An intelligent project management platform for communication supervision
Through the design of the project intelligent management platform, the problems of untimely collection of information, inaccurate analysis, and inflexible scheduling and processing in traditional project management methods in large-scale and complex communication supervision projects have been solved, and the project progress and quality have been improved.
Patent Information
- Application Number
- CN202410517510.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-04-28
AI Technical Summary
When dealing with large-scale and complex communication supervision projects, traditional project management methods have problems such as inaccurate information collection, inaccurate analysis, and inflexible scheduling and processing, and ignore the allocation of human resources in the project, resulting in the impact of project progress and quality. .
An intelligent project management platform was designed, including project planning module, progress acquisition module, project analysis module and scheduling processing module. By calculating progress index, resource allocation is adjusted in real time, adjustment reports are generated, and progress of each sub-project is coordinated.
Improve project management efficiency, ensure project progress and quality, and reduce quality problems caused by delays in progress and unreasonable personnel allocation.
Smart Images

Figure CN118246694B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of project management, and in particular to an intelligent project management platform for communication supervision. Background Art
[0002] In modern project management, with the expansion of project scale and the increase of complexity, traditional management methods can no longer meet the needs of efficient and accurate project management. Especially in the field of communication supervision, due to the particularity of engineering projects, such as wide distribution, large number of participants, and large environmental changes, project management is more difficult. Therefore, how to improve project management efficiency, grasp project progress in real time and accurately, reasonably allocate resources, and effectively deal with various constraints has become an important topic in the current communication supervision project management.
[0003] At present, although there are some project management tools and methods, such as Gantt charts and critical path methods, these methods often have problems such as untimely information collection, inaccurate analysis, and inflexible scheduling when dealing with large-scale and complex communication supervision projects.
[0004] In addition, these methods often ignore the issue of human resource allocation in the project, resulting in unreasonable personnel allocation during the actual implementation process, which affects the progress and quality of the project.
[0005] Based on this, there is an urgent need for an intelligent project management platform for communication supervision, which can achieve comprehensive and in-depth management of projects through scientific and technological means, improve project management efficiency, and ensure project progress and quality. Summary of the invention
[0006] The purpose of the present invention is to provide a project intelligent management platform for communication supervision, which solves the technical problems raised in the background technology.
[0007] The purpose of the present invention can be achieved through the following technical solutions:
[0008] A project intelligent management platform for communication supervision, comprising:
[0009] The project planning module is used to assist the project leader in formulating project planning data for the target project. The project planning data includes several sub-projects divided into the target project, as well as the allocation planning information, time planning information, and constraint factor planning of each sub-project;
[0010] The progress collection module is used to obtain project progress data, which includes the actual allocation execution, actual time progress, and actual constraints of each sub-project;
[0011] The project analysis module is used to calculate the difference between the corresponding information in the project planning data and the project progress data, and then import the corresponding difference into the pre-trained index calculation formula to obtain the progress index of each sub-project;
[0012] The scheduling processing module is used to compare the absolute value of the progress index with the preset index threshold, and extract the progress index whose value is greater than the index threshold. Then, the scheduling result of the corresponding sub-project is obtained by reversing the index calculation formula, and then the adjustment results are summarized to generate an adjustment report.
[0013] As a further solution of the present invention: the time planning information represents the time node for completing the specified engineering quantity of the corresponding sub-project preset by the project leader, the allocation planning information represents the number of personnel of the corresponding executor of the sub-project preset by the project leader, and the constraint factor planning represents the time impact value of the project progress preset by the project leader based on multiple factors;
[0014] Among them, various factors include but are not limited to weather factors and execution worker factors;
[0015] The actual allocated execution is expressed as the number of actual executors of the corresponding sub-project, the actual time progress is expressed as the time node when the specified engineering quantity of the corresponding sub-project is actually completed, and the actual constraint factor is expressed as the time impact value of multiple factors corresponding to the project progress when the specified engineering quantity of the corresponding sub-project is actually completed.
[0016] As a further solution of the present invention: the progress analysis method is as follows:
[0017] Step K1, obtain the project planning data and project progress data at the specified time node;
[0018] Step K2: Calculate the difference between each sub-project in the project planning data and project progress data, as follows:
[0019] Calculate the difference between the actual time progress and the time planning information of each sub-project at the specified time node, and record it as the progress time difference JC i;
[0020] Calculate the difference between the time impact value of the planned and actual constraints corresponding to each sub-project, and record it as the impact time difference YC i;
[0021] Calculate the difference between the allocation planning information corresponding to each sub-project and the number of personnel actually allocated to the execution party, and record it as the personnel number difference RC i;
[0022] Where i = 1, 2, ... m, m represents the number of sub-projects;
[0023] Step K3, then use the index calculation formula:
[0024] Get the progress index Di of the corresponding sub-project;
[0025] Wherein, α, β, λ are preset proportional coefficient sets, α1 and α2, β1 and β2, λ1 and λ2 are proportional coefficients in the proportional coefficient sets α, β, λ respectively, and || is expressed as an absolute value;
[0026] in,
[0027] When the progress index D i is a negative value, it means that the actual progress of the subproject is greater than the planned progress of the project;
[0028] When the progress index Di is a positive value, it means that the actual progress of the subproject is less than the planned progress of the project.
[0029] As a further solution of the present invention: in Step K3, the closer the progress index Di is to 0, the closer the actual progress of the subproject is to the planned progress of the project, and when the values of JC i and / or YC i and / or RC i are 0, the corresponding α, β, and λ in the formula are arbitrary values.
[0030] As a further solution of the present invention: the calculation formulas of the progress time difference, the impact time difference and the personnel quantity difference are respectively as follows:
[0031] Progress time difference = actual time progress - time planning information;
[0032] Impact time difference = constraint planning - actual constraint;
[0033] Difference in number of personnel = allocation planning information - actual allocation execution.
[0034] As a further solution of the present invention: the scheduling processing method is as follows:
[0035] Step G1. First, compare the absolute value of each progress index with the preset index threshold:
[0036] Take the progress index of a group of sub-projects as an example;
[0037] If the absolute value of the progress index is greater than the preset index threshold, the sub-project is extracted;
[0038] If the absolute value of the progress index is less than or equal to the preset index threshold, the sub-item is not extracted;
[0039] Step G2: Take one sub-project among all the sub-projects extracted in Step G1 as an example;
[0040] The index threshold is used as the sub-project progress index of the project, and the impact time difference and progress time difference remain unchanged. Then, the corresponding new personnel quantity difference is calculated by reverse index calculation formula;
[0041] Then the difference between the number of passed personnel and the number of new personnel corresponding to the sub-project is calculated to obtain the number of additional personnel or the number of reduced personnel;
[0042] Step G3, then adjust the participants of each sub-project according to the number of additional personnel or reduction of personnel;
[0043] Step G4: Summarize the adjustment results obtained in Step G3 to generate an adjustment report.
[0044] As a further solution of the present invention: the calculation formula in Step G3 is: the number of additional personnel / the number of reduced personnel=|the difference in the number of personnel-the difference in the number of new personnel|;
[0045] In the formula, || represents the absolute value;
[0046] When the difference in the number of personnel minus the difference in the number of new personnel is negative, the result is the number of additional personnel, which means that a corresponding number of personnel need to be transferred from other subprojects to participate in the implementation of this subproject;
[0047] When the difference in the number of personnel minus the difference in the number of new personnel is positive, the result is the reduction in the number of personnel, which means that the corresponding number of personnel can be transferred from this subproject to participate in the implementation of other subprojects;
[0048] As a further solution of the present invention: the adjustment method of Step G3 is:
[0049] First, the comparison interval is set according to the number of additional personnel, where the comparison interval is: [number of additional personnel - interval compensation coefficient, number of additional personnel + interval compensation coefficient], and the interval compensation coefficient is a preset value;
[0050] Then compare the number of people removed with the comparison interval:
[0051] When the number of personnel to be reduced is within the comparison range, the project leader will adjust the personnel of the corresponding sub-project according to the number of additional personnel and the number of personnel to be reduced;
[0052] When the number of personnel to be reduced is not within the comparison interval, the index threshold is subtracted from the preset index reduction value, and the result is used as the progress index of all sub-projects extracted in Step G1. Subsequently, the corresponding number of new personnel and new number of personnel reduced is calculated according to the subsequent steps of Step G2. The project leader adjusts the personnel of the corresponding sub-project according to the number of new personnel and new number of personnel reduced.
[0053] As a further solution of the present invention: also include:
[0054] The user interface module is used to display the adjustment report to all participants of the execution party.
[0055] Beneficial effects of the present invention:
[0056] The present invention, by setting up a project planning module, the project leader can make detailed plans for the target project, including the division of sub-projects, personnel allocation, time planning, etc., which helps to improve the efficiency of project management;
[0057] The present invention, by setting a progress collection module, can obtain the actual progress data of the project in real time, including actual allocation execution, actual time progress, actual constraints, etc., which helps the project leader to understand the progress of the project in real time;
[0058] The present invention, by setting up a project analysis module, can perform progress analysis on project planning data and project progress data, and obtain the progress index of each sub-project, which helps the project leader to accurately understand the progress of the project;
[0059] The present invention, by setting a scheduling processing module, can schedule and process each sub-project according to the progress index, effectively coordinate the progress of each sub-project, which helps to improve the overall efficiency of the project;
[0060] The present invention, by setting a user interface module, can display the adjustment report to all participants of the execution party, which helps the participants to intuitively understand the progress and scheduling of the project;
[0061] The present invention can improve the completion quality of the project and reduce project quality problems caused by project progress delays or unreasonable personnel allocation through the collaborative work of the project planning module, progress collection module, project analysis module, scheduling processing module and user interface module. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] The present invention will be further described below in conjunction with the accompanying drawings.
[0063] Figure 1 The present invention is a system block diagram of a project intelligent management platform for communication supervision.
[0064] Figure 2 The present invention is a flow chart of a scheduling processing module of a project intelligent management platform for communication supervision. DETAILED DESCRIPTION
[0065] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0066] Embodiment 1
[0067] See also Figure 1 and Figure 2 As shown, the present invention is a project intelligent management platform for communication supervision, comprising:
[0068] The project planning module is used to assist the project leader in formulating project planning data for the target project. The project planning data includes several sub-projects divided into the target project, as well as the allocation planning information, time planning information, and constraint factor planning of each sub-project;
[0069] The time planning information indicates the time node for completing the specified engineering quantity of the corresponding sub-project preset by the project leader;
[0070] The allocation planning information indicates the number of personnel corresponding to the executor of the sub-project preset by the project leader;
[0071] Constraint planning is expressed as the time impact value of the project schedule preset by the project leader based on various factors;
[0072] Among them, various factors include but are not limited to weather factors and execution worker factors;
[0073] In this embodiment, by setting up a project planning module, the project leader can make detailed plans for the target project, including the division of sub-projects, personnel allocation, time planning, etc., which helps to improve the efficiency of project management;
[0074] The progress collection module is used to obtain project progress data, which includes the actual allocation execution, actual time progress, and actual constraints of each sub-project;
[0075] The actual allocated execution is represented by the number of personnel who actually execute the corresponding sub-project;
[0076] The actual time progress is expressed as the time node when the specified engineering quantity of the corresponding sub-project is actually completed;
[0077] The actual constraints are expressed as the time impact values of various factors on the project schedule corresponding to the actual completion of the specified engineering quantity of the corresponding sub-project;
[0078] This embodiment can obtain the actual progress data of the project in real time by setting up a progress collection module, including actual allocation execution, actual time progress, actual constraints, etc., which helps the project leader to understand the progress of the project in real time;
[0079] The project analysis module is used to analyze the project planning data and project progress data and derive the progress index of each sub-project;
[0080] The method is as follows:
[0081] Step K1, obtain the project planning data and project progress data at the specified time node;
[0082] Step K2: Calculate the difference between each sub-project in the project planning data and project progress data, as follows:
[0083] Calculate the difference between the actual time progress and the time planning information corresponding to each sub-project at the specified time node, and record it as the progress time difference JC i, the formula is: progress time difference = actual time progress - time planning information;
[0084] Calculate the difference between the time impact value of the planned and actual constraints corresponding to each sub-project, and record it as the impact time difference YC i, the formula is: impact time difference = constraint planning - actual constraint;
[0085] Calculate the difference between the allocation planning information corresponding to each sub-project and the number of executors in the actual allocation execution, and record it as the number of personnel difference RC i, the formula is: number of personnel difference = allocation planning information - actual allocation execution;
[0086] Where i = 1, 2, ... m, m represents the number of sub-projects;
[0087] Step K3, then use the index calculation formula:
[0088] Get the progress index Di of the corresponding sub-project;
[0089] Wherein, α, β, λ are preset proportional coefficient sets, α1 and α2, β1 and β2, λ1 and λ2 are proportional coefficients in the proportional coefficient sets α, β, λ respectively, and || is expressed as an absolute value;
[0090] in,
[0091] When the progress index D i is a negative value, it means that the actual progress of the subproject is greater than the planned progress of the project;
[0092] When the progress index D i is positive, it means that the actual progress of the subproject is less than the planned progress of the project;
[0093] The closer the progress index Di is to 0, the closer the actual progress of the subproject is to the planned progress of the project;
[0094] In this embodiment, when the value of JC i and / or YC i and / or RC i is 0, the corresponding α, β, and λ in the formula are arbitrary values, because 0 multiplied by any value will result in 0;
[0095] This embodiment can perform progress analysis on project planning data and project progress data by setting up a project analysis module, and obtain a progress index for each sub-project, which helps the project leader to accurately understand the progress of the project.
[0096] The scheduling processing module is used to schedule each sub-project according to the progress index Di. The scheduling processing can effectively coordinate the progress of each sub-project;
[0097] The method is as follows:
[0098] Step G1. First, compare the absolute value of each progress index with the preset index threshold:
[0099] Take the progress index of a group of sub-projects as an example;
[0100] If the absolute value of the progress index is greater than the preset index threshold, the sub-project is extracted;
[0101] If the absolute value of the progress index is less than or equal to the preset index threshold, the sub-item is not extracted;
[0102] Step G2: Take one sub-project among all the sub-projects extracted in Step G1 as an example;
[0103] The index threshold is used as the sub-project progress index of the project, and the impact time difference and progress time difference remain unchanged. Then, the corresponding new personnel quantity difference is calculated by reverse index calculation formula;
[0104] Then the difference between the number of passed personnel and the number of new personnel corresponding to the sub-project is calculated to obtain the number of additional personnel or the number of reduced personnel;
[0105] The calculation formula is: number of additional personnel / number of reduced personnel = |difference in number of personnel - difference in number of new personnel|;
[0106] In the formula,
[0107] When the difference in the number of personnel minus the difference in the number of new personnel is negative, the result is the number of additional personnel, which means that a corresponding number of personnel need to be transferred from other subprojects to participate in the implementation of this subproject;
[0108] When the difference in the number of personnel minus the difference in the number of new personnel is positive, the result is the reduction in the number of personnel, which means that the corresponding number of personnel can be transferred from this subproject to participate in the implementation of other subprojects;
[0109] Step G3, the project leader then adjusts the participants of each sub-project according to the number of additional personnel or reduction of personnel;
[0110] Step G4, summarize the adjustment results obtained in Step G3 to generate an adjustment report;
[0111] By setting up a scheduling processing module, each sub-project can be scheduled according to the progress index, effectively coordinating the progress of each sub-project, which helps to improve the overall efficiency of the project.
[0112] Embodiment 2
[0113] As the second embodiment of the present invention, when the present application is specifically implemented, compared with the first embodiment, the difference between the technical solution of the present embodiment and the first embodiment is that, based on Step G3 in the first embodiment, the present embodiment is also used to make further analysis when the project leader adjusts the participants of each sub-project according to the number of additional personnel and the number of reduced personnel;
[0114] Specifically:
[0115] First, the comparison interval is set according to the number of additional personnel, where the comparison interval is: [number of additional personnel - interval compensation coefficient, number of additional personnel + interval compensation coefficient], and the interval compensation coefficient is a preset value;
[0116] When the number of personnel to be reduced is within the comparison range, the project leader will adjust the personnel of the corresponding sub-project according to the number of additional personnel and the number of personnel to be reduced;
[0117] When the number of personnel to be reduced is not within the comparison interval, the index threshold is subtracted from the preset index reduction value, and the result is used as the progress index of all sub-projects extracted in Step G1. Subsequently, the corresponding number of new personnel and new number of personnel reduced is calculated according to the subsequent steps of Step G2. The project leader adjusts the personnel of the corresponding sub-project according to the number of new personnel and new number of personnel reduced.
[0118] Embodiment 3
[0119] As the third embodiment of the present invention, when the present application is implemented, compared with the first and second embodiments, the technical solution of this embodiment is to combine the solutions of the first and second embodiments, and the difference between the technical solution of this embodiment and the first and second embodiments is that this embodiment also includes:
[0120] The user interface module is used to display the adjustment report to all participants of the execution party;
[0121] By setting up the user interface module, the adjustment report can be displayed to all participants of the execution party, which helps the participants to intuitively understand the progress and scheduling of the project.
[0122] Embodiment 4
[0123] As the fourth embodiment of the present invention, when the present application is specifically implemented, compared with the first, second and third embodiments, the technical solution of this embodiment is to combine and implement the solutions of the above-mentioned first, second and third embodiments.
[0124] Through the collaborative work of each module in Example 1, Example 2, and Example 3, the completion quality of the project can be improved, and project quality problems caused by project progress delays or unreasonable personnel allocation can be reduced.
[0125] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and thresholds in the formula are set by technicians in this field according to actual conditions.
[0126] The above are only specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A project intelligent management platform for communication supervision, characterized in that: include: The project planning module is used to assist the project leader in formulating project planning data for the target project. The project planning data includes several sub-projects divided into the target project, as well as the allocation planning information, time planning information, and constraint factor planning of each sub-project; The progress collection module is used to obtain project progress data, which includes the actual allocation execution, actual time progress, and actual constraints of each sub-project; The project analysis module is used to calculate the difference between the corresponding information in the project planning data and the project progress data, and then import the corresponding difference into the pre-trained index calculation formula to obtain the progress index of each sub-project; The analysis method of the project analysis module is as follows: Step K1, obtain the project planning data and project progress data at the specified time node; Step K2: Calculate the difference between each sub-project in the project planning data and project progress data, as follows: Calculate the difference between the actual time progress and the time planning information corresponding to each sub-project at the specified time node, and record it as the progress time difference JCi; Calculate the difference between the time impact value of the constraint factor plan and the actual constraint factor corresponding to each sub-project, and record it as the impact time difference YCi; Calculate the difference between the allocation planning information corresponding to each sub-project and the number of executors actually allocated for execution, and record it as the number of personnel difference RCi; Where i = 1, 2, ... m, m represents the number of sub-projects; Step K3, then use the index calculation formula: Get the progress index Di of the corresponding sub-project; Wherein, α, β, λ are preset proportional coefficient sets, α1 and α2, β1 and β2, λ1 and λ2 are proportional coefficients in the proportional coefficient sets α, β, λ respectively, and || is expressed as an absolute value; in, When the progress index Di is a negative value, it means that the actual progress of the subproject is greater than the planned progress of the project; When the progress index Di is positive, it means that the actual progress of the subproject is less than the planned progress of the project; The scheduling processing module is used to compare the absolute value of the progress index with the preset index threshold, and extract the progress index whose value is greater than the index threshold, and then obtain the scheduling result of the corresponding sub-project by reversing the index calculation formula, and then summarize the adjustment results to generate an adjustment report; The scheduling process is as follows: Step G1. First, compare the absolute value of each progress index with the preset index threshold: Select a set of progress indices for sub-projects; If the absolute value of the progress index is greater than a preset index threshold, the sub-project is extracted; If the absolute value of the progress index is less than or equal to the preset index threshold, the sub-item is not extracted; Step G2. Select one sub-project from all the sub-projects extracted in Step G1. The index threshold is used as the sub-project progress index of the project, and the impact time difference and progress time difference remain unchanged. Then, the corresponding new personnel quantity difference is calculated by reverse index calculation formula; Then the difference between the number of passed personnel and the number of new personnel corresponding to the sub-project is used to calculate the number of additional personnel or the number of reduced personnel; Step G3, then adjust the participants of each sub-project according to the number of additional personnel or reduction of personnel; Step G4: Summarize the adjustment results obtained in Step G3 to generate an adjustment report.
2. According to claim 1, a project intelligent management platform for communication supervision is characterized in that: The time planning information indicates the time node for completing the specified engineering quantity of the corresponding sub-project preset by the project leader, the allocation planning information indicates the number of personnel of the corresponding executor of the sub-project preset by the project leader, and the constraint factor planning indicates the time impact value of the project progress preset by the project leader based on various factors; Among them, various factors include but are not limited to weather factors and execution worker factors; The actual allocated execution is expressed as the number of actual executors of the corresponding sub-project, the actual time progress is expressed as the time node when the specified engineering quantity of the corresponding sub-project is actually completed, and the actual constraint factor is expressed as the time impact value of multiple factors corresponding to the project progress when the specified engineering quantity of the corresponding sub-project is actually completed.
3. According to claim 1, a project intelligent management platform for communication supervision is characterized in that: In Step K3, the closer the progress index Di is to 0, the closer the actual progress of the subproject is to the planned progress of the project. When the values of JCi and / or YCi and / or RCi are 0, the corresponding α, β, and λ in the formula are arbitrary values.
4. According to claim 1, a project intelligent management platform for communication supervision is characterized in that: The calculation formulas for schedule time difference, impact time difference and personnel quantity difference are as follows: Progress time difference = actual time progress - time planning information; Impact time difference = constraint planning - actual constraint; Difference in number of personnel = allocation planning information - actual allocation execution.
5. According to claim 1, a project intelligent management platform for communication supervision is characterized in that: The calculation formula in Step G3 is: number of additional personnel / number of reduced personnel = |difference in number of personnel - difference in number of new personnel|; In the formula, || represents the absolute value; When the difference in the number of personnel minus the difference in the number of new personnel is negative, the result is the number of additional personnel, which means that a corresponding number of personnel need to be transferred from other subprojects to participate in the implementation of this subproject; When the value of the difference in the number of personnel minus the difference in the number of new personnel is positive, the result is the reduction in the number of personnel, which means that the corresponding number of personnel will be transferred from the subproject to participate in the implementation of other subprojects.
6. The project intelligent management platform for communication supervision according to claim 5, characterized in that: The adjustment method of StepG3 is: First, the comparison interval is set according to the number of additional personnel, where the comparison interval is: [number of additional personnel - interval compensation coefficient, number of additional personnel + interval compensation coefficient], and the interval compensation coefficient is a preset value; Then compare the number of people removed with the comparison interval: When the number of staff to be reduced is within the comparison range, the project leader will adjust the personnel of the corresponding sub-project according to the number of additional staff and the number of staff to be reduced.
7. The project intelligent management platform for communication supervision according to claim 6, characterized in that: When the number of personnel to be reduced is not within the comparison interval, the index threshold is subtracted from the preset index reduction value, and the result is used as the progress index of all sub-projects extracted in Step G1. Subsequently, the corresponding number of new personnel and new number of personnel reduced is calculated according to the subsequent steps of Step G2. The project leader adjusts the personnel of the corresponding sub-project according to the number of new personnel and new number of personnel reduced.
8. The project intelligent management platform for communication supervision according to claim 1, characterized in that: Also includes: The user interface module is used to display the adjustment report to all participants of the execution party.