A method for engineering geophysical exploration of long and large highway tunnels
Through the multi-step engineering geophysical survey method, the geological and subsurface geological data of the highway tunnel are obtained, and its geological reliability is evaluated. This solves the problem that existing methods fail to fully consider subsurface hydrology and environmental geological factors, and improves the safety of tunnel construction. and quality.
Patent Information
- Application Number
- CN202410328804.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-03-21
AI Technical Summary
Existing physical exploration methods for highway tunnel projects fail to fully consider underground hydrology and environmental geological factors, resulting in limited geological disaster risk prevention and project safety.
A multi-step engineering geophysical survey method is adopted, including drilling survey, data analysis, geological profile survey, underground data detection and comprehensive analysis, to obtain rock mass characteristics, soil data, stratigraphic structure and groundwater level information, and evaluate the geological reliability of the highway tunnel.
By comprehensively understanding the geological conditions, we can improve the quality and safety of tunnel construction, prevent geological risks, and ensure the smooth progress and safe operation of tunnel projects.
Smart Images

Figure CN118330754B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of engineering survey, and in particular to an engineering geophysical prospecting method for long and large highway tunnels. Background Art
[0002] A highway tunnel is a transportation project built to connect two areas by crossing mountains, waters or other obstacles. Its construction is of great significance to improving transportation efficiency and promoting regional economic development. Engineering geophysical exploration of highway tunnels refers to the use of geophysical exploration methods to conduct detailed investigations and assessments of the geological environment through which the tunnel passes before the construction of the highway tunnel, in order to obtain information on geological landforms, stratigraphic structures, rock and soil properties, etc., to provide accurate geological data for tunnel design, so as to ensure the construction quality and safety of the tunnel project.
[0003] Geophysical exploration of highway tunnel projects is an important part of tunnel construction. Its results directly affect the tunnel design, construction technology and safety risk assessment. Through scientific geophysical exploration, we can predict geological disaster risks, avoid engineering risks, improve engineering construction efficiency and quality, and ensure the smooth progress and safe operation of tunnel projects.
[0004] The patent name is a technical solution published in a Chinese patent for a method for investigating engineering geological conditions (patent number 202110106616.7). This solution provides the necessary basis for the evaluation of engineering geological conditions by detecting and analyzing geological data such as the conditions of geological structures such as folds and faults, the lithology and distribution of strata, and fracture conditions. However, there are still some shortcomings, which are specifically manifested as follows: 1. The solution involves geological data detection in multiple aspects, but mainly includes the investigation of topography and landforms, the lithology and distribution of site strata, etc., and does not involve the investigation of groundwater conditions. Groundwater conditions have an important impact on geological conditions. For example, changes in groundwater levels may cause geological disasters such as ground subsidence, landslides, mudslides, etc. If the groundwater conditions are not investigated and evaluated, the risks of geological disasters cannot be effectively prevented and reduced.
[0005] Second, the plan may ignore environmental geological factors, such as soil porosity and water content. Soil porosity and water content are important indicators of soil stability. Ignoring these factors may lead to unstable engineering structures or settlement, affecting the safety of the project. Summary of the invention
[0006] In order to overcome the shortcomings of the background technology, an embodiment of the present invention provides an engineering geophysical exploration method for long and large highway tunnels, which can effectively solve the problems involved in the above-mentioned background technology.
[0007] The purpose of the present invention can be achieved through the following technical solutions: an engineering geophysical exploration method for long and large highway tunnels, the method comprising the following steps: S1. Drilling exploration: by detecting the rock characteristic data and soil data of the highway tunnel, the rock characteristic data includes the color and density of the rock at each depth underground, and the soil data includes soil porosity, water content, and soil proportion of each pore size.
[0008] S2. Drilling data analysis: The influence of underground rock mass on the highway tunnel is obtained based on the rock mass characteristic data of the highway tunnel, and the influence of soil on the highway tunnel is obtained based on the soil data of the highway tunnel. The geological reliability of the highway tunnel construction is then obtained through comprehensive analysis.
[0009] S3. Geological profile survey: The geological profile data of the highway tunnel section line is detected by means of geological profile survey. The geological profile data includes the stratum thickness and stratum inclination of each measuring point.
[0010] S4. Geological profile data analysis: used to analyze the geological profile data of the highway tunnel section line to obtain the reliability of the geological structure of the highway tunnel construction
[0011] S5. Underground data detection: Use geophysical radar to detect the underground data of highway tunnels. The underground data includes the distance from the ground to the underground cavity and the distance from the ground to the groundwater level at each cavity survey point.
[0012] S6. Underground data analysis: used to analyze the underground data of highway tunnels to obtain the reliability of underground structures of highway tunnels.
[0013] S7. Geological reliability analysis of highway tunnel construction: The geological reliability of highway tunnel construction is obtained by comprehensive analysis of the underground rock mass reliability, geological reliability and underground structure reliability.
[0014] Preferably, the specific analysis process of the rock mass characteristic data of the highway tunnel is as follows: the first step is to take a number of equally spaced survey points in the highway tunnel according to the set distance, and drill holes therein, which are recorded as each survey borehole, and a set amount of rock mass samples are taken from each set depth of each survey borehole, and images of the rock mass samples at each set depth of each survey borehole are acquired by a camera, which are recorded as images of rock mass samples at each depth of each survey borehole, and color detection is performed on each pixel point in the rock mass sample images at each depth of each survey borehole, which is recorded as ε mix , where m represents the number of the mth exploration borehole, m = 1, 2, ..., q, i represents the number of the i-th pixel point, i = 1, 2, ..., n, and x represents the number of the x-th depth, x = 1, 2, ..., y. Substituting it into the formula Get the chromaticity value of underground rock mass at each depth Where q represents the number of survey boreholes. The rock colors corresponding to the set chromaticity value ranges are extracted from the management database, and the chromaticity values of the rock samples at each depth are matched to obtain the corresponding colors of the rock samples at each depth, which are recorded as the underground rock colors at each depth of the highway tunnel.
[0015] The second step is to select corresponding containers for the rock samples at each depth of each exploration borehole, which are recorded as the rock sample containers at each depth of each exploration borehole. At the same time, a water tank is prepared and water is injected into the water tank to a height that can submerge the rock samples at each exploration borehole. The rock sample containers and water at each depth of each exploration borehole are weighed and recorded as Put the rock samples of each depth in each exploration borehole into the rock sample containers of each depth in each exploration borehole, and then put them into the water tank to allow the water to completely submerge the rock samples. Measure the total mass of the corresponding containers, rocks and water of the rock samples of each depth in each exploration borehole, and record it as Substituting this into the formula Get the underground rock density ρ at each depth of the highway tunnel x , where q represents the number of exploration boreholes.
[0016] Preferably, the specific analysis process of the soil data of the highway tunnel is as follows: In the first step, quantitative soil samples are collected at each exploration borehole according to each set depth, and the initial mass and volume of the soil are measured, which are recorded as the initial mass and volume of the soil samples at each set depth of each exploration borehole, respectively. The initial bulk density of the soil samples at each set depth of each exploration borehole is obtained by dividing the initial mass of the soil samples at each set depth of each exploration borehole by the initial volume of the soil samples at each set depth of each exploration borehole, which is recorded as γ mr , where r represents the number of the rth set depth, r = 1, 2, ..., c, place the soil samples of each set depth of each exploration borehole in a closed container, apply a set negative pressure to allow the air to be emptied from the pores, and measure the soil samples of each set depth of each exploration borehole after emptying according to the method of analyzing the initial bulk density of the soil samples of each set depth of each exploration borehole to obtain the bulk density of the soil samples of each set depth of each exploration borehole, recorded as γ' mr , substituting it into the formula Obtaining soil porosity for highway tunnels Where c represents the number of set depths and q represents the number of survey boreholes.
[0017] The second step is to collect a certain amount of soil samples from each exploration borehole, weigh them and record them as the wet weight of the soil samples in each exploration borehole. The soil samples from each exploration borehole were placed at a certain temperature and dried to a constant weight, and then weighed again, which was recorded as the dry weight of the soil samples from each exploration borehole. By formula Get the water content H of the soil sample.
[0018] The third step is to select a sieve according to the set aperture, and sieve the dried soil samples in order from small to large apertures, and record the weight of the sieved soil as the weight of the soil of each aperture of each exploration borehole. Where s=1,2,...,j, we can get Soil proportion of each pore sizeσ s , Represents the dry weight of the soil sample in the mth exploration borehole.
[0019] Preferably, the specific analysis process of the drilling data analysis is as follows: the first step is to read the color and density of the underground rock mass at each depth of the highway tunnel, and extract the color and density information of various rocks from the management database, put the color and density of the underground rock mass at each depth of the highway tunnel into the management database for comparison, and screen out the rock type that meets the color and density of the underground rock mass at each depth, and match it with the influence degree of each preset rock type on the engineering construction to obtain the engineering influence degree of the underground rock mass at each depth, which is recorded as λ x , substituting it into the formula Obtain the influence degree of underground rock mass on highway tunnel
[0020] Step 2: Read the soil porosity of the road tunnel Water content H of soil samples, soil proportion of each pore size σ s , through the formula Get the soil influence degree of highway tunnel where σ s0 It represents the preset soil reference proportion of the sth aperture, a1, a2, a3 represent the weight factors of the set soil porosity, water content, and soil proportion, respectively, and j represents the number of apertures.
[0021] Preferably, the specific analysis method of the geological reliability of the highway tunnel construction is: reading the influence degree of the underground rock mass of the highway tunnel Soil impact By formula Obtaining geological reliability for road tunnel construction Among them, μ1 and μ2 represent the weight factors of the influence degree of underground rock mass and soil respectively.
[0022] Preferably, the specific analysis method of the geological profile survey is: select a cross-section line in the highway tunnel, and take several points with equal distances on the cross-section line as measurement points, measure the vertical distance between the upper and lower boundary points of the stratum outcrop at each measurement point, and record it as the stratum thickness d at each measurement point of the cross-section line. f, where f represents the number of the fth measuring point, f = 1, 2, ..., k, and the formation dip angle of each measuring point is detected by the dip instrument, which is recorded as the formation dip angle θ of each measuring point of the cross-section line f。
[0023] Preferably, the specific analysis method of the geological profile data analysis is: reading the stratum thickness d at each measuring point f , formation dip angle θ f , substituting it into the formula Obtain the reliability of geological structures for highway tunnel construction Where d0 and θ0 represent the preset most suitable formation thickness and formation dip, respectively; η1 and η2 represent the weight factors of the set formation thickness and formation dip, respectively; and k represents the number of measurement points.
[0024] Preferably, the specific analysis method of underground data detection is as follows: the first step is to select a number of survey points at a set distance in the highway tunnel, use a geophysical radar instrument to vertically transmit electromagnetic waves from the ground of each survey point downward, and record the time from the emission to the reflection of the electromagnetic wave, which is recorded as the electromagnetic wave propagation time t of each survey point k , where k represents the number of the kth survey point, k = 1, 2, ..., p, through the formula Get the distance h from the ground to the groundwater level 水位 , where v 雷达 It represents the preset transmission speed of the radar underground, and p is the number of survey points.
[0025] The second step is to emit electromagnetic waves of set intensity vertically downward from each survey point, which is recorded as the electromagnetic wave intensity P at each survey point. k , and record the intensity of the received electromagnetic wave after the emitted electromagnetic wave is reflected back, recorded as P' k , through the formula ΔP k =P k -P' k The electromagnetic wave intensity deviation of each survey point is obtained, and it is compared with the preset deviation range of the influence of stratum voids on the electromagnetic wave intensity. The survey points whose electromagnetic wave intensity deviation belongs to the deviation range of the influence of stratum voids on the electromagnetic wave intensity are screened out and recorded as void survey points. The number of void survey points is counted and recorded as g. At the same time, the distance from the ground to the underground void at each void survey point is obtained by similar analysis according to the distance from the ground to the groundwater level, which is recorded as h. r , where r represents the number of the rth cavity survey point, r = 1, 2, ..., g.
[0026] Preferably, the specific analysis method of the underground data analysis is: reading the distance h from the ground to the groundwater level, the distance h from the ground to the underground cavity at each cavity survey point r , substitute it into Obtain the reliability of underground structures for highway tunnel construction Where h0 and h'0 represent the reference distances from the ground to the groundwater level and underground cavity, respectively. They are weight factors of the distance from the ground to the groundwater level and the underground cavity respectively, and g is the number of cavity survey points.
[0027] Preferably, the specific analysis process of the geological reliability analysis of the highway tunnel construction is as follows: the first step is to read the geological reliability of the highway tunnel construction respectively. Reliability of geological structure Reliability of underground structures By formula The geological reliability ψ of highway tunnel construction is obtained, where w1, w2, and w3 represent the weight factors of the set geological reliability, geological structure reliability, and underground structure reliability, respectively.
[0028] The second step is to compare the geological reliability of the highway tunnel construction with the preset geological reliability threshold of the highway tunnel construction. If the geological reliability of the highway tunnel construction is greater than or equal to the preset geological reliability threshold of the highway tunnel construction, it means that the address reliability of the highway tunnel construction is qualified, otherwise it is unqualified.
[0029] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects: 1. The present invention obtains the geological reliability of highway tunnel construction by analyzing the influence degree of underground rock mass and soil on highway tunnel, which helps to fully understand the geological conditions, reasonably arrange the construction progress, effectively deal with geological problems, and improve the quality and success rate of highway tunnel construction.
[0030] 2. The present invention obtains the reliability of the geological structure of the highway tunnel construction based on the geological profile data analysis of the highway tunnel section line, which helps to predict and prevent possible geological risks, reduce the possibility of accidents, and ensure the safe construction and use of highway tunnel projects.
[0031] 3. The present invention obtains the reliability of the underground structure of the highway tunnel based on the underground data analysis of the highway tunnel, which helps to determine the underground structure characteristics of the highway tunnel and provide an accurate geological basis for engineering design and construction.
[0032] 4. The present invention obtains the geological reliability of highway tunnel construction based on a comprehensive analysis of the underground rock reliability, geological reliability, and underground structure reliability of highway tunnel construction, which helps to timely discover potential risks and safety hazards, so as to take corresponding measures to deal with them and ensure the construction quality and safety of highway tunnels. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.
[0034] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] See also Figure 1 As shown, the present invention provides an engineering geophysical prospecting method for long and large highway tunnels, the method comprising the following steps: S1. detecting rock mass characteristic data and soil data of the highway tunnel, the rock mass characteristic data including the color and density of the rock mass at each depth underground, and the soil data including soil porosity, water content, and soil proportion of each pore size.
[0037] The specific analysis process of the rock mass characteristic data of the highway tunnel is as follows: the first step is to take a number of equally spaced survey points in the highway tunnel according to the set distance, and drill holes therein, which are recorded as each survey borehole, and take a set amount of rock mass samples from each set depth of each survey borehole, respectively, and obtain images of the rock mass samples at each set depth of each survey borehole through a camera, which are recorded as the rock mass sample images at each depth of each survey borehole, and perform chromaticity detection on each pixel point in the rock mass sample images at each depth of each survey borehole, which is recorded as ε mix , where m represents the number of the mth exploration borehole, m = 1, 2, ..., q, i represents the number of the i-th pixel point, i = 1, 2, ..., n, and x represents the number of the x-th depth, x = 1, 2, ..., y. Substituting it into the formula Get the chromaticity value of underground rock mass at each depth Where q represents the number of survey boreholes. The rock colors corresponding to the set chromaticity value ranges are extracted from the management database, and the corresponding colors of the rock samples at each depth are matched with the chromaticity values of the rock samples at each depth, which are recorded as the underground rock colors at each depth of the highway tunnel. The color characteristics of the rock mass are often related to the physical properties of the rock. After obtaining the color information of the underground rock mass, it can provide a reference for engineering design and help to formulate appropriate geological treatment plans and engineering construction plans.
[0038] The second step is to select corresponding containers for the rock samples at each depth of each exploration borehole, which are recorded as the rock sample containers at each depth of each exploration borehole. At the same time, a water tank is prepared and water is injected into the water tank to a height that can submerge the rock samples at each exploration borehole. The rock sample containers and water at each depth of each exploration borehole are weighed and recorded as Put the rock samples of each depth in each exploration borehole into the rock sample containers of each depth in each exploration borehole, and then put them into the water tank to allow the water to completely submerge the rock samples. Measure the total mass of the corresponding containers, rocks and water of the rock samples of each depth in each exploration borehole, and record it as Substituting this into the formula Get the underground rock density ρ at each depth of the highway tunnel x , where q represents the number of exploration holes; by measuring the density of underground rock mass, it can help monitor the quality changes of rock, timely discover foreign matter, voids and other defects in rock, and help take corresponding treatment measures in advance to ensure the quality of engineering construction.
[0039] The specific analysis process of the soil data of the highway tunnel is as follows: In the first step, quantitative soil samples are collected at each exploration borehole according to each set depth, and the initial mass and volume of the soil are measured, which are recorded as the initial mass and volume of the soil samples at each set depth of each exploration borehole, respectively. The initial bulk density of the soil samples at each set depth of each exploration borehole is obtained by dividing the initial mass of the soil samples at each set depth of each exploration borehole by the initial volume of the soil samples at each set depth of each exploration borehole, which is recorded as γ mr , where r represents the number of the rth set depth, r = 1, 2, ..., c, place the soil samples of each set depth of each exploration borehole in a closed container, apply a set negative pressure to allow the air to be emptied from the pores, and measure the soil samples of each set depth of each exploration borehole after emptying according to the method of analyzing the initial bulk density of the soil samples of each set depth of each exploration borehole to obtain the bulk density of the soil samples of each set depth of each exploration borehole, recorded as γ' mr , substituting it into the formula Obtaining soil porosity for highway tunnels Where c represents the number of set depths, and q represents the number of survey holes. Soil porosity is one of the important indicators for evaluating soil quality and engineering bearing capacity. This measure can be used to obtain soil porosity data at each depth, which is helpful for selecting foundation treatment and soil reinforcement schemes in foundation engineering design.
[0040] The second step is to collect a certain amount of soil samples from each exploration borehole, weigh them and record them as the wet weight of the soil samples in each exploration borehole. The soil samples from each exploration borehole were placed at a certain temperature and dried to a constant weight, and then weighed again, which was recorded as the dry weight of the soil samples from each exploration borehole. By formula Get the moisture content H of the soil sample; the moisture content of the soil has an important influence on the stability and bearing capacity of the roadbed. By measuring the moisture content of the soil sample, the mechanical properties of the soil can be more accurately evaluated, providing a reliable basis for roadbed design and avoiding roadbed settlement or instability problems caused by excessively high or low soil moisture content.
[0041] The third step is to select a sieve according to the set aperture, and sieve the dried soil samples in order from small to large apertures, and record the weight of the sieved soil as the weight of the soil of each aperture of each exploration borehole. Where s=1,2,...,j, we can get Soil proportion of each pore sizeσ s , It represents the dry weight of the soil sample of the mth exploration borehole. Soils with different particle sizes have different application values in highway engineering, and have an important influence on the design and material selection of structures such as roadbed and pavement. The screening analysis of soil samples can help select suitable roadbed materials and improve the bearing capacity and stability of the roadbed.
[0042] S2. Drilling data analysis: The influence of underground rock mass on the highway tunnel is obtained based on the rock mass characteristic data of the highway tunnel. The influence of soil on the highway tunnel is obtained based on the soil data of the highway tunnel. The geological reliability of the highway tunnel construction is then obtained through comprehensive analysis.
[0043] The specific analysis process of the drilling data analysis is as follows: Step 1: Read the color and density of underground rock masses at each depth of the highway tunnel, and extract the color and density information of various rocks from the management database, put the color and density of underground rock masses at each depth of the highway tunnel into the management database for comparison, and screen out the rock types that meet the color and density of underground rock masses at each depth, and match them with the influence of each preset rock type on engineering construction to obtain the engineering influence degree of underground rock masses at each depth, which is recorded as λ x , substituting it into the formula Obtain the influence degree of underground rock mass on highway tunnel By matching the rock type of underground rock mass at each depth with the influence of different preset rock types on engineering construction, the engineering influence of underground rock mass at each depth can be obtained, which helps to evaluate the influence of underground rock mass on tunnel engineering construction and evaluate and control engineering risks.
[0044] Step 2: Read the soil porosity of the road tunnel Water content H of soil samples, soil proportion of each pore size σ s , through the formula Get the soil influence degree of highway tunnel where σ s0represents the preset soil reference proportion of the sth aperture, a1, a2, a3 represent the weight factors of the set soil porosity, water content, and soil proportion, respectively, and j represents the number of apertures; soil parameters such as porosity and water content have an important influence on tunnel construction. Different soil characteristics may lead to different engineering problems and impacts. By calculating the degree of soil influence, the degree of soil influence on tunnel construction and use can be evaluated, providing a scientific basis for engineering decision-making.
[0045] It should be noted that, in a specific embodiment, a1 can be set to 0.4, a2 can be set to 0.3, and a3 can be set to 0.3. The moisture content is the percentage of water content in the soil, which has a greater impact on tunnel engineering. Too high or too low moisture content will have a serious impact on the stability and bearing capacity of the tunnel engineering, and may cause deformation, settlement and other problems of the tunnel structure. Therefore, the weight corresponding to the moisture content is relatively high.
[0046] The specific analysis method of the geological reliability of the highway tunnel construction is: reading the influence degree of the underground rock mass of the highway tunnel Soil impact By formula Obtaining geological reliability for road tunnel construction Among them, μ1 and μ2 represent the weight factors of the set underground rock mass influence degree and soil influence degree respectively; by reading the influence degree data of underground rock mass and soil, the geological problems that may be encountered during tunnel construction can be comprehensively evaluated, so as to fully understand the geological conditions and more accurately reflect the complexity and influence degree of the geological conditions.
[0047] It should be noted that, in a specific embodiment, μ1 can be set to 0.6 and μ2 can be set to 0.4. The stability of the underground rock mass directly affects the overall stability and safety of the tunnel. Factors such as rock cracks, rock layer structure, and rock properties will have an important impact on the construction and use of the tunnel, and thus affect the geological reliability. Therefore, the weight corresponding to the underground rock mass is relatively high.
[0048] S3. Geological profile survey: The geological profile data of the highway tunnel section line is detected by means of geological profile survey. The geological profile data includes the stratum thickness and stratum inclination of each measuring point.
[0049] The specific analysis method of the geological profile survey is as follows: a cross-section line is selected in a highway tunnel, and several points with equal distances are selected on the cross-section line as measuring points. The vertical distance between the upper and lower boundary points of the stratum outcrop at each measuring point is measured and recorded as the stratum thickness d at each measuring point of the cross-section line. f, where f represents the number of the fth measuring point, f = 1, 2, ..., k, and the formation dip angle of each measuring point is detected by the dip instrument, which is recorded as the formation dip angle θ of each measuring point of the cross-section line f The dip of the stratum is one of the important information of geological structure. By measuring the dip of the stratum, we can analyze the inclination and direction of the stratum, so as to infer the shape and nature of the geological structure, and provide important reference for tunnel design and construction.
[0050] S4. Geological profile data analysis: used to obtain the reliability of the geological structure of the highway tunnel construction based on the geological profile data analysis of the highway tunnel section line.
[0051] The specific analysis method of the geological profile data analysis is: reading the stratum thickness d at each measuring point f , formation dip angle θ f , substituting it into the formula Obtain the reliability of geological structures for highway tunnel construction Among them, d0 and θ0 represent the preset most suitable formation thickness and formation inclination, respectively; η1 and η2 represent the weight factors of the set formation thickness and formation inclination, respectively; and k represents the number of measuring points. The calculation results based on the reliability of the geological structure can help to better prevent and manage geological risks. For parts with low geological structure reliability, measures such as strengthening support measures and adjusting construction plans can be taken to respond to potential geological risks in a timely manner.
[0052] It should be noted that, in a specific embodiment, η1 can be set to 0.5, η2 can be set to 0.5, and the stratum thickness refers to the thickness of the stratum, which directly affects the excavation depth, support work and geological structure stability of the tunnel. Thick strata may require greater support measures and construction complexity, and have a greater impact on the project. The stratum inclination refers to the angle between the stratum and the horizontal plane, which has an important influence on the excavation direction and support design of the tunnel. A larger inclination may cause stratum instability and landslides, increasing the difficulty and risk of tunnel construction. Therefore, the weights corresponding to the stratum thickness and stratum inclination are equal.
[0053] S5. Underground data detection: Use geophysical radar to detect the underground data of highway tunnels. The underground data includes the distance from the ground to the underground cavity and the distance from the ground to the groundwater level at each cavity survey point.
[0054] The specific analysis method of underground data detection is as follows: the first step is to select a number of survey points at a set distance in the highway tunnel, use a geophysical radar instrument to vertically transmit electromagnetic waves from the ground of each survey point, and record the time from the emission to the reflection of the electromagnetic wave, which is recorded as the electromagnetic wave propagation time t of each survey point k, where k represents the number of the kth survey point, k = 1, 2, ..., p, through the formula Get the distance h from the ground to the groundwater level 水位 , where v 雷达 represents the transmission speed of the preset radar underground, and p is the number of survey points. By accurately measuring the groundwater level, the drainage and protection measures during the tunnel construction process can be effectively planned to avoid unnecessary construction delays and cost increases caused by groundwater level problems, improve construction efficiency, and save construction costs.
[0055] The second step is to emit electromagnetic waves of set intensity vertically downward from each survey point, which is recorded as the electromagnetic wave intensity P at each survey point. k , and record the intensity of the received electromagnetic wave after the emitted electromagnetic wave is reflected back, recorded as P' k , through the formula ΔP k =P k -P' k The electromagnetic wave intensity deviation of each survey point is obtained, and it is compared with the preset deviation range of the influence of stratum voids on the electromagnetic wave intensity. The survey points whose electromagnetic wave intensity deviation belongs to the deviation range of the influence of stratum voids on the electromagnetic wave intensity are screened out and recorded as void survey points. The number of void survey points is counted and recorded as g. At the same time, the distance from the ground to the underground void at each void survey point is obtained by similar analysis according to the distance from the ground to the groundwater level, which is recorded as h. r , where r represents the number of the rth cavity survey point, r = 1, 2, ..., g; effective detection and analysis of areas with cavities in geology can help reduce the risks caused by cavities during tunnel construction, take corresponding prevention and treatment measures in advance, and ensure construction safety.
[0056] S6. Underground data analysis: It is used to obtain the reliability of underground structures of highway tunnels based on underground data analysis of highway tunnels.
[0057] The specific analysis method of the underground data analysis is: reading the distance h from the ground to the groundwater level, the distance h from the ground to the underground cavity at each cavity survey point r , substitute it into Obtain the reliability of underground structures for highway tunnel construction Where h0 and h'0 represent the reference distances from the ground to the groundwater level and underground cavity, respectively. are weight factors for the distance from the ground to the groundwater level and the underground cavity, respectively, and g is the number of cavity survey points. Assessing the reliability of underground structures helps to predict possible problems in advance and take corresponding countermeasures to avoid delays and risks caused by unclear geological conditions during tunnel construction, thereby improving construction efficiency and ensuring that the project is completed on schedule.
[0058] It should be noted that, in a specific embodiment, It can be set to 0.5. It can be set to 0.5. The distance from the ground to the groundwater level is directly related to the leakage and gushing of groundwater during tunnel construction, and has an important impact on the stability of the tunnel structure and the safety of construction. A groundwater level that is relatively close may cause groundwater leakage, stratum gushing and other problems, increasing the risk of tunnel construction. Underground voids refer to caves or cavitation areas that exist underground, which may affect the geological stability and safety of the tunnel. Underground voids that are relatively close may have risks such as collapse and surface subsidence, and corresponding prevention and control measures need to be taken. Therefore, the weights corresponding to the distances from the ground to the groundwater level and underground voids are equal.
[0059] S7. Geological reliability analysis of highway tunnel construction: The geological reliability of highway tunnel construction is obtained by comprehensive analysis of the underground rock mass reliability, geological reliability and underground structure reliability.
[0060] The specific analysis process of the geological reliability analysis of the highway tunnel construction is as follows: The first step is to read the geological reliability of the highway tunnel construction respectively. Reliability of geological structure Reliability of underground structures By formula The geological reliability ψ of highway tunnel construction is obtained, where w1, w2, and w3 represent the weight factors of the set geological reliability, geological structure reliability, and underground structure reliability, respectively. The geological reliability index can be used as an important guiding basis in the construction process. Reasonable geological reliability assessment results can provide direction for construction, reduce the occurrence of accidents, reduce construction risks, and improve project progress and quality.
[0061] It should be noted that, in a specific embodiment, w1 can be set to 0.4, w2 can be set to 0.3, and w3 can be set to 0.3. The geological reliability refers to whether the geological conditions are suitable for tunnel construction, which directly affects the construction difficulty and geological stability of the tunnel. It is usually considered to be the most important factor in evaluating geological reliability, so the corresponding weight is relatively high.
[0062] The second step is to compare the geological reliability of the highway tunnel construction with the preset geological reliability threshold of the highway tunnel construction. If the geological reliability of the highway tunnel construction is greater than or equal to the preset geological reliability threshold of the highway tunnel construction, it means that the address reliability of the highway tunnel construction is qualified, otherwise it is unqualified. If the geological reliability is unqualified in time, corresponding measures can be taken to adjust and improve it to ensure that the highway tunnel construction meets the specifications and improve the quality of the project.
[0063] The present invention obtains the geological reliability of highway tunnel construction by analyzing the influence degree of underground rock mass and soil of highway tunnel, obtains the geological structure reliability of highway tunnel construction according to the geological profile data of highway tunnel section line, obtains the underground structure reliability of highway tunnel construction according to the underground data of highway tunnel, and then obtains the geological reliability of highway tunnel construction through comprehensive analysis, which is helpful to timely discover potential risks and safety hazards, so as to take corresponding measures to deal with them and ensure the construction quality and safety of highway tunnel.
[0064] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. A person skilled in the art may make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention and they are still covered by the protection scope of the present invention.
Claims
1. A method for engineering geophysical exploration of long and large highway tunnels. It is characterized in that The steps include: S1. Drilling survey: The rock mass characteristic data and soil data of the highway tunnel are tested. The rock mass characteristic data include the color and density of the underground rock mass at each depth. The soil data include the soil porosity, water content, and soil proportion of each pore size. S2. Drilling data analysis: The influence of underground rock mass on the highway tunnel is obtained based on the rock mass characteristic data of the highway tunnel, and the influence of soil on the highway tunnel is obtained based on the soil data of the highway tunnel. The geological reliability of the highway tunnel construction is then obtained through comprehensive analysis. S3. Geological profile survey: The geological profile data of the highway tunnel section line is detected by means of geological profile survey. The geological profile data includes the stratum thickness and stratum inclination of each measuring point; S4. Geological profile data analysis: used to analyze the geological profile data of the highway tunnel section line to obtain the reliability of the geological structure of the highway tunnel construction S5. Underground data detection: Use geophysical radar to detect the underground data of the highway tunnel. The underground data includes the distance from the ground to the underground cavity and the distance from the ground to the groundwater level at each cavity survey point; S6. Underground data analysis: used to analyze the underground data of highway tunnels to obtain the reliability of underground structures of highway tunnels. S7. Geological reliability analysis of highway tunnel construction: According to the geological reliability of highway tunnel construction Reliability of geological structure Reliability of underground structures The geological reliability evaluation index ψ for highway tunnel construction is obtained through comprehensive analysis.
2. The method for engineering geophysical exploration of long highway tunnels according to claim 1, Features: The specific analysis process of the rock mass characteristic data of the highway tunnel is as follows: In the first step, several survey points with equal distances are selected in the highway tunnel according to the set distance, and holes are drilled at them, which are recorded as each survey borehole. A set amount of rock samples are taken from each set depth of each survey borehole, and images of the rock samples at each set depth of each survey borehole are acquired through a camera, which are recorded as the rock sample images at each depth of each survey borehole. The color detection is performed on each pixel point in the rock sample images at each depth of each survey borehole, which is recorded as ε mix , where m represents the number of the mth exploration borehole, m = 1, 2, ..., q, i represents the number of the i-th pixel point, i = 1, 2, ..., n, and x represents the number of the x-th depth, x = 1, 2, ..., y. Substituting it into the formula Get the chromaticity value of underground rock mass at each depth Where q represents the number of survey boreholes, and the rock mass colors corresponding to the set chromaticity value ranges are extracted from the management database, and the corresponding colors of the rock mass samples at each depth are matched with the chromaticity values of the rock mass samples at each depth, which are recorded as the underground rock mass colors at each depth of the highway tunnel; The second step is to select corresponding containers for the rock samples at each depth of each exploration borehole, which are recorded as the rock sample containers at each depth of each exploration borehole. At the same time, a water tank is prepared and water is injected into the water tank to a height that can submerge the rock samples at each exploration borehole. The rock sample containers and water at each depth of each exploration borehole are weighed and recorded as Put the rock samples of each depth in each exploration borehole into the rock sample containers of each depth in each exploration borehole, and then put them into the water tank to allow the water to completely submerge the rock samples. Measure the total mass of the corresponding containers, rocks and water of the rock samples of each depth in each exploration borehole, and record it as Substituting this into the formula Get the underground rock density ρ at each depth of the highway tunnel x , where q represents the number of exploration boreholes.
3. The method for engineering geophysical exploration of long highway tunnels according to claim 2, Features: The specific analysis process of the soil data of the highway tunnel is as follows: In the first step, quantitative soil samples were collected at each exploration borehole according to each set depth, and the initial mass and volume of the soil were measured, which were recorded as the initial mass and volume of the soil samples at each set depth of each exploration borehole, respectively. The initial bulk density of the soil samples at each set depth of each exploration borehole was obtained by dividing the initial mass of the soil samples at each set depth of each exploration borehole by the initial volume of the soil samples at each set depth of each exploration borehole, which was recorded as γ mr , where r represents the number of the rth set depth, r = 1, 2, ..., c, place the soil samples of each set depth of each exploration borehole in a closed container, apply a set negative pressure to allow the air to be emptied from the pores, and measure the soil samples of each set depth of each exploration borehole after emptying according to the method of analyzing the initial bulk density of the soil samples of each set depth of each exploration borehole to obtain the bulk density of the soil samples of each set depth of each exploration borehole, recorded as γ' mr , substituting it into the formula Obtaining soil porosity for highway tunnels Where c represents the number of set depths, and q represents the number of survey boreholes; The second step is to collect a certain amount of soil samples from each exploration borehole, weigh them and record them as the wet weight of the soil samples in each exploration borehole. The soil samples from each exploration borehole were placed at a certain temperature and dried to a constant weight, and then weighed again, which was recorded as the dry weight of the soil samples from each exploration borehole. By formula Get the water content H of the soil sample; The third step is to select a sieve according to the set aperture, and sieve the dried soil samples in order from small to large apertures, and record the weight of the sieved soil as the weight of the soil of each aperture of each exploration borehole. Where s = 1, 2, ..., j, j represents the number of apertures, and the formula is Soil proportion of each pore sizeσ s , Represents the dry weight of the soil sample in the mth exploration borehole.
4. The method for engineering geophysical exploration of long highway tunnels according to claim 3, Features: The specific analysis process of the drilling data analysis is as follows: The first step is to read the color and density of underground rock masses at each depth of the highway tunnel, and extract the color and density information of various rocks from the management database. The color and density of underground rock masses at each depth of the highway tunnel are put into the database for comparison, and the rock types that meet the color and density of underground rock masses at each depth are screened out. The rock types are matched with the influence of each preset rock type on the engineering construction to obtain the engineering influence of underground rock masses at each depth, which is recorded as λ x , substituting it into the formula Obtain the influence degree of underground rock mass on highway tunnel x represents the number of the xth depth; Step 2: Read the soil porosity of the road tunnel Water content H of soil samples, soil proportion of each pore size σ s , through the formula Get the soil influence degree of highway tunnel where σ s0 represents the preset sth aperture soil reference ratio, a 1 、a 2 、a 3 They represent the weight factors of the set soil porosity, water content, and soil proportion respectively, and j represents the number of pore sizes.
5. The method for engineering geophysical exploration of long highway tunnels according to claim 4, Features: The specific analysis method of the geological reliability of the highway tunnel construction is as follows: Read the influence of underground rock mass in highway tunnels Soil impact By formula Obtaining geological reliability for road tunnel construction where μ 1 , μ 2 They respectively represent the weight factors of the influence degree of underground rock mass and the influence degree of soil.
6. The method for engineering geophysical exploration of long highway tunnels according to claim 1, Features: The specific analysis method of the geological profile survey is: Select a section line in the highway tunnel, and select several points with equal distance on the section line as measuring points. Measure the vertical distance between the upper and lower boundary points of the stratum outcrop at each measuring point, and record it as the stratum thickness d at each measuring point of the section line. f , where f represents the number of the fth measuring point, f = 1, 2, ..., k, k represents the number of measuring points, and the dip angle of each measuring point is detected by the dip angle instrument, which is recorded as the dip angle of each measuring point of the cross-section line θ f .
7. The method for engineering geophysical exploration for long highway tunnels according to claim 6, Features: The specific analysis method of the geological profile data analysis is: Read the formation thickness d at each measuring point f , formation dip angle θ f , substituting it into the formula Obtain the reliability of geological structures for highway tunnel construction where d 0 ,θ 0 Respectively represent the preset most suitable formation thickness and formation dip, η 1 , η 2 They represent the weight factors of the set formation thickness and formation dip respectively, and k represents the number of measurement points.
8. The method for engineering geophysical exploration of long highway tunnels according to claim 1, Features: The specific analysis method of the underground data detection is: In the first step, several survey points are selected at set distances in the highway tunnel. Electromagnetic waves are emitted vertically downward from the ground at each survey point using a geophysical radar instrument, and the time from the emission to the reflection of the electromagnetic wave is recorded, which is recorded as the propagation time of the electromagnetic wave at each survey point, t b , where b represents the number of the b-th survey point, b=1,2,...,p, through the formula Get the distance h from the ground to the groundwater level 水位 , where v 雷达 It represents the preset transmission speed of the radar underground, and p is the number of survey points; The second step is to emit electromagnetic waves of set intensity vertically downward from each survey point, which is recorded as the electromagnetic wave intensity P at each survey point. b , and record the intensity of the received electromagnetic wave after the emitted electromagnetic wave is reflected back, recorded as P' b , through the formula ΔP b =P b -P' b The electromagnetic wave intensity deviation of each survey point is obtained, and it is compared with the preset deviation range of the influence of stratum voids on the electromagnetic wave intensity. The survey points whose electromagnetic wave intensity deviation belongs to the deviation range of the influence of stratum voids on the electromagnetic wave intensity are screened out and recorded as void survey points. The number of void survey points is counted and recorded as g. At the same time, the distance from the ground to the underground void at each void survey point is obtained by similar analysis according to the distance from the ground to the groundwater level, which is recorded as h. r , where r represents the number of the rth cavity survey point, r = 1, 2, ..., g, and g is the number of cavity survey points.
9. The method for engineering geophysical exploration for long highway tunnels according to claim 8, Features: The specific analysis method of the underground data analysis is: Read the distance h from the ground to the groundwater level and the distance h from the ground to the underground cavity at each cavity survey point r , substitute it into Obtain the reliability of underground structures for highway tunnel construction where h 0 、h' 0 They represent the reference distances from the ground to the groundwater level and underground cavity, respectively. They are weight factors of the distance from the ground to the groundwater level and the underground cavity respectively, and g is the number of cavity survey points.
10. The method for engineering geophysical exploration for long highway tunnels according to claim 1, Features: The specific analysis process of the geological reliability analysis of the highway tunnel construction is as follows: The first step is to read the geological reliability of the highway tunnel construction Reliability of geological structure Reliability of underground structures By formula The geological reliability evaluation index ψ of highway tunnel construction is obtained, where w 1 、w 2 、w 3 Respectively represent the weight factors of the set geological reliability, geological structure reliability, and underground structure reliability; The second step is to compare the geological reliability evaluation index of the highway tunnel construction with the preset threshold value of the geological reliability evaluation index of the highway tunnel construction. If the geological reliability evaluation index of the highway tunnel construction is greater than or equal to the preset threshold value of the geological reliability evaluation index of the highway tunnel construction, it means that the address reliability of the highway tunnel construction is qualified, otherwise it is unqualified.
