Regional photovoltaic energy storage charging system based on distributed power generation
Through progressive analysis and information feedback, the stability and management problems in the photovoltaic energy storage system are solved, and the utilization rate and mobile charging efficiency of energy storage equipment are improved.
Patent Information
- Application Number
- CN202410341846.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-03-25
AI Technical Summary
The existing photovoltaic energy storage system cannot effectively supervise the photovoltaic power generation system, resulting in reduced stability and the inability to reasonably manage energy storage equipment and mobile equipment, thereby reducing energy storage utilization.
Through progressive analysis, photovoltaic equipment and energy storage equipment are analyzed, information feedback is used to make energy storage decisions, regulate and supervise, judge energy storage needs, and conduct detailed analysis of mobile charging distribution to ensure efficient energy storage and release and improve management Effect.
It improves the stability and safety of photovoltaic equipment and energy storage equipment, improves the management effect of energy storage equipment and the charging efficiency and utilization rate of mobile energy distribution equipment.
Smart Images

Figure CN118249388B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of photovoltaic energy storage and charging technology, and in particular to a regional photovoltaic energy storage and charging system based on distributed power generation. Background Art
[0002] With the transformation of energy structure and the improvement of environmental awareness, distributed photovoltaic power generation has gradually become mainstream. Distributed energy storage systems can alleviate power fluctuations caused by renewable energy production output by adjusting loads, absorbing power peaks, injecting power when power supply suddenly decreases, and storing energy on site. Distributed energy storage systems have flexible access locations and are currently mostly used in medium and low voltage distribution networks, distributed generation, microgrids, and user-side applications.
[0003] The operating mode of the distributed photovoltaic power generation system is that under the condition of solar radiation, the solar cell module array of the photovoltaic power generation system converts the output electricity of solar energy into electricity, which is sent to the DC distribution cabinet through the DC combiner box, and then converted into AC electricity by the grid-connected inverter to supply the building's own load. The excess or insufficient electricity is adjusted by connecting to the power grid. At present, the existing photovoltaic energy storage charging system still has shortcomings. It is impossible to supervise and warn the front-end photovoltaic power generation in the photovoltaic power generation system, which leads to the reduction of the stability of photovoltaic power generation, and it is impossible to reasonably manage the back-end energy storage equipment and reasonably distribute electricity according to demand, thereby reducing the energy storage utilization rate of the energy storage equipment, and it is impossible to reasonably manage mobile equipment;
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a regionalized photovoltaic energy storage charging system based on distributed power generation to solve the above-mentioned technical defects. The present invention analyzes photovoltaic equipment and energy storage equipment in a progressive analysis method to ensure the stability and safety of photovoltaic equipment and energy storage equipment. Under the premise of energy storage safety, energy storage decision analysis is performed on the energy storage demand of energy storage equipment through information feedback, that is, energy storage decision regulation and supervision analysis is performed on demand data to determine the energy storage demand of each energy storage device, and historical information is combined for analysis to reasonably adjust the energy storage decision of each energy storage device to ensure efficient energy storage and release of energy storage equipment, while improving the management effect of energy storage equipment, and the mobile charging distribution is refined analysis of the state risk data to determine whether the equipment meets the charging requirements, so as to improve the charging efficiency and reasonable utilization rate of mobile energy distribution equipment.
[0006] Preferably, the purpose of the present invention can be achieved by the following technical solutions: a regionalized photovoltaic energy storage charging system based on distributed power generation, including an energy storage charging platform, a photovoltaic tracking and analysis unit, an energy storage supervision unit, a distribution evaluation unit, a mobile management unit, an information receiving terminal, and an execution management unit;
[0007] When the energy storage charging platform generates an operation and management instruction, the operation and management instruction is sent to the photovoltaic tracking and analysis unit. When the photovoltaic tracking and analysis unit receives the operation and management instruction, it immediately obtains the status data of the photovoltaic equipment, which includes the power generation risk value and the component abnormal value, and performs power generation risk supervision feedback analysis on the status data. The obtained normal signal is sent to the energy storage supervision unit, and the obtained risk signal is sent to the execution management unit.
[0008] After receiving the normal signal, the energy storage supervision unit immediately collects the energy storage risk data of the energy storage equipment, including the maximum storage capacity, energy storage loss and over-temperature risk value, and performs energy storage safety supervision feedback analysis on the energy storage risk data, sends the obtained stable signal to the allocation evaluation unit and the mobile management unit, and sends the obtained alarm signal to the execution management unit;
[0009] After receiving the stable signal, the allocation and evaluation unit immediately collects the demand data of the energy storage battery, the demand data includes the energy storage usage and the charging evaluation value, and performs energy storage decision-making regulation and supervision analysis on the demand data to obtain a valid signal and a replacement instruction, and sends the obtained valid signal to the execution management unit via the energy storage supervision unit. When the replacement instruction is generated, the data floating verification analysis is performed, and the obtained balance signal, lowering signal and raising signal are sent to the execution management unit via the energy storage supervision unit;
[0010] When the information receiving end generates an order instruction, the order instruction is sent to the mobile management unit. After receiving the order instruction and the stable signal, the mobile management unit immediately collects the status risk data of the mobile energy distribution equipment. The status risk data represents the charging risk value, and performs a detailed analysis of the mobile charging distribution on the status risk data, and sends the maintenance signal and the distribution equipment number to the execution management unit.
[0011] Preferably, the power generation risk supervision feedback analysis process of the photovoltaic tracking analysis unit is as follows:
[0012] A monitoring cycle is set and set as a time threshold, and the power generation risk value and component abnormality value of the photovoltaic power generation equipment in each area within the time threshold are obtained. The power generation risk value represents the ratio of the surface oxidation area of the silicon wafer inside the photovoltaic power generation equipment and the distribution number of the oxidation area after data normalization. The component abnormality value represents the ratio of the part of the inverter operating temperature inside the photovoltaic power generation equipment that exceeds the preset operating temperature threshold to the preset operating temperature threshold, and then the ratio of the part of the inverter operating temperature that exceeds the preset operating temperature threshold to the preset operating temperature threshold, and then the ratio of the part of the photovoltaic panel structure crack length after data normalization. The product value obtained after data normalization of the power generation risk value and the component abnormality value is set as the component failure rate;
[0013] Compare and analyze the component failure rate with the preset component failure rate threshold value stored internally:
[0014] If the component failure rate is less than the preset component failure rate threshold, a normal signal is generated;
[0015] If the component failure rate is greater than or equal to the preset component failure rate threshold, a risk signal is generated.
[0016] Preferably, the energy storage safety supervision feedback analysis process of the energy storage supervision unit is as follows:
[0017] S1: Obtain the energy storage times of each energy storage device within the time threshold, obtain the maximum energy storage and energy storage loss of each energy storage times, establish a rectangular coordinate system with the energy storage times as the X-axis and the maximum energy storage and energy storage loss as the Y-axis, respectively, draw the maximum energy storage curve and energy storage loss curve by plotting points, obtain the ratio of the sum of all descending segments and the number of segments connected to the right end of the descending segment to the total number of segments from the maximum energy storage curve and the energy storage loss curve, and set them as the energy storage attenuation value and loss risk value respectively;
[0018] S2: Obtain the over-temperature risk value of each energy storage device within the time threshold. The over-temperature risk value represents the ratio of the time corresponding to the operating temperature of the energy storage device exceeding the preset operating temperature threshold to the total usage time, and then the sum of the data obtained by normalizing the average maintenance interval of the energy storage battery. The total usage time represents the time from the first start of energy storage to the current time.
[0019] S3: Compare and analyze the energy storage attenuation value, loss risk value and over-temperature risk value with the preset energy storage attenuation value threshold, preset loss risk value threshold and preset over-temperature risk value threshold that are recorded and stored internally:
[0020] If the energy storage attenuation value, the loss risk value, and the over-temperature risk value are all less than the preset energy storage attenuation value threshold, the preset loss risk value threshold, and the preset over-temperature risk value threshold, a stable signal is generated;
[0021] If the energy storage attenuation value, the loss risk value and the over-temperature risk value are all less than the preset energy storage attenuation value threshold, the preset loss risk value threshold and the preset over-temperature risk value threshold, an alarm signal is generated.
[0022] Preferably, the energy storage decision-making, regulation and supervision analysis process of the allocation evaluation unit is as follows:
[0023] T1: Obtain the remaining energy storage and actual energy storage of each energy storage device within the time threshold, set the difference between the remaining energy storage and the actual energy storage as the energy storage usage, and obtain the product of the number of charging times and the average value of the charging interval duration of each energy storage device within the time threshold after data normalization, and set it as the charging evaluation value, and obtain the queue charging value of each energy storage device within the time threshold. The queue charging value represents the ratio of the historical daily charging device average of the mobile energy distribution device to the historical charging interval average after data normalization. The energy storage usage, charging evaluation value and queue charging value are labeled as CS, CP and PC respectively;
[0024] T2: According to the formula The energy storage demand assessment coefficient is obtained, where a1, a2 and a3 are respectively the preset proportional factor coefficients of energy storage usage, charging assessment value and queue charging value, a1, a2 and a3 are all greater than zero, a4 is the preset correction factor coefficient, and the value is 2.018, Q is the energy storage demand assessment coefficient, and then the energy storage demand assessment coefficient Q of each energy storage device is obtained;
[0025] T3: Obtain the energy storage usage and charging evaluation value of each energy storage device within the historical m time thresholds, where m is a natural number greater than zero, respectively construct sets A and B of energy storage usage and charging evaluation values, respectively obtain the discrete coefficients of sets A and B, and set them as energy storage discrete values and charging discrete values, respectively, and compare and analyze the energy storage discrete values and charging discrete values with the preset energy storage discrete value threshold and the preset charging discrete value threshold stored internally:
[0026] If the energy storage discrete value is less than the preset energy storage discrete value threshold, and the charging discrete value is less than the preset charging discrete value threshold, a valid signal is generated;
[0027] If the energy storage discrete value is greater than or equal to the preset energy storage discrete value threshold, or the charging discrete value is greater than or equal to the preset charging discrete value threshold, a replacement instruction is generated.
[0028] Preferably, the data floatability verification and analysis process of the allocation evaluation unit is as follows:
[0029] The set A and the set B of the energy storage devices corresponding to the replacement instruction are obtained, and the largest subset and the smallest subset in the set A and the set B are removed, and then the mean of the set A and the set B after the removal is obtained, and it is set as the mean value of the energy storage usage and the mean value of the charging assessment value. The energy storage usage and the charging assessment value in the formula of the energy storage demand assessment coefficient Q are replaced by the mean value of the energy storage usage and the charging assessment value to calculate and obtain the new energy storage demand assessment coefficient QX of the energy storage device corresponding to the replacement instruction, and the new energy storage demand assessment coefficient QX is compared and analyzed with the preset standard range stored in the internal input:
[0030] If the new energy storage demand assessment coefficient QX falls within the preset standard range, a balancing signal is generated;
[0031] If the new energy storage demand assessment coefficient QX is greater than the maximum value in the preset standard range, an increase signal is generated;
[0032] If the new energy storage demand assessment coefficient QX is less than the maximum value in the preset standard range, a downward adjustment signal is generated.
[0033] Preferably, the mobile charging allocation refinement analysis process of the mobile management unit is as follows:
[0034] The charging risk value of the mobile energy distribution equipment within the time threshold is obtained. The charging risk value represents the product value obtained after the charging data and the energy storage attenuation data are normalized. The charging data represents the part where the average charging rate is lower than the preset average charging rate threshold. The energy storage attenuation data represents the difference between the actual maximum energy storage capacity and the energy storage capacity threshold. The charging risk value is compared and analyzed with the preset charging risk value threshold stored in the internal storage:
[0035] If the charging risk value is greater than or equal to the preset charging risk value threshold, a maintenance signal is generated.
[0036] If the charging risk value is less than the preset charging risk value threshold, the mobile energy allocation device corresponding to the charging risk value less than the preset charging risk value threshold is set as an idle mobile energy allocation device, and the user charging request information of the information receiving end within the time threshold is obtained, and the user charging request information includes the target parking space location and the charging amount, and the idle mobile energy allocation device with a charging amount exceeding the user charging request information is obtained and set as the allocation device;
[0037] The shortest driving time between the target parking space position of the allocation device and the allocation device is obtained, the shortest driving time is sorted in ascending order, and the allocation device number corresponding to the first shortest driving time after sorting is obtained.
[0038] The beneficial effects of the present invention are as follows:
[0039] (1) The present invention analyzes photovoltaic equipment and energy storage equipment in a progressive analysis manner to ensure the stability and safety of photovoltaic equipment and energy storage equipment, that is, the power generation risk supervision feedback analysis is performed on the status data of the photovoltaic equipment to determine whether the photovoltaic equipment is safely generating electricity, so as to enable timely management to ensure the safety of power generation. Under the premise of normal power generation, the energy storage risk data is subjected to energy storage safety supervision feedback analysis to determine whether the energy storage equipment is safely storing energy, so as to reduce the risk of the energy storage equipment charging the rear-end mobile energy distribution equipment, so as to ensure the safety of charging the rear-end mobile energy distribution equipment;
[0040] (2) Under the premise of energy storage safety, the present invention conducts energy storage decision analysis on the energy storage demand of energy storage equipment by means of information feedback, that is, it conducts energy storage decision regulation and supervision analysis on the demand data to determine the energy storage demand of each energy storage device, and combines historical information for analysis so as to reasonably adjust the energy storage decision of each energy storage device to ensure efficient energy storage and release of the energy storage device, while improving the management effect of the energy storage device, and conducts detailed analysis of mobile charging distribution on the status risk data to determine whether the equipment meets the charging requirements, so as to improve the charging efficiency and reasonable utilization rate of the mobile energy distribution equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The present invention will be further described below in conjunction with the accompanying drawings;
[0042] Figure 1 It is a flowchart of the system of the present invention;
[0043] Figure 2 It is a partial reference diagram of the first embodiment of the present invention. DETAILED DESCRIPTION
[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0045] Embodiment 1:
[0046] See also Figure 1 to Figure 2As shown, the present invention is a regionalized photovoltaic energy storage charging system based on distributed power generation, including an energy storage charging platform, a photovoltaic tracking and analysis unit, an energy storage supervision unit, an allocation and evaluation unit, a mobile management unit, an information receiving terminal and an execution management unit. The energy storage charging platform is connected to the photovoltaic tracking and analysis unit in a one-way communication manner, the photovoltaic tracking and analysis unit is connected to the energy storage supervision unit and the execution management unit in a one-way communication manner, the energy storage supervision unit is connected to the allocation and evaluation unit in a two-way communication manner, the energy storage supervision unit is connected to the mobile management unit and the execution management unit in a one-way communication manner, the information receiving terminal is connected to the mobile management unit in a one-way communication manner, and the mobile management unit is connected to the execution management unit in a one-way communication manner;
[0047] When the energy storage charging platform generates an operation and management instruction, it sends the operation and management instruction to the photovoltaic tracking and analysis unit. When the photovoltaic tracking and analysis unit receives the operation and management instruction, it immediately obtains the status data of the photovoltaic equipment, which includes the power generation risk value and the component abnormal value, and performs power generation risk supervision feedback analysis on the status data to determine whether the photovoltaic power generation equipment is generating electricity safely, so as to manage it in time and ensure the stability of power generation. The specific power generation risk supervision feedback analysis process is as follows:
[0048] A monitoring cycle is set and set as a time threshold, and the power generation risk value and component abnormality value of the photovoltaic power generation equipment in each area within the time threshold are obtained. The power generation risk value represents the ratio of the surface oxidation area of the silicon wafer inside the photovoltaic power generation equipment and the distribution number of the oxidation area after data normalization. The component abnormality value represents the ratio of the part of the inverter operating temperature inside the photovoltaic power generation equipment that exceeds the preset operating temperature threshold to the preset operating temperature threshold, and then the product value obtained by normalizing the data with the length of the photovoltaic panel structure crack. The product value obtained by normalizing the power generation risk value and the component abnormality value is set as the component failure rate. It should be noted that the larger the value of the component failure rate, the greater the risk of photovoltaic power generation failure;
[0049] Compare and analyze the component failure rate with the preset component failure rate threshold value stored internally:
[0050] If the component failure rate is less than the preset component failure rate threshold, a normal signal is generated and sent to the energy storage supervision unit;
[0051] If the component failure rate is greater than or equal to the preset component failure rate threshold, a risk signal is generated and sent to the execution management unit. After receiving the risk signal, the execution management unit immediately displays the area number of the photovoltaic power generation equipment corresponding to the risk signal, so as to timely and rationally manage the photovoltaic power generation equipment in the area to ensure the stability of power generation;
[0052] After receiving the normal signal, the energy storage supervision unit immediately collects the energy storage risk data of the energy storage device, including the maximum storage capacity, energy storage loss and over-temperature risk value, and performs energy storage safety supervision feedback analysis on the energy storage risk data to determine whether the energy storage device is storing energy safely, so as to reduce the charging risk of the energy storage device to the back-end mobile energy distribution device, so as to ensure the safety of the charging of the back-end mobile energy distribution device. The specific energy storage safety supervision feedback analysis process is as follows:
[0053] The energy storage times of each energy storage device within the time threshold are obtained, and the maximum energy storage and energy storage loss of each energy storage times are obtained. A rectangular coordinate system is established with the energy storage times as the X-axis and the maximum energy storage and energy storage loss as the Y-axis respectively. The maximum energy storage curve and the energy storage loss curve are respectively drawn by plotting points. The ratio of the sum of the number of all descending segments and the number of connected segments at the right end of the descending segment to the total number of segments is obtained from the maximum energy storage curve and the energy storage loss curve respectively, and they are set as the energy storage attenuation value and the loss risk value respectively. It should be noted that the energy storage loss represents the natural loss of electricity between the end of energy storage of the energy storage device and the next energy storage period. The energy storage attenuation value and the loss risk value are two influencing parameters reflecting the risk of energy storage battery failure;
[0054] Obtain the over-temperature risk value of each energy storage device within the time threshold. The over-temperature risk value represents the ratio of the time corresponding to the operating temperature of the energy storage device exceeding the preset operating temperature threshold to the total usage time, and then the sum of the data obtained by normalizing the average maintenance interval of the energy storage battery. The total usage time represents the time from the first start of energy storage to the current time. It should be noted that the larger the value of the over-temperature risk value, the greater the abnormal risk of the energy storage battery;
[0055] The energy storage attenuation value, loss risk value and over-temperature risk value are compared and analyzed with the preset energy storage attenuation value threshold, preset loss risk value threshold and preset over-temperature risk value threshold that are stored internally:
[0056] If the energy storage attenuation value, the loss risk value, and the over-temperature risk value are all less than the preset energy storage attenuation value threshold, the preset loss risk value threshold, and the preset over-temperature risk value threshold, a stabilization signal is generated and sent to the allocation evaluation unit and the mobile management unit;
[0057] If the energy storage attenuation value, the loss risk value and the over-temperature risk value are all less than the preset energy storage attenuation value threshold, the preset loss risk value threshold and the preset over-temperature risk value threshold, an alarm signal is generated and sent to the execution management unit. After receiving the alarm signal, the execution management unit immediately displays the area number corresponding to the alarm signal, so as to timely and rationally manage the energy storage equipment in the area to ensure the stability of power generation and reduce the charging risk of the back-end mobile energy distribution equipment.
[0058] Embodiment 2:
[0059] After receiving the stable signal, the allocation evaluation unit immediately collects the demand data of the energy storage battery. The demand data includes the energy storage usage and the charging evaluation value, and performs energy storage decision-making, regulation and supervision analysis on the demand data to determine the energy storage demand of each energy storage device, and analyzes it in combination with historical information so as to reasonably adjust the energy storage decision of each energy storage device to ensure the efficient storage and release of energy of the energy storage device. The specific energy storage decision-making, regulation and supervision analysis process is as follows:
[0060] The remaining energy storage and actual energy storage of each energy storage device within the time threshold are obtained, and the difference between the remaining energy storage and the actual energy storage is set as the energy storage usage. At the same time, the product of the number of charging times and the average charging interval duration of each energy storage device within the time threshold is obtained after data normalization, and it is set as the charging evaluation value, and the queue charging value of each energy storage device within the time threshold is obtained. The queue charging value represents the ratio of the historical daily charging device average of the mobile energy distribution device to the historical charging interval average after data normalization. It should be noted that the energy storage usage, charging evaluation value and queue charging value are three values that reflect the utilization demand of the energy storage device. The energy storage usage, charging evaluation value and queue charging value are labeled as CS, CP and PC respectively;
[0061] According to the formula The energy storage demand assessment coefficient is obtained, where a1, a2 and a3 are respectively the preset proportional factor coefficients of energy storage usage, charging assessment value and queue charging value. The proportional factor coefficient is used to correct the deviation of various parameters in the formula calculation process, so as to make the calculation result more accurate. a1, a2 and a3 are all greater than zero, a4 is the preset correction factor coefficient, and the value is 2.018. Q is the energy storage demand assessment coefficient, and then the energy storage demand assessment coefficient Q of each energy storage device is obtained;
[0062] The energy storage usage and charging evaluation values of each energy storage device within the historical m time thresholds are obtained, where m is a natural number greater than zero. Sets A and B of energy storage usage and charging evaluation values are constructed respectively. The discrete coefficients of sets A and B are obtained respectively, and set as energy storage discrete values and charging discrete values respectively. The energy storage discrete values and charging discrete values are compared and analyzed with the preset energy storage discrete value threshold and the preset charging discrete value threshold stored internally respectively:
[0063] If the energy storage discrete value is less than the preset energy storage discrete value threshold, and the charging discrete value is less than the preset charging discrete value threshold, a valid signal is generated, and the valid signal is sent to the execution management unit via the energy storage supervision unit. After receiving the valid signal, the execution management unit performs energy storage management according to the charging and discharging strategy set corresponding to the valid signal, and at the same time performs energy storage operations in a descending order according to the energy storage demand assessment coefficient Q corresponding to the valid signal, so as to ensure efficient energy storage and release of the energy storage device;
[0064] If the energy storage discrete value is greater than or equal to the preset energy storage discrete value threshold, or the charging discrete value is greater than or equal to the preset charging discrete value threshold, a replacement instruction is generated. When the replacement instruction is generated, the set A and set B of the energy storage devices corresponding to the replacement instruction are obtained, the maximum subset and the minimum subset in the set A and the set B are removed, and then the mean of the set A and the set B after the removal is obtained, and it is set as the mean energy storage usage and the mean charging evaluation value. The energy storage usage and the charging evaluation value in the energy storage demand evaluation coefficient Q formula are replaced by the mean energy storage usage and the charging evaluation value to calculate, and the new energy storage demand evaluation coefficient QX of the energy storage device corresponding to the replacement instruction is obtained. The new energy storage demand evaluation coefficient QX is compared and analyzed with the preset standard range stored in the internal input:
[0065] If the new energy storage demand assessment coefficient QX falls within the preset standard range, a balancing signal is generated;
[0066] If the new energy storage demand assessment coefficient QX is greater than the maximum value in the preset standard range, an increase signal is generated;
[0067] If the new energy storage demand assessment coefficient QX is less than the maximum value in the preset standard range, a down-regulation signal is generated, and the balancing signal, down-regulation signal and up-regulation signal are sent to the execution management unit via the energy storage supervision unit. After receiving the balancing signal, down-regulation signal and up-regulation signal, the execution management unit immediately performs the preset warning operations corresponding to the balancing signal, down-regulation signal and up-regulation signal, and adjusts the corresponding charging and discharging strategies of the corresponding energy storage equipment according to the feedback of different signals, so as to ensure the efficient storage and release of energy of the energy storage equipment, and improve the management effect of the energy storage equipment;
[0068] When the information receiving end generates an order instruction, the order instruction is sent to the mobile management unit. After receiving the order instruction and the stable signal, the mobile management unit immediately collects the state risk data of the mobile energy distribution equipment. The state risk data represents the charging risk value, and performs a mobile charging distribution refinement analysis on the state risk data to determine whether the equipment meets the charging requirements, so as to improve the charging efficiency and reasonable utilization rate of the mobile energy distribution equipment. The specific mobile charging distribution refinement analysis process is as follows:
[0069] The charging risk value of the mobile energy distribution equipment within the time threshold is obtained. The charging risk value represents the product value obtained after the charging data and the energy storage attenuation data are normalized. The charging data represents the part where the average charging rate is lower than the preset average charging rate threshold. The energy storage attenuation data represents the difference between the actual maximum energy storage capacity and the energy storage capacity threshold. The charging risk value is compared and analyzed with the preset charging risk value threshold stored in the internal storage:
[0070] If the charging risk value is greater than or equal to the preset charging risk value threshold, a maintenance signal is generated and sent to the execution management unit. After receiving the maintenance signal, the execution management unit immediately performs the preset warning operation corresponding to the maintenance signal, so as to timely perform maintenance management on the mobile energy distribution equipment corresponding to the maintenance signal.
[0071] If the charging risk value is less than the preset charging risk value threshold, the mobile energy distribution device corresponding to the charging risk value less than the preset charging risk value threshold is set as an idle mobile energy distribution device;
[0072] Obtain user charging request information from the information receiving end within the time threshold, the user charging request information including the target parking space location and the charging amount, obtain the idle mobile energy distribution device that exceeds the charging amount in the user charging request information, and set it as the distribution device;
[0073] The shortest driving time between the target parking space of the allocation device and the allocation device is obtained, the shortest driving time is sorted in ascending order, the allocation device number corresponding to the first shortest driving time after sorting is obtained, and the allocation device number is sent to the execution management unit. After receiving the allocation device number, the execution management unit sends the user charging request information to the corresponding allocation device, and the device goes to the target parking space to decouple from the target vehicle and complete charging, so as to improve the utilization rate of charging resources and enhance the user's convenient charging experience;
[0074] In summary, the present invention analyzes photovoltaic equipment and energy storage equipment in a progressive analysis manner to ensure the stability and safety of photovoltaic equipment and energy storage equipment, that is, the state data of the photovoltaic equipment is subjected to power generation risk supervision feedback analysis to determine whether the photovoltaic equipment is safely generating electricity, so as to timely manage and ensure the safety of power generation, and under the premise of normal power generation, the energy storage risk data is subjected to energy storage safety supervision feedback analysis to determine whether the energy storage device is safely storing energy, so as to reduce the charging risk of the energy storage device to the rear-end mobile energy distribution device, so as to ensure the safety of charging of the rear-end mobile energy distribution device, and under the premise of energy storage safety, the energy storage demand of the energy storage device is subjected to energy storage decision analysis by information feedback, that is, the demand data is subjected to energy storage decision regulation and supervision analysis to determine the energy storage demand of each energy storage device, and the historical information is combined for analysis to reasonably adjust the energy storage decision of each energy storage device to ensure the efficient storage and release of energy of the energy storage device, and at the same time improve the management effect of the energy storage device, and the state risk data is subjected to mobile charging distribution refinement analysis to determine whether the device meets the charging requirements, so as to improve the charging efficiency and reasonable utilization rate of the mobile energy distribution device.
[0075] The threshold is set to facilitate comparison. The size of the threshold depends on the amount of sample data and the number of bases set by technicians in this field for each group of sample data; as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0076] The above formulas are obtained by collecting a large amount of data for software simulation and selecting a formula that is close to the actual value. The coefficients in the formula are set by technical personnel in this field according to actual conditions. The above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited to this. Any technical personnel familiar with the technical field within the technical scope disclosed by the present invention, according to the technical solution and the inventive concept of the present invention, make equivalent replacement or change, which should be covered within the protection scope of the present invention.
Claims
1. Regionalized photovoltaic energy storage charging system based on distributed power generation, characterized by: It includes energy storage charging platform, photovoltaic tracking and analysis unit, energy storage supervision unit, distribution evaluation unit, mobile management unit, information receiving terminal and execution management unit; When the energy storage charging platform generates an operation and management instruction, the operation and management instruction is sent to the photovoltaic tracking and analysis unit. When the photovoltaic tracking and analysis unit receives the operation and management instruction, it immediately obtains the status data of the photovoltaic equipment, which includes the power generation risk value and the component abnormal value, and performs power generation risk supervision feedback analysis on the status data. The obtained normal signal is sent to the energy storage supervision unit, and the obtained risk signal is sent to the execution management unit. After receiving the normal signal, the energy storage supervision unit immediately collects the energy storage risk data of the energy storage equipment, including the maximum storage capacity, energy storage loss and over-temperature risk value, and performs energy storage safety supervision feedback analysis on the energy storage risk data, sends the obtained stable signal to the allocation evaluation unit and the mobile management unit, and sends the obtained alarm signal to the execution management unit; After receiving the stable signal, the allocation and evaluation unit immediately collects the demand data of the energy storage battery, the demand data includes the energy storage usage and the charging evaluation value, and performs energy storage decision-making regulation and supervision analysis on the demand data to obtain a valid signal and a replacement instruction, and sends the obtained valid signal to the execution management unit via the energy storage supervision unit. When the replacement instruction is generated, the data floating verification analysis is performed, and the obtained balance signal, lowering signal and raising signal are sent to the execution management unit via the energy storage supervision unit; When the information receiving end generates an order instruction, the order instruction is sent to the mobile management unit. After receiving the order instruction and the stable signal, the mobile management unit immediately collects the state risk data of the mobile energy distribution equipment, the state risk data represents the charging risk value, and performs a detailed analysis of the mobile charging distribution on the state risk data, and sends the maintenance signal and the distribution equipment number to the execution management unit; The energy storage safety supervision feedback analysis process of the energy storage supervision unit is as follows: S1: Obtain the energy storage times of each energy storage device within the time threshold, obtain the maximum energy storage and energy storage loss of each energy storage times, establish a rectangular coordinate system with the energy storage times as the X-axis and the maximum energy storage and energy storage loss as the Y-axis, respectively, draw the maximum energy storage curve and energy storage loss curve by plotting points, obtain the ratio of the sum of all descending segments and the number of segments connected to the right end of the descending segment to the total number of segments from the maximum energy storage curve and the energy storage loss curve, and set them as the energy storage attenuation value and loss risk value respectively; S2: Obtain the over-temperature risk value of each energy storage device within the time threshold. The over-temperature risk value represents the ratio of the time corresponding to the operating temperature of the energy storage device exceeding the preset operating temperature threshold to the total usage time, and then the sum of the data obtained by normalizing the average maintenance interval of the energy storage battery. The total usage time represents the time from the first start of energy storage to the current time. S3: Compare and analyze the energy storage attenuation value, loss risk value and over-temperature risk value with the preset energy storage attenuation value threshold, preset loss risk value threshold and preset over-temperature risk value threshold that are recorded and stored internally: If the energy storage attenuation value, the loss risk value, and the over-temperature risk value are all less than the preset energy storage attenuation value threshold, the preset loss risk value threshold, and the preset over-temperature risk value threshold, a stable signal is generated; If the energy storage attenuation value, loss risk value and over-temperature risk value are all less than the preset energy storage attenuation value threshold, the preset loss risk value threshold and the preset over-temperature risk value threshold, an alarm signal is generated. The energy storage decision-making, regulation and supervision analysis process of the allocation evaluation unit is as follows: T1: Obtain the remaining energy storage and actual energy storage of each energy storage device within the time threshold, set the difference between the remaining energy storage and the actual energy storage as the energy storage usage, and obtain the product of the number of charging times and the average value of the charging interval duration of each energy storage device within the time threshold after data normalization, and set it as the charging evaluation value, and obtain the queue charging value of each energy storage device within the time threshold. The queue charging value represents the ratio of the historical daily charging device average of the mobile energy distribution device to the historical charging interval average after data normalization. The energy storage usage, charging evaluation value and queue charging value are labeled as CS, CP and PC respectively; T2: According to the formula The energy storage demand assessment coefficient is obtained, where a1, a2 and a3 are respectively the preset proportional factor coefficients of energy storage usage, charging assessment value and queue charging value, a1, a2 and a3 are all greater than zero, a4 is the preset correction factor coefficient, and the value is 2.018, Q is the energy storage demand assessment coefficient, and then the energy storage demand assessment coefficient Q of each energy storage device is obtained; T3: Obtain the energy storage usage and charging evaluation value of each energy storage device within the historical m time thresholds, where m is a natural number greater than zero, respectively construct sets A and B of energy storage usage and charging evaluation values, respectively obtain the discrete coefficients of sets A and B, and set them as energy storage discrete values and charging discrete values, respectively, and compare and analyze the energy storage discrete values and charging discrete values with the preset energy storage discrete value threshold and the preset charging discrete value threshold stored internally: If the energy storage discrete value is less than the preset energy storage discrete value threshold, and the charging discrete value is less than the preset charging discrete value threshold, a valid signal is generated; If the energy storage discrete value is greater than or equal to the preset energy storage discrete value threshold, or the charging discrete value is greater than or equal to the preset charging discrete value threshold, a replacement instruction is generated. The data floatability verification and analysis process of the allocation evaluation unit is as follows: The set A and the set B of the energy storage devices corresponding to the replacement instruction are obtained, and the largest subset and the smallest subset in the set A and the set B are removed, and then the mean of the set A and the set B after the removal is obtained, and it is set as the mean value of the energy storage usage and the mean value of the charging assessment value. The energy storage usage and the charging assessment value in the formula of the energy storage demand assessment coefficient Q are replaced by the mean value of the energy storage usage and the charging assessment value to calculate and obtain the new energy storage demand assessment coefficient QX of the energy storage device corresponding to the replacement instruction, and the new energy storage demand assessment coefficient QX is compared and analyzed with the preset standard range stored in the internal input: If the new energy storage demand assessment coefficient QX falls within the preset standard range, a balancing signal is generated; If the new energy storage demand assessment coefficient QX is greater than the maximum value in the preset standard range, an increase signal is generated; If the new energy storage demand assessment coefficient QX is less than the maximum value in the preset standard range, a downward adjustment signal is generated.
2. The regionalized photovoltaic energy storage charging system based on distributed power generation according to claim 1 is characterized in that: The power generation risk supervision feedback analysis process of the photovoltaic tracking analysis unit is as follows: A monitoring cycle is set and set as a time threshold, and the power generation risk value and component abnormality value of the photovoltaic power generation equipment in each area within the time threshold are obtained. The power generation risk value represents the ratio of the surface oxidation area of the silicon wafer inside the photovoltaic power generation equipment and the distribution number of the oxidation area after data normalization. The component abnormality value represents the ratio of the part of the inverter operating temperature inside the photovoltaic power generation equipment that exceeds the preset operating temperature threshold to the preset operating temperature threshold, and then the ratio of the part of the inverter operating temperature that exceeds the preset operating temperature threshold to the preset operating temperature threshold, and then the ratio of the part of the photovoltaic panel structure crack length after data normalization. The product value obtained after data normalization of the power generation risk value and the component abnormality value is set as the component failure rate; Compare and analyze the component failure rate with the preset component failure rate threshold value stored internally: If the component failure rate is less than the preset component failure rate threshold, a normal signal is generated; If the component failure rate is greater than or equal to the preset component failure rate threshold, a risk signal is generated.
3. The regionalized photovoltaic energy storage charging system based on distributed power generation according to claim 1 is characterized in that: The mobile charging allocation refinement analysis process of the mobile management unit is as follows: The charging risk value of the mobile energy distribution equipment within the time threshold is obtained. The charging risk value represents the product value obtained after the charging data and the energy storage attenuation data are normalized. The charging data represents the part where the average charging rate is lower than the preset average charging rate threshold. The energy storage attenuation data represents the difference between the actual maximum energy storage capacity and the energy storage capacity threshold. The charging risk value is compared and analyzed with the preset charging risk value threshold stored in the internal storage: If the charging risk value is greater than or equal to the preset charging risk value threshold, a maintenance signal is generated. If the charging risk value is less than the preset charging risk value threshold, the mobile energy allocation device corresponding to the charging risk value less than the preset charging risk value threshold is set as an idle mobile energy allocation device, and the user charging request information of the information receiving end within the time threshold is obtained, and the user charging request information includes the target parking space location and the charging amount, and the idle mobile energy allocation device with a charging amount exceeding the user charging request information is obtained and set as the allocation device; The shortest driving time between the target parking space position of the allocation device and the allocation device is obtained, the shortest driving time is sorted in ascending order, and the allocation device number corresponding to the first shortest driving time after sorting is obtained.
Citation Information
Patent Citations
Charging and discharging control system suitable for outdoor energy storage power supply
CN116632983A
Photovoltaic power generation intelligent energy storage control system based on artificial intelligence
CN117013606A
New energy automobile shared power supply supervision system
CN117067971A