An optimization scheduling method and system based on partitioned virtual power plant
By constructing a virtual power plant network and an incremental dispatching demand response scheme for virtual power plant partitions, the problems of data intensity differences and large load demands in virtual power plant dispatching optimization are solved, and the grid dispatching efficiency and power quality are improved.
Patent Information
- Application Number
- CN202410781961.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-18
AI Technical Summary
The existing virtual power plant dispatching optimization method based on distributed energy classification and aggregation cannot effectively cope with the differences in data density between differently distributed virtual power sources, resulting in poor clustering results and inability to guarantee the needs of large loads in the overall power grid operation. , resulting in low power grid dispatching efficiency and failure to achieve conservation purposes.
An optimized dispatching method based on partitioned virtual power plants is used to construct a virtual power plant network. Through load transfer between lower levels and incremental dispatching demand response of virtual power plant partitions, the optimal response plan for virtual power plant partitions is determined, resource allocation is optimized, and power is satisfied. Balance conditions and modify the dispatch model based on maximizing operational benefits.
It improves the participation efficiency of virtual power plants in power grid regulation, reduces the impact of resource dispersion on dispatching, ensures the maximization of operating income and grid volume, and at the same time improves the reliability of power grid operation and power quality.
Smart Images

Figure CN118350613B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of electric power automation, and in particular, relates to an optimization scheduling method and system based on a partitioned virtual power plant. Background Art
[0002] Renewable energy generation has limited predictability and has obvious intermittent and volatile characteristics compared to traditional thermal power generating units. In order to reduce the peak-to-valley difference in power grid operation, achieve effective absorption of renewable energy, and improve the stability and economy of power system operation, the concept of virtual power plants came into being. Through advanced communication technology, virtual power plants aggregate various flexible loads, distributed power sources, energy storage systems, etc. in the region into a whole, achieve efficient energy interaction, and improve the stability of power system operation. Flexible loads and energy storage systems in virtual power plants are considered to be two key and potentially huge adjustable resources. Compared with dispersed load-side resources, virtual power plants aggregated into an organic whole can better participate in the electricity market.
[0003] In the prior art, a virtual power plant scheduling optimization method based on distributed energy classification and aggregation constructs multiple virtual power plants through a density clustering method, and constructs an internal optimization model of the virtual power plant with the minimum optimal control of power generation cost as the objective function. Finally, a particle swarm optimization algorithm is used for resource allocation, and overall constraints such as spare capacity and spare adjustment ratio in the real-time power market are also considered. However, the prior art constructs an internal optimization model of the virtual power plant with the minimum optimal control of power generation cost as the objective function, and the density peak clustering algorithm has a large difference in data density between clusters for virtual power sources with different distributions, and cannot obtain a good clustering effect. Therefore, the subsequent ArcGIS spatial analysis will lead to greater calculation errors and is not suitable for the characteristics of partitioned virtual power plants. The virtual power plant operation system based on multi-objective functions has a control device independent of each distribution source to extract multi-objective functions for maximizing profits and minimizing costs, and generate strategies for distribution source operations. The VPP management device collects the power, life cost and operation status information of the corresponding distributed resources from each resource control unit of the load, the power generation source and the energy storage system. Its core is to increase the probability of selection of projects with greater benefits through weight determination units, but it does not consider how to ensure the demand for larger loads in the operation of the overall power grid system. The weight design that only considers the maximization of benefits may lead to low efficiency of the overall power grid dispatching and fail to achieve the general goal of saving. Summary of the invention
[0004] In order to solve the deficiencies in the prior art, the present invention provides an optimization scheduling method and system based on a partitioned virtual power plant. By constructing a partitioned virtual power plant network and reasonably dividing the internal unit power supply, the optimal response to the incremental scheduling demand is obtained by optimizing the model function, which can be used as a reference for the upper-level dispatching and lower-level aggregation operators to invest in or operate the virtual power plant.
[0005] The present invention adopts the following technical solution.
[0006] The present invention proposes an optimization scheduling method based on a partitioned virtual power plant, comprising:
[0007] Constructing a virtual power plant network, the virtual power plant network comprising: an upper ring network, a plurality of lower levels subordinate to the upper ring network, each lower level comprising a plurality of virtual power plant partitions subordinate to the lower level;
[0008] Obtain the load of the lower level; when the load of the lower level is greater than the set threshold, the lower level transfers the load to the adjacent lower level; if the load of the lower level after the load transfer is greater than the set threshold, respond to the incremental dispatch demand in the sending area of each virtual power plant under the lower level;
[0009] When each virtual power plant partition receives an incremental dispatch demand, the optimal response plan of the virtual power plant partition to the incremental dispatch demand is determined based on maximizing the operating benefits of the virtual power plant partition;
[0010] Under the optimal response scheme of virtual power plant partitions to incremental scheduling demand, the benefits of virtual power plant partitions participating in demand response are calculated, which together with the optimal response scheme of virtual power plant partitions to incremental scheduling demand constitute an optimized scheduling scheme based on partitioned virtual power plants.
[0011] Preferably, the load of the lower level is obtained; when the load of the lower level is greater than a set threshold, the lower level transfers the load to an adjacent lower level; if the load of the lower level after the load transfer is greater than the set threshold, an incremental dispatch demand response within the sending area is sent to each virtual power plant partition under the lower level, including:
[0012] Obtain the maximum load value of the lower level. When the maximum load value of the lower level is greater than the set threshold, adjust the power generation operation curve of each virtual power plant partition under the lower level, and determine whether the lower level meets the power balance condition;
[0013] When the lower level does not meet the power balance condition, the lower level is determined to be overloaded, and the power load of the virtual power plant partition under the lower level is transferred to the virtual power plant partitions under other lower levels;
[0014] After load transfer, if the power balance condition is not met at the lower level, the incremental dispatch demand response within the partition sending area of each virtual power plant under the lower level is implemented.
[0015] Preferably, the power balance condition satisfies the following relationship:
[0016] ,
[0017] In the formula, express Time period The active power output of the power units in the virtual power plant partition, express Time period The active power adjustable variable output by the power units in the virtual power plant partition, express Time period Real-time active power output by power units within the virtual power plant partition; is the number of virtual power plant partitions belonging to the same lower level, Indicates the virtual power plant partitions belonging to the same lower level. The total active load of the time period, Indicates the virtual power plant partitions belonging to the same lower level. The total amount of active network loss during the period.
[0018] Preferably, the power load of the virtual power plant partition under the lower level is transferred to the virtual power plant partition under other lower levels, including:
[0019] Transfer load to the virtual power plant partition under the next level with the closest electrical distance and meet the transmission line power constraint of the tie line:
[0020] ,
[0021] In the formula, For the period line The transfer load power; For line transmission power.
[0022] Preferably, when each virtual power plant partition receives an incremental dispatch demand, based on maximizing the operating benefit of the virtual power plant partition, an optimal response plan of the virtual power plant partition to the incremental dispatch demand is determined, including:
[0023] Obtain electricity prices and load change subsidy electricity prices, and obtain electricity consumption information within the virtual power plant partition;
[0024] Based on the acquired data, an operation benefit optimization model of the virtual power plant partition is established; and the operation benefit optimization model is corrected based on the power generation difference model of renewable energy;
[0025] The electricity consumption information in the area when the modified operation benefit optimization model reaches the maximum value is used as the optimal response plan of the virtual power plant partition to the incremental scheduling demand.
[0026] Preferably, the electricity price and the load change subsidy electricity price are the electricity price forecast value and the load change subsidy electricity price forecast value obtained in each preset period;
[0027] The power consumption information in the virtual power plant partition includes: the power generation of each single power source of multiple distributed power sources in a preset period, the load change of each single load of multiple loads in a preset period, and the charging and discharging amount of each single energy storage device of multiple energy storage devices in a preset period;
[0028] Preferably, the operation benefit optimization model satisfies the following relationship:
[0029] ,
[0030] Where Yn is the operating benefit of the virtual power plant partition, For a single time period in a preset period, A single time period The optimization period t that constitutes the optimization model; is the total power generation of multiple distributed power sources, is the total discharge capacity of multiple energy storage devices, △P is the total load change of multiple loads, is the total charge capacity of multiple energy storage devices, For each preset period, the electricity price forecast value is The predicted value of the load change subsidy electricity price for each preset period.
[0031] Preferably, under the optimal response scheme of the virtual power plant partition to the incremental scheduling demand, the benefits of the transferable loads within the virtual power plant partition participating in the demand response include: the benefits of multiple energy storage devices participating in the price-type demand response and the benefits of multiple energy storage devices participating in the incentive-type demand response.
[0032] Preferably, multiple energy storage devices participate in the price-based demand response benefit, satisfying the following relationship:
[0033] ,
[0034] In the formula, Indicates user the benefits of participating in price-based demand response; , They represent the user’s In the period The charging and discharging prices; and They represent the user’s In the period The charging load and discharging load; and After participating in price-based demand response, users In the period The charging and discharging prices; and After participating in price-based demand response, users In the period of charging load and discharging load.
[0035] Preferably, multiple energy storage devices participate in the incentive-based demand response benefit, satisfying the following relationship:
[0036] ,
[0037] In the formula, Indicates user the benefits of participating in incentive-based demand response; and Respectively represent users In the period The upper spinning reserve capacity and lower spinning reserve capacity provided when participating in incentivized demand response; and Respectively represent users In the period the price of up and down spinning reserve provided in response to system demand; is the electricity price discount rate, is the high price compensation rate, Indicates the time period within 24 hours of a day Non-repeating time periods.
[0038] Preferably, under the optimal response scheme of the virtual power plant partition to the incremental scheduling demand, the benefits of the non-transferable loads participating in the demand response within the virtual power plant partition include: the benefits of the non-transferable loads participating in the incentive-type demand response and the electricity cost savings of the non-transferable loads.
[0039] Preferably, the non-transferable load participates in the incentive-based demand response benefit, satisfying the following relationship:
[0040] ,
[0041] In the formula, Indicates user the benefits of participating in incentive-based demand response; Indicates user Participation in incentive-based demand response during the period the amount of spinning reserve capacity provided; Indicates user Participation in incentive-based demand response during the period The spinning reserve capacity provided; and Respectively represent users After participating in the incentive demand response, and time period The price corresponding to the upper and lower spinning reserve capacity provided.
[0042] Preferably, the non-transferable load saves electricity cost and satisfies the following relationship:
[0043] ,
[0044] In the formula, Indicates user The electricity cost saved after participating in incentive-based demand response is mainly determined by the reduction in electricity consumption and electricity prices; and Respectively represent users After participating in the incentive demand response, And the unit electricity cost in time period t.
[0045] The present invention also proposes an optimization dispatching system based on a partitioned virtual power plant, comprising:
[0046] Virtual power plant network establishment module, incremental scheduling demand response module, optimal response plan module, and optimized scheduling plan module;
[0047] A virtual power plant network establishment module is used to construct a virtual power plant network, the virtual power plant network includes: an upper ring network, multiple lower levels subordinate to the upper ring network, and each lower level includes multiple virtual power plant partitions subordinate to the lower level;
[0048] The incremental dispatch demand response module is used to obtain the load of the lower level; when the load of the lower level is greater than the set threshold, the lower level transfers the load to the adjacent lower level; if the load of the lower level after the load transfer is greater than the set threshold, the incremental dispatch demand response within the sending area is sent to each virtual power plant partition under the lower level;
[0049] The optimal response plan module is used to determine the optimal response plan of each virtual power plant partition to the incremental dispatch demand based on maximizing the operating benefits of the virtual power plant partition when each virtual power plant partition receives the incremental dispatch demand;
[0050] The optimization scheduling scheme module is used to calculate the benefits of virtual power plant partitions participating in demand response under the optimal response scheme of virtual power plant partitions to incremental scheduling demand, and together with the optimal response scheme of virtual power plant partitions to incremental scheduling demand, it constitutes an optimized scheduling scheme based on partitioned virtual power plants.
[0051] A terminal comprises a processor and a storage medium; the storage medium is used to store instructions; the processor is used to operate according to the instructions to execute the steps of a method.
[0052] A computer-readable storage medium stores a computer program, which implements the steps of the method when executed by a processor.
[0053] The beneficial effects of the present invention are that, compared with the prior art, it at least includes strengthening the two-way data interaction between massive distributed resources and power grid dispatching and power trading platforms when virtual power plants participate in power grid regulation, avoiding the impact of the dispersion of resource locations within the virtual power plant on dispatching, ensuring both the operating income of the virtual power plant operating organization and the maximization of the amount of online access, while also ensuring the reliability and stability of the power plant network operation according to the influence of weather and other external factors; the dispatching scheme given by the method proposed in the present invention also improves the power quality of the virtual power plant partitions, and the power consumption control of the lower level is integrated into the higher-level dispatching system. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 The present invention proposes a flow chart of an optimization scheduling method based on a partitioned virtual power plant;
[0055] Figure 2 is a reference structure diagram of a partitioned virtual power plant network in an embodiment of the present invention;
[0056] Figure 3 It is a network structure diagram of the intra-district virtual power plant in an embodiment of the present invention. DETAILED DESCRIPTION
[0057] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in this application are only embodiments of a part of the present invention, rather than all embodiments. Based on the spirit of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the protection scope of the present invention.
[0058] The present invention proposes an optimization scheduling method based on partitioned virtual power plants, such as Figure 1 As shown, the optimization scheduling method includes:
[0059] Step 1, constructing a virtual power plant network, the virtual power plant network comprising: an upper ring network, a plurality of lower levels subordinate to the upper ring network, each lower level comprising a plurality of virtual power plant partitions subordinate to the lower level;
[0060] In a non-limiting preferred embodiment, the distribution network is divided into an upper ring network and a lower level according to voltage level, wherein the voltage level of the lower level is lower than the voltage level of the upper ring network, and the lower level is connected to the upper ring network.
[0061] The distribution network partitioning results are mainly related to the network topology and network flow state. The urban distribution network adopts radial power supply. In order to adapt to the fluctuation of load power, the operation state of the distribution network often changes in a shorter time scale. On the other hand, the load characteristics have obvious seasonality, and the load curve will change greatly with the fluctuation of the season. In addition, with the continuous increase in the penetration rate of distributed photovoltaic, electric vehicle energy storage equipment and individual participation, their impact on the power grid flow cannot be ignored. Obviously, the static flow of a single time section cannot meet the long-term power grid operation requirements, so dynamic partitioning must be adopted. In order to maintain the connectivity and stability of the control, the partitioning of the distribution network should not be changed frequently. Therefore, when the operation state of the urban distribution network undergoes a large adjustment or the photovoltaic output and load demand change greatly with the season, the partitioning results of the urban distribution network are updated.
[0062] The virtual power plant network constructed by the present invention is a dispatch-oriented network structure that will not be affected by the dynamic partitioning of the distribution network. Moreover, the construction of the virtual power plant network is the basis for achieving hierarchical response. Only on the virtual power plant network provided by the present invention can the optimal response scheme of the virtual power plant partitions defined in the subsequent steps to the incremental dispatch demand be achieved.
[0063] In a non-limiting preferred embodiment, for a certain power grid hierarchical partition, Figure 2 As shown, the upper ring network includes the 500kV substation in the 500kV ring network, and the lower level includes the 220kV voltage layer power supply. Below the 220kV voltage layer is the area where the virtual power plant is accessed by partitions, including: , , The operation of the virtual power plant first affects the load changes in the power supply area where it is located. Therefore, the virtual power plant network needs to be constructed in layers and partitions to delay the expansion of substations and save investment.
[0064] Step 2, obtain the load of the lower level; when the load of the lower level is greater than the set threshold, the lower level transfers the load to the adjacent lower level; if the load of the lower level after the load transfer is greater than the set threshold, the incremental scheduling demand response within the sending area of each virtual power plant partition under the lower level is sent.
[0065] Specifically, step 2 includes:
[0066] Step 2.1, obtain the maximum load value of the lower level. When the maximum load value of the lower level is greater than the set threshold, adjust the power generation operation curve of each virtual power plant partition under the lower level, and determine whether the lower level meets the power balance condition; the set threshold is the maximum power supply capacity of all virtual power plant partitions under the lower level.
[0067] The power balance condition satisfies the following relationship:
[0068] ,
[0069] In the formula, express Time period The active power output of the power units in the virtual power plant partition, express Time period The active power adjustable variable output by the power units in the virtual power plant partition, express Time period Real-time active power output by power units within the virtual power plant partition; is the number of virtual power plant partitions belonging to the same lower level, Indicates the virtual power plant partitions belonging to the same lower level. The total active load of the time period, Indicates the virtual power plant partitions belonging to the same lower level. The total amount of active network loss during the period.
[0070] Among them, the active power output of the power units in the virtual power plant partition meets the following constraints:
[0071] ,
[0072] In the formula, , Respectively represent The lower and upper limits of the active power output of the power units within the virtual power plant partition.
[0073] Step 2.2, when the lower level does not meet the power balance condition, the lower level is determined to be overloaded, and the power load of the virtual power plant partition under the lower level is transferred to the virtual power plant partitions under other lower levels;
[0074] Specifically, the load is preferentially transferred to the virtual power plant partitions under the next-level hierarchy with the closest electrical distance, and the transmission line power constraints of the tie line are met:
[0075] ,
[0076] In the formula, For the period line The transfer load power; For line transmission power.
[0077] Step 2.3, after the load transfer, if the lower level does not meet the power balance condition, the incremental dispatch demand response within the zone of each virtual power plant under the lower level is sent.
[0078] In the embodiment, when constructing a hierarchical partition structure, the problem of overload is solved as follows: Figure 2 The grid structure shown is an example: when 110kV substation A may face problems such as excessive load rate, the adjustable resources in the power supply area under the jurisdiction of substation A are aggregated and constructed, and power is supplied to the lower level at the same time as substation A to alleviate the overload problem of substation A; similarly, when 220kV substation B may face problems such as excessive load rate, the adjustable resources in the power supply area under the jurisdiction of its subordinate 110kV or 35kV substation are aggregated and constructed, and power is supplied to the lower level substation at the same time as substation B to alleviate the overload problem faced by substation B; when 500kV substation C may face the problem of excessive load rate, the changes of all adjustable loads in the power supply area under its jurisdiction will affect the load rate of substation C. These adjustable resources are aggregated and constructed according to demand, and are used as a power source together with substation C to supply power to the lower level.
[0079] Step 3: When each virtual power plant partition receives an incremental dispatch demand, the optimal response plan of the virtual power plant partition to the incremental dispatch demand is determined based on maximizing the operating efficiency of the virtual power plant partition.
[0080] Specifically, the incremental scheduling demand is used to construct virtual power plant power units to be put into use in the area. Demand response is used to determine whether to connect new power units in the area or whether to build new virtual power units. It can also provide optimization suggestions for the operation of existing virtual power units.
[0081] Specifically, step 3 includes:
[0082] Step 3.1, obtain the electricity price and load change subsidy electricity price, and obtain the electricity consumption information in the virtual power plant partition;
[0083] Specifically, the electricity price and the load change subsidy electricity price are the electricity price forecast value and the load change subsidy electricity price forecast value obtained in each preset period.
[0084] In a non-limiting preferred embodiment, the virtual power plant partition includes multiple distributed power sources, multiple loads, multiple energy storage devices and a management terminal, wherein the management terminal controls the multiple distributed power sources, multiple loads and multiple energy storage devices within the area to determine the optimal response plan for the incremental scheduling demand; the power consumption information within the virtual power plant partition includes but is not limited to: the power generation of each single power source of the multiple distributed power sources during a preset period, the load change of each single load of the multiple loads during a preset period, and the charging and discharging amount of each single energy storage device of the multiple energy storage devices during a preset period.
[0085] Step 3.2, based on the acquired data, establish an operation benefit optimization model of the virtual power plant partition; and modify the operation benefit optimization model based on the power generation difference model of renewable energy;
[0086] The operation benefit optimization model satisfies the following relationship:
[0087] ,
[0088] Where Yn is the operating benefit of the virtual power plant partition, For a single time period in a preset period, A single time period The optimization period t that constitutes the optimization model; is the total power generation of multiple distributed power sources, is the total discharge capacity of multiple energy storage devices, △P is the total load change of multiple loads, is the total charge capacity of multiple energy storage devices, For each preset period, the electricity price forecast value is The predicted value of the load change subsidy electricity price for each preset period.
[0089] In the operation benefit optimization model, multiple distributed power sources include non-renewable energy and renewable energy; non-renewable energy includes traditional power units. When constructing the optimization model, the traditional power units in the upper ring network are classified into this group. Considering the integrity of its original information data, non-renewable energy participates in the calculation of the optimization model as a whole, which facilitates subsequent optimization calculations; renewable energy includes but is not limited to: photovoltaic energy, wind power generation, biomass power generation, geothermal energy, etc. Since the purpose of building a partitioned virtual power plant is to cluster electric energy different from traditional power units, all newly added adjustable power units are classified as renewable energy for subsequent optimization calculations.
[0090] The total power generation of multiple distributed power sources is divided into the power generation of non-renewable energy and the power generation of renewable energy, and the operation benefit optimization model is corrected based on the power generation difference model of renewable energy, thereby facilitating the calculation of the operation benefit optimization model, reducing the amount of data and calculation, and increasing the accuracy of the optimization results.
[0091] The input data of the renewable energy power generation difference model include but are not limited to external environmental data (such as weather, electricity prices and external intervention factors). The first item in the optimization model is Converted into the following relationship:
[0092] ,
[0093] In the formula, represents the electricity generation from non-renewable energy sources, Represents the amount of electricity generated by renewable energy.
[0094] In step 3.3, the power consumption information in the area when the modified operation benefit optimization model reaches the maximum value is used as the optimal response plan of the virtual power plant partition to the incremental scheduling demand.
[0095] The modified optimization model reaches the maximum value and satisfies the following relationship:
[0096] ,
[0097] The incremental dispatch demand response proposed in the present invention has a positive interest-related effect on the virtual power plant operator. In order to obtain operating benefits, the virtual power plant operator needs to ensure the maximization of the amount of grid access. That is, under the premise of the influence of other variables, the function of maximizing the utilization of incremental power is obtained to maximize the utilization of incremental partitioned power.
[0098] Step 4: Under the optimal response scheme of the virtual power plant partition to the incremental dispatch demand, calculate the benefit of the virtual power plant partition participating in the demand response, and together with the optimal response scheme of the virtual power plant partition to the incremental dispatch demand, constitute an optimized dispatch scheme based on the partitioned virtual power plant.
[0099] Specifically, in the optimal response scheme of the virtual power plant partition to the incremental dispatch demand, the total discharge capacity of multiple energy storage devices is and the total charge of multiple energy storage devices , meeting the constraints of participating in price-type demand response benefits and participating in incentive-type demand response benefits.
[0100] The load within the virtual power plant zone includes transferable load and non-transferable load.
[0101] For transferable loads, electric vehicles and energy storage equipment can not only determine the charging and discharging behavior according to the real-time electricity price, but also respond to the system scheduling needs and temporarily charge or discharge. Not only can two-way power exchange be achieved, but also power transfer in time can be achieved. Therefore, this type of load can participate in price-based demand response and incentive-based demand response at the same time.
[0102] In a non-limiting preferred embodiment, the multiple energy storage devices are electric vehicle energy storage devices, and in the optimization model, the total discharge capacity of the multiple energy storage devices is and the total charge of multiple energy storage devices It is constrained by the benefits of participating in price-based demand response and the benefits of participating in incentive-based demand response.
[0103] The benefits of multiple energy storage devices participating in price-based demand response satisfy the following relationship:
[0104] ,
[0105] In the formula, Indicates user the benefits of participating in price-based demand response; , They represent the user’s In the period The charging and discharging prices; and They represent the user’s In the period The charging load and discharging load; and After participating in price-based demand response, users In the period The charging and discharging prices; and After participating in price-based demand response, users In the period of charging load and discharging load.
[0106] Among them, users After participating in price-based demand response, The load satisfies the following relationship:
[0107] ,
[0108] In the formula, and Respectively represent users Before and after participating in price-based demand response Load; and Respectively represent users Before and after participating in price-based demand response The price corresponding to the load; For users In the period The price elasticity of For users In the period For the time period price elasticity.
[0109] Also, users After participating in price-based demand response, The load satisfies the following relationship:
[0110] ,
[0111] The benefits of multiple energy storage devices participating in the incentive-based demand response satisfy the following relationship:
[0112] ,
[0113] In the formula, Indicates user the benefits of participating in incentive-based demand response; and Respectively represent users In the period The upper spinning reserve capacity and lower spinning reserve capacity provided when participating in incentivized demand response; and Respectively represent users In the period the price of up and down spinning reserve provided in response to system demand; is the electricity price discount rate, is the high price compensation rate, Indicates the time period within 24 hours of a day Non-repeating time periods.
[0114] For non-transferable loads, such as commercial users, whose electricity consumption periods are relatively fixed, it is difficult to transfer loads. When responding to system dispatching requirements, they can generally only increase or decrease electricity loads. Therefore, such users can only participate in incentive-based demand response. The main demand response benefits include the benefits of participating in incentive-based demand response and saving electricity costs.
[0115] Among them, the benefits of non-transferable loads participating in incentive-based demand response satisfy the following relationship:
[0116] ,
[0117] In the formula, Indicates user the benefits of participating in incentive-based demand response; Indicates user Participation in incentive-based demand response during the period the amount of spinning reserve capacity provided; Indicates user Participation in incentive-based demand response during the period The spinning reserve capacity provided; and Respectively represent users After participating in the incentive demand response, and time period The price corresponding to the upper and lower spinning reserve capacity provided.
[0118] The non-transferable load saves electricity cost and satisfies the following relationship:
[0119] ,
[0120] In the formula, Indicates user The electricity cost saved after participating in incentive-based demand response is mainly determined by the reduction in electricity consumption and electricity prices; and Respectively represent users After participating in the incentive demand response, And the unit electricity cost in time period t, that is, the electricity price.
[0121] By calculating the benefits of virtual power plant partitions participating in demand response under the optimal response plan of virtual power plant partitions to incremental scheduling demands, and together with the optimal response plan of virtual power plant partitions to incremental scheduling demands, an optimized scheduling plan based on partitioned virtual power plants is formed. The scheduling plan of the present invention also improves the power quality of virtual power plant partitions, making it easier for lower-level power consumption control to be integrated into higher-level scheduling systems.
[0122] Based on the optimized dispatching scheme obtained by the method proposed in the present invention, the dispatching agency publishes the next-day baseline for the partitions with load gaps according to the needs of the power grid, and organizes load aggregators to make market declarations. The declaration information includes:
[0123] (1) Adjustable capacity. The responsive capacity of a virtual power plant is the sum of the responsive capacities of all the combined responsive resources, in MW.
[0124] (2) Adjustable time periods. At present, the default responsive time period is the published demand response time period;
[0125] (3) Declared price. In the initial stage of market construction, an upper limit for the declared price is set. That is, when the demand period published by the dispatch is greater than or equal to the preset hours, the upper limit for the declared price is the first preset price; when the demand period published by the dispatch is less than the preset hours, the upper limit for the declared price is the second preset price.
[0126] The above declared information can be used as reference information for power generation, scheduling model calculation time period, and actual and predicted price factors.
[0127] The incremental dispatch demand response in the region has a positive interest-related effect on the virtual power plant operator. In order to achieve operational benefits, the virtual power plant operator needs to ensure the maximization of the amount of grid-connected power. According to the influence of weather and other external factors, the reliability and stability of the power plant network operation must also be ensured. The dispatch also has basic requirements for the power quality of the virtual power plant partition. At the same time, the power consumption control at the lower level should also be integrated into the higher-level dispatch system as much as possible, such as municipal dispatch, provincial dispatch (regional dispatch) or large regional dispatch center.
[0128] In most cases, the load change takes into account the load reduction of the zone operator, which leads to a passive reduction in the power output. The upper-level power purchasing company needs to subsidize the electricity price for this part of the output to maintain the enthusiasm of the lower-level operators. Since there are many different types of power units in the zone, the setting of this part is a necessary means to ensure that each power unit in the zone participates in the virtual power plant zone in the area.
[0129] In actual operation, the electricity price forecasting module is connected to the relevant electricity price management system for grid operation and forecasting, and receives relevant electricity price information to obtain the predicted electricity price and load change subsidy electricity price for each preset period.
[0130] The present invention also proposes an optimization dispatching system based on a partitioned virtual power plant, comprising:
[0131] Virtual power plant network establishment module, incremental scheduling demand response module, optimal response plan module, and optimized scheduling plan module;
[0132] A virtual power plant network establishment module is used to construct a virtual power plant network, the virtual power plant network includes: an upper ring network, multiple lower levels subordinate to the upper ring network, and each lower level includes multiple virtual power plant partitions subordinate to the lower level;
[0133] The incremental dispatch demand response module is used to obtain the load of the lower level; when the load of the lower level is greater than the set threshold, the lower level transfers the load to the adjacent lower level; if the load of the lower level after the load transfer is greater than the set threshold, the incremental dispatch demand response within the sending area is sent to each virtual power plant partition under the lower level;
[0134] The optimal response plan module is used to determine the optimal response plan of each virtual power plant partition to the incremental dispatch demand based on maximizing the operating benefits of the virtual power plant partition when each virtual power plant partition receives the incremental dispatch demand;
[0135] The optimization scheduling scheme module is used to calculate the benefits of virtual power plant partitions participating in demand response under the optimal response scheme of virtual power plant partitions to incremental scheduling demand, and together with the optimal response scheme of virtual power plant partitions to incremental scheduling demand, it constitutes an optimized scheduling scheme based on partitioned virtual power plants.
[0136] In a non-limiting preferred embodiment, Figure 3 The virtual power plant network in the area shown includes multiple distributed power sources, multiple loads, multiple energy storage devices and management terminals; the management terminal controls multiple distributed power sources, multiple loads, and multiple energy storage devices in the area to determine the optimal response plan for the incremental scheduling demand. The management terminal includes an electricity price prediction module, a data acquisition module, and an optimization calculation generation module; the control method of the management terminal includes: predicting the electricity price and load change subsidy electricity price for each preset period through the electricity price prediction module; and obtaining the electricity consumption information in the area through the data acquisition module. In most cases of load change, the load reduction of the partition operator is considered to lead to the passive reduction of the power output. The upper-level power purchaser needs to subsidize the electricity price for this part of the output to maintain the enthusiasm of the lower-level operator. Since there are many different types of power units in the partition, the setting of this part is a necessary means to ensure that each power unit in the partition participates in the virtual power plant partition in the area. In actual operation, the electricity price prediction module is connected to the relevant electricity price management system for grid operation and prediction, and receives relevant electricity price information to obtain the predicted electricity price and load change subsidy electricity price for each preset period.
[0137] The present disclosure may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present disclosure.
[0138] A computer-readable storage medium may be a tangible device that can hold and store instructions used by an instruction execution device. A computer-readable storage medium may be, for example, but not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the above. More specific examples (a non-exhaustive list) of computer-readable storage media include: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a static random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanical encoding device, such as a punch card or a raised structure in a groove on which instructions are stored, and any suitable combination of the above. The computer-readable storage medium used herein is not to be interpreted as a transient signal itself, such as a radio wave or other freely propagating electromagnetic wave, an electromagnetic wave propagating through a waveguide or other transmission medium (e.g., a light pulse through a fiber optic cable), or an electrical signal transmitted through a wire.
[0139] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to each computing / processing device, or downloaded to an external computer or external storage device via a network, such as the Internet, a local area network, a wide area network, and / or a wireless network. The network can include copper transmission cables, optical fiber transmissions, wireless transmissions, routers, firewalls, switches, gateway computers, and / or edge servers. The network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards the computer-readable program instructions for storage in the computer-readable storage medium in each computing / processing device.
[0140] The computer program instructions for performing the operations of the present disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages, such as Smalltalk, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. The computer-readable program instructions may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer, partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect through the Internet). In some embodiments, by using the state information of the computer-readable program instructions to personalize an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA), the electronic circuit may execute the computer-readable program instructions, thereby implementing various aspects of the present disclosure.
[0141] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. An optimization scheduling method based on partitioned virtual power plants, characterized in that: include: Constructing a virtual power plant network, the virtual power plant network comprising: an upper ring network, a plurality of lower levels subordinate to the upper ring network, each lower level comprising a plurality of virtual power plant partitions subordinate to the lower level; Obtain the load of the lower level; when the load of the lower level is greater than the set threshold, the lower level transfers the load to the adjacent lower level; if the load of the lower level after the load transfer is greater than the set threshold, respond to the incremental dispatch demand in the sending area of each virtual power plant under the lower level; When each virtual power plant partition receives an incremental dispatch demand, based on maximizing the operating benefits of the virtual power plant partition, the optimal response plan of the virtual power plant partition to the incremental dispatch demand is determined; including: obtaining the electricity price and the load change subsidy electricity price, and obtaining the power consumption information within the virtual power plant partition; based on the acquired data, establishing an operation benefit optimization model for the virtual power plant partition; and correcting the operation benefit optimization model based on the renewable energy power generation difference model; using the power consumption information within the zone when the corrected operation benefit optimization model reaches the maximum value as the optimal response plan of the virtual power plant partition to the incremental dispatch demand; wherein the operation benefit optimization model satisfies the following relationship: Where Yn is the operating benefit of the virtual power plant partition, For a single time period in a preset period, A single time period The optimization period t that constitutes the optimization model; is the total power generation of multiple distributed power sources, is the total discharge capacity of multiple energy storage devices, △P is the total load change of multiple loads, is the total charge capacity of multiple energy storage devices, For each preset period, the electricity price forecast value is The forecast value of the load change subsidy electricity price for each preset period; Under the optimal response scheme of virtual power plant partitions to incremental scheduling demand, the benefits of virtual power plant partitions participating in demand response are calculated, which together with the optimal response scheme of virtual power plant partitions to incremental scheduling demand constitute an optimized scheduling scheme based on partitioned virtual power plants.
2. The optimization scheduling method based on partitioned virtual power plant according to claim 1 is characterized in that: Obtain the load of the lower level; when the load of the lower level is greater than the set threshold, the lower level transfers the load to the adjacent lower level; if the load of the lower level after the load transfer is greater than the set threshold, respond to the incremental dispatch demand in the sending area of each virtual power plant under the lower level, including: Obtain the maximum load value of the lower level. When the maximum load value of the lower level is greater than the set threshold, adjust the power generation operation curve of each virtual power plant partition under the lower level, and determine whether the lower level meets the power balance condition; When the lower level does not meet the power balance condition, the lower level is determined to be overloaded, and the power load of the virtual power plant partition under the lower level is transferred to the virtual power plant partitions under other lower levels; After load transfer, if the power balance condition is not met at the lower level, the incremental dispatch demand response within the partition sending area of each virtual power plant under the lower level is implemented.
3. The optimization scheduling method based on partitioned virtual power plants according to claim 2 is characterized in that: The power balance condition satisfies the following relationship: In the formula, express Time period The active power output of the power units in the virtual power plant partition, express Time period The active power adjustable variable output by the power units in the virtual power plant partition, express Time period Real-time active power output by power units within the virtual power plant partition; is the number of virtual power plant partitions belonging to the same lower level, Indicates the virtual power plant partitions belonging to the same lower level. The total active load of the time period, Indicates the virtual power plant partitions belonging to the same lower level. The total amount of active network loss during the period.
4. The optimization scheduling method based on partitioned virtual power plants according to claim 2 is characterized in that: Transferring the power load of the virtual power plant partition under the lower level to the virtual power plant partitions under other lower levels, including: Transfer load to the virtual power plant partition under the next level with the closest electrical distance and meet the transmission line power constraint of the tie line: In the formula, For the period line The transfer load power; For line transmission power.
5. The optimization scheduling method based on partitioned virtual power plant according to claim 1 is characterized in that: The electricity price and load change subsidy electricity price are the electricity price forecast values and load change subsidy electricity price forecast values obtained in each preset period; The electricity consumption information within the virtual power plant partition includes: the power generation of each single power source of multiple distributed power sources in a preset period, the load change of each single load of multiple loads in a preset period, and the charging and discharging amount of each single energy storage device of multiple energy storage devices in a preset period.
6. The optimization scheduling method based on partitioned virtual power plant according to claim 1 is characterized in that: Under the optimal response scheme of the virtual power plant partition to the incremental dispatch demand, the benefits of the transferable loads within the virtual power plant partition participating in the demand response include: the benefits of multiple energy storage devices participating in the price-type demand response and the benefits of multiple energy storage devices participating in the incentive-type demand response.
7. The optimization scheduling method based on partitioned virtual power plants according to claim 6 is characterized in that: The benefits of multiple energy storage devices participating in price-based demand response satisfy the following relationship: In the formula, Indicates user the benefits of participating in price-based demand response; , They represent the user’s In the period The charging and discharging prices; and They represent the user’s In the period The charging load and discharging load; and After participating in price-based demand response, users In the period The charging and discharging prices; and After participating in price-based demand response, users In the period of charging load and discharging load.
8. The optimization scheduling method based on partitioned virtual power plants according to claim 7 is characterized in that: The benefits of multiple energy storage devices participating in the incentive-based demand response satisfy the following relationship: In the formula, Indicates user the benefits of participating in incentivized demand response; and Respectively represent users In the period The upper spinning reserve capacity and lower spinning reserve capacity provided when participating in incentivized demand response; and Respectively represent users In the period the price of up and down spinning reserve provided in response to system demand; is the electricity price discount rate, is the high price compensation rate, Indicates the time period within 24 hours of a day Non-repeating time periods.
9. The optimization scheduling method based on partitioned virtual power plants according to claim 1 is characterized in that: Under the optimal response scheme of the virtual power plant partition to the incremental dispatch demand, the benefits of the non-transferable loads participating in the demand response within the virtual power plant partition include: the benefits of the non-transferable loads participating in the incentive-type demand response and the electricity cost savings of the non-transferable loads.
10. The optimization scheduling method based on partitioned virtual power plants according to claim 9 is characterized in that: The benefits of non-transferable loads participating in incentive-based demand response satisfy the following relationship: In the formula, Indicates user the benefits of participating in incentivized demand response; Indicates user Participation in incentive-based demand response during the period the amount of spinning reserve capacity provided; Indicates user Participation in incentive-based demand response during the period The spinning reserve capacity provided; and Respectively represent users After participating in the incentive demand response, and time period The prices corresponding to the upper and lower spinning reserve capacity provided; is the electricity price discount rate, The high price compensation rate.
11. The optimization scheduling method based on partitioned virtual power plants according to claim 10 is characterized in that: The non-transferable load saves electricity cost and satisfies the following relationship: In the formula, Indicates user The electricity cost saved after participating in incentive-based demand response is mainly determined by the reduction in electricity consumption and electricity prices; and Respectively represent users After participating in the incentive demand response, And the unit electricity cost in time period t.
12. An optimization dispatching system based on a partitioned virtual power plant, characterized in that: include: Virtual power plant network establishment module, incremental scheduling demand response module, optimal response plan module, and optimized scheduling plan module; A virtual power plant network establishment module is used to construct a virtual power plant network, the virtual power plant network includes: an upper ring network, multiple lower levels subordinate to the upper ring network, and each lower level includes multiple virtual power plant partitions subordinate to the lower level; The incremental dispatch demand response module is used to obtain the load of the lower level; when the load of the lower level is greater than the set threshold, the lower level transfers the load to the adjacent lower level; if the load of the lower level after the load transfer is greater than the set threshold, the incremental dispatch demand response within the sending area is sent to each virtual power plant partition under the lower level; The optimal response scheme module is used to determine the optimal response scheme of the virtual power plant partition to the incremental scheduling demand when each virtual power plant partition receives the incremental scheduling demand based on the maximization of the operation benefit of the virtual power plant partition; including: obtaining the electricity price and the load change subsidy electricity price, and obtaining the power consumption information in the virtual power plant partition; based on the acquired data, establishing the operation benefit optimization model of the virtual power plant partition; and correcting the operation benefit optimization model based on the power generation difference model of renewable energy; using the power consumption information in the area when the corrected operation benefit optimization model reaches the maximum value as the optimal response scheme of the virtual power plant partition to the incremental scheduling demand; wherein the operation benefit optimization model satisfies the following relationship: Where Yn is the operating benefit of the virtual power plant partition, For a single time period in a preset period, A single time period The optimization period t that constitutes the optimization model; is the total power generation of multiple distributed power sources, is the total discharge capacity of multiple energy storage devices, △P is the total load change of multiple loads, is the total charge capacity of multiple energy storage devices, For each preset period, the electricity price forecast value is The forecast value of the load change subsidy electricity price for each preset period; The optimization scheduling scheme module is used to calculate the benefits of virtual power plant partitions participating in demand response under the optimal response scheme of virtual power plant partitions to incremental scheduling demand, and together with the optimal response scheme of virtual power plant partitions to incremental scheduling demand, it constitutes an optimized scheduling scheme based on partitioned virtual power plants.
13. A terminal comprising a processor and a storage medium; characterized in that: The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 1 to 11.
14. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 11 are implemented.
Citation Information
Patent Citations
Regional power grid load transferring method
CN109768544A
Virtual power plant resource optimal configuration method and system
CN117973742A
High-load resource allocation method and system applied to grid-connected virtual power plant
CN118054392A
Systems and methods for grid management
US20200350764A1
Multi-energy distributed resource-oriented multi-level aggregation method and apparatus for virtual power plant, and storage medium
WO2023103862A1