A centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair

By designing a centrifugal model test device that simulates pipeline damage-induced subsidence and repair, the problem of research on the subsidence mechanism induced by underground pipeline damage has been solved, the simulation of pipeline damage evolution and repair under hypergravity conditions has been achieved, and effective soil compensation has been provided. Qianghe's grouting repair solution improves the scientificity and feasibility of pipeline damage repair.

CN118243514BActive Publication Date: 2024-10-08ZHEJIANG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311680677.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-08
Publication Date
2024-10-08
Estimated Expiration
2043-12-08

AI Technical Summary

Technical Problem

Existing technology makes it difficult to effectively study and monitor the subsidence catastrophic mechanism induced by underground pipeline damage, especially the seepage erosion process under the coupling effect of water-soil-pipeline, and there is a lack of effective methods for repairing damage to large-diameter and deep-buried pipelines.

Method used

Design a centrifugal model test device that simulates pipeline damage-induced subsidence and repair, including a model box, a compartment separation structure, a half-pipeline model, a data acquisition system, a servo control system, a pipeline damage/reinforcement simulation system and a trenchless system. The grouting repair simulation system can simulate the pipeline damage evolution and repair process under real stress conditions under hypergravity conditions.

Benefits of technology

This device can reveal the relationship between pore water pressure, soil pressure, erosion rate and damage evolution and subsidence disaster, provide soil reinforcement solutions after pipeline damage repair, expand the application scenarios of model tests, and realize pipeline damage reinforcement Simulation methods for rehabilitation and trenchless grouting rehabilitation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118243514B_ABST
    Figure CN118243514B_ABST
Patent Text Reader

Abstract

The present invention discloses a centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair, and belongs to the field of civil engineering. The model device includes a model box, a half-pipeline model, a data acquisition system, a servo control system, a pipeline damage / reinforcement simulation system, and a non-excavation grouting repair simulation system. The present invention can simulate the seepage of damaged openings at any position on the upper part of pipelines with different cross-sections; through the pipeline damage / reinforcement simulation system, the damage evolution and reinforcement simulation of pipelines with regular cross-sections are realized; a non-excavation grouting repair simulation system is designed to simulate the pipeline damage grouting repair process; a submersible pump-three-way valve linkage device is used to realize water level control; the centrifugal model test device provided by the present invention utilizes the scale effect and time reduction effect of the centrifugal supergravity physical simulation test to reproduce the pipeline damage evolution-induced ground subsidence disaster and repair process under the real stress level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of civil engineering, and in particular relates to a centrifugal model test device for simulating ground subsidence induced by pipeline damage and repairing the same. Background Art

[0002] Drainage pipes, communication pipes, traffic tunnels and other pipelines are scattered throughout the urban underground space, ensuring the smooth realization of basic urban functions. However, due to manufacturing and construction defects, long-term service and aging of pipelines, ground overload and other factors, the pipe wall will be damaged to varying degrees. In areas with abundant rainfall or high groundwater levels, if the damage is not discovered and repaired in time, the surrounding soil particles will seep into the pipe under the action of hydraulic force. At the same time, the process of water and soil seepage erosion will promote the expansion and deterioration of the damaged mouth, thereby promoting the process of water and soil seepage, accelerating the loss of soil around the damaged pipe, and reducing the contact strength between soil particles, which will lead to ground subsidence and even ground collapse. Because the pipeline is buried underground and distributed linearly, the disaster induced by pipeline damage is generally not easy to be monitored and has a strong concealment. In addition, the collapse after the loss of soil occurs suddenly, which is often very destructive and can easily cause damage to nearby buildings. Even if pipeline damage is discovered in time and reasonable measures are taken to reinforce and repair it, the residual performance of the soil around the pipe after seepage erosion is very different from that of the original soil layer. Further research is needed to make a reinforcement and repair plan for the residual soil around the pipe.

[0003] For the repair of pipeline damage with large diameter and deep burial depth, trenchless repair technology is often used due to the long pipeline relocation cycle and high cost. Grouting is one of the most widely used technologies. For the repair of damaged pipelines by grouting, such as grouting location, slurry selection, repair effect evaluation, and repair scheme comparison, in-depth research is needed under real stress conditions. Therefore, there is an urgent engineering need to design a corresponding model test device to study the relationship between pipeline damage evolution and repair and water and soil seepage erosion.

[0004] The mechanism of pipeline damage-induced ground subsidence disaster is the result of water-soil-pipeline coupling, which is more complicated than the traditional foundation instability mechanism and soil internal erosion mechanism. However, the mechanism of water-soil-pipeline coupling-induced seepage erosion is still unclear, and no one has conducted in-depth physical model experiments to study its mechanism. Summary of the invention

[0005] In view of the above problems, the present invention proposes a centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair, which can restore the ultra-gravity centrifugal model test of pipeline damage-induced ground subsidence and damage repair under the actual stress level.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is:

[0007] A centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair, comprising a model box, a compartment partition structure, a half-pipeline model, a data acquisition system, a servo control system, a pipeline damage / reinforcement simulation system, and a non-excavation grouting repair simulation system;

[0008] The chamber partition structure is located inside the model box and matches the size of the model box. The chamber partition structure is a number of functional chambers divided by a partition plate, including a sand filling chamber, a seepage water chamber, a supply water chamber and a collection water chamber. The sand filling chamber and the collection water chamber are arranged in the upper and lower layers on the front side of the model box. The supply water chamber is located in the center of the rear side of the model box. The seepage water chamber is distributed in the upper layers on the left and right sides of the supply water chamber. The seepage water chamber is flush with the bottom of the sand filling chamber. The partition plate between the seepage water chamber and the sand filling chamber is perforated and provided with a seepage permeable membrane. Sand samples are laid in the sand filling chamber and soil pressure sensors and pore water pressure sensors are installed. A water pressure sensor is installed in the supply water chamber, and an ultrasonic liquid level sensor is installed in the collection water chamber. The supply water chamber and the seepage water chamber are connected through a submersible pump-three-way valve linkage device.

[0009] The semi-pipeline model is installed at the opening of the water-sand channel opened at the bottom of the sand filling bin, and a sand mining box with a permeable plate at the bottom is provided between the water-sand channel opening and the water collecting bin; a pipeline damage opening is provided at the top of the semi-pipeline model, and the water and sand in the sand filling bin flows into the sand mining box and the water collecting bin below in sequence after passing through the pipeline damage opening and the water-sand channel opening; the pipeline damage / reinforcement simulation system and the non-excavation grouting repair simulation system are installed on the inner wall of the semi-pipeline model, the pipeline damage / reinforcement simulation system is used to adjust the size of the pipeline damage opening horizontally and vertically, and the non-excavation grouting repair simulation system is used to grout the erosion area of ​​the pipeline damage opening, and the angle of the grouting pipe head used for grouting is adjustable;

[0010] The data acquisition system is used to collect soil pressure of sand and soil samples, pore water pressure, water pressure at the bottom of the replenishment water tank, liquid level of the collection water tank, surface settlement of sand and soil samples and grouting pressure.

[0011] Furthermore, a sand collecting box is provided between the water-sand channel opening and the water collecting tank.

[0012] Furthermore, the water collecting bin is divided into three parts, left, middle and right, by a partition plate provided with an overflow hole; the water collecting bin in the middle part is located directly below the opening of the water-sand channel, and when the water level in the water collecting bin in the middle part reaches the height of the overflow hole, it will flow to both sides through the overflow hole.

[0013] Furthermore, the semi-pipe model consists of a semi-pipe main body and an orifice plate with a broken pipe opening. The semi-pipe main body covers the opening of the water-sand channel. The top of the semi-pipe main body is provided with a stepped groove for installing the orifice plate. The orifice plate is installed on the stepped groove. A side wall connected to the broken pipe opening is provided with a hole side groove. A grouting pipe head channel connected to the hole side groove is provided in the orifice plate interlayer and the semi-pipe main body interlayer.

[0014] Furthermore, the front wall of the sand filling bin and the front plate of the model box of the bin partition structure are both provided with transparent windows.

[0015] Furthermore, a cover plate is provided directly above the sand filling bin, a centrally located 3D ToF sensor module and a circumferentially arranged fill light strip are provided in the cover plate, and the cover plate is installed in cooperation with the model box.

[0016] Furthermore, the pipeline damage / reinforcement simulation system includes an electric slide rail, an electric slider, an electric push rod, an active orifice adjustment block, a driven orifice adjustment block, a driven slider and a driven slide rail. The electric slide rail and the driven slide rail are transversely installed on the top inner side of the semi-pipe body, the electric push rod is installed on the electric slide rail through the electric slider, the electric push rod is connected to the active orifice adjustment block, and the telescopic direction of the electric push rod is vertical; the active orifice adjustment block is connected to the driven orifice adjustment block through a vertical slide groove, and the driven orifice adjustment block is installed on the driven slide rail through the driven slider; the driven orifice adjustment block can only move transversely, the active orifice adjustment block can move transversely and vertically, and the driven orifice adjustment block and the active orifice adjustment block can completely cover the damaged opening of the pipeline.

[0017] Furthermore, the trenchless grouting repair simulation system comprises a grouting repair module, a grouting machine and a grouting hose, wherein the grouting repair module is installed in a repair groove on the inner side of the top of the semi-pipe body, and the grouting machine is fixed to the lower layer of the rear side of the model box;

[0018] The grouting repair module comprises a grouting pipe head, a rotating blade, a steering gear, an electromagnetic push rod and a module housing. The electromagnetic push rod is fixedly installed in a repair groove on the inner side of the top of the semi-pipe body. The steering gear housing is connected to the electromagnetic push rod and limited by the module housing. The steering gear moves back and forth laterally towards / away from the damaged opening of the pipe under the push of the electromagnetic push rod. The rotating blade is installed on the rotating shaft of the steering gear. The inlet section of the grouting hose is connected to the grouting machine. The outlet section of the grouting hose is contracted in the hole side groove of the side wall of the damaged opening of the pipe after passing through the grouting pipe head channel. The middle section of the grouting hose is fixed on the rotating blade. When the electromagnetic push rod is extended, the outlet section of the grouting hose is translated from the hole side groove to the center line of the damaged opening of the pipe, and the outlet section of the grouting hose is driven to extend at a certain angle to the erosion damage area above the damaged opening of the pipe under the rotation of the steering gear.

[0019] Furthermore, the submersible pump-three-way valve linkage device includes a submersible pump, a three-way valve and a connecting water pipe. Several three-way valves of different heights are respectively arranged between the supply water tank and the seepage water tanks on both sides. The inlet and outlet of the three-way valve are respectively connected to the supply water tank and the seepage water tank on its corresponding side. A submersible pump is installed inside the supply water tank. The submersible pump is respectively connected to the reversing port of the three-way valve and the water inlet on the bottom side wall of the seepage water tank through a connecting water pipe. When the reversing port of the three-way valve is closed, it serves as an overflow hole, and water directly flows back from the seepage water tank to the supply water tank; when the reversing port of the three-way valve is opened, it serves as a water supply hole, and water flows from the supply water tank to the seepage water tank through the connecting water pipe, and the water inlet on the bottom side wall of the seepage water tank always serves as a water supply hole.

[0020] Furthermore, the centrifugal model test device controls the test process by a servo control system, and the servo control system includes a central control system, a servo control unit, a remote controller and a plurality of servo actuators, and the plurality of servo actuators are used to control the water level of the seepage water tank, the size of the damaged opening, the angle of the grouting pipe head, the grouting amount and the grouting pressure respectively.

[0021] Beneficial effects of the present invention:

[0022] The present invention is based on a centrifuge model test. The device can reveal the relationship between factors such as pore water pressure, soil pressure, erosion rate, damage evolution, damage repair and ground subsidence disasters under real stress states, the performance of residual eroded soil after pipeline damage repair, and guide soil reinforcement work after pipeline damage repair. Through damage evolution / repair and water level regulation, the triggering conditions, evolution laws and multiphase coupled seepage erosion mechanism of water-soil-pipeline damage are explored. At the same time, by utilizing the scale effect of the centrifuge and changing the hypergravity acceleration, a fixed-size half-pipeline model can simulate damaged pipelines of different sizes and different buried depths under real stress states, expanding the application scenarios of the model test. Specific beneficial effects include:

[0023] (1) The present invention innovatively proposes a simulation of pipeline damage evolution under hypergravity conditions. Through a pipeline damage / reinforcement simulation system combined with a servo control system, the lateral and vertical size adjustment process of the top damage opening of a square-section pipeline or other regular-section pipeline is simulated to study the water and soil erosion mechanism under the multiphase coupling of water-soil-pipeline damage evolution.

[0024] (2) The present invention innovatively proposes a simulation technology for pipeline damage reinforcement and repair under hypergravity conditions and a simulation method for trenchless pipeline damage grouting repair. The pipeline damage reinforcement and repair simulation technology uses a pipeline damage / reinforcement simulation system, combined with a servo control system, to control the sealing of the pipeline damage port, so as to study the residual properties and mechanical behavior of the soil around the pipe after pipeline damage reinforcement and repair, and provide a basis for pipeline reinforcement and repair evaluation and subsequent arrangements for pipeline reinforcement and repair work; the trenchless pipeline damage grouting repair simulation method realizes the simulation of grouting repair at the pipeline damage position through a trenchless grouting repair simulation system, and provides a physical model test method for slurry performance research, grouting repair scheme design, grouting effect evaluation, and other work.

[0025] (3) The present invention uses a submersible pump-three-way valve linkage device combined with a servo control system to flexibly control the direction and flow of water between the seepage water tank and the replenishment water tank, thereby adjusting and stabilizing the water level in the sand filling tank, and simulating the actual state of the groundwater level in different seasons and different regions under the action of supergravity.

[0026] (4) The present invention adopts a 3D ToF sensor module to generate an addressable laser array on the surface of the sand sample to measure the distance of each pixel, which can be used for surface displacement research and generate a 3D model of surface settlement, facilitating the visualization study of soil surface deformation. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 It is a schematic diagram of the overall structure of the test device provided by an embodiment of the present invention;

[0029] Figure 2 is a top view of a test device provided by an embodiment of the present invention;

[0030] Figure 3 is a schematic diagram of the internal structure of a model box provided by an embodiment of the present invention;

[0031] Figure 4 is a schematic diagram of a compartment partition structure provided by an embodiment of the present invention;

[0032] Figure 5 It is a rear side cross-sectional schematic diagram of the internal structure of the model box provided by an embodiment of the present invention;

[0033] Figure 6is a schematic diagram of a half-pipe model (rectangle) provided in an embodiment of the present invention;

[0034] Figure 7 is a schematic diagram of a pipeline damage / reinforcement simulation system provided by an embodiment of the present invention;

[0035] Figure 8 is a schematic diagram of grouting repair simulation provided by this experimental embodiment;

[0036] Fig. 9 Schematic diagram of a cover plate and a sand mining box provided in an embodiment of the present invention;

[0037] Fig.10 is a working schematic diagram of a three-way valve provided in an embodiment of the present invention;

[0038] Fig.11 It is a working principle diagram provided by an embodiment of the present invention;

[0039] In the figure: 1-model box, 101-box front plate, 1011-model box front window, 102 box back plate, 103-box left plate, 104-box right plate, 105-box bottom plate, 2-chamber partition structure, 201-back plate, 2011-pipeline channel, 202-bottom plate, 2021-side wall slot, 2022-water sand channel opening, 203-collecting water tank, 2031-overflow hole, 204-sand filling tank, 2041-filling tank transparent window, 2042-seepage permeable membrane, 205-seepage water tank, 206-supply water tank, 3-semi-pipeline model, 301-semi-pipeline body, 3011-grouting pipe head channel, 302-orifice plate, 3021-hole side groove, 4-data acquisition system, 401-data acquisition sensor group, 4011-3D ToF sensor module, 402-sand mining box, 4021-water-permeable plate at the bottom of the box, 403-image acquisition device, 4031-fill light strip, 5-submersible pump-three-way valve linkage device, 501-submersible pump, 502-three-way valve, 503-connecting water pipe, 6-cover plate, 7-pipeline damage / reinforcement simulation system, 701-electric slide rail, 702-electric slider, 703-electric push rod, 704-active orifice adjustment block, 705-driven orifice adjustment block, 706-driven slider, 707-driven slide rail, 708-waterproof rubber pad, 8-non-excavation grouting repair simulation system, 801-grouting repair module, 8011-grouting pipe head, 8012-rotating blades, 8013-servo, 8014-electromagnetic push rod, 8015-module housing, 802-grouting machine, 803-grouting hose. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] The present invention realizes pipeline damage evolution and repair control, water level regulation control, and combines the scale effect and time reduction effect of the physical model test under the action of centrifuge hypergravity. It can simulate the actual working conditions in a small scale and short time, restore the real stress state, and the interaction of water-soil-pipeline damage under working conditions such as damage evolution, reinforcement and repair after pipeline cracking, and seasonal changes in groundwater level. It reveals the evolution law of pore water pressure, seepage rate and soil deformation in the process of ground subsidence disaster induced by pipeline damage evolution, explores the water and soil seepage erosion and damage mechanism and the residual eroded soil layer performance after pipeline damage reinforcement and repair, and provides a simulation method for the process of repairing pipeline damage by non-excavation grouting under hypergravity conditions, which can be used for grouting scheme comparison and effect evaluation. At present, there is no device to realize the control and simulation of pipeline damage evolution, water level regulation and pipeline damage repair process. The present invention adopts pipeline damage / reinforcement simulation system, submersible pump-three-way valve linkage device and non-excavation grouting repair simulation system to fill the gap in this technical field. This embodiment can better achieve the above goals, which is described in detail below with reference to the accompanying drawings.

[0042] like Figure 1 As shown, the present embodiment provides a centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair, comprising a model box 1, a chamber partition structure 2, a semi-pipeline model 3, a data acquisition system 4, a servo control system, a pipeline damage / reinforcement simulation system 7 and a non-excavation grouting repair simulation system 8, wherein the chamber partition structure 2 and the semi-pipeline model 3 are placed in the model box 1.

[0043] The data acquisition system 4 includes a data acquisition sensor group 401, a sand mining box 402 and an image acquisition device 403 with a fill light strip 4031; the data acquisition sensor group 401 includes a soil pressure sensor, a pore water pressure sensor, a 3D ToF sensor module 4011, a water pressure sensor, and an ultrasonic liquid level sensor; the fill light strip 4031 is installed on the inner side of the front cover 6 of the model box 1 to provide sufficient light.

[0044] In the present embodiment, the model box 1 comprises a box front plate 101, a box back plate 102, a box left plate 103, a box right plate 104 and a box bottom plate 105 with a transparent model box front window 1011, the model box front window 1011 is made of organic glass with a light transmittance ≥ 85%, and the rest of the model box 1 is welded by a steel structure, and it should be ensured that the model box strength and deformation can meet the requirements of the model test under the Ng gravity acceleration, and the model box is installed on the centrifuge hanging basket. The external high-speed camera module is fixed by a matching bracket on the external hanging basket stabilizing crossbeam of the model box front window 1011, and the shooting angle of the high-speed camera module is adjusted so that it can shoot and record the test process through the model box front window 1011, and the multi-dimensional data of the image velocimetry technology (PIV) and the data acquisition system are combined to carry out a more in-depth quantitative and visual analysis.

[0045] like Figure 2-5 As shown, the chamber partition structure 2 is an integral structure made of high-strength aluminum alloy plate, which is located inside the model box 1. The chamber partition structure 2 is divided into several chambers with different functions, and the model box 1 serves to provide a protective shell for the chamber partition structure 2. The several chambers with different functions include a sand filling chamber 204, a seepage water chamber 205, a supply water chamber 206 and a collection water chamber 203. Different chambers are separated from each other. The sand filling chamber 204 is located at the upper part of the front side of the model box, and the collection water chamber 203 is located at the lower part of the front side of the model box, that is, directly below the sand filling chamber 204. A sand mining box 402 is also provided between the sand filling chamber 204 and the collection water chamber 203; the supply water chamber 206 is located in the center of the rear side of the model box, and the seepage water chamber 205 is distributed on both sides of the supply water chamber 206, and the bottom height of the seepage water chamber 205 is flush with the bottom height of the sand filling chamber 204. The chamber partition structure 2 is also provided with a water-permeable area (seepage water-permeable membrane 2042), a connecting water pipe 503 and a water-sand channel opening 2022, which realizes the separation and effective connection between multiple chambers, reduces the risk of joint connection failure under the action of super gravity, and ensures the accuracy of the model test; wherein, a seepage water-permeable membrane 2042 is provided between the sand filling chamber 204 and a pair of seepage water chambers 205, and the water in the seepage water chamber 205 can flow into the sand filling chamber 204 through the seepage water-permeable membrane 2042; a semi-pipeline model with a broken opening is provided in the center of the sand filling chamber 204, and the water and sand in the sand filling chamber 204 can enter the semi-pipeline model through the broken opening, and enter the sand mining box 402 and the collection water chamber 203 below from the water-sand channel opening at the bottom of the sand filling chamber 204. The pipeline damage / reinforcement simulation system 7 and the non-excavation grouting repair simulation system 8 are installed in the semi-pipeline model.

[0046] In a specific implementation of the present invention, the chamber partition structure 2 is mainly composed of a back plate 201, a bottom plate 202 and a chamber peripheral plate for forming the outer wall of the chamber with different functions. The back plate 201 divides the interior of the model box 1 into two parts, front and back. The front side of the back plate 201 is a sand filling chamber 204, and the rear side includes a centrally located replenishment water chamber 206 and seepage water chambers 205 located on both sides of the replenishment water chamber 206; the bottom plate 202 divides the front part of the model box 1 into two parts, an upper part and an lower part. Below the water-sand channel opening 2022 in the center of the bottom plate 202 are the sand mining box 402 and the water collection chamber 203. Side wall slots 2021 for fixing the half-pipe model 3 are provided on the left and right sides of the sand channel opening; a grouting machine 802 in the trenchless grouting repair simulation system 8 is installed below the bottom plate 202 and behind the back plate 201, and the grouting machine 802 is connected to a grouting hose 804, and the grouting hose 804 passes through the pipeline channel 2011 on the back plate 202 and is connected to the grouting module 801 in the trenchless grouting repair simulation system 8 in front of the back plate; the sand filling bin 204 is filled with sand samples, and a filling bin transparent window 2041 is provided on the front side of the sand filling bin 204. The back plate 201 between the seepage water bins 205 on the left and right sides of the rear of the back plate 202 is opened with holes and covered with a seepage water-permeable membrane 2042 as a water-permeable area connecting the two chambers, so as to simulate the real state of groundwater infiltration in the sand and soil, eliminate the scouring effect of water flow on the soil body, and reduce the boundary effect of seepage water entering the sand filling bin; the soil pressure sensor and pore water pressure sensor in the data acquisition sensor group 401 are arranged in an array in the sand sample in the sand filling bin 204, and are used to monitor the soil pressure and pore water pressure changes in the seepage process respectively; the water collection bin 203 is located in the acquisition The bottom of the sand box 402 is used to receive water that passes through the water-permeable plate 4021 at the bottom of the box, and is divided into three parts: left, right and middle by the partition plate. When the middle water level reaches the overflow hole 2031, the water in the middle begins to overflow to both sides. Ultrasonic liquid level sensors are installed above the three-part seepage water tank 205 to monitor the amount of seepage water in the collection tank 203; the overflow hole 2031 design of the seepage water tank 205 can obtain accurate seepage water volume data when the water volume is small in the early stage, and at the same time ensure that the bottom plate 202 does not undergo a large displacement under the action of supergravity, thereby ensuring the accuracy of the test.

[0047] A submersible pump-three-way valve linkage device 5 is installed in the rear part of the model box 1, and the submersible pump-three-way valve linkage device 5 includes a submersible pump 501, a three-way valve 502 and a connecting water pipe 503. Three electric T-shaped three-way valves 502 of different heights are respectively arranged between the replenishment water tank 206 and the seepage water tanks 205 on both sides. The inlet and outlet of the three-way valve 502 are respectively connected to the replenishment water tank 206 and the seepage water tank 205 on its corresponding side. A submersible pump 501 is installed inside the replenishment water tank 206. The submersible pump 501 is connected to the reversing port of the three-way valve 502 and the water inlet of the bottom side wall of the seepage water tank 205 through the connecting water pipe 503. The water level in the seepage water tanks 205 on both sides can be adjusted by the connection state of the three-way valve 502, thereby achieving the purpose of stabilizing the water level in the sand sample and simulating the water level change. When the reversing port of the three-way valve 502 is closed, it serves as an overflow hole, and water directly flows back from the seepage water tank 205 to the replenishment water tank 206; when the reversing port of the three-way valve 502 is opened, it serves as a water supply hole, and water flows from the replenishment water tank 206 to the seepage water tank 205 through the connecting water pipe 503, and the water inlet on the bottom side wall of the seepage water tank 205 always serves as the water supply hole.

[0048] In a specific implementation of the present invention, when a three-way valve 502 is in a state as follows Fig.10 In state (a), the seepage tank 205 is connected to the replenishment tank 206, and the water level of the seepage tank 205 will be maintained at the height of the three-way valve 502. It is necessary to make the water level in the replenishment tank 206 lower than the height of the three-way valve 502. The water in the seepage tank 205 flows to the replenishment tank 206, achieving the purpose of controlling the water level of the seepage tank 205 to be stable at the height of the three-way valve 502. The three-way valve 502 located below the water level of the three-way valve 502 is in a state as shown in FIG. Fig.10 (b) state, the seepage water tank 205 is replenished with water through the submersible pump 501 to maintain the water level stability after the water and sand pass through the damaged port of the pipeline. The connection state of the three-way valve 502 and the operation of the submersible pump 501 can be adjusted by the servo control system to achieve accurate water level control; the water pressure sensor in the data acquisition sensor group 401 is installed in the replenishment water tank 206 to monitor the water pressure change in the replenishment water tank 206 and calculate the replenishment water volume, that is, the sum of the water and sand loss volumes flowing out of the sand filling tank 204.

[0049] like Figure 6-7As shown, the semi-pipe model 3 consists of a semi-pipe body 301 and an orifice plate 302, and is assisted by a pipe damage / reinforcement simulation system 7 and a grouting repair module 801 installed on the inner wall of the pipe to realize its test simulation function; in this embodiment, the semi-pipe body 301 is a three-sided rectangle, located at the bottom center of the sand filling bin 204, and is fixed by inserting the pipe side wall with a waterproof rubber sleeve into the side wall slot 2021; the contact position between the semi-pipe body 301 and the back plate 201 and the transparent window 2041 of the filling bin is sealed, and a groove for installing the orifice plate 302 is provided on the top of the semi-pipe body 301, and the groove is arranged near the transparent window 2041 of the filling bin; a pipe model broken port of a preset shape is provided on the orifice plate 302, and the seepage path can only pass through the broken port, and the rest of the parts are sealed; a hole side groove 3021 is provided on one side of the pipe broken port, and a corresponding grouting pipe head channel 3011 is provided on the inner wall of the pipe.

[0050] The pipeline damage / reinforcement simulation system 7 includes an electric slide rail 701, an electric slider 702, an electric push rod 703, an active orifice adjustment block 704, a driven orifice adjustment block 705, a driven slider 706 and a driven slide rail 707; the electric slide rail 701 is horizontally installed on the top inner side of the semi-pipe body 301, and the electric push rod 703 is installed on the electric slide rail 701 through the electric slider 702. The electric push rod 703 can slide horizontally along the direction of the electric slide rail 701 under the drive of the electric slider 702, and the electric push rod 703 can be vertically extended along the top plane of the semi-pipe body 301; the end of the electric push rod 703 is connected to the active orifice adjustment block 704, and the active orifice adjustment block 704 and the driven orifice adjustment block 705 are connected. The driven orifice adjustment block 705 is connected to the driven slider 706 on the driven slide rail 707 through a slide groove to constrain the movement of the driven orifice adjustment block; a waterproof rubber pad 708 is installed on the active orifice adjustment block 704 and the driven orifice adjustment block 705, and the gap between the orifice plate 302 can be sealed by pre-pressing; therefore, the electric slider 702 and the electric push rod 703 can respectively control the active orifice adjustment block 704 to move in the horizontal and vertical directions along the top plane, which is used to adjust the size of the damaged opening of the strip pipe model. The damage evolution and reinforcement and repair simulation of the damaged opening in two directions can be realized by initially setting the operating parameters of the electric slider 702 and the electric push rod 703, which meets the needs of simulation for specific purposes in different studies.

[0051] In this embodiment, the evolution of the strip-shaped damaged opening of a rectangular cross-section half-pipe model and the simulation of reinforcement and repair are introduced. In fact, any shape of pipe model can be used. As long as the half-pipe model meets the design and is fixed on the bottom plate 202 through the side wall slot 2021, relevant experimental research on ground subsidence induced by pipe damage can be carried out. Diversified pipe cross-section forms are more in line with actual engineering conditions. The pipe damage / reinforcement simulation system 7 requires a relatively smooth inner wall for operation, so it is suitable for pipes with regular cross-sections, such as rectangles, circles, etc.; depending on the pipe material and the working conditions around the pipe, the pipe damage mode is diverse, and the orifice plate with different preset shapes of the pipe model damaged opening can be replaced to achieve simulation of pipe damage in various shapes. Those skilled in the art can adapt to actual needs by changing the size of the damaged opening and the corresponding electric slider and electric push rod models.

[0052] The trenchless grouting repair simulation system 8 comprises a grouting repair module 801, a grouting machine 802 and a grouting hose 803. Figure 8 (a) shows a grouting repair module 801 installed on the inner wall of the half-pipe body, which mainly consists of a grouting pipe head 8011, a rotating blade 8012, a steering gear 8013, an electromagnetic push rod 8014 and a module housing 8015 (the module housing 8015 is Figure 8(a) only shows half of the structure, wherein the electromagnetic push rod 8014 is fixedly installed in the repair groove on the inner side of the top of the semi-pipe body 301, the housing of the steering gear 8013 is connected to the electromagnetic push rod 8014, and is limited by the module housing 8015; the steering gear 8013 moves back and forth laterally towards / away from the damaged opening of the pipe under the push of the electromagnetic push rod 8014, the rotating blade 8012 is installed on the rotating shaft of the steering gear 8013, the inlet section of the grouting hose 803 is connected to the grouting machine 802, and the outlet section is connected to the grouting inlet of the grouting pipe head 8011, and the rigid grouting pipe head 8011 passes through the grouting pipe head channel 3011, and the grouting outlet is contracted in the hole side groove 3021 of the side wall of the damaged opening of the pipe, and the grouting inlet section of the grouting pipe head 8011 is fixed on the rotating blade 8012. When the simulation of pipeline damage grouting repair is not carried out, the grouting pipe head 8011 is placed in the groove 3021 on the side of the hole. The grouting pipe head 8011 is installed at a suitable length according to the test plan before the simulation test to simulate the specific grouting depth working condition in the non-excavation grouting repair; the rotating blade 8012 is used to connect the rotating shaft of the steering gear 8013 and fix the grouting pipe head 8011 to ensure that the grouting pipe head 8011 rotates with the steering gear 8013; the steering gear 8013 can adjust its rotation angle, indirectly realizing the grouting pipe head 8011 passing through The damaged opening of the pipe extends to the outside of the pipe and is at a certain angle to the pipe wall; the electromagnetic push rod 8014 has only a small stroke, which can push the servo 8013 to drive the grouting pipe head 8011 to the center line position of the damaged opening of the pipe; the module housing 8015 is used to ensure the stable operation of the grouting repair module 801; in addition, the grouting repair simulation requires the grouting machine 802 set on the rear side of the box to provide sufficient slurry and pressure, and the slurry delivery hose 803 is connected to the grouting machine 802 to transport the slurry to the grouting repair module 801. Figure 8 (b) and (c) are cross-sectional views along the axis of the grouting pipe head channel 3011 parallel to the pipe wall, where: Figure 8 (b) is a simulation of the process of pipeline damage evolution in which the grouting repair module 801 is in a non-working state, at which the electromagnetic push rod 8014 is retracted, the steering gear 8013 is not enabled, the rotating blade 8012 is in a horizontal state, and the nozzle of the grouting pipe head 8011 is placed in the hole side groove 3021; Figure 8 (c) is a state of simulating the grouting method to repair pipeline damage. At this time, the electromagnetic push rod 8014 is extended outward, the steering gear 8013 rotates a certain angle (0-90 degrees), and a certain angle is formed between the rotating blade 8012 and the top plate of the semi-pipe body. The grouting pipe head 8011 is placed on the center line of the pipeline damage port and extends at a certain angle to the erosion damage area above the pipeline damage port, and the grouting machine 802 and the grouting hose 803 are used to inject grout into the erosion area.

[0053] like Fig. 9(a) shows the structure of the cover plate 6 installed on the box model 1. The 3D ToF sensor module 4011 in the data acquisition sensor group 401 is installed in the center of the cover plate 6, which is used to generate an addressable laser array and cover the surface of the sand sample in the sand filling bin 204, measure the distance of each pixel, and the change in the time of the measurement value of the same point can represent the displacement of the point, and the surface settlement 3D model can be generated according to the measurement value of each point. The cover plate 6 is provided with grooves around, and a fill light strip 4031 is installed in the groove to provide sufficient lighting conditions for the high-speed camera module to collect graphics and record the evolution process of the sand sample. Fig. 9 (b) shows a sand mining box 402, the bottom plate of the sand mining box is a box bottom permeable plate 4021, the sand and soil seeping through the damaged opening is intercepted, and the box bottom permeable plate 4021 only allows water to pass into the collecting water tank 203 below. The ultrasonic liquid level sensor in the data acquisition sensor group 401 is arranged on the collecting water tank 203 to monitor the water level in the collecting water tank 203 and calculate the water loss through seepage; combined with the water and sand loss calculated by the water pressure sensor 4014 at the bottom of the replenishment water tank 206, the present invention innovatively proposes a method for calculating the real-time seepage rate of water and sand under supergravity state, respectively using a water pressure sensor to measure the water pressure at the bottom of the replenishment water tank 206 and an ultrasonic liquid level sensor to measure the water level of the collecting water tank 203, so as to directly calculate the water supply of the replenishment water tank 206 and the seepage water of the collecting water tank 203, and then calculate the water and sand loss, and thereby calculate the water and sand loss rate at any time. It should be noted that before the formal test, the calculation method needs to be calibrated through a preliminary experiment on the time difference between the two collected volumes and the chamber volume corresponding to the water level and water pressure. The sand in the sand mining box 402 can be dried and sieved after the test to obtain its gradation, which can be compared with the initial soil sample to study and analyze the escape behavior of soil particles.

[0054] In a specific implementation of the present invention, the data acquisition sensor 401 monitors the data and uploads it to the central control system in the servo control system in real time. After real-time processing, the servo control system controls the pipeline damage / reinforcement simulation system 7, the submersible pump-three-way valve linkage device 5 and the non-excavation grouting repair simulation system 8 to respectively regulate the size of the pipeline damage port, the stable water level and the grouting repair process. The servo control system used in this embodiment is composed of a central control system, a servo actuator control unit, a remote controller and a servo actuator. After processing the real-time data uploaded by the data acquisition sensor, the central control system feeds back an action instruction, which is sent by the servo controller control unit to the local servo control system through the remote controller. Seven servo actuators are set in the local device for adjusting the water supply of the submersible pump 501, switching the connection state of the three-way valve 502, adjusting the size of the damage port in the horizontal and vertical directions (controlling the electric slider 702 and the electric push rod 703), the electromagnetic push rod 8014, the rotation of the steering gear 8013 and the power of the grouting machine 802. For example, servo actuator 1 controls the power of submersible pump 501, and the flow rate pumped by submersible pump 501 changes to adjust the floating change of the water level of seepage water tank 205. Servo actuator 2 controls the circuit opening and closing of electric three-way valve 502, so that the connection state of three-way valve 502 is switched to achieve the purpose of stabilizing and controlling the water level of seepage water tank 205. Servo actuator 3 and servo actuator 4 respectively control the sliding position and extension of electric slider 702 and electric push rod 703, so that the orifice adjustment module moves in the horizontal and vertical directions, and changes the size of the pipeline damage port in two directions. The process of increasing the size of the pipeline damage port is used to simulate the evolution process of pipeline damage, and vice versa to simulate the reinforcement and repair process of pipeline damage. Servo actuator 5 and servo actuator 6 respectively control the extension of electromagnetic push rod 8014 and the rotation of servo gear 8013 to put the grouting pipe head 8011 in place at the set grouting position. Servo actuator 7 can adjust the power of grouting machine 802 according to the pressure data sent back by grouting machine 802, thereby changing the grouting amount and grouting pressure, and regulating the grouting repair simulation process.

[0055] In a specific implementation of the present invention, the submersible pump 501 should meet the requirement that its own power reaches the required water supply flow rate under Ng gravity acceleration; the grouting machine 802 should meet the requirement that its own power reaches the required pressure under Ng gravity acceleration; the three-way valve 502 should meet the requirement of free switching between two connected states under Ng gravity acceleration; the electric slider 702 and the electric push rod 703 should respectively meet the requirements of precise movement and extension under Ng gravity acceleration; the steering gear 8013 and the electromagnetic push rod 8014 should respectively meet the requirements of stable rotation and extension under Ng gravity acceleration. The front window 1011 of the model box and the transparent window 2041 of the filling bin are made of organic glass with a light transmittance of ≥85%, which can resist the lateral pressure of the soil under hypergravity and meet the requirements of shooting clarity. The high-speed camera module should meet the requirements of providing clear and stable shooting pictures under hypergravity. The joint between the transparent window 2041 of the filling and the compartment partition structure 2 should be waterproofed to meet the deformation and strength of the model box to adapt to Ng gravity acceleration.

[0056] In a specific implementation of the present invention, the centrifugal model test device is used to simulate the pipeline damage evolution and reinforcement repair process, the non-excavation grouting repair pipeline damage process and the water level control simulation process, including:

[0057] Preparation stage: install the half-pipe model 3 at the side wall slot 2021 of the bottom plate 202, select a suitable orifice plate 302, and adjust the pipeline damage / reinforcement simulation system 7 so that the damaged port of the pipeline model with a preset shape on the orifice plate 302 is in a closed state and pre-pressed; adjust the initial connection state of the three three-way valves 502 so that the connection state of the three-way valve 502 corresponding to the target water level is as shown in 9(a), and the connection state of the three-way valve 502 below the target water level is as shown in 9(a). 9(b) as a water supply hole; sprinkle sand samples in layers freely in the sand filling bin 204 and compact them to the target density, and bury soil pressure sensors and pore water pressure sensors in the sand samples; add water to the seepage water bin 205 and the replenishment water bin 206 to the target water level, and place the water pressure sensor at the bottom of the replenishment water bin; let the device stand for 24 hours to fully saturate the sand samples below the target water level, and replenish water to the seepage water bin 205 on time during this period to maintain a stable target water level. Cover the model box 1 with a cover plate 6 and then hoist it onto the centrifuge basket, install a high-speed camera module on the basket crossbeam, adjust the 3D ToF sensor module 4011 so that its laser dot matrix covers the surface of the sand sample and can measure the depth information of the position of each pixel point on the surface of the sand sample; test the working conditions of the data acquisition system and the servo control system, and start the test only after confirming that they are correct.

[0058] Damage evolution process: After the hypergravity acceleration of the device reaches the target value, start the submersible pump 501 to continuously supply water to the seepage water tank 205, start the electric slider 702 and the electric push rod 703 to move horizontally and extend vertically respectively to slowly open the damaged mouth. Specifically, according to the preset rate, start driving the active orifice adjustment block 704 to move in the horizontal and vertical directions. The horizontal movement drives the horizontal movement of the driven orifice adjustment block 705, thereby changing the horizontal size of the orifice, and the vertical movement changes the vertical size of the damaged mouth of the pipeline.

[0059] Damage repair process: When the evolution of the damaged opening reaches a predetermined size or a certain measured parameter of water-sand seepage reaches a target value, two types of damage repair process simulations can be realized according to different research purposes: When studying the performance and mechanical behavior of the residual soil around the pipe after pipeline damage reinforcement and repair, the pipeline damage / reinforcement simulation system 7 is used to change the movement and extension state of the electric slider 702 and the electric push rod 703, so that the active orifice adjustment block 704 and the driven orifice adjustment block 705 control the closure of the damaged opening to achieve the purpose of blocking the damaged opening of the pipeline and achieving the established research purpose; when studying the pipeline damage repair by grouting, by driving the grouting repair module 801, the grouting pipe head 8011 is extended to the upper erosion area at a certain angle to the pipe wall on the center line of the damaged opening, and the grouting machine 802 is turned on to grout the erosion area at a specific grouting pressure to simulate non-excavation grouting repair.

[0060] Test process monitoring and servo control: During the test, the soil pressure, pore water pressure and soil surface displacement of the sand filling tank 204 are monitored in real time, and the pipeline damage / reinforcement simulation system 7 and the submersible pump-three-way valve linkage device 5 are adjusted autonomously according to the data processing results. Special attention is paid to the water pressure of the replenishment tank 206 and the liquid level of the collection tank 203. The rate of seepage water and sand can be calculated based on the real-time change values ​​of the two. During the grouting repair simulation, attention should be paid to the grouting pressure monitoring data of the grouting machine 802, which can be used for grouting repair process regulation and grouting repair effect evaluation.

[0061] Groundwater level control: If you need to study the impact of groundwater level changes on erosion damage and ground collapse evolution, you can adjust it by adjusting the connectivity of the three-way valve 502. Adjusting the water supply hole below the current water level to an overflow hole can achieve the requirement of lowering the water level; adjusting the overflow hole at the current water level to a water supply hole can meet the requirement of raising the water level.

[0062] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair, characterized in that: It includes a model box (1), a compartment partition structure (2), a half-pipe model (3), a data acquisition system (4), a servo control system, a pipeline damage / reinforcement simulation system (7) and a non-excavation grouting repair simulation system (8); The chamber partition structure (2) is located inside the model box (1) and matches the size of the model box (1). The chamber partition structure (2) is a plurality of functional chambers divided by a partition plate, including a sand filling chamber (204), a seepage water chamber (205), a supply water chamber (206) and a collection water chamber (203). The sand filling chamber (204) and the collection water chamber (203) are arranged in upper and lower layers on the front side of the model box (1). The supply water chamber (206) is located at the center of the rear side of the model box (1). The seepage water chamber (205) is distributed in the supply water chamber ( 206), the seepage water tank (205) is flush with the bottom of the sand filling tank (204), the partition plate between the seepage water tank (205) and the sand filling tank (204) is perforated and provided with a seepage water permeable membrane (2042), a sand sample is laid in the sand filling tank (204) and a soil pressure sensor and a pore water pressure sensor are installed, a water pressure sensor is installed in the replenishment water tank (206), and an ultrasonic liquid level sensor is installed in the collection water tank (203); the replenishment water tank (206) and the seepage water tank (205) are connected through a submersible pump-three-way valve linkage device; The semi-pipeline model (3) is installed at the opening of the water-sand channel opened at the bottom of the sand filling bin (204), and a sand mining box (402) whose bottom is a permeable plate is provided between the water-sand channel opening and the water collecting bin (203); a pipeline damage opening is provided at the top of the semi-pipeline model (3), and the water-sand in the sand filling bin (204) flows into the sand mining box (402) and the water collecting bin (203) below in sequence after passing through the pipeline damage opening and the water-sand channel opening; the pipeline damage / reinforcement simulation system (7) and the non-excavation grouting repair simulation system (8) are installed on the inner wall of the semi-pipeline model (3), the pipeline damage / reinforcement simulation system (7) is used to adjust the size of the pipeline damage opening in the horizontal and vertical directions, and the non-excavation grouting repair simulation system (8) is used to perform grouting in the erosion area of ​​the pipeline damage opening, and the angle of the grouting pipe head used for grouting is adjustable; The data acquisition system is used to collect soil pressure of sand samples, pore water pressure, bottom water pressure of the replenishment water tank, liquid level of the collection water tank, surface settlement of sand samples and grouting pressure of the non-excavation grouting process.

2. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 1, characterized in that: A sand mining box (402) is provided between the water-sand channel opening and the water collecting bin (203).

3. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 1 or 2, characterized in that: The water collection bin (203) is divided into three parts, left, middle and right, by a partition plate provided with an overflow hole; the water collection bin (203) in the middle part is located directly below the opening of the water-sand channel, and when the water level in the water collection bin (203) in the middle part reaches the height of the overflow hole, the water will flow to both sides through the overflow hole.

4. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 1, characterized in that: The semi-pipe model (3) is composed of a semi-pipe body (301) and an orifice plate (302) with a broken pipe opening. The semi-pipe body (301) covers the opening of the water-sand channel. The top of the semi-pipe body (301) is provided with a stepped groove for installing the orifice plate (302). The orifice plate (302) is installed on the stepped groove. A side wall connected to the broken pipe opening is provided with a hole side groove (3021). A grouting pipe head channel (3011) connected to the hole side groove is provided in the orifice plate interlayer and the semi-pipe body (301) interlayer.

5. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 1, characterized in that: The front wall of the sand filling bin (204) of the bin partition structure (2) and the front plate of the model box (1) are both provided with transparent windows.

6. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 1, characterized in that: A cover plate is provided directly above the sand filling bin (204), a 3D ToF sensor module located in the center and a circumferentially arranged fill light strip are provided in the cover plate, and the cover plate is installed in coordination with the model box (1).

7. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 1, characterized in that: The pipeline damage / reinforcement simulation system (7) comprises an electric slide rail (701), an electric slider (702), an electric push rod (703), an active orifice adjustment block (704), a driven orifice adjustment block (705), a driven slider (706) and a driven slide rail (707), wherein the electric slide rail (701) and the driven slide rail (707) are transversely mounted on the top inner side of the semi-pipe body (301), the electric push rod (703) is mounted on the electric slide rail (701) via the electric slider (702), and the electric push rod (703) is mounted on the electric slide rail (701). 03) is connected to the active orifice adjustment block (704), and the extension direction of the electric push rod (703) is vertical; the active orifice adjustment block (704) is connected to the driven orifice adjustment block (705) through a vertical slide groove, and the driven orifice adjustment block (705) is installed on the driven slide rail (707) through a driven slider (706); the driven orifice adjustment block (705) can only move horizontally, and the active orifice adjustment block (704) can move horizontally and vertically, and the driven orifice adjustment block and the active orifice adjustment block can completely cover the damaged opening of the pipeline.

8. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 4, characterized in that: The trenchless grouting repair simulation system (8) comprises a grouting repair module (801), a grouting machine (802) and a grouting hose (803), wherein the grouting repair module (801) is installed in a repair groove on the inner side of the top of the semi-pipe body (301), and the grouting machine (802) is fixed on the lower layer of the rear side of the model box (1); The grouting repair module (801) comprises a grouting pipe head (8011), a rotating blade (8012), a steering gear (8013), an electromagnetic push rod (8014) and a module housing (8015); the electromagnetic push rod (8014) is fixedly installed in a repair groove on the inner side of the top of the semi-pipe body (301); the steering gear (8013) housing is connected to the electromagnetic push rod (8014) and is limited by the module housing (8015); the steering gear (8013) moves back and forth laterally towards / away from the damaged opening of the pipeline under the push of the electromagnetic push rod (8014); the rotating blade (8012) is installed on the rotating shaft of the steering gear (8013); On the driving shaft, the inlet section of the grouting hose (803) is connected to the grouting machine (802), and the outlet section of the grouting hose (803) is contracted into the hole side groove (3021) of the side wall of the pipeline damage port after passing through the grouting pipe head channel (3011), and the middle section of the grouting hose (803) is fixed on the rotating blade (8012); when the electromagnetic push rod (8014) is extended, the outlet section of the grouting hose (803) is translated from the hole side groove (3021) to the center line of the pipeline damage port, and driven by the rotation of the steering gear, the outlet section of the grouting hose (803) is extended at a certain angle to the erosion damage area above the pipeline damage port.

9. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 1, characterized in that: The submersible pump-three-way valve linkage device comprises a submersible pump (501), a three-way valve (502) and a connecting water pipe (503). A plurality of three-way valves (502) of different heights are respectively arranged between the replenishment water tank (206) and the seepage water tanks (205) on both sides. The inlet and outlet of the three-way valve (502) are respectively connected to the replenishment water tank (206) and the seepage water tank (205) on the corresponding side. The submersible pump (501) is installed inside the replenishment water tank (206). The submersible pump (501) is connected to the water tank (206) by connecting the water tank (206). The pipe (503) is respectively connected to the reversing port of the three-way valve (502) and the water inlet of the bottom side wall of the seepage water tank (205). When the reversing port of the three-way valve (502) is closed, it serves as an overflow hole, and water directly flows back from the seepage water tank (205) to the replenishment water tank (206); when the reversing port of the three-way valve (502) is opened, it serves as a water supply hole, and water flows from the replenishment water tank (206) to the seepage water tank (205) through the connecting water pipe (503). The water inlet of the bottom side wall of the seepage water tank (205) always serves as a water supply hole.

10. The centrifugal model test device for simulating pipeline damage-induced ground subsidence and repair according to claim 1, characterized in that: The centrifugal model test device controls the test process by a servo control system, which includes a central control system, a servo control unit, a remote controller and a plurality of servo actuators. The plurality of servo actuators are used to control the water level of the seepage water tank, the size of the damaged opening, the angle of the grouting pipe head, the grouting amount and the grouting pressure respectively.