A method, device, equipment and medium for estimating human activity intensity

By dividing the target area into multiple grid units and calculating based on entropy value weighting, the problem of poor generalization of human activity intensity estimation method under complex terrain and landforms is solved, and the refined quantitative calculation and accuracy improvement of plateau mountainous areas is achieved .

CN118364214BActive Publication Date: 2024-11-08CENT SOUTH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410774324.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-11-08
Estimated Expiration
2044-06-17

AI Technical Summary

Technical Problem

The existing human activity intensity estimation method is poorly applicable under the influence of complex topography and landforms, and has subjectivity and expert dependence, making it difficult to apply to refined quantitative calculations in plateau mountainous areas.

Method used

Divide the target area into multiple grid units, obtain multiple human activity index values ​​of natural factors, economic factors and human factors, calculate the data standard deviation and correlation coefficient, obtain the final weight based on entropy weighting, and calculate each grid unit the intensity of human activity.

Benefits of technology

It improves the generalization and accuracy of the estimation method of human activity intensity, reduces the requirements for data availability, avoids artificial weight setting, and is suitable for refined quantitative calculations in plateau mountain areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118364214B_ABST
    Figure CN118364214B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of spatiotemporal data mining, and provides a method, device, equipment and medium for estimating the intensity of human activities. The method includes: dividing the target area into multiple grid units; obtaining the values ​​of multiple human activity indicators of the grid units; calculating the data standard deviation of each human activity indicator based on the values ​​of all human activity indicators, and calculating the degree of irrelevance of each human activity indicator based on the correlation coefficient; obtaining the preliminary weight of each human activity indicator based on the data standard deviation and degree of irrelevance of each human activity indicator; calculating the entropy value of the human activity indicator based on the correlation coefficient, and weighting the preliminary weight of the human activity indicator based on the entropy value to obtain the final weight; calculating the human activity intensity of the grid unit based on the final weight of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid unit. The method of the present application can improve the versatility of the method for estimating the intensity of human activities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of spatiotemporal data mining, and in particular to a method, device, equipment and medium for estimating the intensity of human activities. Background Art

[0002] Human activities refer to the various development, utilization and protection behaviors of the natural environment that humans have in order to meet their own survival and development needs. Human activities of different scales and types have had a lasting and far-reaching impact on the Earth's ecosystem. Human activity intensity (HAI) refers to the degree of interference caused by human activities in a certain area. It is an important quantifiable indicator to measure the degree of human activities in the natural environment.

[0003] Therefore, assessing the intensity of human activities is of great significance for determining the impact of humans on regional environmental vulnerability and improving the timeliness and pertinence of disaster prevention and mitigation.

[0004] Through a large number of studies, the relationship between human activities and land use and ecological changes has been obtained. However, people's attention has been focused on large areas, such as plains, oceans and wetlands. In addition, due to spatial fragmentation and terrain factors, these methods cannot be directly applied to plateaus or mountains. Another perspective to capture the above relationship is land use intensity. Traditional studies focus on land use categories, carbon emissions and land use changes. Although scattered indicators can also reflect human activities, they may lead to a lack of in-depth understanding of the causes of research problems or their impacts.

[0005] Therefore, existing technical methods have the following limitations in actual disaster prevention decision-making: (1) Due to the influence of complex topography, existing methods for estimating human activity intensity are generally not suitable for large-scale, refined quantitative calculations in plateau and mountainous areas; (2) Existing methods for estimating human activity intensity are subjective and expert-dependent in terms of indicator selection and weight setting, which is not conducive to cross-regional promotion and generalization.

[0006] This shows that the existing methods for estimating human activity intensity have the problem of poor versatility. Summary of the invention

[0007] The present application provides a method, device, equipment and medium for estimating the intensity of human activities, which can solve the problem of poor versatility of methods for estimating the intensity of human activities.

[0008] In a first aspect, an embodiment of the present application provides a method for estimating human activity intensity, the method comprising:

[0009] Divide the target area into a plurality of grid cells;

[0010] For each grid unit, the values ​​of multiple human activity indicators of the grid unit are obtained; the multiple human activity indicators include natural factors, economic factors and human factors related to disaster prevention decision-making;

[0011] According to the values ​​of all human activity indicators, the standard deviation of the data of each human activity indicator is calculated, and according to the correlation coefficient between every two human activity indicators, the degree of uncorrelation of each human activity indicator is calculated;

[0012] Obtain the preliminary weight of each human activity indicator based on the data standard deviation and irrelevance of each human activity indicator;

[0013] For each human activity indicator, the entropy value of the human activity indicator is calculated based on the correlation coefficient between the human activity indicator and each other human activity indicator, and the preliminary weight of the human activity indicator is weighted based on the entropy value to obtain the final weight;

[0014] For each grid cell, the human activity intensity of the grid cell is calculated according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid cell.

[0015] Optionally, natural factors include land use change, building outline, surface deformation, water system, and coal mine distribution;

[0016] Economic factors include facility distribution points, facility distribution areas, GDP output value distribution, road network, and night light distribution;

[0017] Human factors include population density and carbon emissions.

[0018] Optionally, calculate the data standard deviation of each human activity indicator based on the values ​​of all human activity indicators, including:

[0019] By formula:

[0020]

[0021]

[0022] Calculate the Standard deviation of data for human activity indicators ;

[0023] in, The number of grid cells representing the target area, , represents the number of types of human activity indicators, Indicates The grid cell The values ​​of human activity indicators, Indicates The mean of the data of the human activity indicators;

[0024] According to the correlation coefficient between each two human activity indicators, the degree of irrelevance of each human activity indicator is calculated, including:

[0025] By formula:

[0026]

[0027] Calculate the The degree of irrelevance of the human activity indicators ;

[0028] in, Indicates Human activity indicators and The correlation coefficients between the human activity indicators are , .

[0029] Optionally, a preliminary weight of each human activity indicator is obtained based on the data standard deviation and irrelevance of each human activity indicator, including:

[0030] For each data human activity indicator, perform the following steps:

[0031] Calculate the amount of information based on the standard deviation and irrelevance of the data of human activity indicators;

[0032] Calculate preliminary weights of human activity indicators based on information content.

[0033] Optionally, the information content is calculated based on the standard deviation and irrelevance of the human activity indicators, including:

[0034] By formula:

[0035]

[0036] Calculate the Information content of human activity indicators ;

[0037] in, Indicates The standard deviation of the data of human activity indicators, Indicates The degree of uncorrelation between the various human activity indicators, , The number of categories representing human activity indicators;

[0038] Calculate preliminary weights of human activity indicators based on the amount of information, including:

[0039] By formula:

[0040]

[0041] Calculate the Preliminary weights of human activity indicators .

[0042] Optionally, the entropy value of the human activity indicator is calculated based on the correlation coefficient between the human activity indicator and each other human activity indicator, including:

[0043] By formula:

[0044]

[0045] Calculate the Entropy values ​​of human activity indicators ;

[0046] in, , represents the number of types of human activity indicators, Indicates Human activity indicators and Relative correlation coefficients between the human activity indicators:

[0047]

[0048] in, , , represents the number of types of human activity indicators, Indicates Human activity indicators and Correlation coefficients between various human activity indicators;

[0049] The final weights are obtained by weighting the preliminary weights of human activity indicators based on entropy values, including:

[0050] By formula:

[0051]

[0052] Calculate the Final weights of human activity indicators ;

[0053] in, Indicates Preliminary weights of the human activity indicators, Represents the harmonic parameter.

[0054] Optionally, the human activity intensity of the grid cell is calculated according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid cell, including:

[0055] By formula:

[0056]

[0057] Calculate the Human activity intensity per grid cell ;

[0058] in, Indicates The grid cell The values ​​of human activity indicators, , The number of grid cells representing the target area.

[0059] In a second aspect, an embodiment of the present application provides a human activity intensity estimation device, comprising:

[0060] A partitioning module divides the target area into multiple grid cells;

[0061] An acquisition module, for each grid unit, acquires values ​​of multiple human activity indicators of the grid unit; the multiple human activity indicators include natural factors, economic factors and human factors related to disaster prevention decision-making;

[0062] The first calculation module calculates the data standard deviation of each human activity indicator according to the values ​​of all human activity indicators, and calculates the degree of irrelevance of each human activity indicator according to the correlation coefficient between every two human activity indicators;

[0063] A preliminary weight acquisition module is used to acquire the preliminary weight of each human activity indicator based on the data standard deviation and irrelevance degree of each human activity indicator;

[0064] A weighting module, for each human activity indicator, calculates the entropy value of the human activity indicator based on the correlation coefficient between the human activity indicator and each other human activity indicator, and weights the preliminary weight of the human activity indicator based on the entropy value to obtain the final weight;

[0065] The second calculation module calculates the human activity intensity of each grid cell according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid cell.

[0066] In a third aspect, an embodiment of the present application provides a terminal device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned method for estimating the intensity of human activities when executing the above-mentioned computer program.

[0067] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the above-mentioned method for estimating the intensity of human activities is implemented.

[0068] The above solution of the present application has the following beneficial effects:

[0069] In an embodiment of the present application, the target area is divided into multiple grid units, and then for each grid unit, the values ​​of multiple human activity indicators of the grid unit are obtained, and then the data standard deviation of each human activity indicator is calculated based on the values ​​of all human activity indicators, and the degree of irrelevance of each human activity indicator is calculated based on the correlation coefficient between every two human activity indicators, and then the preliminary weight of each human activity indicator is obtained based on the data standard deviation and the degree of irrelevance of each human activity indicator, and then for each human activity indicator, based on the correlation coefficient between the human activity indicator and each other human activity indicator, the entropy value of the human activity indicator is calculated, and the preliminary weight of the human activity indicator is weighted based on the entropy value to obtain the final weight, and then for each grid unit, according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid unit, the human activity intensity of the grid unit is obtained. Among them, the target area is divided into multiple grid units, so that subsequent analysis is carried out on the grid units, which is not affected by factors such as the scope and terrain of the target area, thereby improving the versatility of the method. The human activity indicators set are natural factors, economic factors, and cultural factors. These indicators are representative of human activities and there is no need to strictly consider the availability of data. At the same time, the final weight obtained by weighting the preliminary weight based on the entropy value is highly accurate, and there is no need to set the weight manually, thereby improving the accuracy of the human activity intensity while improving the versatility of the human activity intensity estimation method.

[0070] Other beneficial effects of the present application will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0072] Figure 1 A flowchart of a method for estimating human activity intensity provided in an embodiment of the present application;

[0073] Figure 2 A schematic diagram of human activity intensity results provided by an embodiment of the present application;

[0074] Figure 3 A schematic diagram of the structure of a human activity intensity estimation device provided in an embodiment of the present application;

[0075] Figure 4 A schematic diagram of the structure of a terminal device provided in one embodiment of the present application. DETAILED DESCRIPTION

[0076] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0077] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0078] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0079] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0080] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0081] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0082] In view of the problem that the existing human activity intensity estimation methods have poor versatility, an embodiment of the present application provides a human activity intensity estimation method, which divides the target area into multiple grid units, and then obtains the values ​​of multiple human activity indicators of the grid unit for each grid unit respectively, and then calculates the data standard deviation of each human activity indicator according to the values ​​of all human activity indicators, and calculates the degree of irrelevance of each human activity indicator according to the correlation coefficient between every two human activity indicators, and then obtains the preliminary weight of each human activity indicator based on the data standard deviation and the degree of irrelevance of each human activity indicator, and then calculates the entropy value of the human activity indicator for each human activity indicator based on the correlation coefficient between the human activity indicator and each other human activity indicator, and weights the preliminary weight of the human activity indicator based on the entropy value to obtain the final weight, and then obtains the human activity intensity of the grid unit according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid unit for each grid unit. Among them, the target area is divided into multiple grid units, so that subsequent analysis is carried out on the grid units, which is not affected by factors such as the scope and terrain of the target area, thereby improving the versatility of the method. The human activity indicators set are natural factors, economic factors, and cultural factors. These indicators are representative of human activities and there is no need to strictly consider the availability of data. At the same time, the final weight obtained by weighting the preliminary weight based on the entropy value is highly accurate, and there is no need to set the weight manually, thereby improving the accuracy of the human activity intensity while improving the versatility of the human activity intensity estimation method.

[0083] Next, the method for estimating the intensity of human activities provided in this application is exemplified.

[0084] like Figure 1 As shown, the method for estimating human activity intensity provided by this application includes the following steps:

[0085] Step 11: Divide the target area into a plurality of grid cells.

[0086] It should be noted that the above-mentioned target area is the area where human activity intensity estimation is required, such as a district or a county.

[0087] For example, the target area can be divided into a plurality of grid cells using computer software such as Matlab.

[0088] It is worth mentioning that the target area is divided into multiple grid units, so that subsequent analysis is performed on grid units, which is not affected by factors such as the scope and terrain of the target area, thereby improving the versatility of the method.

[0089] Step 12: For each grid cell, obtain the values ​​of multiple human activity indicators of the grid cell.

[0090] The above-mentioned various human activity indicators include natural factors, economic factors and human factors related to disaster prevention decisions. Natural factors include land use changes, building outlines, surface deformation, water systems, and coal mine distribution; economic factors include facility distribution points, facility distribution areas, GDP output value distribution, road networks, and night light distribution; human factors include population density and carbon emissions.

[0091] In some embodiments of the present application, the above-mentioned various human activity indicators include: surface deformation, facility distribution points (i.e., information points POI, Polnt of Information), water systems, road networks, land use changes, building outlines, facility distribution surfaces (i.e., information surfaces AOI, Area of ​​Interest), coal mine distribution, gross domestic product (GDP, Gross Domestic Product) output value distribution, carbon emissions, night light distribution (i.e., night light remote sensing), and population density. The above-mentioned facility distribution points can be facilities that can be regarded as a point, such as hospitals, stores, subway stations, etc., and the above-mentioned facility distribution surfaces can be facilities with a range, such as communities, parks, and tourist attractions.

[0092] It should be noted that, when it comes to geological disasters, the human activities taken by humans through natural transformation are mainly reflected in three factors: deforestation and land reclamation, slope cutting and house building, and resource exploitation. The indicators set based on these three aspects include five indicators: land use change, building outline, surface deformation, water system, and coal mine distribution; the human activities taken by humans through economic development are mainly reflected in three factors: real economy, transportation development, and night economy. The indicators set based on these three aspects include five indicators: facility distribution points, facility distribution areas, GDP output value distribution, road network, and night light distribution; the human activities taken by humans through humanistic regulation are mainly reflected in two factors: population distribution and pollution emissions. The indicators set based on these two aspects include population density and carbon emissions. The above indicators comprehensively consider the historical, current, and future status of human activities and are irreplaceable.

[0093] Exemplarily, the values ​​of various human activity indicators of the target area can be obtained by accessing an information disclosure website that records natural, economic, and cultural information of the target area.

[0094] It should be noted that after obtaining the values ​​of various human activity indicators, data conversion is required to conform to the data format of the grid unit. For human activity indicators whose data format is point data, such as surface deformation data and facility distribution point data, it is necessary to determine the target coordinate system and resolution to which the point data is to be converted. Then, the GIS (Geographic Information System) can be used to convert the data. System) software or scripting tools can be used to convert point data into raster data, and further processing such as clipping, merging, and reclassification can be performed as needed, and the processed raster data can be uniformly output into the required format. For human activity indicators whose data format is line data, such as water system data and road network data, it is necessary to determine the target coordinate system and resolution for converting the line data, and then GIS software or scripting tools can be used to rasterize the line data, convert line segments into pixels to generate raster data, and further processing such as clipping, merging, and reclassification can be performed as needed, and the processed raster data can be uniformly output into the required format. For human activity indicators whose data format is surface data, such as facility distribution surface data and coal mine distribution data, it is necessary to determine the target coordinate system and resolution for converting the surface data, and then GIS software or scripting tools can be used to rasterize the line data, convert surface features into pixels to generate raster data, and further processing such as clipping, merging, and reclassification can be performed as needed, and the processed raster data can be uniformly output into the required format.

[0095] It is worth mentioning that the human activity indicators set are natural transformation, economic development, and humanistic regulation. These indicators are representative of human activities and there is no need to strictly consider the availability of data, making the method of this application applicable to a wide range of areas.

[0096] Step 13, according to the values ​​of all human activity indicators, calculate the data standard deviation of each human activity indicator, and according to the correlation coefficient between every two human activity indicators, calculate the degree of irrelevance of each human activity indicator.

[0097] In some embodiments of the present application, the steps of calculating the data standard deviation of each human activity indicator according to the values ​​of all human activity indicators, and calculating the degree of irrelevance of each human activity indicator according to the correlation coefficient between every two human activity indicators are specifically as follows:

[0098] In the first step, the standard deviation of the data for each human activity indicator is calculated based on the values ​​of all human activity indicators.

[0099] Specifically, through the formula:

[0100]

[0101]

[0102] Calculate the Standard deviation of data for human activity indicators .

[0103] in, The number of grid cells representing the target area, , Indicates the number of types of human activity indicators, Indicates The grid cell The values ​​of human activity indicators, Indicates The mean data of various human activity indicators.

[0104] The second step is to calculate the degree of uncorrelation of each human activity indicator based on the correlation coefficient between every two human activity indicators.

[0105] Specifically, through the formula:

[0106]

[0107] Calculate the The degree of irrelevance of the human activity indicators .

[0108] in, Indicates Human activity indicators and The correlation coefficients between the human activity indicators are , .

[0109] For example, the data standard deviation and the degree of uncorrelation of each human activity indicator can be calculated using computer software such as Mathematica. The correlation coefficient calculation formula can be used to calculate the correlation coefficient between each two human activity indicators, such as, by the formula:

[0110]

[0111] Calculate the Human activity indicators and Correlation coefficients between human activity indicators .

[0112] in, Indicates Human activity indicators and The covariance between the human activity indicators, Indicates The variance of the human activity indicators, Indicates The variance of the human activity indicators.

[0113] It is worth mentioning that the data standard deviation can describe the data fluctuation of human activity indicators. The larger the data standard deviation, the stronger the volatility of the value of the human activity indicator. The degree of irrelevance can describe the positive correlation between the human activity indicator and each other human activity indicator. The greater the degree of irrelevance, the greater the positive correlation between the human activity indicator and each other human activity indicator.

[0114] Step 14, obtaining a preliminary weight of each human activity indicator based on the data standard deviation and irrelevance degree of each human activity indicator.

[0115] In some embodiments of the present application, the step of obtaining the preliminary weight of each human activity indicator based on the data standard deviation and irrelevance degree of each human activity indicator is specifically as follows:

[0116] For each data human activity indicator, perform the following steps:

[0117] In the first step, the amount of information is calculated based on the data standard deviation and irrelevance of human activity indicators.

[0118] Specifically, through the formula:

[0119]

[0120] Calculate the Information content of human activity indicators .

[0121] in, Indicates The standard deviation of the data of human activity indicators, Indicates The degree of uncorrelation between the various human activity indicators, , Represents the number of categories of human activity indicators.

[0122] In the second step, the preliminary weights of human activity indicators are calculated based on the amount of information.

[0123] Specifically, through the formula:

[0124]

[0125] Calculate the Preliminary weights of human activity indicators .

[0126] Exemplarily, the above formula can be run using computer software such as Mathematica to obtain a preliminary weight for each human activity indicator.

[0127] It is worth mentioning that the preliminary weights of human activity indicators obtained by considering the standard deviation and irrelevance of the data have high accuracy.

[0128] Step 15, for each human activity indicator, based on the correlation coefficient between the human activity indicator and each other human activity indicator, calculate the entropy value of the human activity indicator, and weight the preliminary weight of the human activity indicator based on the entropy value to obtain the final weight.

[0129] In some embodiments of the present application, the steps of calculating the entropy value of the human activity indicator based on the correlation coefficient between the human activity indicator and each other human activity indicator, and weighting the preliminary weight of the human activity indicator based on the entropy value to obtain the final weight are specifically as follows:

[0130] In the first step, the entropy value of the human activity indicator is calculated based on the correlation coefficient between the human activity indicator and each other human activity indicator.

[0131] Specifically, through the formula:

[0132]

[0133] Calculate the Entropy values ​​of human activity indicators .

[0134] in, , Indicates the number of types of human activity indicators, Indicates Human activity indicators and Relative correlation coefficients between the human activity indicators:

[0135]

[0136] in, , , Indicates the number of types of human activity indicators, Indicates Human activity indicators and The correlation coefficients between the various human activity indicators.

[0137] In the second step, the preliminary weights of human activity indicators are weighted based on the entropy value to obtain the final weights.

[0138] Specifically, through the formula:

[0139]

[0140] Calculate the Final weights of human activity indicators .

[0141] in, Indicates Preliminary weights of the human activity indicators, Represents the harmonic parameter.

[0142] It should be noted that the above-mentioned reconciliation parameter represents the multiple of the importance of the contrast and conflict between indicators compared to the reference value of the indicator importance, has important physical significance, and is usually taken as 0.5, 1 or 2.

[0143] Exemplarily, the above formula can be run using computer software such as Mathematica to obtain the final weight of each human activity indicator.

[0144] It is worth mentioning that the final weights obtained by weighting the preliminary weights based on the entropy value are highly accurate and do not require manual setting of weights, thus reducing the cost of estimating the intensity of human activities.

[0145] Step 16, for each grid cell, calculate the human activity intensity of the grid cell according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid cell.

[0146] Specifically, through the formula:

[0147]

[0148] Calculate the Human activity intensity per grid cell .

[0149] in, Indicates The grid cell The values ​​of human activity indicators, , The number of grid cells representing the target area.

[0150] Exemplarily, the above formula can be run using computer software such as Mathematica to obtain the intensity of human activities in each grid cell.

[0151] It should be noted that the intensity of human activities can be used to predict geological disasters in the target area. If the intensity of human activities in the first grid cell of the target area is greater than the intensity threshold, it means that the area corresponding to the grid cell is likely to have a high probability of geological disasters, and geological disaster prevention should be carried out in combination with the current actual conditions of the area (such as rainfall, etc.).

[0152] It is worth mentioning that the target area is divided into multiple grid units, so that subsequent analysis is carried out on the grid units, which is not affected by factors such as the scope and terrain of the target area, thereby improving the versatility of the method. The human activity indicators set are natural factors, economic factors, and cultural factors. These indicators are representative of human activities and there is no need to strictly consider the availability of data. At the same time, the final weight obtained by weighting the preliminary weight based on the entropy value is highly accurate, and there is no need to set the weight manually, thereby improving the accuracy of the human activity intensity while improving the versatility of the human activity intensity estimation method.

[0153] The human activity intensity estimation method of the present application is illustrated below with reference to a specific example.

[0154] Taking a province as the target area, the values ​​of various human activity indicators of the province are shown in Table 1.

[0155] Table 1

[0156]

[0157] The Landsat-8 images in the table are satellite image data, which are used together with land cover data to study land use changes.

[0158] According to the data in Table 1, the human activity intensity results of the province obtained by using the human activity intensity estimation method provided in this application are as follows: Figure 2 As shown, Figure 2 The horizontal axis is longitude, the vertical axis is latitude, and the scale is one centimeter equals 100 kilometers (km). Different grayscale represents different values ​​of human activity intensity. The range of human activity intensity (i.e. the Value of the tif file in the figure) is: the lowest (Low) is 0, the highest (High) is 1, and above is north (N). The solid line is the provincial boundary.

[0159] It can be seen that the human activity intensity obtained by using the human activity intensity estimation method provided by the present application is highly accurate, is not constrained by factors such as the area of ​​the target area, and has strong versatility.

[0160] The human activity intensity estimation device provided in this application is exemplarily described below.

[0161] like Figure 3As shown, the embodiment of the present application provides a human activity intensity estimation device, and the human activity intensity estimation device 300 includes:

[0162] A division module 301 divides the target area into a plurality of grid cells;

[0163] The acquisition module 302 acquires the values ​​of various human activity indicators of each grid unit respectively; the various human activity indicators include natural factors, economic factors and human factors related to disaster prevention decision-making;

[0164] The first calculation module 303 calculates the data standard deviation of each human activity indicator according to the values ​​of all human activity indicators, and calculates the degree of uncorrelation of each human activity indicator according to the correlation coefficient between every two human activity indicators;

[0165] A preliminary weight acquisition module 304 acquires a preliminary weight of each human activity indicator based on the data standard deviation and irrelevance degree of each human activity indicator;

[0166] A weighting module 305 calculates the entropy value of each human activity indicator based on the correlation coefficient between the human activity indicator and each other human activity indicator, and weights the preliminary weight of the human activity indicator based on the entropy value to obtain a final weight;

[0167] The second calculation module 306 calculates the human activity intensity of each grid cell according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid cell.

[0168] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0169] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0170] like Figure 4 As shown, an embodiment of the present application provides a terminal device. The terminal device D10 of this embodiment includes: at least one processor D100 ( Figure 4 Only one processor is shown in the figure), a memory D101, and a computer program D102 stored in the memory D101 and executable on the at least one processor D100, wherein the processor D100 implements the steps of any of the above-mentioned method embodiments when executing the computer program D102.

[0171] Specifically, when the processor D100 executes the computer program D102, it divides the target area into multiple grid cells, and then obtains the values ​​of multiple human activity indicators of each grid cell respectively, and then calculates the data standard deviation of each human activity indicator based on the values ​​of all human activity indicators, and calculates the degree of irrelevance of each human activity indicator based on the correlation coefficient between every two human activity indicators, and then obtains the preliminary weight of each human activity indicator based on the data standard deviation and the degree of irrelevance of each human activity indicator, and then calculates the entropy value of the human activity indicator based on the correlation coefficient between the human activity indicator and each other human activity indicator for each human activity indicator, and weights the preliminary weight of the human activity indicator based on the entropy value to obtain the final weight, and then obtains the human activity intensity of the grid cell according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid cell for each grid cell. Among them, the target area is divided into multiple grid units, so that subsequent analysis is carried out on the grid units, which is not affected by factors such as the scope and terrain of the target area, thereby improving the versatility of the method. The human activity indicators set are natural factors, economic factors, and cultural factors. These indicators are representative of human activities and there is no need to strictly consider the availability of data. At the same time, the final weight obtained by weighting the preliminary weight based on the entropy value is highly accurate, and there is no need to set the weight manually, thereby improving the accuracy of the human activity intensity while improving the versatility of the human activity intensity estimation method.

[0172] The processor D100 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0173] In some embodiments, the memory D101 may be an internal storage unit of the terminal device D10, such as a hard disk or memory of the terminal device D10. In other embodiments, the memory D101 may also be an external storage device of the terminal device D10, such as a plug-in hard disk, a smart memory card (SMC, SmartMedia Card), a secure digital (SD, Secure Digital) card, a flash card (Flash Card), etc. equipped on the terminal device D10. Further, the memory D101 may also include both an internal storage unit of the terminal device D10 and an external storage device. The memory D101 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program, etc. The memory D101 may also be used to temporarily store data that has been output or is to be output.

[0174] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0175] An embodiment of the present application provides a computer program product. When the computer program product is run on a terminal device, the terminal device can implement the steps in the above-mentioned method embodiments when executing the computer program product.

[0176] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned various method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the human activity intensity estimation method device / terminal device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.

[0177] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0178] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0179] The above is a preferred embodiment of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles described in the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A method for estimating human activity intensity, characterized in that: include: Divide the target area into a plurality of grid cells; For each of the grid cells, values ​​of multiple human activity indicators of the grid cell are obtained respectively; the multiple human activity indicators include natural factors, economic factors and human factors related to disaster prevention decision-making, the natural factors include land use changes, building outlines, surface deformation, water systems, and coal mine distribution, the economic factors include facility distribution points, facility distribution surfaces, road networks, and night light distribution, and the human factors include carbon emissions; Calculate the data standard deviation of each human activity indicator according to the values ​​of all human activity indicators, and calculate the degree of uncorrelation of each human activity indicator according to the correlation coefficient between every two human activity indicators; Obtaining a preliminary weight for each of the human activity indicators based on the data standard deviation and irrelevance level of each of the human activity indicators; For each of the human activity indicators, based on the correlation coefficient between the human activity indicator and each of the other human activity indicators, the entropy value of the human activity indicator is calculated, and the preliminary weight of the human activity indicator is weighted based on the entropy value to obtain a final weight; For each of the grid cells, respectively, according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid cell, calculate the human activity intensity of the grid cell; The geological disasters in the target area are predicted by using the intensity of all human activities. If the intensity of human activities in the grid unit of the target area is greater than the intensity threshold, the area corresponding to the grid unit is likely to have a geological disaster. Geological disaster protection is carried out in combination with the actual current rainfall conditions in the area. Wherein, obtaining the preliminary weight of each human activity indicator based on the data standard deviation and irrelevance degree of each human activity indicator includes: For each data human activity indicator, perform the following steps: Calculating the amount of information based on the data standard deviation and irrelevance of the human activity indicator; Calculating a preliminary weight of the human activity indicator based on the amount of information; The calculating the entropy value of the human activity indicator based on the correlation coefficient between the human activity indicator and each other human activity indicator includes: By formula: Calculate the Entropy values ​​of human activity indicators ; in, , Indicates the number of types of human activity indicators, Indicates the Human activity indicators and Relative correlation coefficients between the human activity indicators: in, , , Indicates the number of types of human activity indicators, Indicates the The human activity indicators are related to the Correlation coefficients between various human activity indicators; The step of weighting the preliminary weight of the human activity indicator based on the entropy value to obtain the final weight includes: By formula: Calculate the Final weights of human activity indicators ; in, Indicates the Preliminary weights of the human activity indicators, Represents the harmonic parameter.

2. The method for estimating human activity intensity according to claim 1, characterized in that: The step of calculating the data standard deviation of each human activity indicator according to the values ​​of all human activity indicators comprises: By formula: Calculate the Standard deviation of data for human activity indicators ; in, represents the number of grid cells of the target area, , Indicates the number of types of human activity indicators, Indicates The grid cell The values ​​of human activity indicators, Indicates the The mean of the data of the human activity indicators; The step of calculating the degree of irrelevance of each of the human activity indicators according to the correlation coefficient between each two human activity indicators comprises: By formula: Calculate the The degree of irrelevance of the human activity indicators ; in, Indicates the Human activity indicators and The correlation coefficients between the human activity indicators are , .

3. The method for estimating human activity intensity according to claim 1, characterized in that: The calculating of information amount according to the data standard deviation and irrelevance degree of the human activity indicator comprises: By formula: Calculate the The information content of human activity indicators ; in, Indicates the The standard deviation of the data of human activity indicators, Indicates the The degree of uncorrelation between the various human activity indicators, , The number of categories representing human activity indicators; The calculating the preliminary weight of the human activity index based on the amount of information includes: By formula: Calculate the Preliminary weights of human activity indicators .

4. The method for estimating human activity intensity according to claim 1, characterized in that: The calculating the human activity intensity of the grid cell according to the final weights of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid cell includes: By formula: Calculate the Human activity intensity per grid cell ; in, Indicates the The grid cell The values ​​of human activity indicators, , The number of grid cells representing the target area.

5. A human activity intensity estimation device, characterized in that: include: A partitioning module divides the target area into multiple grid cells; an acquisition module, for each of the grid cells, respectively acquiring values ​​of a plurality of human activity indicators of the grid cell; the plurality of human activity indicators include natural factors, economic factors and human factors related to disaster prevention decision-making, the natural factors include land use change, building outline, surface deformation, water system, coal mine distribution, the economic factors include facility distribution points, facility distribution surfaces, road networks, night light distribution, and the human factors include carbon emissions; A first calculation module calculates the data standard deviation of each human activity indicator according to the values ​​of all human activity indicators, and calculates the degree of irrelevance of each human activity indicator according to the correlation coefficient between every two human activity indicators; A preliminary weight acquisition module, which acquires a preliminary weight of each of the human activity indicators based on the data standard deviation and irrelevance degree of each of the human activity indicators; A weighting module, for each of the human activity indicators, respectively, calculates the entropy value of the human activity indicator based on the correlation coefficient between the human activity indicator and each other human activity indicator, and weights the preliminary weight of the human activity indicator based on the entropy value to obtain a final weight; The second calculation module calculates the human activity intensity of each grid unit according to the final weight of all human activity indicators and the values ​​of all human activity indicators corresponding to the grid unit; the geological disasters in the target area are predicted by using all human activity intensities. If the human activity intensity of the grid unit in the target area is greater than the intensity threshold, the possibility of geological disasters occurring in the area corresponding to the grid unit is high, and geological disaster protection is carried out in combination with the actual current rainfall conditions in the area; The preliminary weight acquisition module is used to obtain the preliminary weight of each human activity indicator based on the data standard deviation and irrelevance degree of each human activity indicator, and is specifically used to achieve: For each data human activity indicator, perform the following steps: Calculating the amount of information based on the data standard deviation and irrelevance of the human activity indicator; Calculating a preliminary weight of the human activity indicator based on the amount of information; The weighting module is used to calculate the entropy value of the human activity indicator based on the correlation coefficient between the human activity indicator and each other human activity indicator, and weight the preliminary weight of the human activity indicator based on the entropy value to obtain the final weight, specifically for achieving: By formula: ; Calculate the Entropy values ​​of human activity indicators ; in, , Indicates the number of types of human activity indicators, Indicates the Human activity indicators and Relative correlation coefficients between the human activity indicators: ; in, , , Indicates the number of types of human activity indicators, Indicates the The human activity indicators are related to the Correlation coefficients between various human activity indicators; By formula: ; Calculate the Final weights of human activity indicators ; in, Indicates the Preliminary weights of the human activity indicators, Represents the harmonic parameter.

6. A terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method for estimating the intensity of human activities as described in any one of claims 1 to 4 is implemented.

7. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method for estimating human activity intensity according to any one of claims 1 to 4 is implemented.