Double-heating fluorination sample preparation device and test method for in-situ analysis of oxygen isotope micro-area of ​​refractory minerals

Through the use of the dual heating fluorination sample preparation device, the problem of incomplete fluorination reaction in oxygen isotope analysis of refractory minerals is solved, and the analysis results with high accuracy and accuracy are achieved, meeting the needs of modern research.

CN118392589BActive Publication Date: 2024-11-26INST OF MINERAL RESOURCES CHINESE ACAD OF GEOLOGICAL SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410311633.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2024-11-26
Estimated Expiration
2044-03-19

AI Technical Summary

Technical Problem

In the prior art, when analyzing the oxygen isotope composition of refractory minerals, the fluorination reaction is incomplete, resulting in poor accuracy and accuracy of the analysis results, which is difficult to meet the needs of modern fine research.

Method used

Dual heating fluorination sample preparation device, including primary heating fluorination assembly and secondary heating fluorination assembly, through the combined heating of CO2 infrared laser and resistor furnace, ensure complete reaction of aerosol particles, avoid fractionation, and improve the accuracy of analysis results. sex.

Benefits of technology

It achieves high accuracy and accuracy of in-situ analysis of oxygen isotope micro-domains of refractory minerals, ensures the completeness of fluorination reaction, and improves the reliability and precision of the analysis results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118392589B_ABST
    Figure CN118392589B_ABST
Patent Text Reader

Abstract

The present application relates to a dual-heating fluorination sample preparation device and test method for in-situ analysis of oxygen isotopes in refractory minerals. The first-stage heating fluorination component uses infrared laser internal heating to quickly heat the aerosol particles generated by femtosecond ultraviolet laser ablation to avoid excessive temperature and the reaction of the nickel tube wall with the fluorinating agent. The diameter of the reaction chamber of the first-stage heating fluorination component is consistent with the beam spot diameter of the infrared laser, ensuring that all aerosol particles are concentrated in the focus of the infrared laser, so that the fluorination is completed instantly; the second-stage heating fluorination component performs secondary heating and fluorination on the aerosol particles that have not reacted completely in the first-stage heating fluorination component. The second-stage heating fluorination component uses a spiral nickel fluorination tube to increase the high-temperature fluorination path, extend the fluorination reaction time, and make the reaction more thorough. The present application ensures that the refractory mineral aerosol particles react completely through continuous two-stage heating fluorination reactions, without fractionation, and improves the accuracy of the test results.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of oxygen isotope analysis of silicate oxides, and specifically relates to a double-heating fluorination sample preparation device and a testing method for in-situ analysis of oxygen isotopes in micro-areas of refractory minerals. Background Art

[0002] F 5 Can react with most silicates and oxides to release O 2 ,BrF 5 Fluoridation is a classic method for analyzing the oxygen isotope composition of silicate and oxide minerals. 5 The reagent reacts violently with the nickel reaction tube, and the heating temperature of the nickel reaction tube cannot exceed 700°C. However, olivine, garnet, zircon, magnetite and other insoluble minerals have a slow fluorination rate below 700°C. 5 The oxygen isotope composition of refractory minerals is analyzed by this method. However, due to incomplete reaction, the analytical precision and accuracy are relatively poor, which cannot meet the needs of modern precision research.

[0003] Recently, a new laser probe silicate silicon oxygen isotope micro-area in-situ analysis method (ZL202310332515.0) has been developed in China. The silicate minerals are ablated by femtosecond laser. The aerosol particles ablated are carried by helium carrier gas into the fluorination sample preparation device and react with BrF 5 The gaseous reagents react to produce O 2 After enrichment, purification and separation, the pure target O 2 The gas is fed into a mass spectrometer for testing to obtain the three oxygen isotope compositions. This new laser probe effectively avoids the fractionation caused by incomplete reaction and reaction between the fluorinating agent and the matrix components during infrared laser ablation-fluoridation, and realizes high-precision micro-area in-situ oxygen isotope analysis of easily fluoridated minerals such as quartz and feldspar, and promotes the development of laser probe micro-area in-situ stable isotope analysis technology. This analysis method adopts the classic external heating method. The heating temperature of the nickel reaction tube is 680°C. Due to the small aerosol particles, for easily fluoridated minerals such as quartz and feldspar, fluoridation can be completed quickly within 40 seconds, and the analysis results are stable and reliable. However, for refractory minerals such as olivine, garnet, zircon, and magnetite, fluoridation is difficult to complete within tens of seconds, which makes the heating fluoridation reaction of the aerosol incomplete. If the reaction time is too long, the background will increase, making it difficult to achieve automatic online analysis, affecting the accuracy of the analysis results. Summary of the invention

[0004] In view of the above analysis, an embodiment of the present invention aims to provide a dual-heating fluorination sample preparation device and a testing method for in-situ analysis of oxygen isotopes in refractory minerals, so as to solve one or more of the above problems existing in the prior art.

[0005] The object of the present invention is achieved in that:

[0006] On the one hand, a dual-heating fluorination sample preparation device for in-situ analysis of oxygen isotope micro-areas of refractory minerals is provided, comprising:

[0007] One-stage heated fluorination assembly with cylindrical straight nickel fluorination tube and CO 2 Infrared laser, cylindrical linear nickel fluoride tube adopts pure nickel tube, has reaction chamber and tube wall, the top opening of reaction chamber is sealed with MgF 2 Window, MgF 2 Window supply CO 2 The laser emitted by the infrared laser enters the reaction chamber;

[0008] The secondary heating fluorination assembly comprises a resistance furnace and a spiral nickel fluorination tube arranged in the resistance furnace. The resistance furnace is used to heat the spiral nickel fluorination tube. The gas inlet port of the spiral nickel fluorination tube is connected to the bottom port of the reaction chamber, and the gas outlet port of the spiral nickel fluorination tube is connected to the bottom port of the reaction chamber. 2 Enrichment and purification device.

[0009] Furthermore, the cylindrical linear nickel fluorination tube has three ports, the first port is a gas inlet, which is arranged at the upper part of the tube wall and connected to the reaction chamber, and the gas inlet is connected to the laser ablation sample pool through a pipeline. The second port is the top opening of the reaction chamber; the third port is a gas outlet, and the gas outlet is connected to the secondary heating fluorination component.

[0010] Further, the cylindrical linear nickel fluoride tube includes a pure nickel tube, MgF 2 The window is connected to the top opening of the pure nickel tube by screwing the cap; the screw cap is connected to the MgF 2 There is a first sealing ring between the windows, MgF 2 A second sealing ring is arranged between the window and the top end surface of the pure nickel tube.

[0011] Furthermore, the reaction chamber includes a first space and a second space, which are arranged vertically and coaxially connected. The first space is conical, the top cone diameter of the cone is 3 mm, the cone height is 6 mm, the bottom cone of the cone is connected to the second space, and the second space is a regular cylindrical space, the diameter of the cylindrical space is 1 mm, and the height is 60 mm.

[0012] Furthermore, the spiral nickel fluoride tube has an outer diameter of 6.4 mm, an inner diameter of 3.0 mm, and a length of 2 m.

[0013] Furthermore, the secondary heating fluorination assembly includes a resistance furnace, and the spiral nickel fluorination tube is installed in the internal heating space of the resistance furnace.

[0014] Furthermore, the resistance furnace includes an outer shell, a heat-resistant inner shell, a resistance wire, and an electronic control module. The heat-resistant inner shell is connected to the outer shell, and heat insulation cotton can be arranged between the heat-resistant inner shell and the outer shell. The resistance wire is arranged in a spiral groove opened on the inner wall of the heat-resistant inner shell, and the groove extends from one end of the heat-resistant inner shell to the corresponding other end. The electronic control module is connected to the resistance wire, and the electronic control module is used to control the power of the resistance wire, wherein the spiral nickel-fluoride tube is inserted into the middle of the heat-resistant inner shell.

[0015] Furthermore, the resistance furnace also includes an air guide component, which is arranged in the heat-resistant inner shell and is used to circulate the heat generated by the resistance wire in the heat-resistant inner shell.

[0016] Furthermore, the air guide assembly includes a bottom box, a middle cylinder, and a driving motor. The side wall of the middle cylinder is regularly provided with multiple air inlets. An air outlet groove is provided on the side of the bottom box opposite to the heat-resistant inner shell. The air outlet groove is located between the heat-resistant inner shell and the spiral nickel-fluoride tube. The middle cylinder is connected and communicated with the bottom box. The driving motor is connected to the bottom of the bottom box, and the driving shaft of the driving motor is inserted into the bottom box and extends into the middle cylinder. The driving shaft of the driving motor is provided with blades at the part of the middle cylinder.

[0017] Furthermore, the resistance furnace also includes a plurality of heat conducting plates arranged at intervals, one end of which is connected to the outer wall of the middle tube, and the other end of which is overlapped to the outer wall of the spiral nickel-fluoride tube.

[0018] Furthermore, the resistance wire and the spiral nickel-fluoride tube are staggered so that when the resistance wire and the spiral nickel-fluoride tube are in the same cross-section, each part of the resistance wire is located exactly between two adjacent nickel-fluoride tube parts; the air inlet corresponds to the position of the resistance wire.

[0019] Furthermore, the cylindrical linear nickel fluoride tube has an extension tube extending downward; the two ends of the spiral nickel fluoride tube have a front connecting tube and a rear connecting tube, the front connecting tube is connected to the extension tube, and the rear connecting tube is connected to the O 2 The enrichment and purification device is connected, and the front connecting pipe and the rear connecting pipe are located outside the resistance furnace.

[0020] Furthermore, it also includes a tail connector, and the rear connecting pipe is connected to the O 2 The pipeline of the enrichment and purification device is connected, and the rear connecting pipe is detachably connected to the tail connector.

[0021] On the other hand, a method for in-situ analysis of oxygen isotopes in refractory minerals is also provided, characterized in that the test system used includes a helium carrier gas purification device arranged on the analysis gas path, a femtosecond ultraviolet laser ablation device, the above-mentioned dual heating fluorination sample preparation device, an O 2 Enrichment and purification device and gas isotope ratio mass spectrometer.

[0022] Furthermore, the testing method comprises the following steps:

[0023] Step 1: Use silica gel liquid nitrogen cold trap purification device to remove trace impurities O in helium 2 , reduce system background;

[0024] Step 2: Use a femtosecond laser to strip silicate oxide aerosol particles from the refractory mineral sample to be tested in the sample pool. The stripped silicate oxide aerosol particles are carried by helium carrier gas and first enter the cylindrical linear nickel fluorination tube of the first-stage heating fluorination component. 2 The infrared laser emits infrared laser into the reaction chamber, and the aerosol particles carried by the helium carrier gas quickly react with BrF under high temperature conditions. 5 The gas reaction produces target O 2 The remaining trace aerosol particles that have not reacted completely enter the spiral nickel fluorination tube of the secondary heating fluorination component. The heating temperature of the resistance furnace is 680℃. The trace aerosol particles continue to react with BrF at 680℃. 5 Gas reaction;

[0025] Step 3: The mixed gas generated in the spiral nickel fluoride tube is passed through O 2 Enrichment, purification and separation device to collect the purified target O 2 The gas is fed into a mass spectrometer for testing to obtain the three oxygen isotope compositions.

[0026] Furthermore, before using the liquid nitrogen cold trap filled with silica gel, the system was heated to 300°C for 3 days to purge and degas, so that the system background dropped below 200 mV. The purified helium was divided into three paths through a three-way valve, one for helium carrier gas, and the other two for the first back-blow helium gas and the second back-blow helium gas.

[0027] Furthermore, after each day of experiment, the silica gel cold trap was heated to 300°C for activation and back-blown with helium for degassing for more than 12 hours.

[0028] Compared with the prior art, the dual-heating fluorination sample preparation device and test method for in-situ analysis of oxygen isotopes in refractory minerals provided by the present invention ensures that the refractory mineral aerosol particles react completely without fractionation through a two-stage continuous heating fluorination method of internal heating of the primary heating fluorination component and external heating of the secondary heating fluorination component, thereby making the test results more accurate. Among them, the first-stage heating fluorination component adopts internal heating to quickly heat the aerosol particles generated by femtosecond ultraviolet laser ablation. The first-stage heating fluorination component adopts a cylindrical linear nickel fluorination tube. The reaction chamber of the cylindrical linear nickel fluorination tube is a regular cylinder. The diameter of the cylindrical reaction chamber is only 1mm, which is consistent with the beam spot diameter of the infrared laser, ensuring that all aerosol particles are concentrated in the focus of the infrared laser and are quickly heated and fluorinated. At the same time, it avoids the temperature in the reaction chamber being too high and the nickel tube wall reacting with the fluorinating agent; the air outlet end of the first-stage heating fluorination component is directly connected to the second-stage heating fluorination component. The second-stage heating fluorination component adopts a spiral nickel fluorination tube, which increases the high-temperature fluorination path, prolongs the fluorination reaction time, and can make the aerosol particles that have not reacted completely in the first-stage heating fluorination component further react, making the fluorination reaction more complete, thereby improving the accuracy of the results of the in-situ analysis test of oxygen isotopes of refractory minerals. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the embodiments of this specification. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0030] Figure 1 A schematic diagram of the structure of a double-heating fluorination sample preparation device for in-situ analysis of oxygen isotopes in micro-areas of refractory minerals provided by the present invention;

[0031] Figure 2 Schematic diagram of the cross-sectional structure of the secondary heating fluorination component provided by the present invention Figure 1 ;

[0032] Figure 3 A schematic diagram of the structure of the secondary heating fluorination assembly provided by the present invention from a top view;

[0033] Figure 4 Schematic diagram of the internal structure of the secondary heating fluorination component provided by the present invention Figure 1 ;

[0034] Figure 5 Schematic diagram of the cross-sectional structure of the secondary heating fluorination component provided by the present invention Figure 2 ;

[0035] Figure 6Schematic diagram of the internal structure of the secondary heating fluorination component provided by the present invention Figure 2 ;

[0036] Figure 7 A schematic diagram of the structure of the connection between the rear connecting tube and the tail connector of the spiral nickel-fluoride tube provided by the present invention;

[0037] Figure 8 A schematic diagram of the structure of a testing system for in-situ analysis of oxygen isotopes in micro-areas of refractory minerals provided by the present invention.

[0038] Reference numerals:

[0039] 10. primary heating fluorination assembly; 101. cylindrical linear nickel fluorination tube; 101a. reaction chamber; 101b. tube wall; 102. CO 2 Infrared laser; 103, MgF 2 Window; 104, screw cap; 105, first sealing ring; 106, second sealing ring; 107, extension tube;

[0040] 20. Secondary heating fluorination component; 201. Outer shell; 202. Heat-resistant inner shell; 203. Resistance wire;

[0041] 30. spiral nickel-fluoride tube; 301. front connecting tube; 302. rear connecting tube;

[0042] 40, air guide assembly; 401, bottom box; 402, middle tube; 403, drive motor; 404, air inlet; 405, air outlet slot; 406, blades;

[0043] 50. Thermal conductive sheet;

[0044] 60, tail connector; 601, protection tube; 602, telescopic tube; 603, end; 604, connecting ring; 61, external threaded tube; 62a, sealing ring 1; 62b, sealing ring 2; 63, elastic sheet;

[0045] 70. BrF 5 Gas cylinders;

[0046] 80. Helium source for dilution;

[0047] 90. Stainless steel ferrule;

[0048] 100. Femtosecond ultraviolet laser ablation device; 100a. Helium carrier gas purification device;

[0049] 200. Double heating fluorination sample preparation device;

[0050] 300, O 2 Enrichment and purification device; 300a, first backflush helium; 300b, second backflush helium;

[0051] 400, diverter valve assembly;

[0052] 500. Gas isotope ratio mass spectrometer; DETAILED DESCRIPTION

[0053] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. It should be noted that, in the absence of conflict, the embodiments in the present application and the features in the embodiments can be combined, separated, interchanged and / or rearranged with each other. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0054] In the accompanying drawings, the size and relative size of components may be exaggerated for clarity and / or descriptive purposes. When the exemplary embodiments may be implemented differently, a specific process sequence may be performed in a different order than described. For example, two successively described processes may be performed substantially simultaneously or in an order opposite to the order described. In addition, the same reference numerals represent the same components.

[0055] The terms used here are for the purpose of describing specific embodiments, and are not intended to be restrictive. As used here, unless the context clearly indicates otherwise, the singular forms "one (kind, person)" and "said (the)" are also intended to include plural forms. In addition, when the terms "comprise" and / or "include" and their variations are used in this specification, it is explained that there are stated features, integral bodies, steps, operations, parts, assemblies and / or their groups, but it is not excluded that there are or add one or more other features, integral bodies, steps, operations, parts, assemblies and / or their groups. It should also be noted that, as used here, the terms "substantially", "approximately" and other similar terms are used as approximate terms and not as degree terms, so that they are used to explain the inherent deviations of the measured values, calculated values ​​and / or the values ​​provided that will be recognized by those of ordinary skill in the art.

[0056] Example 1

[0057] A specific embodiment of the present invention, as Figures 1 to 4 As shown, a double heating fluorination sample preparation device for in-situ analysis of oxygen isotope micro-area of ​​refractory minerals is disclosed, which may be referred to as "double heating fluorination sample preparation device" hereinafter. The double heating fluorination sample preparation device comprises:

[0058] The primary heating fluorination assembly 10 has a cylindrical linear nickel fluorination tube 101 and a CO 2Infrared laser 102, cylindrical linear nickel fluoride tube 101 is made of pure nickel tube, having reaction chamber 101a and tube wall 101b, the top and bottom of reaction chamber 101a are open, and the top opening is sealed with MgF 2 Window 103, MgF 2 Window 103 for CO 2 The laser emitted by the infrared laser 102 enters the reaction chamber 101a;

[0059] The secondary heating fluorination assembly 20 has a resistance furnace and a spiral nickel fluorination tube 30 arranged in the resistance furnace. The resistance furnace is used to heat the spiral nickel fluorination tube 30. The air inlet port of the spiral nickel fluorination tube 30 is connected to the bottom port of the reaction chamber 101a of the primary heating fluorination assembly 10, and the air outlet port of the spiral nickel fluorination tube 30 is connected to the bottom port of the reaction chamber 101a of the primary heating fluorination assembly 10. 2 Enrichment and purification device.

[0060] Compared with the prior art, the dual-heating fluorination sample preparation device for in-situ analysis of oxygen isotopes in refractory minerals provided in this embodiment uses a two-stage continuous heating fluorination method of internal heating of the primary heating fluorination component 10 and external heating of the secondary heating fluorination component 20 to ensure that the refractory mineral aerosol particles react completely without fractionation, making the test results more accurate and significantly improving the accuracy of the results of the in-situ analysis test of oxygen isotopes in refractory minerals.

[0061] In this embodiment, the dual heating fluorination sample preparation device also includes BrF 5 Gas cylinder 70, BrF 5 The gas storage bottle 70 is connected to the cylindrical linear nickel fluorination tube 101 of the primary heating fluorination assembly 10 to provide the BrF required for the reaction. 5 The silicate oxide aerosol particles eroded out are carried by the helium carrier gas into the cylindrical linear nickel fluoride tube 101, and in the cylindrical linear nickel fluoride tube 101 with BrF 5 The gas reaction produces target O 2 of mixed gas.

[0062] In this embodiment, the primary heating fluorination component 10 is CO 2 Infrared laser device, CO 2 The infrared laser 102 may be a MIR10 laser produced by NewVave Corporation of the United States, with an output power of 30W and an adjustable spot diameter of 100 μm to 3000 μm. 2 The laser light emitted by the infrared laser 102 passes through the MgF 2 The window 103 rapidly heats the aerosol particles passing through the micro cylindrical linear nickel fluoride tube 101 by internal heating, and reacts with BrF at high temperature. 5 The gas reaction produces target O 2The cylindrical linear nickel fluoride tube 101 has three ports. The first port is a gas inlet, which is located at the upper part of the tube wall 101b. The gas inlet is connected to the reaction chamber 101a. The gas inlet is connected to the laser ablation sample pool through a pipeline. The second port is the top opening of the reaction chamber 101a. MgF 2 The window 103 is sealed on the second port; the third port is a gas outlet, and the gas outlet is connected to the secondary heating fluorination component 20.

[0063] In this embodiment, the cylindrical linear nickel fluoride tube 101 is a micro structure, which is specifically reflected in the volume of the reaction chamber 101a is micro, that is, the MgF 2 The micro cylindrical linear nickel fluoride tube 101 of the window 103 includes a pure nickel tube and MgF 2 Window 103, MgF 2 The window 103 is connected to the top opening of the pure nickel tube by a screw cap 104, and the screw cap 104 is connected to the top of the pure nickel tube by screwing; MgF 2 Window 103 is made of MgF 2 Glass, screw cap 104 with MgF 2 A first sealing ring 105 is provided between the windows 103. 2 A second sealing ring 106 is provided between the window 103 and the top surface of the pure nickel tube; the first sealing ring 105 and the second sealing ring 106 are both O-type Teflon gaskets. The reaction chamber 101a includes a first space and a second space provided inside the pure nickel tube, the first space and the second space are arranged vertically and coaxially connected, the first space is conical, the top cone of the cone has a diameter of 3 mm, the cone height of the cone is 6 mm, and the top cone of the cone is aligned with the MgF 2 The glass is sealed by an O-type Teflon gasket, and the conical bottom cone is connected to the second space. The second space is a regular cylindrical space with a diameter of 1mm and a height of 60mm. The diameter of the cylindrical space is the same as that of the CO 2 The beam spot diameters of the infrared lasers are equal or approximately equal, which is beneficial to the concentration of aerosols and laser heating of aerosol particles.

[0064] In this embodiment, the fluorination sample preparation device further includes a dilution helium source 80, and the dilution helium source 80 and the BrF 5 The gas cylinder 70 is connected and is configured to provide helium to dilute the BrF supplied to the cylindrical linear nickel fluoride tube 101. 5 Gas; BrF 5 The gas outlet of the gas storage cylinder 70 is connected to a stainless steel capillary tube, the inner diameter of the stainless steel capillary tube is 0.13 mm and the length is 10 m. The stainless steel capillary tube is connected to the gas inlet of the cylindrical linear nickel fluoride tube 101 through a three-way valve.

[0065] In this embodiment, the secondary heating fluorination assembly 20 adopts the external heating form of the resistance furnace, and the spiral nickel fluorination tube 30 is installed in the internal heating space of the resistance furnace. The resistance furnace includes a furnace body, a heater, a control system, etc. The furnace body is made of refractory materials. The trace unreacted aerosol particles in the cylindrical linear nickel fluorination tube continue to react with BrF through the spiral nickel fluorination tube 30. 5 The gas reaction produces target O 2 Gas mixture, CO 2 Infrared laser and resistance furnace are used for dual heating, and the secondary reactor is continuously fluorinated to ensure complete reaction. The spiral nickel fluorination tube 30 also uses a pure nickel tube. The spiral nickel fluorination tube 30 extends in a spiral along a predetermined direction, and the overall spiral structure can increase the high-temperature fluorination path by more than 4 times, significantly prolonging the fluorination reaction time, making the fluorination reaction more thorough. The spiral nickel fluorination tube 30 has two ports. The air inlet port of the spiral nickel fluorination tube 30 is connected to the gas outlet of the cylindrical linear nickel fluorination tube 101, and the air outlet port of the spiral nickel fluorination tube 30 is connected to the O 2 Enrichment and purification device connection; CO 2 The laser emitted by the infrared laser passes through MgF 2 The window quickly heats the aerosol particles passing through the reaction chamber 101a of the cylindrical linear nickel fluoride tube 101 by internal heating, and reacts with BrF at high temperature. 5 The gas reaction produces target O 2 The mixed gas carries the unreacted aerosol particles into the spiral nickel fluoride tube 30 for secondary heating at a temperature of 680°C. The trace unreacted aerosol particles continue to react with BrF through the 2-meter-long spiral nickel fluoride tube 30. 5 The gas reaction produces target O 2 The gas mixture is doubly heated by a primary heating fluorination component 10 and a secondary heating fluorination component 20. The two-stage heating reaction realizes continuous fluorination and ensures complete reaction.

[0066] In one preferred embodiment, the internal space of the spiral nickel-fluoride tube 30 is filled with nickel wire, the nickel wire is filled in the space near the air outlet port of the spiral nickel-fluoride tube 30, and the space near the air inlet port of the spiral nickel-fluoride tube 30 is not filled with nickel wire.

[0067] In one preferred embodiment, the spiral nickel-fluoride tube 30 has an outer diameter of 6.4 mm, an inner diameter of 3.0 mm, and a length of 2 m.

[0068] In this embodiment, the secondary heating fluorination assembly 20 can be arranged vertically or horizontally. That is, in the vertical arrangement scheme, the longitudinal height of the resistance furnace is greater than the horizontal length; in the horizontal arrangement scheme, the longitudinal height of the resistance furnace is less than the horizontal length. Among them, the arrangement of the resistance furnace is preferably a horizontal arrangement scheme, which can avoid baking the primary heating fluorination assembly 10 arranged vertically above due to the excessive height of the resistance furnace.

[0069] Exemplarily, the cylindrical linear nickel fluorination tube 101 has an extension tube 107 extending downward, and the extension tube 107 is integrally formed with the cylindrical linear nickel fluorination tube 101. The extension tube 107 is connected to the bottom opening of the cylindrical linear nickel fluorination tube 101 and extends downward from the bottom opening. The fluorination reaction in the cylindrical linear nickel fluorination tube 101 is mainly completed in the reaction chamber 101a, and does not react in the extension tube 107. The extension tube 107 only serves to connect the reaction chamber 101a with the cylindrical linear nickel fluorination tube 101. The air inlet port and the air outlet port of the spiral nickel fluoride tube 30 are both located outside the resistance furnace. The two ends of the spiral nickel fluoride tube 30 have a front connecting tube 301 and a rear connecting tube 302. The portion between the front connecting tube 301 and the rear connecting tube 302 is a spiral structure. The middle spiral structure portion is integrally formed with the front connecting tube 301 and the rear connecting tube 302. The front connecting tube 301 is located on one side of the air inlet port, and the rear connecting tube 302 is located on one side of the air outlet port. The front connecting tube 301 is connected to the extension tube 107, and the rear connecting tube 302 is connected to the O 2 The enrichment and purification device is connected, the front connecting pipe 301 and the rear connecting pipe 302 are straight pipe sections, and the front connecting pipe 301 and the rear connecting pipe 302 are located outside the resistance furnace, only the spiral structure part is located in the resistance furnace for heating, and the front connecting pipe 301 and the rear connecting pipe 302 are not heated.

[0070] When the spiral nickel fluorination tube 30 is connected to the cylindrical straight nickel fluorination tube 101, a stainless steel ferrule 90 is used for connection and a stainless steel gasket or a Teflon gasket is used for sealing. Specifically, the front connecting tube 301 is connected to the extension tube 107 using a Swagelok stainless steel ferrule. The Swagelok stainless steel ferrule adopts a right-angle structure, which enables the extension tube 107 to be arranged vertically as a whole and the front connecting tube 301 to be arranged horizontally, so as to avoid the baking of the primary heating fluorination component 10 arranged vertically above due to the high height of the resistance furnace.

[0071] In this embodiment, the resistance furnace can adopt an existing resistance furnace, such as a resistance furnace commonly used in laboratories, without the need for additional purchase, and the cost is low.

[0072] In order to improve the heating effect of the resistance furnace on the spiral nickel-fluoride tube 30, in an optional implementation mode of this embodiment, the structure of the existing resistance furnace is improved accordingly. Specifically, the resistance furnace includes an outer shell 201, a heat-resistant inner shell 202, a resistance wire 203, and an electric control module. The heat-resistant inner shell 202 is connected to the outer shell 201, and the outer shell 201 and the heat-resistant inner shell 202 constitute a furnace body. Heat insulation cotton can be arranged between the heat-resistant inner shell and the outer shell. The resistance wire 203 is arranged in a spiral groove opened on the inner wall of the heat-resistant inner shell 202, and the groove extends from one end of the heat-resistant inner shell 202 to the corresponding other end. The electric control module is connected to the resistance wire 203, and the electric control module is used to control the power of the resistance wire 203, wherein the spiral nickel-fluoride tube 30 is inserted into the middle of the heat-resistant inner shell 202.

[0073] In this embodiment, the electric control module controls the current to flow through the resistance wire 203, so that the resistance wire 203 heats up. After the resistance wire 203 heats up, it heats the spiral nickel-fluoride tube 30. By controlling the power of the current through the electric control module, the temperature generated by the resistance wire 203 can be controlled to achieve the purpose of temperature control.

[0074] Since the resistance wire 203 is arranged on the outside of the spiral nickel fluoridation tube 30, there is a difference between the temperature at the center of the resistance furnace and the heating temperature of the resistance wire 203 at the furnace wall. The temperature is high near the furnace wall, and the temperature at the center is slightly lower. The temperature at different positions in the furnace is not uniform. The inner heating temperature of the spiral nickel fluoridation tube 30 is slightly lower than the outer temperature, which will affect the accuracy of temperature monitoring. Slight fluctuations in the heating temperature will also affect the fluorination reaction effect in the spiral nickel fluoridation tube 30. Based on this, in one of the optional embodiments, the resistance furnace also includes an air guide component 40, which is arranged in the heat-resistant inner shell 202, and is used to circulate the heat generated by the resistance wire 203 in the heat-resistant inner shell 202. By setting the air guide component 40, the heat generated by the resistance wire 203 can be circulated in the heat-resistant inner shell 202, and the heat of the spiral nickel fluoridation tube 30 can be guided to the inner side of the spiral nickel fluoridation tube 30, so that the temperature at different positions in the resistance furnace is uniform, thereby achieving balanced heating of the spiral nickel fluoridation tube 30 and ensuring the fluorination reaction effect.

[0075] Specifically, the air guide assembly 40 includes a bottom box 401, a middle cylinder 402, and a driving motor 403. The side wall of the middle cylinder 402 is regularly provided with multiple air inlets 404. An air outlet groove 405 is provided on the side of the bottom box 401 opposite to the heat-resistant inner shell 202. The air outlet groove 405 is located between the heat-resistant inner shell 202 and the spiral nickel-fluoride tube 30. The middle cylinder 402 is connected and communicated with the bottom box 401. The driving motor 403 is connected to the bottom of the bottom box 401, and the driving shaft of the driving motor 403 is inserted into the bottom box 401 and extends into the middle cylinder 402. The driving shaft of the driving motor 403 located in the middle cylinder 402 is provided with blades 406.

[0076] After the driving motor 403 is started, the driving shaft of the driving motor 403 can drive the blades 406 to rotate rapidly, generating an airflow blowing from the bottom direction of the middle cylinder 402. The airflow enters the middle cylinder 402 from the air inlet 404. Since the air inlet 404 is close to the resistance wire 203, the hot airflow near the resistance wire 203 moves toward the inside of the spiral nickel-fluoride tube 30. After the airflow enters the bottom box 401, it is blown out from the air outlet slot 405. Since the air outlet slot 405 is located between the heat-resistant inner shell 202 and the spiral nickel-fluoride tube 30, the airflow flows back from between the heat-resistant inner shell 202 and the spiral nickel-fluoride tube 30 into the heat-resistant inner shell 202, forming an airflow circulation. In this way, the heat of the heat-resistant inner shell 202 is evenly distributed.

[0077] In one optional implementation, the middle cylinder 402 may be made of copper or other materials with good thermal conductivity.

[0078] In order to further improve the heating uniformity in the resistance furnace, a plurality of heat-conducting sheets 50 are arranged at intervals in the resistance furnace. The heat-conducting sheets 50 are arranged in the heat-resistant inner shell 202. One end of the heat-conducting sheet 50 is connected to the outer wall of the middle cylinder 402, and the other end is overlapped to the outer wall of the spiral nickel-fluoride tube 30. By providing the heat-conducting sheet 50, the heat near the resistance wire 203 can be directly introduced into the inner area of ​​the side wall of the spiral nickel-fluoride tube 30, further improving the temperature balance of the heat-resistant inner shell 202. The material of the heat-conducting sheet 50 can also be made of copper, a material with good thermal conductivity.

[0079] The heat conductive sheet 50 is at the overlapping end of the spiral nickel fluoride tube 30, and its end is within the cross-sectional area of ​​the spiral nickel fluoride tube 30, so that the heat conductive sheet 50 does not extend into the gap between the spiral nickel fluoride tube 30 and the resistance wire 203, preventing it from obstructing the blowing of the reflux airflow.

[0080] The heat conducting sheet 50 is also spirally connected to the middle cylinder 402 and is evenly connected to the spiral nickel-fluoride tube 30 .

[0081] The resistance wire 203 and the spiral nickel-fluoride tube 30 are staggered, so that when the resistance wire 203 and the spiral nickel-fluoride tube 30 are in the same cross section, each part of the resistance wire 203 is exactly located between two adjacent spiral sections of the spiral nickel-fluoride tube 30; the air inlet 404 corresponds to the position of the resistance wire 203. By staggering the resistance wire 203 and the spiral nickel-fluoride tube 30, the heat radiation of the resistance wire 203 is exactly in two adjacent spiral sections of the spiral nickel-fluoride tube 30, and the heat radiation is more balanced.

[0082] In one optional embodiment, Figures 5 to 7 As shown, the rear connecting tube 302 of the spiral nickel fluoride tube 30 is connected to the O through the tail connector 60. 2The pipeline connection of the enrichment and purification device, the rear connecting tube 302 is detachably connected to the tail connector 60, the rear connecting tube 302 has an inner portion extending outward from the outside of the resistance furnace, and is inserted and extended to the outside of the bottom box 401, and the connection between the rear connecting tube 302 and the tail connector 60 is set on the outside of the resistance furnace, which is convenient for replacement operation; the top center of the bottom box 401 is connected with a hollow externally threaded tube 61, the inner wall of the bottom end part of the middle tube 402 is provided with an internal thread, the middle tube 402 is threadedly connected with the externally threaded tube 61, the externally threaded tube 61 is connected to the bottom box 401 and the middle tube 402, and the front connecting tube 301 of the spiral nickel fluoride tube 30 is detachably connected to the extension tube 107 of the cylindrical linear nickel fluoride tube 101 through a stainless steel ferrule 90.

[0083] By detachably connecting the tail connector 60 and the rear connecting tube 302 of the spiral nickel fluoride tube 30, the tail connector 60 and the spiral nickel fluoride tube 30 can be replaceably set. When it is necessary to replace the spiral nickel fluoride tube 30 with a spiral nickel fluoride tube 30 of different size parameters to achieve the heating temperature setting or flow setting under different circumstances, the spiral nickel fluoride tube 30 can be disassembled and replaced. The specific disassembly steps are: first disassemble the downstream pipeline connected to the tail connector 60 and the outside, and then disassemble the tail connector 60 and the rear connecting tube 302. After the tail connector 60 and the rear connecting tube 302 are disassembled, the spiral nickel fluoride tube 30 can be replaced. After the replacement is completed, the assembly of the device is completed in reverse order of the above steps.

[0084] In this disassembly step, if the structure of the heat conductive sheet 50 is added, the heat conductive sheet 50 can be set to a bendable and elastic sheet structure, that is, when the heat conductive sheet 50 is a copper sheet, it can be both heat conductive and bendable, and the bent heat conductive sheet 50 can be directly pulled out through the middle tube 402. During installation, after the middle tube 402 is installed in place, thermal grease can be used to apply the heat conductive sheet 50 and the outer wall of the spiral nickel fluoride tube 30 so that the two are adhered and contacted, and because the cross-section of the spiral nickel fluoride tube 30 is circular, after heating the thermal grease, the thermal conductivity area and effect of the heat conductive sheet 50 and the spiral nickel fluoride tube 30 are also increased.

[0085] In one of the optional embodiments, the rear connector 60 includes a protective tube 601, a telescopic tube 602 and an end head 603. The end head 603 is detachably connected to the rear connecting tube 302. The protective tube 601 is sleeved on the outside of the end head 603 to protect the telescopic tube 602. A connecting ring 604 is provided in the sleeve gap between the protective tube 601 and the end head 603. The connecting ring 604 connects the protective tube 601 and the end head 603 and seals the sleeve gap between the two. There is a reserved space between the connecting ring 604 and the end of the protective tube 601, so that when the rear connecting tube 302 is plugged in, it can be inserted into the reserved space to improve the connection stability. The first end of the telescopic tube 602 is connected and communicated with the end head 603. The first end of the telescopic tube 602 is located in the protective tube 601 and can be communicated with the rear connecting tube 302. The second end of the telescopic tube 602 can be directly connected to the end head 603. 2 The enrichment and purification device is connected, or the telescopic tube 602 is used as a connection with O 2 A part of the pipeline connected to the enrichment and purification device. The telescopic pipe 602 is a heat-resistant telescopic pipe, and the telescopic structure can adjust the position of the resistance furnace within a certain range to avoid affecting the sealing of the connection due to the movement of the pipeline.

[0086] In one of the optional embodiments, some supporting structures can be provided outside the secondary heating fluorination component 20 to support the bottom box 401, the outer shell 201 and other parts of the secondary heating fluorination component 20 to prevent the secondary heating fluorination component 20 from shaking.

[0087] In one optional embodiment, referring to Figure 7 As shown, a sealing ring 62a is provided on the outer wall of the top end of the terminal 603. After the terminal 603 is inserted into the rear connecting tube 302, the sealing ring 62a fits tightly with the inner wall of the rear connecting tube 302, thereby achieving a seal between the terminal 603 and the rear connecting tube 302 to prevent aerosol leakage.

[0088] In one optional embodiment, referring to Figure 7As shown, a plurality of spaced-apart sealing rings 62b are provided on the outer wall of the connecting portion between the rear connecting tube 302 and the tail connector 60, that is, a plurality of spaced-apart sealing rings 62b are provided on the outer wall of the air outlet end of the rear connecting tube 302, and a V-shaped elastic sheet 63 is provided on the inner wall of the protective tube 601. After the protective tube 601 and the end head 603 are plugged into place, the rear connecting tube 302 is just plugged into the annular space between the protective tube 601 and the end head 603, and the elastic sheet 63 just abuts against two adjacent sealing rings 62b on the outer wall of the rear connecting tube 302. A plurality of sealing rings 62b are arranged at intervals on the outer wall of the connection portion between the rear connecting tube 302 and the tail connector 60, so that a second seal is formed to enhance the sealing effect. At the same time, the V-shaped elastic sheet 63 is arranged so that after the rear connecting tube 302 is just inserted into the annular space between the protective tube 601 and the end head 603, the V-shaped elastic sheet 63 is squeezed and contacted with two adjacent sealing rings 62b at the same time, so that the elastic sheet 63 forms abutment against the sealing rings 62b, and the protective tube 601 and the rear connecting tube 302 are not easily separated, thereby ensuring the coaxiality of the rear connecting tube 302 and the protective tube 601, avoiding the swing of the rear connecting tube 302, resulting in sealing leakage at the connection with the end head 603, thereby improving the sealing performance; and the arrangement of multiple sealing rings 62b ensures that even if the elastic sheet 63 is displaced, it will stop between the next two adjacent sealing rings 62b, thereby ensuring the sealing reliability.

[0089] In this embodiment, the tail connector 60 may also adopt a Swagelok stainless steel ferrule with a linear structure.

[0090] Example 2

[0091] Another specific implementation of the present invention also discloses a method for in-situ analysis of oxygen isotopes in refractory minerals, using a testing system for in-situ analysis of oxygen isotopes in refractory minerals, such as Figure 8 As shown, the test system includes a helium carrier gas purification device 100a, a femtosecond ultraviolet laser ablation device 100, a double heating fluorination sample preparation device 200 of Example 1, and a helium carrier gas purification device 100a, a femtosecond ultraviolet laser ablation device 100, and a double heating fluorination sample preparation device 200 of Example 1. 2 Enrichment and purification device 300 and gas isotope ratio mass spectrometer 500;

[0092] The helium carrier gas purification device 100a has a liquid nitrogen cold trap filled with silica gel and a heating activation device; the helium carrier gas and the backwash helium gas are both 5N high-purity helium, but they still contain trace impurities O 2 , collect sample O 2 At the same time, impurities O 2 It will also be enriched, resulting in an increase in the background. In this embodiment, a large-capacity liquid nitrogen cold trap filled with silica gel is used to remove trace impurities O in high-purity helium. 2 , reduce system background;

[0093] The femtosecond ultraviolet laser ablation device 100 comprises a femtosecond laser, a laser ablation platform and a high-purity helium source; a sample pool for containing a sample to be tested is provided in the laser ablation platform, and the femtosecond laser is configured to emit a femtosecond ultraviolet laser to the surface of the sample to be tested in the sample pool, so as to ablate refractory mineral aerosol particles from the sample to be tested; the high-purity helium source is configured to provide helium carrier gas, so as to blow the ablated refractory mineral aerosol particles out of the sample pool;

[0094] The double-heating fluorination sample preparation device 200 comprises a primary heating fluorination component 10 and a secondary heating fluorination component 20; 2 The laser light emitted by the infrared laser 102 passes through the MgF 2 The window 103 rapidly heats the aerosol particles passing through the micro cylindrical linear nickel fluoride tube 101 by internal heating, and reacts with BrF at high temperature. 5 The gas reaction produces target O 2 The mixed gas carries the unreacted aerosol particles into the spiral nickel fluorination tube 30 for secondary heating and continues to react with BrF 5 The gas reaction produces target O 2 The gas mixture is doubly heated by a primary heating fluorination component 10 and a secondary heating fluorination component 20. The two-stage heating reaction realizes continuous fluorination and ensures complete reaction.

[0095] O 2 The enrichment and purification device 300 is connected to the gas outlet port of the secondary heating fluorination component 20, and is used to collect and purify the target O in the reaction mixed gas in the secondary heating fluorination component 20. 2 gas.

[0096] The gas isotope ratio mass spectrometer 500 comprises a mass spectrometer host, which is connected to the gas isotope ratio mass spectrometer 500 through a diverter valve assembly 400. 2 Enrichment and purification device connection for measuring target O 2 The three oxygen isotopic compositions of the gas.

[0097] Specifically, the in-situ analysis and testing method of oxygen isotope micro-area of ​​refractory minerals includes the following steps:

[0098] Step 1: Use silica gel liquid nitrogen cold trap purification device to remove trace impurities O in helium 2 , reducing the system background; before using the liquid nitrogen cold trap filled with silica gel, the system was heated to 300℃ for purging and degassing for 3 days to reduce the system background to below 200mV. The purified helium was divided into three paths through a three-way valve, one for helium carrier gas, and the other two for the first back-blowing helium 300a and the second back-blowing helium 300b. Furthermore, after the end of each day's experiment, the silica gel cold trap was heated to 300℃ for activation and back-blown with helium for more than 12 hours.

[0099] Step 2: Using a femtosecond laser to strip silicate oxide aerosol particles from the refractory mineral sample to be tested in the sample pool, the stripped silicate oxide aerosol particles are first carried by helium carrier gas into the cylindrical linear nickel fluorination tube 101 of the primary heating fluorination assembly 10, CO 2 The infrared laser 102 emits infrared laser into the reaction chamber 101a, and the aerosol particles carried by the helium carrier gas rapidly react with the BrF 5 The gas reaction produces target O 2 The remaining trace aerosol particles that have not reacted completely enter the spiral nickel fluorination tube 30 of the secondary heating fluorination component 20. The heating temperature of the resistance furnace is 680°C. The trace aerosol particles continue to react with BrF at 680°C. 5 Gas reaction ensures complete fluorination reaction without fractionation;

[0100] Step 3: The mixed gas generated in the spiral nickel fluoride tube 30 is passed through O 2 Enrichment, purification and separation device to collect the purified target O 2 The gas is fed into a mass spectrometer for testing to obtain the three oxygen isotope compositions.

[0101] Compared with the prior art, the test method for in-situ analysis of oxygen isotope micro-areas of refractory minerals provided by the present invention can achieve at least one of the following beneficial effects:

[0102] a) Use high power CO 2 The infrared laser quickly heats the aerosol particles generated by femtosecond ultraviolet laser ablation by internal heating, making the fluorination instantaneous. At the same time, it avoids the over-high temperature of the nickel fluorination tube and the reaction with the fluorination agent. 2 The diameter of the micro cylindrical linear NiF tube 101 heated by infrared laser is 1 mm, and the 2 The beam spot diameter of the infrared laser is consistent, ensuring that all aerosol particles are concentrated in the focus of the infrared laser and are quickly heated and fluorinated, while avoiding excessive temperature of the nickel fluorination tube; the spiral nickel fluorination tube 30 heated by a resistance furnace is further used to increase the high-temperature fluorination path by more than 4 times, thereby extending the fluorination reaction time; the cylindrical linear nickel fluorination tube 101 heated inside the infrared laser is used in conjunction with the spiral nickel fluorination tube 30 heated outside the resistance furnace to ensure that the refractory mineral aerosol particles react completely without fractionation, thereby achieving high-precision in-situ oxygen isotope analysis of refractory silicate and oxide mineral micro-areas by femtosecond ultraviolet laser probe.

[0103] b) Using a liquid nitrogen cold trap filled with silica gel to purify the helium carrier gas and backflush the trace amount of O in the helium flow 2 , which improves the purity of helium, reduces the system background and improves the precision of the test.

[0104] c) Collect and purify trace amounts of O using a liquid nitrogen cold trap filled with silica gel 2 , improve the sensitivity of the test, O 2 The enrichment and purification device can 2 The gas was enriched and purified twice, and the impurity gas was further separated by gas chromatography (GC) before the second enrichment and purification, which improved the target O 2 Gas purity and analytical precision.

[0105] The above specific implementation methods further illustrate the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above are only specific implementation methods of the present application and are not intended to limit the scope of protection of the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application.

Claims

1. A double-heating fluorination sample preparation device for in-situ analysis of oxygen isotope micro-areas of refractory minerals, characterized in that: include: The first-stage heating fluorination assembly comprises a cylindrical linear nickel fluorination tube and a CO2 infrared laser. The cylindrical linear nickel fluorination tube is made of pure nickel and has a reaction chamber and a tube wall. A MgF2 window is sealed at the top opening of the reaction chamber. The MgF2 window allows the laser emitted by the CO2 infrared laser to enter the reaction chamber. The secondary heating fluorination component comprises a resistance furnace and a spiral nickel fluorination tube arranged in the resistance furnace. The resistance furnace is used to heat the spiral nickel fluorination tube. The air inlet port of the spiral nickel fluorination tube is connected to the bottom port of the reaction chamber, and the air outlet port of the spiral nickel fluorination tube is connected to the O2 enrichment and purification device.

2. The dual-heating fluorination sample preparation device for in-situ analysis of oxygen isotope micro-areas of refractory minerals according to claim 1, characterized in that: The cylindrical linear nickel fluorination tube has three ports, the first port is a gas inlet, the gas inlet is arranged at the upper part of the tube wall and is connected to the reaction chamber, the gas inlet is connected to the laser ablation sample pool through a pipeline, the second port is the top opening of the reaction chamber; the third port is a gas outlet, and the gas outlet is connected to the secondary heating fluorination component.

3. The dual-heating fluorination sample preparation device for in-situ analysis of oxygen isotope micro-areas of refractory minerals according to claim 2, characterized in that: The MgF2 window is connected to the top opening of the pure nickel tube by a screw cap; a first sealing ring is provided between the screw cap and the MgF2 window, and a second sealing ring is provided between the MgF2 window and the top end surface of the pure nickel tube.

4. The dual-heating fluorination sample preparation device for in-situ analysis of oxygen isotope micro-areas of refractory minerals according to claim 3, characterized in that: The reaction chamber includes a first space and a second space, which are arranged vertically and coaxially connected. The first space is conical, the top cone diameter of the cone is 3 mm, the cone height is 6 mm, the bottom cone of the cone is connected to the second space, and the second space is a regular cylindrical space, the diameter of the cylindrical space is 1 mm, and the height is 60 mm.

5. The dual-heating fluorination sample preparation device for in-situ analysis of oxygen isotope micro-areas of refractory minerals according to any one of claims 1 to 4, characterized in that: The spiral nickel-fluoride tube has an outer diameter of 6.4 mm, an inner diameter of 3.0 mm, and a length of 2 m.

6. The dual-heating fluorination sample preparation device for in-situ analysis of oxygen isotope micro-areas of refractory minerals according to claim 1, characterized in that: The secondary heating fluorination assembly comprises a resistance furnace, and a spiral nickel fluorination tube is installed in the internal heating space of the resistance furnace.

7. A method for in-situ analysis of oxygen isotopes in refractory minerals, characterized in that: The test system used includes a helium carrier gas purification device arranged on the analytical gas path, a femtosecond ultraviolet laser ablation device, a double-heating fluorination sample preparation device as described in any one of claims 1 to 6, an O2 enrichment and purification device, and a gas isotope ratio mass spectrometer.

8. The method for in-situ analysis of oxygen isotopes in micro-areas of refractory minerals according to claim 7, characterized in that: The test method comprises the following steps: Step 1: Use a silica gel liquid nitrogen cold trap purification device to remove trace impurities O2 in helium and reduce the system background; Step 2: A femtosecond laser is used to strip silicate oxide aerosol particles from the refractory mineral sample to be tested in the sample pool. The stripped silicate oxide aerosol particles are first carried by a helium carrier gas into a cylindrical linear nickel fluorination tube of a primary heating fluorination component. A CO2 infrared laser emits an infrared laser into the reaction chamber. The aerosol particles carried by the helium carrier gas react rapidly with the BrF5 gas under high temperature conditions to generate a mixed gas containing the target O2 gas. The remaining trace aerosol particles that have not reacted completely enter the spiral nickel fluorination tube of the secondary heating fluorination component. The heating temperature of the resistance furnace is 680°C, and the trace aerosol particles continue to react with the BrF5 gas at 680°C. Step 3: The mixed gas generated in the spiral nickel fluorination tube is passed through an O2 enrichment, purification and separation device to collect the purified target O2 gas, which is then fed into a mass spectrometer for testing to obtain the three oxygen isotope compositions.

9. The method for in-situ analysis of oxygen isotopes in micro-areas of refractory minerals according to claim 8, characterized in that: Before using the liquid nitrogen cold trap filled with silica gel, the system was heated to 300°C for 3 days to purge and degas, so that the system background dropped below 200mV. The purified helium was divided into three paths through a three-way valve, one for helium carrier gas, and the other two for the first backflush helium gas and the second backflush helium gas.

10. The method for in-situ analysis of oxygen isotopes in micro-areas of refractory minerals according to claim 9, characterized in that: After each day's experiment, the silica gel cold trap was heated to 300°C for activation and back-blown with helium for more than 12 hours.