A recycled concrete drainage pipe and a preparation device thereof

Through the oblique downward movement of the mold and the coordination of the electric push rod, the automatic closing and position adjustment of the steel bar frame is achieved, which solves the problem of difficulty in fixing the steel bar frame and easy damage to the plastic pad during the casting of recycled concrete pipes, and improves the strength of the pipe and ease of operation.

CN118342636BActive Publication Date: 2024-11-01SUQIAN JINPENG PIPE MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410735580.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-11-01
Estimated Expiration
2044-06-07

AI Technical Summary

Technical Problem

During the mold pouring process of recycled concrete pipes, it is difficult to fix the position of the steel bar frame, and the plastic pads are prone to damage, resulting in reduced strength and cumbersome operation.

Method used

During the process of moving the mold obliquely downward, the U-shaped extension rod contacts the base, and the reciprocating screw drives the second sliding sleeve to move, the electric push rod shrinks, the push plate and push rod are abutted, and the U-shaped extension rod is rotated to move the U-shaped extension rod upward. , pull the steel bar frame to close, and adjust and fix it after pouring concrete to replace the plastic pad to support the steel bar frame.

Benefits of technology

The position fixing process of the steel skeleton is simplified, the strength inside the concrete is improved, the operation complexity is reduced, and the strength reduction caused by the breakage of the plastic pad is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118342636B_ABST
    Figure CN118342636B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of concrete drainage pipe preparation, and specifically to a recycled concrete drainage pipe and a preparation device thereof, comprising a base, both end surfaces of the base being fixedly mounted with a fixing frame, a support plate being slidably connected inside the fixing frame, an end plate being fixedly mounted on one end of the support plate, and an inner mold being fixedly embedded and mounted on one side surface of the end plate. In the present invention, the steel bar skeleton inside the concrete pipe is placed inside the outer mold, and the top of the steel bar skeleton is opened, replacing the lifting equipment to lift the inner mold, and during the installation of the inner mold, the position of the already placed steel bar skeleton is adjusted and fixed, and the steel bar skeleton is closed, so that the position of the steel bar skeleton is fixed to the middle position of the concrete pouring, simplifying the operation process, replacing the plastic pad to support the steel bar skeleton, so as to prevent the plastic pad from being damaged after being encapsulated inside the concrete, resulting in a reduction in strength at that location.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete drainage pipe preparation, and in particular to a recycled concrete drainage pipe and a preparation device thereof. Background Art

[0002] Recycled concrete is a new type of building material made by recycling waste concrete, garbage and building materials. Recycled concrete can be used in water conservancy projects such as reservoirs, dams, sluices, cement channels, drainage pipes and flood control walls. Due to its high strength and durability, it can effectively protect water conservancy facilities. Drain pipes are divided into circular, rectangular, elliptical and semicircular shapes according to their different usage sites. Recycled concrete pipes are prepared by mold casting and centrifugal molding.

[0003] However, when the recycled concrete pipe is prepared by mold casting, the steel skeleton inside the concrete pipe needs to be placed inside the outer mold first, and then the steel skeleton is supported by plastic pads. The plastic pads are directly encapsulated in the concrete, and the contact between the plastic pads and the outer mold will be exposed to the outside world. At the same time, the plastic pads are easily damaged, resulting in poor strength at this location. It is also inconvenient to fix the position of the steel skeleton to the middle position of the concrete. After the steel skeleton is placed, the inner mold needs to be inserted into the steel skeleton from one end of the outer mold through a lifting equipment, and the operation process is relatively cumbersome. Summary of the invention

[0004] In order to overcome the above technical problems, the purpose of the present invention is to provide a recycled concrete drain pipe and a preparation device thereof. In the process of the mold moving obliquely downward, the U-shaped extension rod contacts the base, the reciprocating screw drives the No. 2 sliding sleeve to move, and the extension rod is extended out of the two side surfaces of the inner mold, and then the electric push rod is retracted, and the two push rods are against each other. At this time, the No. 1 push plate and the No. 2 push plate are both leaked out, and the handle is rotated to move the U-shaped extension rod upward, and the reciprocating screw drives the No. 2 sliding sleeve and the extension rod to reset, and the two sides of the steel skeleton are pulled to flip toward the middle to close the steel skeleton, and the position of the steel skeleton is fixed. After pouring a part of the concrete, the lower end of the steel skeleton is fixed, and the push rod is moved to reset the No. 1 push plate and the No. 2 push plate, and then the rotating shaft is continued to be rotated to make the U-shaped extension rod and the extension rod continue to be received into the inner mold, so that the position of the steel skeleton that has been placed is adjusted and fixed during the installation of the inner mold, and the steel skeleton is closed at the same time, so that the position of the steel skeleton is fixed to the middle position of the concrete pouring, simplifying the operation process, replacing the plastic pad to support the steel skeleton, so as to avoid the plastic pad being damaged after being encapsulated into the concrete, resulting in a reduction in strength at this location.

[0005] The purpose of the present invention can be achieved through the following technical solutions:

[0006] A preparation device for a recycled concrete drainage pipe comprises a base, both ends of the base are fixedly mounted with a fixing frame, a support plate is slidably connected inside the fixing frame, an end plate is fixedly mounted on one end of the support plate, an inner mold is fixedly embedded and mounted on one side surface of the end plate, a plurality of U-shaped extension rods are equidistantly arranged on the lower surface of the inner mold, a No. 1 L-shaped storage groove is provided inside the U-shaped extension rod, two No. 1 push plates are slidably connected inside the No. 1 L-shaped storage groove, a No. 1 flexible connecting sheet is fixedly connected between the two No. 1 push plates, and the inner mold is symmetrically movable inside. A plurality of extension rods are movably provided, a No. 2 storage groove is opened inside the extension rod, two No. 2 push plates are slidably connected inside the No. 2 storage groove, a No. 2 flexible connecting piece is fixedly connected between the two No. 2 push plates, a push rod is movably provided inside the inner mold above the U-shaped extension rod, a limited position frame is fixedly installed on the outer side of the push rod on the inner upper surface of the inner mold, a rotating shaft is movably inserted at one end of the inner mold, a steel frame is movably provided above the base, two motors connected by a mounting frame are fixedly provided below the base, and a No. 2 clamping block is fixedly installed on the output end of the motor.

[0007] Furthermore, a Y-shaped fixing plate is fixedly installed on the lower surface of the base, a screw rod is rotatably connected between the Y-shaped fixing plate and the fixing frame, a No. 1 sliding sleeve is screwedly connected to the outer side of the screw rod, and one end of the No. 1 sliding sleeve is fixedly connected to the support plate.

[0008] Furthermore, a connecting seat is fixedly installed on one side surface of the fixed frame, a side panel is rotatably connected between two connecting seats located on the same side, connecting screws are rotatably connected at both ends of the upper surface of one side panel, and a card frame is fixedly installed at both ends of the upper surface of the other side panel.

[0009] Further, the lower surface of the inner mold is provided with a plurality of No. 1 through holes, the two side surfaces of the inner mold are provided with a plurality of No. 2 through holes, the surface of one end of the inner mold is provided with a mounting groove, the U-shaped extension rod passes through the No. 1 through hole and is slidably connected to the No. 1 through hole, the extension rod passes through the No. 2 through hole and is slidably connected to the No. 2 through hole, and the rotating shaft passes through the mounting groove and is rotatably connected to the mounting groove.

[0010] Furthermore, a stopper is fixedly installed on one side surface of the No. 1 push plate, a No. 1 spring is fixedly installed on one side surface of the stopper, one end of the No. 1 spring is fixedly connected to the inner wall of the No. 1 L-shaped storage groove, a tooth plate is fixedly installed on one side surface of the U-shaped extension rod, the tooth plate passes through the inner mold and is slidably connected to the inner mold.

[0011] Furthermore, a plurality of fixed seats are equidistantly fixedly installed on the inner lower surface of the inner mold, a No. 1 gear is rotatably connected inside the fixed seat, reciprocating screws are fixedly installed at both ends of the No. 1 gear, a No. 2 sliding sleeve is screwedly connected to the outer side of the reciprocating screw, two No. 2 sliding sleeves are respectively fixedly connected to two extension rods, the No. 1 gear is movably meshed with adjacent tooth plates, an electric push rod is fixedly connected inside the No. 2 storage groove, and one end of the electric push rod is fixedly connected to a No. 2 push plate.

[0012] Furthermore, multiple sliding grooves are equidistantly provided on the outer surface of the push rod, a limiting plate is symmetrically fixedly installed on the inner surface of the limit frame, the push rod is slidably connected to the limit frame, the sliding groove is slidably connected to the limit plate, multiple clamping plates are equidistantly fixedly installed on the lower surface of the push rod, a pressure strip is fixedly installed on one side of the clamping plate on the lower surface of the push rod, a limiting ring is fixedly installed on the surface of one end of the push rod, a telescopic rod is fixedly installed on the upper surface of the inner mold, and a No. 2 spring is movably provided inside the telescopic rod.

[0013] Furthermore, a No. 2 gear is fixedly mounted on the outer surfaces of the two rotating shafts, a tooth groove is provided on the inner surface of the U-shaped extension rod, the No. 2 gear is movably meshed with the tooth groove, a No. 1 clamping seat is fixedly mounted on one end surface of one rotating shaft, a No. 1 clamping block is fixedly mounted on one end surface of the other rotating shaft, the No. 1 clamping seat is movably engaged with the No. 1 clamping block, and a rotating handle is fixedly mounted on the other end surface of one rotating shaft.

[0014] The upper end of the steel bar skeleton is movably engaged with a plurality of buckles, a cylinder is fixedly connected between the motors, a mounting plate is fixedly connected to the lower end of the cylinder, a bevel gear shaft is rotatably connected to the lower end surface of the Y-shaped fixing plate, a bevel gear is fixedly mounted on one end surface of the screw rod, the bevel gear is movably meshed with the bevel gear on the outside of the bevel gear shaft, a No. 2 clamping seat is fixedly mounted on the lower end of the bevel gear shaft, and the No. 2 clamping seat is movably engaged with the No. 2 clamping block.

[0015] Beneficial effects of the present invention:

[0016] 1. The motor is operated to rotate the two screws, pushing the support plate to move inside the fixed frame, thereby pushing the end plate and the inner mold to move obliquely up and down. After the position of the inner mold is fixed, the side plate is turned over, the connecting screw is clamped inside the clamping frame, and fastened with bolts, so that the side plate, end plate, inner mold and base form a casting template for pouring, thereby placing the steel skeleton inside the concrete pipe into the outer mold, and keeping the top of the steel skeleton open, replacing the lifting equipment to lift the inner mold.

[0017] 2. When the inner mold moves obliquely downward, the U-shaped extension rod contacts the base first, and the tooth plate moves synchronously, driving the No. 1 gear to rotate, so that the reciprocating screw drives the No. 2 sliding sleeve to move, and the extension rod extends out of the two side surfaces of the inner mold. Then the electric push rod contracts. When the two inner molds contact, the two push rods resist and move outward, and the pressure strip squeezes the No. 1 push plate. At this time, the No. 1 push plate and the No. 2 push plate are both exposed and located on the outside of the steel frame. At the same time, the clamping plate is stuck on the outside of the U-shaped extension rod. The handle is turned to move the U-shaped extension rod upward through the transmission of the tooth groove. At this time, the reciprocating screw drives the No. 2 sliding sleeve and the extension rod to reset, pulling the two sides of the steel frame to flip to the middle, and the steel frame is closed. When it moves up to the specified position, the position of the steel skeleton is fixed. After pouring a part of concrete, the lower end of the steel skeleton is fixed and the push rod is moved. At this time, the pressure strip moves out from above the No. 1 push plate, so that the No. 1 push plate and the No. 2 push plate are reset, and then the rotating shaft continues to rotate to make the U-shaped extension rod and the extension rod continue to be retracted into the inner mold, so that the position of the already placed steel skeleton is adjusted and fixed during the installation of the inner mold, and the steel skeleton is closed at the same time, so that the position of the steel skeleton is fixed to the middle position of the concrete pouring, simplifying the operation process, replacing the plastic pad to support the steel skeleton, so as to avoid the plastic pad being damaged after being encapsulated into the concrete, resulting in a reduction in strength at this location.

[0018] 3. When demoulding, the motor runs in the reverse direction, driving the two inner molds to move obliquely upward, while making the inner molds slide inside the concrete drain pipe, moving the concrete drain pipe upward, and making it easier to lift the concrete drain pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The present invention will be further described below in conjunction with the accompanying drawings.

[0020] Figure 1 It is a schematic diagram of the overall unfolded state structure of the present invention;

[0021] Figure 2 It is a schematic diagram of the overall closed state structure of the present invention;

[0022] Figure 3 It is a schematic diagram of the vertical cross-section structure of the overall closed state in the present invention;

[0023] Figure 4 It is a schematic diagram of the vertical cross-section structure of the inner mold and the steel bar skeleton in the present invention;

[0024] Figure 5 It is a schematic diagram of the side section structure of the inner mold and the steel bar skeleton in the present invention;

[0025] Figure 6 It is a schematic diagram of the side cross-sectional structure of the overall closed state in the present invention;

[0026] Figure 7 It is a schematic diagram of the vertical cross-section structure of the U-shaped extension rod part of the present invention;

[0027] Figure 8 It is a schematic diagram of the side cross-section structure of the connection between the push rod and the U-shaped extension rod in the present invention;

[0028] Fig. 9 It is a partial structural schematic diagram of the connection between the rotating shaft and the inner mold in the present invention;

[0029] Fig.10 It is a schematic diagram of the cross-sectional structure of the extension rod and the reciprocating screw rod in the present invention.

[0030] In the figure: 1. base; 101. fixing frame; 102. Y-shaped fixing plate; 103. supporting plate; 104. screw rod; 105. No. 1 sliding sleeve; 106. connecting seat; 107. side plate; 108. connecting screw rod; 109. clamping frame; 2. end plate; 201. inner mold; 202. No. 1 through hole; 203. No. 2 through hole; 204. mounting slot; 3. U-shaped extension rod; 301. No. 1 L-shaped storage slot; 302. No. 1 push plate; 303. No. 1 flexible connecting piece; 304. stopper; 305. No. 1 spring; 306. tooth plate; 4. extension rod; 401. No. 2 sliding sleeve; 402. No. 2 storage slot; 403. No. 2 push plate Plate; 404, No. 2 flexible connecting piece; 405, electric push rod; 406, fixed seat; 407, No. 1 gear; 408, reciprocating screw; 5, push rod; 501, slide groove; 502, limit frame; 503, limit plate; 504, clamping plate; 505, pressure strip; 506, limit ring; 507, telescopic rod; 6, rotating shaft; 601, No. 2 gear; 602, tooth groove; 603, No. 1 clamping seat; 604, No. 1 clamping block; 605, rotating handle; 7, steel frame; 701, buckle; 8, motor; 801, No. 2 clamping block; 802, cylinder; 803, mounting plate; 804, bevel gear rotating shaft; 805, No. 2 clamping seat. DETAILED DESCRIPTION

[0031] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] See also Figure 1-10As shown, a preparation device for a recycled concrete drainage pipe comprises a base 1, a fixing frame 101 is fixedly installed on both end surfaces of the base 1, a support plate 103 is slidably connected inside the fixing frame 101, an end plate 2 is fixedly installed on one end of the support plate 103, an inner mold 201 is fixedly embedded and installed on one side surface of the end plate 2, a plurality of U-shaped extension rods 3 are equidistantly arranged on the lower surface of the inner mold 201, a No. 1 L-shaped receiving groove 301 is provided inside the U-shaped extension rod 3, two No. 1 push plates 302 are slidably connected inside the No. 1 L-shaped receiving groove 301, a No. 1 flexible connecting piece 303 is fixedly connected between the two No. 1 push plates 302, and the inner mold 201 is aligned with the inner mold 201. It is said that a plurality of extension rods 4 are movably provided, a No. 2 storage groove 402 is opened inside the extension rod 4, two No. 2 push plates 403 are slidably connected inside the No. 2 storage groove 402, and a No. 2 flexible connecting piece 404 is fixedly connected between the two No. 2 push plates 403, a push rod 5 is movably provided inside the inner mold 201 above the U-shaped extension rod 3, a limited position frame 502 is fixedly installed on the outer side of the push rod 5 on the internal upper surface of the inner mold 201, a rotating shaft 6 is movably inserted at one end of the inner mold 201, a steel frame 7 is movably provided above the base 1, and two motors 8 connected by a mounting frame are fixedly provided below the base 1, and a No. 2 clamping block 801 is fixedly installed at the output end of the motor 8.

[0033] A Y-shaped fixing plate 102 is fixedly installed on the lower surface of the base 1, and a screw rod 104 is rotatably connected between the Y-shaped fixing plate 102 and the fixing frame 101. The outer side of the screw rod 104 is screwed and connected to a No. 1 sliding sleeve 105. One end of the No. 1 sliding sleeve 105 is fixedly connected to the support plate 103. The screw rod 104 rotates and moves the No. 1 sliding sleeve 105 by screwing with the No. 1 sliding sleeve 105, pushing the support plate 103 to move inside the fixing frame 101, thereby pushing the end plate 2 and the inner mold 201 to move obliquely upward and downward; a plurality of buckles 701 are movably engaged at the upper end of the steel frame 7, and the buckles 701 are Ω-shaped , which is convenient for clamping on the outside of the steel bar. When the steel bar skeleton 7 is closed, the buckle 701 is clamped on the steel bars at both ends of the steel bar skeleton 7 to close and fix the upper end of the steel bar skeleton 7. A cylinder 802 is fixedly connected between the motors 8, and a mounting plate 803 is fixedly connected to the lower end of the cylinder 802. A bevel gear shaft 804 is rotatably connected to the lower end surface of the Y-shaped fixing plate 102. A bevel gear is fixedly installed on one end surface of the screw rod 104. The bevel gear is movably meshed with the bevel gear on the outside of the bevel gear shaft 804. A second clamping seat 805 is fixedly installed at the lower end of the bevel gear shaft 804. The second clamping seat 805 and the second clamping seat 805 are connected to the second The clamping block 801 is movably engaged and connected. During production, the base 1 is fixed above the track to facilitate the movement of the casting template. The mounting plate 803 is fixed between the tracks by fasteners. The cylinder 802 extends to push the two motors 8 to move upward, and the second clamping block 801 is clamped inside the second clamping seat 805. Then the motor 8 runs, and the two screw rods 104 are rotated through the transmission of the bevel gear shaft 804 and the bevel gear, so as to adjust the position of the inner mold 201; a connecting seat 106 is fixedly installed on one side of the fixed frame 101, and a side connecting seat 106 located on the same side is rotatably connected between the two connecting seats 106. Plate 107, one side plate 107 is rotatably connected with connecting screws 108 at both ends of the upper surface, and the other side plate 107 is fixedly installed with a clamping frame 109 at both ends of the upper surface. After the position of the inner mold 201 is fixed, the side plate 107 is turned over, the connecting screws 108 are clamped inside the clamping frame 109, and fastened with bolts, so that the side plate 107, the end plate 2, the inner mold 201 and the base 1 are surrounded by a casting template for casting, so that the steel skeleton 7 inside the concrete pipe is placed inside the outer mold, and the top of the steel skeleton 7 is opened, and the lifting equipment is replaced to lift the inner mold 201.

[0034] The lower surface of the inner mold 201 is provided with a plurality of No. 1 through holes 202, and the two side surfaces of the inner mold 201 are provided with a plurality of No. 2 through holes 203. A mounting groove 204 is provided on one end surface of the inner mold 201. The U-shaped extension rod 3 passes through the No. 1 through hole 202 and is slidably connected to the No. 1 through hole 202. The extension rod 4 passes through the No. 2 through hole 203 and is slidably connected to the No. 2 through hole 203. The rotating shaft 6 passes through the mounting groove 204 and is rotatably connected to the mounting groove 204. A stopper 304 is fixedly installed on one side surface of a No. 1 push plate 302. The stopper A spring 305 is fixedly installed on one side surface of 304, and one end of the spring 305 is fixedly connected to the inner wall of the L-shaped receiving groove 301. A tooth plate 306 is fixedly installed on one side surface of the U-shaped extension rod 3. The tooth plate 306 penetrates the inner mold 201 and is slidably connected to the inner mold 201. When the inner mold 201 moves obliquely downward, the U-shaped extension rod 3 first contacts the base 1, so that it is gradually collected into the inner mold 201, and the tooth plate 306 moves synchronously. The spring 305 enables the push plate 302 to be reset after moving, which is convenient for the next push plate 302. The inner lower surface of the inner mold 201 is equidistantly fixed with a plurality of fixed seats 406, the fixed seat 406 is internally rotatably connected to a No. 1 gear 407, both ends of the No. 1 gear 407 are fixedly installed with reciprocating screws 408, the outer side of the reciprocating screw 408 is screwed and connected with a No. 2 sliding sleeve 401, the two No. 2 sliding sleeves 401 are respectively fixedly connected to the two extension rods 4, the No. 1 gear 407 is movably meshed with the adjacent toothed plate 306, the No. 2 storage slot 402 is internally fixedly connected with an electric push rod 405, and the electric push rod 405 One end is fixedly connected to a No. 2 push plate 403. When the U-shaped extension rod 3 moves, the tooth plate 306 drives the No. 1 gear 407 to rotate, so that the reciprocating screw rod 408 drives the No. 2 sliding sleeve 401 to move, and the extension rod 4 extends out of the two side surfaces of the inner mold 201. Then the electric push rod 405 contracts, driving the No. 2 push plate 403 to move, and the No. 2 flexible connecting piece 404 is deformed, and a No. 2 push plate 403 is moved out of the No. 2 storage groove 402. At this time, the No. 1 push plate 302 and the No. 2 push plate 403 are both exposed and located on the outside of the steel frame 7.

[0035] The outer surface of the push rod 5 is equidistantly provided with a plurality of slide grooves 501, and the inner surface of the limit frame 502 is symmetrically fixedly installed with a limit plate 503. The push rod 5 is slidably connected with the limit frame 502, and the slide groove 501 is slidably connected with the limit plate 503. A plurality of card plates 504 are equidistantly fixedly installed on the lower surface of the push rod 5, and a pressure strip 505 is fixedly installed on one side of the card plate 504 on the lower surface of the push rod 5. A limit ring 506 is fixedly installed on one end surface of the push rod 5, and a telescopic rod 507 is fixedly installed on the upper surface of the inner mold 201. A second spring is movably arranged inside the telescopic rod 507. When the two inner molds 201 are in contact, the two push rods 5 resist and move outward, and the pressure strip 505 squeezes the No. 1 push plate 302, and the No. 1 flexible connecting piece 303 is deformed, so that a part of the No. 1 push plate 302 is pushed out of the No. 1 L-shaped storage groove 301. At this time, the card plate 504 is stuck on the outer side of the U-shaped extension rod 3, so that the two can move up synchronously;The outer surfaces of the two rotating shafts 6 are fixedly mounted with a No. 2 gear 601, the inner surface of the U-shaped extension rod 3 is provided with a tooth groove 602, the No. 2 gear 601 is movably meshed with the tooth groove 602, a No. 1 clamping seat 603 is fixedly mounted on one end surface of one rotating shaft 6, a No. 1 clamping block 604 is fixedly mounted on one end surface of the other rotating shaft 6, the No. 1 clamping seat 603 is movably engaged with the No. 1 clamping block 604, and a rotating handle 605 is fixedly mounted on the other end surface of one rotating shaft 6, and the two rotating shafts 6 are connected through the No. 1 clamping block 604 and the No. 1 clamping seat 603 so that they can be simultaneously The rotating handle 605 is rotated step by step, driving the rotating shaft 6 and the second gear 601 to rotate, and the U-shaped extension rod 3 is moved up through the transmission of the tooth groove 602, and the push rod 5 is driven to move up at the same time, so that the slide groove 501 moves along the limit plate 503. At this time, the reciprocating screw rod 408 drives the second sliding sleeve 401 and the extension rod 4 to reset, and pulls the two sides of the steel frame 7 to flip toward the middle to close the steel frame 7. When it moves up to the specified position, the position of the steel frame 7 is fixed, and then pouring is carried out. After pouring a part of concrete, the lower end of the steel frame 7 is fixed, and the push rod 5 is moved. , so that the telescopic rod 507 is stuck in the limiting ring 506, and the push rod 5 is fixed. At this time, the pressure strip 505 moves out from above the No. 1 push plate 302. Under the elastic force of the No. 1 spring 305, the No. 1 push plate 302 is retracted into the No. 1 L-shaped receiving groove 301. At the same time, the electric push rod 405 extends to retract the No. 2 push plate 403 into the No. 2 L-shaped receiving groove 402. Then, the rotating shaft 6 continues to rotate to retract the U-shaped extension rod 3 and the extension rod 4 into the inner mold 201, and the outer surface of the inner mold 201 is closed to keep the inner wall of the drain pipe flat, so that the inner mold 201 is installed. During the installation process, the position of the already placed steel frame 7 is adjusted and fixed, and the steel frame 7 is closed at the same time, so that the position of the steel frame 7 is fixed to the middle position of the concrete pouring, simplifying the operation process, replacing the plastic pad to support the steel frame 7, so as to prevent the plastic pad from being damaged after being encapsulated inside the concrete, resulting in a reduction in strength at this point. When demolding, the motor 8 runs in the reverse direction, driving the two inner molds 201 to move obliquely upward, and at the same time making the inner mold 201 slide inside the concrete drain pipe, and moving the concrete drain pipe upward, so that the concrete drain pipe is also easy to lift. ;

[0036] Working principle: When in use, during production, the base 1 is fixed above the track to facilitate the movement of the casting template, the mounting plate 803 is fixed between the tracks by fasteners, the cylinder 802 extends, and pushes the two motors 8 to move upward, and the No. 2 clamping block 801 is clamped inside the No. 2 clamping seat 805, and then the motor 8 is turned, and the two screws 104 are rotated through the transmission of the bevel gear shaft 804 and the bevel gear, and the No. 1 sliding sleeve 105 is moved by screwing with the No. 1 sliding sleeve 105, pushing the support plate 103 to move inside the fixed frame 101, thereby pushing the end plate 2 and the inner mold 201 to move obliquely up and down. When the steel frame 7 is closed, the buckle 701 is clamped on the steel bars at both ends of the column steel frame 7, and the upper end of the steel frame 7 is closed and fixed, and fixed in the position of the inner mold 201. After that, flip the side plate 107, clamp the connecting screw 108 inside the clamping frame 109, and tighten it with bolts, so that the side plate 107, the end plate 2, the inner mold 201 and the base 1 are surrounded by a casting template for casting, so that the steel skeleton 7 inside the concrete pipe is placed inside the outer mold, and the top of the steel skeleton 7 is opened, and the inner mold 201 is lifted by the lifting equipment. In the process of the inner mold 201 moving obliquely downward, the U-shaped extension rod 3 first contacts the base 1, so that it is collected into the inner mold 201, and the tooth plate 306 moves synchronously, driving the No. 1 gear 407 to rotate, so that the reciprocating screw rod 408 drives the No. 2 sliding sleeve 401 to move, and the extension rod 4 extends out of the two side surfaces of the inner mold 201, and then the electric push rod 405 contracts, driving the No. 2 push plate 403 to move, and the No. 2 soft The flexible connecting piece 404 is deformed, and a No. 2 push plate 403 is moved out of the No. 2 storage groove 402. At this time, the No. 1 push plate 302 and the No. 2 push plate 403 are both leaked out and located outside the steel frame 7. When the two inner molds 201 are in contact, the two push rods 5 resist and move outward, and the pressure strip 505 squeezes the No. 1 push plate 302. The No. 1 flexible connecting piece 303 is deformed, and a No. 1 push plate 302 is partially pushed out of the No. 1 L-shaped storage groove 301. At this time, the clamping plate 504 is clamped on the outside of the U-shaped extension rod 3, so that the two can move up synchronously, and the rotating handle 605 is rotated to drive the rotating shaft 6 and the No. 2 gear 601 to rotate. The U-shaped extension rod 3 is moved up through the transmission of the tooth groove 602, and the push rod 5 is driven to move up at the same time. The slide groove 501 moves along the limit plate 503. At this time, the reciprocating screw rod 4 08 drives the second sliding sleeve 401 and the extension rod 4 to reset, pulls the two sides of the steel frame 7 to flip towards the middle, and closes the steel frame 7. When it moves up to the specified position, the position of the steel frame 7 is fixed, and then pouring is carried out. After pouring a part of concrete, the lower end of the steel frame 7 is fixed, and the push rod 5 is moved to make the telescopic rod 507 stuck in the limit ring 506 to fix the push rod 5. At this time, the pressure strip 505 moves out from above the No. 1 push plate 302. Under the elastic force of the No. 1 spring 305, the No. 1 push plate 302 is stored in the No. 1 L-shaped storage groove 301. At the same time, the electric push rod 405 extends to make the No. 2 push plate 403 stored in the No. 2 L-shaped storage groove 402. Then continue to rotate the rotating shaft 6 to make the U-shaped extension rod 3 and the extension rod 4 continue to be stored in the inner mold 201.The outer surface of the inner mold 201 is closed to keep the inner wall of the drain pipe flat, so that the position of the already placed steel frame 7 can be adjusted and fixed during the installation of the inner mold 201. At the same time, the steel frame 7 is closed to fix the position of the steel frame 7 to the middle position of the concrete pouring, simplifying the operation process, replacing the plastic pad to support the steel frame 7, so as to avoid the plastic pad being damaged after being encapsulated in the concrete, resulting in a reduction in strength at this point. When demolding, the motor 8 runs in the reverse direction, driving the two inner molds 201 to move obliquely upward, and at the same time making the inner mold 201 slide inside the concrete drain pipe, and moving the concrete drain pipe upward, which also makes it easier to lift the concrete drain pipe.

[0037] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0038] The above contents are merely examples and explanations of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the invention or exceed the scope defined by the claims, they shall all fall within the protection scope of the present invention.

Claims

1. A preparation device for a recycled concrete drainage pipe, It is characterized in that The invention comprises a base (1), wherein both end surfaces of the base (1) are fixedly mounted with a fixing frame (101), a supporting plate (103) is slidably connected inside the fixing frame (101), an end plate (2) is fixedly mounted on one end of the supporting plate (103), an inner mold (201) is fixedly embedded and mounted on one side surface of the end plate (2), a plurality of U-shaped extension rods (3) are equidistantly arranged on the lower surface of the inner mold (201), a No. 1 L-shaped storage groove (301) is arranged inside the U-shaped extension rod (3), two No. 1 push plates (302) are slidably connected inside the No. 1 L-shaped storage groove (301), a No. 1 flexible connecting sheet (303) is fixedly connected between the two No. 1 push plates (302), and a plurality of extension rods (4) are symmetrically and movably arranged inside the inner mold (201). A No. 2 storage groove (402) is provided inside the extension rod (4), two No. 2 push plates (403) are slidably connected inside the No. 2 storage groove (402), and a No. 2 flexible connecting piece (404) is fixedly connected between the two No. 2 push plates (403). A push rod (5) is movably provided inside the inner mold (201) and located above the U-shaped extension rod (3). A limit frame (502) is fixedly installed on the upper surface of the inner mold (201) and located outside the push rod (5). A rotating shaft (6) is movably inserted at one end of the inner mold (201). A steel frame (7) is movably provided above the base (1). Two motors (8) connected by a mounting frame are fixedly provided below the base (1), and a No. 2 clamping block (801) is fixedly installed at the output end of the motor (8).

2. A preparation device for a recycled concrete drainage pipe according to claim 1, It is characterized in that A Y-shaped fixing plate (102) is fixedly mounted on the lower surface of the base (1); a screw rod (104) is rotatably connected between the Y-shaped fixing plate (102) and the fixing frame (101); a first sliding sleeve (105) is screwedly connected to the outer side of the screw rod (104); one end of the first sliding sleeve (105) is fixedly connected to the support plate (103).

3. A preparation device for a recycled concrete drainage pipe according to claim 1, It is characterized in that A connection seat (106) is fixedly mounted on one side surface of the fixed frame (101); a side plate (107) is rotatably connected between two connection seats (106) located on the same side; connection screws (108) are rotatably connected at both ends of the upper surface of one side plate (107); and a clamping frame (109) is fixedly mounted at both ends of the upper surface of the other side plate (107).

4. The device for preparing a recycled concrete drainage pipe according to claim 1, It is characterized in that The lower surface of the inner mold (201) is provided with a plurality of No. 1 through holes (202), the two side surfaces of the inner mold (201) are provided with a plurality of No. 2 through holes (203), a mounting groove (204) is provided on one end surface of the inner mold (201), the U-shaped extension rod (3) passes through the No. 1 through hole (202) and is slidably connected to the No. 1 through hole (202), the extension rod (4) passes through the No. 2 through hole (203) and is slidably connected to the No. 2 through hole (203), and the rotating shaft (6) passes through the mounting groove (204) and is rotatably connected to the mounting groove (204).

5. The preparation device of a recycled concrete drainage pipe according to claim 1, It is characterized in that A stopper (304) is fixedly mounted on one side surface of the No. 1 push plate (302), a No. 1 spring (305) is fixedly mounted on one side surface of the stopper (304), one end of the No. 1 spring (305) is fixedly connected to the inner wall of the No. 1 L-shaped receiving groove (301), and a tooth plate (306) is fixedly mounted on one side surface of the U-shaped extension rod (3), the tooth plate (306) passes through the inner mold (201) and is slidably connected to the inner mold (201).

6. A device for preparing a recycled concrete drainage pipe according to claim 5, It is characterized in that A plurality of fixed seats (406) are fixedly installed at equal intervals on the lower surface of the inner mold (201); a first gear (407) is rotatably connected inside the fixed seat (406); reciprocating screws (408) are fixedly installed at both ends of the first gear (407); a second sliding sleeve (401) is screwedly connected to the outer side of the reciprocating screw (408); the two second sliding sleeves (401) are respectively fixedly connected to two extension rods (4); the first gear (407) is movably meshed with the adjacent toothed plates (306); an electric push rod (405) is fixedly connected inside the second receiving groove (402); one end of the electric push rod (405) is fixedly connected to a second push plate (403).

7. The device for preparing a recycled concrete drainage pipe according to claim 1, It is characterized in that The outer surface of the push rod (5) is provided with a plurality of slidable grooves (501) at equal intervals, the inner surface of the limit frame (502) is symmetrically fixedly mounted with a limit plate (503), the push rod (5) is slidably connected to the limit frame (502), the slidable grooves (501) are slidably connected to the limit plate (503), a plurality of clamping plates (504) are equidistantly fixedly mounted on the lower surface of the push rod (5), a pressure strip (505) is fixedly mounted on one side of the clamping plate (504) on the lower surface of the push rod (5), a limit ring (506) is fixedly mounted on one end surface of the push rod (5), a telescopic rod (507) is fixedly mounted on the inner upper surface of the inner mold (201), and a second spring is movably mounted inside the telescopic rod (507).

8. The device for preparing a recycled concrete drainage pipe according to claim 1, It is characterized in that A second gear (601) is fixedly mounted on the outer surface of the two rotating shafts (6); a tooth groove (602) is provided on the inner surface of the U-shaped extension rod (3); the second gear (601) is movably meshed with the tooth groove (602); a first clamping seat (603) is fixedly mounted on one end surface of one rotating shaft (6); a first clamping block (604) is fixedly mounted on one end surface of the other rotating shaft (6); the first clamping seat (603) is movably engaged with the first clamping block (604); and a rotating handle (605) is fixedly mounted on the other end surface of one rotating shaft (6).

9. The device for preparing a recycled concrete drainage pipe according to claim 2, It is characterized in that The upper end of the steel bar skeleton (7) is movably engaged with a plurality of buckles (701); a cylinder (802) is fixedly connected between the motors (8); a mounting plate (803) is fixedly connected to the lower end of the cylinder (802); a bevel gear shaft (804) is rotatably connected to the lower end surface of the Y-shaped fixing plate (102); a bevel gear is fixedly mounted on one end surface of the screw rod (104); the bevel gear is movably meshed with a bevel gear on the outer side of the bevel gear shaft (804); a second clamping seat (805) is fixedly mounted on the lower end of the bevel gear shaft (804); the second clamping seat (805) is movably engaged with the second clamping block (801).

10. A recycled concrete drain pipe, It is characterized in that It is made by using a preparation device for a recycled concrete drainage pipe as described in any one of claims 1-9.