A chute bulk material loading system and method with dust suppression and quantitative functions
By designing a chute bulk loading system with dust suppression and quantitative functions in the port loading system, and using technologies such as hollow structures and negative pressure air suction devices, the problems of dust pollution and inaccurate quantitative loading have been solved and achieved The efficient and environmentally friendly loading process saves resources and manpower and improves economic benefits.
Patent Information
- Application Number
- CN202410692676.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-05-31
AI Technical Summary
In the existing port loading technology, there are serious dust pollution and inaccurate quantitative loading problems during the bulk material loading and unloading process, resulting in dust spillage, waste of electricity and water, low operating efficiency, and high labor consumption.
A chute bulk material loading system with dust suppression and quantitative functions is designed, including an automatic bulk material loading device and a detection device, using a hollow dust-sealing structure, a negative pressure suction device, a bag dust collector, and sensors and visual recognition system, which realizes automatic loading by calculating and controlling the height of the push plate and the amount of material pushed, ensuring dust containment and accurate measurement.
It significantly improves the dust suppression rate, saves electricity and water resources, improves operating efficiency and manpower utilization, reduces replenishment links, improves economic benefits, and solves the problems of dust pollution and quantitative loading.
Smart Images

Figure CN118306817B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of port loading, and in particular relates to a chute bulk material loading system with dust suppression and quantitative functions and a method thereof. Background Art
[0002] Most ports now use bulk ships to transport bulk materials, such as coal, iron ore powder, and cassava chips. When unloading at the port, the bulk materials are generally grabbed from the cabin by the gantry grab and sent to a loading and unloading hopper. The loading and unloading hopper generally has no metering device. Some loading and unloading hoppers are equipped with weighing devices, but they are easily damaged and have large errors. The materials go down from the telescopic chute to the car or truck parked below in advance. Due to the large amount of dust, the loading and unloading hopper needs to be equipped with a high-power negative pressure suction motor, which consumes a lot of power. During the loading process, fog cannons are still needed to suppress the dust, but even so, there is still a lot of dust, especially cassava chips. The dust density is close to the air density, and a large amount of dust will be generated and form a stable floating. In addition, since the port gantry crane needs to be moved, it is impossible to install a fixed scale, and the mobile scale is inaccurate in measurement. Therefore, the staff loads the vehicle based on experience and cannot load quantitatively. After loading, the driver needs to drive to the weighing room to weigh the goods. If the weight is overweight, for example, if the quota is 30 tons and the weight exceeds 0.5 tons, the driver needs to return to the site to unload the excess material with a grab bucket. If the weight is less than 0.5 tons, the driver will ask for more material, because the driver's transportation fee is calculated based on the transportation volume. Therefore, most vehicles need to unload or restock, which is time-consuming and labor-intensive, and generates a lot of new dust.
[0003] Based on the above problems, the applicant has previously applied for an automatic loading device for bulk materials with a dust suppression function. The publication number is CN118025852A. The technical solution includes a dust sealing structure and a pushing mechanism. The dust sealing structure includes a dust suppression plate and a box body. The box body is a hollow structure located above the dust suppression plate. The dust suppression plate is used to press on the car body to form a closed space. A number of feed ports are provided on the box body for material entry. The materials are loaded and moved in this space to prevent dust from overflowing and affecting the environment. A pushing assembly mechanism is installed in the box body to transport the materials. When the materials are accumulated to a certain height in the car body, the pushing assembly pushes the materials along the box body to move toward the front and rear ends of the car body, and at the same time plays a role in transferring the materials. The length and width of the box body do not exceed the length and width of the car body. This technology seals most of the dust in a closed space. Compared with the existing funnel loading system, the device has a better environmental protection effect.
[0004] When the inventors actually applied the above technology, they found that when the above technology sealed most of the dust in a closed space, there was air pressure inside the closed space. When the material entered the car, the air was discharged from the gaps in the car railing under strong air pressure, and the exhaust from the gaps also caused dust to overflow from the gaps in the car railing. In this way, dust overflow still exists, and there is a lack of collection of the overflowed dust. Secondly, the mobile scale measurement in the port is inaccurate, so the staff loads the car based on experience, so quantitative loading in the process of bulk loading is also a major problem. Summary of the invention
[0005] The present invention achieves the purposes of quantitative loading, dust suppression and dust collection, and proposes a chute bulk material loading system with dust suppression and quantitative functions and a method thereof. Compared with the existing loading structure and method, the dust suppression rate is increased by 99%, electricity is saved by 50% (mainly because no high-power negative pressure suction dust removal is required), water resources are saved by 100% (no fog cannon is required for dust suppression), operating efficiency is increased by more than 50% (no need for replenishment), manpower is saved by more than 70% (no need for replenishment), and the economic benefits are also greatly improved.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0007] A chute bulk material loading system with dust suppression and quantitative functions, the system includes an automatic loading device for bulk materials and a detection device. The automatic loading device for bulk materials includes a funnel, a discharge valve, a chute, a dust sealing structure and a pushing mechanism. The dust sealing structure includes a dust suppression plate and a box body. The box body is a hollow structure located above the dust suppression plate. The feeding port of the box body is connected to the chute. The dust sealing structure contacts with the carriage to form a closed space. A plurality of feeding ports are arranged on the box body. A measuring instrument is installed on the funnel. A discharge valve is installed at the bottom of the funnel. The top of the chute is connected to the discharge valve. The bottom of the chute is connected to the feeding port of the box body. Air holes are arranged on the two side ends of the box body. The air holes are connected to the dust removal device through a negative pressure suction device. Check valves are installed on both sides of the chute. Soft materials are installed on the edge of the dust sealing structure. The soft material covers the carriage and can also adjust the changes caused by the different heights of the push plates. The loading device and the carriage are closed to prevent dust from overflowing. The detection device is used to detect vehicle information.
[0008] Furthermore, the chute bulk material loading system is installed on the original funnel bracket.
[0009] Furthermore, the discharge valve is controlled by an oil cylinder or an electric valve.
[0010] Furthermore, the air holes, the negative pressure suction device and the dust removal device are connected through pipelines, and the dust removal device adopts a bag dust collector.
[0011] Furthermore, the detection device includes a sensor and a visual recognition system, and the detection device relies on a movable arm to obtain information about the vehicle from multiple angles.
[0012] A loading method based on the above-mentioned chute bulk material loading system with dust suppression and quantitative functions, the method is as follows:
[0013] S1: The vehicle enters the chute bulk material loading system, and the carriage is located below the chute and the material automatic loading device;
[0014] S2: Measure the length, width and height of the carriage, the position of the chute, and the front end distance Lq and rear end distance Lh between the center of the chute and the carriage through the detection device;
[0015] S3: Based on the length, width and height of the carriage, the loading volume Wz, the material density and the angle of repose, the height Ht of the bottom of the push plate from the bottom of the carriage is calculated, and the box body is controlled to descend so that the height of the push plate from the bottom of the carriage is Ht;
[0016] S4: According to the front end distance Lq, rear end distance Lh, push plate height Ht, compartment railing height, material repose angle, preset material top shape, relative to the chute center, calculate the total amount of material to be loaded at the front end Wzq and the total amount of material to be loaded at the rear end Wzh, and satisfy the loading amount Wz = total amount of material to be loaded at the front end Wzq + total amount of material to be loaded at the rear end Wzh;
[0017] S5: Calculate the data of material discharge: after the discharge valve is opened, the material in the hopper falls freely into the carriage and the box through the chute. In the final stop state, based on the carriage and loading system data, calculate the material quantity Wf below the loading box. According to the chute diameter and the box size, calculate the material quantity Wyt in the box. This quantity Wyt is also the quantity pushed by the push plate in one complete time. According to the chute size data, calculate the material quantity Wlt in the chute below the discharge valve;
[0018] S6: Based on the data in S4 and S5, the material automatic loading device pushes the material forward and backward, and determines that when loading is completed, the forward material quantity is Wqt=Wzq-Wf / 2, and the backward material quantity is Wht=Wzh-Wf / 2; calculate that when the discharge valve is closed, the total amount of forward and backward materials is Wts=Wqt+Wht-Wlt-Wyt;
[0019] S7: Before the first unloading, the motors of the negative pressure suction devices on both sides of the box start to work, suck air, and put the push plate under the chute close to the min (Wqt, Wht) position, corresponding to position X, and push it out to the outside of the chute in the direction of min (Wqt, Wht), and X volume of material can be pushed out;
[0020] S8: RemainWqt is set to record the amount of material left in the forward push process, and the initial value of RemainWqt is Wqt; RemainWht is set to record the amount of material left in the backward push process, and the initial value of RemainWht is Wt; RemainWts is set to record the total amount left in the pushing process, and the initial value of RemainWts is Wts;
[0021] S9: Open the discharge valve and delay to ensure that the material in the chute stops flowing;
[0022] S10: Officially start pushing materials: determine a forward and backward material pushing plan. When pushing forward, RemainWqt decreases the amount of material pushed out, and when pushing backward, RemainWht decreases the amount of material pushed out. Push forward and backward until RemainWts=Wlt+Wyt. During the pushing process of the push plate, when the discharge valve is open, it is necessary to check the material situation in the hopper. If the material in the chute is not full, stop loading immediately. When the material in the hopper is sufficient, continue to push the push plate and continue loading;
[0023] S11: Close the discharge valve;
[0024] S12: Distribution of materials in the chute and box: At this time, RemainWqt+RemainWht=RemainWts=Wlt+Wyt. Based on the above data, push forward and backward, while decreasing RemainWqt, RemainWht, and RemainWts until all three quantities are 0. During the last push, all the remaining materials in the chute fall into the box and are pushed out into the carriage, achieving smooth pushing of the carriage.
[0025] S13: The negative pressure motors on both sides of the box continue to suck air to remove the dust in the box. At this time, the one-way valve opens to transport gas inward;
[0026] S14: The loading system is upgraded, the vehicle drives away, and loading is completed.
[0027] The following beneficial effects can be obtained through the above technical solution:
[0028] Compared with the previous operation mode, the dust suppression rate of the present invention is improved by more than 99%. Only when the material is unloaded, a small amount of dust overflows from the gap of the fence. Since there are small negative pressure suctions on both sides of the device, the wind enters from the outside to the inside of the gap of the fence, which can effectively block the dust from overflowing from the inside of the car through the gap of the fence. Only when the gap of the fence contacts the material for the first time, a very small amount of dust overflows. It saves more than 50% of electricity (mainly because there is no need for high-power negative pressure suction dust removal), saves 100% of water (no need for fog cannon dust reduction), improves operating efficiency by more than 50% (no need for replenishment), saves more than 70% of manpower (no replenishment link and steps, the equipment can also realize unmanned operation), and the economic benefits are also greatly improved. In the closed state formed by the present invention, there is no electrical or cable, the operation is safe and reliable, and there is no problem of dust explosion. The present invention can completely solve the dust pollution and quantitative loading problems caused by loading bulk materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the chute bulk material loading system.
[0030] Figure 2 It is a structural diagram of an automatic loading device for bulk materials.
[0031] Figure 3 It is the side material repose angle state diagram.
[0032] Figure 4 This is a diagram showing the material repose angle status from directly behind the vehicle body. DETAILED DESCRIPTION
[0033] The following is a combination of the embodiments and the attached Figure 1-4 The present invention is further described as follows:
[0034] like Figure 2 As shown, the automatic loading device for bulk materials includes a dust sealing structure and a material pushing mechanism; the dust sealing structure includes a dust suppression plate and a box body, the box body is a hollow structure located above the dust suppression plate, the dust sealing structure contacts the carriage to form a closed space, a plurality of feed ports are arranged on the box body, the feed ports are used for materials to enter, and at least one set of slide rails is arranged on the inner wall of the box body;
[0035] The material pushing mechanism is used to transfer materials in the carriage. The material pushing mechanism includes a push plate and a driving mechanism. The push plate is vertically mounted in the box body through a slide rail to transfer the materials in the box body.
[0036] The driving mechanism comprises a driving device and a traction assembly. The driving device controls the left and right movement of the pushing assembly by driving the left and right movement of the traction assembly.
[0037] like Figure 1As shown, a chute bulk material loading system with dust suppression and quantitative functions, the system includes an automatic loading device for bulk materials and a detection device, the automatic loading device for bulk materials includes a hopper 1, a discharge valve 4, a chute 3, a dust sealing structure and a pushing mechanism, the dust sealing structure includes a dust suppression plate and a box 6, the box is a hollow structure located above the dust suppression plate, the box feed port is connected to the chute, the dust sealing structure is in contact with the car body to form a closed space, a plurality of feed ports are arranged on the box, and the characteristics are as follows: a measuring instrument is installed in the funnel, a discharge valve is installed at the bottom of the funnel, the discharge valve is controlled by an oil cylinder or an electric valve, the top of the chute is connected to the discharge valve, the bottom of the chute is connected to the feed port of the box, and air valves are arranged on both sides of the box. Hole 5, the air hole is connected to the dust removal device through the negative pressure suction device, the air hole, the negative pressure suction device and the dust removal device 8 are connected through the pipeline 7, the one-way valve 9 is installed on both sides of the upper chute of the box body, and the soft material 10 is installed on the edge of the dust sealing structure. The soft material 10 can completely block the compartment part. The dust sealing structure, the soft material 10 and the compartment form a closed space to prevent dust from overflowing. Secondly, the hanging soft material 10 can also meet the height difference of the dust sealing structure moving up and down. Even if the dust sealing structure moves up and down, it can completely cover the compartment. The dust removal device adopts a bag dust collector. The detection device includes a sensor and a visual recognition system. The detection device relies on a movable arm to obtain information from multiple angles of the vehicle. The detection device can extend from the side of the system and then retract, or it can extend from the box body and then retract into the box body.
[0038] The dust removal device of the present invention can prevent dust from overflowing from the gaps in the railings. When the negative pressure suction device is working, the gaps in the railings will let in air from the outside into the car compartment, further preventing dust from overflowing. Assuming that the negative pressure suction motor sucks 1600 cubic meters per hour per KW, and assuming that the gaps in the car are 0.06 square meters in total (for example, 12 gaps, each gap is 1 meter high and 5mm wide), after measurement, when not unloading, 0.6KW motors are turned on on both sides, and the gap air intake speed can reach 8.9m / s. When unloading, the unloading speed is the fastest in the first 20 seconds, and the falling speed is 1200 cubic meters per hour. At this time, 1Kw suction motors are needed on both sides, and the gap air intake speed can also reach 8.9m / s. In fact, only 2 to 4 gaps within a radius of about 2.5 meters below the chute will have a very small amount of dust overflow. The dust suppression effect can reduce 99.9% of dust when loading strong dust materials such as cassava chips.
[0039] Embodiment 1: A loading method based on a chute bulk material loading system with dust suppression and quantitative functions, comprising the steps of:
[0040] 1: The vehicle enters the chute bulk material loading system, and the carriage is located below the chute and the material automatic loading device;
[0041] 2: Use the detection device to measure the length, width and height of the carriage, the position of the chute, and the front end distance Lq and rear end distance Lh between the center of the chute and the carriage;
[0042] 3: Based on the length, width and height of the carriage, the loading volume Wz, the material density and the angle of repose, the height Ht of the bottom of the push plate from the bottom of the carriage is calculated, and the box is controlled to descend so that the height of the push plate from the bottom of the carriage is Ht;
[0043] 4: According to the front end distance Lq, rear end distance Lh, push plate height Ht, compartment railing height, material repose angle, preset material top shape, relative to the chute center, calculate the total amount of material to be loaded at the front end Wzq, the total amount of material to be loaded at the rear end Wzh, and satisfy the loading amount Wz = total amount of material to be loaded at the front end Wzq + total amount of material to be loaded at the rear end Wzh;
[0044] 5: Calculate the data of material discharge: After the discharge valve is opened, the material in the hopper falls freely into the carriage, box, and chute through the chute. When it stops, the material quantity Wf under the loading box is calculated based on the carriage and loading system data. The material quantity Wyt in the box is calculated based on the chute diameter and box size. This quantity Wyt is also the quantity pushed by the push plate in a complete operation. Based on the chute size data, the material quantity Wlt in the chute under the discharge valve is calculated;
[0045] 6: Based on the data in S4 and S5, the automatic material loading device pushes the material forward and backward, and determines that when loading is completed, the amount of material pushed forward is Wqt=Wzq-Wf / 2, and the amount of material pushed backward is Wht=Wzh-Wf / 2; calculate that when the discharge valve is closed, the total amount of material pushed forward and pushed backward is Wts=Wqt+Wht-Wlt-Wyt;
[0046] 7: Determine the number of times the push plate needs to push n and the remainder Wys. The number n is the integer closest to and not greater than Wts / Wyt, and the remainder Wys = Wts-Wyt*n. Before the first unloading, the motors of the negative pressure suction devices on both sides of the box start to work and suck air. Put the push plate under the chute near the min (Wqt, Wht) position, corresponding to Wys, and push it to the outside of the chute in the direction of min (Wqt, Wht). Then, Wys volume of material can be pushed out. Figure 3 As shown, the outer side of the chute here refers to the outer side of the Wyt area under the chute;
[0047] 8: Set RemainWqt to record the amount of material left in the forward push process, and the initial value of RemainWqt is Wqt; set RemainWht to record the amount of material left in the backward push process, and the initial value of RemainWht is Wt; set RemainWts to record the total amount left in the pushing process, and the initial value of RemainWts is Wts;
[0048] 9: Open the discharge valve and delay to ensure that the material in the chute stops flowing;
[0049] 10: Officially start pushing the material: first push Wys of the material in the direction of min (Wqt, Wht), then push Wyt of the material in the opposite direction, and then push Wyt of the material in the opposite direction. When pushing forward, RemainWqt decreases the amount of material pushed out, and when pushing backward, RemainWht decreases the amount of material pushed out. When pushing forward and backward, RemainWts decreases. Push forward and backward until RemainWts=Wlt+Wyt and stop. During the pushing process of the push plate, when the discharge valve is open, it is necessary to check the material situation in the hopper. If the material in the chute is not full, stop loading immediately. When the material in the hopper is sufficient, continue to push the push plate and continue loading;
[0050] 11: Close the discharge valve;
[0051] 12: Distribution of materials in the chute and box: At this time, RemainWqt+RemainWht=RemainWts=Wlt+Wyt. Based on the above data, push the material of min(RemainWqt+RemainWht) in the direction represented by max(RemainWqt+RemainWht), then push the material of min(RemainWqt+RemainWht) in the opposite direction, and then push all the remaining materials in the opposite direction. Push forward and backward, while decreasing RemainWqt, RemainWht, and RemainWts, until all three quantities are 0. At the last push, all the remaining materials in the chute fall into the box and are all pushed out of the chute range, so that the material pushing in the carriage is smooth.
[0052] 13: The negative pressure motors on both sides of the box continue to suck air to remove the dust in the box. At this time, the one-way valve opens to transport gas inward.
[0053] 14: The loading system is upgraded, the vehicle drives away, and loading is completed.
[0054] 15. The density of some bulk materials will change during loading. In this case, communication can be carried out with the outbound weighing room to obtain the weight and correct the density.
[0055] The method of embodiment 2 is as follows:
[0056] 1: The vehicle enters the chute bulk material loading system, and the carriage is located below the chute and the material automatic loading device;
[0057] 2: Use the detection device to measure the length, width and height of the carriage, the position of the chute, and the front end distance Lq and rear end distance Lh between the center of the chute and the carriage;
[0058] 3: Based on the length, width and height of the carriage, the loading volume Wz, the material density and the angle of repose, the height Ht of the bottom of the push plate from the bottom of the carriage is calculated, and the box is controlled to descend so that the height of the push plate from the bottom of the carriage is Ht;
[0059] 4: According to the front end distance Lq, rear end distance Lh, push plate height Ht, compartment railing height, material repose angle, preset material top shape, relative to the chute center, calculate the total amount of material to be loaded at the front end Wzq, the total amount of material to be loaded at the rear end Wzh, and satisfy the loading amount Wz = total amount of material to be loaded at the front end Wzq + total amount of material to be loaded at the rear end Wzh;
[0060] 5: Calculate the data of material discharge: After the discharge valve is opened, the material in the hopper freely falls into the carriage, box, and chute through the chute. When it stops, the material quantity Wf under the loading box is calculated based on the carriage and loading system data. The material quantity Wyt in the box is calculated based on the chute diameter and box size. This quantity Wyt is also the quantity pushed by the push plate in a complete time. Based on the chute size data, the material quantity Wlt in the chute under the discharge valve is calculated;
[0061] 6: Based on the data in S4 and S5, the automatic material loading device pushes the material forward and backward, and determines that when loading is completed, the amount of material pushed forward is Wqt=Wzq-Wf / 2, and the amount of material pushed backward is Wht=Wzh-Wf / 2; calculate that when the discharge valve is closed, the total amount of material pushed forward and pushed backward is Wts=Wqt+Wht-Wlt-Wyt;
[0062] 7: Before the first unloading, the motors of the negative pressure suction devices on both sides of the box start to work, suck air, and put the push plate under the chute close to the min (Wqt, Wht) position, corresponding to position X, and push it out to the outside of the chute in the direction of min (Wqt, Wht), and X volume of material can be pushed out. Figure 3 As shown, the outer side of the chute here refers to the outer side of the Wyt area under the chute;
[0063] 8: Set RemainWqt to record the amount of material left in the forward push process, and the initial value of RemainWqt is Wqt; set RemainWht to record the amount of material left in the backward push process, and the initial value of RemainWht is Wt; set RemainWts to record the total amount left in the pushing process, and the initial value of RemainWts is Wts;
[0064] 9: Open the discharge valve and delay to ensure that the material in the chute stops flowing;
[0065] 10: Officially start pushing materials: first push X materials in the direction of min (Wqt, Wht), then push Wyt materials in the opposite direction, and then push Wyt materials in the opposite direction. When pushing forward, RemainWqt decreases the amount of materials pushed out, and when pushing backward, RemainWht decreases the amount of materials pushed out. When pushing forward and backward, RemainWts decreases. Push forward and backward until RemainWts=Wlt+Wyt. During the pushing process of the push plate, when the discharge valve is open, it is necessary to check the material situation in the hopper. If the material in the chute is not full, stop loading immediately. When the material in the hopper is sufficient, continue to push the push plate and continue loading;
[0066] 11: Close the discharge valve;
[0067] 12: Distribution of materials in the chute and box: At this time, RemainWqt+RemainWht=RemainWts=Wlt+Wyt, and the push plate position Y=Wts-Wlt-Wyt-(the total amount of materials that have been pushed out). Push the material of min(RemainWqt+RemainWht)-Y in the direction represented by max(RemainWqt+RemainWht), then push the material of min(RemainWqt+RemainWht) in the opposite direction, and then push all the remaining materials in the opposite direction. Push forward and backward, while decreasing RemainWqt, RemainWht, and RemainWts, until all three quantities are 0. At the last push, all the remaining materials in the chute fall into the box and are all pushed out of the chute range, so that the material pushing in the carriage is smooth.
[0068] 13: The negative pressure motors on both sides of the box continue to suck air to remove the dust in the box. At this time, the one-way valve opens to transport gas inward.
[0069] 14: The loading system is upgraded, the vehicle drives away, and loading is completed.
[0070] 15. The density of some bulk materials will change during loading. In this case, communication can be carried out with the outbound weighing room to obtain the weight and correct the density.
Claims
1. A loading method based on a chute bulk material loading system with dust suppression and quantitative functions, the system includes an automatic loading device for bulk materials and a detection device, the automatic loading device for bulk materials includes a hopper, a discharge valve, a chute, a dust sealing structure and a pushing mechanism, the dust sealing structure includes a dust suppression plate and a box body, the box body is a hollow structure located above the dust suppression plate, the box body feed port is connected to the chute, the dust sealing structure is in contact with the carriage to form a closed space, and a plurality of feed ports are arranged on the box body. Features: The funnel is equipped with a measuring instrument, a discharge valve is installed at the bottom of the funnel, the top of the chute is connected to the discharge valve, the bottom of the chute is connected to the feed port of the box, air holes are arranged at the ends of both sides of the box, the air holes are connected to the dust removal device through the negative pressure suction device, a one-way valve is installed outside the chute on the box, the edge of the dust sealing structure is made of soft material, and is softly connected to the closed compartment, and the detection device is used to detect vehicle information; The method is as follows: S1: The vehicle enters the chute bulk material loading system, and the carriage is located below the chute and the material automatic loading device; S2: Measure the length, width and height of the carriage, the position of the chute, and the front end distance Lq and rear end distance Lh between the center of the chute and the carriage through the detection device; S3: Based on the length, width and height of the carriage, the loading volume Wz, the material density and the repose angle parameter data, calculate the height Ht of the bottom of the push plate of the pushing mechanism from the bottom of the carriage, and control the box body to descend so that the height of the push plate from the bottom of the carriage is Ht; S4: According to the front end distance Lq, rear end distance Lh, push plate height Ht, compartment railing height, material repose angle, preset material top shape, relative to the chute center, calculate the total amount of material to be loaded at the front end Wzq and the total amount of material to be loaded at the rear end Wzh, and satisfy the loading amount Wz = total amount of material to be loaded at the front end Wzq + total amount of material to be loaded at the rear end Wzh; S5: Calculate the data of material discharge: after the discharge valve is opened, the material in the hopper falls freely into the carriage and the box through the chute. In the final stop state, based on the carriage and loading system data, calculate the material quantity Wf below the loading box. According to the chute diameter and the box size, calculate the material quantity Wyt in the box. This quantity Wyt is also the quantity pushed by the push plate in one complete time. According to the chute size data, calculate the material quantity Wlt in the chute below the discharge valve; S6: Based on the data in S4 and S5, the material automatic loading device pushes the material forward and backward, and determines that when loading is completed, the forward material quantity is Wqt=Wzq-Wf / 2, and the backward material quantity is Wht=Wzh-Wf / 2; calculate that when the discharge valve is closed, the total amount of forward and backward materials is Wts=Wqt+Wht-Wlt-Wyt; S7: Determine the number of times n that the push plate needs to push and the remainder Wys. The number n is the integer closest to and not greater than Wts / Wyt, and the remainder Wys = Wts-Wyt*n. Before the first unloading, the motors of the negative pressure suction devices on both sides of the box start to work and suck air. Put the push plate under the chute near the min (Wqt, Wht) position, corresponding to Wys, and push it to the outside of the chute in the direction of min (Wqt, Wht). Then, Wys volume of material can be pushed out. Here, the outside of the chute refers to the outside of the Wyt area under the chute. S8: RemainWqt is set to record the amount of material left in the forward push process, and the initial value of RemainWqt is Wqt; RemainWht is set to record the amount of material left in the backward push process, and the initial value of RemainWht is Wt; RemainWts is set to record the total amount left in the pushing process, and the initial value of RemainWts is Wts; S9: Open the discharge valve and delay to ensure that the material in the chute stops flowing; S10: Officially start pushing materials: determine a forward and backward material pushing plan. When pushing forward, RemainWqt decreases the amount of material pushed out, and when pushing backward, RemainWht decreases the amount of material pushed out. Push forward and backward, RemainWts decreases, push forward and backward, and stop when RemainWts=Wlt+Wyt. During the pushing process of the push plate, when the discharge valve is open, it is necessary to check the material situation in the hopper. If the material in the chute is not full, stop loading immediately. When the material in the hopper is sufficient, continue to push the push plate and continue loading. S11: Close the discharge valve; S12: Material distribution in the chute and the box: At this time, RemainWqt+RemainWht=RemainWts=Wlt+Wyt. Based on the above data, push forward and backward, and reduce RemainWqt, RemainWht, and RemainWts at the same time until the three quantities are all 0. During the last push, all the remaining materials in the chute fall into the box and are pushed out into the carriage, so that the carriage pushes the materials smoothly. S13: The negative pressure motors on both sides of the box continue to suck air to remove the dust in the box. At this time, the one-way valve opens to transport gas inward; S14: The loading system is upgraded, the vehicle drives away, and loading is completed.
2. A loading method based on a chute bulk material loading system with dust suppression and quantitative functions according to claim 1, Features: The chute bulk material loading system is installed on the original funnel bracket.
3. A loading method based on a chute bulk material loading system with dust suppression and quantitative functions according to claim 1, Features: The discharge valve is controlled by a cylinder or an electric valve.
4. A loading method based on a chute bulk material loading system with dust suppression and quantitative functions according to claim 1, Features: The air holes, the negative pressure air suction device and the dust removal device are connected through pipelines, and the dust removal device adopts a bag dust collector.
5. A loading method based on a chute bulk material loading system with dust suppression and quantitative functions according to claim 1, Features: The detection device includes a sensor and a visual recognition system, and the detection device relies on a movable arm to obtain information from multiple angles of the vehicle.
