An anti-floating pipe pile structure and a pile end enlarged head grouting method

By adopting an anti-floating pipe pile structure in the pile foundation project, combined with trapezoidal drainage outlets and grouting technology, the drainage problem and insufficient pull-out bearing capacity when the groundwater level is high are solved, and the pile body strength and pull-out bearing capacity are achieved. The improvement avoids accidents such as lateral soil displacement and ground uplift.

CN118273319BActive Publication Date: 2024-10-11GUANGZHOU CONSTRUCTION ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410686619.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2024-10-11
Estimated Expiration
2044-05-30

Smart Images

  • Figure CN118273319B_ABST
    Figure CN118273319B_ABST
Patent Text Reader

Abstract

The present invention relates to an anti-floating pipe pile structure and a pile end enlargement head grouting method. The anti-floating pipe pile structure comprises a concrete pipe pile, a pipe pile end plate, a prestressed steel bar, a main grouting pipe, a drainage pipe, a trapezoidal drainage port, a grouting pile tip, an annular grouting pipe, an anti-pulling claw, a grouting inner pipe, a pressure control chamber and an anti-blocking component. The drainage pipe is connected to the trapezoidal drainage port, the annular grouting pipe is connected to the main grouting pipe, the grouting inner pipe is vertically connected to the annular grouting pipe, the pressure control chamber can make the slurry first slurry out of the grouting inner pipe and then slurry out of the annular grouting pipe, a limiting groove is provided between the grouting pile tip and the pipe pile end plate, when the concrete pipe pile is sunk, the anti-pulling claw is retracted in the limiting groove, after the concrete pipe pile is sunk, the concrete pipe pile is rotated counterclockwise to make the anti-pulling claw rotate and extend out of the limiting groove. The beneficial effect of the present invention is that on the basis of ensuring the strength of the pipe pile body, water intake and drainage are realized, and the anti-pulling bearing capacity of the pipe pile is improved while solving the drainage problem of the pipe pile.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation engineering, and in particular to an anti-floating pipe pile structure and a pile end enlarged head grouting method. Background Art

[0002] Compared with natural foundations, pile foundations have great advantages in improving foundation bearing capacity and reducing foundation settlement. However, when the groundwater level is high, the water buoyancy is large, which can easily cause lateral displacement of the soil or ground uplift, leading to accidents such as pile tilting and pile breaking.

[0003] Lowering the groundwater level is an active anti-floating measure. At present, there are drainage piles with drainage mesh holes set through the wall of the pile, such as: a drainage pile composite foundation treatment method (patent publication number: CN102061695A), plug-hole pressure-reducing drainage pile and its preparation process (patent publication number: CN102277869B) and a fiber-reinforced composite reinforced concrete drainage pile (patent publication number: CN104372790B). The above patents all involve densely opening holes in the wall of the pile, and then introducing water into the inner cavity of the pile for drainage. However, the holes in the wall of the pile weaken the strength of the pile body, and thus are not suitable for high-bearing capacity pile foundations. The patent with publication number CN105569095B discloses a drainage pressure-reducing anti-floating system, which uses a large-diameter sandless concrete pressure-reducing well to lower the groundwater level and reduce the water buoyancy under the basement floor, but the pressure-reducing well cannot bear the load and cannot be used as a pile foundation. In this regard, how to solve the drainage problem and improve the pull-out bearing capacity of the pile is a key technical problem that needs to be solved in pile foundation engineering at present. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an anti-floating pipe pile structure and a pile end enlarged head grouting method, which can achieve water intake and drainage on the basis of ensuring the strength of the pipe pile body, solve the drainage problem of the pipe pile and improve the pull-out bearing capacity of the pipe pile.

[0005] The purpose of the present invention is achieved through the following technical solutions:

[0006] A floating-resistant pipe pile structure comprises: a concrete pipe pile and a pipe pile end plate, wherein prestressed steel bars, a main grouting pipe and a drainage pipe are pre-buried in the concrete pipe pile along the length direction of the concrete pipe pile, and the pipe pile end plate is fixedly connected to the bottom of the concrete pipe pile through the prestressed steel bars; a drainage outlet, which is pre-buried at the anti-floating water level elevation on the outer wall of the concrete pipe pile, and the drainage pipe is located above the drainage outlet and is connected to the drainage outlet; a grouting pile tip, an annular grouting pipe, an anti-extraction claw and a grouting inner pipe, wherein the grouting pile tip is arranged at the bottom of the pipe pile end plate, and the annular grouting pipe is arranged at the bottom of the grouting pile tip and is connected to the main grouting pipe The grouting inner tube is vertically connected to the annular grouting tube. A plurality of slurry outlet holes are arranged on the side wall of the annular grouting tube and the side wall of the bottom end of the grouting inner tube. A pressure control chamber is arranged at the slurry outlet hole on the annular grouting tube, which makes the slurry firstly discharge from the grouting inner tube and then discharge from the annular grouting tube. An anti-blocking component is arranged at the slurry outlet hole on the grouting inner tube. A limit groove is arranged between the grouting pile tip and the end plate of the pipe pile. The anti-extraction claw is rotatably arranged in the limit groove. When the concrete pipe pile is sunk, the anti-extraction claw is retracted in the limit groove. After the concrete pipe pile is sunk, the concrete pipe pile is rotated counterclockwise to make the anti-extraction claw rotate and extend out of the limit groove.

[0007] Furthermore, the number of main grouting pipes is not less than two.

[0008] Furthermore, there are multiple drainage pipes and drainage outlets, the length direction of the drainage outlets is consistent with the length direction of the concrete pipe piles, and the multiple drainage outlets are distributed in a circular array with the axis of the concrete pipe piles as the center, and the drainage pipes and drainage outlets are connected one by one.

[0009] Furthermore, the drain outlet is a hollow structure with a trapezoidal cross-section formed by bending a steel plate. The panel of the drain outlet is adapted to the side wall shape of the concrete pipe pile. The panel of the drain outlet is densely covered with drainage mesh holes, and a filter cloth is pasted on the inner side of the panel of the drain outlet.

[0010] Furthermore, the grouting pile tip comprises a pile tip plate and a cross pile tip, the pile tip plate is arranged at the bottom of the pipe pile end plate, the cross pile tip is arranged at the bottom of the pile tip plate, and the annular grouting pipe is arranged at the bottom of the pile tip plate and surrounds the cross pile tip.

[0011] Furthermore, a connecting pipe connected to the annular grouting pipe is provided at the bottom of the pile tip plate along the side wall of the cross pile tip, and the grouting inner pipe is provided on the side wall of the cross pile tip and vertically connected to the connecting pipe.

[0012] Furthermore, the grouting pile tip also includes a guard plate, which is arranged at the bottom of the pile tip plate and surrounds the annular grouting pipe. A plurality of limit grooves are formed between the guard plate and the pipe pile end plate. The plurality of limit grooves are distributed in a circular array with the axis of the concrete pipe pile as the center. A rotating shaft connecting the guard plate and the pipe pile end plate is provided in the limit groove, and the anti-extraction claw is rotatably sleeved on the rotating shaft.

[0013] Furthermore, the grout outlet hole on the annular grouting pipe is closed in the pressure control chamber, a pressure check valve is provided on the side wall of the pressure control chamber, and the pressure check valve is connected to the annular grouting pipe through a pressure spring.

[0014] Furthermore, the anti-blocking component includes a sleeve and a nut. One end of the sleeve is open and the other end of the sleeve is provided with a closed cone tip. The nut is arranged at the end of the sleeve near the cone tip. The sleeve is sleeved on the grouting inner tube and is threadedly connected to the bottom end of the grouting inner tube through the nut. The open end of the sleeve surrounds the slurry outlet hole on the grouting inner tube.

[0015] Furthermore, based on the above anti-floating pipe pile structure, the present invention also provides a pile end enlarged head grouting method, comprising the following steps:

[0016] S1. Prefabricate the drainage outlet and process the pipe pile end plate;

[0017] S2. Make a steel cage for concrete pipe piles, embed prestressed steel bars, main grouting pipes, drainage pipes and drainage outlets on the steel cage, and install the pipe pile end plates;

[0018] S3, installing the pipe pile formwork, placing the pipe pile reinforcement cage on the pipe pile formwork and pouring high-strength concrete, and forming the concrete pipe pile after centrifugal molding and steam curing;

[0019] S4, making and installing the grouting pile tip, and installing the annular grouting pipe, the grouting inner pipe, the pressure control chamber, the anti-blocking assembly and the anti-pulling claw;

[0020] S5. Use static pressure method or pile planting method to sink the pile. After the pile is in place, rotate the concrete pipe pile counterclockwise to open the anti-extraction claws.

[0021] S6. After the pile is sunk, connect the drainage pipe to the water pump, and then pump out the groundwater to lower the groundwater level to the anti-floating water level;

[0022] S7. Connect the main grouting pipe to the grouting pump and leave one main grouting pipe connected to the drainage pipe. Then start the grouting pump for grouting. When the grouting volume and grouting pressure reach the design requirements, stop grouting and complete the pipe pile construction.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. The present invention provides a trapezoidal drain outlet locally on the outer wall of the pipe pile. The trapezoidal drain outlet is made of a steel plate that is bent on four sides to form a closed trapezoid. The strength of the closed trapezoidal steel plate is greater than the strength of the replaced concrete, thereby achieving drainage while ensuring the cross-sectional strength of the pile body.

[0025] 2. When the pile is sunk, the anti-extraction claws are retracted and hidden in the limiting grooves. After the pile is sunk into place, the pipe pile is rotated counterclockwise to open the anti-extraction claws to form enlarged heads of the anti-extraction claws, thereby improving the anti-extraction bearing capacity of the pipe pile.

[0026] 3. The present invention performs grouting at the pile tip from bottom to top, first grouting at the bottom of the pile tip, and as the grouting pressure increases, the pressure check valve in the grouting pressure control chamber is opened, and then grouting is performed around the tip plate of the pile tip, thereby forming an enlarged head of the grouting body. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic cross-sectional view of the overall structure of the present invention;

[0028] Figure 2 for Figure 1 Schematic diagram of the structural cross section in the AA direction;

[0029] Figure 3 for Figure 1 Schematic diagram of the structural cross section in the middle BB direction;

[0030] Figure 4 It is a schematic diagram of the structure of the anti-extraction claw in the present invention;

[0031] Figure 5 for Figure 2 Schematic diagram of the structural cross-section in the CC direction;

[0032] Figure 6 It is a schematic diagram of the structure of the drain outlet in the present invention;

[0033] Figure 7 It is a schematic diagram of the structural projection of the grouting pile tip in the present invention;

[0034] Figure 8 for Figure 7 Schematic diagram of the structural cross-section in the EE direction;

[0035] Fig. 9 It is a structural schematic diagram of the anti-blocking component in the present invention;

[0036] Fig.10 It is a schematic diagram of the structure of the pressure control chamber in the present invention.

[0037] In the figure: 101, concrete pipe pile; 102, prestressed steel bar; 103, main grouting pipe; 104, drainage pipe; 2, drainage outlet; 201, panel; 202, bottom plate; 203, drainage mesh; 3, pipe pile end plate; 301, grouting pipe hole; 4, grouting pile tip; 401, pile tip plate; 402, guard plate; 5, pressure control chamber; 501, pressure check valve; 502, pressure spring; 601, annular grouting pipe; 602, anti-extraction claw; 603, grouting inner pipe; 604, nut; 605, casing; 606, grouting hole; 607, limit groove. DETAILED DESCRIPTION

[0038] The present invention is further described below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description.

[0039] like Figure 1 , Figure 2 , Figure 3 , Fig. 9 , Fig.10 As shown, an anti-floating pipe pile structure includes a concrete pipe pile 101, a pipe pile end plate 3, a drain outlet 2, a grouting pile tip 4, an annular grouting pipe 601, an anti-pulling claw 602 and a grouting inner pipe 603. Prestressed steel bars 102, main grouting pipes 103 and drainage pipes 104 are pre-buried in the concrete pipe pile 101 along the length direction of the concrete pipe pile 101. The pipe pile end plate 3 is fixedly connected to the bottom of the concrete pipe pile 101 through the prestressed steel bars 102; the drainage outlet 2 is pre-buried at the anti-floating water level elevation on the outer wall of the concrete pipe pile 101, and the drainage pipe 104 is located above the drainage outlet 2 and is connected to the drainage outlet 2; the grouting pile tip 4 is arranged at the bottom of the pipe pile end plate 3, the annular grouting pipe 601 is arranged at the bottom of the grouting pile tip 4 and is connected to the main grouting pipe 103, the grouting inner pipe 603 is vertically connected to the annular grouting pipe 601, and a plurality of grouting holes 606 are provided on the side walls of the annular grouting pipe 601 and the bottom side walls of the grouting inner pipe 603; a limiting groove 607 is provided between the grouting pile tip 4 and the pipe pile end plate 3, and the anti-extraction claw 602 is rotatably arranged in the limiting groove 607.

[0040] Based on the above anti-floating pipe pile structure, when the concrete pipe pile 101 is sunk, the anti-extraction claw 602 is retracted in the limiting groove 607. After the concrete pipe pile 101 is sunk, the concrete pipe pile 101 is rotated counterclockwise, and the anti-extraction claw 602 rotates and extends out of the limiting groove 607 under the action of soil pressure, and the anti-extraction claw 602 is then embedded in the surrounding soil layer, thereby forming an enlarged head of the anti-extraction claw 602 at the pile end of the concrete pipe pile 101, thereby improving the anti-extraction bearing capacity of the concrete pipe pile 101; after sinking the pile, the drainage pipe 104 is connected to the water pump, and the groundwater that has infiltrated into the drainage port 2 can be pumped out through the drainage pipe 104, so that the groundwater level drops to the anti-floating defense water level; after draining the groundwater, the main grouting pipe 103 can be connected to the grouting pump, and then grouting is injected into the soil at the bottom of the concrete pipe pile 101 through the main grouting pipe 103, the annular grouting pipe 601, and the grouting inner pipe 603 to further fix the concrete pipe pile 101.

[0041] like Figure 1 , Figure 2 As shown, there are multiple drain pipes 104 and drain outlets 2, the length direction of the drain outlets 2 is consistent with the length direction of the concrete pipe pile 101, and the multiple drain outlets 2 are arranged in a circular array with the axis of the concrete pipe pile 101 as the center. The drain pipes 104 are connected to the drain outlets 2 one by one. Figure 5 , Figure 6As shown, the drain outlet 2 is a hollow structure with a trapezoidal cross section formed by bending a steel plate, including a bottom plate 202, two side plates and a panel 201, which is made directly from a piece of steel plate, wherein the panel 201 of the drain outlet 2 is adapted to the side wall shape of the concrete pipe pile 101, and the panel 201 of the drain outlet 2 is densely covered with drainage mesh holes 203, and a filter cloth is pasted on the inner side of the panel 201 of the drain outlet 2. The drain outlet 2 is made of a steel plate, and its strength is greater than that of concrete, which solves the problem that the side wall opening of the concrete pipe pile 101 weakens the cross-sectional strength of the pile body, and at the same time, the filter cloth can filter mud and gravel while achieving water permeability to prevent clogging of the drain pipe 104.

[0042] like Figure 1 , Figure 7 , Figure 8 As shown, the grouting pile tip 4 includes a pile tip plate 401 and a cross pile tip. The pile tip plate 401 is fixed to the bottom of the pipe pile end plate 3 by welding or the like, and the cross pile tip is fixed to the bottom of the pile tip plate 401. The cross pile tip can be integrally formed with the pile tip plate 401. The annular grouting pipe 601 is fixed to the bottom of the pile tip plate 401 by welding or the like and surrounds the cross pile tip. A connecting pipe connected to the annular grouting pipe 601 is fixed along the side wall of the cross pile tip at the bottom of the pile tip plate 401 by welding or the like, and the grouting inner pipe 603 is fixed to the side wall of the cross pile tip by welding or the like and is vertically connected to the connecting pipe.

[0043] like Figure 1 , Figure 4 , Figure 7 As shown, the grouting pile tip 4 also includes a guard plate 402, which is fixed to the bottom of the pile tip plate 401 by welding or the like and surrounds the annular grouting pipe 601. A plurality of limiting grooves 607 are formed between the guard plate 402 and the pile end plate 3. The plurality of limiting grooves 607 are distributed in a circular array with the axis of the concrete pile 101 as the center. A rotating shaft connecting the guard plate 402 and the pile end plate 3 is provided in the limiting groove 607, and the anti-extraction claw 602 is rotatably sleeved on the rotating shaft.

[0044] like Figure 1 , Fig.10As shown, in order to improve the pull-out bearing capacity of the concrete pipe pile 101, a pressure control chamber 5 is provided at the grouting hole 606 on the annular grouting pipe 601, which allows the grout to be firstly discharged from the grouting inner pipe 603 and then from the annular grouting pipe 601. Specifically, the grouting hole 606 on the annular grouting pipe 601 is enclosed in the pressure control chamber 5, and a pressure check valve 501 is provided on the side wall of the pressure control chamber 5, and the pressure check valve 501 is connected to the annular grouting pipe 601 through a pressure spring 502. The opening and closing of the pressure check valve 501 is set by the pressure spring 502. Through the setting of the pressure control chamber 5, the pile tip grouting is completed sequentially from bottom to top, that is, grouting is firstly performed around the bottom of the pile tip through the grouting inner tube 603. When the grouting pressure at the bottom of the pile tip is greater than the pressure of the pressure check valve 501 in the pressure control chamber 5, the pressure check valve 501 is opened, and then grouting is performed around the soil under the pile tip plate 401 and the anti-extraction claw 602, and finally a grouting body enlarged head is formed at the pile end of the concrete pipe pile 101. By forming the grouting body enlarged head, the anti-extraction bearing capacity of the concrete pipe pile 101 can be improved.

[0045] like Figure 8 , Fig. 9 As shown, the grouting holes 606 on the grouting inner tube 603 are arranged at equal intervals of 5 mm to 10 mm along the length direction of the grouting inner tube 603. In order to prevent the grouting inner tube 603 from being blocked during grouting, an anti-blocking component is provided at the grouting holes 606 on the grouting inner tube 603. Specifically, the anti-blocking component includes a sleeve 605 and a nut 604. One end of the sleeve 605 is open, and the other end of the sleeve 605 is provided with a closed cone tip. The nut 604 is fixed at one end of the sleeve 605 near the cone tip. The sleeve 605 is sleeved on the grouting inner tube 603 and is threadedly connected to the bottom end of the grouting inner tube 603 through the nut 604, so that the open end of the sleeve 605 surrounds the grouting holes 606 on the grouting inner tube 603, and then the arrangement of the sleeve 605 prevents mud and sand from blocking the grouting holes 606 on the grouting inner tube 603.

[0046] A pile end enlarged head grouting method based on the above anti-floating pipe pile structure comprises the following steps:

[0047] S1. Prefabricate the drain outlet 2 and process the pipe pile end plate 3.

[0048] Specifically, the steel plate is cut and processed so that the length of the steel plate is equal to the length of the drain outlet 2, and the width is equal to the sum of the four sides of the drain outlet 2. The panel 201 of the drain outlet 2 is processed into an arc-shaped plate with the same outer diameter as the pipe pile, and then a drainage mesh 203 is opened on the panel 201. The hole spacing of the drainage mesh 203 is 20mm~50mm, and the width of the trapezoidal drain outlet 2 is 50mm~100mm.

[0049] In addition to the anchoring and tensioning holes for the prestressed steel bars 102, the end plate 3 of the pipe pile also needs to reserve a grouting pipe hole 301 and a sleeve hole adapted to the rotating shaft. When connecting multiple sections of pipe piles, the main grouting pipe 103 and the drainage pipe 104 are aligned and connected.

[0050] S2. Make a steel cage for the concrete pipe pile 101, embed prestressed steel bars 102, main grouting pipes 103, drain pipes 104 and drain outlets 2 on the steel cage, position and fix the prestressed steel bars 102, main grouting pipes 103, drain pipes 104 and drain outlets 2, and install the pipe pile end plates 3; the number of main grouting pipes 103 is not less than two, one of the main grouting pipes 103 is connected to the drain pipe 104, and then it can be used for drainage and exhaust first, and then for secondary pressure supplementary grouting.

[0051] S3, installing the pipe pile formwork, placing the pipe pile reinforcement cage on the pipe pile formwork and pouring high-strength concrete, and forming the concrete pipe pile 101 after centrifugal molding and steam curing.

[0052] S4, making and installing the grouting pile tip 4, and installing the annular grouting pipe 601, the grouting inner pipe 603, the pressure control chamber 5, the anti-blocking assembly and the anti-pulling claw 602.

[0053] Specifically, after processing the limiting groove 607, the anti-extraction claw 602 is installed so that the anti-extraction claw 602 is retracted in the limiting groove 607; then the annular grouting pipe 601 is installed so that the main grouting pipe 103 is connected to the annular grouting pipe 601 through the grouting pipe hole 301 on the pile tip plate 401, and then the connecting pipe and the grouting inner pipe 603 are installed.

[0054] S5. Use static pressure method or pile planting method to sink piles. After the piles are in place, rotate counterclockwise (such as Figure 4 , Figure 7 The concrete pipe pile 101 is rotated (in the direction indicated by the middle arrow) to open the anti-extraction claw 602 to form an enlarged head of the anti-extraction claw 602.

[0055] S6. After the pile sinking is completed, the drainage pipe 104 is connected to the water pump, and then the groundwater is pumped out to lower the groundwater level to the anti-floating water level.

[0056] S7, connect the main grouting pipe 103 to the grouting pump and leave one main grouting pipe 103 connected to the drainage pipe 104, then start the grouting pump to perform grouting, and stop grouting when the grouting volume and grouting pressure reach the design requirements, and complete the pipe pile construction.

[0057] Specifically, grouting is first performed through the grouting inner tube 603. When the grouting pressure at the bottom of the pile tip is greater than the pressure of the pressure check valve 501 on the pressure control chamber 5, the pressure check valve 501 opens, and then grouting can be performed to the soil below the pile tip plate 401 and around the anti-extraction claw 602 until the grouting amount and grouting pressure meet the design requirements.

[0058] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An anti-floating pipe pile structure, characterized in that: include: A concrete pipe pile (101) and a pipe pile end plate (3), wherein prestressed steel bars (102), a main grouting pipe (103) and a drainage pipe (104) are pre-buried in the concrete pipe pile (101) along the length direction of the concrete pipe pile (101), and the pipe pile end plate (3) is fixedly connected to the bottom of the concrete pipe pile (101) through the prestressed steel bars (102); A drainage outlet (2), the drainage outlet (2) being pre-buried at an anti-floating water level elevation on the outer wall of the concrete pipe pile (101), and a drainage pipe (104) being located above the drainage outlet (2) and in communication with the drainage outlet (2); The drain outlet (2) is a hollow structure formed by bending a steel plate and having a trapezoidal cross section. The panel (201) of the drain outlet (2) is adapted to the outer shape of the side wall of the concrete pipe pile (101). The panel (201) of the drain outlet (2) is densely covered with drainage mesh holes (203). A filter cloth is pasted on the inner side of the panel (201) of the drain outlet (2). The invention relates to a grouting pile tip (4), an annular grouting pipe (601), an anti-extraction claw (602) and an inner grouting pipe (603). The grouting pile tip (4) is arranged at the bottom of the pipe pile end plate (3). The annular grouting pipe (601) is arranged at the bottom of the grouting pile tip (4) and is connected to the main grouting pipe (103). The inner grouting pipe (603) is vertically connected to the annular grouting pipe (601). A plurality of grouting holes (606) are arranged on the side wall of the annular grouting pipe (601) and the side wall of the bottom end of the inner grouting pipe (603). The grouting holes (606) on the annular grouting pipe (601) are provided with a means for firstly discharging grout from the inner grouting pipe (603) and then discharging grout. 3) Slurry is discharged from the pressure control chamber (5) of the annular grouting pipe (601). An anti-blocking component is provided at the grouting hole (606) on the grouting inner pipe (603). A limit groove (607) is provided between the grouting pile tip (4) and the pile end plate (3). The anti-pulling claw (602) is rotatably arranged in the limit groove (607). When the concrete pipe pile (101) is sunk, the anti-pulling claw (602) is retracted in the limit groove (607). After the concrete pipe pile (101) is sunk, the concrete pipe pile (101) is rotated counterclockwise to make the anti-pulling claw (602) rotate and extend out of the limit groove (607); The grouting pile tip (4) comprises a pile tip plate (401) and a cross pile tip, wherein the pile tip plate (401) is arranged at the bottom of the pipe pile end plate (3), the cross pile tip is arranged at the bottom of the pile tip plate (401), an annular grouting pipe (601) is arranged at the bottom of the pile tip plate (401) and surrounds the cross pile tip, a connecting pipe connected to the annular grouting pipe (601) is arranged at the bottom of the pile tip plate (401) along the side wall of the cross pile tip, and a grouting inner pipe (603) is arranged on the side wall of the cross pile tip and vertically connected to the connecting pipe; The grouting pile tip (4) further comprises a guard plate (402), the guard plate (402) being arranged at the bottom of the pile tip plate (401) and surrounding the annular grouting pipe (601), a plurality of limiting grooves (607) being formed between the guard plate (402) and the pipe pile end plate (3), the plurality of limiting grooves (607) being arranged in a circular array with the axis of the concrete pipe pile (101) as the center, a rotation shaft connecting the guard plate (402) and the pipe pile end plate (3) being arranged in the limiting groove (607), and the anti-extraction claw (602) being rotatably sleeved on the rotation shaft.

2. The anti-floating pipe pile structure according to claim 1, characterized in that: The number of main grouting pipes (103) is not less than two.

3. The anti-floating pipe pile structure according to claim 1, characterized in that: A plurality of drainage pipes (104) and drainage outlets (2) are provided, the length direction of the drainage outlets (2) is consistent with the length direction of the concrete pipe pile (101), the plurality of drainage outlets (2) are distributed in a circular array with the axis of the concrete pipe pile (101) as the center, and the drainage pipes (104) are connected to the drainage outlets (2) in a one-to-one correspondence.

4. The anti-floating pipe pile structure according to claim 1, characterized in that: The grout outlet hole (606) on the annular grouting pipe (601) is enclosed in the pressure control chamber (5). A pressure check valve (501) is provided on the side wall of the pressure control chamber (5). The pressure check valve (501) is connected to the annular grouting pipe (601) via a pressure spring (502).

5. The anti-floating pipe pile structure according to claim 1, characterized in that: The anti-blocking component comprises a sleeve (605) and a nut (604); one end of the sleeve (605) is open, and the other end of the sleeve (605) is provided with a closed cone tip; the nut (604) is provided at an end of the sleeve (605) near the cone tip; the sleeve (605) is sleeved on the grouting inner tube (603) and is threadedly connected to the bottom end of the grouting inner tube (603) through the nut (604); the open end of the sleeve (605) surrounds the grouting outlet hole (606) on the grouting inner tube (603).

6. A method for grouting the pile end enlarged head of an anti-floating pipe pile structure as claimed in claim 2, characterized in that: The following steps are involved: S1, prefabricate the drainage outlet (2) and process the pipe pile end plate (3); S2, manufacturing a steel cage of a concrete pipe pile (101), pre-embedding prestressed steel bars (102), a main grouting pipe (103), a drainage pipe (104) and a drainage port (2) on the steel cage, and installing a pipe pile end plate (3); S3, installing the pipe pile formwork, placing the pipe pile reinforcement cage on the pipe pile formwork and pouring high-strength concrete, and forming the concrete pipe pile after centrifugal molding and steam curing (101); S4, manufacturing and installing the grouting pile tip (4), and installing the annular grouting pipe (601), the grouting inner pipe (603), the pressure control chamber (5), the anti-blocking assembly and the anti-pulling claw (602); S5, using a static pressure method or a pile planting method to sink the pile, and after the pile is sunk into place, rotating the concrete pipe pile (101) counterclockwise to open the anti-extraction claw (602); S6, after the pile is sunk, the drainage pipe (104) is connected to a water pump, and then the groundwater is pumped out to lower the groundwater level to the anti-floating water level; S7, connecting the main grouting pipe (103) to the grouting pump and leaving one main grouting pipe (103) connected to the drainage pipe (104), then starting the grouting pump to perform grouting, and stopping the grouting when the grouting volume and grouting pressure reach the design requirements, thus completing the pipe pile construction.