Distribution fault sensing control method and system for low voltage distribution network
Through the power supply grid division and optimization technology, the problem of unbalanced distribution of power supply units and loads in low-voltage distribution networks is solved, the load acceptance capacity and fault response speed are improved, real-time perception and rapid processing of distribution faults are realized, and the improvement of improvement of power distribution faults is improved. Operation and maintenance efficiency and power supply reliability.
Patent Information
- Application Number
- CN202410391561.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-04-02
AI Technical Summary
The unbalanced distribution of power supply units and loads in low-voltage distribution networks leads to limited load acceptance capabilities of the grid, and the fault response is lagging, making it difficult to achieve fast and accurate fault positioning and handling.
Through technical means such as power supply grid division, monitoring distribution unit blocks, taking over and improving power supply quality evaluation, expanding and shrinking low-voltage distribution unit blocks, optimizing power supply resource allocation, and improving the load acceptance capacity and fault response speed of the power grid. .
Real-time perception and rapid response to distribution faults are achieved, and the operation and maintenance efficiency and power supply reliability of the low-voltage distribution network are significantly improved.
Smart Images

Figure CN118336689B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field related to power distribution management technology, and specifically to a distribution fault perception and control method and system for low-voltage distribution networks. Background Art
[0002] With the development of the power system and the increase in electricity demand, safety and stability have become important parts of the low-voltage distribution system. Low-voltage distribution is a power system that distributes and supplies high-voltage electricity output from the power grid after it is reduced in voltage through transformers and other equipment. Its stable operation is crucial to ensuring the reliability of power supply. Various faults may occur during the low-voltage distribution process. If they are not perceived in time and effectively controlled, they will cause damage to equipment in the power grid system or even fire accidents. It is particularly important for the low-voltage distribution system to perceive and control distribution faults. However, the unbalanced load distribution in traditional distribution networks makes it difficult to quickly and accurately locate the fault node, the fault response is delayed, and the overall load acceptance capacity of the power grid is poor, resulting in poor fault perception and operation and maintenance efficiency of the low-voltage distribution network.
[0003] Therefore, in the current low-voltage power distribution fault perception related technologies, there are technical problems such as unbalanced distribution of power supply units and loads, which leads to limited load acceptance capacity of the power grid and delayed fault response of the low-voltage distribution network. Summary of the invention
[0004] The present application provides a distribution fault perception and control method and system for a low-voltage distribution network, and adopts technical means such as power supply grid division, monitoring distribution unit blocks, merger optimization, and power supply quality assessment to solve the technical problems of unbalanced power supply unit and load distribution in the existing low-voltage distribution network, resulting in limited load acceptance capacity of the power grid and delayed fault response of the low-voltage distribution network, thereby improving the overall load acceptance capacity of the power grid, realizing real-time perception and rapid response to distribution faults, and achieving the technical effect of significantly improving the operation and maintenance efficiency of the low-voltage distribution network.
[0005] The present application provides a distribution fault perception and control method for a low-voltage distribution network, the method comprising: obtaining basic information of a target low-voltage distribution network, the basic information comprising load density, basic line parameters, and basic transformer parameters, dividing the power supply grid based on the basic information, determining preset low-voltage distribution unit blocks of M power supply units in the target low-voltage distribution network, respectively monitoring the preset low-voltage distribution unit blocks of the M power supply units in the target low-voltage distribution network, determining key nodes and fault-prone nodes of the M power supply units, based on the load characteristics of the first preset low-voltage distribution unit block, taking the key nodes and fault-prone nodes of the M power supply units as constraint information, performing Merge optimization, determine U expandable low-voltage distribution unit blocks and V contractable low-voltage distribution unit blocks, wherein the first preset low-voltage distribution unit block is any one of the preset low-voltage distribution unit blocks of the M power supply units, and U+V≤M, U, V, M∈N*, based on the M power supply units in the target low-voltage distribution network, combine the potential load growth space to perform power supply quality assessment, determine the power supply quality assessment result, based on the U expandable low-voltage distribution unit blocks and V contractable low-voltage distribution unit blocks, combine the power supply quality assessment result to optimize and adjust the power supply resources, obtain the operation configuration plan of the target low-voltage distribution network, and perform fault perception through the operation configuration plan.
[0006] In a possible implementation, based on the load characteristics of the first preset low-voltage distribution unit block, with the key nodes and fault-prone nodes of the M power supply units as constraint information, the merger optimization is performed between the M power supply units, and U expandable low-voltage distribution unit blocks and V contractable low-voltage distribution unit blocks are determined, and the following processing is performed: according to the load characteristics, the M power supply units are evaluated to identify the first idle power supply unit; the connection relationship between the first idle power supply unit and the remaining M-1 power supply units is analyzed to determine the first adjacent power supply unit set; based on the first adjacent power supply unit set, the first idle power supply unit is used as an auxiliary power supply unit, and the power supply radius of the first idle power supply unit is directionally expanded to determine the first expandable low-voltage distribution unit block, and the first expandable low-voltage distribution unit block is any one of the U expandable low-voltage distribution unit blocks.
[0007] In a possible implementation, based on the first adjacent power supply unit set, the first idle power supply unit is used as an auxiliary power supply unit, the power supply radius of the first idle power supply unit is directionally expanded, and a first expandable low-voltage distribution unit block is determined, and the following processing is performed: based on the order of the load saturation of the first adjacent power supply unit set from large to small, a load saturation sequence of the first adjacent power supply unit set is obtained; through the load saturation sequence of the first adjacent power supply unit set, multiple adjacent power supply units to be optimized are screened; the direction from the first idle power supply unit to the first adjacent power supply unit to be optimized is used as the expansion vector direction, and the load saturation of the first adjacent power supply unit to be optimized is used as the expansion vector size, and a first expansion vector is set, and the first idle power supply unit is any one of the multiple adjacent power supply units to be optimized; the multiple adjacent power supply units to be optimized are traversed to generate multiple first expansion vectors, and the power supply radius of the first power supply unit to be optimized is directionally expanded according to the multiple first expansion vectors to determine a first expandable low-voltage distribution unit block.
[0008] In a possible implementation, the power supply radius of the first idle power supply unit is directionally expanded according to the multiple first expansion vectors to determine the first expanded low-voltage distribution unit block, and the following processing is also performed: based on the multiple first expansion vectors, the expansion vectors are merged to obtain a first merged vector; based on the first merged vector, the first idle power supply unit is used as the origin to construct a pre-expansion space; based on the distribution density of the multiple first expansion vectors, the pre-expansion space is divided to determine the expansion space, and the expansion space is merged with the original low-voltage distribution space of the first idle power supply unit to determine the first expanded low-voltage distribution unit block.
[0009] In a possible implementation, based on the distribution density of the multiple first expansion vectors, the pre-expansion space is divided to determine the expansion space, and the following processing is performed: based on the power distribution fault database, in the pre-expansion space, the expansion demand frequencies corresponding to the multiple first expansion vectors are counted; through the load saturation, multi-level expansion intensity is set, and a spatial distribution model is established in combination with the expansion demand frequencies corresponding to the multiple first expansion vectors; through the distribution density analysis result output by the spatial distribution model, the pre-expansion space is divided, and if the high-density area in the distribution density analysis result is a whole, the expansion space is determined.
[0010] In a possible implementation, the pre-expanded space is divided and the following processing is performed: if the high-density area in the distribution density analysis result is a plurality of sub-areas, the power supply capacities of the adjacent power supply units to be optimized corresponding to the plurality of sub-areas are evaluated; based on the order of the power supply capacity indexes of the adjacent power supply units to be optimized corresponding to the plurality of sub-areas from small to large, a power supply capacity index sequence is determined; based on the power supply capacity index sequence, the plurality of sub-areas are merged under the constraint of the load characteristics of the first idle power supply unit.
[0011] In a possible implementation, based on the M power supply units in the target low-voltage distribution network, a power supply quality assessment is performed in combination with the potential load growth space to determine the power supply quality assessment result, and the following processing is also performed: the current load data of the M power supply units in the target low-voltage distribution network are collected; the current load data is used as the starting point, and the load density and load curve of the M power supply units in the target low-voltage distribution network are used as incentives to estimate the potential load growth space; according to the basic parameters of the line and the basic parameters of the transformer, the remaining capacity of the M power supply units within the limit of the potential load growth space is evaluated; the overload risk is analyzed through the remaining capacity of the M power supply units within the limit of the potential load growth space to obtain a first power supply quality assessment factor; during the peak load period, the power supply stability of the M power supply units is quantitatively assessed to obtain a second power supply quality assessment factor, wherein the quantitative indicators of power supply stability include voltage qualification rate, power supply reliability rate, and power quality parameters; the power supply quality assessment result is determined through the first power supply quality assessment factor and the second power supply quality assessment factor.
[0012] The present application also provides a distribution fault perception and control system for a low-voltage distribution network, including:
[0013] A preset low-voltage distribution unit block determination module, the preset low-voltage distribution unit block determination module is used to obtain basic information of the target low-voltage distribution network, the basic information includes load density, basic line parameters, and basic transformer parameters, and perform power supply grid division based on the basic information to determine the preset low-voltage distribution unit blocks of M power supply units in the target low-voltage distribution network;
[0014] A preset low-voltage distribution unit block monitoring module, which is used to respectively monitor the preset low-voltage distribution unit blocks of M power supply units in the target low-voltage distribution network, and determine the key nodes and fault-prone nodes of the M power supply units;
[0015] A power supply unit annexation optimization module, which is used to perform annexation optimization between M power supply units based on the load characteristics of the first preset low-voltage distribution unit block, taking the key nodes and fault-prone nodes of the M power supply units as constraint information, and determine U expansion-type low-voltage distribution unit blocks and V contraction-type low-voltage distribution unit blocks, wherein the first preset low-voltage distribution unit block is any one of the preset low-voltage distribution unit blocks of the M power supply units, and U+V≤M, U, V, M∈N*;
[0016] A power supply quality assessment result generation module, the power supply quality assessment result generation module is used to perform power supply quality assessment based on the M power supply units in the target low-voltage distribution network and in combination with the potential load growth space to determine the power supply quality assessment result;
[0017] A power distribution fault perception module is used to optimize and adjust power supply resources based on the U expandable low-voltage distribution unit blocks and the V contractive low-voltage distribution unit blocks in combination with the power supply quality assessment results, obtain an operation configuration plan for the target low-voltage distribution network, and perform fault perception through the operation configuration plan.
[0018] It is intended to obtain the basic information of the target low-voltage distribution network through the distribution fault perception control method and system for low-voltage distribution network proposed in this application, divide the power supply grid based on the basic information, determine the preset low-voltage distribution unit blocks of the power supply units in the target low-voltage distribution network, and monitor them separately to determine the key nodes and fault-prone nodes of the power supply units. Based on the load characteristics of the first preset low-voltage distribution unit block, the annexation optimization between the power supply units is performed, the expandable low-voltage distribution unit block and the contracted low-voltage distribution unit block are determined, and the power supply quality is evaluated in combination with the potential load growth space. The evaluation results are obtained, and power supply resources are optimized and adjusted based on the expandable low-voltage distribution unit block and the contracted low-voltage distribution unit block, combined with the power supply quality evaluation results, to obtain the operation configuration plan of the target low-voltage distribution network, and fault perception is performed through the operation configuration plan, which solves the technical problems of the unbalanced distribution of power supply units and loads in the existing low-voltage distribution network, resulting in limited load acceptance capacity of the power grid and delayed fault response of the low-voltage distribution network, thereby improving the overall load acceptance capacity of the power grid, realizing real-time perception and rapid response to distribution faults, and significantly improving the operation and maintenance efficiency of the low-voltage distribution network. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solution of the embodiment of the present disclosure, the accompanying drawings of the embodiment of the present disclosure will be briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the system according to the embodiment of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.
[0020] Figure 1 A schematic diagram of a flow chart of a method for sensing and controlling power distribution faults in a low-voltage power distribution network provided in an embodiment of the present application;
[0021] Figure 2 A schematic diagram of the structure of a power distribution fault sensing and control system for a low-voltage power distribution network provided in an embodiment of the present application. DETAILED DESCRIPTION
[0022] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.
[0023] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.
[0024] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.
[0025] The present application provides a method for sensing and controlling power distribution faults in a low-voltage power distribution network. Figure 1As shown, the method includes:
[0026] Low-voltage power distribution refers to the process in which the high voltage transmitted by the power grid is converted into low voltage (usually 220V or 380V) through transformers and other equipment, and distributed and supplied to end users. Industrial, commercial and residential power systems all require low-voltage power distribution. In low-voltage power distribution systems, in order to maintain the safety of personnel and equipment, the transmission and distribution of electric energy are usually controlled through equipment such as circuit breakers, disconnectors, and grounding switches. Various monitoring equipment, protection devices, and fault detection systems are used to monitor the operating status of the low-voltage distribution system, protect the safety of distribution equipment, and promptly perceive and handle faults in the distribution system to improve the efficiency, safety, and reliability of the entire distribution system.
[0027] Step S100, obtain the basic information of the target low-voltage distribution network, the basic information includes load density, basic line parameters, and basic transformer parameters. Determine the target low-voltage distribution network and collect the basic information of the target low-voltage distribution network, including load density, basic line parameters, and basic transformer parameters, wherein load density refers to the load size per unit area or length, indicating the total load size of the load equipment connected in a specific area of the low-voltage distribution network, such as residential electricity, commercial building electricity, industrial electricity, etc.; basic line parameters include resistance, inductance, capacitance and other parameters of the low-voltage distribution network line, describing the characteristics of the power line, for example, resistance indicates the degree of resistance of the line to the current, inductance indicates the ability of the line to respond to voltage changes, capacitance indicates the energy storage capacity of the line, and the basic parameters of the line are helpful to evaluate the power loss and voltage stability of the line; basic transformer parameters include rated capacity, transformation ratio, loss, short-circuit impedance and other parameters of the transformer, describing the performance characteristics of the transformer, for example, rated capacity indicates the maximum output power of the transformer, transformation ratio indicates the transformation ratio of the transformer, loss indicates the energy loss of the transformer during operation, and short-circuit impedance indicates the impedance of the transformer under short-circuit conditions. Accurately acquiring the basic information of the low-voltage distribution network will help with subsequent fault detection and location of the distribution system, thereby improving the reliability and safety of power supply in the power grid.
[0028] After obtaining the basic information of the low-voltage distribution network, step S200 is executed to divide the power supply grid based on the basic information and determine the preset low-voltage distribution unit blocks of the M power supply units in the target low-voltage distribution network. According to the acquired basic information of the low-voltage distribution network, the preset low-voltage distribution unit blocks of the M power supply units in the target low-voltage distribution network are determined. Specifically, the entire target low-voltage distribution network is divided into M power supply units, each of which contains multiple low-voltage distribution unit blocks, wherein M is a positive integer, and a power supply unit refers to an independent power supply area in the low-voltage distribution network, which is usually powered by a transformer. A power supply unit may contain multiple low-voltage distribution unit blocks for managing power supply and load distribution in the area. A preset low-voltage distribution unit block refers to a small area or a specific power distribution unit within the power supply unit, which is usually composed of a transformer, one or more distribution lines and loads, and operates independently in the distribution system. Dividing the low-voltage distribution network into power supply units and low-voltage distribution unit blocks can realize independent load monitoring of each power supply unit, real-time monitoring of the power grid operation status, reduce the impact range of faults, facilitate rapid and accurate positioning and isolation of distribution faults, and improve the efficiency and reliability of the low-voltage distribution network.
[0029] After determining the power supply unit and the preset low-voltage distribution unit block of the power supply unit, execute step S300 to monitor the preset low-voltage distribution unit blocks of the M power supply units in the target low-voltage distribution network respectively and determine the key nodes and fault-prone nodes of the M power supply units. Specifically, the preset low-voltage distribution unit blocks of the M power supply units determined in the target low-voltage distribution network are monitored to determine all key nodes and fault-prone nodes in the M power supply units, wherein the key nodes refer to operating nodes that play an important role in the power supply units of the target low-voltage distribution network, for example, nodes with large loads in the power supply units, important distribution equipment nodes such as transformers and switchgear, connection nodes between various preset low-voltage distribution unit blocks or other power supply unit blocks, etc.; fault-prone nodes refer to operating nodes in the power supply units of the low-voltage distribution network where faults or abnormalities often occur, for example, nodes with serious aging of distribution equipment and lines, nodes with large power load fluctuations and unstable voltage, nodes with harsh environmental conditions such as high temperature and humidity, etc. By monitoring and determining the key nodes and fault-prone nodes of the M power supply units, targeted inspection and maintenance can be carried out, and fault anomalies of key nodes and fault-prone nodes can be quickly located and processed, thereby reducing the scope of fault impact, optimizing the operation and load distribution of the low-voltage distribution network, and improving the efficiency and reliability of the entire low-voltage distribution network.
[0030] After determining the key nodes and fault-prone nodes of the M power supply units, execute step S400, based on the load characteristics of the first preset low-voltage distribution unit block, take the key nodes and fault-prone nodes of the M power supply units as constraint information, perform annexation optimization between the M power supply units, and determine U expandable low-voltage distribution unit blocks and V contractive low-voltage distribution unit blocks, wherein the first preset low-voltage distribution unit block is any one of the preset low-voltage distribution unit blocks of the M power supply units, and U+V≤M, U, V, M∈N*. Specifically, based on the load characteristics of the first preset low-voltage distribution unit block, the key nodes and fault-prone nodes of the M power supply units are used as constraints, for example, the locations, characteristics and other information of the key nodes and fault-prone nodes, and the M power supply units are merged and optimized to determine U expandable low-voltage distribution unit blocks and V contractable low-voltage distribution unit blocks, that is, the operation efficiency and stability of the entire low-voltage distribution network are optimized by merging and adjusting the number of low-voltage distribution unit blocks, wherein the first preset low-voltage distribution unit block refers to any one of the preset low-voltage distribution unit blocks of the M power supply units, U+V≤M, that is, the sum of the number of U expandable low-voltage distribution unit blocks and V contractable low-voltage distribution unit blocks is less than the determined M power supply units, and U and V are both positive integers.
[0031] In a possible implementation, step S400 is based on the load characteristics of the first preset low-voltage distribution unit block, with the key nodes and fault-prone nodes of the M power supply units as constraint information, to perform annexation optimization between the M power supply units, determine U expansion-type low-voltage distribution unit blocks and V contraction-type low-voltage distribution unit blocks, and further includes step S410, according to the load characteristics, the M power supply units are evaluated to identify the first idle power supply unit. Specifically, the load characteristics of the M power supply units are first evaluated, including the load level, load fluctuation, load type (such as industrial, commercial, residential electricity, etc.), peak load period and other information of each power supply unit, the load conditions of each power supply unit are monitored in real time, and the power supply unit with a low load or close to zero is identified as the first idle power supply unit, that is, the first idle power supply unit refers to the power supply unit with the lowest load within a specific time. It also includes step S420, analyzing the connection relationship between the first idle power supply unit and the remaining M-1 power supply units, and determining the first adjacent power supply unit set. Specifically, the connection relationship between the determined first idle power supply unit and the remaining M-1 power supply units is analyzed, including the connection status of the power line, the distance between the power supply units, the power transmission capacity and other factors, and the power supply units directly connected to the first idle power supply unit are found, and combined into a power supply unit set as the first adjacent power supply unit set. There is a direct power line connection between these adjacent power supply units and the first idle power supply unit, which can quickly respond to and affect the operating state of the first idle power supply unit. It also includes step S430, based on the first adjacent power supply unit set, the first idle power supply unit is used as an auxiliary power supply unit, and the power supply radius of the first idle power supply unit is directionally expanded to determine the first extended low-voltage distribution unit block, and the first extended low-voltage distribution unit block is any one of the U extended low-voltage distribution unit blocks. Specifically, the first idle power supply unit is taken as the center, and the power supply radius of the first idle power supply unit is directionally expanded according to the first adjacent power supply unit set, that is, other power supply units within a certain range are selected around the first idle power supply unit to expand their own power supply range, that is, the first extended low-voltage distribution unit block, to optimize the operation layout of the low-voltage distribution network.
[0032] In a possible implementation, step S430 uses the first idle power supply unit as an auxiliary power supply unit based on the first adjacent power supply unit set, and directionally expands the power supply radius of the first idle power supply unit to determine the first extended low-voltage distribution unit block, and further includes step S431, based on the order of the load saturation of the first adjacent power supply unit set from large to small, to obtain the load saturation sequence of the first adjacent power supply unit set. Specifically, the load saturation of each power supply unit in the multiple power supply units in the first adjacent power supply unit set is calculated and sorted to obtain the load saturation sequence of the first adjacent power supply unit set, wherein the load saturation refers to the ratio of the actual load to the maximum load capacity, the larger the ratio, the greater the load saturation, and the load saturation sequence refers to a list or sequence arranged from large to small according to the load saturation, which is used to display the load conditions of each power supply unit in the first adjacent power supply unit set. It also includes step S432, through the load saturation sequence of the first adjacent power supply unit set, multiple adjacent power supply units to be optimized are screened. Based on the load saturation sequence of the first adjacent power supply unit set, the power supply units with higher load saturation are screened out as the objects to be optimized. For example, a load saturation threshold is set, and the power supply units with load saturation lower than the load saturation threshold are used as multiple adjacent power supply units to be optimized. It also includes step S433, taking the direction from the first idle power supply unit to the first adjacent power supply unit to be optimized as the direction of the expansion vector, taking the load saturation of the first adjacent power supply unit to be optimized as the size of the expansion vector, setting the first expansion vector, and the first power supply unit to be optimized is any one of the multiple adjacent power supply units to be optimized. Specifically, the direction from the first idle power supply unit to the first adjacent power supply unit to be optimized and the load saturation of the first adjacent power supply unit to be optimized are respectively used as the direction and size of the expansion vector, and the direction and size of the determined expansion vector are combined to form a first expansion vector. It also includes step S434, traversing the multiple adjacent power supply units to be optimized, generating multiple first expansion vectors, and directionally expanding the power supply radius of the first idle power supply unit according to the multiple first expansion vectors to determine the first extended low-voltage distribution unit block.
[0033] In a possible implementation, step S434, based on the multiple first expansion vectors, the power supply radius of the first idle power supply unit is directionally expanded to determine the first expanded low-voltage distribution unit block, and further includes step S434-A, based on the multiple first expansion vectors, the expansion vectors are merged to obtain a first merged vector. The multiple first expansion vectors generated are merged, for example, all the first expansion vectors are added or weighted averaged to generate a first merged vector. It also includes step S434-B, based on the first merged vector, the first idle power supply unit is used as the origin to construct a pre-expanded space. Specifically, the first idle power supply unit is used as the origin, its position is used as the reference point, and the direction and distance of the expansion in the space are determined according to the size of the first merged vector, so as to construct and expand the space, wherein the pre-expanded space is a power supply area. The method further includes step S434-C, wherein the pre-expansion space is divided based on the distribution density of the plurality of first expansion vectors, the expansion space is determined, the expansion space is merged with the original low-voltage distribution space of the first idle power supply unit, and the first expansion type low-voltage distribution unit block is determined. Specifically, in the pre-expansion space after division, the area with a higher distribution density of expansion vectors is used as the expansion space, and these areas require more power supply resources and optimization adjustment, and then the determined expansion space is merged with the original low-voltage distribution space of the first idle power supply unit to determine the first expansion type low-voltage distribution unit block.
[0034] In a possible implementation, step S434-C divides the pre-expansion space based on the distribution density of the plurality of first expansion vectors to determine the expansion space, and further includes step S434-C10, based on the power distribution fault database, in the pre-expansion space, counting the expansion demand frequencies corresponding to the plurality of first expansion vectors. The power distribution fault database records the types, occurrence frequencies, and corresponding maintenance records of power distribution faults in different regions, maps the plurality of first expansion vectors to corresponding positions in the pre-expansion space, and counts the expansion demand frequencies corresponding to the plurality of first expansion vectors according to the power distribution fault records in the power distribution fault database, including the occurrence frequencies of various power distribution faults in the region, and further includes step S434-C20, sets multi-level expansion strengths according to the load saturation, and establishes a spatial distribution model in combination with the expansion demand frequencies corresponding to the plurality of first expansion vectors. According to the load saturation, multiple levels of expansion intensity are set, for example, set to light expansion, medium expansion and heavy expansion, each expansion intensity level corresponds to different expansion requirements and measures, and a spatial distribution model is established in combination with the expansion requirement frequencies corresponding to multiple first expansion vectors. It also includes steps S434-C30, wherein the pre-expansion space is segmented by the distribution density analysis result output by the spatial distribution model, and if the high-density area in the distribution density analysis result is a whole, the expansion space is determined. Specifically, the pre-expansion space is analyzed for distribution density using the established spatial distribution model and the analysis result is output. According to the analysis result of the distribution density, the pre-expansion space is segmented into different areas. If the area with high distribution density is a whole, the area with high distribution density as a whole is determined to be the expansion space.
[0035] In a possible implementation, step S434-C30, dividing the pre-expanded space, further includes step S434-C31, if the high-density area in the distribution density analysis result is a plurality of sub-areas, evaluating the power supply capacity of the adjacent power supply units to be optimized corresponding to the plurality of sub-areas. Specifically, if the high-density area in the distribution density analysis result is a plurality of sub-areas, then for each sub-area, evaluating the power supply capacity of the adjacent power supply units in this area, including the load capacity, voltage stability, etc. of the power supply unit. It also includes step S434-C32, based on the power supply capacity index of the adjacent power supply units to be optimized corresponding to the plurality of sub-areas in order from small to large, determining the power supply capacity index sequence. Among them, the power supply capacity index is an indicator value for measuring the power supply capacity of the adjacent power supply units to be optimized corresponding to each sub-area, and the power supply capacity index is arranged in order from small to large to determine the power supply capacity index sequence. It also includes step S434-C33, based on the power supply capacity index sequence, under the constraint of the load characteristics of the first idle power supply unit, merging the plurality of sub-areas.
[0036] After generating a scattered set of monitoring nodes, execute step S500, and perform a power supply quality assessment based on the M power supply units in the target low-voltage distribution network in combination with the potential load growth space to determine the power supply quality assessment result. Specifically, for the M power supply units in the target low-voltage distribution network, perform a power supply quality assessment in combination with the potential load growth space to determine the power supply quality assessment result. Among them, the potential load growth space refers to the range of potential load growth possibilities of the low-voltage distribution system within a certain time range in the future. The potential load growth space needs to take into account multiple factors such as the increase in the number of electricity users, the introduction of new distribution equipment and new loads, which lead to the load growth of the low-voltage distribution system.
[0037] Finally, step S600 is executed, and the power supply resources are optimized and adjusted based on the U expanded low-voltage distribution unit blocks and the V contracted low-voltage distribution unit blocks, combined with the power supply quality assessment results, to obtain the operation configuration plan of the target low-voltage distribution network, and fault perception is performed through the operation configuration plan. Specifically, the power supply resources are optimized and adjusted according to the U expanded low-voltage distribution unit blocks, the V contracted low-voltage distribution unit blocks and the power supply quality assessment results, and the operation configuration plan of the target low-voltage distribution network is obtained according to the optimized and adjusted low-voltage distribution unit blocks, including determining the load distribution of each unit block, etc., to ensure the stable operation of the low-voltage distribution system under different load conditions, and then the operation configuration plan and the intelligent monitoring system are used to realize the fault perception of the target low-voltage distribution network, timely discover and accurately locate the faults of the low-voltage distribution network, so as to respond quickly and ensure the stability and reliability of the entire distribution system.
[0038] In a possible implementation, step S600 performs power supply quality assessment based on the M power supply units in the target low-voltage distribution network and combines the potential load growth space to determine the power supply quality assessment result, and also includes step S610, collecting the current load data of the M power supply units in the target low-voltage distribution network. Among them, the current load data refers to the real-time load data of the M power supply units (such as load type, load size, load characteristics, load fluctuation, etc.). It also includes step S620, taking the current load data as the starting point, taking the load density and load curve of the M power supply units in the target low-voltage distribution network as an incentive, and estimating the potential load growth space. Taking the current load data as the starting point, taking the load density and load curve of the M power supply units in the target distribution network as an incentive, predicting the future load demand results, and estimating the potential load growth space according to the load prediction results. It also includes step S630, according to the line basic parameters and transformer basic parameters, evaluating the remaining capacity of the M power supply units under the potential load growth space limit. Among them, the remaining capacity refers to the load that the power supply unit can still bear in the current operating state without overloading or affecting the stability of the power supply system. It also includes step S640, analyzing the overload risk through the remaining capacity of M power supply units under the potential load growth space limit, obtaining a first power supply quality assessment factor, and performing a quantitative assessment of the power supply stability of the M power supply units during the peak load period to obtain a second power supply quality assessment factor, wherein the quantitative indicators of power supply stability include voltage qualification rate, power supply reliability rate, and power quality parameters. It also includes step S650, determining the power supply quality assessment result through the first power supply quality assessment factor and the second power supply quality assessment factor. It is convenient to fully understand the overall status of the power supply system, detect and accurately locate the distribution faults of the low-voltage distribution network, and take corresponding measures in time to improve the operation and maintenance efficiency and stability of the low-voltage distribution system.
[0039] In the above, refer to Figure 1 The present invention describes in detail a method for sensing and controlling power distribution faults in a low-voltage power distribution network according to an embodiment of the present invention. Figure 2 A power distribution fault sensing and control system for a low-voltage power distribution network according to an embodiment of the present invention is described.
[0040] The distribution fault perception control system for low-voltage distribution network according to the embodiment of the present invention is used to solve the technical problems of limited load acceptance capacity of the power grid and delayed fault response of the low-voltage distribution network caused by the imbalance between power supply units and load distribution in the existing low-voltage distribution network, thereby improving the load acceptance capacity of the entire power grid, realizing real-time perception and rapid response to distribution faults, and achieving the technical effect of significantly improving the operation and maintenance efficiency of the low-voltage distribution network. The distribution fault perception control system for low-voltage distribution network includes: a preset low-voltage distribution unit block determination module 10, a preset low-voltage distribution unit block monitoring module 20, a power supply unit annexation optimization module 30, a power supply quality assessment result generation module 40, and a distribution fault perception module 50.
[0041] A preset low-voltage distribution unit block determination module 10, the preset low-voltage distribution unit block determination module 10 is used to obtain basic information of the target low-voltage distribution network, the basic information includes load density, basic line parameters, and basic transformer parameters, and perform power supply grid division based on the basic information to determine the preset low-voltage distribution unit blocks of M power supply units in the target low-voltage distribution network;
[0042] A preset low-voltage distribution unit block monitoring module 20 is used to respectively monitor the preset low-voltage distribution unit blocks of the M power supply units in the target low-voltage distribution network, and determine the key nodes and fault-prone nodes of the M power supply units;
[0043] A power supply unit annexation optimization module 30 is used to perform annexation optimization between M power supply units based on the load characteristics of the first preset low-voltage distribution unit block, taking the key nodes and fault-prone nodes of the M power supply units as constraint information, and determine U expansion-type low-voltage distribution unit blocks and V contraction-type low-voltage distribution unit blocks, wherein the first preset low-voltage distribution unit block is any one of the preset low-voltage distribution unit blocks of the M power supply units, and U+V≤M, U, V, M∈N*;
[0044] A power supply quality assessment result generating module 40, wherein the power supply quality assessment result generating module 40 is used to perform power supply quality assessment based on the M power supply units in the target low-voltage distribution network and in combination with the potential load growth space to determine the power supply quality assessment result;
[0045] A power distribution fault sensing module 50 is used to optimize and adjust power supply resources based on the U expandable low-voltage distribution unit blocks and the V contracted low-voltage distribution unit blocks in combination with the power supply quality assessment results, obtain an operation configuration plan for the target low-voltage distribution network, and sense faults through the operation configuration plan.
[0046] The specific configuration of the power supply unit annexation optimization module 30 will be described in detail below. As described above, based on the load characteristics of the first preset low-voltage distribution unit block, the key nodes and fault-prone nodes of the M power supply units are used as constraint information to perform annexation optimization between the M power supply units, and determine U expansion-type low-voltage distribution unit blocks and V contraction-type low-voltage distribution unit blocks. The power supply unit annexation optimization module 30 may further include: according to the load characteristics, the M power supply units are evaluated to identify the first idle power supply unit; the connection relationship between the first idle power supply unit and the remaining M-1 power supply units is analyzed to determine the first adjacent power supply unit set; based on the first adjacent power supply unit set, the first idle power supply unit is used as an auxiliary power supply unit, and the power supply radius of the first idle power supply unit is directionally expanded to determine the first expansion-type low-voltage distribution unit block, and the first expansion-type low-voltage distribution unit block is any one of the U expansion-type low-voltage distribution unit blocks.
[0047] The specific configuration of the power supply unit annexation optimization module 30 will be described in detail below. As described above, based on the first adjacent power supply unit set, the first idle power supply unit is used as an auxiliary power supply unit, and the power supply radius of the first idle power supply unit is directionally expanded to determine the first extended low-voltage distribution unit block. The power supply unit annexation optimization module 30 further includes: based on the order of the load saturation of the first adjacent power supply unit set from large to small, the load saturation sequence of the first adjacent power supply unit set is obtained; through the load saturation sequence of the first adjacent power supply unit set, a plurality of adjacent power supply units to be optimized are screened; the direction from the first idle power supply unit to the first adjacent power supply unit to be optimized is used as the expansion vector direction, the load saturation of the first adjacent power supply unit to be optimized is used as the expansion vector size, and the first expansion vector is set, and the first power supply unit to be optimized is any one of the plurality of adjacent power supply units to be optimized; the plurality of adjacent power supply units to be optimized are traversed to generate a plurality of first expansion vectors, and the power supply radius of the first idle power supply unit is directionally expanded according to the plurality of first expansion vectors to determine the first extended low-voltage distribution unit block.
[0048] The specific configuration of the power supply unit annexation optimization module 30 will be described in detail below. As described above, the power supply radius of the first idle power supply unit is directionally expanded according to the multiple first expansion vectors to determine the first expanded low-voltage distribution unit block. The power supply unit annexation optimization module 30 may further include: based on the multiple first expansion vectors, the expansion vectors are merged to obtain a first merged vector; based on the first merged vector, the first idle power supply unit is used as the origin to construct a pre-expansion space; based on the distribution density of the multiple first expansion vectors, the pre-expansion space is divided to determine the expansion space, and the expansion space is merged with the original low-voltage distribution space of the first idle power supply unit to determine the first expanded low-voltage distribution unit block.
[0049] The specific configuration of the power supply unit annexation optimization module 30 will be described in detail below. As described above, based on the distribution density of the multiple first expansion vectors, the pre-expansion space is divided to determine the expansion space, and the power supply unit annexation optimization module 30 further includes: based on the power distribution fault database, in the pre-expansion space, the expansion demand frequencies corresponding to the multiple first expansion vectors are counted; through the load saturation, multi-level expansion strengths are set, and the spatial distribution model is established in combination with the expansion demand frequencies corresponding to the multiple first expansion vectors; through the distribution density analysis results output by the spatial distribution model, the pre-expansion space is divided, and if the high-density area in the distribution density analysis results is a whole, the expansion space is determined.
[0050] The specific configuration of the power supply unit annexation optimization module 30 will be described in detail below. As described above, the pre-expansion space is divided, and the power supply unit annexation optimization module 30 further includes: if the high-density area in the distribution density analysis result is a plurality of sub-areas, evaluating the power supply capacity of the adjacent power supply units to be optimized corresponding to the plurality of sub-areas; determining a power supply capacity index sequence based on the power supply capacity index of the adjacent power supply units to be optimized corresponding to the plurality of sub-areas in ascending order; based on the power supply capacity index sequence, merging the plurality of sub-areas under the constraint of the load characteristics of the first idle power supply unit.
[0051] The specific configuration of the distribution fault perception module 50 will be described in detail below. As described above, based on the M power supply units in the target low-voltage distribution network, the power supply quality is evaluated in combination with the potential load growth space to determine the power supply quality evaluation result. The distribution fault perception module 50 may further include: collecting the current load data of the M power supply units in the target low-voltage distribution network; taking the current load data as the starting point, and taking the load density and load curve of the M power supply units in the target low-voltage distribution network as the excitation, estimating the potential load growth space; evaluating the remaining capacity of the M power supply units under the potential load growth space according to the basic parameters of the line and the basic parameters of the transformer; analyzing the overload risk through the remaining capacity of the M power supply units under the potential load growth space, and obtaining the first power supply quality evaluation factor; during the peak load period, the power supply stability of the M power supply units is quantitatively evaluated to obtain the second power supply quality evaluation factor, wherein the quantitative indicators of power supply stability include voltage qualification rate, power supply reliability rate, and power quality parameters; determining the power supply quality evaluation result through the first power supply quality evaluation factor and the second power supply quality evaluation factor.
[0052] The distribution fault perception and control system for a low-voltage distribution network provided in an embodiment of the present invention can execute the distribution fault perception and control method for a low-voltage distribution network provided in any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method.
[0053] Although the present application makes various references to certain modules in the system according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, and the various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.
[0054] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. Distribution fault perception and control method for low voltage distribution network, It is characterized in that The method comprises: Obtaining basic information of the target low-voltage distribution network, wherein the basic information includes load density, basic line parameters, and basic transformer parameters; Perform power supply grid division based on the basic information, and determine the preset low-voltage distribution unit blocks of M power supply units in the target low-voltage distribution network; Respectively monitor the preset low-voltage distribution unit blocks of the M power supply units in the target low-voltage distribution network to determine the key nodes and fault-prone nodes of the M power supply units; Based on the load characteristics of the first preset low-voltage distribution unit block, taking the key nodes and fault-prone nodes of the M power supply units as constraint information, perform annexation optimization between the M power supply units, and determine U expansion-type low-voltage distribution unit blocks and V contraction-type low-voltage distribution unit blocks, wherein the first preset low-voltage distribution unit block is any one of the preset low-voltage distribution unit blocks of the M power supply units, and U+V≤M, U, V, M∈N*; Based on the M power supply units in the target low-voltage distribution network, power supply quality assessment is performed in combination with potential load growth space to determine a power supply quality assessment result; Based on the U expandable low-voltage distribution unit blocks and the V contracted low-voltage distribution unit blocks, power supply resources are optimized and adjusted in combination with the power supply quality assessment result to obtain an operation configuration scheme of the target low-voltage distribution network, and fault perception is performed through the operation configuration scheme; Based on the load characteristics of the first preset low-voltage distribution unit block, taking the key nodes and fault-prone nodes of the M power supply units as constraint information, performing annexation optimization between the M power supply units, and determining U expansive low-voltage distribution unit blocks and V contractive low-voltage distribution unit blocks, the method includes: According to the load characteristics, the M power supply units are evaluated to identify a first idle power supply unit; Analyze the connection relationship between the first idle power supply unit and the remaining M-1 power supply units to determine a first adjacent power supply unit set; Based on the first adjacent power supply unit set, the first idle power supply unit is used as an auxiliary power supply unit, the power supply radius of the first idle power supply unit is directionally expanded, and a first extended low-voltage power distribution unit block is determined, and the first extended low-voltage power distribution unit block is any one of the U extended low-voltage power distribution unit blocks; Based on the first adjacent power supply unit set, the first idle power supply unit is used as an auxiliary power supply unit, the power supply radius of the first idle power supply unit is directionally expanded, and a first expandable low-voltage distribution unit block is determined, the method comprising: Based on the order of the load saturation of the first adjacent power supply unit set from large to small, obtaining a load saturation sequence of the first adjacent power supply unit set; Screening a plurality of adjacent power supply units to be optimized through the load saturation sequence of the first set of adjacent power supply units; The direction from the first idle power supply unit to the first adjacent power supply unit to be optimized is used as the direction of the expansion vector, the load saturation of the first adjacent power supply unit to be optimized is used as the size of the expansion vector, and the first expansion vector is set, and the first adjacent power supply unit to be optimized is any one of the multiple adjacent power supply units to be optimized; Traversing the plurality of adjacent power supply units to be optimized, generating a plurality of first expansion vectors, directionally expanding the power supply radius of the first idle power supply unit according to the plurality of first expansion vectors, and determining a first expanded low-voltage power distribution unit block; Directively expanding the power supply radius of the first idle power supply unit according to the plurality of first expansion vectors to determine a first expansion type low-voltage power distribution unit block, the method comprising: Based on the multiple first extended vectors, performing extended vector merging to obtain a first merged vector; Based on the first merged vector, taking the first idle power supply unit as an origin, constructing a pre-expansion space; Based on the distribution density of the multiple first expansion vectors, the pre-expansion space is divided to determine the expansion space, and the expansion space is merged with the original low-voltage distribution space of the first idle power supply unit to determine the first expansion-type low-voltage distribution unit block.
2. The power distribution fault sensing and control method for a low voltage distribution network according to claim 1, It is characterized in that Based on the distribution density of the plurality of first expansion vectors, the pre-expanded space is divided to determine the expanded space, the method comprising: Based on the power distribution fault database, counting the expansion demand frequencies corresponding to the plurality of first expansion vectors in the pre-expansion space; By using the load saturation, setting multiple levels of expansion strength, and combining the expansion demand frequencies corresponding to the multiple first expansion vectors, establishing a spatial distribution model; The pre-expanded space is segmented according to the distribution density analysis result output by the spatial distribution model, and if the high-density area in the distribution density analysis result is a whole, the expanded space is determined.
3. The power distribution fault sensing and control method for a low voltage distribution network as claimed in claim 2, It is characterized in that The pre-expanded space is divided, and the method further comprises: If the high-density area in the distribution density analysis result is a plurality of sub-areas, evaluating the power supply capabilities of the adjacent power supply units to be optimized corresponding to the plurality of sub-areas; Determine a power supply capability index sequence based on the power supply capability indexes of the adjacent power supply units to be optimized corresponding to the multiple sub-areas in ascending order; Based on the power supply capability index sequence, the multiple sub-areas are merged under the constraint of the load characteristics of the first idle power supply unit.
4. The power distribution fault sensing and control method for a low voltage distribution network according to claim 1, It is characterized in that Based on the M power supply units in the target low-voltage distribution network, power supply quality assessment is performed in combination with potential load growth space to determine a power supply quality assessment result, the method comprising: Collecting current load data of M power supply units in the target low-voltage distribution network; Taking the current load data as a starting point, and the load density and load curve of the M power supply units in the target low-voltage distribution network as incentives, the potential load growth space is estimated; According to the basic parameters of the line and the basic parameters of the transformer, the remaining capacity of the M power supply units under the limitation of the potential load growth space is evaluated; The overload risk is analyzed by the remaining capacity of the M power supply units under the potential load growth space limit, and a first power supply quality assessment factor is obtained; during the load peak period, the power supply stability of the M power supply units is quantitatively evaluated to obtain a second power supply quality assessment factor, wherein the power supply stability quantitative indicators include voltage qualification rate, power supply reliability rate, and power quality parameters; A power supply quality assessment result is determined by using the first power supply quality assessment factor and the second power supply quality assessment factor.
5. Distribution fault sensing and control system for low voltage distribution network, It is characterized in that The system is used to implement the distribution fault perception and control method for a low-voltage distribution network according to any one of claims 1 to 4, and the system includes: A preset low-voltage distribution unit block determination module, the preset low-voltage distribution unit block determination module is used to obtain basic information of the target low-voltage distribution network, the basic information includes load density, basic line parameters, and basic transformer parameters, and perform power supply grid division based on the basic information to determine the preset low-voltage distribution unit blocks of M power supply units in the target low-voltage distribution network; A preset low-voltage distribution unit block monitoring module, which is used to respectively monitor the preset low-voltage distribution unit blocks of M power supply units in the target low-voltage distribution network, and determine the key nodes and fault-prone nodes of the M power supply units; A power supply unit annexation optimization module, which is used to perform annexation optimization between M power supply units based on the load characteristics of the first preset low-voltage distribution unit block, taking the key nodes and fault-prone nodes of the M power supply units as constraint information, and determine U expansion-type low-voltage distribution unit blocks and V contraction-type low-voltage distribution unit blocks, wherein the first preset low-voltage distribution unit block is any one of the preset low-voltage distribution unit blocks of the M power supply units, and U+V≤M, U, V, M∈N*; A power supply quality assessment result generation module, the power supply quality assessment result generation module is used to perform power supply quality assessment based on the M power supply units in the target low-voltage distribution network and in combination with the potential load growth space to determine the power supply quality assessment result; A power distribution fault perception module is used to optimize and adjust power supply resources based on the U expandable low-voltage distribution unit blocks and the V contractive low-voltage distribution unit blocks in combination with the power supply quality assessment results, obtain an operation configuration plan for the target low-voltage distribution network, and perform fault perception through the operation configuration plan.