Installation method and system of special-shaped aluminum structure

By performing keel segmentation and quality control on the special-shaped aluminum structure building information model, combined with point cloud model splicing and three-dimensional model optimization, the efficient and accurate installation of special-shaped aluminum structures was achieved, solving the problems of low efficiency and insufficient accuracy in traditional methods, and improving Improve construction efficiency and building quality.

CN118308984BActive Publication Date: 2024-10-22NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410736274.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-22
Estimated Expiration
2044-06-07

AI Technical Summary

Technical Problem

In the installation of special-shaped aluminum structures with complex structures, the traditional point-by-point setting out method is inefficient and difficult to meet the visibility conditions of the construction site, resulting in prolonged construction period and increased cost. Manual correction is cumbersome and untimely, affecting construction progress and accuracy.

Method used

By performing keel segmentation and quality control on the special-shaped aluminum structure building information model, establishing a point cloud model splicing control target, optimizing the three-dimensional model of the keel structure, performing corner code positioning and aluminum plate installation, an automated and high-precision installation process is achieved.

Benefits of technology

It improves the installation efficiency and accuracy, reduces the construction time and cost, ensures the high quality and high precision standards of the building, and enhances the functionality and aesthetics of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118308984B_ABST
    Figure CN118308984B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for installing a special-shaped aluminum structure, which relates to the technical field of measuring and installing special-shaped structures. In order to effectively improve the installation accuracy and installation efficiency, the installation method of the special-shaped aluminum structure includes: S1: segmenting the keel of the special-shaped aluminum structure building information design model to obtain a segmentation result; wherein the segmentation result includes a main keel and a secondary keel; S2: producing a physical keel based on the segmentation result to obtain a physical keel set; S3: performing quality control on each physical keel in the physical keel set to obtain a target keel set, wherein the target keel set includes a target main keel and a target secondary keel; S4: installing the special-shaped aluminum structure based on the target keel set. The present invention can effectively improve the installation accuracy and installation efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Background Art

[0002] In modern construction and manufacturing, automatic total stations are widely used as an advanced measurement tool, especially when dealing with complex structures such as the positioning and installation of special-shaped aluminum structures. With their high-precision measurement capabilities and user-friendly operation interface, these instruments have greatly improved the accuracy and efficiency of engineering measurements. Automatic total stations use electronic distance measurement, angle measurement and built-in data processing capabilities to quickly complete the three-dimensional coordinate measurement of target points, which is an important means to ensure engineering quality.

[0003] However, despite the advanced technology of the automatic total station, its basic working principle is still based on optical observation, which means that it needs a direct line of sight to measure the target point when performing tasks, which is the so-called "line of sight condition". In complex construction sites, especially in the installation of special-shaped aluminum structures involving a large number of obstructions and irregular structures, such requirements are often difficult to meet. Due to the complexity and uniqueness of the aluminum structure design, the installation position and posture of each component need to be precisely controlled. The traditional point-by-point lofting method is inefficient because it requires technicians to measure each point one by one, and then manually adjust the structure position according to the measurement results. This process is time-consuming and labor-intensive.

[0004] In addition, when facing a complex environment, the point-by-point surveying method is limited by the visibility conditions and the complexity of the aluminum structure itself. The installation team may need to adjust the position of the total station several times and repeat the measurement steps to cover all key points, which undoubtedly increases the workload and time cost, thereby extending the construction period and indirectly increasing the total cost of the project. Moreover, in actual operation, once a deviation is found, the manual correction process is also cumbersome and not timely enough, affecting the overall construction progress and precision control. Summary of the invention

[0005] In order to overcome the problems existing in the related art, the present invention provides a method and system for installing a special-shaped aluminum structure.

[0006] According to a first aspect of an embodiment of the present invention, a method for installing a special-shaped aluminum structure is provided, and the method for installing the special-shaped aluminum structure comprises:

[0007] S1: performing keel segmentation on the special-shaped aluminum structure building information design model to obtain a segmentation result; wherein the segmentation result includes a main keel and a secondary keel;

[0008] S2: Produce a solid keel based on the segmentation result to obtain a solid keel set;

[0009] S3: performing quality control on each physical keel in the physical keel set to obtain a target keel set, wherein the target keel set includes a target main keel and a target secondary keel;

[0010] S4: Installing the special-shaped aluminum structure based on the target keel set.

[0011] In some exemplary embodiments of the present invention, based on the above solution, S3 includes:

[0012] Establishing a physical keel model corresponding to each physical keel in the physical keel set;

[0013] Performing quality inspection on each entity keel model respectively to obtain inspection results;

[0014] Determine whether the detection result meets the accuracy requirement. If so, include the physical keel corresponding to the current physical keel model into the target keel set. Otherwise, return to S2.

[0015] In some exemplary embodiments of the present invention, based on the above-mentioned solution, before quality inspection is performed on each solid keel model and the inspection results are obtained, the installation method of the special-shaped aluminum structure further includes:

[0016] An independent coordinate system is established, and the main keel and / or the secondary keel in the segmentation result are registered to the independent coordinate system.

[0017] In some exemplary embodiments of the present invention, based on the above solution, the S4 includes:

[0018] S41: Establish point cloud model stitching control target;

[0019] S42: using the point cloud model to splice the control target, sequentially installing the target main keel and the target secondary keel to obtain a first keel structure;

[0020] S43: establishing a three-dimensional model of the first keel structure;

[0021] S44: optimizing and adjusting the three-dimensional model of the first keel structure based on the special-shaped aluminum structure building information model to obtain a first optimal keel structure;

[0022] S45: performing angle code positioning and aluminum plate installation on the first optimal keel structure to obtain a second keel structure;

[0023] S46: establishing a three-dimensional model of the second keel structure;

[0024] S47: Optimizing and adjusting the three-dimensional model of the second keel structure based on the special-shaped aluminum structure building information model to obtain a second optimal keel structure;

[0025] S48: Using the second optimal keel structure to install the special-shaped aluminum structure.

[0026] In some exemplary embodiments of the present invention, based on the above solution, the S42 includes:

[0027] S421: Arrange positioning marks on the installation structure of the special-shaped aluminum structure;

[0028] S422: installing the main keel onto the installation structure according to the positioning mark to obtain a first installation structure architecture;

[0029] S423: Establishing a three-dimensional model of the first installation structure architecture;

[0030] S424: Determine whether the three-dimensional model of the first installation structure meets the accuracy requirement. If so, proceed to S425; otherwise, return to S421;

[0031] S425: Arranging welding point marks of the secondary keel on the first installation structure frame;

[0032] S426: Based on the welding point marks, install the secondary keel on the first installation structure frame to obtain a second installation structure frame;

[0033] S427: Establishing a three-dimensional model of the second installation structure architecture;

[0034] S428: Determine whether the three-dimensional model of the second installation structure meets the accuracy requirement, if so, proceed to S429; otherwise, return to S425;

[0035] S429: welding and hoisting the secondary keel based on the three-dimensional model of the second installation structure structure to obtain a first keel structure.

[0036] In some exemplary embodiments of the present invention, based on the above-mentioned solution, the installation structure is a bridge body, and the main keel and the secondary keel are arranged on both sides of the bridge body.

[0037] In some exemplary embodiments of the present invention, based on the above solution, the S429 includes:

[0038] S4291: Determine aerial node positions based on the three-dimensional model of the second installation structure, wherein each secondary keel has at least three aerial node positions;

[0039] S4292: Determine the inclination, height and orientation of the current secondary keel according to the aerial node position;

[0040] S4293: Determine the position of the support member below the current secondary keel according to the inclination, height and orientation of the current secondary keel;

[0041] S4294: welding the lower support member according to the position of the lower support member;

[0042] S4295: Weld and hoist the current secondary keel;

[0043] S4296: Repeat S4291 to S4295 until the welding and hoisting of all secondary keels in the second installation structure are completed to obtain the first keel structure.

[0044] In some example embodiments of the present invention, based on the above-mentioned solution, before S2, the method for installing the special-shaped aluminum structure further includes: numbering the segmentation results.

[0045] According to a second aspect of an embodiment of the present invention, there is provided a mounting system for a special-shaped aluminum structure, the mounting system for the special-shaped aluminum structure comprising:

[0046] A keel segmentation device, the keel segmentation device is used to segment the keel of the special-shaped aluminum structure building information design model to obtain a segmentation result; wherein the segmentation result includes a main keel and a secondary keel;

[0047] A keel production device, the keel production device is used to produce a physical keel based on the segmentation result to obtain a physical keel set;

[0048] A quality control device, the quality control device is used to perform quality control on each physical keel in the physical keel set to obtain a target keel set, wherein the target keel set includes a target main keel and a target secondary keel;

[0049] An installation device is used to install a special-shaped aluminum structure based on the target keel set.

[0050] According to a third aspect of an embodiment of the present invention, there is provided an electronic device, comprising: a processor; and a memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by the processor, steps S1 and S3 of the method for installing the special-shaped aluminum structure in the first aspect are implemented.

[0051] According to a fourth aspect of an embodiment of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, steps S1 and S3 of the method for installing a special-shaped aluminum structure in the first aspect are implemented.

[0052] The technical solution provided by the embodiments of the present invention may have the following beneficial effects:

[0053] 1. By segmenting the keel of the special-shaped aluminum structure building information model, the special-shaped aluminum structure building information is refined into the main keel and the secondary keel, which can effectively refine the design details and make the keel production more accurate, thereby effectively avoiding material waste;

[0054] 2. Through quality control of the solid keel, it is ensured that each keel meets the established standards, which improves the safety and durability of the overall structure and reduces potential risks during the construction process;

[0055] 3. Using point cloud models to splice control targets can effectively improve positioning accuracy and installation efficiency compared to ordinary targets in the existing technology, especially when dealing with complex-shaped special-shaped buildings, effectively ensuring the accurate reproduction of the building form;

[0056] 4. By establishing and optimizing the three-dimensional model of the keel structure, two optimization adjustments were made (from the first keel structure to the first optimal keel structure, and then to the second optimal keel structure). This iterative optimization process ensured a high degree of consistency between the design and the actual construction, reduced the workload of on-site adjustments, and improved the accuracy and efficiency of construction;

[0057] 5. The precise positioning of the corner code simplifies the installation process of the aluminum plate and improves the installation efficiency. It also enhances the connection strength between the aluminum plate and the keel, ensuring the flatness and aesthetics of the building surface.

[0058] 6. The present invention incorporates a refined control mechanism in every step from preliminary design, precision production to on-site installation, which fundamentally reduces the assembly time and cost consumption at the construction site, ensuring that the final special-shaped aluminum structure follows the most stringent high-quality and high-precision standards, which not only significantly enhances the functionality and durability of the building, but also greatly improves its appearance aesthetics.

[0059] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0061] Figure 1 Schematically showing a flow chart of a method according to some embodiments of the present invention;

[0062] Figure 2 Schematically showing a schematic diagram of the installation structure of a special-shaped aluminum structure according to some embodiments of the present invention;

[0063] Figure 3 Schematically showing a schematic diagram of an apparatus according to some embodiments of the present invention;

[0064] Figure 4 A schematic diagram schematically shows a structure of a computer system of an electronic device according to some embodiments of the present invention;

[0065] Figure 5 A schematic diagram of a computer-readable storage medium according to some embodiments of the present invention is schematically shown. DETAILED DESCRIPTION

[0066] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Instead, they are merely examples of devices and methods consistent with some aspects of the present invention as detailed in the appended claims.

[0067] The terms used in the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The singular forms "a", "the" and "the" used in the present invention and the appended claims are also intended to include plural forms unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.

[0068] It should be understood that although the terms first, second, third, etc. may be used in the present invention to describe various information, these information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present invention, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".

[0069] Next, the embodiments of the present invention are described in detail.

[0070] like Figure 1 As shown, Figure 1 It is a flow chart of a method for installing a special-shaped aluminum structure according to an exemplary embodiment of the present invention.

[0071] refer to Figure 1 As shown, the installation method 100 of the special-shaped aluminum structure includes:

[0072] S1: performing keel segmentation on the special-shaped aluminum structure building information design model to obtain a segmentation result; wherein the segmentation result includes a main keel 210 and a secondary keel 220;

[0073] S2: Produce a solid keel based on the segmentation result to obtain a solid keel set;

[0074] S3: performing quality control on each physical keel in the physical keel set to obtain a target keel set, wherein the target keel set includes a target main keel and a target secondary keel;

[0075] S4: Installing the special-shaped aluminum structure based on the target keel set.

[0076] The technical solution provided by the embodiments of the present invention may have the following beneficial effects:

[0077] 1. By dividing the keel of the special-shaped aluminum structure building information model, the special-shaped aluminum structure building information is refined into the main keel 210 and the secondary keel 220, which can effectively refine the design details and make the keel production more accurate, thereby effectively avoiding material waste;

[0078] 2. By conducting quality control on the solid keels, we ensure that each keel meets the established standards, thereby improving the safety and durability of the overall structure and reducing potential risks during the construction process.

[0079] In S1, the special-shaped aluminum structure has extremely high requirements for design accuracy and construction complexity due to its unique shape and structure. By finely segmenting the keel in the building information model (BIM), on the one hand, the complex three-dimensional structure can be decomposed into components that are easier to manage and construct, namely the main keel 210 and the secondary keel 220, so as to achieve precise control and design optimization of the building structure. On the other hand, it can assist in production and manufacturing, so as to more accurately calculate the quantity and specifications of the required materials during the production and manufacturing process, reduce material waste, and effectively control project costs.

[0080] Here, the main keel 210 usually bears the main structural load, while the secondary keel 220 is used to refine the structure and provide surface support. This distinction helps to select appropriate material grades and sizes to improve economic benefits.

[0081] As for the method of keel segmentation, the present invention does not make any specific limitation. Those skilled in the art can select a suitable segmentation method according to actual needs. For example, in some embodiments, a segmentation method based on digital modeling, free surface segmentation, function-oriented segmentation or structure optimization segmentation can be adopted. It can be any one or more combinations of the above segmentation methods.

[0082] In addition, since aluminum structures are generally more complex, the number of main keels 210 and secondary keels 220 is not unique, and is generally greater than 2.

[0083] In S2, since the segmentation result includes the main keel 210 and the secondary keel 220, and the number of the main keel 210 and the secondary keel 220 are relatively large, the main keel 210 and the secondary keel 220 can also be numbered before the physical keel is produced based on the segmentation result. In this way, each keel has a unique identity, and in the subsequent production and installation process, it is convenient for operators to quickly and accurately carry out corresponding production and find the corresponding installation position according to the number, avoid confusion, reduce the possibility of incorrect installation, and thus improve the efficiency and accuracy of on-site assembly.

[0084] In addition, during the construction process, if a part of the keel is found to have quality problems or needs to be adjusted, the specific part can be quickly located according to the number, which is convenient for timely correction and later quality inspection and maintenance. For keels made of specific materials or with special requirements, the number can also help trace their source and specifications to ensure that the materials meet the design standards.

[0085] On this basis, the solid keel is produced based on the segmentation results, for example, using advanced manufacturing technologies such as computer numerical control machine tools (CNC), laser cutting machines or 3D printing. It is possible to directly produce a solid keel that fully matches the special-shaped aluminum structure building information design model, ensuring the high precision of the manufacturing process.

[0086] In S3, since the production process is inevitably affected by the cutting accuracy and the welding temperature difference, each physical keel in the physical keel set may have some size errors to a greater or lesser extent. In order to reduce the size errors and improve the accuracy of the physical keels, the present invention performs quality control on each physical keel in the physical keel set. In this way, each physical keel after quality control corresponds to a target keel, and the target keels corresponding to all the physical keels form a target keel set.

[0087] In this way, through a strict quality control process, quality control of the solid keel can be carried out to eliminate unqualified products and ensure that each target main keel and target secondary keel can meet the design requirements and safety standards, thereby ensuring the overall structural quality and bearing capacity of the building.

[0088] The present invention does not specifically limit the method of quality control. For example, in some embodiments, the physical keels in the physical keel set can be randomly inspected, that is, all the keels in the physical keel set are divided, one part is inspected for materials, and the other part is inspected for processing accuracy; all the physical keels in the physical keel set can also be inspected in order of numbering, and the inspection targets include material and processing accuracy.

[0089] In order to ensure the accuracy of each physical keel, as an embodiment, the present invention performs quality control on all keels in all physical keels, and the quality control method further includes:

[0090] Establishing a physical keel model corresponding to each physical keel in the physical keel set;

[0091] Performing quality inspection on each entity keel model respectively to obtain inspection results;

[0092] Determine whether the detection result meets the accuracy requirement. If so, include the physical keel corresponding to the current physical keel model into the target keel set. Otherwise, return to S2.

[0093] Here, each physical keel can be laser scanned and a physical keel model corresponding to each physical keel can be generated by reverse modeling based on the scanning results. Alternatively, each physical keel can be digitally photographed and measured in combination with three-dimensional reconstruction technology to generate a physical keel model, which is not specifically limited in the present invention.

[0094] On this basis, since the generated solid keel model is established based on the solid keel, and the special-shaped aluminum structure building information design model is preset, the main keel 210 and the secondary keel 220 included in the segmentation result are both designed keel models, and quality inspection can be performed based on the comparison difference between the solid keel model and the designed keel model by comparing the two. This process includes but is not limited to size deviation analysis, shape consistency inspection and structural integrity verification.

[0095] Of course, in order to unify the quality inspection benchmark, before performing quality inspection on each physical keel model and obtaining the inspection results, those skilled in the art may also design some algorithms or reference objects to align the main keel 210 and / or the secondary keel 220 in the segmentation result to a unified reference standard. For example, in some embodiments, an independent coordinate system may be established to align the main keel 210 and / or the secondary keel 220 in the segmentation result to the independent coordinate system, so that the registered keel model is more accurately positioned in space.

[0096] Since the entire quality inspection process is performed by computer, it can not only significantly shorten the time required for traditional manual inspection, but also effectively avoid human observation errors, ensure the high accuracy of the inspection results, and thus achieve automation and efficiency.

[0097] In S4, since the solid keel that has passed quality control can be determined to a certain degree of accuracy, the installation of special-shaped aluminum structures on this basis can reduce the assembly time and cost consumption at the construction site, ensuring that the final special-shaped aluminum structure complies with the most stringent high-quality and high-precision standards.

[0098] As an implementation mode, S4 may also be designed to include:

[0099] S42: using the point cloud model to splice the control target, sequentially installing the target main keel and the target secondary keel to obtain a first keel structure;

[0100] S43: establishing a three-dimensional model of the first keel structure;

[0101] S44: optimizing and adjusting the three-dimensional model of the first keel structure based on the special-shaped aluminum structure building information model to obtain a first optimal keel structure;

[0102] S45: performing angle code positioning and aluminum plate installation on the first optimal keel structure to obtain a second keel structure;

[0103] S46: establishing a three-dimensional model of the second keel structure;

[0104] S47: Optimizing and adjusting the three-dimensional model of the second keel structure based on the special-shaped aluminum structure building information model to obtain a second optimal keel structure;

[0105] S48: Using the second optimal keel structure to install the special-shaped aluminum structure.

[0106] In this way, the use of point cloud model splicing control targets can effectively improve positioning accuracy and installation efficiency compared to ordinary targets in the prior art, especially when dealing with complex-shaped special-shaped buildings, effectively ensuring the accurate reproduction of the building form;

[0107] By building and optimizing the three-dimensional model of the keel structure, two optimization adjustments were made (from the first keel structure to the first optimal keel structure, and then to the second optimal keel structure). This iterative optimization process ensured a high degree of consistency between the design and the actual construction, reduced the workload of on-site adjustments, and improved the accuracy and efficiency of construction.

[0108] The precise positioning of the corner code simplifies the aluminum plate installation process and improves the installation efficiency. It also enhances the connection strength between the aluminum plate and the keel, ensuring the flatness and aesthetics of the building surface.

[0109] The present invention incorporates a refined control mechanism in every step from preliminary design, precision production to on-site installation, fundamentally reducing the assembly time and cost consumption at the construction site, ensuring that the final special-shaped aluminum structure complies with the most stringent high-quality and high-precision standards, which not only significantly enhances the functionality and durability of the building, but also greatly improves its aesthetic appearance.

[0110] In S41, the present invention does not impose any specific restrictions on the installation structure of the special-shaped aluminum structure, and it can be, for example, the bridge body 230, the building curtain wall, the roof, the interior decoration, etc., as an embodiment, Figure 2 A schematic diagram of one of the mounting structures 200 is shown. Figure 2In the embodiment, the main keel 210 and the secondary keel 220 are both installed on the bridge body 230. On this basis, the point cloud model control targets are established at the stable foundations on both sides of the bridge body 230. Of course, this is not the only solution. Figure 2 This is only one implementation method. If the special-shaped aluminum structure is installed on other structures, then the other structures are the installation structures of the special-shaped aluminum structure.

[0111] In addition, in order to ensure that the characteristic points on the target can be fully and clearly captured by the laser scanner, so as to facilitate accurate identification and matching in subsequent processing, thereby improving the stitching accuracy, the point cloud model controls the target to face the side of the bridge body 230; in addition, based on the principle of triangulation (three non-collinear points can uniquely determine a plane), the configuration of the three targets can provide sufficient geometric constraints to achieve accurate three-dimensional spatial positioning even in complex environments, ensuring effective alignment and stitching of data between different scanning stations, and can be set to ensure that three targets enter the scanning field of view at the same time when each station is scanning.

[0112] By combining the point cloud model with the existence of control targets, non-contact high-precision measurement can be achieved. Accurate data can be obtained even for parts that are difficult to reach or visually identify, providing a reliable basis for design and construction.

[0113] On this basis, in S42, the target main keel installation and the target secondary keel installation are performed in sequence by splicing the point cloud model control target, and the first keel structure can be further expanded as follows:

[0114] S421: Arrange positioning marks on the installation structure of the special-shaped aluminum structure;

[0115] S422: installing the main keel 210 onto the installation structure according to the positioning mark to obtain a first installation structure architecture;

[0116] S423: Establishing a three-dimensional model of the first installation structure architecture;

[0117] S424: Determine whether the three-dimensional model of the first installation structure meets the accuracy requirement. If so, proceed to S425; otherwise, return to S421;

[0118] S425: Arranging welding point marks of the secondary keel 220 on the first installation structure frame;

[0119] S426: Based on the welding point marks, the secondary keel 220 is installed on the first installation structure frame to obtain a second installation structure frame;

[0120] S427: Establishing a three-dimensional model of the second installation structure architecture;

[0121] S428: Determine whether the three-dimensional model of the second installation structure meets the accuracy requirement, if so, proceed to S429; otherwise, return to S425;

[0122] S429: welding and hoisting the secondary keel 220 based on the three-dimensional model of the second installation structure structure to obtain a first keel structure.

[0123] In S421, the positioning mark can be any form of marking content, for example, the marking body can be a cross mark with fluorescent or reflective effects, or it can be other special symbols or patterns, such as triangles, circles, moons, suns, or project-related patterns. Technical personnel in this field can set it according to actual conditions.

[0124] In S422, the main keel 210 can be positioned, hoisted and welded directly according to the positioning mark. Of course, positioning and hoisting can also be performed first, and the precision of the structure after hoisting is adjusted, and then welded and fixed, which will be set according to the actual situation.

[0125] In S423 and S427, the three-dimensional model of the first mounting structure architecture and the three-dimensional model of the second mounting structure architecture may be established in different ways or in the same way. In order to save resources and improve efficiency at the same time, as an implementation mode, the scanning data of the first mounting structure architecture and / or the second mounting structure architecture may be obtained by three-dimensional laser scanning, and reverse modeling may be performed based on the scanning data. Of course, the three-dimensional model of the first mounting structure architecture and / or the second mounting structure architecture may also be generated by performing digital photogrammetry on the first mounting structure architecture and / or the second mounting structure architecture in combination with three-dimensional reconstruction technology, which is not specifically limited in the present invention.

[0126] In S424 and S428, the accuracy judgment can be achieved by performing coordinate comparison based on the coordinate systems established in S423, S427 and the above-mentioned solutions.

[0127] In S425, due to poor visibility conditions, when installing the secondary keel 220, you can choose to use the "coordinate method + distance measurement method" to locate the welding points. Specifically, you can select the starting node and target node with good visibility conditions and easy to accurately locate according to the number. The starting node can be any main keel 210, and correspondingly, the target node can also be any main keel 210 adjacent to or close to the starting node. Then measure the distance from the starting node to the target node, mark the welding points and lay out small reflective targets; then install the secondary keel 220.

[0128] During the installation of the secondary keel 220, since each secondary keel 220 is a three-dimensional inclined surface with different curvatures and circumferences, the root and top of the support between the main keel 210 and the secondary keel 220 are not cross-sections and have different lengths, which makes it difficult to weld the secondary keel 220. When the secondary keel 220 is installed at nodes, each section of the secondary keel 220 extracts the installation and positioning detection nodes to control the inclination, height and orientation of the keel section.

[0129] In S429, since it is difficult to locate the aerial points, three short steel bars can be welded to determine the aerial node positions. The key nodes can be located at the spatial positions when the secondary keel 220 is installed. Each secondary keel 220 has at least three aerial nodes, so the inclination, height and orientation of the secondary keel 220 can be determined. The position of the lower support is welded and installed according to the inclination, height and cutting angle on both sides of the model.

[0130] In summary, by arranging positioning marks and welding point marks on the installation structure, an accurate reference is provided for the installation of the keel, ensuring that the main keel 210 and the secondary keel 220 can be accurately positioned according to the design requirements, avoiding the accumulation of installation errors, and improving the accuracy and efficiency of the installation; establishing a three-dimensional model of the first installation structure architecture and a three-dimensional model of the second installation structure architecture not only helps to intuitively monitor the installation progress, but also provides a digital platform for project management. Managers can perform construction simulation, progress tracking and quality audit based on these models, thereby enhancing the scientific nature and transparency of construction management; and the accuracy verification of the three-dimensional model of the first installation structure architecture and the three-dimensional model of the second installation structure architecture can achieve real-time quality control during the installation process, identify installation deviations early, and make adjustments in time, thereby avoiding rework caused by early errors in subsequent work, saving costs, and shortening construction period; in addition, through the phased installation and verification process, the stable construction of the overall structure layer by layer is ensured, the deformation risk of the special-shaped structure can be effectively controlled, and the stability and safety of the building are guaranteed.

[0131] In S43 and S46, the three-dimensional model of the first keel structure and the three-dimensional model of the second keel structure can be established in the same way or in different ways. In order to save resources and improve production and installation efficiency, they can be established in the same way, that is, the first keel structure and the second keel structure are modeled in the same way as the physical keel model, the first installation structure structure and the second installation structure structure in the aforementioned scheme, such as performing laser scanning, and generating the three-dimensional models corresponding to the first keel structure and the second keel structure by reverse modeling based on the scanning results. It is also possible to generate the physical keel model by performing digital photogrammetry on the first keel structure and the second keel structure in combination with three-dimensional reconstruction technology, and the present invention does not make specific limitations.

[0132] In S44 and S47, the optimization and adjustment of the three-dimensional model can be realized by some software, for example, the three-dimensional model of the first keel structure and / or the three-dimensional model of the second keel structure established is imported into some software, and the software needs to be able to import the special-shaped aluminum structure building information model, and can compare and optimize the special-shaped aluminum structure building information model and the three-dimensional model. The software can be, for example, Autodesk Revit, Tekla Structures, Rhino or Navisworks.

[0133] According to a second aspect of an embodiment of the present invention, a mounting system 300 of a special-shaped aluminum structure is also provided. Figure 3 As shown, the installation system 300 of the special-shaped aluminum structure includes:

[0134] A keel segmentation device 310, wherein the keel segmentation device 310 is used to segment the keel of the special-shaped aluminum structure building information design model to obtain a segmentation result; wherein the segmentation result includes a main keel 210 and a secondary keel 220;

[0135] A keel production device 320, wherein the keel production device 320 is used to produce a physical keel based on the segmentation result to obtain a physical keel set;

[0136] A quality control device 330, wherein the quality control device 330 is used to perform quality control on each physical keel in the physical keel set to obtain a target keel set, wherein the target keel set includes a target main keel and a target secondary keel;

[0137] The installation device 340 is used to install the special-shaped aluminum structure based on the target keel set.

[0138] In addition, in an exemplary embodiment of the present invention, an electronic device capable of implementing steps S1 and S3 of the above-mentioned method for installing a special-shaped aluminum structure is also provided.

[0139] Those skilled in the art will appreciate that various aspects of the present invention may be implemented as systems, methods or program products. Therefore, various aspects of the present invention may be specifically implemented in the following forms, namely: complete hardware embodiments, complete software embodiments (including firmware, microcode, etc.), or embodiments combining hardware and software aspects, which may be collectively referred to herein as "circuits", "modules" or "systems".

[0140] Refer to the following Figure 4 An electronic device 400 according to such an embodiment of the present invention is described. Figure 4 The electronic device 400 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0141] like Figure 4 As shown, the electronic device 400 is in the form of a general computing device. The components of the electronic device 400 may include but are not limited to: the at least one processing unit 410, the at least one storage unit 420, a bus 430 connecting different system components (including the storage unit 420 and the processing unit 410), and a display unit 440.

[0142] The storage unit stores program codes, which can be executed by the processing unit 410, so that the processing unit 410 performs the steps of various exemplary embodiments of the present invention described in the above “Exemplary Method” section. For example, the processing unit 410 can perform the following steps: Figure 1 As shown in S1, the keel segmentation is performed on the special-shaped aluminum structure building information design model to obtain a segmentation result; wherein the segmentation result includes a main keel 210 and a secondary keel 220; S3, quality control is performed on each entity keel in the entity keel set to obtain a target keel set, wherein the target keel set includes a target main keel and a target secondary keel.

[0143] The storage unit 420 may include a readable medium in the form of a volatile storage unit, such as a random access memory unit (RAM) 421 and / or a cache memory unit 422 , and may further include a read-only memory unit (ROM) 423 .

[0144] The storage unit 420 may also include a program / utility 424 having a set (at least one) of program modules 425, such program modules 425 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.

[0145] Bus 430 may represent one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.

[0146] The electronic device 400 may also communicate with one or more external devices 470 (e.g., keyboards, pointing devices, Bluetooth devices, etc.), may also communicate with one or more devices that enable a user to interact with the electronic device 400, and / or communicate with any device that enables the electronic device 400 to communicate with one or more other computing devices (e.g., routers, modems, etc.). This communication may be performed through an input / output (I / O) interface 450. In addition, the electronic device 400 may also communicate with one or more networks (e.g., local area networks (LANs), wide area networks (WANs), and / or public networks, such as the Internet) through a network adapter 460. As shown, the network adapter 460 communicates with other modules of the electronic device 400 through a bus 430. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 400, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems, etc.

[0147] Through the description of the above embodiments, it is easy for those skilled in the art to understand that the exemplary embodiments described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the embodiment of the present invention can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which can be a personal computer, a server, a terminal device, or a network device, etc.) to execute the method according to the embodiment of the present invention.

[0148] In an exemplary embodiment of the present invention, a computer-readable storage medium is also provided, on which a program product capable of implementing the above method of the present invention is stored. In some possible embodiments, various aspects of the present invention can also be implemented in the form of a program product, which includes a program code, and when the program product is run on a terminal device, the program code is used to enable the terminal device to perform the steps of various exemplary embodiments of the present invention described in the above "Exemplary Method" section of the present invention.

[0149] refer to Figure 5 As shown, a program product 500 for implementing the above-mentioned underground pipeline detection method according to an embodiment of the present invention is described, which can adopt a portable compact disk read-only memory (CD-ROM) and include program code, and can be run on a terminal device, such as a personal computer. However, the program product of the present invention is not limited thereto. In the present invention, the readable storage medium can be any tangible medium containing or storing a program, which can be used by or in combination with an instruction execution system, an apparatus or a device.

[0150] The program product may use any combination of one or more readable storage media. The readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination thereof. More specific examples of readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof.

[0151] Program code for performing the operations of the present invention may be written in any combination of one or more programming languages, including object-oriented programming languages ​​such as Java, C++, etc., and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server. In the case of a remote computing device, the remote computing device may be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computing device (e.g., via the Internet using an Internet service provider).

[0152] In addition, the above-mentioned figures are only schematic illustrations of the processes included in the method according to an exemplary embodiment of the present invention, and are not intended to be limiting. It is easy to understand that the processes shown in the above-mentioned figures do not indicate or limit the time sequence of these processes. In addition, it is also easy to understand that these processes can be performed synchronously or asynchronously, for example, in multiple modules.

[0153] Through the description of the above embodiments, it is easy for those skilled in the art to understand that the exemplary embodiments described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the embodiment of the present invention can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which can be a personal computer, a server, a touch terminal, or a network device, etc.) to execute the method according to the embodiment of the present invention.

[0154] Other embodiments of the invention will readily occur to those skilled in the art after considering the specification and practicing the invention disclosed herein. The invention is intended to cover any variations, uses, or adaptations of the invention that follow the general principles of the invention and include common knowledge or customary techniques in the art not disclosed herein. The specification and examples are to be considered exemplary only, and the true scope and spirit of the invention are indicated by the claims.

[0155] It should be understood that the present invention is not limited to the exact construction that has been described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.

Claims

1. A method for installing a special-shaped aluminum structure, characterized in that: The installation method of the special-shaped aluminum structure includes: S1: performing keel segmentation on the special-shaped aluminum structure building information design model to obtain a segmentation result; wherein the segmentation result includes a main keel and a secondary keel; S2: Produce a solid keel based on the segmentation result to obtain a solid keel set; S3: performing quality control on each physical keel in the physical keel set to obtain a target keel set, wherein the target keel set includes a target main keel and a target secondary keel; S4: installing the special-shaped aluminum structure based on the target keel set; The S4 includes: S41: Establish point cloud model stitching control target; S42: using the point cloud model to splice the control target, sequentially installing the target main keel and the target secondary keel to obtain a first keel structure; S43: establishing a three-dimensional model of the first keel structure; S44: optimizing and adjusting the three-dimensional model of the first keel structure based on the special-shaped aluminum structure building information model to obtain a first optimal keel structure; S45: performing angle code positioning and aluminum plate installation on the first optimal keel structure to obtain a second keel structure; S46: establishing a three-dimensional model of the second keel structure; S47: Optimizing and adjusting the three-dimensional model of the second keel structure based on the special-shaped aluminum structure building information model to obtain a second optimal keel structure; S48: Using the second optimal keel structure to install the special-shaped aluminum structure; the S42 includes: S421: Arrange positioning marks on the installation structure of the special-shaped aluminum structure; S422: installing the main keel onto the installation structure according to the positioning mark to obtain a first installation structure architecture; S423: Establishing a three-dimensional model of the first installation structure architecture; S424: Determine whether the three-dimensional model of the first installation structure meets the accuracy requirement. If so, proceed to S425; otherwise, return to S421; S425: Arranging welding point marks of the secondary keel on the first installation structure frame; S426: Based on the welding point marks, install the secondary keel on the first installation structure frame to obtain a second installation structure frame; S427: Establishing a three-dimensional model of the second installation structure architecture; S428: Determine whether the three-dimensional model of the second installation structure meets the accuracy requirement, if so, proceed to S429; otherwise, return to S425; S429: welding and hoisting the secondary keel based on the three-dimensional model of the second installation structure structure to obtain a first keel structure; The S429 includes: S4291: Determine aerial node positions based on the three-dimensional model of the second installation structure, wherein each secondary keel has at least three aerial node positions; S4292: Determine the inclination, height and orientation of the current secondary keel according to the aerial node position; S4293: Determine the position of the support member below the current secondary keel according to the inclination, height and orientation of the current secondary keel; S4294: welding the lower support member according to the position of the lower support member; S4295: Weld and hoist the current secondary keel; S4296: Repeat S4291 to S4295 until the welding and hoisting of all secondary keels in the second installation structure are completed to obtain the first keel structure.

2. The installation method of special-shaped aluminum structure according to claim 1, characterized in that: The S3 includes: Establishing a physical keel model corresponding to each physical keel in the physical keel set; Performing quality inspection on each entity keel model respectively to obtain inspection results; Determine whether the detection result meets the accuracy requirement. If so, include the physical keel corresponding to the current physical keel model into the target keel set. Otherwise, return to S2.

3. The installation method of special-shaped aluminum structure according to claim 2, characterized in that: Before quality inspection of each solid keel model is performed and the inspection results are obtained, the installation method of the special-shaped aluminum structure further includes: An independent coordinate system is established, and the main keel and / or the secondary keel in the segmentation result are registered to the independent coordinate system.

4. The installation method of special-shaped aluminum structure according to claim 1, characterized in that: The installation structure is a bridge body, and the main keel and the secondary keel are arranged on both sides of the bridge body.

5. The installation method of the special-shaped aluminum structure according to any one of claims 1 to 4, characterized in that: Before S2, the installation method of the special-shaped aluminum structure also includes: The segmentation results are numbered.

6. An installation system based on the installation method of the special-shaped aluminum structure according to any one of claims 1 to 5, characterized in that: The mounting system comprises: A keel segmentation device, the keel segmentation device is used to segment the keel of the special-shaped aluminum structure building information design model to obtain a segmentation result; wherein the segmentation result includes a main keel and a secondary keel; A keel production device, the keel production device is used to produce a physical keel based on the segmentation result to obtain a physical keel set; A quality control device, the quality control device is used to perform quality control on each physical keel in the physical keel set to obtain a target keel set, wherein the target keel set includes a target main keel and a target secondary keel; An installation device is used to install a special-shaped aluminum structure based on the target keel set.

7. An electronic device, characterized in that: include: processor; as well as A memory having computer-readable instructions stored thereon, wherein the computer-readable instructions, when executed by the processor, implement steps S1 and S3 of the method for installing the special-shaped aluminum structure according to any one of claims 1 to 5.

Citation Information

Patent Citations

  • Installing method for large open-type stone curtain wall and based on BIM

    CN107558642A

  • Special-shaped curved surface modeling keel supporting system and construction method

    CN115822162A

  • Installation and construction method for large-span special-shaped double-curved-surface plate

    CN116950417A

  • Construction method of single-curved-surface special-shaped glass curtain wall structure

    CN117034417A

  • Automatic forming production process and system of light steel joist

    CN117102297A