One-time ore-dropping construction method of medium-deep hole zonal blasting

By adopting the one-time ore dropping construction method of medium and deep hole zoning blasting in metal mines, the vertical ore body of the stope is divided into multiple areas for compensation of large holes in the middle and blasting of peripheral small holes, which solves the problem of the existing technology of medium and deep hole ore dropping. Problems of complexity and safety risks have been solved, and efficient and safe stope mining has been achieved in one fell swoop.

CN118346277BActive Publication Date: 2024-10-18CHANGCHUN GOLD RES INST
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410767301.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2024-10-18
Estimated Expiration
2044-06-14

AI Technical Summary

Technical Problem

In metal mines with medium-thick ore bodies and above, the existing deep-hole ore dropping technology has problems such as numerous construction procedures, long cycle, low operating efficiency, and high safety risks.

Method used

The construction method of medium and deep hole zoning blasting is used to divide the vertical ore body into multiple areas along the length direction. The construction method of large hole compensation in the middle and peripheral small holes is used to accurately control the blasting through micro-differences to achieve one-time falling. Mineral shaping.

Benefits of technology

It greatly improves the safety and construction efficiency of stope operations, simplifies the construction process, reduces costs, and achieves efficient one-time ore dropping and forming of the stope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118346277B_ABST
    Figure CN118346277B_ABST
Patent Text Reader

Abstract

The present invention provides a medium-deep hole partition blasting one-time ore-drop construction method, which relates to the technical field of medium-deep hole mining in medium-thick or thicker ore bodies in underground metal mines. The method arranges the stope perpendicular to the ore body, the stope length is more than 15m, the stope width is 3m~4m, and the stope height is 10~15m. The entire stope is divided into 4~7 areas along the length direction, and each area adopts a construction method of middle large hole compensation plus peripheral small hole blasting, and the blasting is precisely controlled by micro-difference in the partition, so as to realize one-time ore-dropping for the medium-deep hole stope, which greatly improves the safety of the stope operation and the construction efficiency. The construction method of the present invention is simple to operate, safe and efficient, and low in cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of medium-deep hole mining in medium-thick or thicker ore bodies in underground metal mines, and in particular to a medium-deep hole zoned blasting and one-time ore dropping construction method. Background Art

[0002] At present, in the medium-depth hole ore-dropping process of medium-thick or thicker ore bodies in metal mines, the compensation space is generally obtained by grooving at the end or middle of the ore body, and then constructing fan-shaped or parallel medium-depth hole retreat ore-dropping. This ore-dropping method mainly has problems such as numerous construction procedures, long cycle, low operation efficiency, and high safety risks.

[0003] The patent with publication number CN117386364A provides a one-time forming construction method for medium-long hole inclined grooves. This method constructs compensation spaces at the upper and lower parts of the cutting groove area to be constructed, and controls the order of detonation of detonators in different blasting areas to form the grooves in one blasting, thereby improving the overall groove drawing efficiency of the groove drawing process. However, this invention is mainly aimed at the construction of cutting grooves in the stope, and the subsequent blasting of normal blast holes is still required to complete the overall recovery of the stope.

[0004] In view of this, it is necessary to design a medium-deep hole partition blasting one-time mining construction method to solve the above problems. Summary of the invention

[0005] In view of the defects of the above-mentioned prior art, the present invention provides a one-time ore-dropping construction method for medium-deep hole zoned blasting, in which the mining field is arranged vertically to the ore body, and the entire mining field is divided into multiple areas along the length direction. Each area adopts a construction method of middle large hole compensation and peripheral small hole blasting, and the blasting is precisely controlled by micro-difference in the zone, so that the medium-deep hole mining field can be formed by one-time ore-dropping, which greatly improves the safety of mining operations and construction efficiency.

[0006] To achieve the above object, the present invention provides a medium-long hole zoned blasting one-time ore dropping construction method, comprising the following steps:

[0007] S1, arrange the stope vertically along the ore body, with a stope length of more than 15m, a stope width of 3m~4m, and a stope height of 10~15m; divide the stope into 4~7 zones along the stope length according to the stope length, with each zone having a width of 3m~4m and a length of 4m~5m;

[0008] S2, first construct the bottom layer of the mining area, with ore-exit access roads on both sides of the bottom layer; the width of the bottom layer is 3m~4m, the height is 2m~3m, and the length is the same as the length of the mining area;

[0009] S3, then, construct the first partition located in the middle of the 4 to 7 partitions, and use an underground shaft drilling machine to construct a compensating large hole in the first partition, the diameter of the compensating large hole is 800 mm to 1000 mm, and the length of the compensating large hole is the stope height; when the number of partitions is an even number, the first partition is any one of the two middle partitions;

[0010] S4, after the construction of the compensation large hole is completed, use an underground medium-deep hole drilling rig to construct 16 peripheral small holes in the first subarea. The diameter of the peripheral small holes is 60mm~65mm, the length of the peripheral small holes is the height of the stope, and the distance between adjacent peripheral small holes is 400-500mm; the 16 peripheral small holes are arranged in a "M" shape around the compensation large hole; the 8 holes in a circle adjacent to the compensation large hole are numbered 1, 2, 3, 4, 5, 6, 7, 8 from left to right and from top to bottom, and the 8 holes in the outer circle are numbered 9, 10, 11, 12, 13, 14, 15, 16 from left to right and from top to bottom;

[0011] S5, after the construction of the compensating large hole and the surrounding small holes in the first partition is completed, the compensating large holes and the surrounding small holes are constructed in the remaining partitions in the order of the middle first and the two sides, and the blasthole structure of each partition is the same;

[0012] S6, after the construction of blastholes in each area is completed, charge blasting operation is carried out; detonators are designed in the blastholes to control the micro-difference interval of each area to 25ms-50ms;

[0013] S7, charge, all zones are detonated simultaneously, and the whole mine is dropped in one blast;

[0014] S8, finally, the mining operation is carried out in the mining area, and the mining is carried out in a backward manner from the mining connecting roads on both sides.

[0015] As a further improvement of the present invention, in step S1, the mining field is divided into 5 partitions along the length direction of the mining field, namely the first partition in the middle, the second partition and the third partition on both sides of the first partition, the fourth partition on the other side of the second partition, and the fifth partition on the other side of the third partition; wherein, holes 2, 4, 5, and 7 of the first partition are designed with 1 section of detonators, holes 1, 3, 6, and 8 are designed with 2 sections of detonators, and holes 9-16 are designed with 3 sections of detonators, and the micro-difference interval of each section is 50ms; holes 2, 4, 5, and 7 of the second partition are designed with 4 sections of detonators, holes 1, 3, 6, and 8 are designed with 5 sections of detonators, and holes 9-16 are designed with 6 sections of detonators. Detonators, each section has a micro-difference interval of 50ms; in the third sub-area, holes 2, 4, 5, and 7 are designed with 7 sections of detonators, holes 1, 3, 6, and 8 are designed with 8 sections of detonators, and holes 9-16 are designed with 9 sections of detonators, each section has a micro-difference interval of 50ms; in the fourth sub-area, holes 2, 4, 5, and 7 are designed with 10 sections of detonators, holes 1, 3, 6, and 8 are designed with 11 sections of detonators, and holes 9-16 are designed with 12 sections of detonators, each section has a micro-difference interval of 50ms; in the fifth sub-area, holes 2, 4, 5, and 7 are designed with 13 sections of detonators, holes 1, 3, 6, and 8 are designed with 14 sections of detonators, and holes 9-16 are designed with 15 sections of detonators, each section has a micro-difference interval of 50ms.

[0016] As a further improvement of the present invention, when the stope is divided into 4 or 6 subareas along the length direction of the stope, the other of the two subareas in the middle position is the second subarea.

[0017] As a further improvement of the present invention, No. 2 rock ammonium nitrate explosive is used for blasting, and digital electronic detonator is used as detonator.

[0018] As a further improvement of the present invention, when the stope length is 15-20m, the stope is divided into 4-5 partitions along the stope length direction; when the stope length is 20-30m, the stope is divided into 6-7 partitions along the stope length direction.

[0019] As a further improvement of the present invention, the specifications of each partition are the same.

[0020] As a further improvement of the present invention, the partition is a diamond-shaped stope.

[0021] As a further improvement of the present invention, in each partition, the number of the compensating macrohole is one.

[0022] The beneficial effects of the present invention are:

[0023] The medium-deep hole zoned blasting one-time ore-dropping construction method provided by the present invention is to arrange the stope perpendicular to the ore body, with a stope length of more than 15m, a stope width of 3m~4m, and a stope height of 10~15m. The entire stope is divided into 4~7 areas along the length direction, and each area adopts the construction method of middle large hole compensation + peripheral small hole blasting, and the zone micro-difference precise control of blasting is carried out to achieve one-time ore-dropping for the medium-deep hole stope. The present invention does not require the construction of cutting grooves, and adopts a construction method of multi-zone blasting and one-time ore-dropping in the stope, which greatly improves the safety and construction efficiency of the stope operation. The method is simple to operate, safe and efficient, and low-cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the main structure of the medium-deep hole zoned blasting and one-time ore-dropping construction method of the present invention.

[0025] Figure 2 for Figure 1 Top view along the II axis.

[0026] Figure 3 for Figure 2 Schematic diagram of the blasthole structure of the first partition. The structures of the remaining partitions are arranged in the same way.

[0027] Reference numerals:

[0028] 10-mining access road; 20-pull bottom layer; 30-peripheral small holes; 40-compensating large holes; 50-ore body. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0030] It should also be noted that, in order to avoid obscuring the present invention due to unnecessary details, only structures and / or processing steps closely related to the scheme of the present invention are shown in the drawings, while other details that are not closely related to the present invention are omitted.

[0031] In addition, it should be noted that the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0032] See also Figures 1 to 3As shown, the present invention provides a medium-deep hole partition blasting one-time ore-dropping construction method, in which the stope is arranged vertically to the ore body, the stope length is more than 15m, the stope width is 3m~4m, and the stope height is 10~15m. The entire stope is divided into 4~7 areas along the length direction, and each area adopts the construction method of middle large hole compensation + peripheral small hole blasting, and the partition micro-difference precise control blasting is carried out to realize one-time ore-dropping formation for the medium-deep hole stope, which greatly improves the safety of stope operation and construction efficiency.

[0033] The medium-deep hole zoned blasting one-time ore-dropping construction method provided by the present invention specifically comprises the following steps:

[0034] S1, the stope is arranged vertically along the ore body, with a stope length of more than 15m, a stope width of 3m~4m, and a stope height of 10~15m; according to the stope length, the stope is divided into 4~7 zones along the stope length direction, and the specifications of each zone are 3m~4m in width and 4m~5m in length; the zones are diamond-shaped stopes.

[0035] S2, first construct the bottom layer 20 of the stope, and the two sides of the bottom layer 20 are provided with ore-exiting connecting roads 10; the width of the bottom layer 20 is 3m~4m, the height is 2m~3m, and the length is consistent with the stope length;

[0036] S3, then, construct the first partition located in the middle of the 4 to 7 partitions, and construct a large compensating hole 40 in the first partition using an underground raise drilling machine. The diameter of the large compensating hole 40 is 800 mm to 1000 mm, and the length of the large compensating hole 40 is the stope height, that is, 10 to 15 m; when the number of partitions is an even number, the first partition is one of the two middle partitions;

[0037] Specifically, when the stope is divided into 4 or 6 subareas along the length direction of the stope, the first subarea is one of the two subareas located in the middle position along the length direction of the entire stope.

[0038] S4, after the construction of the compensation large hole 40 is completed, 16 peripheral small holes 30 are constructed in the first subarea using an underground medium-deep hole drilling rig. The diameter of the peripheral small holes 30 is 60mm-65mm, the length of the peripheral small holes 30 is the height of the stope, and the distance between adjacent peripheral small holes 30 is 400-500mm; the 16 peripheral small holes 30 are arranged in a "M" shape around the compensation large hole; the 8 holes in a circle adjacent to the compensation large hole are numbered 1, 2, 3, 4, 5, 6, 7, and 8 from left to right and from top to bottom, and the 8 holes in the outer circle are numbered 9, 10, 11, 12, 13, 14, 15, and 16 from left to right and from top to bottom;

[0039] S5, after the construction of the compensating large hole 40 and the peripheral small holes 30 in the first partition is completed, the compensating large holes and the peripheral small holes are constructed in the remaining partitions in the order of the middle first and the two sides, and the blasthole structure of each partition is the same;

[0040] Specifically, when the stope is divided into 4 or 6 partitions along the length direction of the stope, the first partition is one of the two partitions located in the middle of the entire stope length direction, and the other of the two partitions in the middle is the second partition. When the number of partitions is 4, the two outermost partitions are the third partition and the fourth partition. When the number of partitions is 6, the two outermost partitions are the fifth partition and the sixth partition, and the remaining two partitions are the third partition and the fourth partition.

[0041] S6, after the construction of blastholes in each area is completed, charge blasting operation is carried out; detonators are designed in the blastholes to control the micro-difference interval of each area to 25ms-50ms;

[0042] S7, charge, all zones are detonated simultaneously, and the whole mine is dropped in one blast;

[0043] S8, finally, the mining operation is carried out in the mining area, and the mining is carried out by a remote-controlled scraper from the mining connecting roads 10 on both sides in a backward manner.

[0044] In each partition, the number of compensating large holes is one.

[0045] In this embodiment, the stope is divided into 5 zones along the length direction of the stope, and the 5 zones have the same specifications of 4m×4m. The 5 zones are the first zone (zone 1) in the middle, the second zone (zone 2) and the third zone (zone 3) on both sides of the first zone, the fourth zone (zone 4) on the other side of the second zone, and the fifth zone (zone 5) on the other side of the third zone.

[0046] Among them, see Figure 3As shown, holes 2, 4, 5, and 7 in the first partition are designed with 1 section of detonator, holes 1, 3, 6, and 8 are designed with 2 sections of detonator, and holes 9-16 are designed with 3 sections of detonator, with a micro-difference interval of 50ms for each section; holes 2, 4, 5, and 7 in the second partition are designed with 4 sections of detonator, holes 1, 3, 6, and 8 are designed with 5 sections of detonator, and holes 9-16 are designed with 6 sections of detonator, with a micro-difference interval of 50ms for each section; holes 2, 4, 5, and 7 in the third partition are designed with 7 sections of detonator, holes 1, 3, 6, and 8 are designed with 7 sections of detonator. There are 8 sections of detonators, 9 sections of detonators are designed for holes 9-16, and the micro-difference interval of each section is 50ms; the fourth partition's holes 2, 4, 5, and 7 are designed with 10 sections of detonators, holes 1, 3, 6, and 8 are designed with 11 sections of detonators, and holes 9-16 are designed with 12 sections of detonators, and the micro-difference interval of each section is 50ms; the fifth partition's holes 2, 4, 5, and 7 are designed with 13 sections of detonators, holes 1, 3, 6, and 8 are designed with 14 sections of detonators, and holes 9-16 are designed with 15 sections of detonators, and the micro-difference interval of each section is 50ms.

[0047] The pull layer 20 has a width of 4 m, a height of 2.6 m, and a length of 20 m.

[0048] The diameter of the compensating large hole 40 is 1000 mm; the diameter of the peripheral small holes is 65 mm, and the distance between the holes is 400-500 mm.

[0049] The blasting uses No. 2 rock ammonium nitrate explosive, and the detonator uses digital electronic detonator.

[0050] Those skilled in the art should understand that, according to different mining field lengths and heights, the number of partitions can be adjusted, as well as the size, number and spacing of the compensating large holes and surrounding small holes in each zone, while other mining steps remain unchanged, thereby achieving one-time mining operations in medium and deep holes for different mining fields.

[0051] Specifically, when the stope length is 15-20m, the stope can be divided into 4-5 sub-areas along the stope length; when the stope length is 20-30m, the stope can be divided into 6-7 sub-areas along the stope length.

[0052] Each partition has the same specifications.

[0053] In summary, the present invention provides a method for one-time ore dropping by zoned blasting of medium-deep holes. The method arranges the mining field vertically to the direction of the ore body, with a mining field length of more than 15m, a mining field width of 3m~4m, and a mining field height of 10~15m. The entire mining field is divided into 4~7 areas along the length direction, and each area adopts a construction method of middle large hole compensation + peripheral small hole blasting, and the blasting is precisely controlled by micro-difference in the zones to achieve one-time ore dropping for the medium-deep hole mining field. The present invention adopts a construction method of multi-zone blasting and one-time ore dropping in the mining field, which greatly improves the safety and construction efficiency of mining field operations. The method is simple to operate, safe and efficient, and low-cost.

[0054] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A medium-deep hole zoning blasting one-time ore dropping construction method, characterized in that: It includes the following steps: S1. Arrange the stope perpendicular to the orebody strike. The length of the stope is more than 15 m, the width is 3 m - 4 m, and the height is 10 - 15 m. According to the stope length, divide the stope into 4 - 7 sub - areas along the stope length direction. The width of each sub - area is 3 m - 4 m, and the length is 4 m - 5 m. S2. First, construct the draw - off floor of the stope. There are ore - drawing access drifts on both sides of the draw - off floor. The width of the draw - off floor is 3 m - 4 m, the height is 2 m - 3 m, and the length is the same as the stope length. S3. Then, construct the first sub - area located in the middle of the 4 - 7 sub - areas. Use an underground raise borer to construct relief holes in the first sub - area. The diameter of the relief holes is 800 mm - 1000 mm, and the length of the relief holes is the stope height. When the number of sub - areas is even, the first sub - area is one of the two middle sub - areas. S4. After the construction of the relief holes is completed, use an underground medium - deep hole drill to construct 16 peripheral small holes in the first sub - area. The diameter of the peripheral small holes is 60 mm - 65 mm, the length of the peripheral small holes is the stope height, and the distance between adjacent peripheral small holes is 400 - 500 mm. The 16 peripheral small holes are arranged in a "rice" shape around the relief holes. The 8 holes in the innermost circle adjacent to the relief holes are numbered 1, 2, 3, 4, 5, 6, 7, 8 in sequence from left to right and from top to bottom. The 8 holes in the outer circle are numbered 9, 10, 11, 12, 13, 14, 15, 16 in sequence from left to right and from top to bottom. S5. After the construction of the relief holes and peripheral small holes in the first sub - area is completed, construct the relief holes and peripheral small holes in the remaining sub - areas in sequence from the middle to the two sides. The blast - hole structure of each sub - area is the same. S6. After the blast - hole construction in each area is completed, carry out the charging and blasting operation. Design detonators in the blast holes, and control the millisecond interval between each area to be 25 ms - 50 ms. S7. Charge the explosives, and all sub - areas are detonated simultaneously to complete the overall ore caving in one blast. S8. Finally, carry out the stope ore - drawing operation, and draw the ore in a retreating manner from the ore - drawing access drifts on both sides. In step S1, the stope is divided into 5 zones along the length direction of the stope, namely, the first zone in the middle, the second zone and the third zone on both sides of the first zone, the fourth zone on the other side of the second zone, and the fifth zone on the other side of the third zone; wherein, holes 2, 4, 5, and 7 of the first zone are designed with 1 section of detonators, holes 1, 3, 6, and 8 are designed with 2 sections of detonators, holes 9-16 are designed with 3 sections of detonators, and the micro-difference interval of each section is 50ms; holes 2, 4, 5, and 7 of the second zone are designed with 4 sections of detonators, holes 1, 3, 6, and 8 are designed with 5 sections of detonators, holes 9-16 are designed with 6 sections of detonators, and the micro-difference interval of each section is 50ms. The micro-difference interval is 50ms; in the third sub-area, holes 2, 4, 5, and 7 are designed with 7 sections of detonators, holes 1, 3, 6, and 8 are designed with 8 sections of detonators, and holes 9-16 are designed with 9 sections of detonators, with each section having a micro-difference interval of 50ms; in the fourth sub-area, holes 2, 4, 5, and 7 are designed with 10 sections of detonators, holes 1, 3, 6, and 8 are designed with 11 sections of detonators, and holes 9-16 are designed with 12 sections of detonators, with each section having a micro-difference interval of 50ms; in the fifth sub-area, holes 2, 4, 5, and 7 are designed with 13 sections of detonators, holes 1, 3, 6, and 8 are designed with 14 sections of detonators, and holes 9-16 are designed with 15 sections of detonators, with each section having a micro-difference interval of 50ms.

2. The method for one-time ore dropping by medium-deep hole zoning blasting according to claim 1 is characterized by: When the mining area is divided into 4 or 6 subareas along the length direction of the mining area, the other of the two subareas in the middle position is the second subarea.

3. The method for one-time ore dropping by medium-deep hole zoning blasting according to claim 1 is characterized in that: The blasting uses No. 2 rock ammonium nitrate explosive, and the detonator uses digital electronic detonator.

4. The method for one-time ore dropping by medium-deep hole zoning blasting according to claim 1 is characterized in that: When the length of the mining area is 15-20m, the mining area is divided into 4 to 5 sub-areas along the length of the mining area; when the length of the mining area is 20-30m, the mining area is divided into 6 to 7 sub-areas along the length of the mining area.

5. The method for one-time ore dropping by medium-deep hole zoning blasting according to claim 1 is characterized in that: The specifications of each of the partitions are the same.

6. The method for one-time ore dropping by medium-deep hole zoning blasting according to claim 1 is characterized by: The partition is a diamond-shaped stope.

7. The method for one-time ore dropping by medium-deep hole zoning blasting according to claim 1 is characterized in that: In each partition, the number of the compensating large holes is one.

Citation Information

Patent Citations

  • One-time forming construction method for medium-length hole cable-stayed groove

    CN117386364A

  • Method for recycling ore pillars by middle-deep hole and deep hole united blasting technique

    CN102808622A

  • Underground metal mine stage stoping deep hole cutting and slot broaching method

    CN113898345A