Evaluation method for safe speed threshold of multi-standard trains passing through lifting platform doors

By building aerodynamic and track system dynamics models of multi-working station doors and trains, the safety speed threshold of multi-standard trains passes through lifting station doors is solved, and the problems of low applicability and safety hazards of platform doors in the existing technology are solved. , realizes the safe and stable operation evaluation of multiple vehicles.

CN118332678BActive Publication Date: 2024-11-19CHINA DESIGN GROUP CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410316716.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-19
Estimated Expiration
2044-03-20

AI Technical Summary

Technical Problem

The existing platform doors are difficult to adapt to different models and door positions of multiple trains, resulting in safety hazards and structural stability problems. Especially when high-speed trains pass, the safety speed threshold and stability of the lifting platform doors are difficult to evaluate.

Method used

The safety speed threshold evaluation method of multi-standard train passing lifting platform doors is adopted, and the aerodynamic and track system dynamics model of platform doors and trains in multiple working states is built, combined with Navier-Stokes simulation flow field and finite volume discretization method , calculate the dynamic behavior and aerodynamic load under different operating conditions, determine the safety speed threshold and verify the structural strength.

Benefits of technology

Provides safety assessment methods for multi-standard vehicles in multi-level rail transit, ensures the working stability of lifting platform doors under multiple operating conditions, solves the problems of low applicability and unreliable application in the existing technology, and overcomes the practical Difficulties and high cost problems in vehicle testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118332678B_ABST
    Figure CN118332678B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for evaluating the safe speed threshold of multi-standard trains passing through a lifting platform door. The method takes a multi-unit lifting platform door suitable for multi-standard railway vehicles to stop and meet the needs of passengers boarding and alighting as the research object, and refers to the vehicle limits, overall aerodynamic appearance dimensions, operating speed ranges and door position technical parameters of CRH series vehicles, CR400 series vehicles, urban trains and subway trains of different speed grades in China. An aerodynamic model of the lifting platform door in multiple working states and the platform and a train track system dynamic model for the multi-standard EMU trains passing through the platform and a dynamic response of the lifting platform door in multiple working states under different operating conditions are jointly calculated. The safe speed threshold for the multi-standard vehicles to pass through is determined by evaluating the operating safety and stability indicators of the train and platform doors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of rail transit platform screen door systems and train aerodynamics, and in particular to a method for evaluating a safe speed threshold of multi-standard trains passing through a lifting platform door. Background Art

[0002] At present, my country has entered a new stage of promoting new urbanization with urban agglomerations and metropolitan areas as the main body. Promote the integrated development of trunk railways, intercity railways, urban (suburban) railways, and urban rail transit, and build a railway network and comprehensive transportation hubs with high-quality development. Promote the integration of transportation in urban agglomerations and metropolitan areas, accelerate the construction of intercity railways and urban (suburban) railways, orderly promote the development of urban rail transit, and build a multi-level rail transit system based on the "four-network integration". Based on the characteristics of regional "network operation, interconnection, resource sharing, and intensive utilization", construct technical requirements and management models that are suitable for the integrated operation of my country's multi-level rail transit, and achieve the goal of "integrated operation, integrated management, and integrated service".

[0003] The platform screen door system is a continuous barrier set at the edge of the platform to isolate the passenger waiting area from the train running area, and corresponding to the train door, it can control the opening and closing of the sliding door at multiple levels. It is generally divided into full-height, half-height, enclosed and non-enclosed, referred to as screen door or platform door. When the train arrives and departs, the screen door can be opened and closed automatically to mechanically isolate the driving space from the passenger waiting space, creating a safe and comfortable waiting environment for passengers. In the context of multi-level rail transit integration, due to many factors such as the large number of train models and the different door layout positions of different models, the existing platform doors with fixed door opening positions are difficult to adapt to the needs of different models of multi-standard vehicles. At the same time, most high-speed railway and intercity railway platforms are not equipped with platform screen doors, which poses certain risks to driving safety.

[0004] The Chinese invention patent with the authorization announcement number CN111547071B and the invention name "A high-speed railway platform door with adjustable door opening position" discloses a high-speed railway platform door with adjustable door opening position, which relates to the technical field of high-speed railway / intercity railway platform screen doors, and in particular to a high-speed railway platform door with adjustable door opening position, comprising a plurality of fixed door frames connected to each other on the same straight line along the length direction of the platform edge, each fixed door frame is provided with a plurality of movable units, the movable units include a movable door, a first telescopic device, a second telescopic device, a first driving member and a second driving member; the first telescopic device and the second telescopic device are respectively located on both sides of the movable door, a first fixing device matching each other is provided between the movable unit and the fixed door frame, and a second fixing device is also provided between adjacent movable units. This patented technology can only solve the problem that the door opening position cannot be adjusted for different models within a certain error range, and the problem of opening the door for boarding and disembarking when a train stops at the column position cannot be solved; the movable door is transformed between the functions of movement and stable fixation within the range of the unit column, and the installation stability and practicality are insufficient.

[0005] The Chinese invention patent with authorization announcement number CN111775965B and invention name "A bottom-driven staggered high-speed railway platform door" discloses a bottom-driven staggered high-speed railway platform door, including a plurality of movable door unit groups arranged continuously along the platform direction, each movable door unit group including a first movable door, a second movable door, a third movable door and a fourth movable door arranged in sequence when in a closed state; the first movable door and the third movable door are arranged in the first row, and the second movable door and the fourth movable door are arranged in the second row; the driving devices of the first movable door and the third movable door are arranged at the bottom of the first row and staggered up and down, and the driving devices of the second movable door and the fourth movable door are arranged at the bottom of the second row and staggered up and down; the first movable door and the fourth movable door are configured to be able to move 1 or 2 movable door widths to the central position of the movable door unit group where they are located under the drive of their driving mechanisms; the second movable door and the third movable door are configured to be able to move 1 movable door width to the left or right under the drive of their driving devices This patented technology adopts a staggered door opening method, which results in inconsistent space widths at each platform door section, making it difficult to board and disembark passengers, posing certain safety hazards. It also adopts a staggered door opening drive method with multiple belt drive systems on the lower side, which occupies a large space. At the same time, the drive belt drive systems of the platform door units on the far sides are arranged at a long distance, which greatly reduces the working stability, sensitivity and accuracy.

[0006] The Chinese invention patent application with the publication number CN104176067A and the name “Platform safety door adapted to all train models” discloses a platform safety door structure, which is formed by installing two sets of sliding door assemblies on the same column in a staggered manner, and the door structure includes a left sliding door and a right sliding door with opposite sliding directions. After the train arrives at the station and stops, the left sliding door of the door structure slides and overlaps with the right sliding door of the door structure adjacent to the left; the right sliding door of the door structure slides and overlaps with the left sliding door of the door structure adjacent to the right, so as to achieve the door position adapted to different models of parking. However, in this technical solution, since the left / right sliding stroke is fixed and each sliding door can only open the door through unidirectional movement, this method is still limited in adaptability to the vehicle model, and the door opening position cannot be adjusted according to different vehicle models. For example, when the train stops and its door is just located in the overlapping area of ​​the left / right sliding door, this solution cannot achieve the door opening in the right position.

[0007] A Chinese invention patent application with publication number CN111762204A and name “A lifting and folding platform protection device suitable for various types of vehicles” discloses a lifting and folding platform protection device suitable for various types of vehicles, including a lifting and folding platform door, a column, and an end door; a plurality of lifting and folding platform doors and columns are alternately formed in the longitudinal direction of the track to form a longitudinal platform door, and transverse end doors are respectively arranged at both ends of the longitudinal platform door; the width of each lifting and folding platform door is equal, and the sum of the widths of all lifting and folding platform doors accounts for more than 80% of the total length of the longitudinal platform door; the lifting and folding platform door includes multiple shielding folding sheets which are hinged up and down in sequence, and the two ends of the shielding folding sheets can slide up and down on the columns on both sides. By folding and unfolding the lifting and folding platform door up and down, the fixed door and sliding door of the traditional platform door are replaced to realize the shielding function of the platform door. The folding piece of this type of vertical lifting platform door is placed above the platform door, which may injure passengers if it falls. In addition, due to the limitations of the folding structure itself, a fixed installation and transmission structure must always be maintained on the platform surface. The maximum opening of the platform door will always be affected by these structures, and the passage between the platform surface and the train door cannot be opened arbitrarily.

[0008] The Chinese patent application with publication number CN206844928U and titled “A half-height safety door with a driving mechanism placed on top” discloses a half-height safety door with a driving mechanism placed on top, which includes a door structure, a driving mechanism and a supporting structure. The door structure includes two sliding doors arranged on the left and right and a fixed door installed between the two sliding doors, and a top box is fixedly arranged on the top of the fixed door; the driving mechanism is arranged as a whole inside the top box, and includes two sets of driving units respectively connected to the two sliding doors, and the two sets of driving units each independently drive the sliding doors to perform opening and closing operations; the supporting structure is arranged at the bottom of each sliding door and is used to support the sliding door. It can effectively reduce the cumulative error of the door body opening and closing synchronization, ensure the synchronization of the sliding door opening and closing, and is suitable for platforms such as high-speed railways and intercity railways. This patented technology uses two sets of drive units to drive two adjacent sliding doors to open and close the platform doors. The drive mechanism is complex and the platform door device is relatively thick. At the same time, the platform door opening and opening position are fixed, which makes it difficult to adapt to the needs of different vehicle models and different door positions.

[0009] At the same time, unlike traditional half-height and full-height fixed platform doors, which have the advantages of stable structure and fixed installation, the structural system operation safety and stability of the lifting platform doors face certain threats under the action of train wind when vehicles of different speed levels pass through. It is necessary to conduct a safe speed threshold and stability assessment for the passage of multi-standard EMU trains through the lifting platform doors under the action of wind. Clarifying the safe speed threshold for the passage of multi-standard EMU trains and the safe load-bearing ability of the lifting platform door structure are necessary conditions for the development and application of lifting platform doors. Summary of the invention

[0010] In order to ensure the operation safety and stability of multi-standard EMU trains passing through lift-type platform doors, with reference to the vehicle limits, overall aerodynamic appearance dimensions, operating speed ranges and door position technical parameters of CRH series trains, CR400 series trains, urban trains and subway trains of different speed levels in China, the present invention proposes a method for evaluating the safe speed threshold of multi-standard trains passing through lift-type platform doors.

[0011] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:

[0012] The method for evaluating the safe speed threshold of multi-standard trains passing through lifting platform doors takes multi-unit lifting platform doors suitable for multi-standard railway vehicles to stop and meet the needs of passengers boarding and alighting as the research object, and refers to the vehicle limits, overall aerodynamic appearance scales, operating speed ranges and door position technical parameters of CRH series vehicles, CR400 series vehicles, urban trains and subway trains of different speed levels in China. The aerodynamic models of lifting platform doors and platforms in multiple working states and the dynamics model of the train track system are respectively established, and the dynamic behaviors of multi-standard EMU trains passing through platforms and the dynamic responses of lifting platform doors in multiple working states under different operating conditions are jointly calculated; the safe speed threshold of multi-standard vehicles passing through is determined by evaluating the operating safety and stability indicators of trains and platform doors; the specific method for evaluating the safe speed threshold of multi-standard trains passing through lifting platform doors includes the following steps:

[0013] 1) Determine the integrated layout and calculation conditions of multi-unit lifting platform doors:

[0014] 11) Determine the lifting platform door model: According to the safety assessment indicators, four evaluation models are constructed respectively: the platform door single-unit descending boarding work position model I, the platform door double-unit descending boarding work position model II, the platform door full protection work position model III, and the platform door multi-unit interval descending boarding work position model IV; wherein the platform door single-unit descending boarding work position model I means that one unit door of the platform door is in the descending boarding work position state, and the other unit doors are in the lifting protection work position; the platform door double-unit descending boarding work position model II means that two consecutive unit doors of the platform door are in the descending boarding work position state, and the other unit doors are in the lifting protection work position; the platform door full protection work position model III means that all unit doors of the platform door are in the lifting protection work position; the platform door multi-unit interval descending boarding work position model IV means that the platform door adapts to the door position of a whole train of multi-standard vehicles and part of it is in the descending boarding work position state, and the other unit doors are in the lifting protection work position;

[0015] 12) Construction of standard scenario railway station layout model: Based on the current railway technical standard system in China, two models are created, namely, station layout model I for general intermediate stations and station layout model II for intermediate stations with islands; wherein the station layout model I for general intermediate stations is close to the platform and the side close to the multi-unit lifting platform door, which is generally the arrival and departure track with passengers boarding and alighting, and the station layout model II for intermediate stations with islands is close to the platform and the side close to the multi-unit lifting platform door, which is generally the railway main track with train through operation and passenger boarding and alighting functions;

[0016] 13) Construction of multi-state evaluation model for multi-unit lifting platform doors: Based on the four lifting platform door models determined in step 11) and the four standard scenario railway yard layout models determined in step 12), eight unified computational geometry models for multi-standard vehicles passing through different forms of platform doors are constructed in pairs;

[0017] 2) Multi-standard EMU trains are created through multi-working state lifting platform doors and platform aerodynamic models:

[0018] 21) Setting the mathematical model: Setting the calculation of compressible, transient, viscous Navier-Stokes simulation flow field, turbulence simulation using k-ω The SST two-equation model uses a finite volume discretization method, the discrete terms use a second-order implicit format, and the convection terms use a second-order upwind and bounded center format;

[0019] 22) Determine the calculation domain: Taking the total length of the simulated platform (L) as a reference object, create a rectangular external flow field calculation domain with a length greater than or equal to 4 times the total length of the platform (L), a width greater than or equal to 2 times the total length of the platform (L), and a height greater than or equal to 1 times the total length of the platform (L); the multi-standard EMU train passing through the multi-working state lifting platform door and the platform model are located in the middle of the symmetric boundary of the rectangular external flow field calculation domain, wherein the distance between the front end of the model and the front side of the external flow field is greater than or equal to 1 times the total length of the platform (L), and the distance between the rear end of the model and the rear side of the external flow field is greater than or equal to 2 times the total length of the platform (L), and the horizontal plane of the multi-standard EMU train passing through the multi-working state lifting platform door and the platform model is flush with the track surface, and the horizontal plane coincides with the bottom surface of the external flow field;

[0020] 23) Calculation settings: The grid division adopts unstructured grid. For the fluid-solid contact surface of multi-standard EMU trains and lifting platform doors and the area with prominent changes in the peripheral flow field, the global and local grids are used for superposition processing. The number of surface boundary layers is set to 15-25, the growth rate is set to 1.2, and the grid includes two types: fluid grid and contact calculation model surface grid; the calculation turbulence intensity is set to 0.5%, and the residual value range is 10 -6 ~10 -4 ;

[0021] 24) Verification of grid independence conditions: Select any calculation condition model in step 1) to compare aerodynamic characteristics, set three different grid density conditions based on the same iterative calculation method for independence evaluation, where the number of grids in the fine grid model is greater than 125% of the number of medium grids, and the number of grids in the coarse grid model is less than 75% of the number of medium grids, and take the aerodynamic resistance of the multi-standard EMU train passing through the middle of the platform as the evaluation object, and calculate whether the change rate of aerodynamic resistance of the calculation model corresponding to different grid densities is less than 5%. If it meets the requirements, proceed to the next step. If not, adjust the total number of grids in the calculation domain and continue the calculation until the conditions are met and the independence verification is passed;

[0022] 3) Aerodynamic model calculation and loading: The aerodynamic model calculation and result loading of the multi-standard EMU train passing through the multi-working state lifting platform door and the platform is carried out. On the basis of step 2), the transient pressure field and velocity field of the multi-standard EMU train passing through the multi-working state lifting platform door are solved respectively when the train is in the speed range of 30~400km / h with a calculation gradient of 20km / h under each calculation condition, and the transient pressure field is converted into aerodynamic load, which is loaded onto the surface of the simulated multi-standard EMU train and the lifting platform door in the corresponding working state;

[0023] 4) Establish a dynamic calculation model of the train track system;

[0024] 41) Establishing a model for coupling the lateral motion and vertical motion of a multi-standard EMU train vehicle under the aerodynamic load in step 3);

[0025] 42) Creation of train track system dynamics model: A model consisting of 1 car body, 2 bolsters, 2 frames, 4 wheel sets and 8 swing arms is established based on a single-section vehicle; the car body, frame and wheel set have 6 degrees of freedom, and the swing arm has 1 nodding degree of freedom; the train track system dynamics model also includes nonlinear systems such as wheel-rail contact geometry, wheel-rail creep, primary and secondary suspension systems, lateral buffers, and anti-snaking shock absorbers; the calculation uses the train dynamics parameters under full load, the wheel sets, frames and car bodies are all regarded as rigid bodies, the elastic deformation of the rails is not considered, the LMA tread is matched with the TB2344 60kg rail, the inner distance of the wheelset adopts the Chinese standard 1353mm, and the track irregularity excitation adopts the measured Chinese high-speed railway track spectrum;

[0026] 43) Loading and calculating aerodynamic loads: loading the aerodynamic load data corresponding to the eight calculation conditions obtained in step 3) into the corresponding train track system dynamics model established, and simulating and calculating the derailment coefficient, wheel load reduction rate, wheel axle lateral force and wheel-rail vertical force parameters corresponding to each condition, wherein the aerodynamic load is continuously loaded according to the function table corresponding to the fitting curve;

[0027] 5) Elimination of derailment or overturning conditions: Based on the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force parameters corresponding to the 8 calculation conditions calculated in step 43) when the multi-standard EMU train passes through the multi-working state lifting platform door, and referring to the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force indicators of the Chinese high-speed railway technical standard system as constraints, the calculation conditions of derailment or overturning in the simulation calculation are determined and excluded;

[0028] 6) Determine the safety speed threshold of the safety criterion: Based on the calculated working condition obtained in step 4), exclude the derailment or overturning working condition described in step 5), establish the curve relationship between the train speed and the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force corresponding to different crosswind speeds in the same coordinate system, and analyze whether the curve breaks through the limit value of the constraint index according to the constraint index in step 5). If so, the index can be determined as the safety criterion index, and the safety speed threshold of the multi-standard EMU train passing through the multi-working state lifting platform door corresponding to the safety criterion index is determined by the breakthrough point;

[0029] 7) Establish and check the multi-body dynamic model of the platform door under the action of train wind: Create the multi-body dynamic model of the lifting platform door under different working states respectively, load the aerodynamic load described in step 3) to the surface of the lifting platform door in the corresponding working state, perform structural strength index verification, fatigue calculation, and structural vibration calculation according to the standard strength allowable value of each system component, and calculate and confirm whether the index requirements are met;

[0030] 8) Adaptability verification: respectively determine the safe speed threshold range for the safe and stable operation of the multi-standard EMU train in step 6) and the safe range for the structural strength of the lift platform door in step 7, according to the calculation conditions that both satisfy the stable operation and safe operation of the multi-standard EMU train and the lift platform door, and then determine the safe speed threshold for the multi-standard EMU train to pass through the lift platform door.

[0031] Preferably, the multi-standard EMU train mainly includes a door leaf body, a screen door lifting system, a protection height compensation telescopic system, a screen door unit combined connection mechanism, a screen door protection system and a linkage control unit; wherein the screen door lifting system includes a driving lifting mechanism, a clamping connection mechanism, and a lifting limit mechanism which are symmetrically arranged on the left and right of the door leaf body; the protection height compensation telescopic system is a glass plate telescopic mechanism with stepless adjustment of the platform protection height, and the screen door protection system is installed and arranged at the edge of the platform to protect the platform screen door from people stepping on the top of the screen door when the platform screen door is in the lowered working state.

[0032] Preferably, the lift platform door control system is mainly composed of vehicle-mounted equipment, station equipment and ground communication network system. The vehicle-mounted equipment is mainly a lift platform door vehicle-mounted controller, which contains basic parameter information including the train model, external geometric dimensions and door position of the corresponding standard vehicle model; the station equipment mainly includes multi-unit ground intelligent lift platform doors suitable for multi-standard railway vehicles, lift platform door platform controller and door position identification monitoring system. The lift platform door platform controller contains basic parameter information including the train model, external geometric dimensions and door position of all standard vehicle models that stop or pass at this station, and also contains all unit door control systems of the platform of this station;

[0033] Preferably, in step 4), other nonlinear systems such as the lateral stop force are simplified in the train track system dynamics model, and the original nonlinear characteristics are maintained after simplification to meet calculation requirements.

[0034] Preferably, step 2) the creation of the aerodynamic model of the multi-standard EMU train through the multi-working state lifting platform doors and the platform is completed with the help of ANSYS Fluent software or STAR-CCM+ software platform; step 5) the creation of the train track system dynamics calculation model is completed with the help of Universal Mechanism software or SIMULIA Simpack software platform.

[0035] Preferably, the indicator determined in step 7) that can be used as a safety criterion is the wheel load reduction rate.

[0036] Preferably, in the Chinese high-speed railway technical standard system described in step 6), the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force index constraint conditions are as follows: Derailment coefficient safety limit value ( Q / P ) lim =0.8; wheel load reduction rate safety limit value (∆ P / P ) lim =0.8; wheel axle lateral force safety limit value H lim =10+ P 0 / 3 (unit kN, where P 0 is the static axle weight of the multi-standard EMU train); the maximum vertical force safety limit value of the axle P lim =170kN.

[0037] The beneficial effects of the present invention are: the multi-standard train, through the safety speed threshold assessment method for the lifting platform door, can provide a technical reference and safety assessment method for the operation of multi-standard vehicles in the next stage of multi-level rail transit deep interconnection and interoperability, ensure the working stability of the lifting platform door in adapting to multiple operating conditions, and effectively solve the technical problems of low applicability of existing multi-standard vehicle selection and unreliable application of lifting platform doors, while overcoming the problems of difficulty in actual vehicle testing and high testing costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a flow chart of the method for evaluating the safe speed threshold of a multi-standard train passing through a lifting platform door of the present invention;

[0039] Figure 2 It is a multi-mode EMU train multi-operating condition calculation model of the present invention;

[0040] Figure 3 It is the multi-operating condition calculation model of the lifting platform door of the present invention;

[0041] Figure 4 The vehicle-track system dynamics calculation model of the present invention;

[0042] Figure 5 A structural diagram of a lift platform door applicable to the present invention;

[0043] Figure 6 It is a structural installation layout diagram of a lift platform door unit applicable to the present invention;

[0044] Figure 7 A schematic diagram of railway clearance selection for a multi-standard EMU train applicable to the present invention;

[0045] Figure 8 It is a layout diagram of a semi-high platform door for rail transit under the Chinese technical standard system applicable to the present invention;

[0046] Fig. 9 It is a cross-sectional diagram of the layout of intermediate stations and track layout of island intermediate stations under the Chinese technical standard system applicable to the present invention. DETAILED DESCRIPTION

[0047] The present invention will be further described below in conjunction with the accompanying drawings:

[0048] like Figure 1 As shown in the figure, the safety speed threshold assessment method for multi-standard trains passing through lifting platform doors takes multi-unit lifting platform doors suitable for multi-standard railway vehicles to stop and meet the needs of passengers boarding and alighting as the research object, and refers to the vehicle limits, overall aerodynamic appearance dimensions, operating speed range and door position technical parameters of CRH series vehicles, CR400 series vehicles, urban trains and subway trains of different speed levels in China (reference Figure 7), respectively build a multi-standard EMU train passing through a multi-working state lifting platform door and platform aerodynamic model and a train track system dynamics model, jointly calculate the dynamic behavior of a multi-standard EMU train passing through the platform under different operating conditions and the dynamic response of a multi-working state lifting platform door; determine the safe speed threshold for multi-standard vehicles to pass through by evaluating the train and platform door operation safety and stability indicators; the specific method for evaluating the safe speed threshold for multi-standard trains passing through lifting platform doors includes the following steps:

[0049] 1) Determine the integrated layout and calculation conditions of multi-unit lifting platform doors:

[0050] 11) Determine the lift platform door model (reference Figure 2 ): According to the safety assessment indicators, four evaluation models are constructed, namely, platform door single-unit descending boarding work position model I, platform door double-unit descending boarding work position model II, platform door full protection work position model III, and platform door multi-unit interval descending boarding work position model IV; wherein the platform door single-unit descending boarding work position model I means that one unit door of the platform door is in the descending boarding work position state, and the other unit doors are in the lifting protection work position; the platform door double-unit descending boarding work position model II means that two consecutive unit doors of the platform door are in the descending boarding work position state, and the other unit doors are in the lifting protection work position; the platform door full protection work position model III means that all unit doors of the platform door are in the lifting protection work position; the platform door multi-unit interval descending boarding work position model IV means that the platform door adapts to the door position of a whole train of multi-standard vehicles and part of it is in the descending boarding work position state, and the other unit doors are in the lifting protection work position;

[0051] 12) Construction of railway station layout model for standard scenarios (reference Figure 3 ): Based on the current Chinese railway technical standard system, two models are created, which are applicable to the general intermediate station layout model I and the island intermediate station layout model II; wherein the general intermediate station layout model I is close to the platform and the multi-unit lifting platform door side is generally the arrival and departure track with passengers boarding and alighting, and the island intermediate station layout model II is close to the platform and the multi-unit lifting platform door side is generally the railway mainline track with train through operation and passenger boarding and alighting functions, wherein the rail transit platform door layout and standard common battlefield section layout under the existing Chinese technical standard system are as follows Figure 7 and Figure 8 As shown;

[0052] 13) Construction of multi-state evaluation model for multi-unit lifting platform doors: Based on the four lifting platform door models determined in step 11) and the four standard scenario railway station layout models determined in step 12), eight unified computational geometry models of multi-standard vehicles passing through different forms of platform doors are constructed in pairs, such as Figure 1As shown;

[0053] 2) Multi-standard EMU trains are created through multi-working state lifting platform doors and platform aerodynamic models:

[0054] 21) Setting the mathematical model: Setting the calculation of compressible, transient, viscous Navier-Stokes simulation flow field, turbulence simulation using k-ω The SST two-equation model uses a finite volume discretization method, the discrete terms use a second-order implicit format, and the convection terms use a second-order upwind and bounded center format;

[0055] 22) Determine the calculation domain: Taking the total length of the simulated platform (L) as a reference object, create a rectangular external flow field calculation domain with a length greater than or equal to 4 times the total length of the platform (L), a width greater than or equal to 2 times the total length of the platform (L), and a height greater than or equal to 1 times the total length of the platform (L); the multi-standard EMU train passing through the multi-working state lifting platform door and the platform model are located in the middle of the symmetric boundary of the rectangular external flow field calculation domain, wherein the distance between the front end of the model and the front side of the external flow field is greater than or equal to 1 times the total length of the platform (L), and the distance between the rear end of the model and the rear side of the external flow field is greater than or equal to 2 times the total length of the platform (L), and the horizontal plane of the multi-standard EMU train passing through the multi-working state lifting platform door and the platform model is flush with the track surface, and the horizontal plane coincides with the bottom surface of the external flow field;

[0056] 23) Calculation settings: The grid division adopts unstructured grid. For the fluid-solid contact surface of multi-standard EMU trains and lifting platform doors and the area with prominent changes in the peripheral flow field, the global and local grids are used for superposition processing. The number of surface boundary layers is set to 15-25, the growth rate is set to 1.2, and the grid includes two types: fluid grid and contact calculation model surface grid; the calculation turbulence intensity is set to 0.5%, and the residual value range is 10 -6 ~10 -4 ;

[0057] 24) Verification of grid independence conditions: Select any calculation condition model in step 1) to compare aerodynamic characteristics, set three different grid density conditions based on the same iterative calculation method for independence evaluation, where the number of grids in the fine grid model is greater than 125% of the number of medium grids, and the number of grids in the coarse grid model is less than 75% of the number of medium grids, and take the aerodynamic resistance of the multi-standard EMU train passing through the middle of the platform as the evaluation object, and calculate whether the change rate of aerodynamic resistance of the calculation model corresponding to different grid densities is less than 5%. If it meets the requirements, proceed to the next step. If not, adjust the total number of grids in the calculation domain and continue the calculation until the conditions are met and the independence verification is passed;

[0058] 3) Aerodynamic model calculation and loading: The aerodynamic model calculation and result loading of the multi-standard EMU train passing through the multi-working state lifting platform door and the platform is carried out. On the basis of step 2), the transient pressure field and velocity field of the multi-standard EMU train passing through the multi-working state lifting platform door are solved respectively when the train is in the speed range of 30~400km / h with a calculation gradient of 20km / h under each calculation condition, and the transient pressure field is converted into aerodynamic load, which is loaded onto the surface of the simulated multi-standard EMU train and the lifting platform door in the corresponding working state;

[0059] 4) Establish a dynamic calculation model of the train track system (reference Figure 4 );

[0060] 41) Establishing a model for coupling the lateral motion and vertical motion of a multi-standard EMU train vehicle under the aerodynamic load in step 3);

[0061] 42) Creation of train track system dynamics model: A model consisting of 1 car body, 2 bolsters, 2 frames, 4 wheel sets and 8 swing arms is established based on a single-section vehicle; the car body, frame and wheel set have 6 degrees of freedom, and the swing arm has 1 nodding degree of freedom; the train track system dynamics model also includes nonlinear systems such as wheel-rail contact geometry, wheel-rail creep, primary and secondary suspension systems, lateral buffers, and anti-snaking shock absorbers; the calculation uses the train dynamics parameters under full load, the wheel sets, frames and car bodies are all regarded as rigid bodies, the elastic deformation of the rails is not considered, the LMA tread is matched with the TB2344 60kg rail, the inner distance of the wheelset adopts the Chinese standard 1353mm, and the track irregularity excitation adopts the measured Chinese high-speed railway track spectrum;

[0062] 43) Loading and calculating aerodynamic loads: loading the aerodynamic load data corresponding to the eight calculation conditions obtained in step 3) into the corresponding train track system dynamics model established, and simulating and calculating the derailment coefficient, wheel load reduction rate, wheel axle lateral force and wheel-rail vertical force parameters corresponding to each condition, wherein the aerodynamic load is continuously loaded according to the function table corresponding to the fitting curve;

[0063] 5) Elimination of derailment or overturning conditions: Based on the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force parameters corresponding to the 8 calculation conditions calculated in step 43) when the multi-standard EMU train passes through the multi-working state lifting platform door, and referring to the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force indicators of the Chinese high-speed railway technical standard system as constraints, the calculation conditions of derailment or overturning in the simulation calculation are determined and excluded;

[0064] 6) Determine the safety speed threshold of the safety criterion: Based on the calculated working condition obtained in step 4), exclude the derailment or overturning working condition described in step 5), establish the curve relationship between the train speed and the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force corresponding to different crosswind speeds in the same coordinate system, and analyze whether the curve breaks through the limit value of the constraint index according to the constraint index in step 5). If so, the index can be determined as the safety criterion index, and the safety speed threshold of the multi-standard EMU train passing through the multi-working state lifting platform door corresponding to the safety criterion index is determined by the breakthrough point;

[0065] 7) Establish and check the multi-body dynamic model of the platform door under the action of train wind: Create the multi-body dynamic model of the lifting platform door under different working states respectively, load the aerodynamic load described in step 3) to the surface of the lifting platform door in the corresponding working state, perform structural strength index verification, fatigue calculation, and structural vibration calculation according to the standard strength allowable value of each system component, and calculate and confirm whether the index requirements are met;

[0066] 8) Adaptability verification: respectively determine the safe speed threshold range for the safe and stable operation of the multi-standard EMU train in step 6) and the safe range for the structural strength of the lift platform door in step 7, according to the calculation conditions that both satisfy the stable operation and safe operation of the multi-standard EMU train and the lift platform door, and then determine the safe speed threshold for the multi-standard EMU train to pass through the lift platform door.

[0067] Step 4) The train track system dynamics model is simplified to process other nonlinear systems such as the lateral stop force, and the original nonlinear characteristics are maintained after simplification to meet the calculation requirements.

[0068] Step 2) The multi-standard EMU train is created with the aid of ANSYS Fluent software or STAR-CCM+ software platform through the multi-working state lifting platform door and platform aerodynamic model; Step 5) The train track system dynamics calculation model is created with the aid of Universal Mechanism software or SIMULIA Simpack software platform.

[0069] The indicator determined in step 7) that can be used as a safety criterion is the wheel weight reduction rate. In the Chinese high-speed railway technical standard system in step 6), the constraints of the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force indicators are as follows: Derailment coefficient safety limit value ( Q / P ) lim =0.8; wheel load reduction rate safety limit value (∆ P / P ) lim =0.8; wheel axle lateral force safety limit value Hlim =10+ P 0 / 3 (unit kN, where P 0 is the static axle weight of the multi-standard EMU train); the maximum vertical force safety limit value of the axle P lim =170kN.

[0070] like Figure 5 As shown, the multi-standard EMU train mainly includes a door leaf body, a platform shield door lifting system, a protection height compensation telescopic system, a platform shield door unit combined connection mechanism, a platform shield door protection system and a linkage control unit; wherein the platform shield door lifting system includes a driving lifting mechanism, a clamping connection mechanism, and a lifting limit mechanism which are arranged symmetrically on the left and right of the door leaf body; the protection height compensation telescopic system is a glass plate telescopic mechanism with stepless adjustment of the platform protection height, and the platform shield door protection system is installed and arranged at the edge of the platform to protect the platform shield door from people stepping on it when it is in the lowered working state.

[0071] The lifting platform door control system is mainly composed of on-board equipment, station equipment and ground communication network system. The on-board equipment is mainly the lifting platform door on-board controller, which contains basic parameter information including the train model, external geometric dimensions and door position of the corresponding standard vehicle model; the station equipment mainly includes multi-unit ground intelligent lifting platform doors suitable for multi-standard railway vehicles, lifting platform door platform controllers and door position identification and monitoring systems. The lifting platform door platform controller contains basic parameter information including the train model, external geometric dimensions and door position of all standard vehicle models that stop or pass at this station, and also contains all unit door control systems of this station platform.

[0072] The lifting platform door is installed at the edge of the platform and has two working states: 1) the normal working position is the lifting state, that is, multiple groups of adjacent platform screen doors are locked with each other on the left and right, and the protective glass panels are in the extended state; 2) the riding working state, that is, 1 to 3 groups of platform doors corresponding to the opening of the doors of the vehicles parked on the platform are in the lowered working state for passengers to get on and off.

[0073] Working mode: When any type of vehicle stops at any position on the platform for passengers to get on or off, under the linkage control of the vehicle's on-board equipment, trackside integrated train control equipment, vehicle-ground safety communication control system, station platform screen door control system, etc., 1 to 3 groups of platform screen doors corresponding to the parked vehicle move downward along the sliding bodies on both sides of the outer end of the platform door in the lifting working state under the linkage of the driving and transmission mechanisms. At the same time, the platform door protection height compensation telescopic system is started, and the steplessly adjustable glass plate telescopic mechanism is controlled to retract into the door leaf body. When the door leaf body drops to a height slightly lower than the platform plane than the upper end, the screen door lifting system stops working, and then the screen door protection system is started. The electric-controlled hydraulic push rod drives the protection plate to gradually move to the protection working position at the upper end of the platform screen door. The upper surface of the protection plate is flush with the platform plane, ensuring the protection of the platform screen door from being stepped on by people when riding the vehicle. After passengers get on and off the board, the linkage control system controls the platform shield door protection system to start and return to the lifting state, and then starts the platform shield door lifting system and the protection height compensation telescopic system separately or simultaneously, and gradually resets them to the normal working position corresponding to the lifting state.

[0074] It should be noted that the directions or positional relationships indicated by "left", "right", "front", "back", "inside", "outside", "upper", "lower" and the like mentioned in this document are based on the positional relationships shown in the drawings, and are only for the convenience of describing the technical solution and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed or operate in a specific direction. Therefore, it cannot be understood as a limitation on the technical solution, and the connection relationship may refer to a direct connection relationship or an indirect connection relationship.

[0075] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. Evaluation method of safe speed threshold for multi-standard trains passing through lifting platform doors, Features: The method takes a multi-unit lifting platform door suitable for multi-standard railway vehicles to stop and meet the needs of passengers boarding and alighting as the research object, and refers to the vehicle limits, overall aerodynamic appearance dimensions, operating speed range and door position technical parameters of CRH series vehicles, CR400 series vehicles, urban trains and subway trains of different speed levels in China, respectively builds a multi-standard EMU train passing through a multi-working state lifting platform door and platform aerodynamic models and a train track system dynamics model, and jointly calculates the dynamic behavior of a multi-standard EMU train passing through the platform under different operating conditions and the dynamic response of a multi-working state lifting platform door; determines the safe speed threshold of a multi-standard vehicle passing through by evaluating the running safety and stability indexes of the train and platform door; the specific method for evaluating the safe speed threshold of a multi-standard train passing through a lifting platform door comprises the following steps: 1) Determine the integrated layout and calculation conditions of multi-unit lifting platform doors: 11) Determine the lifting platform door model: According to the safety assessment indicators, four evaluation models are constructed respectively: the platform door single-unit descending boarding work position model I, the platform door double-unit descending boarding work position model II, the platform door full protection work position model III, and the platform door multi-unit interval descending boarding work position model IV; wherein the platform door single-unit descending boarding work position model I means that one unit door of the platform door is in the descending boarding work position state, and the other unit doors are in the lifting protection work position; the platform door double-unit descending boarding work position model II means that two consecutive unit doors of the platform door are in the descending boarding work position state, and the other unit doors are in the lifting protection work position; the platform door full protection work position model III means that all unit doors of the platform door are in the lifting protection work position; the platform door multi-unit interval descending boarding work position model IV means that the platform door adapts to the door position of a whole train of multi-standard vehicles and part of it is in the descending boarding work position state, and the other unit doors are in the lifting protection work position; 12) Construction of standard scenario railway station layout model: Based on the current railway technical standard system in China, two models are created, namely, station layout model I for general intermediate stations and station layout model II for intermediate stations with islands; wherein the station layout model I for general intermediate stations is close to the platform and the side close to the multi-unit lifting platform door, which is generally the arrival and departure track with passengers boarding and alighting, and the station layout model II for intermediate stations with islands is close to the platform and the side close to the multi-unit lifting platform door, which is generally the railway main track with train through operation and passenger boarding and alighting functions; 13) Construction of multi-state evaluation model for multi-unit lifting platform doors: Based on the four lifting platform door models determined in step 11) and the four standard scenario railway yard layout models determined in step 12), eight unified computational geometry models for multi-standard vehicles passing through different forms of platform doors are constructed in pairs; 2) Multi-standard EMU trains are created through multi-working state lifting platform doors and platform aerodynamic models: 21) Setting the mathematical model: Setting the calculation of compressible, transient, viscous Navier-Stokes simulation flow field, turbulence simulation using k-ω The SST two-equation model uses a finite volume discretization method, the discrete terms use a second-order implicit format, and the convection terms use a second-order upwind and bounded center format; 22) Determine the calculation domain: Taking the total length of the simulated platform (L) as a reference object, create a rectangular external flow field calculation domain with a length greater than or equal to 4 times the total length of the platform (L), a width greater than or equal to 2 times the total length of the platform (L), and a height greater than or equal to 1 times the total length of the platform (L); the multi-standard EMU train passing through the multi-working state lifting platform door and the platform model are located in the middle of the symmetric boundary of the rectangular external flow field calculation domain, wherein the distance between the front end of the model and the front side of the external flow field is greater than or equal to 1 times the total length of the platform (L), and the distance between the rear end of the model and the rear side of the external flow field is greater than or equal to 2 times the total length of the platform (L), and the horizontal plane of the multi-standard EMU train passing through the multi-working state lifting platform door and the platform model is flush with the track surface, and the horizontal plane coincides with the bottom surface of the external flow field; 23) Calculation settings: The grid division adopts unstructured grid. For the fluid-solid contact surface of multi-standard EMU trains and lifting platform doors and the area with prominent changes in the peripheral flow field, the global and local grids are used for superposition processing. The number of surface boundary layers is set to 15-25, the growth rate is set to 1.2, and the grid includes two types: fluid grid and contact calculation model surface grid; the calculation turbulence intensity is set to 0.5%, and the residual value range is 10 -6 ~10 -4 ; 24) Verification of grid independence conditions: Select any calculation condition model in step 1) to compare aerodynamic characteristics, set three different grid density conditions based on the same iterative calculation method for independence evaluation, where the number of grids in the fine grid model is greater than 125% of the number of medium grids, and the number of grids in the coarse grid model is less than 75% of the number of medium grids, and take the aerodynamic resistance of the multi-standard EMU train passing through the middle of the platform as the evaluation object, and calculate whether the change rate of aerodynamic resistance of the calculation model corresponding to different grid densities is less than 5%. If it meets the requirements, proceed to the next step. If not, adjust the total number of grids in the calculation domain and continue the calculation until the conditions are met and the independence verification is passed; 3) Aerodynamic model calculation and loading: The aerodynamic model calculation and result loading of the multi-standard EMU train passing through the multi-working state lifting platform door and the platform is carried out. On the basis of step 2), the transient pressure field and velocity field of the multi-standard EMU train passing through the multi-working state lifting platform door are solved respectively when the train is in the speed range of 30~400km / h with a calculation gradient of 20km / h under each calculation condition, and the transient pressure field is converted into aerodynamic load, which is loaded onto the surface of the simulated multi-standard EMU train and the lifting platform door in the corresponding working state; 4) Establish a dynamic calculation model of the train track system; 41) Establishing a model for coupling the lateral motion and vertical motion of a multi-standard EMU train vehicle under the aerodynamic load in step 3); 42) Creation of train track system dynamics model: A model consisting of 1 car body, 2 bolsters, 2 frames, 4 wheel sets and 8 swing arms is established based on a single-section vehicle; the car body, frame and wheel set have 6 degrees of freedom, and the swing arm has 1 nodding degree of freedom; the train track system dynamics model also includes nonlinear systems such as wheel-rail contact geometry, wheel-rail creep, primary and secondary suspension systems, lateral buffers, and anti-snaking shock absorbers; the calculation uses the train dynamics parameters under full load, the wheel sets, frames and car bodies are all regarded as rigid bodies, the elastic deformation of the rails is not considered, the LMA tread is matched with the TB2344 60kg rail, the inner distance of the wheelset adopts the Chinese standard 1353mm, and the track irregularity excitation adopts the measured Chinese high-speed railway track spectrum; 43) Loading and calculating aerodynamic loads: loading the aerodynamic load data corresponding to the eight calculation conditions obtained in step 3) into the corresponding train track system dynamics model established, and simulating and calculating the derailment coefficient, wheel load reduction rate, wheel axle lateral force and wheel-rail vertical force parameters corresponding to each condition, wherein the aerodynamic load is continuously loaded according to the function table corresponding to the fitting curve; 5) Elimination of derailment or overturning conditions: Based on the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force parameters corresponding to the 8 calculation conditions calculated in step 43) when the multi-standard EMU train passes through the multi-working state lifting platform door, and referring to the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force indicators of the Chinese high-speed railway technical standard system as constraints, the calculation conditions of derailment or overturning in the simulation calculation are determined and excluded; 6) Determine the safety speed threshold of the safety criterion: Based on the calculated working condition obtained in step 4), exclude the derailment or overturning working condition described in step 5), establish the curve relationship between the train speed and the derailment coefficient, wheel weight reduction rate, wheel axle lateral force and wheel-rail vertical force corresponding to different crosswind speeds in the same coordinate system, and analyze whether the curve breaks through the limit value of the constraint index according to the constraint index in step 5). If so, the index can be determined as the safety criterion index, and the safety speed threshold of the multi-standard EMU train passing through the multi-working state lifting platform door corresponding to the safety criterion index is determined by the breakthrough point; 7) Establish and check the multi-body dynamic model of the platform door under the action of train wind: Create the multi-body dynamic model of the lifting platform door under different working states respectively, load the aerodynamic load described in step 3) to the surface of the lifting platform door in the corresponding working state, perform structural strength index verification, fatigue calculation, and structural vibration calculation according to the standard strength allowable value of each system component, and calculate and confirm whether the index requirements are met; 8) Adaptability verification: respectively determine the safe speed threshold range for the safe and stable operation of the multi-standard EMU train in step 6) and the safe range for the structural strength of the lift platform door in step 7, according to the calculation conditions that both satisfy the stable operation and safe operation of the multi-standard EMU train and the lift platform door, and then determine the safe speed threshold for the multi-standard EMU train to pass through the lift platform door.

2. The method for evaluating the safe speed threshold of a multi-standard train passing through a lifting platform door according to claim 1, Features: The multi-standard EMU train mainly includes a door leaf body, a screen door lifting system, a protection height compensation telescopic system, a screen door unit combined connection mechanism, a screen door protection system and a linkage control unit; wherein the screen door lifting system includes a driving lifting mechanism, a clamping connection mechanism, and a lifting limit mechanism which are arranged symmetrically on the left and right of the door leaf body; the protection height compensation telescopic system is a glass plate telescopic mechanism with stepless adjustment of the platform protection height, and the screen door protection system is installed and arranged at the edge of the platform to protect the platform screen door from people stepping on the top of the screen door when the platform screen door is in the lowered working state.

3. The method for evaluating the safe speed threshold of a multi-standard train passing through a lifting platform door according to claim 1 or 2, Features: The lifting platform door control system is mainly composed of on-board equipment, station equipment and ground communication network system. The on-board equipment is mainly the lifting platform door on-board controller, which contains basic parameter information including the train model, external geometric dimensions and door position of the corresponding standard vehicle model; the station equipment mainly includes multi-unit ground intelligent lifting platform doors suitable for multi-standard railway vehicles, lifting platform door platform controllers and door position identification and monitoring systems. The lifting platform door platform controller contains basic parameter information including the train model, external geometric dimensions and door position of all standard vehicle models that stop or pass at this station, and also contains all unit door control systems of this station platform.

4. The method for evaluating the safe speed threshold of a multi-standard train passing through a lifting platform door according to claim 1, Features: Step 4) The train track system dynamics model is simplified to process other nonlinear systems such as the lateral stop force, and the original nonlinear characteristics are maintained after simplification to meet the calculation requirements.

5. The method for evaluating the safe speed threshold of a multi-standard train passing through a lifting platform door according to claim 1, Features: Step 2) The multi-standard EMU train is created with the aid of ANSYS Fluent software or STAR-CCM+ software platform through the multi-working state lifting platform door and platform aerodynamic model; Step 5) The train track system dynamics calculation model is created with the aid of Universal Mechanism software or SIMULIA Simpack software platform.

6. The method for evaluating the safe speed threshold of a multi-standard train passing through a lifting platform door according to claim 1, Features: The indicator determined in step 7) that can be used as a safety criterion is the wheel load reduction rate.

7. The method for evaluating the safe speed threshold of a multi-standard train passing through a lifting platform door according to claim 1, Features: Step 6) In the Chinese high-speed railway technical standard system, the derailment coefficient, wheel load reduction rate, wheel axle lateral force and wheel-rail vertical force index constraint conditions are as follows: Derailment coefficient safety limit value ( Q / P ) lim =0.8; wheel load reduction rate safety limit value (∆ P / P ) lim =0.8; wheel axle lateral force safety limit value H lim =10+ P 0 / 3=66.67kN, (where P 0 Take the static axle weight of the multi-standard EMU train); the maximum vertical force safety limit value of the axle P lim =170kN.

Citation Information

Cited By

  • Dynamic model test design and determination method suitable for lifting platform door to pass through train pneumatic impact

    CN120141786A

  • Design and determination method for model test of train aerodynamic impact on lifting platform door

    CN120141786B