Robust planning method for AC / DC hybrid distribution network under multi-layer consumption mode

By evaluating the stable operation of distributed power sources and the access effect of renewable energy in the AC-DC hybrid distribution network, the planning solution is optimized, the problem of insufficient analysis in the existing technology is solved, and the resource utilization rate and efficiency of the distribution network are improved. Economy.

CN118246637BActive Publication Date: 2024-10-01ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410659256.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2024-10-01
Estimated Expiration
2044-05-27

AI Technical Summary

Technical Problem

In the existing AC and DC hybrid distribution network planning technology, the local density mean clustering algorithm does not comprehensively analyze the output of renewable energy, and does not consider the analysis and calculation of distributed energy sources, resulting in inaccurate solution results and inability to maximize the use of the distribution network. Economics of planning.

Method used

By obtaining the operation indicator set of each distributed power supply in the AC and DC hybrid distribution network, the stable operation evaluation degree of the distributed power supply and the access effect of renewable energy are evaluated. The degree of plan executability is obtained through comprehensive analysis and compared with the set threshold. Yes, match the planned preset plan to optimize distribution network resource utilization and management costs.

Benefits of technology

It improves the power supply reliability and renewable energy utilization of distributed power sources, reduces resource waste and investment costs, optimizes the anti-interference ability and adaptability of the distribution network, and ensures the stable operation and economy of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118246637B_ABST
    Figure CN118246637B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of distribution network planning, and specifically discloses a robust planning method for an AC / DC hybrid distribution network under a multi-layer consumption mode. The method comprises: distributed power supply operation evaluation, renewable energy intervention effect determination, and AC / DC hybrid distribution network planning matching. Firstly, the stable operation evaluation degree of the distributed power supply in the AC / DC hybrid distribution network and the access effect evaluation index of the renewable energy in the AC / DC hybrid distribution network are evaluated respectively, thereby obtaining the planning executable degree of the AC / DC hybrid distribution network, and then comparing with the set planning executable threshold, and finally matching to obtain the planning preset plan of the AC / DC hybrid distribution network. By combining multiple consumption modes with robust planning technology, the distribution network resources can be optimized, the anti-interference ability and adaptability of the distribution network can be improved, the renewable energy can be utilized to the maximum extent, and the operation and management cost of the AC / DC hybrid distribution network planning can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of distribution network planning, and in particular to a robust planning method for an AC / DC hybrid distribution network under a multi-layer consumption mode. Background Art

[0002] The current AC / DC hybrid distribution network planning technology involves multiple voltage levels, multiple power supply types and complex control strategies, and its planning and management are difficult. In addition, the construction and transformation of the AC / DC hybrid distribution network requires a large amount of capital. Therefore, it is necessary to introduce a new method to solve the problems of high complexity and high investment cost of AC / DC hybrid distribution network planning technology. The AC / DC hybrid distribution network planning studied in the present invention maximizes the use of renewable energy through multiple consumption modes combined with robust planning technology, thereby reducing resource waste in the AC / DC hybrid distribution network and improving the utilization efficiency of renewable energy, reducing the technical difficulty and investment cost of planning the AC / DC hybrid distribution network, and reducing the management difficulty of AC / DC hybrid distribution network planning.

[0003] For example, the invention patent with announcement number CN109598377B discloses a robust planning method for AC / DC hybrid distribution networks based on fault constraints, and the steps are as follows: based on the local density mean clustering algorithm, the load and renewable energy output in the planning area are clustered to generate several typical operation scenarios; a planning sub-model, a fault sub-model and an operation sub-model are constructed; a two-layer robust planning model for the AC / DC distribution network is constructed based on the sub-models established in the steps; the two-layer robust planning model for the AC / DC distribution network is solved based on the C&CG algorithm. The above application, on the basis of minimizing planning and operating costs, ensures that under any N-1 fault conditions, neither load shedding nor wind, solar and water abandonment occurs, and fully optimizes its economy on the basis of ensuring system safety.

[0004] However, in the process of implementing the above-mentioned application embodiments, the present application discovered that the above-mentioned technology has at least the following technical problems: when the above-mentioned application uses the local density mean clustering algorithm, the analysis of the output of renewable energy is not comprehensive enough to support the clustering algorithm, and when using the two-layer robust planning model of the distribution network, the analysis and calculation of distributed energy is not considered, which may make the solution result inaccurate, so that the conclusion reached also has errors, and cannot achieve the maximum economy of the distribution network planning. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a robust planning method for an AC / DC hybrid distribution network under a multi-layer consumption mode, which can effectively solve the problems involved in the above-mentioned background technology.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: The present invention provides a robust planning method for an AC / DC hybrid distribution network under a multi-layer consumption mode, including: obtaining an operating indicator set of each distributed power source in the AC / DC hybrid distribution network, and evaluating the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network; collecting and processing data related to the access effect of renewable energy in the AC / DC hybrid distribution network, and evaluating the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network; comprehensively analyzing and processing the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network and the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network, obtaining the planning executable degree of the AC / DC hybrid distribution network, and comparing it with the set planning executable threshold, and finally matching to obtain the planning preset plan of the AC / DC hybrid distribution network.

[0007] As a further method, the matching obtains a planning preset plan of an AC / DC hybrid distribution network, and the specific analysis process is: comparing the planning executable degree of the AC / DC hybrid distribution network with a set planning executable threshold; if the planning executable degree of the AC / DC hybrid distribution network is lower than the planning executable threshold, performing difference processing on the planning executable degree of the AC / DC hybrid distribution network and the planning executable threshold to obtain a planning executable deviation value of the AC / DC hybrid distribution network; matching the planning executable deviation value of the AC / DC hybrid distribution network with the planning preset plans corresponding to each planning executable deviation value interval defined in the AC / DC distribution network information library, thereby obtaining a planning preset plan of the AC / DC hybrid distribution network.

[0008] As a further method, the degree of feasibility of planning of the AC / DC hybrid distribution network is specifically analyzed by the formula:

[0009]

[0010] in It is expressed as the planning feasibility of AC / DC hybrid distribution network. It is expressed as the stable operation evaluation degree of distributed generation in AC / DC hybrid distribution network. It is expressed as the access effect evaluation index of renewable energy in AC / DC hybrid distribution network, It is represented by the weight factor corresponding to the predefined stable operation evaluation degree of distributed power sources, It is expressed as the weight factor corresponding to the predefined renewable energy access effect evaluation index, and e is a natural constant.

[0011] As a further method, the stable operation evaluation degree of the distributed power sources in the AC / DC hybrid distribution network is specifically analyzed as follows: according to the operation index set of each distributed power source in the AC / DC hybrid distribution network, wherein the operation index set includes power generation technology related information and storage technology related information, the power generation technology influence coefficient of each distributed power source and the storage technology influence coefficient of each distributed power source are evaluated respectively, and a comprehensive analysis is performed to obtain the stable operation evaluation degree of the distributed power sources in the AC / DC hybrid distribution network.

[0012] As a further method, the power generation technology influence coefficient of each distributed power source has a specific analysis process as follows: according to the power generation technology related information of each distributed power source, the cumulative power generation, power generation efficiency, number of faults and duration of each fault of each distributed power source within the set planning period are extracted; the number of faults of each distributed power source within the set planning period and the duration of each fault are analyzed and processed by the state enumeration method, and finally the power generation reliability of each distributed power source within the set planning period is obtained; the power generation reference quantity and power generation boundary efficiency are extracted from the AC / DC distribution network information database, and the power generation technology influence coefficient of each distributed power source is comprehensively analyzed.

[0013] As a further method, the storage technology impact coefficient of each distributed power source is specifically analyzed as follows: based on the storage technology related information of each distributed power source, the cumulative storage capacity and storage efficiency of each distributed power source within the set planning period are extracted; the storage reference amount and storage boundary efficiency are extracted from the AC / DC distribution network information library, and the storage technology impact coefficient of each distributed power source is comprehensively analyzed.

[0014] As a further method, the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network has a specific analysis process as follows: based on the access effect related data of renewable energy in the AC / DC hybrid distribution network, extract the information related to the operator support indicators and the operator economic indicators, and the information related to the power quality evaluation indicators on the grid side, respectively evaluate the influence degree coefficient of the operator support indicators, the influence degree coefficient of the operator economic indicators, and the influence degree coefficient of the power quality evaluation indicators on the grid side, and perform a comprehensive analysis to obtain the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network.

[0015] As a further method, the operator support indicator influence degree coefficient has a specific analysis process as follows: based on the information related to the operator support indicator, the operator's on-grid electricity sales revenue, power outage loss cost and renewable energy operation and maintenance cost within the set planning period are extracted; the on-grid electricity sales defined revenue, power outage loss license cost and renewable energy operation defined maintenance cost are extracted from the AC / DC distribution network information database, and the operator support indicator influence degree coefficient is comprehensively analyzed.

[0016] As a further method, the influence degree coefficient of the operator's economic indicators has a specific analysis process as follows: according to the relevant information of the operator's economic indicators, the operator's dynamic investment recovery period is extracted; based on the basic formula of cash inflows and outflows, the net cash flow of the operator at each planning time point is calculated, thereby constructing the operator's net cash flow change curve, and extracting the profit angle value corresponding to each profit of the operator; from the AC / DC distribution network information database, the profit angle boundary value is extracted, and the influence degree coefficient of the operator's economic indicators is comprehensively analyzed.

[0017] As a further method, the influence degree coefficient of the power quality evaluation index on the grid side is specifically analyzed as follows: according to the relevant information of the power quality evaluation index on the grid side, the load point voltage qualification rate and the load point voltage deviation rate on the grid side within the set planning period are extracted; from the AC / DC distribution network information library, the load point voltage definition qualification rate and the load point voltage definition deviation rate are extracted, and the influence degree coefficient of the power quality evaluation index on the grid side is comprehensively analyzed.

[0018] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:

[0019] (1) The present invention provides a robust planning method for an AC / DC hybrid distribution network under a multi-layer consumption mode. First, the stable operation evaluation degree of distributed power sources in the AC / DC hybrid distribution network and the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network are evaluated respectively, thereby obtaining the planning executable degree of the AC / DC hybrid distribution network, and then comparing it with the set planning executable threshold. Finally, the planning preset plan of the AC / DC hybrid distribution network is matched. By combining multiple consumption modes with robust planning technology, it is possible to optimize the distribution network resources, improve the anti-interference ability and adaptability of the distribution network, maximize the use of renewable energy, and reduce the operation and management cost of the AC / DC hybrid distribution network planning.

[0020] (2) The present invention obtains the operating indicator set of each distributed power source in the AC / DC hybrid distribution network, evaluates the stable operation evaluation degree of the distributed power sources in the AC / DC hybrid distribution network, improves the power supply reliability of the distributed power sources, and optimizes resource allocation, thereby reducing resource waste in the AC / DC hybrid distribution network and improving the utilization efficiency of renewable energy, thereby ensuring the normal power supply of key facilities and residents in the AC / DC hybrid distribution network area.

[0021] (3) The present invention collects and processes data related to the access effect of renewable energy in the AC / DC hybrid distribution network and evaluates the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network. This can optimize the renewable energy structure, improve the utilization rate of renewable energy, help reduce dependence on traditional energy, reduce carbon emissions in the AC / DC hybrid distribution network area, improve the power generation efficiency of renewable energy, and reduce the power generation cost of renewable energy. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.

[0023] Figure 1 The figure is a schematic flow chart of the method steps of the present invention.

[0024] Figure 2 It is a schematic diagram of the net cash flow change line involved in the present invention.

[0025] Figure numerals: 1. Profit angle value, 2. First horizontal straight line. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0027] Reference Figure 1 As shown, the present invention provides a robust planning method for an AC / DC hybrid distribution network under a multi-layer consumption mode, including: obtaining an operating indicator set of each distributed power source in the AC / DC hybrid distribution network, and evaluating the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network.

[0028] It should be explained that the multi-layer absorption model usually refers to the digestion and utilization of electricity generated by distributed energy or renewable energy through multiple levels and channels in the power system. This model aims to improve energy utilization, reduce energy waste, and balance the supply and demand relationship of the power grid to ensure the stable operation of the power system. Specifically, the multi-layer absorption model may include the following levels: local absorption, regional power grid absorption, energy storage system absorption, cross-seasonal or cross-time absorption, and demand-side management.

[0029] Specifically, the power generation technology influence coefficient of each distributed power source is analyzed in the following process:

[0030] According to the operation index set of each distributed power source in the AC / DC hybrid distribution network, the operation index set includes power generation technology related information and storage technology related information.

[0031] According to the power generation technology related information of each distributed power source, the cumulative power generation, power generation efficiency, number of faults and duration of each fault of each distributed power source within the set planning period are extracted, wherein the cumulative power generation of each distributed power source within the planning period can be achieved by installing a smart meter at the output port of the distributed power source, and recording and accumulating the power generation from the start time point to the end time point of the planning period in real time; the power generation efficiency of each distributed power source within the planning period can be obtained by ratio processing between the above-mentioned cumulative power generation and the planning time point; the number of faults and the duration of each fault can be directly extracted from the log records of each distributed power system.

[0032] The number of faults that occur in each distributed power source within a set planning period and the duration of each fault are analyzed and processed through the state enumeration method, and finally the power generation reliability of each distributed power source within the set planning period is obtained. The above-mentioned state enumeration method is to list the number of faults and the duration of each fault one by one, analyze the data of each fault, and obtain the power generation reliability after processing and integration.

[0033] The power generation reference quantity and power generation efficiency are extracted from the AC / DC distribution network information database.

[0034] The influence coefficient of the power generation technology of each distributed power source is comprehensively analyzed. In a specific embodiment, the performance characteristics, operation efficiency, reliability, maintenance cost and other aspects of different distributed power generation technologies can be understood through a case study method, the advantages and disadvantages of different power generation technologies can be compared, and their impact on the overall performance of the distributed power system can be analyzed, so as to obtain the influence coefficient of the power generation technology of each distributed power source.

[0035] The above-mentioned power generation technology influence coefficient of each distributed power source, in this embodiment, is obtained by comprehensive analysis of the cumulative power generation, power generation efficiency and power generation reliability of each distributed power source within a set planning period, so as to determine the value of the power generation technology influence degree of each distributed power source. In this embodiment, a more accurate calculation method is used to obtain it, and the specific expression is:

[0036]

[0037] in It is expressed as the influence coefficient of the power generation technology of the ith distributed power source. In this embodiment, too high cumulative power generation indicates that the distributed power source is in long-term and high-load operation, which will accelerate its wear and tear, and may increase the maintenance cost of the distributed power source and the frequency of replacing the power source; too low cumulative power generation may lead to poor economic benefits of the distributed power source, and cannot effectively reduce the cost of the distributed power source and increase the income of the distributed power source; too low power generation efficiency means more energy loss in the energy conversion process, which not only wastes a lot of electric energy resources, but also increases the cost of distributed power generation; when the power generation reliability is low, the power generation technology of the distributed power source may not be able to stably provide the required power within the specified conditions and time, which may lead to unstable power supply, and further affect the normal operation of users or systems that rely on these power sources; in summary, the cumulative power generation, power generation efficiency and power generation reliability are crucial to the influence coefficient of the power generation technology of the distributed power source, so these parameters should be fully considered when calculating this coefficient to reduce their negative impact.

[0038] i is the number of each distributed power source, , m is the number of distributed generation sources.

[0039] It is expressed as the cumulative power generation of the i-th distributed power source within the set planning period, which refers to the total amount of electricity generated by the distributed power source within the planning period. Too high or too low cumulative power generation may have a negative impact on the power generation technology of the distributed power source.

[0040] Expressed as the reference amount of power generation, it refers to the standard amount of electricity specified for power generation.

[0041] It is expressed as the power generation efficiency of the ith distributed generation within the set planning period, which refers to the conversion efficiency of various types of energy in the process of distributed generation converting electrical energy into other forms of energy.

[0042] Expressed as power generation efficiency, it refers to the minimum value allowed for power generation efficiency.

[0043] It is expressed as the power generation reliability of the i-th distributed power source within the set planning period, which refers to the ability of the distributed power source to complete the specified power generation within the planning period. High power generation reliability means that the distributed power source has a low failure rate and can provide power continuously and stably.

[0044] It is expressed as the correction factor corresponding to the predefined cumulative power generation, Expressed as a correction factor corresponding to the predefined power generation efficiency, It is expressed as the impact factor corresponding to the predefined unit value of power generation reliability, and e is a natural constant.

[0045] Furthermore, the storage technology influence coefficient of each distributed power source is specifically analyzed as follows:

[0046] According to the storage technology related information of each distributed power source, the cumulative storage capacity and storage efficiency of each distributed power source within the set planning period are extracted, wherein the cumulative storage capacity and storage efficiency of each distributed power source within the set planning period can be directly extracted from the log file of the distributed power source storage device.

[0047] The storage reference quantity and storage definition efficiency are extracted from the AC / DC distribution network information database.

[0048] The storage technology impact coefficient of each distributed power source is comprehensively analyzed. In a specific embodiment, a mathematical model of the distributed power storage system can be established through simulation methods and computer simulation software. By setting different conditions, such as key indicators such as charging and discharging efficiency, energy density, and cycle life, the operation process of the system is simulated, thereby obtaining the storage technology impact coefficient of each distributed power source.

[0049] The storage technology impact coefficient of each distributed power source is obtained by comprehensively analyzing the cumulative storage capacity and storage efficiency of each distributed power source within a set planning period in this embodiment, so as to determine the value of the storage technology impact of each distributed power source. In this embodiment, a more accurate calculation method is used to obtain the value, and the specific expression is:

[0050] ,in It is represented as the storage technology impact coefficient of the i-th distributed power source. In this embodiment, when the accumulated storage capacity is too small, the distributed power source may not be able to provide sufficient power support during peak hours or sudden demand, resulting in power outage or instability, and means that the excess electric energy generated by the distributed power source cannot be effectively stored, resulting in energy waste; too large a storage capacity may also result in low utilization of the distributed power source, increasing the cost burden; too large a storage capacity means that more power supply equipment needs to be maintained and managed, which will lead to an increase in the initial investment cost; too small a storage efficiency means that there will be more energy loss during the charging and discharging process, which reduces the overall energy utilization efficiency of the system, and too small a storage efficiency may lead to an increase in the operating cost of the distributed power source, including production capacity cost, maintenance cost and the cost of replacing power supply equipment; in summary, too small or too large an accumulated storage capacity and too small a storage efficiency will have a negative impact on the storage technology impact coefficient of the distributed power source. Therefore, when designing and selecting the storage technology of the distributed power source, these factors need to be considered comprehensively to ensure the stable, efficient and economical operation of the distributed power source.

[0051] i is the number of each distributed power source, , m is the number of distributed generation sources.

[0052] It is expressed as the cumulative storage capacity of the i-th distributed power source within the set planning period, which refers to the total amount of electricity that the distributed power system can store within the planning period. This is usually closely related to factors such as the type of power source, storage capacity, charging efficiency, and length of the planning period.

[0053] Expressed as storage reference quantity, it refers to the standard value of storage quantity.

[0054] It is expressed as the storage efficiency of the i-th distributed power source within the set planning period. It refers to the efficiency of the storage devices in the distributed power system in storing and releasing electrical energy. The storage efficiency is affected by many factors, including the physical characteristics, chemical properties, working conditions and environmental conditions of the distributed power system.

[0055] Expressed as storage-bounded efficiency, it refers to the minimum value specified by the storage efficiency.

[0056] It is expressed as the correction factor corresponding to the predefined cumulative storage volume, It is expressed as a correction factor corresponding to the predefined storage efficiency, and e is a natural constant.

[0057] Specifically, the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network can, in a specific embodiment, be obtained by collecting the operating data of the distributed power source, including key parameters such as voltage, current, power factor, and temperature, through a real-time monitoring system, and performing statistics and analysis on the collected data to obtain the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network.

[0058] The stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network is obtained by comprehensive analysis of the power generation technology influence coefficient of each distributed power source and the storage technology influence coefficient of each distributed power source in this embodiment, so as to determine the value of the stable operation evaluation of the distributed power source in the AC / DC hybrid distribution network. In this embodiment, a more accurate calculation method is used to obtain the value, and the specific analysis formula is:

[0059]

[0060] in It is expressed as the stable operation evaluation degree of distributed power sources in the AC / DC hybrid distribution network. In this embodiment, when the power generation technology impact coefficient is too large, it means that the fluctuation or change of the power generation technology has a significant impact on the stable operation of the distributed power source, which may lead to unstable power output and increase the risk of distributed power collapse; an excessively high power generation technology impact coefficient may require more frequent power equipment maintenance, more complex distributed power control systems, and higher power conversion efficiency, thereby increasing the operating cost of the distributed power source; when the storage technology impact coefficient is too large, the performance fluctuation of the energy storage device may have a significant impact on the stable operation of the distributed power source, which may lead to the energy storage Efficiency is reduced and energy waste is increased; when the storage technology impact coefficient is too high, the response speed of the energy storage device may slow down, resulting in a longer response time for the distributed power system and reducing the real-time adjustment capability of the distributed power source; in summary, excessive power generation technology impact coefficient and storage technology impact coefficient will reduce the stable operation evaluation of distributed power sources in AC / DC hybrid distribution networks and increase the operation risk of distributed power sources. Therefore, in the design and operation of distributed power sources, these factors need to be fully considered, and these negative effects can be reduced by optimizing technology, improving power equipment performance, and strengthening distributed power system management to ensure the stable operation of distributed power sources.

[0061] It is expressed as the power generation technology influence coefficient of the ith distributed power source, which represents the value of the power generation technology influence degree of each distributed power source obtained by comprehensive analysis of the cumulative power generation, power generation efficiency and power generation reliability of each distributed power source within the set planning period.

[0062] i is the number of each distributed power source, , m is the number of distributed generation sources.

[0063] It is expressed as the storage technology impact coefficient of the ith distributed power source, which means that the value of the storage technology impact degree of each distributed power source is obtained by comprehensive analysis of the cumulative storage capacity and storage efficiency of each distributed power source within the set planning period.

[0064] It is expressed as the weight factor corresponding to the predefined power generation technology impact coefficient, It is expressed as a weight factor corresponding to the predefined storage technology impact coefficient.

[0065] The data related to the access effect of renewable energy in the AC / DC hybrid distribution network are collected and processed to determine the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network.

[0066] Specifically, the influence coefficient of the operator support indicator is analyzed in the following process:

[0067] According to the data related to the access effect of renewable energy in the AC / DC hybrid distribution network, the information related to the operator's support indicators, the information related to the operator's economic indicators, and the information related to the power quality evaluation indicators on the grid side are extracted.

[0068] Based on the relevant information of the operator's support indicators, the operator's on-grid electricity sales revenue, power outage loss costs and renewable energy operation and maintenance costs within the set planning period are extracted. The operator's on-grid electricity sales revenue, power outage loss costs and renewable energy operation and maintenance costs within the set planning period can all be directly obtained from the operator's project revenue report.

[0069] The defined revenue from grid-connected electricity sales, permitted cost of power outage losses, and defined maintenance costs for renewable energy operation are extracted from the AC / DC distribution network information database.

[0070] Comprehensively analyze the influence coefficient of operator support indicators. In a specific embodiment, a mathematical evaluation model can be established to clarify the operator support indicators, which may include network quality, customer service satisfaction, system failure rate, order processing efficiency, etc. These data are used to verify the established model to obtain the influence coefficient of operator support indicators.

[0071] The above-mentioned operator support index influence coefficient, in this embodiment, is obtained by comprehensive analysis of the operator's on-grid electricity sales revenue, power outage loss cost, and renewable energy operation and maintenance cost within a set planning period. In order to judge the value of the operator support index influence, a more accurate calculation method is used in this embodiment to obtain it. The specific expression is:

[0072]

[0073] in It is expressed as the influence degree coefficient of the operator support index. In this embodiment, too small an income means that the operator's economic benefits are not good and it may be difficult to support continuous operation and development; too small an income from on-grid electricity sales may lead to a lower-than-expected return on investment, affecting the operator's decision-making and future investment plans; frequent power outages will seriously affect the user's electricity experience and reduce user satisfaction; the power outage loss cost includes the costs of compensation, repair and emergency response caused by power outages. These additional costs will increase the operator's operating costs and reduce overall profitability; the operation and maintenance of renewable energy equipment usually requires high costs. If these costs are too high, it will bring a heavy financial burden to the operator and affect its continuous operation and expansion capabilities; excessive operation and maintenance costs may restrict the operator's enthusiasm for promoting renewable energy; In summary, problems such as too small an income from on-grid electricity sales, too high a power outage loss cost, and too high a renewable energy operation and maintenance cost will have a negative impact on the influence degree coefficient of the operator support index. In order to reduce these negative impacts, operators need to actively seek effective measures to reduce costs, increase revenues, and ensure service reliability to optimize their operations and business development.

[0074] It is expressed as the operator's revenue from grid-connected electricity sales during a set planning period. It refers to the total revenue the operator obtains by selling electricity to the grid or other users during the planning period. This is usually calculated based on two factors: electricity sales and electricity prices.

[0075] It indicates the defined profit amount for grid-connected electricity sales, which refers to the minimum profit amount allowed for grid-connected electricity sales.

[0076] In a specific embodiment, the above-mentioned on-grid electricity sales revenue is set to be affected by the electricity sales price and the region, and the on-grid electricity sales revenue will be different. For example, the basic electricity sales unit price in Hefei is 0.56 yuan per kWh. If each household consumes 180 kWh of electricity per month, the operator's on-grid electricity sales revenue is 100.8, and the on-grid electricity sales limit revenue is set to 90. Through the expression in the operator support indicator influence coefficient, it can be seen that the ratio of the two is 0.9.

[0077] It is expressed as the power outage loss cost of the operator within the set planning period, which refers to the economic loss brought to the operator by power outages caused by power system failure, maintenance or other reasons, including direct losses such as reduction in electricity sales revenue and indirect losses such as decreased customer satisfaction and damaged brand image.

[0078] Expressed as the allowable cost of power outage loss, it refers to the maximum cost of power outage loss.

[0079] In a specific embodiment, the above-mentioned power outage loss cost is set. Taking Hefei as an example, the basic electricity selling price in Hefei is 0.56 yuan per kWh. If the power outage causes a loss of 100 kWh of electricity, the operator's power outage loss cost is 56, and the power outage loss allowable cost is set to 100. Through the expression in the operator support indicator influence coefficient, it can be seen that the ratio of the two is 0.56.

[0080] It is expressed as the renewable energy operation and maintenance cost of the operator within the set planning period. It refers to the various expenses incurred by the operator to maintain and ensure the normal operation of renewable energy power generation facilities, such as solar photovoltaic panels, wind turbines, etc. within the planning period, including equipment maintenance, maintenance personnel wages, purchase of spare parts, insurance costs of energy facilities, etc.

[0081] It represents the maintenance cost defined for the operation of renewable energy, which refers to the maximum value of the operation and maintenance cost of renewable energy.

[0082] It is represented by the correction factor corresponding to the predefined on-grid electricity sales revenue, It is expressed as the correction factor corresponding to the predefined power outage loss cost, It is expressed as the correction factor corresponding to the predefined renewable energy operation and maintenance cost, and e is a natural constant.

[0083] Furthermore, the influence coefficient of the operator's economic indicators is analyzed in detail as follows:

[0084] According to the relevant information of the operator's economic indicators, the operator's dynamic investment payback period is extracted, wherein the operator's dynamic investment payback period can be directly extracted from the operator's project summary report.

[0085] Based on the basic formula of cash inflow and outflow, the net cash flow of the operator at each planning time point is calculated, and the net cash flow change curve of the operator is constructed, from which the profit angle value corresponding to each profit of the operator is extracted.

[0086] According to the net cash flow of the operator at each planning time point, the net cash flow change curve of the operator is constructed, such as Figure 2 As shown, the horizontal axis of the operator's net cash flow change line is the planning time point, in seconds; the vertical axis is the net cash flow, in millions.

[0087] And extract and count the profit angle values ​​corresponding to each profit of the operator, such as Figure 2As shown in the figure, the specific process of obtaining the profit angle value is as follows:

[0088] According to the operator's net cash flow change line, a profit line is located from it, and Figure 2 The first horizontal straight line (2) in the figure is obtained, and the minimum angle value of the intersection between the profit straight line and the first horizontal straight line (2) is obtained, and recorded as the profit angle value (1).

[0089] The profit perspective definition value is extracted from the AC / DC distribution network information database.

[0090] A comprehensive analysis of the influence coefficient of the operator's economic indicators can be performed. In a specific embodiment, a regression analysis model can be constructed to estimate the influence of each independent variable, which can be renewable energy construction, renewable energy equipment upgrades, renewable energy service promotion, etc., on the dependent variable economic indicators, thereby obtaining the influence coefficient of the operator's economic indicators.

[0091] In this embodiment, the above-mentioned operator economic indicator influence coefficient is obtained by comprehensive analysis of the operator's dynamic investment recovery period and the profit angle value corresponding to each profit of the operator. In order to judge the value of the operator economic indicator influence, a more accurate calculation method is adopted in this embodiment to obtain the value, and the specific expression is:

[0092]

[0093] in It is expressed as the coefficient of influence of the operator's economic indicators. In this embodiment, a too large dynamic investment recovery period means that the operator needs a longer time to recover the investment, which will cause the funds to be occupied for a long time and cannot be used for other potential high-return projects or emergency needs, thereby reducing the liquidity and utilization efficiency of the funds; a long fund recovery cycle increases the financial risk of the operator; a too small profit angle value means that the operator's profitability is weak and it is difficult to compete with other operators with strong profitability; a too small profit angle value may cause investors to have doubts about the operator's prospects, thereby affecting their investment decisions and financial support; in summary, a too large dynamic investment recovery period of the operator and a too small profit angle value will have a negative impact on the coefficient of influence of the operator's economic indicators. In order to reduce these impacts, the operator needs to optimize investment decisions, improve profitability, strengthen risk management and other aspects to improve its economic indicator performance and comprehensive competitiveness.

[0094] Expressed as the operator's dynamic investment payback period, it refers to the total time required to offset the present value of the original investment with the present value of the net cash flow of the investment project, taking into account the time value of money. This indicator is the time required from the start of investment to the time when the cumulative discounted cash flow equals 0.

[0095] It is represented as the profit angle value corresponding to the operator's j-th profit, which refers to the minimum angle value of the intersection between the profit straight line and the first horizontal straight line, recorded as the profit angle value.

[0096] Expressed as the profit angle limit value, it refers to the minimum value allowed for the profit angle value.

[0097] The impact factor expressed as a unit value corresponding to the predefined dynamic payback period, It is expressed as the correction factor corresponding to the predefined profit angle value, and e is a natural constant.

[0098] Specifically, the influence coefficient of the power quality evaluation index on the grid side is analyzed in the following process:

[0099] According to the relevant information of the power quality evaluation index on the grid side, the load point voltage qualification rate and the load point voltage deviation rate on the grid side within the set planning period are extracted, wherein the load point voltage qualification rate and the load point voltage deviation rate on the grid side within the set planning period can be extracted through the voltage monitoring device carried by the renewable energy equipment itself.

[0100] The load point voltage definition qualification rate and load point voltage definition deviation rate are extracted from the AC / DC distribution network information database.

[0101] The influence coefficient of the power quality evaluation index on the grid side is comprehensively analyzed. In a specific embodiment, the correlation between different power qualities and the overall power quality on the grid side can be calculated by using a grey correlation analysis model, thereby obtaining the influence coefficient of the power quality evaluation index on the grid side.

[0102] The above-mentioned influence coefficient of the power quality evaluation index on the grid side is obtained by comprehensively analyzing the load point voltage qualification rate and the load point voltage deviation rate on the grid side within the set planning period in this embodiment. In order to determine the value of the influence degree of the power quality evaluation index on the grid side, a more accurate calculation method is adopted in this embodiment to obtain the specific expression:

[0103]

[0104] in It is represented as the influence degree coefficient of the power quality evaluation index on the grid side. In this embodiment, when the load point voltage qualification rate is too low, it means that the proportion of the time when the voltage level in the grid is qualified is low, which directly reflects the instability of the grid power supply. This instability may cause the user equipment to fail to operate normally, affect the performance and life of the power equipment, and may even cause equipment damage. At the same time, the reduction of the load point voltage qualification rate will also affect the overall stability and safety of the power system and increase the risk of grid failure. The load point voltage deviation rate reflects the difference between the actual voltage and the ideal voltage. When the load point voltage deviation rate is too high, the voltage fluctuation in the grid will increase, resulting in a decrease in power quality, which will interfere with the normal operation of the power equipment and affect product quality and production efficiency. In the power quality evaluation index, the voltage qualification rate and the voltage deviation rate are two important parameters. Their values ​​directly reflect the quality of the power supply of the grid. Therefore, in order to ensure that the power quality evaluation index on the grid side is in a good state, it is necessary to pay close attention to the changes in the load point voltage qualification rate and the voltage deviation rate, and take effective measures to adjust and optimize them.

[0105] It is expressed as the voltage qualification rate of the load points on the grid side within the set planning period. It refers to the percentage of the cumulative operating time of the actual operating voltage within the allowable deviation range to the corresponding total operating time. It reflects the proportion of the time when the voltage level in the grid is qualified to the total time, and is one of the important evaluation indicators of the power system.

[0106] It is expressed as the load point voltage qualification rate, which refers to the minimum value of the load point voltage qualification rate.

[0107] It is expressed as the voltage deviation rate of the load point on the grid side within the set planning period. It refers to the percentage of the difference between the actual voltage and the system nominal voltage to the system nominal voltage. It is affected by many factors, including the voltage deviation at the head end of the line, the voltage drop of the high-voltage line and the low-voltage line, the voltage drop variation of the transformer, the voltage boost of the transformer tap equipment, etc.

[0108] It is expressed as the load point voltage limit deviation rate, which refers to the maximum value of the load point voltage deviation rate.

[0109] It is expressed as the correction factor corresponding to the predefined load point voltage qualification rate, It is expressed as the correction factor corresponding to the predefined load point voltage deviation rate, and e is a natural constant.

[0110] Furthermore, the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network, in a specific embodiment, can be obtained by training a neural network model to learn the complex relationship between renewable energy and access effect, and output the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network.

[0111] The access effect evaluation index of renewable energy in the AC / DC hybrid distribution network is obtained by comprehensive analysis of the influence coefficient of the operator support index, the influence coefficient of the operator economic index, and the influence coefficient of the power quality evaluation index on the grid side in this embodiment. In order to determine the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network, a more accurate calculation method is used in this embodiment to obtain the index. The specific analysis formula is:

[0112]

[0113] in It is represented as the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network. In this embodiment, the operator support index involves multiple aspects such as equipment performance and service quality. If the influence coefficients of these indicators are too large, it may mean that the operator faces greater technical and management challenges in the access of renewable energy. For example, poor performance of renewable energy equipment may lead to unstable or inefficient access of renewable energy. The access of renewable energy usually requires a large amount of initial investment and operating costs, including equipment purchase, installation, commissioning and later maintenance costs. If the operator's economic indicators are not good, it may limit its investment in renewable energy access, thereby affecting the access effect evaluation index. If the influence coefficient of the power quality evaluation index is too large, it may mean that the power grid faces greater power quality problems when accepting renewable energy. After renewable energy is connected to the power grid, voltage fluctuations, harmonic interference and other problems may occur, which will affect the power quality of the power grid. In summary, the excessive influence coefficient of the operator support index, the influence coefficient of the operator economic index and the influence coefficient of the power quality evaluation index on the grid side may have a negative impact on the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network. Therefore, when evaluating the access effect of renewable energy, it is necessary to comprehensively consider the influence of these factors and take corresponding measures to optimize and improve them.

[0114] It is expressed as the operator support index influence coefficient, which represents the value of the operator support index influence obtained by comprehensive analysis of the operator's on-grid electricity sales revenue, power outage loss cost and renewable energy operation and maintenance cost within the set planning period.

[0115] It is expressed as the influence coefficient of the operator's economic indicators, which is the value of the influence of the operator's economic indicators obtained by comprehensive analysis of the operator's dynamic investment recovery period and the profit angle value corresponding to each profit of the operator.

[0116] It is expressed as the influence coefficient of the power quality evaluation index on the grid side, which means the value of the influence of the power quality evaluation index on the grid side obtained by comprehensive analysis of the load point voltage qualification rate and the load point voltage deviation rate within the set planning period on the grid side.

[0117] It is represented by the weight factor corresponding to the predefined operator support indicator influence coefficient, It is expressed as the weight factor corresponding to the predefined operator economic indicator influence coefficient, It is expressed as a weight factor corresponding to the influence coefficient of the power quality evaluation index on the predefined grid side.

[0118] The stable operation evaluation degree of distributed power sources in the AC / DC hybrid distribution network and the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network are comprehensively analyzed and processed to obtain the planning executable degree of the AC / DC hybrid distribution network, which is then compared with the set planning executable threshold to finally match the planning preset plan of the AC / DC hybrid distribution network.

[0119] Specifically, in a specific embodiment, the feasibility of the planning of the AC / DC hybrid distribution network can be comprehensively evaluated and decided through technical feasibility assessment, economic cost-benefit analysis, environmental impact assessment, social acceptance survey, and risk assessment and management, so as to obtain the feasibility of the planning of the AC / DC hybrid distribution network.

[0120] In this embodiment, the planning feasibility of the AC / DC hybrid distribution network is obtained by comprehensive analysis of the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network and the access effect evaluation index of the renewable energy in the AC / DC hybrid distribution network. In order to judge the planning feasibility of the AC / DC hybrid distribution network, a more accurate calculation method is used in this embodiment. The specific analysis formula is:

[0121]

[0122] in It is expressed as the degree of plan executable of the AC / DC hybrid distribution network. In this embodiment, if the stable operation evaluation degree of the distributed power source is too small, it means that the distributed power source may have greater instability and unreliability during operation, which may lead to frequent failures, shutdowns or performance degradation, affecting the overall stability and power supply reliability of the distribution network; the AC / DC hybrid distribution network needs to take into account the access and coordinated operation of distributed power sources. If the stable operation evaluation degree of the distributed power source is insufficient, it will increase the difficulty and risk of operation and maintenance of the distribution network and reduce the executableness of the planning scheme; the renewable energy access effect evaluation index is an important indicator for evaluating the access effect of renewable energy in the distribution network. If the evaluation index is too small, it means that the access effect of renewable energy is not good. If the access effect evaluation index is too small, the planning scheme will appear to be not attractive and feasible in terms of renewable energy utilization, and the feasibility of the plan will be reduced; in summary, too small stable operation evaluation degree of distributed power sources and access effect evaluation index of renewable energy will reduce the feasibility of AC / DC hybrid distribution network planning. In order to ensure the effective implementation of the plan, it is necessary to improve the stable operation level of distributed power sources, optimize the access strategies and technical solutions of renewable energy, and improve the access effect evaluation index, thereby enhancing the feasibility and attractiveness of the planning scheme.

[0123] It is expressed as the stable operation evaluation degree of distributed power sources in the AC / DC hybrid distribution network, which is obtained by comprehensive analysis of the power generation technology influence coefficient of each distributed power source and the storage technology influence coefficient of each distributed power source, and is used to determine the value of the stable operation evaluation of distributed power sources in the AC / DC hybrid distribution network.

[0124] It is expressed as the access effect evaluation index of renewable energy in AC / DC hybrid distribution network, which is obtained by comprehensive analysis of the influence coefficient of operator support indicators, the influence coefficient of operator economic indicators and the influence coefficient of power quality evaluation indicators on the grid side, so as to determine the access effect evaluation index of renewable energy in AC / DC hybrid distribution network.

[0125] It is represented by the weight factor corresponding to the predefined stable operation evaluation degree of distributed power sources, It is expressed as the weight factor corresponding to the predefined renewable energy access effect evaluation index, and e is a natural constant.

[0126] Furthermore, the matching obtains a planning preset plan for the AC / DC hybrid distribution network, and the specific analysis process is as follows:

[0127] The planning feasibility of the AC / DC hybrid distribution network is compared with the set planning feasibility threshold. If the planning feasibility of the AC / DC hybrid distribution network is lower than the planning feasibility threshold, it may mean that there are major technical, economic, environmental or social problems in the planning scheme, resulting in the project being unable to proceed on time or having to be cancelled; a plan with low feasibility may result in a large amount of resources being invested in the early stage, but the scheme is not feasible and cannot be implemented, resulting in a waste of resources; if the planning feasibility is insufficient, it may lead to problems such as unreasonable grid structure and improper equipment selection, which in turn affects the stability of power supply.

[0128] The planning executable degree of the AC / DC hybrid distribution network is differenced with the planning executable threshold to obtain the planning executable deviation value of the AC / DC hybrid distribution network, and the planning executable deviation value of the AC / DC hybrid distribution network is matched with the planning preset plans corresponding to each planning executable deviation value interval defined in the AC / DC distribution network information database, thereby obtaining the planning preset plan of the AC / DC hybrid distribution network.

[0129] The above-mentioned planning pre-set plans for the AC / DC hybrid distribution network refer to a series of strategies and measures formulated in advance when constructing and planning the AC / DC hybrid distribution network to ensure the safe, reliable and efficient operation of the distribution network; these plans usually include detailed emergency plans for various possible faults and abnormal situations, including fault identification, isolation, recovery and other measures to quickly respond to emergencies.

[0130] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.

Claims

1. A robust planning method for AC / DC hybrid distribution network under multi-layer consumption mode, characterized in that: include: Obtain the operating index set of each distributed power source in the AC / DC hybrid distribution network, and evaluate the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network; The specific analysis process of the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network is as follows: According to the operation index set of each distributed power source in the AC / DC hybrid distribution network, wherein the operation index set includes the power generation technology related information and the storage technology related information, the power generation technology influence coefficient of each distributed power source and the storage technology influence coefficient of each distributed power source are evaluated and analyzed comprehensively, and the stable operation evaluation degree of the distributed power source in the AC / DC hybrid distribution network is obtained; Collect and process data related to the access effect of renewable energy in AC / DC hybrid distribution networks, and evaluate the access effect evaluation index of renewable energy in AC / DC hybrid distribution networks; The access effect evaluation index of renewable energy in the AC / DC hybrid distribution network is analyzed in detail as follows: According to the data related to the access effect of renewable energy in the AC / DC hybrid distribution network, the information related to the operator support indicators, the operator economic indicators and the power quality evaluation indicators on the grid side are extracted, and the influence coefficients of the operator support indicators, the operator economic indicators and the power quality evaluation indicators on the grid side are evaluated respectively, and a comprehensive analysis is performed to obtain the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network; The stable operation evaluation degree of distributed power sources in the AC / DC hybrid distribution network and the access effect evaluation index of renewable energy in the AC / DC hybrid distribution network are comprehensively analyzed and processed to obtain the planning executable degree of the AC / DC hybrid distribution network, which is then compared with the set planning executable threshold to finally match the planning preset plan of the AC / DC hybrid distribution network.

2. The method for robust planning of AC / DC hybrid distribution network under multi-layer consumption mode according to claim 1 is characterized by: The matching obtains the planning preset plan of the AC / DC hybrid distribution network, and the specific analysis process is as follows: The planning executable degree of the AC / DC hybrid distribution network is compared with the set planning executable threshold. If the planning executable degree of the AC / DC hybrid distribution network is lower than the planning executable threshold, the planning executable degree of the AC / DC hybrid distribution network and the planning executable threshold are difference processed to obtain the planning executable deviation value of the AC / DC hybrid distribution network. The planning executable deviation value of the AC / DC hybrid distribution network is matched with the planning preset plans corresponding to each planning executable deviation value interval defined in the AC / DC distribution network information database, thereby obtaining the planning preset plan of the AC / DC hybrid distribution network.

3. The method for robust planning of AC / DC hybrid distribution network under multi-layer consumption mode according to claim 2 is characterized by: The specific analysis formula for the feasibility of the planning of the AC / DC hybrid distribution network is as follows: in It is expressed as the planning feasibility of AC / DC hybrid distribution network. It is expressed as the stable operation evaluation degree of distributed generation in AC / DC hybrid distribution network. It is expressed as the access effect evaluation index of renewable energy in AC / DC hybrid distribution network, It is represented by the weight factor corresponding to the predefined stable operation evaluation degree of distributed power sources, It is expressed as the weight factor corresponding to the predefined renewable energy access effect evaluation index, and e is a natural constant.

4. The method for robust planning of AC / DC hybrid distribution network under multi-layer consumption mode according to claim 3 is characterized by: The specific analysis process of the influence coefficient of the power generation technology of each distributed power source is as follows: According to the power generation technology correlation information of each distributed power source, the cumulative power generation, power generation efficiency, number of faults and duration of each fault of each distributed power source within the set planning period are extracted; The number of faults of each distributed power source within the set planning period and the duration of each fault are analyzed and processed through the state enumeration method, and finally the power generation reliability of each distributed power source within the set planning period is obtained; The power generation reference quantity and power generation efficiency are extracted from the AC / DC distribution network information database, and the power generation technology influence coefficient of each distributed power source is comprehensively analyzed.

5. The method for robust planning of AC / DC hybrid distribution network under multi-layer consumption mode according to claim 4 is characterized by: The specific analysis process of the storage technology influence coefficient of each distributed power source is as follows: According to the storage technology association information of each distributed power source, the cumulative storage capacity and storage efficiency of each distributed power source within the set planning period are extracted; The storage reference quantity and storage definition efficiency are extracted from the AC / DC distribution network information database, and the storage technology influence coefficient of each distributed power source is comprehensively analyzed.

6. The method for robust planning of AC / DC hybrid distribution network under multi-layer consumption mode according to claim 5 is characterized by: The specific analysis process of the influence coefficient of the operator support indicator is as follows: Based on the information related to the operator's support indicators, the operator's on-grid electricity sales revenue, power outage loss costs, and renewable energy operation and maintenance costs within the set planning period are extracted; The defined revenue amount of grid-connected electricity sales, the permitted cost of power outage losses, and the defined maintenance cost of renewable energy operation are extracted from the AC / DC distribution network information database, and the influence coefficient of operator support indicators is comprehensively analyzed.

7. The method for robust planning of AC / DC hybrid distribution network under multi-layer consumption mode according to claim 6 is characterized by: The specific analysis process of the influence coefficient of the operator's economic indicators is as follows: According to the relevant information of the operator's economic indicators, the operator's dynamic investment payback period is extracted; Based on the basic formula of cash inflow and outflow, the net cash flow of the operator at each planning time point is calculated, and the net cash flow change curve of the operator is constructed, from which the profit angle value corresponding to each profit of the operator is extracted; The profit-oriented value is extracted from the AC / DC distribution network information database, and the influence coefficient of the operator's economic indicators is comprehensively analyzed.

8. The method for robust planning of AC / DC hybrid distribution network under multi-layer consumption mode according to claim 7 is characterized by: The specific analysis process of the influence degree coefficient of the power quality evaluation index on the grid side is as follows: According to the relevant information of the power quality evaluation index on the grid side, the load point voltage qualification rate and the load point voltage deviation rate on the grid side within the set planning period are extracted; From the AC / DC distribution network information database, the load point voltage qualification rate and load point voltage definition deviation rate are extracted, and the influence coefficient of the power quality evaluation index on the grid side is comprehensively analyzed.