The construction method of the station's dark excavation section and connecting passage is organized and implemented by the station's open excavation section

By using the drilling pile and cross-middle partition method between the open excavation section and the concealed excavation section of the subway station in the central urban area, combined with the guidance hole excavation and advance support, the problem of the construction and settlement risks of the station rectangular section is solved, and the The implementation of station functions and construction safety save construction period and cost.

CN118292915BActive Publication Date: 2024-11-22CHINA RAILWAY DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410710942.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-11-22
Estimated Expiration
2044-06-04

AI Technical Summary

Technical Problem

When houses around subway stations in central urban areas cannot be demolished, traditional shield construction and open excavation methods are difficult to achieve the construction of rectangular section stations, and the hidden excavation method has the risk of settlement, and there is a lack of flexible construction methods to connect open excavation sections and hidden excavation. part.

Method used

The construction method of the station's hidden excavation section and connecting passage is organized by the open excavation section of the station, including the open excavation section, the hidden excavation section and the connecting passage. The advance support is set up through drilling piles, the cross-middle partition method and the guidance hole excavation. and deformation joints to ensure construction safety and functional integrity.

Benefits of technology

It realizes the station function and connects the open and hidden sections, reduces the amount of ground demolition, improves construction flexibility and safety, saves construction period and cost, and reduces the impact of uneven settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118292915B_ABST
    Figure CN118292915B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for constructing a station dark excavation section and a connecting passage organized and implemented by the open excavation section of the station, comprising the following steps: S1: constructing the enclosure and main structure of the open excavation section of the station by the open excavation method; S2: implementing advance support measures for the dark excavation section by the end wall of the open excavation section of the station; S3: adopting the cross-middle partition method to construct the dark excavation section and each guide tunnel, and timely implementing initial support; S4: implementing secondary lining of the dark excavation section; S5: implementing measures to strengthen the horse head gate of the connecting passage; S6: implementing secondary lining of the connecting passage. The present invention solves the problem that the open excavation station cannot be implemented partially due to the influence of demolished houses, and has the characteristics of strong flexibility of construction method, complete functions, high construction safety, no abandoned projects, etc., and at the same time has obvious advantages in realizing station functions and saving construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underground tunnel construction, in particular to a method for constructing a station dark excavation section and a connecting passage by organizing and implementing the construction of the station open excavation section. Background Art

[0002] In order to better serve residents, subway stations are often located in the central urban area. When the houses around the station cannot be demolished, the open excavation part of the station affected by it is not feasible to implement. The shield method often uses a circular cross section for interval construction, but underground stations usually use a rectangular cross section considering their functional layout and space utilization. Therefore, the shield method is not suitable for station construction.

[0003] The dark excavation method has the characteristics of flexible cross-section and effective control of settlement of surrounding risk sources. Therefore, it is necessary to study a construction method for implementing dark excavation sections and connecting passages from the open excavation section of the station.

[0004] The significance of solving the above technical problems lies in that, compared with traditional open-cut or underground-cut stations, the present invention implements the underground-cut section of the station from the open-cut section of the station, which not only ensures the realization of the station functions, but also solves the construction problem of the connecting passage between the open-cut section and the underground-cut section of the station, saves construction time and cost, and has broad promotion prospects. Summary of the invention

[0005] According to the above problems, the present invention proposes a method for constructing a station underground excavation section and a connecting passage by organizing the construction of the station open excavation section. The specific scheme is as follows:

[0006] A method for constructing a station underground excavation section and a connecting passage by organizing and implementing the construction of the station open excavation section, comprising an open excavation section, an underground excavation section and a connecting passage;

[0007] The open-cut section includes an end wall, and the dark-cut section is constructed after a certain range of the end wall is broken, and a connecting passage is constructed from the dark-cut section to the open-cut section, and the connecting passage is used to connect the open-cut section with the dark-cut section;

[0008] The construction method comprises the following steps:

[0009] S1: Open-cut method is used to construct the station open-cut section enclosure and main structure;

[0010] Level the site, relocate pipelines, use bored cast-in-place piles to construct the retaining pile structure of the station open-cut section, excavate the foundation pit and set up supports to the base, pour the cushion layer, lay the waterproof layer, and then backbuild the station open-cut section structure;

[0011] S2: Advanced support measures for the dark excavation section from the end wall of the station open excavation section;

[0012] Demolish the first range of reinforced concrete walls and bored cast-in-place piles at the end wall of the open-cut section, and implement advance support measures for the arch of the dark-cut section;

[0013] S3: Use the cross-middle partition method to construct the dark excavation section and each pilot tunnel, and implement initial support in a timely manner;

[0014] From the open-cut section to the soil-facing side, the dark-cut section is excavated by the cross-middle partition method, and a pilot tunnel is excavated under the arch of the dark-cut section. The pilot tunnel is excavated by the circular excavation and reserved core soil method, and the remaining pilot tunnels are excavated by the upper and lower steps method. After the pilot tunnel is excavated, it is closed in time to provide initial support for the dark-cut section;

[0015] S4: Construction of secondary lining of the dark excavation section;

[0016] A middle ring beam of the open-cut section is reserved on one side of the open-cut section, a second range of the end wall of the open-cut section is broken, and the first and second lining structures of the dark-cut section are constructed. After the first and second lining structures are rebuilt, a top ring beam of the open-cut section is cast on one side of the open-cut section, and the top ring beam of the open-cut section is rigidly connected to the first and second lining structures;

[0017] Then, the second second lining structure, the third second lining structure, and the fourth second lining structure of the dark excavation section are sequentially constructed;

[0018] S5: Strengthen the horse head gate of the connecting passage;

[0019] A double row of small conduits is constructed along the vault range of the connecting passage opening, and after the grouting of the double row of small conduits is completed, a combination of steel beams 28 and combination of columns 28 are erected along the opening;

[0020] S6: Construction of secondary lining of connecting channel;

[0021] The initial support implemented in the dark excavation section along the opening range of the connecting channel is removed, the initial support of the connecting channel is constructed, the secondary lining of the connecting channel is constructed after laying the waterproof layer, the work 28 combined columns are poured into the secondary lining of the connecting channel, and then the fifth second lining structure and the sixth second lining structure are constructed.

[0022] Preferably, in step S1, the open cut section structure consists of a top plate, a middle plate, a bottom plate, a center column, a side wall and an end wall.

[0023] Preferably, in step S2, the advanced support measures include:

[0024] S201: Horizontal grouting of sleeve valve pipes is carried out on the arch top of the dark excavation section;

[0025] Construct the arch of the dark excavation section. In the arch structure of the dark excavation section, construct a sleeve valve pipe, and perform horizontal grouting into the surrounding soil through the sleeve valve pipe;

[0026] S202: The arch of the dark excavation section is constructed with a large pipe shed in advance;

[0027] On the basis of step S201, an advanced large pipe shed is constructed on the arch of the dark excavation section;

[0028] S203: A single row of small advance guide tubes is constructed on the arch of the dark excavation section;

[0029] Based on step S202, a single row of small conduits is constructed in the arch structure of the dark excavation section.

[0030] Preferably, step S3 specifically includes the following steps:

[0031] S301: Excavate the first pilot tunnel using the reserved core soil method, construct a temporary intermediate partition wall for the first pilot tunnel, and form the initial support for the first pilot tunnel;

[0032] S302: excavating the second pilot tunnel by using the step method, constructing a temporary intermediate partition wall of the second pilot tunnel, and forming the initial support of the second pilot tunnel;

[0033] S303: Use the reserved core soil method to excavate the third pilot tunnel, construct a temporary intermediate partition wall for the third pilot tunnel, and form the initial support for the third pilot tunnel;

[0034] S304: Use the step method to excavate the fourth pilot tunnel below, construct a temporary intermediate partition of the fourth pilot tunnel, form the initial support of the fourth pilot tunnel, and complete the excavation of the upper section;

[0035] S305: using the step method to sequentially excavate the fifth pilot tunnel, the sixth pilot tunnel, the seventh pilot tunnel, the eighth pilot tunnel, the ninth pilot tunnel, and the tenth pilot tunnel, and provide initial support for the corresponding pilot tunnels;

[0036] Further preferably, the longitudinal spacing between the excavated guide tunnels is not less than 6m.

[0037] Preferably, in step S4, a first deformation joint is provided between the first second lining structure and the second second lining structure, a first lining plate is provided in the first deformation joint, and also includes a first external waterstop provided on the outside of the first deformation joint and a first embedded waterstop provided in the middle of the first deformation joint; a first sealant and a water receiving box for sealing are provided at the lower end of the first deformation joint.

[0038] Preferably, in step S6, a connecting channel top ring beam, a connecting channel middle ring beam and a connecting channel bottom ring beam are sequentially arranged at both ends of the connecting channel from top to bottom, and the connecting channel top ring beam, the connecting channel middle ring beam and the connecting channel bottom ring beam are respectively connected to the open-cut section and the dark-cut section;

[0039] The connecting channel is secondary lined between two connecting channel top ring beams.

[0040] Preferably, a second deformation joint is provided in the secondary lining of the connecting channel, a second lining plate is provided in the second deformation joint, and also includes a second external waterstop arranged on the outside of the second deformation joint and a second embedded waterstop arranged in the middle of the second deformation joint; a second sealant for sealing is provided at the upper end of the second deformation joint.

[0041] Preferably, when constructing the open-cut section into the hole, the bored pile heads are chiseled out to weld the main reinforcement to the initial support of the dark-cut section, and three steel frames are connected at the entrance to the hole, and the three steel frames are connected by longitudinal reinforcement.

[0042] Further preferably, grid steel frames are used for initial support of each guide tunnel, the grid steel frames are connected by bolts, and connecting steel bars are provided longitudinally between the grid steel frames.

[0043] The beneficial effects of the present invention are:

[0044] 1. By constructing the underground section of the station from the open-cut section, the amount of ground demolition is reduced, the flexibility of station location setting is improved, and the problem of building a subway station without demolishing houses is solved;

[0045] 2. By constructing the underground excavation section of the station and its connecting passage from the open excavation section of the station, the station hall and platform levels of the open excavation section and the underground excavation section of the station are connected to each other, ensuring the realization of the station building functions;

[0046] 3. By setting up double rows of small ducts for grouting in the arch range of the connecting passage opening and erecting the No. 28 composite steel beams and No. 28 composite columns along the opening, the construction safety of the connecting passage through the dark excavation section is improved;

[0047] 4. By setting a deformation joint between the first second lining structure section and the second second lining structure in the dark excavation section and setting a deformation joint between the open excavation section and the dark excavation section connecting channel, the influence of uneven settlement between the open excavation section and the dark excavation section is reduced.

[0048] Therefore, compared with traditional open-cut station or underground excavation station construction methods, the present invention solves the problem that open-cut stations cannot be implemented in some areas due to the impact of demolished houses. It has the characteristics of strong flexibility in construction methods, complete functions, high construction safety, and no abandoned projects. At the same time, it has obvious advantages in realizing station functions and saving construction time, and has broad promotion prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments, but it should be understood that these drawings are designed only for explanation purposes and are not intended to limit the scope of the present invention. In addition, unless otherwise specified, these drawings are intended only to conceptually illustrate the structural configurations described herein and are not necessarily drawn to scale.

[0050] Figure 1 It is a flow chart of the construction method provided by the present invention;

[0051] Figure 2 It is a plan view of the station construction method provided by the present invention;

[0052] Figure 3 It is the demolition scope diagram of the end wall of the station open-cut section connecting to the station dark-cut section;

[0053] Figure 4 This is the overdue support measures diagram for the station’s open cut section to the underground cut section;

[0054] Figure 5 It is a schematic diagram of the connection between the open-cut section and the dark-cut section of the station of the present invention;

[0055] Figure 6 This is the construction sequence diagram of the cross-middle partition method in the dark excavation section;

[0056] Figure 7 This is a diagram of measures to break the advanced support of the horse head gate in the connecting channel;

[0057] Figure 8 This is the cross-section diagram of the connecting passage between the open-cut section and the underground section of the station;

[0058] Fig. 9 This is the construction sequence diagram of the secondary lining of the dark excavation section;

[0059] Fig.10 is a schematic diagram of the first deformation joint structure;

[0060] Fig.11 is a schematic diagram of the second deformation joint structure;

[0061] In the figure:

[0062] 1-houses not demolished; 2-open cut section; 201-bored cast-in-place piles; 20201-first scope; 20202-second scope; 203-top ring beam of open cut section; 204-middle ring beam of open cut section;

[0063] 3-dark excavation section; 300-advance support; 30001-horizontal grouting; 30002-advance large pipe shed; 30003-single row of small pipes;

[0064] 301- initial support of dark excavation section; 302- secondary lining of dark excavation section; 303- first deformation joint;

[0065] 30101-first guide hole; 30102-second guide hole; 30103-third guide hole; 30104-fourth guide hole; 30105-fifth guide hole; 30106-sixth guide hole; 30107-seventh guide hole; 30108-eighth guide hole; 30109-ninth guide hole; 30110-tenth guide hole;

[0066] 30201-first second lining structure; 30202-second second lining structure; 30203-third second lining structure; 30204-fourth second lining structure; 30205-fifth second lining structure; 30206-sixth second lining structure;

[0067] 30301-first liner plate; 30302-first embedded waterstop; 30303-first external waterstop; 30304-first sealant; 30305-water receiving box;

[0068] 30310-second liner plate; 30311-second embedded waterstop; 30312-second external waterstop; 30313-second sealant;

[0069] 4-connecting channel; 40001-double row of small ducts; 40002-combined steel beam of 28; 40003-combined column of 28;

[0070] 401- initial support of connecting channel; 402- secondary lining of connecting channel; 403- second deformation joint; 404- top ring beam of connecting channel; 405- middle ring beam of connecting channel; 406- bottom ring beam of connecting channel. DETAILED DESCRIPTION

[0071] First of all, it should be noted that the specific structure, features and advantages of the present invention will be specifically described below by way of example, but all descriptions are only for illustration and should not be understood as limiting the present invention in any way. In addition, any single technical feature described or implied in the embodiments mentioned herein, or any single technical feature displayed or implied in the drawings, can still be combined or deleted between these technical features to obtain more other embodiments of the present invention that may not be directly mentioned in this document. In addition, in order to simplify the drawings, the same or similar technical features may be marked only in one place in the same drawing.

[0072] In the present invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.

[0073] The following is combined with Figure 1 -Attached Fig.11 The present invention will be described in detail. Example 1

[0074] like Figure 1 to Figure 11 As shown, a method for constructing a station underground excavation section and a connecting passage is organized and implemented by an open excavation section of a station, comprising an open excavation section 2, an underground excavation section 3 and a connecting passage 4;

[0075] The open-cut section 2 includes an end wall, and the dark-cut section 3 is constructed after a certain range of the end wall is broken, and a connecting passage 4 is constructed from the dark-cut section 3 to the open-cut section 2, and the connecting passage 4 is used to connect the open-cut section 2 with the dark-cut section 3;

[0076] The construction method comprises the following steps:

[0077] S1: Open-cut method is used to construct the enclosure and main structure of the open-cut section 2 of the station;

[0078] Level the site, relocate the pipelines, use bored cast-in-place piles 201 to construct the retaining pile structure of the station open cut section 2, excavate the foundation pit and set up the support to the base, pour the cushion layer, lay the waterproof layer, and then backbuild the station open cut section 2 structure;

[0079] S2: 300 measures of advance support of the dark excavation section 3 are implemented by the end wall of the open excavation section 2 of the station;

[0080] The reinforced concrete wall and bored cast-in-place piles 201 of the first range 20201 of the end wall of the open-cut section 2 are removed, and the arch advance support 300 measures of the dark-cut section 3 are implemented;

[0081] S3: Use the cross-middle partition method to construct the dark excavation section 3 and each pilot tunnel, and promptly implement the initial support 301 of the dark excavation section;

[0082] From the open cut section 2 to the soil facing side, the dark cut section 3 is excavated by the cross middle partition method, and a pilot tunnel is excavated under the arch of the dark cut section 3. The pilot tunnel is excavated by the circular excavation and reserved core soil method, and the remaining pilot tunnels are excavated by the upper and lower step method. After the pilot tunnel is excavated, it is closed in time to serve as the initial support 301 of the dark cut section;

[0083] S4: construct the secondary lining 302 of the dark excavation section;

[0084] A ring beam 204 of the open cut section is reserved on one side of the open cut section 2, the second range 20202 of the end wall of the open cut section 2 is broken, and the first and second lining structures 30201 of the dark cut section 3 are constructed. After the first and second lining structures 30201 are backbuilt, an open cut section top ring beam 203 is cast on one side of the open cut section 2, and the open cut section top ring beam 203 is rigidly connected to the first and second lining structures 30201;

[0085] Then, the second second lining structure 30202, the third second lining structure 30203, and the fourth second lining structure 30204 of the dark excavation section 3 are sequentially constructed;

[0086] S5: Strengthen the horse head gate of connecting passage 4;

[0087] A double row of small conduits 40001 is constructed along the vault range of the opening of the connecting passage 4, and after the grouting of the double row of small conduits 40001 is completed, a combination steel beam 40002 of Work 28 and a combination column 40003 of Work 28 are erected along the opening;

[0088] S6: construct secondary lining 402 of the connecting channel;

[0089] The initial support 301 of the dark excavation section 3 that has been implemented along the opening range of the connecting channel 4 is removed, the initial support 401 of the connecting channel is constructed, and the secondary lining 402 of the connecting channel is constructed after laying the waterproof layer. The work 28 combined columns 40003 are poured into the secondary lining 402 of the connecting channel, and then the fifth second lining structure 30205 and the sixth second lining structure 30206 are continuously constructed.

[0090] In this embodiment, step S4 is as follows Figure 4 As shown, it is necessary to reserve and cast the middle ring beam 204 of the open-cut section on the open-cut section 2 first, and then remove the end wall range. The casting of the middle ring beam 204 of the open-cut section and the top ring beam 203 of the open-cut section are both for the purpose of structural stability and safety during construction.

[0091] like Fig. 9 As shown, the secondary lining 302 of the dark excavation section includes the first secondary lining structure 30201, the second secondary lining structure 30202, the third secondary lining structure 30203, the fourth secondary lining structure 30204, the fifth secondary lining structure 30205, and the sixth secondary lining structure 30206. When constructing the secondary lining 302 of the dark excavation section, it should be carried out in sequence, first implementing the first secondary lining structure 30201, the second secondary lining structure 30202, the third secondary lining structure 30203, and the fourth secondary lining structure 30204, then implementing the secondary lining 402 of the connecting channel, and finally constructing the fifth secondary lining structure 30205 and the sixth secondary lining structure 30206 of the dark excavation section 3, which is equivalent to the construction process of first the two sides and then the middle, with the purpose of retaining the connecting channel for easy construction, rather than directly completing the secondary lining 302 of the entire dark excavation section.

[0092] After the end wall of the open-cut section top ring beam 203 is removed, the secondary lining 302 of the dark-cut section is constructed. After the backfill is completed, the top ring beam 203 of the open-cut section is cast for the second time, ensuring the connectivity between the open-cut section 2 and the dark-cut section 3, and realizing the interconnection between the concourse layers of the subway station.

[0093] In step S5, the initial support 401 of the connecting channel is implemented from the underground excavation section 3 of the station to the open excavation section 2 of the station. Before implementation, the horse head gate reinforcement measures of step S5 are completed first. After the reinforcement measures are completed, the initial support 401 of the connecting channel is constructed. The initial support of each guide tunnel adopts a grid steel frame, and the steel frames are connected by bolts. Connecting steel bars are arranged longitudinally between the grid steel frames, and a waterproof layer is arranged between the initial support 401 of the connecting channel and the secondary lining 402 of the connecting channel.

[0094] In step S4, the end wall of the open-cut section 2 is demolished to reserve the ring beam 204 in the open-cut section in advance, thereby reducing the excavation section of the dark-cut section and effectively reducing the construction risk.

[0095] Furthermore, in the embodiment, it can also be considered that in step S2, when the groundwater is higher than the bottom of the underground excavation section 3, grouting is required to stop water in the area below the groundwater level, and excavation can only be carried out after grouting and stopping water.

[0096] Furthermore, it can also be considered in the embodiment that in step S1, the structure of the open cut section 2 is composed of a top plate, a middle plate, a bottom plate, a middle column, a side wall and an end wall.

[0097] The open cut section 2 structure is composed of a top plate, a middle plate, a bottom plate, a middle column, a side wall and an end wall connected to each other. This is the prior art, and the specific shape is as follows Figure 3 As shown, the end wall and the side wall can be directly connected to form a part of the wall body, the walls on both sides connect the top plate, the middle plate and the bottom plate, and the middle column connects the top plate, the middle plate and the bottom plate to each other.

[0098] Furthermore, it can also be considered in the embodiment that in step S2, the advanced support 300 measures include:

[0099] S201: Horizontal grouting of sleeve valve pipe 30001 is applied to the arch top of the dark excavation section;

[0100] Construct the arch of the dark excavation section 3. In the arch structure of the dark excavation section 3, construct a sleeve valve pipe, and perform horizontal grouting 30001 into the surrounding soil through the sleeve valve pipe;

[0101] S202: The advanced large pipe shed 30002 is constructed on the arch top of the dark excavation section 3;

[0102] Based on step S201, an advance large pipe shed 30002 is constructed on the arch of the dark excavation section 3;

[0103] S203: A single row of small advance guide tubes is constructed on the top of the arch in the dark excavation section 3;

[0104] Based on step S202, a single row of small ducts 30003 is constructed in the arch structure of the dark excavation section 3.

[0105] In this embodiment, Figure 4As shown, the process of setting the arch of the dark excavation section 3 reduces the impact of the construction of the dark excavation section 3 on the ground houses 1 that have not been demolished, and plays an important role in protecting the ground houses.

[0106] Furthermore, it can also be considered in the embodiment that step S3 specifically includes the following steps:

[0107] S301: excavate the first pilot tunnel 30101 by using the reserved core soil method, construct a temporary intermediate partition wall of the first pilot tunnel 30101, and form the initial support of the first pilot tunnel 30101;

[0108] S302: excavating the second pilot tunnel 30102 by using the step method, constructing a temporary partition wall of the second pilot tunnel 30102, and forming an initial support for the second pilot tunnel 30102;

[0109] S303: excavate the third pilot tunnel 30103 by using the reserved core soil method, construct a temporary intermediate partition wall of the third pilot tunnel 30103, and form the initial support of the third pilot tunnel 30103;

[0110] S304: excavate the fourth pilot tunnel 30104 below by using the step method, construct a temporary middle partition of the fourth pilot tunnel 30104, form the initial support of the fourth pilot tunnel 30104, and complete the excavation of the upper section;

[0111] S305: using the step method to sequentially excavate the fifth pilot tunnel 30105, the sixth pilot tunnel 30106, the seventh pilot tunnel 30107, the eighth pilot tunnel 30108, the ninth pilot tunnel 30109, and the tenth pilot tunnel 30110, and perform initial support for the corresponding pilot tunnels;

[0112] In this embodiment, as shown in the attached Figure 7 As shown, the dark excavation section 3 adopts the cross-middle partition method to implement the excavation of the first guide tunnel 30101, the second guide tunnel 30102, the third guide tunnel 30103, the fourth guide tunnel 30104, the fifth guide tunnel 30105, the sixth guide tunnel 30106, the seventh guide tunnel 30107, the eighth guide tunnel 30108, the ninth guide tunnel 30109, and the tenth guide tunnel 30110. At the same time, the first guide tunnel 30101 and the third guide tunnel 30103 adopt the up and down step method to effectively control the ground subsidence caused by the dark excavation construction and protect the ground houses.

[0113] In this embodiment, the guide tunnel is arranged according to this layout to provide a better ventilation environment, while lowering the groundwater level, reducing the foundation pit pressure, and ensuring the safe progress of the foundation pit project.

[0114] The excavation method of the first pilot tunnel 30101 and the third pilot tunnel 30103 is as shown in the attached Figure 6 As shown, there are protruding stepped soil slopes formed by dotted line marks. This design provides support for the guide tunnel structure to a certain extent, reduces the pressure of the soil on the tunnel wall, enhances the stability of the foundation pit structure, and reduces the deformation and damage of the support structure.

[0115] Furthermore, it can also be considered in the embodiment that the longitudinal spacing between the excavated guide tunnels is not less than 6m.

[0116] Furthermore, in the embodiments, it can also be considered that in step S4, a first deformation joint 303 is provided between the first second lining structure 30201 and the second second lining structure 30202, a first lining plate 30301 is provided in the first deformation joint 303, and also includes a first external waterstop 30303 provided on the outside of the first deformation joint 303 and a first embedded waterstop 30302 provided in the middle of the first deformation joint 303; a first sealant 30304 and a water receiving box 30305 for sealing are provided at the lower end of the first deformation joint 303.

[0117] The first deformation joint 303 is provided between the first secondary lining structure 30201 and the second secondary lining structure 30202, and is used to control the uneven settlement between the open excavation section 2 and the dark excavation section 3. The first sealant 30304 and the water receiving box 30305 are used to prevent water seepage or prevent water from falling into the foundation pit in case of seepage, so as to avoid the problem of structural instability over time.

[0118] like Figure 5 , Figure 8 , Fig. 9 As shown, further, it can also be considered in the embodiment that in step S6, the two ends of the connecting channel 4 are sequentially provided with a connecting channel top ring beam 404, a connecting channel middle ring beam 405 and a connecting channel bottom ring beam 406 from top to bottom, and the connecting channel top ring beam 404, the connecting channel middle ring beam 405 and the connecting channel bottom ring beam 406 are respectively connected to the open-cut section 2 and the dark-cut section 3;

[0119] The secondary lining 402 of the connecting channel is between the two top ring beams 404 of the connecting channel.

[0120] The functions of the connecting channel top ring beam 404 , the connecting channel middle ring beam 405 and the connecting channel bottom ring beam 406 are to increase the stability of the connecting channel 4 .

[0121] Furthermore, in an embodiment, it can also be considered that a second deformation joint 403 is provided in the secondary lining 402 of the connecting channel, a second lining plate 30310 is provided in the second deformation joint 403, and also includes a second external waterstop 30312 provided on the outside of the second deformation joint 403 and a second embedded waterstop 30311 provided in the middle of the second deformation joint 403; a second sealant 30313 for sealing is provided at the upper end of the second deformation joint 403.

[0122] The second deformation joint 403 is used to control the uneven settlement between the open-cut section 2 and the dark-cut section 3 .

[0123] Furthermore, in the embodiment, it can also be considered that when constructing the open-cut section 2 into the hole, the pile head of the bored pile 201 is chiseled out to weld the main steel bar to the initial support 301 of the dark-cut section, and three steel frames are connected at the entrance to the hole, and the three steel frames are connected by longitudinal steel bars.

[0124] Furthermore, in the embodiments, it can also be considered that the initial support of each guide tunnel adopts a grid steel frame, the grid steel frames are connected by bolts, and connecting steel bars are arranged longitudinally between the grid steel frames.

[0125] Working principle: The present invention first implements the station open cut section 2, and implements the advanced support 300 measures from the open cut end wall demolition range, including horizontal grouting 30001, advanced large pipe shed 30002 and single row of small pipes 30003, implements the initial support 301 of the dark cut section from the station open cut section 2 to the station dark cut section 3, and then implements the secondary lining 302 of the dark cut section, and sets the first deformation joint 303 to control the uneven settlement of the open cut section 2 and the dark cut section 3. Strengthening measures are taken along the opening of the connecting channel 4 to open the connecting channel horse head door, implement the initial support 401 of the connecting channel and the secondary lining 402 of the connecting channel, set the top ring beam 404 of the connecting channel, the middle ring beam 405 of the connecting channel and the bottom ring beam 406 of the connecting channel at both ends of the connecting channel 4, and set the second deformation joint 403 in the middle of the secondary lining 402 of the connecting channel to control the uneven settlement of the open cut section 2 and the dark cut section 3.

[0126] The above embodiments describe the present invention in detail, but the contents are only preferred embodiments of the present invention and cannot be considered to limit the scope of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the present invention.

Claims

1. A method for constructing a station underground excavation section and a connecting passage by organizing and implementing the construction of the station open excavation section, characterized in that: It comprises an open excavation section (2), a dark excavation section (3) and a connecting passage (4); The open cut section (2) comprises an end wall, the dark cut section (3) is constructed after a certain range of the end wall is broken, a connecting passage (4) is constructed from the dark cut section (3) to the open cut section (2), and the connecting passage (4) is used to connect the open cut section (2) with the dark cut section (3); The construction method comprises the following steps: S1: Open-cut construction of the station open-cut section (2) enclosure and main structure; The site is leveled, the pipeline is relocated, bored cast-in-place piles (201) are used to construct the retaining pile structure of the station open cut section (2), a foundation pit is excavated and supports are erected to the base, a cushion layer is poured, a waterproof layer is laid, and then the station open cut section (2) structure is rebuilt; S2: Advanced support (300) measures are implemented by using the end wall of the station open-cut section (2) to construct the dark-cut section (3); The reinforced concrete wall and bored cast-in-place piles (201) of the first range (2201) of the end wall of the open-cut section (2) are removed, and the arch advance support (300) measures of the dark-cut section (3) are implemented; S3: Use the cross-wall method to construct the dark excavation section (3) and each pilot tunnel, and promptly implement the initial support of the dark excavation section (301); From the open cut section (2) toward the soil facing side, a dark cut section (3) is excavated by a cross middle partition method, a pilot tunnel is excavated below the arch of the dark cut section (3), the pilot tunnel is excavated by a circular excavation and reserved core soil method, and the remaining pilot tunnels are excavated by an upper and lower step method. After the pilot tunnel is excavated, it is promptly closed to serve as an initial support for the dark cut section (301); S4: Construction of secondary lining of the dark excavation section (302); A ring beam (204) in the open cut section is reserved on one side of the open cut section (2), a second range (20202) of the end wall of the open cut section (2) is broken, and the first and second lining structures (30201) of the dark cut section (3) are constructed. After the first and second lining structures (30201) are rebuilt, an open cut section top ring beam (203) is cast on one side of the open cut section (2), and the open cut section top ring beam (203) is rigidly connected to the first and second lining structures (30201); Then, the second second lining structure (30202), the third second lining structure (30203), and the fourth second lining structure (30204) of the dark excavation section (3) are sequentially constructed; S5: Strengthen the horse head gate of the connecting passage (4); A double row of small conduits (40001) is constructed along the vault range of the opening of the connecting passage (4), and after grouting of the double row of small conduits (40001) is completed, a combined steel beam (40002) and a combined column (40003) of No. 28 are erected along the opening; S6: construct secondary lining of the connecting channel (402); The initial support (301) of the dark excavation section (3) that has been implemented is removed along the opening range of the connecting channel (4), the initial support (401) of the connecting channel is constructed, and after laying the waterproof layer, the secondary lining (402) of the connecting channel is constructed. The work 28 combined columns (40003) are poured into the secondary lining (402) of the connecting channel, and then the fifth second lining structure (30205) and the sixth second lining structure (30206) of the dark excavation section (3) are continuously constructed. Only in this way can the connecting channel (4) be retained through the construction process of first the two sides and then the middle.

2. The method for constructing the underground excavation section and the connecting passage of the station by organizing the open excavation section of the station according to claim 1 is characterized in that: In step S1, the open cut section (2) structure is composed of a top plate, a middle plate, a bottom plate, a middle column, a side wall and an end wall.

3. The method for constructing the underground excavation section and the connecting passage of the station by organizing the open excavation section of the station according to claim 1 is characterized in that: In step S2, the advanced support (300) measures include: S201: Horizontal grouting of sleeve valve pipes (30001) is carried out on the arch top of the dark excavation section; Constructing the arch of the dark excavation section (3), constructing a sleeve valve pipe in the arch structure of the dark excavation section (3), and performing horizontal grouting (30001) into the surrounding soil through the sleeve valve pipe; S202: The arch of the dark excavation section (3) is constructed with a large pipe shed (30002) in advance; Based on step S201, an advance large pipe shed (30002) is constructed on the arch of the dark excavation section (3); S203: A single row of small advance ducts is constructed on the arch top of the dark excavation section (3); Based on step S202, a single row of small ducts (30003) is constructed in the arch structure of the dark excavation section (3).

4. The method for constructing the underground excavation section and the connecting passage of the station by organizing the open excavation section of the station according to claim 1 is characterized in that: Step S3 specifically includes the following steps: S301: excavate the first pilot tunnel (30101) by using the reserved core soil method, construct a temporary intermediate partition wall of the first pilot tunnel (30101), and form the initial support of the first pilot tunnel (30101); S302: excavating the second pilot tunnel (30102) by using the step method, constructing a temporary partition wall of the second pilot tunnel (30102), and forming the initial support of the second pilot tunnel (30102); S303: Use the reserved core soil method to excavate the third pilot tunnel (30103), construct a temporary middle partition wall of the third pilot tunnel (30103), and form the initial support of the third pilot tunnel (30103); S304: excavate the fourth pilot tunnel (30104) below using the step method, construct a temporary middle partition of the fourth pilot tunnel (30104), form the initial support of the fourth pilot tunnel (30104), and complete the excavation of the upper section; S305: Use the step method to excavate the fifth guide tunnel (30105), the sixth guide tunnel (30106), the seventh guide tunnel (30107), the eighth guide tunnel (30108), the ninth guide tunnel (30109), and the tenth guide tunnel (30110) in sequence, and provide initial support for the corresponding guide tunnels.

5. The method for constructing the underground excavation section and the connecting passage of the station by organizing the open excavation section of the station according to claim 4 is characterized in that: The longitudinal spacing between each pilot tunnel excavation shall not be less than 6m.

6. The method for constructing the underground excavation section and the connecting passage of the station by organizing the open excavation section of the station according to claim 2 is characterized in that: In step S4, a first deformation joint (303) is provided between the first second lining structure (30201) and the second second lining structure (30202), a first lining plate (30301) is provided in the first deformation joint (303), and further comprises a first external waterstop (30303) provided on the outside of the first deformation joint (303) and a first embedded waterstop (30302) provided in the middle of the first deformation joint (303); a first sealant (30304) and a water receiving box (30305) for sealing are provided at the lower end of the first deformation joint (303).

7. The method for constructing the underground excavation section and the connecting passage of the station by organizing the open excavation section of the station according to claim 1 is characterized in that: In step S6, a connecting channel top ring beam (404), a connecting channel middle ring beam (405) and a connecting channel bottom ring beam (406) are sequentially arranged at both ends of the connecting channel (4) from top to bottom, and the connecting channel top ring beam (404), the connecting channel middle ring beam (405) and the connecting channel bottom ring beam (406) are respectively connected to the open-cut section (2) and the dark-cut section (3); The secondary lining (402) of the connecting channel is between the two connecting channel top ring beams (404).

8. The method for constructing the underground excavation section and the connecting passage of the station by organizing the open excavation section of the station according to claim 7 is characterized in that: A second deformation joint (403) is provided in the secondary lining (402) of the connecting channel, a second lining plate (30310) is provided in the second deformation joint (403), and further comprises a second external waterstop (30312) provided on the outside of the second deformation joint (403) and a second embedded waterstop (30311) provided in the middle of the second deformation joint (403); a second sealant (30313) for sealing is provided at the upper end of the second deformation joint (403).

9. The method for constructing the underground excavation section and the connecting passage of the station by organizing the open excavation section of the station according to claim 1 is characterized in that: When the open cut section (2) is constructed, the pile head of the bored pile (201) is removed to weld the main steel bar to the initial support (301) of the dark cut section, and three steel frames are connected at the entrance to the hole. The three steel frames are connected by longitudinal steel bars.

10. The method for constructing a station underground excavation section and a connecting passage by organizing the construction of the station open excavation section according to claim 4, characterized in that: The initial support of each guide tunnel adopts grid steel frames, the grid steel frames are connected by bolts, and connecting steel bars are arranged in the longitudinal direction of the grid steel frames.