Index acquisition method and system for passenger transport hub operation risk identification

By using indicator type confirmation, data collection, classification, screening, redistribution and evaluation modules in the passenger transport hub operation risk identification system, combined with the analytic hierarchy process and Pearson correlation coefficient, the problem of lack of real-time monitoring and early warning in traditional risk management methods is solved , achieving effective identification and assessment of risks in passenger transport hubs to ensure operational safety.

CN118350642BActive Publication Date: 2024-10-01RES INST OF HIGHWAY MINIST OF TRANSPORT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410592284.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2024-10-01
Estimated Expiration
2044-05-14

AI Technical Summary

Technical Problem

Traditional passenger transport hub risk management methods rely on empirical judgment and post-event analysis, lack real-time monitoring and early warning mechanisms, and cannot meet the needs of modern passenger transport hubs for efficient and systematic risk management, especially in large transportation hubs such as airports and railway stations, which may lead to Serious safety accidents and economic losses.

Method used

An indicator acquisition system for passenger transport hub operational risk identification is designed, including indicator type confirmation module, data collection module, classification module, screening module, reassignment module, analysis module and evaluation module, through the analytic hierarchy process and Pearson correlation coefficient and other methods to identify and assess risks, generate early warning signals, and achieve real-time monitoring and early warning of risks.

Benefits of technology

It achieves the effective identification and assessment of various risks in the operation process of passenger transport hubs, provides scientific and systematic risk management, helps managers give priority to high-risk factors, optimize resource allocation, respond to risk events in a timely manner, and ensure operational safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118350642B_ABST
    Figure CN118350642B_ABST
Patent Text Reader

Abstract

The present invention discloses an indicator acquisition method and system for passenger transport hub operation risk identification, and specifically relates to the passenger transport hub operation technology field, including an indicator type confirmation module, an indicator data collection module, an indicator data classification module, an indicator data screening module, an indicator data reallocation module, an analysis module, an evaluation module, and an early warning module; the risk type is confirmed by the indicator type confirmation module, the relevant indicator data are collected and classified respectively by the indicator data collection module and the indicator data classification module, the indicators are optimized by screening and reallocation by the indicator data screening module and the indicator data reallocation module, the analysis module performs analysis operations, and the evaluation module generates single and comprehensive risk signals; the early warning module determines whether to trigger the early warning operation according to these signals; the present invention can help managers better identify, analyze and evaluate various potential risk factors, thereby providing strong support for the safe operation of passenger transport hubs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of passenger transport hub operation, and more specifically, to an indicator acquisition method and system for passenger transport hub operation risk identification. Background Art

[0002] Passenger hubs are important nodes in urban transportation networks. They are mainly responsible for the gathering, distribution and transfer of passengers. Passenger hubs undertake the transfer and through-through functions of daily urban passenger flow and meet the needs of the diversity and complexity of urban passenger flow directions. A city's passenger transportation hub usually includes railway stations, long-distance bus stations, port terminals, airports, etc. as parts of the internal and external connection system, as well as bus hubs, intersections, rail transit stations, etc. as parts of the city's internal transportation system. Traditional risk management methods often rely on experience judgment and post-analysis, lacking real-time monitoring and early warning mechanisms. With the increase in traffic flow and the complexity of transportation networks, this method can no longer meet the needs of modern passenger hubs for efficient and systematic risk management. Especially in large transportation hubs, such as airports and railway stations, they face multiple sources of risk. If these risks are not identified and properly handled in a timely manner, they may lead to serious safety accidents and economic losses. Therefore, this paper proposes an indicator acquisition method and system for passenger hub operation risk identification. Summary of the invention

[0003] To achieve the above object, the present invention provides the following technical solutions:

[0004] An indicator acquisition system for passenger transport hub operation risk identification, including an indicator type confirmation module, an indicator data collection module, an indicator data classification module, an indicator data screening module, an indicator data reallocation module, an analysis module, and an evaluation module;

[0005] The indicator type confirmation module is used to identify risks according to the operation status of the passenger transport hub, obtain multiple risk types, and transmit the preset indicator types corresponding to all risk types to the indicator data collection module;

[0006] The indicator data collection module is used to collect data for each target indicator type according to the indicator type sent by the indicator type confirmation module, obtain an indicator data acquisition set and transmit it to the indicator data classification module;

[0007] The indicator data classification module classifies the indicator data acquisition set according to the indicator type corresponding to the target risk type to obtain the target risk indicator classification subset, aggregates all the target risk indicator classification subsets to obtain the total risk indicator classification set and transmits it to the indicator data screening module and the analysis module;

[0008] The indicator data screening module is used to screen the target risk indicator classification subsets respectively, and then divide them according to the preset strategy to obtain high-risk screening subsets, medium-risk screening subsets, and low-risk screening subsets, and remove the low-risk screening subsets. The high-risk screening subsets and medium-risk screening subsets that are retained are combined as the screening sets of the target risk indicator classification subsets and then transmitted to the indicator data reallocation module and the evaluation module;

[0009] The analysis module is used to analyze the total set of risk indicator classifications and transmit the analysis results to the indicator data reallocation module;

[0010] The indicator data reallocation module is used to reallocate the comprehensive indicator data according to the analysis results and all the screening sets, and transmit the reallocation results to the evaluation module;

[0011] The assessment module is used to perform risk assessment of the target risk type according to the target screening set, obtain the individual risk assessment value of the target risk type and issue the corresponding individual risk signal, and perform passenger hub operation risk assessment according to the redistribution result, obtain the comprehensive operation risk value of the passenger hub and issue the corresponding comprehensive risk signal.

[0012] In a preferred embodiment, the indicator acquisition system for passenger hub operational risk identification also includes an early warning module. The evaluation module aggregates the generated different types of individual risk signals and different types of comprehensive risk signals to obtain a risk signal set, and then transmits the risk signal set to the early warning module. The early warning module decides whether to execute or not execute the corresponding early warning operation according to the preset early warning strategy.

[0013] In a preferred embodiment, the indicator data screening module is used to screen the target risk indicator classification subsets respectively, which means:

[0014] Obtain the target indicator data and the occurrence probability of the target risk type in the same target risk indicator classification subset, and then obtain a first correlation coefficient value by calculating the Pearson correlation coefficient between the two. When the absolute value of the first correlation coefficient value is greater than or equal to the preset first standard coefficient value, the target indicator data is judged to be valuable reference data for the occurrence probability of the target risk type, and the target indicator data is retained. When the absolute value of the first correlation coefficient value is less than the preset first standard coefficient value, the target indicator data is judged to be worthless reference data for the occurrence probability of the target risk type, and the target indicator data is eliminated. Then, a confirmation operation is performed to confirm the indicator data retained in the target risk indicator classification subset as positively correlated data and negatively correlated data, and obtain a positively correlated data set and a negatively correlated data set.

[0015] All target risk indicator classification subsets are operated in the same way, and each target risk indicator classification subset obtains a corresponding positive correlation data set and a negative correlation data set.

[0016] In a preferred embodiment, the indicator data screening module is divided according to a preset strategy to obtain a high-risk screening subset, a medium-risk screening subset, and a low-risk screening subset, which means:

[0017] Respectively obtain the positively correlated data set and the negatively correlated data set corresponding to the indicator data retained in the same target risk indicator classification subset;

[0018] Match any two of the indicator data in the positive correlation data set to obtain the second correlation coefficient value of the two indicator data, then establish a correlation matrix, obtain the sum of the second correlation coefficient values ​​of the target indicator data and other indicator data in the correlation matrix as the division standard value, and then divide the numerical interval into which the division standard value falls into the corresponding risk level according to the division standard value and the high-risk division numerical interval, medium-risk division numerical interval, and low-risk division numerical interval in the preset strategy;

[0019] In the same way, the indicator data in the negative correlation data set are divided into corresponding risk levels, and the positive correlation data and negative correlation data divided into the high-risk division numerical interval are summarized to obtain the high-risk screening subset, the positive correlation data and negative correlation data divided into the medium-risk division numerical interval are summarized to obtain the medium-risk screening subset, and the positive correlation data and negative correlation data divided into the low-risk division numerical interval are summarized to obtain the low-risk screening subset.

[0020] In a preferred embodiment, the analysis module is used to perform analysis operations on the risk indicator classification set, which refers to:

[0021] The total set of risk indicator classification is analyzed using the hierarchical analysis method. The criterion layer is multiple risk types, and the preset indicator type corresponding to each risk type is multiple sub-criteria of the risk type. Finally, the weights of all criterion layers are combined to obtain the final scheme ranking, that is, the initial relative weight of each sub-criteria.

[0022] In a preferred embodiment, the indicator data reallocation module is used to reallocate the comprehensive indicator data according to the analysis results and all the screening sets, which means:

[0023] Get the initial relative weight of each sub-criteria and mark it as CSi, mark the number of times the target sub-criteria is divided into the high-risk screening subset in all screening sets as n, mark the number of times the target sub-criteria is divided into the medium-risk screening subset in all screening sets as m, and then calculate the redistribution weight value of each sub-criteria: N and M are both preset standard values, c1 and c2 are both preset redistribution coefficients, and CFi is the redistribution weight value of the target sub-criterion.

[0024] In a preferred embodiment, the evaluation module is used to perform risk evaluation of the target risk type according to the target screening set, obtain the monomer risk evaluation value of the target risk type and issue the corresponding monomer risk signal, which means:

[0025] Obtain each item of positively correlated data in the high-risk screening subset corresponding to the target risk type and mark it as GZi, sort the classification standard values ​​corresponding to each item of positively correlated data, and assign a preset first risk coefficient x1i according to the sorted number; obtain each item of negatively correlated data and mark it as GFi, sort the classification standard values ​​corresponding to each item of negatively correlated data, and assign a preset second risk coefficient x2i according to the sorted number;

[0026] The positively correlated data in the medium-risk screening subset are marked as ZZi, the classification standard values ​​corresponding to each positively correlated data are sorted, and the preset third risk coefficient x3i is assigned according to the sorted number; the negatively correlated data are marked as ZFi, the classification standard values ​​corresponding to each negatively correlated data are sorted, and the preset fourth risk coefficient x4i is assigned according to the sorted number;

[0027] Calculate the individual risk assessment value of the target risk type:

[0028]

[0029] k1 and k2 are the preset high risk coefficient and medium risk coefficient respectively, and DTi is the individual risk assessment value of the target risk type;

[0030] The individual risk assessment value DTi of the target risk type is compared with the preset individual risk threshold of the target risk type. If the individual risk assessment value DTi of the target risk type is greater than or equal to the preset individual risk threshold of the target risk type, a first type of individual risk signal is issued; if the individual risk assessment value DTi of the target risk type is less than the preset individual risk threshold of the target risk type, a second type of individual risk signal is issued.

[0031] The assessment module conducts a passenger transport hub operation risk assessment based on the results of the reallocation, obtains the comprehensive operation risk value of the passenger transport hub and issues a corresponding comprehensive risk signal, which means:

[0032] Obtain the comprehensive indicator data corresponding to each sub-criterion and mark it as ZHi, as well as the redistributed weight value CFi, and calculate the comprehensive operational risk value of the passenger hub: ZHi = ∑[CFi·(ZHi-BZi)], BZi is the preset standard value corresponding to the comprehensive indicator data ZHi, and ZHi is the comprehensive operational risk value of the passenger hub. Then compare the comprehensive operational risk value ZHi of the passenger hub with the preset comprehensive operational risk threshold. If the comprehensive operational risk value ZHi of the passenger hub is greater than or equal to the preset comprehensive operational risk threshold, a first type of comprehensive risk signal is issued; if the comprehensive operational risk value ZHi of the passenger hub is less than the preset comprehensive operational risk threshold, a second type of comprehensive risk signal is issued.

[0033] In a preferred embodiment, the method for obtaining indicators for passenger transport hub operation risk identification includes the following steps:

[0034] Step 1: The indicator type confirmation module identifies risks according to the operation status of the passenger transport hub, obtains multiple risk types, and transmits the preset indicator types corresponding to all risk types to the indicator data collection module;

[0035] Step 2: The indicator data collection module collects data for each target indicator type according to the indicator type sent by the indicator type confirmation module to obtain an indicator data acquisition set;

[0036] Step 3: classify the indicator data acquisition set according to the indicator type corresponding to the target risk type through the indicator data classification module to obtain the target risk indicator classification subset, and summarize all the target risk indicator classification subsets to obtain the total risk indicator classification set;

[0037] Step 4: The target risk indicator classification subsets are screened by the indicator data screening module, and then divided according to the preset strategy to obtain a high-risk screening subset, a medium-risk screening subset, and a low-risk screening subset. The low-risk screening subset is eliminated, and the high-risk screening subset and the medium-risk screening subset that are retained are used as the screening set of the target risk indicator classification subset;

[0038] Step 5: The analysis module analyzes the total set of risk indicator classifications and transmits the analysis results to the indicator data reallocation module. The indicator data reallocation module reallocates the comprehensive indicator data according to the analysis results and all the screening sets, and transmits the reallocation results to the evaluation module.

[0039] Step 6: Perform risk assessment on the target risk type according to the target screening set through the assessment module, obtain the individual risk assessment value of the target risk type and issue the corresponding individual risk signal, perform passenger hub operation risk assessment according to the redistribution result, obtain the comprehensive operation risk value of the passenger hub and issue the corresponding comprehensive risk signal;

[0040] Step 7: The early warning module decides whether to execute or not execute the corresponding early warning operation according to the evaluation result of the evaluation module and the preset early warning strategy.

[0041] Technical effects and advantages of the present invention:

[0042] The present invention realizes effective identification and evaluation of various risks in the operation process of passenger hubs through the collaborative work of multiple modules. Through the indicator type confirmation module, analysis module, indicator data screening module, indicator data reallocation module and evaluation module, the risk prediction, identification, screening, reallocation and evaluation are realized. The indicator type confirmation module is responsible for confirming the risk type that may affect the operation of the passenger hub; the analysis module uses the hierarchical analysis method to analyze the total set of risk indicator classification and determine the relative importance of each risk indicator; the indicator data screening module calculates the Pearson correlation coefficient to screen out indicator data that has a significant contribution to risk prediction; the indicator data reallocation module adjusts the weight of the indicator data according to the importance of the risk indicator and the distribution in different risk levels. The indicator acquisition system for passenger hub operation risk identification can help managers identify, analyze and evaluate various potential risk factors in a more scientific and systematic manner, thereby providing strong support for the safe operation of passenger hubs.

[0043] The present invention utilizes methods such as hierarchical analysis method to systematically analyze and assign weights to risk indicators, which can more accurately reflect the relative importance of each risk factor in the overall risk structure, and can distinguish high-risk, medium-risk and low-risk indicators, which helps managers to give priority to and deal with high-risk factors, and achieve optimal allocation of risk management resources. It can also update risk assessments based on real-time data, so that managers can promptly understand the current operational risk status and quickly respond to possible risk events. The assessment module not only provides individual risk assessment values, but also provides comprehensive risk assessment values, so that managers can monitor various risks in real time and make timely adjustments. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;

[0045] Figure 1 This is a schematic diagram of the indicator acquisition system for passenger hub operation risk identification in the present invention.

[0046] Figure 2 This is a schematic diagram of the indicator acquisition method for passenger hub operation risk identification in the present invention. DETAILED DESCRIPTION

[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] Reference Figure 1 - Figure 2 The following embodiments are obtained:

[0049] Example 1

[0050] An indicator acquisition system for passenger hub operation risk identification includes an indicator type confirmation module, an indicator data collection module, an indicator data classification module, an indicator data screening module, an indicator data reallocation module, an analysis module, and an evaluation module; the indicator type confirmation module, the indicator data collection module, the indicator data classification module, the indicator data screening module, the indicator data reallocation module, the analysis module, and the evaluation module are communicated with each other.

[0051] The indicator type confirmation module is used to identify risks based on the operation status of the passenger hub, obtain multiple risk types, and transmit the preset indicator types corresponding to all risk types to the indicator data collection module; determine the risk types that may affect the operation of the passenger hub through historical data analysis, expert consultation or industry specifications. These risk types include safety accident risks, passenger flow fluctuation risks, equipment failure risks, etc. For example, historical data shows that the passenger flow of the passenger hub surges in certain periods, resulting in a decrease in service efficiency, then "passenger flow fluctuation risk" will be listed as a risk type.

[0052] The indicator data collection module is used to collect data for each target indicator type according to the indicator type sent by the indicator type confirmation module, obtain the indicator data acquisition set and transmit it to the indicator data classification module; this module collects corresponding indicator data from common information collection channels according to the determined risk type. For example, for the "passenger flow fluctuation risk", it is necessary to collect indicator data such as the number of people entering the station, the number of people leaving the station, and the degree of congestion in the waiting area.

[0053] The indicator data classification module classifies the indicator data acquisition set according to the indicator type corresponding to the target risk type to obtain the target risk indicator classification subset, summarizes all the target risk indicator classification subsets to obtain the risk indicator classification total set and transmits it to the indicator data screening module and the analysis module; this module classifies the collected indicator data according to the risk type to form data sets for different risk types, for example, the indicator data sets related to the "passenger flow fluctuation risk" are combined to form a data set for this risk type.

[0054] The indicator data screening module is used to screen the target risk indicator classification subsets respectively, and then divide them according to the preset strategy to obtain high-risk screening subsets, medium-risk screening subsets, and low-risk screening subsets. The low-risk screening subset is eliminated, and the retained high-risk screening subset and medium-risk screening subset are combined as the screening sets of the target risk indicator classification subset and then transmitted to the indicator data reallocation module and the evaluation module; by calculating the Pearson correlation coefficient between the indicator data and the probability of risk occurrence, the indicators that have a significant contribution to risk prediction are screened out. For example, if it is found that the correlation between the congestion level of the waiting area and the passenger flow fluctuation is very high, then this indicator may be retained as valuable reference data.

[0055] The analysis module is used to analyze the total set of risk indicator classifications and transmit the analysis results to the indicator data redistribution module; the hierarchical analysis method is used to assign weights and sort the risk indicators to determine which indicators contribute the most to the overall risk. For example, through analysis, it is found that although multiple indicators are related to the "passenger flow fluctuation risk", some indicators, such as the changes in passenger flow during holidays, are more important to risk assessment than the fluctuations of other indicators.

[0056] The indicator data reallocation module is used to reallocate the comprehensive indicator data according to the analysis results and all the screening sets, and transmit the reallocation results to the evaluation module; according to the analysis results, the weights of the indicator data are adjusted to ensure that important indicators receive sufficient attention in subsequent evaluations. For example, if an indicator is proven to be very important for predicting a specific risk type, its weight will be readjusted so that it can more accurately reflect the risk level during the evaluation.

[0057] The assessment module is used to perform risk assessment of the target risk type according to the target screening set, obtain the individual risk assessment value of the target risk type and issue the corresponding individual risk signal, and perform passenger hub operation risk assessment according to the reallocation result, obtain the comprehensive operation risk value of the passenger hub and issue the corresponding comprehensive risk signal. For example, the assessment module will consider the impact of all high-risk and medium-risk related indicators corresponding to the "passenger flow fluctuation risk", such as holiday passenger flow, waiting area congestion and other indicators on it, to calculate the individual risk assessment value of the target risk type of "passenger flow fluctuation risk", and the calculation of the indicators corresponding to all the sub-criteria after the redistribution of weights can obtain the comprehensive operation risk value of the passenger hub that reflects the operation risk of the passenger hub.

[0058] The indicator acquisition system for passenger hub operation risk identification also includes an early warning module. The evaluation module aggregates the generated different types of individual risk signals and different types of comprehensive risk signals to obtain a risk signal set, and then transmits the risk signal set to the early warning module. The early warning module decides whether to execute or not to execute the corresponding early warning operation according to the preset early warning strategy. According to the risk signal generated by the evaluation module, the early warning module decides whether to trigger the early warning mechanism, such as issuing an alarm, initiating an emergency plan, etc. For example, if the comprehensive risk assessment value is greater than or equal to the corresponding preset threshold, the early warning module may trigger the station broadcasting system to notify passengers and staff to take corresponding safety measures. If the individual risk assessment value corresponding to the "passenger flow fluctuation risk" is greater than or equal to the corresponding preset threshold, the early warning module may open more circulation channels to alleviate passenger flow pressure.

[0059] The indicator data screening module is used to screen the target risk indicator classification subsets respectively, which refers to:

[0060] Obtain the target indicator data and the occurrence probability of the target risk type in the same target risk indicator classification subset, and then obtain a first correlation coefficient value by calculating the Pearson correlation coefficient between the two. When the absolute value of the first correlation coefficient value is greater than or equal to the preset first standard coefficient value, the target indicator data is judged to be valuable reference data for the occurrence probability of the target risk type, and the target indicator data is retained. When the absolute value of the first correlation coefficient value is less than the preset first standard coefficient value, the target indicator data is judged to be worthless reference data for the occurrence probability of the target risk type, and the target indicator data is eliminated. Then, a confirmation operation is performed to confirm the indicator data retained in the target risk indicator classification subset as positively correlated data and negatively correlated data, and obtain a positively correlated data set and a negatively correlated data set.

[0061] All target risk indicator classification subsets are operated in the same way, and each target risk indicator classification subset obtains a corresponding positive correlation data set and a negative correlation data set;

[0062] For example, suppose you are analyzing the "passenger flow fluctuation risk" and have collected a series of indicator data that may affect passenger flow, such as weather conditions, holidays, and fare changes. You have collected weather data, holiday arrangements, and fare change records over the past period of time, as well as corresponding passenger flow data. The Pearson correlation coefficient calculation method is used to obtain the correlation coefficient between these indicator data and passenger flow changes. For example, the correlation coefficient between fare changes and passenger flow changes is 0.75. If the preset first standard coefficient value is 0.7, then the correlation between fare changes and passenger flow changes is considered to be valuable, so the fare change indicator data is retained and added to the positive correlation data set. Repeat this process until all indicator data have been evaluated to form complete positive correlation data sets and negative correlation data sets; the purpose of the indicator data screening module is to ensure that only those indicator data that are closely related to the risk type are used for subsequent risk assessment, which can reduce the interference of noise data and improve the accuracy of risk assessment. By setting a reasonable first standard coefficient value, the strictness of screening can be controlled, and the risks of false positives and false negatives can be balanced. Dividing indicator data into positive correlation and negative correlation data sets can help us understand which factors may increase the probability of risk occurrence, that is, positive correlation data, and which factors may reduce the probability of risk occurrence, that is, negative correlation data.

[0063] The indicator data screening module is divided according to the preset strategy to obtain high-risk screening subsets, medium-risk screening subsets, and low-risk screening subsets, which refer to:

[0064] Respectively obtain the positively correlated data set and the negatively correlated data set corresponding to the indicator data retained in the same target risk indicator classification subset;

[0065] Match any two of the indicator data in the positive correlation data set to obtain the second correlation coefficient values ​​of the two indicator data, and then establish a correlation matrix, which contains the correlation coefficients between all the retained positive correlation indicator data. These correlation coefficients are calculated using the Pearson correlation coefficient formula. The sum of the second correlation coefficient values ​​of the target indicator data and other indicator data in the correlation matrix is ​​obtained as the division standard value, and then according to the division standard value and the high-risk division numerical interval, medium-risk division numerical interval, and low-risk division numerical interval in the preset strategy, the numerical interval into which the division standard value falls is divided into the corresponding risk level;

[0066] In the same way, the indicator data in the negative correlation data set are divided into corresponding risk levels, and the positive correlation data and negative correlation data divided into the high-risk division numerical interval are summarized to obtain a high-risk screening subset, the positive correlation data and negative correlation data divided into the medium-risk division numerical interval are summarized to obtain a medium-risk screening subset, and the positive correlation data and negative correlation data divided into the low-risk division numerical interval are summarized to obtain a low-risk screening subset;

[0067] For example, suppose you are paying attention to "passenger safety risks" and have collected indicator data related to passenger safety, such as passenger flow, emergency response time, monitoring system coverage, etc. The correlation coefficients between indicator data such as passenger flow, emergency response time and monitoring system coverage are calculated to form a correlation matrix. For the indicator of passenger flow, calculate the sum of its correlation coefficients with other indicator data such as emergency response time and monitoring system coverage as the standard value for dividing passenger flow. If the standard value for dividing passenger flow is within the preset high-risk division value interval, then the indicator of passenger flow is divided into the high-risk screening subset. Similarly, the emergency response time and monitoring system coverage will also be divided according to their standard values. The indicators are divided into corresponding risk screening subsets, and all the indicator data classified as high risk are summarized into a set to form a high-risk screening subset. The same method is also used to summarize the medium-risk and low-risk screening subsets. By dividing the indicator data into high-risk, medium-risk and low-risk screening subsets, decision makers can more easily identify the risk factors that need priority attention and treatment. This screening method helps to improve the efficiency and effectiveness of risk management, ensure the safety and smooth operation of passenger hubs, and because the overall operational risk will be evaluated later, the low-risk screening subset can be eliminated when conducting single risk assessment. On the one hand, it reduces the amount of calculation, and on the other hand, it can also reduce the data dimension, focusing on data with more important features to maintain stable evaluation performance in actual application evaluation.

[0068] The analysis module is used to analyze the total set of risk indicator classifications, which refers to:

[0069] The total set of risk indicator classification is analyzed using the hierarchical analysis method. The criterion layer is multiple risk types, and the preset indicator type corresponding to each risk type is multiple sub-criteria of the risk type. Finally, the weights of all criterion layers are combined to obtain the final scheme ranking, that is, the initial relative weight of each sub-criteria.

[0070] The indicator data redistribution module is used to redistribute comprehensive indicator data based on the analysis results and all the filter sets.

[0071] Get the initial relative weight of each sub-criteria and mark it as CSi, mark the number of times the target sub-criteria is divided into the high-risk screening subset in all screening sets as n, mark the number of times the target sub-criteria is divided into the medium-risk screening subset in all screening sets as m, and then calculate the redistribution weight value of each sub-criteria: N and M are both preset standard values, c1 and c2 are both preset redistribution coefficients, and CFi is the redistribution weight value of the target sub-criterion; the analysis module uses the hierarchical analysis method to analyze the total set of risk indicator classification. In this process, the criterion layer contains multiple risk types, and the preset indicator type corresponding to each risk type is used as the sub-criterion of the risk type. Through this method, the initial relative weight of each sub-criterion can be calculated. These weights reflect the relative importance of each risk indicator in the overall risk assessment. Finally, by synthesizing the weights of all criterion layers, the initial relative weight of each sub-criterion is obtained, and then the scheme ranking is obtained. For example, it is assumed that the risk types of concern to the passenger hub include passenger safety, facility failure, etc. , service delays, etc. For the risk type of passenger safety, its sub-criteria may include passenger flow, emergency response time, monitoring system coverage, etc. Through the hierarchical analysis method, the initial relative weight of passenger flow is calculated to be 0.3, the weight of emergency response time is 0.5, and the weight of monitoring system coverage is 0.2. These weights are then used for comprehensive evaluation and program ranking. The importance of different risk indicators is determined by quantitative methods, which helps to make more scientific and reasonable decisions in subsequent risk management. As a widely used multi-criteria decision analysis method, the hierarchical analysis method can systematically analyze and synthesize the relative importance of multiple risk factors, thereby providing decision makers with a clear risk assessment framework.

[0072] The indicator data reallocation module reallocates the comprehensive indicator data according to the results of the analysis module and all the screening sets. In this process, the initial relative weight CSi of each sub-criterion is first obtained, and then the number of times n that the target sub-criterion is divided into the high-risk screening subset and the number of times m that the medium-risk screening subset is divided in all the screening sets is taken into account. Then the reallocation weight value of each sub-criterion is calculated. This value is calculated based on the number of times the sub-criterion appears in the screening subsets of different risk levels and the preset standard values ​​N, M and the reallocation coefficients c1, c2. CFi represents the reallocation weight value of the target sub-criterion. The significance of introducing the indicator data reallocation module is that since the indicator data corresponding to the same sub-criterion may have a certain correlation with different monomers when conducting monomer evaluation, and the degree of influence of each is different, when the monomer evaluation results are directly applied to the comprehensive evaluation, the indicator data corresponding to the same sub-criterion actually participates in multiple operations, and the risk levels in the respective monomer evaluations are different, which is more likely to lead to the problem of reduced evaluation accuracy of the comprehensive evaluation. Therefore, the indicator data reallocation module is required to reallocate the comprehensive indicator data.

[0073] For example: Assume that in the operation of a passenger hub, there is a sub-criterion "passenger flow" with an initial weight value of 0.30. It appears 5 times in the high-risk screening subset and 3 times in the medium-risk screening subset. Set N as the standard value of high risk and 10, M as the standard value of medium risk and 12, c1 and c2 as redistribution coefficients, c1 is 0.7, c2 is 0.3, and the redistribution weight value of passenger flow can be calculated as 0.138 according to the above formula. The role of the indicator data redistribution module is to adjust the weight of the indicator data according to the importance of the risk indicator and its distribution in different risk levels. This adjustment helps to ensure that in subsequent risk assessments, those indicators that frequently appear in the high-risk screening subset receive more attention, while those indicators in the medium-risk or low-risk screening subsets receive less attention accordingly. Such weight redistribution can improve the accuracy and effectiveness of the overall risk assessment.

[0074] The evaluation module is used to perform risk evaluation of the target risk type according to the target screening set, obtain the monomer risk evaluation value of the target risk type and issue the corresponding monomer risk signal, which refers to:

[0075] Obtain each item of positively correlated data in the high-risk screening subset corresponding to the target risk type and mark it as GZi, sort the classification standard values ​​corresponding to each item of positively correlated data, and assign a preset first risk coefficient x1i according to the sorted number; obtain each item of negatively correlated data and mark it as GFi, sort the classification standard values ​​corresponding to each item of negatively correlated data, and assign a preset second risk coefficient x2i according to the sorted number;

[0076] The positively correlated data in the medium-risk screening subset are marked as ZZi, the classification standard values ​​corresponding to each positively correlated data are sorted, and the preset third risk coefficient x3i is assigned according to the sorted number; the negatively correlated data are marked as ZFi, the classification standard values ​​corresponding to each negatively correlated data are sorted, and the preset fourth risk coefficient x4i is assigned according to the sorted number;

[0077] Calculate the individual risk assessment value of the target risk type:

[0078]

[0079] k1 and k2 are respectively the preset high risk coefficient and medium risk coefficient, and DTi is the single risk assessment value of the target risk type; k1 reflects the possibility of risk events and the impact caused under high risk conditions, and is used to amplify the risk assessment value to reflect the potential serious consequences under high risk conditions, while k2 focuses on the possibility and impact of risks under medium risk levels, and is used to adjust the risk assessment value to reflect the impact of medium risk events. The single risk assessment value DTi refers to the assessment value of a specific risk type under independent consideration, which reflects the possibility of risk occurrence and the severity of its potential impact. The single risk assessment value DTi of the target risk type is compared with the preset single risk threshold of the target risk type. If the single risk assessment value DTi of the target risk type is greater than or equal to the preset single risk threshold of the target risk type, a first type of single risk signal is issued; if the single risk assessment value DTi of the target risk type is less than the preset single risk threshold of the target risk type, a second type of single risk signal is issued; the first type of single risk signal indicates that there is a risk of the target risk type, and the second type of single risk signal indicates that there is no risk of the target risk type.

[0080] The assessment module conducts a passenger transport hub operation risk assessment based on the results of the reallocation, obtains the comprehensive operation risk value of the passenger transport hub and issues a corresponding comprehensive risk signal, which means:

[0081] Obtain the comprehensive indicator data corresponding to each sub-criterion and mark it as ZHi, as well as the redistributed weight value CFi, and calculate the comprehensive operational risk value of the passenger hub: ZHi = ∑[CFi`(ZHi-BZi)], BZi is the preset standard value corresponding to the comprehensive indicator data ZHi, and ZHi is the comprehensive operational risk value of the passenger hub. Then compare the comprehensive operational risk value ZHi of the passenger hub with the preset comprehensive operational risk threshold. If the comprehensive operational risk value ZHi of the passenger hub is greater than or equal to the preset comprehensive operational risk threshold, a first type of comprehensive risk signal is issued, indicating that the comprehensive risk level is high and emergency measures need to be taken. If the comprehensive operational risk value ZHi of the passenger hub is less than the preset comprehensive operational risk threshold, a second type of comprehensive risk signal is issued, indicating that the comprehensive risk level is within an acceptable range, but continuous monitoring is still required.

[0082] Example 2

[0083] The indicator acquisition method for passenger transport hub operation risk identification includes the following steps:

[0084] Step 1: The indicator type confirmation module identifies risks according to the operation status of the passenger transport hub, obtains multiple risk types, and transmits the preset indicator types corresponding to all risk types to the indicator data collection module;

[0085] Step 2: The indicator data collection module collects data for each target indicator type according to the indicator type sent by the indicator type confirmation module to obtain an indicator data acquisition set;

[0086] Step 3: classify the indicator data acquisition set according to the indicator type corresponding to the target risk type through the indicator data classification module to obtain the target risk indicator classification subset, and summarize all the target risk indicator classification subsets to obtain the total risk indicator classification set;

[0087] Step 4: The target risk indicator classification subsets are screened by the indicator data screening module, and then divided according to the preset strategy to obtain a high-risk screening subset, a medium-risk screening subset, and a low-risk screening subset. The low-risk screening subset is eliminated, and the high-risk screening subset and the medium-risk screening subset that are retained are used as the screening set of the target risk indicator classification subset;

[0088] Step 5: The analysis module analyzes the total set of risk indicator classifications and transmits the analysis results to the indicator data reallocation module. The indicator data reallocation module reallocates the comprehensive indicator data according to the analysis results and all the screening sets, and transmits the reallocation results to the evaluation module.

[0089] Step 6: Perform risk assessment on the target risk type according to the target screening set through the assessment module, obtain the individual risk assessment value of the target risk type and issue the corresponding individual risk signal, perform passenger hub operation risk assessment according to the redistribution result, obtain the comprehensive operation risk value of the passenger hub and issue the corresponding comprehensive risk signal;

[0090] Step 7: The early warning module decides whether to execute or not execute the corresponding early warning operation according to the evaluation result of the evaluation module and the preset early warning strategy.

[0091] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0092] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0093] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0094] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0095] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An indicator acquisition system for passenger transport hub operation risk identification, characterized by: It includes indicator type confirmation module, indicator data collection module, indicator data classification module, indicator data screening module, indicator data reallocation module, analysis module and evaluation module; The indicator type confirmation module is used to identify risks according to the operation status of the passenger transport hub, obtain multiple risk types, and transmit the preset indicator types corresponding to all risk types to the indicator data collection module; The indicator data collection module is used to collect data for each target indicator type according to the indicator type sent by the indicator type confirmation module, obtain an indicator data acquisition set and transmit it to the indicator data classification module; The indicator data classification module classifies the indicator data acquisition set according to the indicator type corresponding to the target risk type to obtain the target risk indicator classification subset, aggregates all the target risk indicator classification subsets to obtain the total risk indicator classification set and transmits it to the indicator data screening module and the analysis module; The indicator data screening module is used to screen the target risk indicator classification subsets respectively, and then divide them according to the preset strategy to obtain high-risk screening subsets, medium-risk screening subsets, and low-risk screening subsets, and remove the low-risk screening subsets. The high-risk screening subsets and medium-risk screening subsets that are retained are combined as the screening sets of the target risk indicator classification subsets and then transmitted to the indicator data reallocation module and the evaluation module; The analysis module is used to analyze the total set of risk indicator classifications and transmit the analysis results to the indicator data reallocation module; The indicator data reallocation module is used to reallocate the comprehensive indicator data according to the analysis results and all the screening sets, and transmit the reallocation results to the evaluation module; The assessment module is used to perform risk assessment of the target risk type according to the target screening set, obtain the individual risk assessment value of the target risk type and issue the corresponding individual risk signal, and perform passenger hub operation risk assessment according to the redistribution result, obtain the comprehensive operation risk value of the passenger hub and issue the corresponding comprehensive risk signal; The analysis module is used to analyze the total set of risk indicator classifications, which refers to: The total set of risk indicator classification is analyzed by using the hierarchical analysis method. The criterion layer is multiple risk types. The preset indicator type corresponding to each risk type is multiple sub-criteria of the risk type. Finally, the weights of all criterion layers are combined to obtain the final scheme ranking, that is, the initial relative weight of each sub-criteria. The indicator data redistribution module is used to redistribute comprehensive indicator data based on the analysis results and all the filter sets. Get the initial relative weight of each sub-criteria and mark it as CSi, mark the number of times the target sub-criteria is divided into the high-risk screening subset in all screening sets as n, mark the number of times the target sub-criteria is divided into the medium-risk screening subset in all screening sets as m, and then calculate the redistribution weight value of each sub-criteria: , N and M are preset standard values, c1 and c2 are preset redistribution coefficients, and CFi is the redistribution weight value of the target sub-criterion; The evaluation module is used to perform risk evaluation of the target risk type according to the target screening set, obtain the monomer risk evaluation value of the target risk type and issue the corresponding monomer risk signal, which refers to: Obtain each item of positively correlated data in the high-risk screening subset corresponding to the target risk type and mark it as GZi, sort the classification standard values ​​corresponding to each item of positively correlated data, and assign a preset first risk coefficient x1i according to the sorted number; obtain each item of negatively correlated data and mark it as GFi, sort the classification standard values ​​corresponding to each item of negatively correlated data, and assign a preset second risk coefficient x2i according to the sorted number; The positively correlated data in the medium-risk screening subset are marked as ZZi, the classification standard values ​​corresponding to each positively correlated data are sorted, and the preset third risk coefficient x3i is assigned according to the sorted number; the negatively correlated data are marked as ZFi, the classification standard values ​​corresponding to each negatively correlated data are sorted, and the preset fourth risk coefficient x4i is assigned according to the sorted number; Calculate the individual risk assessment value of the target risk type: , k1 and k2 are the preset high risk coefficient and medium risk coefficient respectively, and DTi is the individual risk assessment value of the target risk type; Compare the monomer risk assessment value DTi of the target risk type with the preset monomer risk threshold of the target risk type; if the monomer risk assessment value DTi of the target risk type is greater than or equal to the preset monomer risk threshold of the target risk type, issue a first type monomer risk signal; if the monomer risk assessment value DTi of the target risk type is less than the preset monomer risk threshold of the target risk type, issue a second type monomer risk signal; The assessment module conducts a passenger transport hub operation risk assessment based on the results of the reallocation, obtains the comprehensive operation risk value of the passenger transport hub and issues a corresponding comprehensive risk signal, which means: Obtain the comprehensive indicator data corresponding to each sub-criterion and mark it as ZHi, and redistribute the weight value CFi to calculate the comprehensive operational risk value of the passenger transport hub: , BZi is the preset standard value corresponding to the comprehensive indicator data ZHi, ZHi is the comprehensive operation risk value of the passenger transport hub, and then the comprehensive operation risk value ZHi of the passenger transport hub is compared with the preset comprehensive operation risk threshold. If the comprehensive operation risk value ZHi of the passenger transport hub is greater than or equal to the preset comprehensive operation risk threshold, a first type of comprehensive risk signal is issued; if the comprehensive operation risk value ZHi of the passenger transport hub is less than the preset comprehensive operation risk threshold, a second type of comprehensive risk signal is issued.

2. The indicator acquisition system for passenger transport hub operation risk identification according to claim 1 is characterized in that: The indicator acquisition system for passenger hub operation risk identification also includes an early warning module. The evaluation module aggregates the generated different types of individual risk signals and different types of comprehensive risk signals to obtain a risk signal set, and then transmits the risk signal set to the early warning module. The early warning module decides whether to execute or not execute the corresponding early warning operation according to the preset early warning strategy.

3. The indicator acquisition system for passenger transport hub operation risk identification according to claim 2 is characterized in that: The indicator data screening module is used to screen the target risk indicator classification subsets respectively, which refers to: Obtain the target indicator data and the occurrence probability of the target risk type in the same target risk indicator classification subset, and then obtain a first correlation coefficient value by calculating the Pearson correlation coefficient between the two. When the absolute value of the first correlation coefficient value is greater than or equal to the preset first standard coefficient value, the target indicator data is judged to be valuable reference data for the occurrence probability of the target risk type, and the target indicator data is retained. When the absolute value of the first correlation coefficient value is less than the preset first standard coefficient value, the target indicator data is judged to be worthless reference data for the occurrence probability of the target risk type, and the target indicator data is eliminated. Then, a confirmation operation is performed to confirm the indicator data retained in the target risk indicator classification subset as positively correlated data and negatively correlated data, and obtain a positively correlated data set and a negatively correlated data set. All target risk indicator classification subsets are operated in the same way, and each target risk indicator classification subset obtains a corresponding positive correlation data set and a negative correlation data set.

4. The indicator acquisition system for passenger transport hub operation risk identification according to claim 3 is characterized in that: The indicator data screening module is divided according to the preset strategy to obtain high-risk screening subsets, medium-risk screening subsets, and low-risk screening subsets, which refer to: Respectively obtain the positively correlated data set and the negatively correlated data set corresponding to the indicator data retained in the same target risk indicator classification subset; Match any two of the indicator data in the positive correlation data set to obtain the second correlation coefficient value of the two indicator data, then establish a correlation matrix, obtain the sum of the second correlation coefficient values ​​of the target indicator data and other indicator data in the correlation matrix as the division standard value, and then divide the numerical interval into which the division standard value falls into the corresponding risk level according to the division standard value and the high-risk division numerical interval, medium-risk division numerical interval, and low-risk division numerical interval in the preset strategy; In the same way, the indicator data in the negative correlation data set are divided into corresponding risk levels, and the positive correlation data and negative correlation data divided into the high-risk division numerical interval are summarized to obtain the high-risk screening subset, the positive correlation data and negative correlation data divided into the medium-risk division numerical interval are summarized to obtain the medium-risk screening subset, and the positive correlation data and negative correlation data divided into the low-risk division numerical interval are summarized to obtain the low-risk screening subset.

5. A method for obtaining indicators for identifying operational risks of passenger transport hubs, implemented based on a system for obtaining indicators for identifying operational risks of passenger transport hubs as described in any one of claims 1 to 4, characterized in that: The following steps are involved: Step 1: The indicator type confirmation module identifies risks according to the operation status of the passenger transport hub, obtains multiple risk types, and transmits the preset indicator types corresponding to all risk types to the indicator data collection module; Step 2: The indicator data collection module collects data for each target indicator type according to the indicator type sent by the indicator type confirmation module to obtain an indicator data acquisition set; Step 3: classify the indicator data acquisition set according to the indicator type corresponding to the target risk type through the indicator data classification module to obtain the target risk indicator classification subset, and summarize all the target risk indicator classification subsets to obtain the total risk indicator classification set; Step 4: The target risk indicator classification subsets are screened by the indicator data screening module, and then divided according to the preset strategy to obtain a high-risk screening subset, a medium-risk screening subset, and a low-risk screening subset. The low-risk screening subset is eliminated, and the high-risk screening subset and the medium-risk screening subset that are retained are used as the screening set of the target risk indicator classification subset; Step 5: The analysis module analyzes the total set of risk indicator classifications and transmits the analysis results to the indicator data reallocation module. The indicator data reallocation module reallocates the comprehensive indicator data according to the analysis results and all the screening sets, and transmits the reallocation results to the evaluation module. Step 6: Perform risk assessment on the target risk type according to the target screening set through the assessment module, obtain the individual risk assessment value of the target risk type and issue the corresponding individual risk signal, perform passenger hub operation risk assessment according to the redistribution result, obtain the comprehensive operation risk value of the passenger hub and issue the corresponding comprehensive risk signal; Step 7: The early warning module decides whether to execute or not execute the corresponding early warning operation according to the evaluation result of the evaluation module and the preset early warning strategy.