Interstage separation test system, reliability growth test method and device
By designing an interstage separation test system, simulating different separation conditions, verifying whether the interstage separation standards are met, solving the problem of failure to effectively consider influencing factors in the existing technology, and improving the reliability and accuracy of the interstage cooling separation test of the launch vehicle stage is achieved. sex.
Patent Information
- Application Number
- CN202410140631.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-02-01
AI Technical Summary
The prior art has failed to effectively consider various influencing factors in the launch vehicle-stage intercooled separation test, and the reliability growth test plan design is lacking, which affects the reliability and accuracy of the test.
A interstage separation test system was designed, including a simulated mass body, a fixing and separation mechanism, a pushing and acquisition mechanism, which collected data through pneumatic push rods and sensors, combined with a solenoid valve timing controller and a gas distribution table to simulate different separation directions, Angle, initial thrust and sealing performance are verified by repeated pneumatic function tests to meet the interstage separation standards.
The reliability and accuracy of the inter-stage cooling separation test are improved, the real separation situation is simulated, the friction of the separation body is eliminated or reduced, the deceleration and reset are controlled, and the safety and efficiency of the test are improved.
Smart Images

Figure CN118376136B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of launch vehicles, and in particular to an interstage separation test system, a reliability growth test method and a device. Background Art
[0002] The interstage separation of a launch vehicle refers to the separation between two adjacent stages in a multi-stage rocket, with the purpose of discarding the propellant-depleted stage. With the research and exploration of reusable rockets, the development trend of interstage separation technology has gradually moved towards cold separation. The US Falcon 9 rocket uses cold separation technology. In order to improve the reliability of cold separation, the interstage cold separation test of the launch vehicle has become particularly important. However, the existing technology does not consider the various influencing factors in the actual test, nor does it involve the design of the reliability growth test plan. Summary of the invention
[0003] In view of this, the purpose of the embodiments of the present invention is to provide an inter-stage separation test system, a reliability growth test method and a device, taking into account various influencing factors in actual tests and providing a design of a reliability growth test scheme.
[0004] To achieve the above-mentioned purpose, in a first aspect, an embodiment of the present invention provides a launch vehicle interstage separation test system, the separation system comprising: a first simulated mass body, a second simulated mass body, and a fixing and separation mechanism and a pushing and collecting mechanism located between the first simulated mass body and the second simulated mass body;
[0005] The fixed separation mechanism includes a plurality of pull rods and an unlocking mechanism, one end of the pull rod is connected to the first simulated mass body, and the other end of the pull rod is connected to the second simulated mass body through the unlocking mechanism;
[0006] The pushing and collecting mechanism includes a pneumatic push rod and a sensor, wherein the sensor is arranged on the pneumatic push rod, one end of the pneumatic push rod is fixedly connected to the first simulated mass body, and the other end of the pneumatic push rod is movably connected to the second simulated mass body, and the sensor is used to collect thrust and time data and displacement and thrust data on the pneumatic push rod.
[0007] In some possible implementations, the separation test system further includes: a first gas cylinder, a second gas cylinder, and a solenoid valve timing controller;
[0008] The first gas cylinder is connected to the unlocking mechanism, and a first solenoid valve is provided between the first gas cylinder and the unlocking mechanism;
[0009] The second gas cylinder is connected to the pneumatic push rod, and a second solenoid valve is provided between the second gas cylinder and the pneumatic push rod;
[0010] The solenoid valve timing controller is used to control the switching of the first solenoid valve and the second solenoid valve;
[0011] The sensor is also used to collect the air pressure on the inter-stage separation push rod and obtain the air pressure value on the pneumatic push rod in real time.
[0012] In some possible embodiments, the separation test system further includes: a gas distribution platform and a stopping mechanism, the gas distribution platform is used to provide gas to the pneumatic push rod, the first gas cylinder and the second gas cylinder; the stopping mechanism is connected to the second simulated mass body, and is used to stop the second simulated mass body pushed out by the pneumatic push rod.
[0013] In a second aspect, an embodiment of the present invention provides a method for reliability growth test of inter-stage separation, wherein the reliability growth test method is based on any one of the inter-stage separation test systems described in the first aspect, and the method includes:
[0014] Changing the offset angle of the second simulated mass body to simulate different separation directions, repeatedly performing aerodynamic function tests through the inter-stage separation test system, and verifying whether different separation directions can meet the inter-stage separation standard according to the separation energy obtained by the aerodynamic function test; and / or,
[0015] When verifying that different separation directions can meet the inter-stage separation standard, changing the eccentric distance of the pneumatic push rod to simulate different separation angles, repeatedly performing pneumatic function tests through the inter-stage separation test system, and verifying whether different separation angles can meet the inter-stage separation standard based on the separation energy obtained by the pneumatic function test; and / or,
[0016] When verifying that different separation angles can meet the interstage separation standard, changing the initial air pressure of the pneumatic push rod to simulate different initial thrusts, repeatedly performing a pneumatic function test through the interstage separation test system, and verifying whether different initial thrusts can meet the interstage separation standard based on the separation energy obtained by the pneumatic function test; and / or,
[0017] When verifying that different initial thrusts can meet the inter-stage separation standard, changing the mass of the second simulated mass body to simulate different lower stage separation bodies, repeatedly performing aerodynamic function tests through the inter-stage separation test system, and verifying whether different second simulated mass bodies can meet the inter-stage separation standard based on the separation energy obtained from the aerodynamic function test; and / or,
[0018] When verifying that different second simulated mass bodies can meet the inter-stage separation standard, the number of sealing rings of the pneumatic push rod is changed to simulate different sealing performances, and the pneumatic function test is repeatedly performed through the inter-stage separation test system. The separation energy obtained from the pneumatic function test is used to verify whether the different sealing performances can meet the inter-stage separation standard.
[0019] In some possible implementations, the method further includes:
[0020] The gas pressure of the second gas cylinder of the pneumatic push rod is changed to simulate different separation thrusts, and the pneumatic function test is repeatedly performed through the interstage separation test system. The separation energy obtained by the pneumatic function test is used to verify whether different separation thrusts can meet the interstage separation standard.
[0021] In some possible implementations, the pneumatic function test includes:
[0022] Unlocking the unlocking mechanism to disconnect the pull rod from the second simulated mass body, and the pneumatic push rod pushes the second simulated mass body to move;
[0023] The sensor on the pneumatic push rod collects the thrust and time data and the displacement and time data of the interstage separation push rod;
[0024] Obtaining an interstage separation velocity according to the displacement and time data;
[0025] calculating the interstage separation energy according to the interstage separation velocity and the mass of the second simulated mass body;
[0026] It is verified according to the inter-stage separation energy whether the inter-stage separation standard can be achieved when the mass of the second simulated mass body and the thrust of the pneumatic push rod are offset.
[0027] In a third aspect, an embodiment of the present invention provides an inter-stage separation reliability growth test device, the device comprising:
[0028] A first simulation test unit is used to change the offset angle of the second simulation mass body to simulate different separation directions, and repeatedly perform a pneumatic function test through the interstage separation test system to verify whether different separation directions can meet the interstage separation standard according to the separation energy obtained by the aerodynamic function test; and / or,
[0029] The second simulation test unit is used to change the eccentric distance of the pneumatic push rod to simulate different separation angles when verifying that different separation directions can meet the inter-stage separation standard, and repeatedly perform pneumatic function tests through the inter-stage separation test system to verify whether different separation angles can meet the inter-stage separation standard based on the separation energy obtained by the pneumatic function test; and / or,
[0030] A third simulation test unit is used to change the initial air pressure of the pneumatic push rod to simulate different initial thrusts when verifying that different separation angles can meet the interstage separation standard, repeatedly perform a pneumatic function test through the interstage separation test system, and verify whether different initial thrusts can meet the interstage separation standard according to the separation energy obtained by the pneumatic function test; and / or,
[0031] a fourth simulation test unit, for changing the mass of the second simulation mass body to simulate different lower stage separation bodies when verifying that different initial thrusts can meet the interstage separation standard, repeatedly performing aerodynamic function tests through the interstage separation test system, and verifying whether different second simulation mass bodies can meet the interstage separation standard according to the separation energy obtained by the aerodynamic function test; and / or,
[0032] The fifth simulation test unit is used to change the number of sealing rings of the pneumatic push rod to simulate different sealing performances when verifying that different second simulated mass bodies can meet the inter-stage separation standards, and repeatedly perform pneumatic function tests through the inter-stage separation test system to verify whether different sealing performances can meet the inter-stage separation standards based on the separation energy obtained from the pneumatic function tests.
[0033] In some possible implementations, the device further includes:
[0034] The sixth simulation test unit is used to change the air pressure of the second gas cylinder of the pneumatic push rod to simulate different separation thrusts, and repeatedly perform pneumatic function tests through the inter-stage separation test system, and verify whether different separation thrusts can meet the inter-stage separation standard based on the separation energy obtained from the pneumatic function test.
[0035] In a fourth aspect, an embodiment of the present invention provides an electronic device, including:
[0036] one or more processors;
[0037] A storage device for storing one or more programs. When the one or more programs are executed by the one or more processors, the one or more processors implement any one of the inter-level reliability growth test methods described in the second aspect.
[0038] In a fifth aspect, an embodiment of the present invention provides a computer-readable medium having a computer program stored thereon, which, when executed by a processor, implements an inter-level reliability growth test method as described in any one of the second aspects.
[0039] The beneficial technical effects of the above technical solution are:
[0040] An embodiment of the present invention provides an interstage separation test system, a reliability growth test method and an apparatus, wherein the test method includes: changing the offset angle of the second simulated mass body to simulate different separation directions, and verifying whether different separation directions can meet the interstage separation standard based on the separation energy obtained from the pneumatic function test; changing the eccentric distance of the pneumatic push rod to simulate different separation angles, and verifying whether different separation angles can meet the interstage separation standard; changing the initial air pressure of the pneumatic push rod to simulate different initial thrusts, and verifying whether different initial thrusts can meet the interstage separation standard; changing the mass of the second simulated mass body to simulate different second simulated mass bodies, and verifying whether different second simulated mass bodies can meet the interstage separation standard; changing the air pressure of the second gas cylinder of the pneumatic push rod to simulate different separation thrusts, and verifying whether different separation thrusts can meet the interstage separation standard. The embodiment of the present invention takes into account various influencing factors in actual tests and provides a design of a reliability growth test scheme. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0042] Figure 1A It is a structural schematic diagram of a launch vehicle interstage separation test system according to an embodiment of the present invention;
[0043] Figure 1B It is a schematic diagram of an inter-stage separation push rod connected to a first mass body and a second mass body through a transfer tooling according to an embodiment of the present invention;
[0044] Figure 1C It is a structural schematic diagram of another launch vehicle interstage separation test system according to an embodiment of the present invention;
[0045] Figure 2 It is a flow chart of a launch vehicle inter-stage reliability growth test method according to an embodiment of the present invention;
[0046] Figure 3 is a flow chart of a pneumatic function test method according to an embodiment of the present invention;
[0047] Figure 4 It is a structural block diagram of an inter-stage separation reliability growth test device according to an embodiment of the present invention;
[0048] Figure 5 It is a functional block diagram of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0049] The features and exemplary embodiments of various aspects of the present invention will be described in detail below. In the detailed description below, many specific details are proposed in order to provide a comprehensive understanding of the present invention. However, it is obvious to those skilled in the art that the present invention can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present invention by illustrating examples of the present invention. In the drawings and the following description, at least part of the known structures and technologies are not shown in order to avoid unnecessary ambiguity of the present invention; and, for clarity, the size of some structures may be exaggerated. In addition, the features, structures or characteristics described below may be loaded in one or more embodiments in any suitable manner.
[0050] The embodiment of the present invention provides a novel test method for improving the efficiency, test safety and test accuracy of ground interstage cold separation tests. The simulation of the actual separation situation is achieved through the simulation of the separation body and the interstage section. The friction is eliminated through the design of the track and the track car. In addition, mechanical finite element simulation calculation is used to optimize the performance of various tooling, ultimately achieving a cost-effective, robust and reusable test device.
[0051] Figure 1A FIG. 1 is a schematic diagram of the structure of a launch vehicle interstage separation test system according to an embodiment of the present invention. Figure 1A As shown, the separation system includes: a first simulated mass body M1, a second simulated mass body M2, and a fixing and separation mechanism and a pushing and collecting mechanism located between the first simulated mass body M1 and the second simulated mass body M2; the fixing and separation mechanism includes a plurality of pull rods 1 and an unlocking mechanism 2, one end of the pull rod 1 is connected to the first simulated mass body M1, and the other end of the pull rod 1 is connected to the second simulated mass body M2 through the unlocking mechanism 2; the pushing and collecting mechanism includes a pneumatic push rod 3 and a sensor 4, the sensor 4 is arranged on the pneumatic push rod 3, one end of the pneumatic push rod 3 is fixedly connected to the first simulated mass body M1, and the other end of the pneumatic push rod 3 is movably connected to the second simulated mass body M2, and the sensor 4 is used to collect thrust and time data and displacement and thrust data on the pneumatic push rod 3 and transmit them to the data collecting mechanism 5 for subsequent data processing and analysis.
[0052] In some embodiments, the separation test system also includes: a first gas cylinder 6, a second gas cylinder 7, and a solenoid valve timing controller 8; the first gas cylinder 6 is connected to the unlocking mechanism 2, and a first solenoid valve 9 is arranged between the first gas cylinder 6 and the unlocking mechanism 2; the second gas cylinder 7 is connected to the pneumatic push rod 3, and a second solenoid valve 10 is arranged between the second gas cylinder 7 and the pneumatic push rod 3; the solenoid valve timing controller 8 is used to control the switching of the first solenoid valve 9 and the second solenoid valve 10; the sensor 4 is also used to collect the air pressure on the inter-stage separation push rod 3, and obtain the air pressure value on the pneumatic push rod 3 in real time.
[0053] In some embodiments, the separation test system also includes: a gas distribution platform 11 and a stopping mechanism 12, the gas distribution platform 11 is used to provide gas to the pneumatic push rod 3, the first gas cylinder 6 and the second gas cylinder 7; the stopping mechanism 12 is connected to the second simulated mass body M2, and is used to stop the second simulated mass body M2 pushed out by the pneumatic push rod.
[0054] Figure 1B is a schematic diagram of an interstage separation push rod connected to a first mass body and a second mass body through a transfer tooling according to an embodiment of the present invention, such as Figure 1B As shown, the pneumatic push rod 3 is a multi-stage extension tube powered by liquid or gas. The pneumatic push rod 3 can be connected to the first simulated mass body M1 and the second simulated mass body M2 through a transfer tool, wherein the transfer tool includes a thrust dispersion seat a and a buffer pad b. The top of the pneumatic push rod 3 is connected to the first simulated mass body M1 through the thrust dispersion seat a, and the thrust of the pneumatic push rod 3 is dispersed through the thrust dispersion seat a. The bottom is connected to the second simulated mass body M2 through a buffer pad b. The buffer pad b is a soft material. The soft material buffers the real state on the simulated arrow to protect the structure of the position where the pneumatic push rod 3 contacts the second simulated mass body M2 from being damaged. In addition, the number of pull rods 1 can be determined according to actual conditions, for example, three pull rods 3 are distributed in a triangle, and the pneumatic push rod 3 is located at the center of the triangle formed by the three pull rods to maintain the balance of the system. An unlocking mechanism is connected in series between each pull rod 3 and the second simulated mass body M2, and the unlocking mechanism can be a pneumatic mechanical connection unlocking device. Sensors 4, such as air pressure sensors, thrust sensors and displacement sensors, are respectively arranged at the top and bottom of the pneumatic push rod 3, for measuring the air pressure, thrust and displacement on the pneumatic push rod 3, wherein the displacement of the pneumatic push rod 3 is also the displacement of the second simulated mass body M2.
[0055] During the actual launch of the carrier rocket of the embodiment of the present invention, the mass of the upper stage separation body of the rocket is much greater than the mass of the lower stage separation body, so the first simulated mass body M1 in this embodiment can be a large mass object such as a fixed wall, and the second simulated mass body M2 can be a rail car with a certain mass, and the rail car is filled with a sufficient amount of mass (for example, the rail car is loaded with 30t of sand) to simulate the mass of the lower stage separation body. In addition, the end of the track close to the first simulated mass body M1 can be raised so that there is a certain slope between the first simulated mass body M1 and the second simulated mass body M2. For example, the end close to the first simulated mass body M1 can be raised with wedge steel. The advantages of using wedge steel to raise the near end of the track to form a downhill slope mainly include: easy to adjust the height, the wedge steel can be cut or stacked as needed, so as to conveniently adjust the height of the track; good stability, the wedge steel has high strength and rigidity, can provide stable support force, and ensure the stability of the track; easy installation, the wedge steel can usually fit closely with the track structure, simplifying the installation process. The pull rod 2 is connected between the fixed wall and the rail car, and the rail car is fixed by the pull rod 2. Since the gas pressure of the pneumatic push rod 3 is as high as tens of MPa, in order to prevent high-pressure gas leakage and injury during the test, the side of the entire test system can be isolated by two partition walls, so that the relevant tooling during the test process can be placed inside the partition wall.
[0056] Figure 1C FIG. 1 is a schematic diagram of the structure of another launch vehicle interstage separation test system according to an embodiment of the present invention. Figure 1C As shown, in some embodiments, the separation test system further includes: a first gas cylinder 6, a second gas cylinder 7, and a solenoid valve timing controller 8; when the unlocking mechanism 2 is pneumatic unlocking, the first gas cylinder 6 is connected to the unlocking mechanism 2, and a first solenoid valve 9 is arranged between the first gas cylinder 6 and the unlocking mechanism 2; the second gas cylinder 7 is connected to the pneumatic push rod 3, and a second solenoid valve 10 is arranged between the second gas cylinder 7 and the pneumatic push rod 3; the solenoid valve timing controller 8 is used to control the switch of the first solenoid valve 9 and the second solenoid valve 10; the sensor 4 is also used to collect the air pressure on the pneumatic push rod 3 and obtain the air pressure value on the pneumatic push rod 3 in real time. In addition, since the gas pressure of the pneumatic push rod 3 is as high as tens of MPa, in order to prevent the leakage of high-pressure gas from injuring people during the test, the side of the entire test system can be isolated by two partition walls G, so that the relevant tooling in the test process is placed inside the partition wall G, such as the pneumatic push rod 3 and the pull rod 1, etc. In addition, this embodiment can also include a data acquisition device, which is arranged outside the partition wall, and the data collected by the sensor 4 is transmitted to the data acquisition device 5 for subsequent data analysis.
[0057] In this embodiment, after the pneumatic push rod 3 is pushed out, the internal volume increases and the air pressure decreases, so the solenoid valve timing controller 8 needs to control the second solenoid valve 10 to open and close at intervals to inflate the pneumatic push rod 3.
[0058] like Figure 1C As shown, in some embodiments, the separation test system also includes: a gas distribution platform 11 and a stopping mechanism 12, the gas distribution platform 11 provides gas to the pneumatic push rod 3, the first gas cylinder 6 and the second gas cylinder 7 through an inflation hose; the stopping mechanism 12 is connected to the second simulated mass body M2, and is used to stop the second simulated mass body M2 pushed out by the pneumatic push rod 3.
[0059] Since the energy of the entire system in this embodiment comes from high-pressure gas, the first gas cylinder 6, the second gas cylinder 7 and the pneumatic push rod 3 need to be inflated through the gas distribution platform 11 at the beginning to provide initial energy; and a blocking mechanism is placed on both sides of the second simulated mass body M2, such as a stone plate or other large mass objects connected to both sides of the second simulated mass body M2, which is used to stop the second simulated mass body M2 pushed out by the pneumatic push rod 3, so as to facilitate the withdrawal and reset after the test.
[0060] In this embodiment, since the tie rod 1 and the pneumatic push rod 3 are both suspended, in order to reduce the bending moment load generated by their own weight, a support frame can be used to support the tie rod 1 and the pneumatic push rod 3 near the unlocking mechanism. When the unlocking mechanism 2 is unlocked, the tie rod 1 is disconnected from the second simulated mass body M2, and then the tie rod 1 is supported by the support frame. In addition, a crane and a cart can be prepared outside the partition wall G to reset the corresponding tooling after the test, so as to be used repeatedly in subsequent tests. In this embodiment, before the start of the test, the pneumatic push rod 3, the first gas cylinder 6, and the second gas cylinder 7 are inflated through the gas distribution platform 11 (the pneumatic push rod 3 will gradually generate thrust after being inflated until the air pressure reaches a predetermined value and the thrust gradually stabilizes). After the preparation test is officially started, the brakes of the rail car are released, the first solenoid valve 9 of the unlocking mechanism 2 is opened, and the unlocking mechanism 2 is inflated and unlocked through the first gas cylinder 6. At this time, the pull rod 1 is disconnected from the second simulated mass body M2, the pneumatic push rod 3 starts to work, and the sensor 4 starts to collect data. After a period of time, the second solenoid valve 10 for replenishing air to the pneumatic push rod 3 is opened, and the second gas cylinder 7 of the pneumatic push rod 3 starts to replenish air to the pneumatic push rod 3. After the pneumatic push rod 3 and the car are stable, data collection is stopped and the test is completed.
[0061] In the embodiment of the present invention, the rail carriage can be replaced by a large truck, an engineering vehicle or other modified movable heavy vehicles, the fixed wall can be replaced by a fixed steel member, the pneumatic push rod 3 can be replaced by a hydraulic push rod or other separation device, and the rail can be replaced by a smooth road surface or a road surface with a low friction coefficient.
[0062] The launch vehicle interstage separation system provided by the embodiment of the present invention can effectively eliminate or reduce the friction of the separation body during the separation process, and can also control the deceleration and resetting of the separation body.
[0063] Figure 2is a flow chart of an inter-stage separation reliability growth test method according to an embodiment of the present invention. Figure 2 As shown, the method is based on the inter-stage separation test system of Example 1, and includes the following steps:
[0064] Step S11, changing the offset angle of the second simulated mass body M2 to simulate different separation directions, repeatedly performing aerodynamic function tests through the inter-stage separation test system, and verifying whether different separation directions can meet the inter-stage separation standard based on the separation energy obtained from the aerodynamic function test.
[0065] In this embodiment, the second simulated mass body M2 is taken as a rail car as an example. Since the rails are laid by the test unit itself, the expansion bolts on the rails can be removed, and the rails can be fixed after the angle is moved. Since the pneumatic push rod 3 may push the upper stage and the lower stage off during stage separation, this step can verify whether it can adapt to the situation after the push is off. And / or,
[0066] Step S12, when verifying that different separation directions can meet the inter-stage separation standard, the eccentric distance of the pneumatic push rod 3 is changed to simulate different separation angles, and the pneumatic function test is repeatedly performed through the inter-stage separation test system. The separation energy obtained by the pneumatic function test is used to verify whether the different separation angles can meet the inter-stage separation standard.
[0067] In this embodiment, since the pneumatic push rod 3 may push the upper stage and the lower stage off-center during stage separation, different separation angles are simulated by changing the eccentric distance of the pneumatic push rod 3 to verify whether it can adapt to the situation after the off-center push. And / or,
[0068] Step S13, when verifying that different separation angles can meet the inter-stage separation standard, the initial air pressure of the pneumatic push rod 3 is changed to simulate different initial thrusts, and the pneumatic function test is repeatedly performed through the inter-stage separation test system, and the separation energy obtained by the pneumatic function test is used to verify whether the different initial thrusts can meet the inter-stage separation standard.
[0069] In this embodiment, since the initial pressure of the pneumatic push rod 3 will change due to the vibration and temperature changes during the rocket flight, it is necessary to adapt to this situation, that is, to simulate different initial thrusts by changing the initial air pressure of the pneumatic push rod to conduct tests to verify whether the existing design can adapt to the vibration and temperature changes during the rocket flight and improve reliability. And / or,
[0070] Step S14, when verifying that different initial thrusts can meet the inter-stage separation standard, the mass of the second simulated mass body M2 is changed to simulate a different second simulated mass body M2, and aerodynamic function tests are repeatedly performed through the inter-stage separation test system. According to the separation energy obtained from the aerodynamic function test, it is verified whether the different second simulated mass bodies M2 can meet the inter-stage separation standard.
[0071] In this embodiment, since the mass of the lower stage separation body will change with the time of rocket operation during the interstage separation process, for example, the fuel will decrease after the fuel is burned during the operation of the rocket, that is, the overall mass of the rocket will decrease, etc., this embodiment needs to simulate the mass of different lower stage separation bodies, for example, by adding weighing objects such as sand and gravel, steel structure, or reducing the sand and gravel or steel structure on the rail train. And / or,
[0072] Step S15, when verifying that different second simulated mass bodies M2 can meet the inter-stage separation standard, the number of sealing rings of the pneumatic push rod 3 is changed to simulate different sealing performances, and the pneumatic function test is repeatedly performed through the inter-stage separation test system. The separation energy obtained from the pneumatic function test is used to verify whether the different sealing performances can meet the inter-stage separation standard.
[0073] In this embodiment, the airtightness of the tooling related to high-pressure gas during the entire separation process between rocket stages is ensured by a sealing ring. However, due to changes in the mechanical and thermal environments during the flight of the rocket, the sealing ring may fail or fall off, and it is verified whether the pneumatic push rod 3 can adapt to this situation.
[0074] In this embodiment, the test order of step S11 to step S15 can be changed arbitrarily, as long as each test is guaranteed to meet the separation standard before the next test is carried out. That is, when the verification result is "no" each time, it is necessary to change the design parameters and re-verify until the test result is "yes", so as to verify the reliability of the separation.
[0075] In some embodiments, the method may also include: changing the air pressure of the second gas cylinder 7 of the pneumatic push rod 3 to simulate different separation thrusts, repeatedly performing pneumatic function tests through an interstage separation test system, and verifying whether different separation thrusts can meet the interstage separation standards based on the separation energy obtained from the pneumatic function test.
[0076] In this embodiment, the second gas cylinder 7 is used to inflate the pneumatic push rod 3. The initial separation thrust is related to the initial air pressure of the pneumatic push rod 3, and the entire separation thrust is related to the initial pressure of the pneumatic push rod 3 and the pressure of the second gas cylinder 7. In this embodiment, different separation thrusts are simulated by changing the air pressure of the second gas cylinder 7 of the pneumatic push rod 3 to verify whether the existing design can adapt to the temperature changes during the rocket flight and improve reliability.
[0077] The reliability growth test method of the embodiment of the present invention has the same criteria for judging whether the stage separation is met, that is, the structure is not damaged, the speed, displacement and time of the stage separation meet the expected standards, and the separation energy meets the expected standards, which means that the reliability is achieved. The embodiment of the present invention comprehensively considers various influencing factors in actual tests and provides a design of a reliability growth test scheme suitable for the stage separation of a launch vehicle.
[0078] Figure 3 is a flow chart of a pneumatic function test method according to an embodiment of the present invention. Figure 3 As shown, the pneumatic function test method is based on the above-mentioned pneumatic separation system, and the method includes the following steps:
[0079] Step S21, unlocking the unlocking mechanism 2, disconnecting the pull rod from the second simulated mass body M2, and the pneumatic push rod 3 pushes the second simulated mass body M2 to move.
[0080] In this embodiment, after receiving the interstage separation mass of the rocket, the unlocking mechanism 2 is unlocked to start the interstage separation test. Specifically, the interstage separation process is divided into two steps. First, it needs to be unlocked, and then the separation energy is provided by the pneumatic push rod 3 after unlocking. Domestic traditional separation energy sources are mostly forward and reverse thrust rockets (pyrotechnics are separation energy sources), and a small number of models use thermal separation (the separation energy is the high-temperature combustion gas flow of the upper stage engine). Different from the traditional domestic separation energy, the pneumatic push rod 3 in this embodiment provides energy to the push rod through air pressure, which is easier to control the separation force.
[0081] Step S22 , collecting the thrust and time data and the displacement and time data of the inter-stage separation push rod through the sensor 4 on the pneumatic push rod 3 .
[0082] Step S23, obtaining the inter-stage separation speed according to the displacement and time data.
[0083] In this embodiment, the displacement of interstage separation is a design indicator, the interstage separation time is obtained by the sensor based on the interstage separation displacement measurement, and the interstage separation speed can be obtained by calculating the first derivative of the displacement and time curve. Before the test, the entire separation process will be simulated by simulation software to obtain the separation time, thrust and speed. After obtaining the test data, a comparison is performed, and the simulation model is corrected according to the comparison results.
[0084] Step S24, calculating the inter-stage separation energy according to the inter-stage separation speed and the mass of the second simulated mass body M2.
[0085] In this embodiment, the interstage separation energy can be calculated according to the formula E = (m*v 2 ) / 2, where E is the interstage separation energy, m is the mass of the second simulated mass body M2, and v is the interstage separation velocity.
[0086] Step S25 , verifying whether the inter-stage separation standard can be achieved when the mass of the second simulated mass body M2 and the thrust of the pneumatic push rod 3 are offset according to the inter-stage separation energy.
[0087] This embodiment verifies whether the interstage separation energy meets the requirements by computer simulation and ground testing. The simulation can help predict various situations in the separation process, while the ground test provides actual verification, and the simulation model is modified after verification. For example, if the rocket has already flown, the flight data can be analyzed to verify whether the interstage separation is carried out as expected when the relevant parameters of the second simulated mass body M2 and the pneumatic push rod 3 are offset. It is also possible to compare the calculated interstage separation energy E with the design standard and the safety margin. If the calculated energy is greater than or equal to the energy required by the design standard and the safety margin, it is considered that the rocket can meet the standard of interstage separation when the relevant parameters of the second simulated mass body M2 and the pneumatic push rod 3 are offset. If the energy is insufficient, the separation mechanism or rocket design needs to be re-evaluated to ensure that the separation can be successfully carried out. Among them, the safety margin refers to that in actual engineering, a certain safety margin is usually designed to ensure that separation can be carried out reliably under various circumstances, including extreme conditions.
[0088] Since the present embodiment can eliminate or reduce the friction of the separation body during the separation process, aerodynamic function tests can be carried out on the ground to truly simulate the inter-stage separation process of the launch vehicle, thereby verifying whether the pneumatic push rod 3 can meet the first and second stage separation process. At the same time, the structural stability, coordination, and safety of the pneumatic push rod 3 can also be observed to verify whether the existing design meets the inter-stage separation standard. In addition, the deceleration and resetting of the separation body can be controlled after separation to repeat the test and improve the utilization rate of the system.
[0089] In some embodiments, the method further includes: collecting air pressure and time data on the pneumatic push rod 3 through the sensor 4 on the pneumatic push rod 3, and when the air pressure value of the pneumatic push rod 3 reaches a preset air pressure threshold, the solenoid valve timing controller 8 controls the second solenoid valve 10 to open, and replenishes gas to the pneumatic push rod 3 through the second gas cylinder 7. In this embodiment, after the pneumatic push rod 3 is pushed out, since the internal volume increases and the air pressure decreases, it is necessary to control the second solenoid valve 10 to open and close at intervals through the solenoid valve timing controller 8 to inflate the pneumatic push rod 3, so as to keep the pneumatic push rod 3 with sufficient thrust to simulate interstage separation.
[0090] In some embodiments, before receiving the launch vehicle instruction, it also includes: inflating the pneumatic push rod 3, the first gas cylinder 6 and the second gas cylinder 7 through the gas distribution platform 11, checking the safety of the test site, and checking whether the data acquisition device is working normally, and recording the separation process through a camera mechanism.
[0091] Since the energy of the entire system in this embodiment comes from high-pressure gas, it is necessary to inflate the first gas cylinder 6, the second gas cylinder 7 and the pneumatic push rod 3 through the gas distribution 11 at the beginning to provide initial energy; in addition, during the test, a high-definition camera can be used to record the entire process of the pneumatic function test, and each frame of the image recorded by the camera can be referenced to verify whether the data collected by the sensor is accurate, thereby improving the accuracy of the test. After the test, the rail car can be restored to its original position by tools such as a crane, and the supporting tooling such as the pull rod 1 and the pneumatic push rod 3 can be reinstalled, and the air pipe, cable, sensor, high-speed camera, etc. can be checked for damage for subsequent tests.
[0092] Figure 4 : is a structural block diagram of an inter-stage separation reliability growth test device according to an embodiment of the present invention, such as Figure 4 As shown, the device 100 includes:
[0093] The first simulation test unit 110 is used to change the offset angle of the second simulation mass body M2 to simulate different separation directions, repeatedly perform aerodynamic function tests through the inter-stage separation test system, and verify whether different separation directions can meet the inter-stage separation standard based on the separation energy obtained by the aerodynamic function test. And / or,
[0094] The second simulation test unit 120 is used to change the eccentric distance of the pneumatic push rod 3 to simulate different separation angles when verifying that different separation directions can meet the inter-stage separation standard, and repeatedly perform pneumatic function tests through the inter-stage separation test system to verify whether different separation angles can meet the inter-stage separation standard based on the separation energy obtained by the pneumatic function test. And / or,
[0095] The third simulation test unit 130 is used to change the initial air pressure of the pneumatic push rod 3 to simulate different initial thrusts when verifying that different separation angles can meet the inter-stage separation standard, and repeatedly perform pneumatic function tests through the inter-stage separation test system to verify whether different initial thrusts can meet the inter-stage separation standard based on the separation energy obtained by the pneumatic function test. And / or,
[0096] The fourth simulation test unit 140 is used to change the mass of the second simulated mass body M2 to simulate the mass of different lower stage separation bodies when verifying that different initial thrusts can meet the interstage separation standard, and repeatedly perform aerodynamic function tests through the interstage separation test system to verify whether different second simulated mass bodies can meet the interstage separation standard based on the separation energy obtained from the aerodynamic function test. And / or,
[0097] The fifth simulation unit 150 is used to change the number of sealing rings of the pneumatic push rod 3 to simulate different sealing performances when verifying that different second simulated mass bodies M2 can meet the inter-stage separation standards, and repeatedly perform pneumatic function tests through the inter-stage separation test system to verify whether different sealing performances can meet the inter-stage separation standards based on the separation energy obtained from the pneumatic function tests.
[0098] In some embodiments, the device 100 also includes: a sixth simulation unit, which is used to change the air pressure of the second gas cylinder 7 of the pneumatic push rod 3 to simulate different separation thrusts, and repeatedly perform pneumatic function tests through the inter-stage separation test system, and verify whether different separation thrusts can meet the inter-stage separation standards based on the separation energy obtained from the pneumatic function test.
[0099] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. Of course, there are other ways of readable storage media, such as quantum memory, graphene memory, etc. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media does not include electrical carrier signals and telecommunication signals.
[0100] Reference below Figure 5 , which shows an electronic device suitable for implementing the embodiments of the present disclosure.
[0101] The terminal devices in the embodiments of the present disclosure may include but are not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., as well as fixed terminals such as digital TVs, desktop computers, etc. Figure 5The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.
[0102] like Figure 5 As shown, the electronic device may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 501, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 502 or a program loaded from a storage device 508 into a random access memory (RAM) 503. In RAM 503, various programs and data required for the operation of the electronic device are also stored. The processing device 501, ROM 502, and RAM 503 are connected to each other via a bus 504. An input / output (I / O) interface 505 is also connected to the bus 504.
[0103] Typically, the following devices may be connected to the I / O interface 505: an input device 506 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 507 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 508 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 509. The communication device 509 may allow the electronic device to communicate with other devices wirelessly or by wire to exchange data. Although Figure 4 An electronic device having various devices is shown, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.
[0104] In particular, according to an embodiment of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present disclosure includes a computer program product, which includes a computer program carried on a non-transitory computer-readable medium, and the computer program contains program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication device 509, or installed from the storage device 508, or installed from the ROM502. When the computer program is executed by the processing device 501, the above-mentioned functions defined in the method of the embodiment of the present disclosure are executed.
[0105] It should be noted that the computer-readable medium disclosed above may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by an instruction execution system, device or device or loaded with it. In the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or loaded with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.
[0106] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an adhoc network), as well as any currently known or future developed network.
[0107] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device.
[0108] The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device:
[0109] Changing the offset angle of the second simulated mass body to simulate different separation directions, repeatedly performing aerodynamic function tests through the inter-stage separation test system, and verifying whether different separation directions can meet the inter-stage separation standard according to the separation energy obtained by the aerodynamic function test; and / or,
[0110] When verifying that different separation directions can meet the inter-stage separation standard, changing the eccentric distance of the pneumatic push rod to simulate different separation angles, repeatedly performing pneumatic function tests through the inter-stage separation test system, and verifying whether different separation angles can meet the inter-stage separation standard based on the separation energy obtained by the pneumatic function test; and / or,
[0111] When verifying that different separation angles can meet the interstage separation standard, changing the initial air pressure of the pneumatic push rod to simulate different initial thrusts, repeatedly performing a pneumatic function test through the interstage separation test system, and verifying whether different initial thrusts can meet the interstage separation standard based on the separation energy obtained by the pneumatic function test; and / or,
[0112] When verifying that different initial thrusts can meet the inter-stage separation standard, changing the mass of the second simulated mass body to simulate the mass of different lower stage separation bodies, repeatedly performing aerodynamic function tests through the inter-stage separation test system, and verifying whether different second simulated mass bodies can meet the inter-stage separation standard based on the separation energy obtained by the aerodynamic function test; and / or,
[0113] When verifying that different second simulated mass bodies can meet the inter-stage separation standard, the number of sealing rings of the pneumatic push rod is changed to simulate different sealing performances, and the pneumatic function test is repeatedly performed through the inter-stage separation test system. The separation energy obtained from the pneumatic function test is used to verify whether the different sealing performances can meet the inter-stage separation standard.
[0114] Computer program code for performing the operations of the present disclosure may be written in one or more programming languages or a combination thereof, including, but not limited to, object-oriented programming languages, such as Java, Smalltalk (an object-oriented programming language), C++, and conventional procedural programming languages, such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., through the Internet using an Internet service provider).
[0115] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0116] The units involved in the embodiments described in the present disclosure may be implemented by software or hardware, wherein the name of a unit does not, in some cases, limit the unit itself.
[0117] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0118] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by an instruction execution system, device, or equipment or for use with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0119] The above description is only a preferred embodiment of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in the present disclosure (but not limited to) by each other to form a technical solution.
[0120] In addition, although each operation is described in a specific order, this should not be understood as requiring these operations to be performed in the specific order shown or in a sequential order. Under certain circumstances, multitasking and parallel processing may be advantageous. Similarly, although some specific implementation details are included in the above discussion, these should not be interpreted as limiting the scope of the present disclosure. Some features described in the context of a separate embodiment can also be implemented in a single embodiment in combination. On the contrary, the various features described in the context of a single embodiment can also be implemented in multiple embodiments individually or in any suitable sub-combination mode.
[0121] Although the subject matter has been described in language specific to structural features and / or methodological logical actions, it should be understood that the subject matter defined in the appended claims is not necessarily limited to the specific features or actions described above. On the contrary, the specific features and actions described above are merely example forms of implementing the claims.
Claims
1. A launch vehicle interstage separation reliability growth test method, characterized in that: The reliability growth test method is based on a launch vehicle interstage separation test system, which includes: a first simulated mass body and a second simulated mass body, and a fixing and separation mechanism and a pushing and collecting mechanism located between the first simulated mass body and the second simulated mass body; The fixing and separating mechanism comprises a plurality of pull rods and an unlocking mechanism, one end of the pull rod is connected to the first simulated mass body, and the other end of the pull rod is connected to the second simulated mass body through the unlocking mechanism; The pushing and collecting mechanism comprises a pneumatic push rod and a sensor, wherein the sensor is arranged on the pneumatic push rod, one end of the pneumatic push rod is fixedly connected to the first simulated mass body, and the other end of the pneumatic push rod is movably connected to the second simulated mass body, and the sensor is used to collect thrust and time data and displacement and thrust data on the pneumatic push rod; The method comprises: Changing the offset angle of the second simulated mass body to simulate different separation directions, repeatedly performing aerodynamic function tests through the inter-stage separation test system, and verifying whether different separation directions can meet the inter-stage separation standard according to the separation energy obtained by the aerodynamic function test; and / or, When verifying that different separation directions can meet the inter-stage separation standard, changing the eccentric distance of the pneumatic push rod to simulate different separation angles, repeatedly performing pneumatic function tests through the inter-stage separation test system, and verifying whether different separation angles can meet the inter-stage separation standard based on the separation energy obtained by the pneumatic function test; and / or, When verifying that different separation angles can meet the interstage separation standard, changing the initial air pressure of the pneumatic push rod to simulate different initial thrusts, repeatedly performing a pneumatic function test through the interstage separation test system, and verifying whether different initial thrusts can meet the interstage separation standard based on the separation energy obtained by the pneumatic function test; and / or, When verifying that different initial thrusts can meet the inter-stage separation standard, changing the mass of the second simulated mass body to simulate the mass of different lower stage separation bodies, repeatedly performing aerodynamic function tests through the inter-stage separation test system, and verifying whether different second simulated mass bodies can meet the inter-stage separation standard based on the separation energy obtained by the aerodynamic function test; and / or, When verifying that different second simulated mass bodies can meet the inter-stage separation standard, the number of sealing rings of the pneumatic push rod is changed to simulate different sealing performances, and the pneumatic function test is repeatedly performed through the inter-stage separation test system. The separation energy obtained from the pneumatic function test is used to verify whether the different sealing performances can meet the inter-stage separation standard.
2. A launch vehicle interstage separation reliability growth test method according to claim 1, characterized in that: The method further comprises: The gas pressure of the second gas cylinder of the pneumatic push rod is changed to simulate different separation thrusts, and the pneumatic function test is repeatedly performed through the interstage separation test system. The separation energy obtained by the pneumatic function test is used to verify whether different separation thrusts can meet the interstage separation standard.
3. A launch vehicle interstage separation reliability growth test method according to claim 2, characterized in that: The pneumatic function test includes: The unlocking mechanism disconnects the pull rod from the second simulated mass body, and the pneumatic push rod pushes the second simulated mass body to move; The sensor on the pneumatic push rod collects the thrust and time data and the displacement and time data of the pneumatic push rod; Obtaining an interstage separation velocity according to the displacement and time data; calculating the interstage separation energy according to the interstage separation velocity and the mass of the second simulated mass body; It is verified according to the inter-stage separation energy whether the inter-stage separation standard can be achieved when the mass of the second simulated mass body and the thrust of the pneumatic push rod are offset.
4. A launch vehicle interstage separation reliability growth test method according to claim 1, characterized in that: The inter-stage separation test system also includes: a first gas cylinder, a second gas cylinder and a solenoid valve timing controller; The first gas cylinder is connected to the unlocking mechanism, and a first solenoid valve is provided between the first gas cylinder and the unlocking mechanism; The second gas cylinder is connected to the pneumatic push rod, and a second solenoid valve is provided between the second gas cylinder and the pneumatic push rod; The solenoid valve timing controller is used to control the switching of the first solenoid valve and the second solenoid valve; The sensor is also used to collect the air pressure on the pneumatic push rod and obtain the air pressure value on the pneumatic push rod in real time.
5. A launch vehicle interstage separation reliability growth test method according to claim 4, characterized in that: The inter-stage separation test system also includes: a gas distribution platform and a stopping mechanism, the gas distribution platform is used to provide gas to the pneumatic push rod, the first gas cylinder and the second gas cylinder; the stopping mechanism is connected to the second simulated mass body and is used to stop the second simulated mass body pushed out by the pneumatic push rod.
6. A launch vehicle interstage separation reliability growth test device, characterized in that: A launch vehicle interstage separation reliability growth test method based on any one of claims 1 to 5, the device comprising: A first simulation test unit is used to change the offset angle of the second simulation mass body to simulate different separation directions, and repeatedly perform a pneumatic function test through the interstage separation test system to verify whether different separation directions can meet the interstage separation standard according to the separation energy obtained by the aerodynamic function test; and / or, The second simulation test unit is used to change the eccentric distance of the pneumatic push rod to simulate different separation angles when verifying that different separation directions can meet the inter-stage separation standard, and repeatedly perform pneumatic function tests through the inter-stage separation test system to verify whether different separation angles can meet the inter-stage separation standard based on the separation energy obtained by the pneumatic function test; and / or, A third simulation test unit is used to change the initial air pressure of the pneumatic push rod to simulate different initial thrusts when verifying that different separation angles can meet the interstage separation standard, repeatedly perform a pneumatic function test through the interstage separation test system, and verify whether different initial thrusts can meet the interstage separation standard according to the separation energy obtained by the pneumatic function test; and / or, a fourth simulation test unit, for changing the mass of the second simulation mass body to simulate different lower stage separation bodies when verifying that different initial thrusts can meet the interstage separation standard, repeatedly performing aerodynamic function tests through the interstage separation test system, and verifying whether different second simulation mass bodies can meet the interstage separation standard according to the separation energy obtained by the aerodynamic function test; and / or, The fifth simulation test unit is used to change the number of sealing rings of the pneumatic push rod to simulate different sealing performances when verifying that different second simulated mass bodies can meet the inter-stage separation standards, and repeatedly perform pneumatic function tests through the inter-stage separation test system to verify whether different sealing performances can meet the inter-stage separation standards based on the separation energy obtained from the pneumatic function tests.
7. A launch vehicle interstage separation reliability growth test device according to claim 6, characterized in that: The device also includes: The sixth simulation test unit is used to change the air pressure of the second gas cylinder of the pneumatic push rod to simulate different separation thrusts, and repeatedly perform pneumatic function tests through the inter-stage separation test system, and verify whether different separation thrusts during the separation process can meet the inter-stage separation standards based on the separation energy obtained from the pneumatic function test.
8. An electronic device, characterized in that: include: one or more processors; A storage device for storing one or more programs. When the one or more programs are executed by the one or more processors, the one or more processors implement a launch vehicle inter-stage separation reliability growth test method as described in any one of claims 1 to 5.
9. A computer readable medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, a launch vehicle stage separation reliability growth test method as described in any one of claims 1 to 5 is implemented.
