A monitoring method and system for recycled concrete with graded distribution
By sampling and testing of recycled concrete and regularly monitoring and testing, combining use information and preset monitoring period determination database, the problem of incomplete monitoring after use of recycled concrete is solved, the safety of use and comprehensive supervision of recycled concrete is improved, and the recycled concrete is ensured. The performance and purpose of the standard are in compliance with the standards.
Patent Information
- Application Number
- CN202410308930.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-03-19
AI Technical Summary
The lack of targeted monitoring of recycled concrete in the grading after use, resulting in incomplete supervision of safety and compliance with standards, and the inability to effectively ensure the effectiveness of recycled concrete.
By sampling and testing the recycled concrete, the detection data and purpose information are obtained, the monitoring period is determined based on the preset monitoring period determination library, and the target facilities are regularly monitored and tested within this period. The preferred update of the monitoring period determination library is to improve monitoring Accuracy and comprehensiveness.
It improves the safety of recycled concrete and the comprehensive supervision of whether it meets the standards, ensures that the performance and use of recycled concrete meet the standards, and extends its service life and reliability.
Smart Images

Figure CN118243497B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of concrete preparation and application, and in particular to a monitoring method and system for recycled concrete with graded concrete. Background Art
[0002] Recycled concrete technology is of great significance to resource conservation, energy and environmental protection. It can not only reduce costs, but also solve the problems of urban construction waste stacking, land occupation and environmental pollution, realize the material recycling of the concrete industry, and ensure the sustainable development of the construction industry.
[0003] Recycled concrete with graded composition uses waste concrete generated during the construction, reconstruction, and demolition of road traffic projects to make recycled aggregates. Based on the research on graded composition, the recycled concrete is optimized and the mix design is carried out to improve the performance of recycled concrete in order to absorb a large amount of construction waste. At the same time, in view of the current shortage of sand and gravel in the concrete industry, the source of concrete raw materials used in road traffic projects is solved, the cost of concrete is reduced, and the engineering application of recycled concrete is promoted.
[0004] However, after the recycled concrete with graded composition is used to build facilities, there is a lack of targeted monitoring based on the performance of the recycled concrete itself and the purpose of the recycled concrete, resulting in a lack of more comprehensive supervision on the safety of the use of recycled concrete and whether the use meets the standards. Therefore, a solution is urgently needed. Summary of the invention
[0005] The present invention provides a monitoring method and system for recycled concrete with graded distribution, which performs targeted monitoring based on the performance of the recycled concrete itself and the purpose of the recycled concrete, thereby improving the safety of the use of the recycled concrete and ensuring more comprehensive supervision of whether the use of the recycled concrete meets the standards.
[0006] The present invention provides a monitoring method for recycled concrete with graded concrete, comprising:
[0007] Sampling of graded recycled concrete;
[0008] Test the sampled materials and obtain test data;
[0009] Obtain information on the uses of recycled concrete;
[0010] Determine the monitoring period based on the detection data, usage information and a preset monitoring period determination library;
[0011] During the monitoring period, regular monitoring and inspection shall be carried out on the target facilities constructed using recycled concrete.
[0012] Preferably, the monitoring method for recycled concrete with graded distribution also includes:
[0013] Update and expand the monitoring period determination library.
[0014] Preferably, the monitoring period determination library is updated and expanded, including:
[0015] Obtain multiple applicable scenarios for monitoring period determination library;
[0016] Based on multiple applicable scenarios and a preset complete applicable scenario comparison table, determine at least one missing scenario;
[0017] Based on the preset feature extraction template, feature extraction is performed on the missing situation to obtain multiple feature values;
[0018] Generate a template based on event search conditions, and generate event search conditions based on multiple feature values;
[0019] Based on the event search conditions, multiple abnormal events of recycled concrete use construction are searched online;
[0020] Obtain the credibility of each abnormal event of recycled concrete use construction;
[0021] The corresponding i-th abnormal event of recycled concrete use construction is traversed in descending order of credibility; wherein i=1, 2, ..., N, N is the total number of abnormal events of recycled concrete use construction;
[0022] During each traversal, based on the preset information extraction template, the candidate monitoring period is extracted from the currently traversed i-th recycled concrete use construction abnormal event;
[0023] Determine whether the calculation trigger condition is currently met;
[0024] When the condition is met, a plurality of historical candidate monitoring periods extracted when traversing each abnormal construction event of the i-th recycled concrete use are obtained;
[0025] The average of the candidate monitoring period and multiple historical candidate monitoring periods is used as the monitoring period.
[0026] Preferably, the calculation trigger condition includes:
[0027] The sum of the credibility of each abnormal event of using recycled concrete in history is greater than or equal to the preset credibility and threshold;
[0028] and / or,
[0029] The credibility of the currently traversed i-th recycled concrete use construction abnormal event is greater than the preset credibility threshold and is closest to the credibility threshold.
[0030] Preferably, obtaining the credibility of each abnormal event of recycled concrete use construction includes:
[0031] The abnormal construction event of recycled concrete use is represented on a preset time axis to obtain a plurality of event items distributed and set on the time axis;
[0032] Get the event type of each event item;
[0033] When the event type exists in the preset standard event type library, the corresponding event item is used as the target event item;
[0034] Determine multiple sampling intervals; the sampling intervals include: the time interval between the first and last target event items of any three consecutive target event items on the time axis;
[0035] Traverse each sampling interval in turn;
[0036] During each traversal, two sampling frames are controlled to start from the target event item in the middle of the traversed sampling interval and sample at both sides at a preset sampling speed;
[0037] Get the event items sampled by 2 sampling frames;
[0038] When the event items sampled by the two sampling frames meet the sampling conditions, they are counted at the preset target value;
[0039] After the sampling interval is traversed, the count sum of the target value is used as the credibility.
[0040] The present invention provides a monitoring system for recycled concrete with graded concrete, comprising:
[0041] Sampling module, used for sampling the graded recycled concrete;
[0042] A detection module is used to detect the sample and obtain the detection data;
[0043] An acquisition module, used for acquiring usage information of recycled concrete;
[0044] A determination module, for determining a monitoring period based on the detection data, the usage information and a preset monitoring period determination library;
[0045] The monitoring module is used to perform regular monitoring and detection on target facilities constructed using recycled concrete within a monitoring period.
[0046] Preferably, the monitoring system for recycled concrete with graded distribution also includes:
[0047] An update module is used to update and expand the monitoring period determination library.
[0048] Preferably, the updating module updates and expands the monitoring period determination library, including:
[0049] Obtain multiple applicable scenarios for monitoring period determination library;
[0050] Based on multiple applicable scenarios and a preset complete applicable scenario comparison table, determine at least one missing scenario;
[0051] Based on the preset feature extraction template, feature extraction is performed on the missing situation to obtain multiple feature values;
[0052] Generate a template based on event search conditions, and generate event search conditions based on multiple feature values;
[0053] Based on the event search conditions, multiple abnormal events of recycled concrete use construction are searched online;
[0054] Obtain the credibility of each abnormal event of recycled concrete use construction;
[0055] The corresponding i-th abnormal event of recycled concrete use construction is traversed in descending order of credibility; wherein i=1, 2, ..., N, N is the total number of abnormal events of recycled concrete use construction;
[0056] During each traversal, based on the preset information extraction template, the candidate monitoring period is extracted from the currently traversed i-th recycled concrete use construction abnormal event;
[0057] Determine whether the calculation trigger condition is currently met;
[0058] When the condition is met, a plurality of historical candidate monitoring periods extracted when traversing each abnormal construction event of the i-th recycled concrete use are obtained;
[0059] The average of the candidate monitoring period and multiple historical candidate monitoring periods is used as the monitoring period.
[0060] Preferably, the calculation trigger condition includes:
[0061] The sum of the credibility of each abnormal event of using recycled concrete in history is greater than or equal to the preset credibility and threshold;
[0062] and / or,
[0063] The credibility of the currently traversed i-th recycled concrete use construction abnormal event is greater than the preset credibility threshold and is closest to the credibility threshold.
[0064] Preferably, the updating module obtains the credibility of each abnormal event of using recycled concrete to build, including:
[0065] The abnormal construction event of recycled concrete use is represented on a preset time axis to obtain a plurality of event items distributed and set on the time axis;
[0066] Get the event type of each event item;
[0067] When the event type exists in the preset standard event type library, the corresponding event item is used as the target event item;
[0068] Determine multiple sampling intervals; the sampling intervals include: the time interval between the first and last target event items of any three consecutive target event items on the time axis;
[0069] Traverse each sampling interval in turn;
[0070] During each traversal, two sampling frames are controlled to start from the target event item in the middle of the traversed sampling interval and sample at both sides at a preset sampling speed;
[0071] Get the event items sampled by 2 sampling frames;
[0072] When the event items sampled by the two sampling frames meet the sampling conditions, they are counted at the preset target value;
[0073] After the sampling interval is traversed, the count sum of the target value is used as the credibility.
[0074] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.
[0075] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0077] Figure 1 It is a flow chart of a monitoring method for recycled concrete with graded distribution according to an embodiment of the present invention;
[0078] Figure 2 The figure is a schematic diagram of a monitoring system for recycled concrete with graded concrete according to an embodiment of the present invention. DETAILED DESCRIPTION
[0079] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0080] The present invention provides a monitoring method for recycled concrete with graded concrete, such as Figure 1 As shown, including:
[0081] S1. Sampling of graded recycled concrete;
[0082] S2. Test the sampled materials and obtain test data;
[0083] S3, obtaining usage information of recycled concrete;
[0084] S4, determining the monitoring period based on the detection data, usage information and a preset monitoring period determination library;
[0085] S5. Conduct regular monitoring and inspection of target facilities constructed using recycled concrete during the monitoring period.
[0086] After the recycled concrete is manufactured based on the classification and grading, it is sampled. Sampling refers to extracting an appropriate amount of recycled concrete as a sampling sample; the sampled sample is tested, specifically the compressive strength, axial compressive strength, tensile strength, etc., and the test results are compressive strength, axial compressive strength, tensile strength, etc.; the use information is the use and construction purpose of the recycled concrete, such as: pouring a layer plate with a certain weight, etc.; the monitoring period determination library has monitoring periods corresponding to different test data and different use information; the monitoring period determination library can be set up by technical personnel according to the monitoring period of recycled concrete with different test data and different use information; after the monitoring period is determined, the target facilities constructed by the use of recycled concrete are regularly monitored and tested within the monitoring period. This application conducts targeted monitoring based on the performance of the recycled concrete itself and the use of the recycled concrete, so as to improve the safety of the use of recycled concrete and whether the use meets the standards and make the supervision more comprehensive.
[0087] In one embodiment, the monitoring method for recycled concrete with graded distribution further includes:
[0088] Update and expand the monitoring period determination library.
[0089] The monitoring period determination library can be updated and expanded to improve the ability of the monitoring period determination library to determine the monitoring period, thereby improving the accuracy and comprehensiveness of the monitoring period determination.
[0090] In one embodiment, the monitoring period determination library is updated and expanded, including:
[0091] Obtain multiple applicable scenarios for monitoring period determination library;
[0092] Based on multiple applicable scenarios and a preset complete applicable scenario comparison table, determine at least one missing scenario;
[0093] Based on the preset feature extraction template, feature extraction is performed on the missing situation to obtain multiple feature values;
[0094] Generate a template based on event search conditions, and generate event search conditions based on multiple feature values;
[0095] Based on the event search conditions, multiple abnormal events of recycled concrete use construction are searched online;
[0096] Obtain the credibility of each abnormal event of recycled concrete use construction;
[0097] The corresponding i-th abnormal event of recycled concrete use construction is traversed in descending order of credibility; wherein i=1, 2, ..., N, N is the total number of abnormal events of recycled concrete use construction;
[0098] During each traversal, based on the preset information extraction template, the candidate monitoring period is extracted from the currently traversed i-th recycled concrete use construction abnormal event;
[0099] Determine whether the calculation trigger condition is currently met;
[0100] When the condition is met, a plurality of historical candidate monitoring periods extracted when traversing each abnormal construction event of the i-th recycled concrete use are obtained;
[0101] The average of the candidate monitoring period and multiple historical candidate monitoring periods is used as the monitoring period. At this time, the traversal of the abnormal construction event of the i-th recycled concrete use is also stopped;
[0102] Applicable situations include: the monitoring period determination library has set up the detection data and usage information corresponding to the monitoring period; the complete applicable situation comparison table contains detection data and usage information with different numerical combinations; by comparing and contrasting the applicable situation with the complete applicable situation comparison table, the missing situation can be determined, that is, the monitoring period determination library has not set up the detection data and usage information corresponding to the monitoring period; the characteristic value includes: the specific value of the missing situation; the event search condition is generated according to multiple characteristic values, and the abnormal events of recycled concrete use and construction found can be limited to those related to the missing situation; the abnormal event of recycled concrete use and construction is an event in which the recycled concrete with different detection data and different usage information has abnormalities after being put into use in history; when traversing the i-th abnormal event of recycled concrete use and construction, the i-th abnormal event of recycled concrete use and construction records how long after the recycled concrete is put into use, and the time can be extracted as the candidate monitoring period; when the calculation trigger condition is currently met, it indicates the timing of entering the calculation to determine the monitoring period, and multiple historical candidate monitoring periods extracted when traversing each i-th abnormal event of recycled concrete use and construction in history are obtained, and the average value of the candidate monitoring period and multiple historical candidate monitoring periods is used as the monitoring period. When updating and expanding the monitoring period determination library, credibility is introduced, and the corresponding abnormal construction event of recycled concrete use is traversed in order from large to small credibility. When the calculation trigger condition is currently met, the average of the candidate monitoring period and multiple historical candidate monitoring periods is used as the monitoring period, which improves the efficiency and accuracy of updating and expanding the monitoring period determination library. In addition, the introduction of calculation trigger conditions improves the work efficiency of the system.
[0103] In one embodiment, calculating the trigger condition includes:
[0104] The sum of the credibility of each i-th recycled concrete use construction abnormal event traversed in history is greater than or equal to the preset credibility and threshold; the credibility and threshold can be, for example, 30; when this calculation trigger condition is met, it means that the overall credibility of enough recycled concrete use construction abnormal events is high, and the monitoring period can be calculated;
[0105] and / or,
[0106] The credibility of the currently traversed i-th recycled concrete use construction abnormal event is greater than the preset credibility threshold and is closest to the credibility threshold. When this calculation trigger condition is met, it means that the credibility of the recycled concrete use construction abnormal event traversed later is low, and the monitoring period can be calculated.
[0107] In one embodiment, obtaining the credibility of each abnormal event of recycled concrete use construction includes:
[0108] The abnormal event of recycled concrete use construction is represented on a preset time axis to obtain multiple event items distributed and set on the time axis; the abnormal event of recycled concrete use construction will include event contents occurring at multiple time points, and the event contents are set at the time nodes corresponding to the event points on the event axis to form event items;
[0109] Get the event type of each event item;
[0110] When the event type exists in the preset standard event type library, the corresponding event item is used as the target event item; there are a large number of standard event types in the standard event type library. Other event items that reflect the credibility of abnormal events in the use of recycled concrete construction may exist near the time when the event items of the standard event type are generated, such as abnormal update events (there may be information about personnel who perform abnormal updates before and after the time when this type of event is generated, etc.);
[0111] Determine multiple sampling intervals; the sampling intervals include: the time interval between the first and last target event items of any three consecutive target event items on the time axis;
[0112] Traverse each sampling interval in turn;
[0113] During each traversal, two sampling frames are controlled to start from the middle target event item in the traversed sampling interval and simultaneously sample at a preset sampling speed to both sides; the middle target event item is the middle target event item among three consecutive target event items; the sampling speed can be set in advance by the technician;
[0114] Get the event items sampled by 2 sampling frames;
[0115] When the event items sampled by the two sampling frames meet the sampling conditions, they are counted at the preset target value; the sampling condition is that the event items sampled by the two sampling frames can reflect the abnormal events of recycled concrete construction, for example, the personnel information of the abnormal update indicates that the personnel is a certified person; the target value can be, for example, 3;
[0116] After the sampling interval is traversed, the count sum of the target value is used as the credibility.
[0117] When obtaining the credibility of each abnormal event in the construction of recycled concrete, the timeline is introduced. First, the target event item is found, and then the sampling interval is constructed. Two sampling frames are used for sampling. According to the situation that the event items sampled by the two sampling frames meet the sampling conditions, the target value is counted in a triggered manner. Finally, the credibility is determined, which improves the accuracy, efficiency and comprehensiveness of credibility determination.
[0118] The present invention provides a monitoring system for recycled concrete with graded concrete, such as Figure 2 As shown, including:
[0119] Sampling module 1, used for sampling the graded recycled concrete;
[0120] Detection module 2, used to detect the sample and obtain detection data;
[0121] An acquisition module 3 is used to obtain usage information of recycled concrete;
[0122] A determination module 4, configured to determine the monitoring period based on the detection data, the usage information and the preset monitoring period determination library;
[0123] The monitoring module 5 is used to regularly monitor and inspect the target facilities constructed using recycled concrete within the monitoring period.
[0124] The monitoring system for recycled concrete with graded concrete also includes:
[0125] An update module is used to update and expand the monitoring period determination library.
[0126] The update module updates and expands the monitoring period determination library, including:
[0127] Obtain multiple applicable scenarios for monitoring period determination library;
[0128] Based on multiple applicable scenarios and a preset complete applicable scenario comparison table, determine at least one missing scenario;
[0129] Based on the preset feature extraction template, feature extraction is performed on the missing situation to obtain multiple feature values;
[0130] Generate a template based on event search conditions, and generate event search conditions based on multiple feature values;
[0131] Based on the event search conditions, multiple abnormal events of recycled concrete use construction are searched online;
[0132] Obtain the credibility of each abnormal event of recycled concrete use construction;
[0133] The corresponding i-th abnormal event of recycled concrete use construction is traversed in descending order of credibility; wherein i=1, 2, ..., N, N is the total number of abnormal events of recycled concrete use construction;
[0134] During each traversal, based on the preset information extraction template, the candidate monitoring period is extracted from the currently traversed i-th recycled concrete use construction abnormal event;
[0135] Determine whether the calculation trigger condition is currently met;
[0136] When the condition is met, a plurality of historical candidate monitoring periods extracted when traversing each abnormal construction event of the i-th recycled concrete use are obtained;
[0137] The average of the candidate monitoring period and multiple historical candidate monitoring periods is used as the monitoring period.
[0138] Calculation trigger conditions include:
[0139] The sum of the credibility of each abnormal event of using recycled concrete in history is greater than or equal to the preset credibility and threshold;
[0140] and / or,
[0141] The credibility of the currently traversed i-th recycled concrete use construction abnormal event is greater than the preset credibility threshold and is closest to the credibility threshold.
[0142] The update module obtains the credibility of each abnormal event of recycled concrete use construction, including:
[0143] The abnormal construction event of recycled concrete use is represented on a preset time axis to obtain a plurality of event items distributed and set on the time axis;
[0144] Get the event type of each event item;
[0145] When the event type exists in the preset standard event type library, the corresponding event item is used as the target event item;
[0146] Determine multiple sampling intervals; the sampling intervals include: the time interval between the first and last target event items of any three consecutive target event items on the time axis;
[0147] Traverse each sampling interval in turn;
[0148] During each traversal, two sampling frames are controlled to start from the target event item in the middle of the traversed sampling interval and sample at both sides at a preset sampling speed;
[0149] Get the event items sampled by 2 sampling frames;
[0150] When the event items sampled by the two sampling frames meet the sampling conditions, they are counted at the preset target value;
[0151] After the sampling interval is traversed, the count sum of the target value is used as the credibility.
[0152] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A monitoring method for recycled concrete with graded concrete, characterized in that: include: Sampling of graded recycled concrete; Test the sampled materials and obtain test data; Obtaining usage information of the recycled concrete; Determining a monitoring period based on the detection data, the usage information, and a preset monitoring period determination library; Conduct regular monitoring and testing of the target facilities constructed using the recycled concrete within the monitoring period; The monitoring method further comprises: Updating and expanding the monitoring period determination library; Among them, the monitoring period determination library is updated and expanded, including: Obtain multiple applicable scenarios for monitoring period determination library; Based on multiple applicable scenarios and a preset complete applicable scenario comparison table, determine at least one missing scenario; Based on the preset feature extraction template, feature extraction is performed on the missing situation to obtain multiple feature values; Generate a template based on event search conditions, and generate event search conditions based on multiple feature values; Based on the event search conditions, multiple abnormal events of recycled concrete use construction are searched online; Obtain the credibility of each abnormal event of recycled concrete use construction; The corresponding abnormal events of recycled concrete use and construction are traversed in order from large to small in terms of credibility; wherein i=1,2,…,N, where N is the total number of abnormal events of recycled concrete use and construction; Each time the traversal is performed, based on the preset information extraction template, the candidate monitoring period is extracted from the i-th recycled concrete use construction abnormality event currently traversed; wherein, when the i-th recycled concrete use construction abnormality event is traversed, the i-th recycled concrete use construction abnormality event records how long after the recycled concrete is put into use the abnormality occurs, and the time is extracted as the candidate monitoring period; Determine whether the calculation trigger condition is currently met; When the condition is met, a plurality of historical candidate monitoring periods extracted when traversing each abnormal construction event of the i-th recycled concrete use are obtained; The monitoring period to be selected and the average value of multiple historical monitoring periods to be selected are used as the monitoring period; Among them, the credibility of each abnormal event of recycled concrete use construction is obtained, including: The abnormal construction event of recycled concrete use is represented on a preset time axis to obtain a plurality of event items distributed and set on the time axis; Get the event type of each event item; When the event type exists in the preset standard event type library, the corresponding event item is used as the target event item; Determine multiple sampling intervals; the sampling intervals include: the time interval between the first and last target event items of any three consecutive target event items on the time axis; Traverse each sampling interval in turn; During each traversal, two sampling frames are controlled to start from the target event item in the middle of the traversed sampling interval and sample at both sides at a preset sampling speed; Get the event items sampled by 2 sampling frames; When the event items sampled by the two sampling frames meet the sampling conditions, they are counted at the preset target value; After the sampling interval is traversed, the count sum of the target value is used as the credibility.
2. A monitoring method for recycled concrete with graded concrete as claimed in claim 1, characterized in that: Calculation trigger conditions include: The sum of the credibility of each abnormal event of using recycled concrete in history is greater than or equal to a preset credibility sum threshold; and / or, The credibility of the currently traversed i-th recycled concrete use construction abnormal event is greater than the preset credibility threshold and is closest to the credibility threshold.
3. A monitoring system for recycled concrete with graded concrete, characterized in that: include: Sampling module, used for sampling the graded recycled concrete; A detection module is used to detect the sample and obtain the detection data; An acquisition module, used to acquire usage information of the recycled concrete; A determination module, configured to determine a monitoring period based on the detection data, the usage information and a preset monitoring period determination library; A monitoring module, used for regularly monitoring and testing the target facility constructed using the recycled concrete within the monitoring period; The monitoring system also includes: An updating module, used for updating and expanding the monitoring period determination library; The update module updates and expands the monitoring period determination library, including: Obtain multiple applicable scenarios for monitoring period determination library; Based on multiple applicable scenarios and a preset complete applicable scenario comparison table, determine at least one missing scenario; Based on the preset feature extraction template, feature extraction is performed on the missing situation to obtain multiple feature values; Generate a template based on event search conditions, and generate event search conditions based on multiple feature values; Based on the event search conditions, multiple abnormal events of recycled concrete use construction are searched online; Obtain the credibility of each abnormal event of recycled concrete use construction; The corresponding abnormal events of recycled concrete use and construction are traversed in order from large to small in terms of credibility; wherein i=1,2,…,N, where N is the total number of abnormal events of recycled concrete use and construction; Each time the traversal is performed, based on the preset information extraction template, the candidate monitoring period is extracted from the i-th recycled concrete use construction abnormality event currently traversed; wherein, when the i-th recycled concrete use construction abnormality event is traversed, the i-th recycled concrete use construction abnormality event records how long after the recycled concrete is put into use the abnormality occurs, and the time is extracted as the candidate monitoring period; Determine whether the calculation trigger condition is currently met; When the condition is met, a plurality of historical candidate monitoring periods extracted when traversing each abnormal construction event of the i-th recycled concrete use are obtained; The monitoring period to be selected and the average value of multiple historical monitoring periods to be selected are used as the monitoring period; The update module obtains the credibility of each abnormal event of recycled concrete use construction, including: The abnormal construction event of recycled concrete use is represented on a preset time axis to obtain a plurality of event items distributed and set on the time axis; Get the event type of each event item; When the event type exists in the preset standard event type library, the corresponding event item is used as the target event item; Determine multiple sampling intervals; the sampling intervals include: the time interval between the first and last target event items of any three consecutive target event items on the time axis; Traverse each sampling interval in turn; During each traversal, two sampling frames are controlled to start from the target event item in the middle of the traversed sampling interval and sample at both sides at a preset sampling speed; Get the event items sampled by 2 sampling frames; When the event items sampled by the two sampling frames meet the sampling conditions, they are counted at the preset target value; After the sampling interval is traversed, the count sum of the target value is used as the credibility.
4. A monitoring system for recycled concrete with graded concrete as claimed in claim 3, characterized in that: Calculation trigger conditions include: The sum of the credibility of each abnormal event of using recycled concrete in history is greater than or equal to a preset credibility sum threshold; and / or, The credibility of the currently traversed i-th recycled concrete use construction abnormal event is greater than the preset credibility threshold and is closest to the credibility threshold.