Internal cooling control method for pre-coating film production
By laying detection points on the pre-coated film production line and analyzing temperature changes, the stability control of the hot melt adhesive layer is achieved, the instability problem caused by temperature changes is solved, and product quality and production stability are improved.
Patent Information
- Application Number
- CN202410802675.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-06-20
AI Technical Summary
During the production process of pre-coated film, temperature changes lead to unstable hot melt adhesive layer, affecting its uniformity and the performance of composite materials, which may lead to delamination between the substrate and the hot melt adhesive layer, reducing production stability and product quality.
By laying detection points on the precoated film production line, monitoring and analyzing the influencing factors and temperature states, calculating the temperature change coefficient, determining the composite temperature abnormality, triggering cooling control instructions, and automatically regulating the cooling equipment and heating power to achieve accurate temperature control.
It realizes comprehensive coverage and accurate monitoring of temperature during the pre-coated film production process, ensures product quality, improves cooling control accuracy and efficiency, and improves the automation and intelligence level of the production line.
Smart Images

Figure CN118358102B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cooling control, in particular to a method for controlling internal cooling in the production of a pre-coated film. Background Art
[0002] As an environmentally friendly new material that has developed rapidly in my country in recent years, pre-coated film has been widely used in the printing industry with its unique performance advantages. Generally, hot melt adhesive is used as an adhesive. The hot melt adhesive is fed into an extruder, and extruded into a drooling state after shearing and melting. The base film and the drooling hot melt adhesive are then compounded under roller extrusion, and then quickly cooled and shaped to become a composite material with new properties, which is then applied to the printing industry. Among them, the uniformity and stability of the hot melt adhesive are crucial to the overall performance of the composite material;
[0003] However, in the actual production process of pre-coated films, as the production line continues to run, changes in the external environment and the operating status of the equipment itself will have a significant impact on the temperature of the hot melt adhesive flowing out of the die during lamination and the real-time temperature under roller extrusion. These unmonitored and unregulated temperature changes often lead to the inability of the hot melt adhesive layer to fully adhere, thereby affecting its uniformity and stability. In the subsequent use of printed products, this instability may lead to delamination between the substrate and the hot melt adhesive layer, seriously reducing the stability of the production process and product quality;
[0004] In order to solve the above defects, a technical solution is now provided. Summary of the invention
[0005] In order to overcome the shortcomings of the background technology, an embodiment of the present invention provides a method for controlling internal cooling in the production of a pre-coating film, which can effectively solve the problems involved in the above-mentioned background technology.
[0006] The purpose of the present invention can be achieved through the following technical solutions:
[0007] A method for controlling internal cooling in the production of pre-coating films, comprising:
[0008] Step 1: Layout of testing points: Layout of testing points on the pre-coated film production line;
[0009] Step 2: Influencing factor analysis: Monitor the corresponding influencing factor information in the pre-coating film production process, thereby analyzing and processing the corresponding influencing factors in the pre-coating film production process to obtain the influencing factor coefficient;
[0010] Step 3: Temperature status monitoring and analysis: Monitor the corresponding temperature status information during the pre-coating film production process, and analyze and process the corresponding temperature status during the pre-coating film production process based on the influencing factor coefficient to obtain the temperature variation coefficient;
[0011] Step 4: Temperature state determination and analysis: Based on the corresponding temperature variation coefficient in the pre-coating film production process, the corresponding composite temperature state in the pre-coating film production process is determined and analyzed to obtain a composite temperature abnormality signal;
[0012] Step 5: Cooling control execution: Based on the composite temperature abnormality signal, the corresponding temperature in the pre-coating film production process is subjected to cooling control analysis, and a cooling control instruction is triggered accordingly. According to the triggered cooling control instruction, the water flow and water temperature of the cooling equipment are automatically controlled;
[0013] Step 6: Re-test and analysis: Re-test and analyze the corresponding temperature after cooling control in the pre-coated film production process to obtain a re-test unqualified signal. Based on the re-test unqualified signal, a secondary cooling control instruction is triggered. Based on the triggered secondary cooling control instruction, the heating power of the extruder and the roller is automatically adjusted.
[0014] Furthermore, the detection points are arranged on the pre-coated film production line, and the specific arrangement process is as follows:
[0015] The shape, size and position information of the extruder die and roller on the pre-coated film production line are obtained, and the center points of the extruder die and the roller are used as reference points to determine their respective monitoring ranges. Circles are drawn with preset lengths as radii, and the area of the circles is used as the monitoring range corresponding to the extruder die and the roller. The monitoring range is radially arranged, and a number of rays are radiated from the reference point to the surroundings, and detection points are set on the rays to obtain a number of detection points a. The surface areas of the extruder die and the roller are obtained, and the surface areas of the extruder die and the roller are divided into grids of equal size, and detection points are set at the center of each grid to obtain a number of detection points b.
[0016] Furthermore, the corresponding influencing factors in the pre-coating film production process are analyzed and processed, and the specific analysis process is as follows:
[0017] By obtaining the temperature corresponding to each detection point a in the pre-coated film production process within the current monitoring time period, the temperature corresponding to each detection point a within the current monitoring time period is sorted from small to large, and the temperature sequence corresponding to each detection point a within the current monitoring time period is obtained, and the values of the mode corresponding temperature and the median corresponding temperature are extracted from them, and they are calibrated as the mode temperature value Ctemper i and medium temperature value Wtemper i , according to the set calculation model: , thus obtaining the temperature influence value WDZ, where e represents the natural constant, i represents each monitoring time point in the current monitoring time period, and i=1, 2, 3…n, n represents the total number of monitoring time points, and the value is a positive integer, and a1 and a2 represent the set weight coefficients respectively;
[0018] By obtaining the transport time value, transport speed value and transport rate value in the pre-coating film production process during the current monitoring period, and calibrating them as Sranlue i 、Tranlue i and Lranlue i , according to the set calculation model: , thus obtaining the operation impact value YXZ, where Tranlue * and Lranlue * They represent reference transport speed and reference transport rate respectively, and a3, a4 and a5 represent set weight coefficients respectively;
[0019] The values of temperature influence value WDZ and operation influence value YXZ are extracted and normalized according to the formula: , and the influence factor coefficient δ is obtained, where η1 and η2 represent the weight coefficients of temperature influence value and operation influence value respectively.
[0020] Furthermore, the corresponding temperature state in the pre-coating film production process is analyzed and processed, and the specific analysis process is as follows:
[0021] By obtaining the temperature corresponding to each detection point b in the pre-coating film production process during the current monitoring period, and marking it as the detection temperature value Jwz i k , extract the standard temperature corresponding to each detection point b in the pre-coating film production process from the cloud database as the reference temperature corresponding to each detection point b in the pre-coating film production process, and mark it as the reference temperature value Jwz i k* ; According to the formula: , get the temperature variation coefficient WGZ, where wpz i k represents the temperature evaluation index, u represents the natural constant, k represents the number of the extruder die and the roller, k=1, 2, when k=1, it represents the extruder die, when k=2, it represents the roller, λ1, λ2 represent the set weight coefficients respectively.
[0022] Furthermore, the corresponding composite temperature state in the pre-coating film production process is determined and analyzed, and the specific analysis process is as follows:
[0023] The temperature variation coefficient corresponding to the pre-coated film production process within a period of time is used as the ordinate, and the period of time is used as the abscissa, thereby constructing a temperature variation dynamic coordinate system, and the temperature variation coefficient corresponding to the pre-coated film production process within a period of time is plotted on the temperature variation dynamic coordinate system by drawing points, thereby obtaining a temperature variation line graph corresponding to the pre-coated film production process within a period of time, setting a temperature variation threshold corresponding to the pre-coated film production process, thereby drawing a temperature variation reference line parallel to the abscissa in the temperature variation line graph, obtaining the peak point and the valley point in the temperature variation line graph, and drawing perpendicular lines to the temperature variation reference line with the peak inflection point and the valley inflection point in the temperature variation line graph as the center points, thereby obtaining the peak perpendicular point and the valley perpendicular point, and connecting the peak inflection point with the valley perpendicular point and the valley inflection point with the peak perpendicular point through a line segment, thereby obtaining a temperature variation graph, and extracting the area of the temperature variation graph as the temperature variation fluctuation value;
[0024] The temperature fluctuation value is compared with a preset reference comparison interval. If the temperature fluctuation value is outside the reference comparison interval, a composite temperature anomaly signal is generated.
[0025] Furthermore, the cooling control analysis of the corresponding temperature in the pre-coating film production process is performed, and the specific analysis process is as follows:
[0026] According to the captured composite temperature abnormality signal, the corresponding temperature change fluctuation value in the pre-coating film production process is retrieved, and the conversion factor of the corresponding temperature change fluctuation value in the pre-coating film production process is set. According to the conversion analysis, the corresponding conversion temperature change fluctuation comprehensive value in the pre-coating film production process is obtained;
[0027] Set the preset temperature value corresponding to the pre-coating film production process, and perform superposition analysis on the preset temperature value corresponding to the pre-coating film production process and the comprehensive value of the conversion temperature change fluctuation to obtain the corresponding control parameter temperature value in the pre-coating film production process;
[0028] The corresponding control parameter temperature values in the pre-coating film production process are matched and analyzed with the control parameter temperature status table stored in the cloud database, thereby obtaining the corresponding control parameter temperature level in the pre-coating film production process, and at the same time, they are matched with the cooling control parameters corresponding to the control parameter temperature level, thereby obtaining the corresponding cooling control parameters in the pre-coating film production process and triggering the cooling control instructions.
[0029] Furthermore, the temperature corresponding to the cooling control in the pre-coating film production process is re-tested and analyzed, and the specific analysis process is as follows:
[0030] Monitor the temperature variation coefficient after cooling control during the pre-coating film production process over a period of time and calibrate it as WGZ p & At the same time, the reference temperature coefficient corresponding to the cooling control in the pre-coating film production process is extracted from the cloud database and calibrated as CGZ &, according to the formula: , and obtain the retest value ZGP, where p represents each monitoring time period within a period of time, and p=1, 2, 3…m, and m represents the total number of monitoring time periods, which is a positive integer;
[0031] A re-inspection threshold is set, and the re-inspection value is compared and analyzed with the re-inspection threshold. If the re-inspection value is greater than or equal to the re-inspection threshold, a re-inspection failure signal is generated; based on the generated re-inspection failure signal, the values of the re-inspection value and the re-inspection threshold are extracted for difference calculation to obtain a re-inspection difference, and the re-inspection difference is matched and analyzed with the re-inspection difference state table stored in the cloud database, thereby obtaining a re-inspection difference grade, and each re-inspection difference corresponds to a re-inspection difference grade, and at the same time, it is matched with the secondary cooling control parameters corresponding to the re-inspection difference grade, thereby obtaining the secondary cooling control parameters corresponding to the cooling control in the pre-coating film production process, and triggering the secondary cooling control instruction;
[0032] If the re-inspection value is less than the re-inspection threshold, a re-inspection qualified signal is generated.
[0033] Compared with the known prior art, the technical solution provided by the present invention has the following beneficial effects:
[0034] 1. The present invention can achieve comprehensive coverage and accurate monitoring of the temperature of key areas on the pre-coated film production line through radial layout and grid-divided detection point layout scheme, thereby helping to timely discover and solve temperature anomalies and ensure that the subsequent analysis of product quality provides an accurate and comprehensive data basis;
[0035] 2. The present invention, by real-time monitoring the temperature of each detection point a and calculating the temperature influence value, not only considers the temperature factor, but also comprehensively incorporates key operation parameters such as operation time value, operation speed value and operation rate value, and calculates the operation influence value. At the same time, the temperature influence value and the operation influence value are further comprehensively analyzed to obtain the influence factor coefficient. The temperature of the detection point b is obtained based on the influence factor coefficient, and the temperature variation coefficient is calculated accordingly, thereby achieving the ability to accurately evaluate the real-time temperature state of the hot melt adhesive flowing out of the die and under roller extrusion during compounding in the pre-coating film production process, ensuring the accuracy and comprehensiveness of the analysis results, and providing a real-time data basis for production adjustment;
[0036] The present invention can intuitively display the changing trend of the temperature state by constructing a temperature change dynamic coordinate system and drawing a temperature change line graph. At the same time, a temperature change graph is drawn in the temperature change line graph, and the area of the temperature change graph is extracted as the temperature change fluctuation value, which represents the amplitude of the temperature change. The temperature change fluctuation value is compared with a preset reference comparison interval to judge the composite temperature state, thereby realizing accurate judgment of the composite temperature state in the pre-coating film production process, and providing timely and accurate processing warning for production abnormalities;
[0037] The present invention starts cooling control immediately after capturing the composite temperature abnormality signal, standardizes the temperature change fluctuation value through the conversion factor, and then superimposes the preset temperature value to obtain the control parameter temperature value, and at the same time automatically matches the cooling control parameters with the control parameter temperature state table stored in the cloud database, and automatically adjusts the water flow and water temperature of the cooling equipment to ensure that the temperature cooling control of the extruder die and the roller is within a predetermined range, and at the same time, re-inspects and analyzes the corresponding temperature after cooling control in the pre-coated film production process to obtain a re-inspection value, compares and analyzes the re-inspection value with the re-inspection threshold value, and if the re-inspection fails, performs secondary cooling control, and automatically adjusts the heating power of the extruder and the roller, thereby effectively improving the cooling control accuracy and efficiency in the pre-coated film production process, ensuring product quality and stability, and also improving the automation and intelligence level of the production line. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0039] Figure 1 It is a block diagram of the overall method of the present invention. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] like Figure 1 As shown, a method for controlling internal cooling of pre-coating film production comprises:
[0042] Step 1: Detection point layout: Detection points are laid out on the pre-coated film production line. The specific layout is as follows: obtain the shape, size and position information of the extruder die and the roller on the pre-coated film production line, take the center points of the extruder die and the roller as reference points, determine their respective monitoring ranges, draw circles with preset lengths as radii, take the area of the circles as the monitoring ranges corresponding to the extruder die and the roller, and radially layout the monitoring ranges, take the reference point as the starting point, radiate several rays to the surroundings, and set detection points on the rays, thereby obtaining several detection points a, obtain the surface areas of the extruder die and the roller, divide the surface areas of the extruder die and the roller into grids of equal size, and set detection points at the center of each grid, thereby obtaining several detection points b;
[0043] In the above, each detection point is equipped with corresponding sensors to collect data information in the production process in real time, and transmit the collected data information to the cloud database in real time to provide an accurate and comprehensive data basis for subsequent analysis;
[0044] Step 2: Influencing factor analysis: Monitor the corresponding influencing factor information in the pre-coating film production process, and analyze and process the corresponding influencing factors in the pre-coating film production process. The specific analysis process is as follows:
[0045] By obtaining the temperature corresponding to each detection point a in the pre-coated film production process within the current monitoring time period, the temperature corresponding to each detection point a within the current monitoring time period is sorted from small to large, and the temperature sequence corresponding to each detection point a within the current monitoring time period is obtained, and the values of the mode corresponding temperature and the median corresponding temperature are extracted from them, and they are calibrated as the mode temperature value Ctemper i and medium temperature value Wtemper i , according to the set calculation model: , thus obtaining the temperature influence value WDZ, where e represents the natural constant, i represents each monitoring time point in the current monitoring time period, and i=1, 2, 3…n, n represents the total number of monitoring time points, and the value is a positive integer, and a1 and a2 represent the set weight coefficients respectively;
[0046] By obtaining the transport time value, transport speed value and transport rate value in the pre-coating film production process during the current monitoring period, and calibrating them as Sranlue i 、Tranlue i and Lranlue i , according to the set calculation model: , thus obtaining the operation impact value YXZ, where Tranlue * and Lranlue * They represent reference transport speed and reference transport rate respectively, and a3, a4 and a5 represent set weight coefficients respectively;
[0047] It should be noted that the operation time value refers to the time from the time when the equipment starts to operate in the pre-coating film production process to the current monitoring time point, the length of time the equipment continues to operate; the operation speed value refers to the output of pre-coating film produced during the current monitoring time period; the operation rate value refers to the operating power of the motor in the pre-coating film production process;
[0048] The values of temperature influence value WDZ and operation influence value YXZ are extracted and normalized according to the formula: , the influence factor coefficient δ is obtained, wherein η1 and η2 represent the weight coefficients of the temperature influence value and the operation influence value respectively, and η1>η2. The weight coefficient is used to balance the weight of each data in the formula calculation, thereby promoting the accuracy of the calculation result. The specific weight coefficient is reasonably set by those skilled in the art according to the actual situation.
[0049] Step 3: Temperature status monitoring and analysis: Monitor the corresponding temperature status information during the pre-coating film production process, and analyze and process the corresponding temperature status during the pre-coating film production process. The specific analysis process is as follows:
[0050] By obtaining the temperature corresponding to each detection point b in the pre-coating film production process during the current monitoring period, and marking it as the detection temperature value Jwz i k , extract the standard temperature corresponding to each detection point b in the pre-coating film production process from the cloud database as the reference temperature corresponding to each detection point b in the pre-coating film production process, and mark it as the reference temperature value Jwz i k* ; According to the formula: , get the temperature variation coefficient WGZ, where wpz i k represents the temperature evaluation index, u represents the natural constant, k represents the number of the extruder die and the roller, k=1, 2, when k=1, it represents the extruder die, when k=2, it represents the roller, λ1, λ2 represent the set weight coefficients respectively;
[0051] Step 4: Temperature state determination and analysis: Based on the corresponding temperature variation coefficient in the pre-coating film production process, the corresponding composite temperature state in the pre-coating film production process is determined and analyzed. The specific analysis process is as follows:
[0052] The temperature variation coefficient corresponding to the pre-coated film production process within a period of time is used as the ordinate, and the period of time is used as the abscissa, thereby constructing a temperature variation dynamic coordinate system, and the temperature variation coefficient corresponding to the pre-coated film production process within a period of time is plotted on the temperature variation dynamic coordinate system by plotting points, thereby obtaining a temperature variation line graph corresponding to the pre-coated film production process within a period of time, setting a temperature variation threshold corresponding to the pre-coated film production process, thereby drawing a temperature variation reference line parallel to the abscissa in the temperature variation line graph, obtaining the peak point and the valley bottom point in the temperature variation line graph, and drawing perpendicular lines to the temperature variation reference line with the peak inflection point and the valley bottom inflection point in the temperature variation line graph as the center points, thereby obtaining the peak perpendicular point and the valley bottom perpendicular point, and connecting the peak inflection point with the valley bottom perpendicular point and the valley bottom inflection point with the peak perpendicular point through a line segment, thereby obtaining a temperature variation graph, and extracting the area of the temperature variation graph as the temperature variation fluctuation value, recorded as WBZ;
[0053] The temperature fluctuation value is compared with a preset reference comparison interval. If the temperature fluctuation value is within the reference comparison interval, a composite temperature normal signal is generated; if the temperature fluctuation value is outside the reference comparison interval, a composite temperature abnormal signal is generated;
[0054] Step 5: Cooling control execution: Based on the composite temperature abnormality signal, the corresponding temperature in the pre-coating film production process is subjected to cooling control analysis. The specific analysis process is as follows:
[0055] According to the captured composite temperature anomaly signal, the corresponding temperature fluctuation value in the pre-coating film production process is retrieved, and the conversion factor of the corresponding temperature fluctuation value in the pre-coating film production process is set to β, according to the conversion formula: , the corresponding conversion temperature change fluctuation comprehensive value Δ in the pre-coating film production process is obtained, wherein the conversion factor of the corresponding temperature change fluctuation value in the pre-coating film production process indicates that the corresponding temperature change fluctuation value in the pre-coating film production process can be converted into the corresponding conversion temperature change fluctuation comprehensive value in the pre-coating film production process. The specific setting of the conversion factor is reasonably set by those skilled in the art according to the actual situation;
[0056] Set the preset temperature value corresponding to the pre-coating film production process and calibrate it as yswdz, and perform superposition analysis on the preset temperature value corresponding to the pre-coating film production process and the comprehensive value of the conversion temperature change fluctuation, according to the formula: , and obtain the corresponding control parameter temperature value SJW in the pre-coating film production process;
[0057] The corresponding control parameter temperature value in the pre-coating film production process is matched and analyzed with the control parameter temperature state table stored in the cloud database, thereby obtaining the corresponding control parameter temperature level in the pre-coating film production process, and each control parameter temperature value in the pre-coating film production process corresponds to a control parameter temperature level, and at the same time, it is matched with the cooling control parameter corresponding to the control parameter temperature level, thereby obtaining the corresponding cooling control parameter in the pre-coating film production process, and triggering the cooling control instruction. According to the triggered cooling control instruction, the water flow and water temperature of the cooling equipment are automatically controlled, so as to control the temperature of the extruder die and the roller within the allowable range;
[0058] Step 6: Re-test and analysis: Re-test and analyze the corresponding temperature after cooling and regulation in the pre-coating film production process. The specific analysis process is as follows:
[0059] Monitor the temperature variation coefficient after cooling control during the pre-coating film production process over a period of time and calibrate it as WGZ p & At the same time, the reference temperature coefficient corresponding to the cooling control in the pre-coating film production process is extracted from the cloud database and calibrated as CGZ & , according to the formula: , and obtain the retest value ZGP, where p represents each monitoring time period within a period of time, and p=1, 2, 3…m, and m represents the total number of monitoring time periods, which is a positive integer;
[0060] A re-inspection threshold is set, and the re-inspection value is compared and analyzed with the re-inspection threshold. If the re-inspection value is greater than or equal to the re-inspection threshold, a re-inspection failure signal is generated; based on the generated re-inspection failure signal, the values of the re-inspection value and the re-inspection threshold are extracted for difference calculation to obtain a re-inspection difference, and the re-inspection difference is matched and analyzed with the re-inspection difference state table stored in the cloud database to obtain a re-inspection difference grade, and each re-inspection difference corresponds to a re-inspection difference grade, and at the same time, it is matched with the secondary cooling control parameters corresponding to the re-inspection difference grade, thereby obtaining the secondary cooling control parameters corresponding to the cooling control in the pre-coated film production process, and triggering the secondary cooling control instruction, and according to the triggered secondary cooling control instruction, the heating power of the extruder and the roller is automatically controlled;
[0061] If the re-inspection value is less than the re-inspection threshold, a re-inspection qualified signal is generated and displayed on the display terminal for notification.
[0062] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for controlling internal cooling in the production of pre-coated films, characterized in that: include: Step 1: Detection point layout: Detection points are laid out on the pre-coated film production line. The specific layout process is as follows: The shape, size and position information of the extruder die and roller on the pre-coated film production line are obtained, and the center points of the extruder die and roller are respectively used as reference points to determine their respective monitoring ranges, and circles are drawn with preset lengths as radii, and the circle areas are used as the monitoring ranges corresponding to the extruder die and roller, and the monitoring ranges are radially arranged, and a number of rays are radiated to the surroundings with the reference point as the starting point, and detection points are set on the rays, thereby obtaining a number of detection points a, and the surface areas of the extruder die and roller are obtained, and the surface areas of the extruder die and roller are respectively divided into grids of equal size, and detection points are set at the center of each grid, thereby obtaining a number of detection points b; Step 2: Influencing factor analysis: Monitor the corresponding influencing factor information in the pre-coating film production process, and analyze and process the corresponding influencing factors in the pre-coating film production process. The specific analysis process is as follows: By obtaining the temperature corresponding to each detection point a in the pre-coated film production process within the current monitoring time period, the temperature corresponding to each detection point a within the current monitoring time period is sorted from small to large, and the temperature sequence corresponding to each detection point a within the current monitoring time period is obtained, and the values of the mode corresponding temperature and the median corresponding temperature are extracted from them, and they are calibrated as the mode temperature value Ctemper i and medium temperature value Wtemper i , according to the set calculation model: Thus, the temperature influence value WDZ is obtained, wherein e represents a natural constant, i represents each monitoring time point in the current monitoring time period, and i=1, 2, 3…n, n represents the total number of monitoring time points, and the value is a positive integer, and a1 and a2 represent the set weight coefficients respectively; By obtaining the transport time value, transport speed value and transport rate value in the pre-coating film production process during the current monitoring period, and calibrating them as Sranlue i 、Tranlue i and Lranlue i , according to the set calculation model: The operation impact value YXZ is obtained, where Tranlue * and Lranlue * They represent reference transport speed and reference transport rate respectively, and a3, a4 and a5 represent set weight coefficients respectively; The values of the temperature influence value WDZ and the operation influence value YXZ are extracted and normalized, and the influence factor coefficient δ is obtained according to the formula: δ=WDZ×η1+YXZ×η2, where η1 and η2 represent the weight coefficients of the temperature influence value and the operation influence value respectively; Step 3: Temperature status monitoring and analysis: Monitor the corresponding temperature status information during the pre-coating film production process, and analyze and process the corresponding temperature status during the pre-coating film production process based on the influencing factor coefficient. The specific analysis process is as follows: By obtaining the temperature corresponding to each detection point b in the pre-coating film production process during the current monitoring period, and marking it as the detection temperature value Jwz i k , extract the standard temperature corresponding to each detection point b in the pre-coating film production process from the cloud database as the reference temperature corresponding to each detection point b in the pre-coating film production process, and mark it as the reference temperature value Jwz i k* ; According to the formula: Get the temperature variation coefficient WGZ, where wpz i k represents the temperature evaluation index, u represents the natural constant, k represents the number of the extruder die and the roller, k = 1, 2, when k = 1, it represents the extruder die, when k = 2, it represents the roller, λ1, λ2 represent the set weight coefficients respectively; Step 4: Temperature state determination and analysis: Based on the corresponding temperature variation coefficient in the pre-coating film production process, the corresponding composite temperature state in the pre-coating film production process is determined and analyzed to obtain a composite temperature abnormality signal; Step 5: Cooling control execution: Based on the composite temperature abnormality signal, the corresponding temperature in the pre-coating film production process is subjected to cooling control analysis, and a cooling control instruction is triggered accordingly. According to the triggered cooling control instruction, the water flow and water temperature of the cooling equipment are automatically controlled; Step 6: Re-test and analysis: Re-test and analyze the corresponding temperature after cooling control in the pre-coated film production process to obtain a re-test unqualified signal. Based on the re-test unqualified signal, a secondary cooling control instruction is triggered. Based on the triggered secondary cooling control instruction, the heating power of the extruder and the roller is automatically adjusted.
2. A method for controlling internal cooling of pre-coating film production according to claim 1, characterized in that: The determination and analysis of the corresponding composite temperature state in the pre-coating film production process is as follows: The temperature variation coefficient corresponding to the pre-coated film production process within a period of time is used as the ordinate, and the period of time is used as the abscissa, thereby constructing a temperature variation dynamic coordinate system, and the temperature variation coefficient corresponding to the pre-coated film production process within a period of time is plotted on the temperature variation dynamic coordinate system by drawing points, thereby obtaining a temperature variation line graph corresponding to the pre-coated film production process within a period of time, setting a temperature variation threshold corresponding to the pre-coated film production process, thereby drawing a temperature variation reference line parallel to the abscissa in the temperature variation line graph, obtaining the peak point and the valley point in the temperature variation line graph, and drawing perpendicular lines to the temperature variation reference line with the peak inflection point and the valley inflection point in the temperature variation line graph as the center points, thereby obtaining the peak perpendicular point and the valley perpendicular point, and connecting the peak inflection point with the valley perpendicular point and the valley inflection point with the peak perpendicular point through a line segment, thereby obtaining a temperature variation graph, and extracting the area of the temperature variation graph as the temperature variation fluctuation value; The temperature fluctuation value is compared with a preset reference comparison interval. If the temperature fluctuation value is outside the reference comparison interval, a composite temperature anomaly signal is generated.
3. The method for controlling internal cooling of pre-coating film production according to claim 1, characterized in that: The cooling control analysis of the corresponding temperature in the pre-coating film production process is as follows: According to the captured composite temperature abnormality signal, the corresponding temperature change fluctuation value in the pre-coating film production process is retrieved, and the conversion factor of the corresponding temperature change fluctuation value in the pre-coating film production process is set. According to the conversion analysis, the corresponding conversion temperature change fluctuation comprehensive value in the pre-coating film production process is obtained; Set the preset temperature value corresponding to the pre-coating film production process, and perform superposition analysis on the preset temperature value corresponding to the pre-coating film production process and the comprehensive value of the conversion temperature change fluctuation to obtain the corresponding control parameter temperature value in the pre-coating film production process; The corresponding control parameter temperature values in the pre-coating film production process are matched and analyzed with the control parameter temperature status table stored in the cloud database, thereby obtaining the corresponding control parameter temperature level in the pre-coating film production process, and at the same time, they are matched with the cooling control parameters corresponding to the control parameter temperature level, thereby obtaining the corresponding cooling control parameters in the pre-coating film production process and triggering the cooling control instructions.
4. The method for controlling internal cooling of pre-coating film production according to claim 1, characterized in that: The temperature corresponding to the cooling control in the pre-coating film production process is re-tested and analyzed, and the specific analysis process is as follows: Monitor the temperature variation coefficient after cooling control during the pre-coating film production process over a period of time and calibrate it as WGZ p & At the same time, the reference temperature coefficient corresponding to the cooling control in the pre-coating film production process is extracted from the cloud database and calibrated as CGZ & , according to the formula: A retest value ZGP is obtained, wherein p represents each monitoring time period within a period of time, and p=1, 2, 3…m, and m represents the total number of each monitoring time period, which is a positive integer; A re-inspection threshold is set, and the re-inspection value is compared and analyzed with the re-inspection threshold. If the re-inspection value is greater than or equal to the re-inspection threshold, a re-inspection failure signal is generated; based on the generated re-inspection failure signal, the values of the re-inspection value and the re-inspection threshold are extracted for difference calculation to obtain a re-inspection difference, and the re-inspection difference is matched and analyzed with the re-inspection difference state table stored in the cloud database, thereby obtaining a re-inspection difference grade, and each re-inspection difference corresponds to a re-inspection difference grade, and at the same time, it is matched with the secondary cooling control parameters corresponding to the re-inspection difference grade, thereby obtaining the secondary cooling control parameters corresponding to the cooling control in the pre-coating film production process, and triggering the secondary cooling control instruction; If the re-inspection value is less than the re-inspection threshold, a re-inspection qualified signal is generated.
Citation Information
Patent Citations
System for achieving automation control over film covering machine
CN109016831A
Spiral conical roller equidistant rolling method for large-size titanium alloy bar
CN115301731A
Extrusion preparation method and system for LCP film production
CN115816798A
Cooling control method and system for hot-rolled seamless steel pipe
CN116727462A
Cooling control system and method in degradable film production line
CN118003530A