address the deficiencies of the prior art, and to realize the automated production of edge banding strips by setting a conveying mechanism to cooperate with a forming mechanism, a punching mechanism, a filling mechanism and a film pasting mechanism in sequence, with high production efficiency. In the filling process of the filling mechanism, the reinforcing member is first filled in the through hole to support the filling slot to open, which is convenient for the subsequent filling of the filling layer. In the film pasting process of the film pasting mechanism, under the action of the reinforcing member positioning through hole and the filling layer supporting body, it is convenient to accurately paste the film on the body, and it is convenient to accurately press the reinforcing member into the mounting hole; at the same time, the reinforcing member in the connecting tooth can improve the stability and connection strength of the connection between the connecting tooth and the plate, and the optimization of the production process is convenient for the filling of the internal structure, so that the raw material can be changed so that the forming mechanism can form a body with higher deformation ability, improve the strength and toughness of the body, and the pattern on the film can be a wood grain that matches the grain of the plate, thereby improving the decorative effect of the edge banding strip. Thereby solving the problem that the existing edge banding strips have low strength and toughness when in use, high production difficulty during production, and low yield rate.

[0006] In view of the above technical problems, the technical solution adopted is as follows: a high-efficiency molding production line for reinforced and toughened PVC edge banding, including:

[0007] A conveying mechanism, a forming mechanism, a punching mechanism, a filling mechanism and a film pasting mechanism sequentially arranged along the conveying direction of the conveying mechanism, wherein the forming mechanism is used to form the body of the edge banding strip and the filling groove and the connecting teeth on the body, the punching mechanism is used to punch a plurality of through holes connected to the filling groove on the body and a plurality of mounting holes connected to the filling groove on the connecting teeth, the filling mechanism is used to fill the through holes with a reinforcing member to support the filling groove and then fill the filling layer in the filling groove, and the film pasting mechanism is used to cooperate with the positioning of the reinforcing member to paste the film on the outer wall of the body and then install the reinforcing member in the mounting hole through the notch on the filling layer;

[0008] The edge banding strip includes the main body, the filling layer filled in the filling groove on the main body, a through hole connected to the filling groove, the connecting teeth arranged on the main body and used for clamping the plate material, the reinforcing member arranged in the installation groove on the connecting teeth and used for strengthening the strength of the connecting teeth, and a film adhered to the surface of the main body.

[0009] Preferably, the punching mechanism includes a first annular knife movably arranged on the outside of the main body and used to punch the mounting hole and a through hole arranged coaxially with the mounting hole, a plurality of second annular knives movably arranged on the outside of the main body and used to punch a plurality of through holes at intervals on both sides of the through hole punched by the first annular knife, and a negative pressure tube connected to the first annular knife and the second annular knife and used to suck out waste materials inside the two.

[0010] Preferably, the filling mechanism includes a first filling component arranged between the first annular knife and the second annular knife and used to fill the reinforcement in the through hole punched by the first annular knife, a conveying component one end of which is arranged between the first filling component and the second annular knife and used to connect and convey the reinforcement, and a second filling component arranged behind the second annular knife and used to fill the filling layer in the filling groove.

[0011] Preferably, the conveying mechanism comprises a frame, a support plate arranged on the frame and used to support the body, a pushing plate movably arranged on the forming mechanism and used to push the body to the support plate, and a plurality of conveying rollers arranged on both sides of the support plate and used to connect the connecting teeth to convey the body;

[0012] The first filling component includes a hopper arranged on the frame and used to store the reinforcement, a discharge roller with one end connected to the conveying roller and the other end extending to just below the discharge port on the hopper and with a discharge groove on the outer ring surface, a positioning plate arranged on the hopper and cooperating with the rotation of the discharge roller to position the reinforcement in the discharge groove, and a first pressing column movably arranged on the frame and used to press the positioned reinforcement into the through hole.

[0013] Preferably, the conveying assembly comprises two conveying belts arranged outside the body and used for conveying the reinforcement in the same direction, and clamping grooves arranged at intervals on the two conveying belts and used for clamping and positioning the reinforcement;

[0014] The second filling mechanism includes a first unwinding roller rotatably arranged on the conveying mechanism and used to carry the filling layer roll, a first clamping component movably arranged on the conveying mechanism and used to clamp and pull out the filling layer on the first unwinding roller, a positioning pin movably arranged on the conveying mechanism and positioning one end of the filling layer through the through hole, a comparison component arranged on the conveying mechanism and used to compare whether the filling layer is installed in place, and a first cutter movably arranged on the conveying mechanism and used to cut the filling layer installed in place.

[0015] Preferably, the film-sticking mechanism includes a gluing component arranged on the conveying mechanism and used to convey the film while applying glue on the film, a film-sticking component arranged on the conveying mechanism and cooperating with the reinforcement for accurately sticking the film on the main body, and a pressing component arranged on the conveying mechanism and used to push the reinforcement into the mounting hole.

[0016] Preferably, the glue coating assembly includes a second unwinding roller rotatably arranged on the conveying mechanism and used to carry the film roll, a second clamping assembly movably arranged on the conveying mechanism and used to clamp and pull out the film on the second unwinding roller, a second cutter movably arranged on the conveying mechanism and used to cut the film, a first rotating shaft rotatably arranged on the conveying mechanism, two glue pot assemblies arranged on the first rotating shaft, a delivery tank arranged on the conveying mechanism and used to deliver a cleaning agent into one of the glue pot assemblies, a second rotating shaft rotatably arranged on the conveying mechanism, a cleaning brush and a wiping piece movably arranged on the second rotating shaft, wherein the cleaning brush is used to cooperate with the cleaning agent to clean the inside of the glue pot assembly, and the wiping piece is used to wipe the cleaning agent inside the glue pot assembly.

[0017] Preferably, the film sticking assembly includes two first film sticking rollers rotatably arranged on both sides of the reinforcement and used to stick the two sides of the film to the two sides of the outer wall of the main body away from the connecting tooth, two bending plates rotatably arranged on both sides of the main body and used to bend the two sides of the film, two second film sticking rollers rotatably arranged on both sides of the connecting tooth and used to stick the bent film to the outer wall of the main body close to the connecting tooth, and a third film sticking roller arranged at the rear of the pressing assembly and used to press the film of the main body away from the middle of the outer wall of the connecting tooth after the pressing assembly presses the reinforcement into the mounting hole;

[0018] The pressing assembly includes two positioning grippers movably arranged on the conveying mechanism and used for positioning the reinforcement, and a second pressing column movably arranged on the conveying mechanism and used for pressing the positioned reinforcement into the mounting hole.

[0019] Preferably, the molding mechanism includes an extruder, a molding groove connected to the extruder outlet and having the same outer contour as the main body, a molding column arranged in the molding groove and used to mold the filling groove, and a cooling pool arranged outside the molding groove and used to cool the main body.

[0020] The present application also provides a molding process based on an efficient molding production line for reinforced and toughened PVC edge banding, comprising the following steps:

[0021] Step 1: a molding process, in which the PVC material is put into the molding mechanism to mold the body with the filling groove and the connecting teeth, and the body is molded onto the conveying mechanism;

[0022] Step 2: a punching process, wherein the conveying mechanism conveys the body to the punching mechanism and the punching mechanism punches the through hole and the mounting hole on the body;

[0023] Step 3: a filling process, wherein the conveying mechanism conveys the punched body to the filling mechanism and the reinforcing member is first filled in the through hole through the filling mechanism to support the filling groove, and then the filling layer is filled in the filling groove through the filling mechanism;

[0024] Step 4: Film pasting process, the conveying mechanism conveys the main body filled with the filling layer to the film pasting mechanism, and with the reinforcement member positioning the through hole and the filling layer supporting the main body, the film pasting mechanism first accurately sticks the film on the main body, and then accurately presses the reinforcement member into the mounting hole.

[0025] Beneficial effects of the present invention:

[0026] (1) The present invention realizes the automated production of edge banding strips by setting a conveying mechanism to cooperate with a forming mechanism, a punching mechanism, a filling mechanism and a film pasting mechanism in sequence, and has high production efficiency. During the filling process of the filling mechanism, the reinforcing member is first filled in the through hole to support the filling slot to open, which is convenient for the subsequent filling of the filling layer, reducing the production difficulty and improving the yield rate. During the film pasting process of the film pasting mechanism, under the action of the reinforcing member positioning through hole and the filling layer supporting body, it is convenient to accurately paste the film on the body and to accurately press the reinforcing member into the mounting hole, further reducing the production difficulty and further improving the yield rate.

[0027] (2) In the present invention, the connection stability and connection strength between the connecting teeth and the plate are improved by setting a reinforcing member in the connecting teeth, and the optimization of the production process facilitates the filling of the internal structure, thereby changing the raw materials so that the molding mechanism can form the body with a higher deformation ability, thereby improving the strength and toughness of the body. By setting the pattern on the film to match the wood grain of the plate, the decorative effect of the edge banding strip is improved.

[0028] In summary, the equipment has the advantages of low production difficulty, high yield rate, and the edge banding strips produced have high strength and toughness when used, and is particularly suitable for the field of edge banding strip technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0030] Figure 1 A three-dimensional diagram of an edge banding strip provided by the present invention.

[0031] Figure 2 A three-dimensional cross-sectional view of an edge banding strip provided by the present invention.

[0032] Figure 3 This is a schematic diagram of the reinforcement member provided by the present invention being connected to the through hole.

[0033] Figure 4 A three-dimensional diagram of an efficient molding production line for reinforced and toughened PVC edge banding strips provided by the present invention.

[0034] Figure 5 This is a schematic structural diagram of the punching mechanism and the filling mechanism provided by the present invention.

[0035] Figure 6 The present invention provides Figure 5 Top view of the structure.

[0036] Figure 7 The present invention provides Figure 6 Cross-sectional view along the middle line A.

[0037] Figure 8 A schematic diagram of the conveying mechanism and the structure thereon provided by the present invention.

[0038] Fig. 9 The present invention provides Figure 8 A partial enlarged view of point B in the middle.

[0039] Fig.10 The present invention provides Figure 8 Schematic diagrams in different orientations.

[0040] Fig.11 The present invention provides Fig.10 A partial enlarged view of point C in the middle.

[0041] Fig.12 The present invention provides Fig.10 A partial enlarged view of point D in the middle.

[0042] Fig.13 The present invention provides Fig.10 A partial enlarged view of point E in the middle.

[0043] Fig.14 This is a structural schematic diagram of the film sticking mechanism provided by the present invention.

[0044] Fig.15 The present invention provides Fig.14 Top view of the structure.

[0045] Fig.16 This is a schematic structural diagram of the glue coating assembly provided by the present invention.

[0046] Fig.17This is a schematic structural diagram of the forming mechanism provided by the present invention. DETAILED DESCRIPTION

[0047] The technical solutions in the embodiments of the present invention are clearly and completely described below in conjunction with the accompanying drawings.

[0048] Embodiment 1

[0049] like Figure 1-17 As shown, a high-efficiency molding production line for reinforced and toughened PVC edge banding includes:

[0050] The conveying mechanism 1, the forming mechanism 2, the punching mechanism 3, the filling mechanism 4 and the film pasting mechanism 5 are sequentially arranged along the conveying direction of the conveying mechanism 1, and the forming mechanism 2 is used to form the body 61 of the edge banding strip 6 and the filling groove 612 and the connecting teeth 63 on the body 61, the punching mechanism 3 is used to punch a plurality of through holes 611 connected to the filling groove 612 on the body 61 and punch a plurality of mounting holes 631 connected to the filling groove 612 on the connecting teeth 63, the filling mechanism 4 is used to fill the reinforcing member 64 in the through hole 611 to support the filling groove 612 and then fill the filling layer 62 in the filling groove 612, and the film pasting mechanism 5 is used to cooperate with the positioning of the reinforcing member 64 to paste the film on the outer wall of the body 61 and then install the reinforcing member 64 in the mounting hole 631 through the notch 621 on the filling layer 62;

[0051] The edge banding strip 6 includes a main body 61, a filling layer 62 filled in a filling groove 612 on the main body 61, a through hole 611 connected to the filling groove 612, a connecting tooth 63 arranged on the main body 61 and used to clamp the plate material, a reinforcing member 64 arranged in a mounting groove 631 on the connecting tooth 63 and used to strengthen the strength of the connecting tooth 63, and a film 65 adhered to the surface of the main body 61.

[0052] In this embodiment, the conveying mechanism 1 is provided to cooperate with the forming mechanism 2, the punching mechanism 3, the filling mechanism 4 and the film pasting mechanism 5 in sequence to realize the automated production of the edge banding strip 6, and the production efficiency is high. During the filling process of the filling mechanism 4, the reinforcing member 64 is first filled in the through hole 611 to support the filling groove 612 to open, which is convenient for the subsequent filling of the filling layer 62, reducing the production difficulty and improving the yield rate. During the film pasting process of the film pasting mechanism 5, under the action of the reinforcing member 64 positioning the through hole 611 and the filling layer 62 supporting the main body 61, it is convenient to accurately paste the film 65 on the main body 61, and it is convenient to accurately press the reinforcing member 64 into the mounting hole 631, further reducing the production difficulty and further improving the yield rate.

[0053] At the same time, the reinforcement 64 in the connecting tooth 63 can improve the stability and connection strength of the connection between the connecting tooth 63 and the plate, and the optimization of the production process facilitates the filling of the internal structure, so that the raw material can be changed so that the molding mechanism 2 can form a main body 61 with a higher deformation ability, thereby improving the strength and toughness of the main body 61. By setting the pattern on the film 65 to match the wood grain of the plate, the decorative effect of the edge banding strip 6 is improved.

[0054] In detail, the PVC material is put into the molding mechanism 2 to form a main body 61 with a filling groove 612 and a connecting tooth 63, and the main body 61 is molded on the conveying mechanism 1. During the conveying process of the conveying mechanism 1, the main body 61 is firstly placed on the punching mechanism 3 and the through hole 611 and the mounting hole 631 are punched on the main body 61 by the punching mechanism 3, and then the reinforcing member 64 is first filled in the through hole 611 by the filling mechanism 4 to support the filling groove 612, so that the filling layer 62 is filled in the filling groove 612 by the filling mechanism 4, and finally, the film sticking mechanism 5 cooperates with the reinforcing member 64 to position the through hole 611 and the filling layer 62 to support the main body 61, so that the film 65 can be accurately attached to the main body 61 and the reinforcing member 64 can be accurately pressed into the mounting hole 631.

[0055] It should be noted that the reinforcement member 64 installed in the installation hole 631 extends into the notch 621 to limit the displacement movement of the filling layer 62 during transportation and use.

[0056] Further, if Figure 4-9 As shown, the punching mechanism 3 includes a first annular knife 31 movably arranged on the outside of the main body 61 and used to punch the mounting hole 631 and a through hole 611 arranged coaxially with the mounting hole 631, a plurality of second annular knives 32 movably arranged on the outside of the main body 61 and used to punch a plurality of through holes 611 at intervals on both sides of the through hole 611 punched by the first annular knife 31, and a negative pressure tube 33 connected to the first annular knife 31 and the second annular knife 32 and used to suck out the waste materials inside the two.

[0057] In this embodiment, the through hole 611 and the mounting groove 631 are formed by setting the first annular knife 31 in cooperation with the second annular knife 32, and the cut waste is sucked out by setting a negative pressure valve, which not only prevents the waste from being retained in the main body 61 and interfering with subsequent filling work, but also allows the waste to be recovered and avoids material waste.

[0058] It should be noted that the negative pressure pipe 33 generates negative pressure through a negative pressure device, and the negative pressure device that generates negative pressure to suck out solids is a prior art and will not be described in detail here.

[0059] Further, if Figure 4-12As shown, the filling mechanism 4 includes a first filling component 41 arranged between the first annular knife 31 and the second annular knife 32 and used to fill the reinforcement 64 in the through hole 611 punched by the first annular knife 31, a conveying component 42 one end of which is arranged between the first filling component 41 and the second annular knife 32 and used to connect and convey the reinforcement 64, and a second filling component 43 arranged behind the second annular knife 32 and used to fill the filling layer 62 in the filling groove 612.

[0060] In this embodiment, by setting up the first filling mechanism 4 to cooperate with the conveying component 42 and the second filling mechanism 4, the second annular knife 32 can punch multiple through holes 611 at intervals on both sides of the through hole 611 punched by the first annular knife 31 when the reinforcement member 64 supports the main body 61, and the filling layer 62 can be filled into the filling groove 612 when the reinforcement member 64 supports the filling groove 612.

[0061] In detail, first, the first annular knife 31 punches a through hole 611 and a mounting groove 631 coaxially arranged with the through hole 611, then the first filling component 41 fills the reinforcement 64 into the through hole 611 punched by the first annular knife 31, and then the conveying component 42 connects and conveys the reinforcement 64 while the conveying mechanism 1 conveys the main body 61, so that the reinforcement 64 supports the main body 61 and the filling groove 612, and finally, after the second annular knife 32 punches a plurality of through holes 611 at intervals on both sides of the through hole 611 punched by the first annular knife 31, the second filling component 43 is able to fill the filling layer 62 into the filling groove 612.

[0062] Further, if Figure 8 as well as Fig.10 As shown, the conveying mechanism 1 includes a frame 11, a support plate 12 disposed on the frame 11 and used to support the body 61, a pushing plate 13 movably disposed on the forming mechanism 2 and used to push the body 61 to the support plate 12, and a plurality of conveying rollers 14 disposed on both sides of the support plate 12 and used to connect the connecting teeth 63 to convey the body 61;

[0063] The first filling component 41 includes a hopper 411 arranged on the frame 11 and used to store the reinforcement 64, a discharge roller 412 with one end connected to the conveying roller 14 and the other end extending to just below the discharge port on the hopper 411 and with a discharge groove 4121 on the outer ring surface, a positioning plate 413 arranged on the hopper 411 and cooperating with the rotation of the discharge roller 412 to position the reinforcement 64 in the discharge groove 4121, and a first pressing column 414 movably arranged on the frame 11 and used to press the positioned reinforcement 64 into the through hole 611.

[0064] In this embodiment, the support plate 12 is provided to cooperate with the push plate 13 to push the body 61 between the conveying rollers 14 located on both sides of the support plate 12, and then the body 61 is conveyed by the plurality of conveying rollers 14;

[0065] By setting the hopper 411 in cooperation with the discharge roller 412 and the positioning plate 413 , the output reinforcement members 64 are spaced and positioned while the conveying roller 14 conveys the body 61 , and then in cooperation with the first pressing column 414 , the reinforcement members 64 are pressed into each through hole 611 at intervals.

[0066] In detail, after the molding mechanism 2 molds the main body 61, the pushing plate 13 pushes the main body 61 to the supporting plate 12 for positioning, so that the conveying roller 14 can convey the main body 61; in the process of the main body 61 conveying the main body 61, the discharging roller 412 simultaneously rotates the reinforcement 64 to enter the discharging trough 4121 through the discharging port, and then after being positioned to a position aligned with the through hole 611 through the positioning plate 413, the reinforcement 64 is pressed into the through hole 611 through the first pressing column 414; in addition, when the conveying roller 14 does not convey the main body 61, the first pressing column 414 stops pressing.

[0067] It should be noted that the conveying roller 14 is connected between the connecting teeth 63 and the body 61, so as to prevent the body 61 from being misplaced during conveyance, and the body 61 is positioned during the conveyance process to facilitate subsequent production.

[0068] Further, if Figure 4-12 As shown, the conveying assembly 42 includes two conveying belts 421 disposed outside the body 61 and used to convey the reinforcing member 64 in the same direction, and clamping grooves 422 disposed at intervals on the two conveying belts 421 and used to clamp and position the reinforcing member 64;

[0069] The second filling mechanism 4 includes a first unwinding roller 431 rotatably arranged on the conveying mechanism 1 and used for carrying a roll of the filling layer 62, a first clamping component 432 movably arranged on the conveying mechanism 1 and used for clamping and pulling out the filling layer 62 on the first unwinding roller 431, a positioning needle 433 movably arranged on the conveying mechanism 1 and positioning one end of the filling layer 62 through the through hole 611, a comparison component 434 arranged on the conveying mechanism 1 and used for comparing whether the filling layer 62 is installed in place, and a first cutter 435 movably arranged on the conveying mechanism 1 and used for cutting the filling layer 62 installed in place.

[0070] In this embodiment, two conveyor belts 421 are provided to cooperate with the clamping groove 422 to clamp and position the reinforcement member 64, so that the reinforcement member 64 can support the body 61 and the filling groove 612 inside the body 61 during the conveying mechanism 1 conveying the body 61;

[0071] By setting the first unwinding roller 431 in cooperation with the first clamping component 432, the filling layer 62 is pulled to be aligned with the filling groove 612, and then the positioning needle 433 is cooperated to limit the positioning of the filling layer 62, and then the conveying of the conveying mechanism 1 is cooperated to intermittently fill the filling layer 62 in the filling layer 62 and the comparison component is cooperated. After the filling is completed, the first cutter 435 cuts the filling layer 62 to complete the filling.

[0072] In detail, first, the first clamping component 432 pulls out the filling layer 62 on the first unwinding roller 431, and then the positioning pin 433 is inserted into the filling layer 62 to position one end of the filling layer 62, and then the conveying mechanism 1 conveys the body 61 to insert one end of the positioned filling layer 62 into the filling groove 612, and then the first clamping component 432 releases the filling layer 62 to avoid interference, and then the conveying mechanism 1 conveys the body 61 while the positioning pin 433 is inserted into the filling layer 62 through each through hole 611 for positioning, so that the filling layer 62 can be intermittently filled into the filling groove 612 little by little, to avoid the filling layer 62 bending and not being easy to enter the filling groove 612, and finally when the filling layer 62 is filled into the filling groove 612, the first cutter 435 cuts off the filling layer 62 after comparing the through hole 611 with the reinforcement 64 and the notch 621 to complete the filling.

[0073] It should be noted that the present application does not limit the specific structure of the comparison component and only provides one structure for reference, for example:

[0074] The comparison component can be a camera working with a computer to compare the picture after the filling layer 62 is filled, determine the distance between the gap 621 on the filling layer 62 outside the body 61 and the through hole 611 filled with the reinforcement 64, and then determine whether the through hole 611 is aligned with another gap 621.

[0075] Further, if Figure 13-16 As shown, the film sticking mechanism 5 includes a glue coating component 51 arranged on the conveying mechanism 1 and used to coat glue on the film 65 while conveying the film 65, a film sticking component 52 arranged on the conveying mechanism 1 and used to cooperate with the reinforcement 64 to accurately stick the film 65 on the main body 61, and a pressing component 53 arranged on the conveying mechanism 1 and used to push the reinforcement 64 into the mounting hole.

[0076] In this embodiment, after the film 65 is attached by providing the glue coating component 51 in cooperation with the film sticking component 52 , the reinforcing member 64 is finally installed in the installation groove 631 in cooperation with the pressing component 53 .

[0077] Further, if Fig.16As shown, the glue coating component 51 includes a second unwinding roller 511 rotatably arranged on the conveying mechanism 1 and used to carry the film 65 roll, a second clamping component 512 movably arranged on the conveying mechanism 1 and used to clamp and pull out the film 65 on the second unwinding roller 511, a second cutter 513 movably arranged on the conveying mechanism 1 and used to cut the film 65, a first rotating shaft 514 rotatably arranged on the conveying mechanism 1, two glue pot components 515 arranged on the first rotating shaft 514, a delivery tank arranged on the conveying mechanism 1 and used to deliver a cleaning agent into one glue pot component 515, a second rotating shaft 516 rotatably arranged on the conveying mechanism 1, a cleaning brush 517 and a wiping piece 518 movably arranged on the second rotating shaft 516, and the cleaning brush 517 is used to cooperate with the cleaning agent to clean the inside of the glue pot component 515, and the wiping piece 518 is used to wipe the cleaning agent inside the glue pot component 515.

[0078] In this embodiment, the second unwinding roller 511 is provided to cooperate with the second clamping assembly 512 and the conveying mechanism 1 to convey the main body 61, so as to complete the positioning between the connecting groove 651 and the through hole 611; the first rotating shaft 514 is provided to control the alternating use of the two glue pot assemblies 515, so as to facilitate the coordination with the delivery tank and the second rotating shaft 516 to control the cleaning brush 517 and the wiping piece 518 to clean the glue pot assembly 515, so as to avoid uneven glue discharge from the glue pot assembly 515 after long-term use, and to automatically clean the inside of the glue pot assembly 515 without stopping production, thereby improving production efficiency.

[0079] In detail, the second clamping assembly 512 pulls the film 65 on the second unwinding roller 511 to the front of the main body 61 until the reinforcement 64 is inserted into the connecting groove 651 of the film 65 during the process of the conveying mechanism 1 conveying the main body 61, and the second clamping assembly 512 releases the film 65; when one glue pot assembly 515 has been used for a period of time, the first rotating shaft 514 is rotated to switch to another glue pot assembly 515, so that the cleaning agent can be put into the used glue pot assembly 515 through the delivery tank, and the second rotating shaft 516 is rotated to allow the cleaning brush 517 and the wiping piece 518 to be inserted into the glue pot assembly 515 in turn, and then the cleaning brush 517 is used to brush the inside of it, and then the cleaning agent is wiped out by the wiping piece 518 to complete the automatic cleaning.

[0080] It should be noted that the glue pot assembly 515 for discharging glue during film lamination is prior art, the first clamping assembly 432 and the second clamping assembly 512 both include two openable and closable clamping arms, which are prior art, and the delivery tank itself and the installation method for delivering materials are prior art (not shown in the attached drawings), and the lower end opening is located directly above the glue pot assembly 515. The above are prior art and will not be described in detail here.

[0081] In addition, the conveying mechanism 1 is also provided with two pairs of traction rollers 15 for pulling the filling layer 62 and the film 65 on the first unwinding roller 431 and the second unwinding roller 511 to the first clamping assembly 432 and the second clamping assembly 512 respectively, so as to facilitate the clamping work of the first clamping assembly 432 and the second clamping assembly 512.

[0082] Further, if Figure 13-15 As shown, the film sticking assembly 52 includes two first film sticking rollers 521 rotatably arranged on both sides of the reinforcing member 64 and used to stick both sides of the film 65 to both sides of the outer wall of the body 61 away from the connecting teeth 63, two bending plates 522 rotatably arranged on both sides of the body 61 and used to bend both sides of the film 65, two second film sticking rollers 523 rotatably arranged on both sides of the connecting teeth 63 and used to stick the bent film 65 to the outer wall of the body 61 close to the connecting teeth 63, and a third film sticking roller 524 arranged at the rear of the pressing assembly 53 and used to press the film 65 of the middle part of the outer wall of the body 61 away from the connecting teeth 63 after the pressing assembly 53 presses the reinforcing member 64 into the mounting hole;

[0083] The pressing assembly 53 includes two positioning grippers 531 movably disposed on the conveying mechanism 1 and used to position the reinforcement member 64 , and a second pressing column 532 movably disposed on the conveying mechanism 1 and used to press the positioned reinforcement member 64 into the mounting hole.

[0084] In this embodiment, the first film laminating roller 521 is provided to cooperate with the bending plate 522 and the second film laminating roller 523 to wrap the film 65 and paste it on the outside of the main body 61, so that when the connecting teeth 63 are connected to the plate, the two sides of the film 65 are clamped between the main body 61 and the plate to prevent the film 65 from curling and detaching easily; the third film laminating roller 524 is provided to press the reinforcement member 64 to be installed in the installation groove 631, and the main body 61 is away from the film 65 in the middle of the outer wall of the connecting tooth 63, so that the film laminating effect is better; the positioning gripper 531 is provided to cooperate with the second pressing column 532 to accurately press the reinforcement member 64 into the installation groove 631.

[0085] In detail, first, the first film laminating roller 521 sticks the two sides of the film 65 to the two sides of the outer wall of the main body 61 away from the connecting teeth 63, and then the bending plate 522 bends the two sides of the film 65 to facilitate the second film laminating roller 523 to stick the two sides of the film 65 to the outer wall of the main body 61 close to the connecting teeth 63, and then the two positioning grippers 531 clamp the positioning reinforcement 64, and cooperate with the second pressing column 532 to press the reinforcement 64 into the installation groove 631, and finally the third film laminating roller 524 presses the film 65 on the middle of the outer wall of the main body 61 away from the connecting teeth 63 and sticks it to the main body 61, thereby improving the film laminating effect.

[0086] It should be noted that the second clamping assembly 512 and the second cutter 513 will cause excess film 65 to leak out from both ends of the body 61, which can be trimmed manually. During the trimming process, it is possible to check whether the edge banding strip 6 is qualified, thereby improving the qualified rate of the product.

[0087] Further, if Fig.15 As shown, the molding mechanism 2 includes an extruder 21, a molding groove 22 connected to the discharge port of the extruder 21 and having the same outer contour as the main body 61, a molding column 23 arranged in the molding groove 22 and used to mold the filling groove 612, and a cooling pool 24 arranged on the outside of the molding groove 22 and used to cool the main body 61.

[0088] In this embodiment, the molding of the main body 61 and the connecting teeth 63 thereon and the filling groove 612 are realized by providing a molding groove 22 connected to the material port of the extruder 21 and cooperating with the molding column 23, and then cooled and shaped by the cooling pool 24.

[0089] It should be noted that the extruder 21 and the cooling pool 24 for producing PVC products are prior art and will not be described in detail herein.

[0090] Embodiment 2

[0091] like Figure 1-17 As shown, a molding process based on an efficient molding production line for reinforced and toughened PVC edge banding strips comprises the following steps:

[0092] Step 1: a molding process, in which the PVC material is put into the molding mechanism 2 to mold a body 61 with a filling groove 612 and a connecting tooth 63, and the body 61 is molded onto the conveying mechanism 1;

[0093] Step 2: Punching process, the conveying mechanism 1 conveys the body 61 to the punching mechanism 3 and punches the through hole 611 and the mounting hole on the body 61 through the punching mechanism 3;

[0094] Step 3: Filling process, the conveying mechanism 1 conveys the punched body 61 to the filling mechanism 4 and the reinforcing member 64 is first filled in the through hole 611 by the filling mechanism 4 to support the filling groove 612, and then the filling layer 62 is filled in the filling groove 612 by the filling mechanism 4;

[0095] Step 4: Film pasting process, the conveying mechanism 1 conveys the main body 61 filled with the filling layer 62 to the film pasting mechanism 5. With the reinforcement 64 positioning the through hole 611 and the filling layer 62 supporting the main body 61, the film pasting mechanism 5 first accurately sticks the film 65 on the main body 61, and then accurately presses the reinforcement 64 into the installation hole.

[0096] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by the terms "front and back", "left and right", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or component referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the invention.

[0097] Of course, in the present technical solution, those skilled in the art should understand that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.

[0098] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art under the technical guidance of the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. An efficient molding production line for reinforced and toughened PVC edge banding, characterized in that: include: A conveying mechanism, a forming mechanism, a punching mechanism, a filling mechanism and a film pasting mechanism sequentially arranged along the conveying direction of the conveying mechanism, wherein the forming mechanism is used to form the body of the edge banding strip and the filling groove and the connecting teeth on the body, the punching mechanism is used to punch a plurality of through holes connected to the filling groove on the body and a plurality of mounting holes connected to the filling groove on the connecting teeth, the filling mechanism is used to fill the through holes with a reinforcing member to support the filling groove and then fill the filling layer in the filling groove, and the film pasting mechanism is used to cooperate with the positioning of the reinforcing member to paste the film on the outer wall of the body and then install the reinforcing member in the mounting hole through the notch on the filling layer; The edge banding strip includes the body, the filling layer filled in the filling groove on the body, a through hole connected to the filling groove, the connecting teeth arranged on the body and used for clamping the plate, the reinforcing member arranged in the mounting groove on the connecting teeth and used for reinforcing the strength of the connecting teeth, and a film adhered to the surface of the body; The punching mechanism comprises a first annular knife movably arranged on the outside of the body and used to punch the mounting hole and one of the through holes arranged coaxially with the mounting hole, a plurality of second annular knives movably arranged on the outside of the body and used to punch a plurality of through holes at intervals on both sides of the through hole punched by the first annular knife, and a negative pressure tube connected to the first annular knife and the second annular knife and used to suck out waste materials inside the two. The filling mechanism comprises a first filling component disposed between the first annular knife and the second annular knife and used to fill the reinforcing member in the through hole punched by the first annular knife, a conveying component having one end disposed between the first filling component and the second annular knife and used to connect and convey the reinforcing member, and a second filling component disposed behind the second annular knife and used to fill the filling layer in the filling groove; The conveying mechanism includes a frame, a support plate disposed on the frame and used to support the body, a pushing plate movably disposed on the forming mechanism and used to push the body to the support plate, and a plurality of conveying rollers disposed on both sides of the support plate and used to connect the connecting teeth to convey the body; The first filling assembly includes a hopper disposed on the frame and used to store the reinforcement member, a discharge roller with one end connected to the conveying roller and the other end extending to just below the discharge port on the hopper and having a discharge groove on the outer annular surface, a positioning plate disposed on the hopper and used to position the reinforcement member in the discharge groove in cooperation with the rotation of the discharge roller, and a first pressing column movably disposed on the frame and used to press the positioned reinforcement member into the through hole; The conveying assembly includes two conveying belts arranged outside the body and used to convey the reinforcement in the same direction, and clamping grooves arranged at intervals on the two conveying belts and used to clamp and position the reinforcement; The second filling mechanism includes a first unwinding roller rotatably disposed on the conveying mechanism and used for carrying the filling layer roll, a first clamping component movably disposed on the conveying mechanism and used for clamping and pulling out the filling layer on the first unwinding roller, a positioning pin movably disposed on the conveying mechanism and positioning one end of the filling layer through the through hole, a comparing component disposed on the conveying mechanism and used for comparing whether the filling layer is installed in place, and a first cutter movably disposed on the conveying mechanism and used for cutting the filling layer installed in place.

2. The high-efficiency molding production line of reinforced and toughened PVC edge banding according to claim 1, characterized in that: The film-sticking mechanism includes a glue-coating component arranged on the conveying mechanism and used to convey the film and apply glue on the film at the same time, a film-sticking component arranged on the conveying mechanism and used to cooperate with the reinforcement to accurately stick the film on the main body, and a pressing component arranged on the conveying mechanism and used to push the reinforcement into the mounting hole.

3. The high-efficiency molding production line of reinforced and toughened PVC edge banding according to claim 2, characterized in that: The glue coating assembly includes a second unwinding roller rotatably arranged on the conveying mechanism and used for carrying the film roll, a second clamping assembly movably arranged on the conveying mechanism and used for clamping and pulling out the film on the second unwinding roller, a second cutter movably arranged on the conveying mechanism and used for cutting the film, a first rotating shaft rotatably arranged on the conveying mechanism, two glue pot assemblies arranged on the first rotating shaft, a delivery tank arranged on the conveying mechanism and used for delivering a cleaning agent into one of the glue pot assemblies, a second rotating shaft rotatably arranged on the conveying mechanism, a cleaning brush and a wiping member movably arranged on the second rotating shaft, wherein the cleaning brush is used to cooperate with the cleaning agent to clean the inside of the glue pot assembly, and the wiping member is used to wipe the cleaning agent inside the glue pot assembly.

4. The high-efficiency molding production line for reinforced and toughened PVC edge banding according to claim 2, characterized in that: The film sticking assembly includes two first film sticking rollers rotatably arranged on both sides of the reinforcement and used to stick the two sides of the film to the two sides of the outer wall of the body away from the connecting teeth, two bending plates rotatably arranged on both sides of the body and used to bend the two sides of the film, two second film sticking rollers rotatably arranged on both sides of the connecting teeth and used to stick the bent film to the outer wall of the body close to the connecting teeth, and a third film sticking roller arranged at the rear of the pressing assembly and used to press the film of the body away from the middle of the outer wall of the connecting teeth after the pressing assembly presses the reinforcement into the mounting hole; The pressing assembly includes two positioning grippers movably arranged on the conveying mechanism and used for positioning the reinforcement, and a second pressing column movably arranged on the conveying mechanism and used for pressing the positioned reinforcement into the mounting hole.

5. The high-efficiency molding production line for reinforced and toughened PVC edge banding according to claim 1, characterized in that: The molding mechanism includes an extruder, a molding groove connected to the extruder outlet and having the same outer contour as the main body, a molding column arranged in the molding groove and used for molding the filling groove, and a cooling pool arranged outside the molding groove and used for cooling the main body.

6. The molding process of the high-efficiency molding production line for reinforced and toughened PVC edge banding according to any one of claims 1 to 5 comprises the following steps: Step 1: a molding process, in which the PVC material is put into the molding mechanism to mold the body with the filling groove and the connecting teeth, and the body is molded onto the conveying mechanism; Step 2: a punching process, wherein the conveying mechanism conveys the body to the punching mechanism and punches the through hole and the mounting hole on the body through the punching mechanism; Step 3: a filling process, wherein the conveying mechanism conveys the punched body to the filling mechanism and the reinforcing member is first filled in the through hole through the filling mechanism to support the filling groove, and then the filling layer is filled in the filling groove through the filling mechanism; Step 4: Film pasting process, the conveying mechanism conveys the main body filled with the filling layer to the film pasting mechanism, and with the reinforcement member positioning the through hole and the filling layer supporting the main body, the film pasting mechanism first accurately sticks the film on the main body, and then accurately presses the reinforcement member into the mounting hole.