A method and system for intelligent monitoring of inspection data of wind power generation equipment
Through RFID technology, intelligent monitoring of wind power equipment inspection data has been achieved, and the inspection work monitoring problems in the existing technology have been solved, the inspection quality and data accuracy have been ensured, and the problem-solving efficiency has been improved.
Patent Information
- Application Number
- CN202410519180.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-28
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-04-28
AI Technical Summary
The existing technology is difficult to effectively monitor and ensure the quality of the inspection work of wind power generation equipment, which makes it difficult to carry out inspection work in a timely and accurate manner.
Using an intelligent monitoring method and system for inspection data of wind power equipment, through RFID technology, the inspection task information is automatically retrieved, the inspection duration is determined, the inspection personnel account and time are recorded, the inspection data is received and analyzed, and the inspection data is identified, and abnormal information is identified. , promptly notify the inspectors for inspection.
Ensure that the inspection personnel conduct detailed inspections, upload inspection data in a timely and accurate manner, and improve the quality of inspection work completion and problem-solving efficiency.
Smart Images

Figure CN118428928B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of equipment inspection, and in particular to a method and system for intelligently monitoring inspection data of wind power generation equipment. Background Art
[0002] As a clean and renewable energy, wind energy has the prospect of large-scale development and utilization. Compared with other new energy sources, wind energy has the outstanding advantages of being safe, clean, locally sourced, and inexhaustible. In order to ensure the stable operation of wind power generation equipment, the daily maintenance and inspection of wind power generation equipment is one of the important tasks of wind farm operation and maintenance. In the prior art, an inspection plan will be formulated in advance, and the inspectors will conduct on-site inspections according to the inspection plan to check whether the wind power generation equipment is operating safely and stably. However, at present, it is difficult to monitor the inspection work of the inspectors well and to ensure the quality of the inspection work. Therefore, it is necessary to provide a method and system for intelligent monitoring of wind power generation equipment inspection data, aiming to solve the above problems. Summary of the invention
[0003] In view of the deficiencies in the prior art, the object of the present invention is to provide a method and system for intelligently monitoring inspection data of wind power generation equipment to solve the problems existing in the above-mentioned background technology.
[0004] The present invention is implemented as follows: a method for intelligently monitoring inspection data of wind power generation equipment, the method comprising the following steps:
[0005] Retrieving inspection task information, wherein the inspection task information includes a number of wind power generation equipment, and each wind power generation equipment corresponds to an inspection item;
[0006] The inspection task information is sent to the inspection personnel account, and the RFID content and inspection duration are determined based on the inspection personnel account and the inspection task information. Each wind power generation equipment corresponds to an inspection duration;
[0007] Determine the patrol personnel account, patrol start time and patrol end time based on the RFID reader installed on the wind power generation equipment;
[0008] Receive inspection data uploaded by the inspection personnel account, the inspection data includes item values and upload time, and verify the inspection duration and filling time;
[0009] Analyze the inspection data, identify abnormal information and timely inspection items, and send the abnormal information to the inspection personnel account for timely inspection to determine the problem.
[0010] As a further solution of the present invention: when inspectors conduct inspections, they wear RFID electronic tags, which record radio frequency identification content. Each inspector account corresponds to a radio frequency identification content. The RFID electronic tag is an ultra-high frequency electronic tag with an operating range of 3-5 meters.
[0011] As a further solution of the present invention: the step of determining the RFID content and the inspection duration based on the inspection personnel account and the inspection task information specifically includes:
[0012] Determine the RFID content and the inspector level coefficient K based on the inspector account;
[0013] Determine the standard duration T0 of each wind power generation equipment according to the inspection items in the inspection task information;
[0014] The inspection time T1 of each wind power generation equipment is determined according to the inspection personnel grade coefficient K and the standard time T0, where T1 = K*T0.
[0015] As a further solution of the present invention: the step of determining the patrol personnel account, patrol start time and patrol end time based on the RFID reader installed on the wind power generation equipment specifically includes:
[0016] When the RFID reader installed on the wind power generation equipment communicates wirelessly with the RFID electronic tag, the radio frequency identification content in the RFID electronic tag is read, and the wind power generation equipment and the RFID reader correspond one to one;
[0017] Determine whether there is a corresponding patrol personnel account based on the radio frequency identification content. If there is a corresponding account, record the start time of wireless communication and the disconnection time of wireless communication to determine the start time and end time of the patrol.
[0018] As a further solution of the present invention: the step of checking the inspection duration and the filling time specifically includes:
[0019] Retrieve the inspection start time, inspection end time and inspection task information corresponding to the inspection personnel account of the inspection data;
[0020] Determine the actual inspection duration based on the inspection start time and inspection end time, compare the actual inspection duration with the corresponding inspection duration, and generate inspection duration verification information;
[0021] According to the upload time of the inspection data, and the corresponding inspection start time and inspection end time, it is determined whether the filled-in time is valid, and the filled-in time verification information is generated.
[0022] As a further solution of the present invention: the steps of analyzing the inspection data, determining abnormal information and timely checking items specifically include:
[0023] Input the item values in the inspection data and the corresponding inspection items into the item anomaly library for matching;
[0024] Output abnormal items and corresponding timely inspection items, the item abnormality library contains all inspection items, each inspection item corresponds to a number of abnormal value ranges, and each abnormal value range corresponds to a timely inspection item.
[0025] Another object of the present invention is to provide an intelligent monitoring system for inspection data of wind power generation equipment, the system comprising:
[0026] An inspection task information module is used to retrieve inspection task information, wherein the inspection task information includes a number of wind power generation equipment, and each wind power generation equipment corresponds to an inspection item;
[0027] The inspection duration determination module is used to send the inspection task information to the inspection personnel account, determine the RFID content and inspection duration based on the inspection personnel account and the inspection task information, and each wind power generation equipment corresponds to an inspection duration;
[0028] Inspection information collection module, used to determine the inspection personnel account, inspection start time and inspection end time based on the RFID reader installed on the wind power generation equipment;
[0029] The inspection data verification module is used to receive the inspection data uploaded by the inspection personnel account, the inspection data includes the item value and the upload time, and to verify the inspection duration and the filling time;
[0030] The abnormal data inspection module is used to analyze the inspection data, determine the abnormal information and timely check items, and send the abnormal information to the inspection personnel account for timely inspection to determine the problem.
[0031] As a further solution of the present invention: the inspection duration determination module includes:
[0032] A grade coefficient determination unit, used to determine the radio frequency identification content and the grade coefficient K of the inspector according to the inspector account;
[0033] A standard time determination unit, used to determine the standard time T0 of each wind power generation equipment according to the inspection items in the inspection task information;
[0034] The inspection time determination unit is used to determine the inspection time T1 of each wind power generation equipment according to the inspection personnel grade coefficient K and the standard time T0, where T1 = K*T0.
[0035] As a further solution of the present invention: the inspection information collection module includes:
[0036] A radio frequency content reading unit, used to read the radio frequency identification content in the RFID electronic tag when the RFID reader installed on the wind power generation equipment communicates wirelessly with the RFID electronic tag, and the wind power generation equipment and the RFID reader correspond one to one;
[0037] The inspection time recording unit is used to determine whether there is a corresponding inspection personnel account according to the radio frequency identification content. If there is a corresponding account, the start time of wireless communication is recorded, the disconnection time of wireless communication is recorded, and the inspection start time and inspection end time are determined.
[0038] As a further solution of the present invention: the inspection data verification module includes:
[0039] A related information retrieving unit, used to retrieve the inspection start time, inspection end time and inspection task information corresponding to the inspection personnel account of the inspection data;
[0040] An inspection duration verification unit is used to determine the actual inspection duration according to the inspection start time and the inspection end time, compare the actual inspection duration with the corresponding inspection duration, and generate inspection duration verification information;
[0041] The filling time verification unit is used to determine whether the filling time is valid according to the upload time of the inspection data, and the corresponding inspection start time and inspection end time, and generate filling time verification information.
[0042] Compared with the prior art, the present invention has the following beneficial effects:
[0043] The present invention can determine the radio frequency identification content and inspection duration based on the inspection personnel account and inspection task information, and determine the inspection personnel account, inspection start time and inspection end time based on the RFID reader installed on the wind power generation equipment; by receiving the inspection data uploaded by the inspection personnel account, the inspection duration and filling time are checked; the inspection data is analyzed to determine abnormal information and timely inspection items, and the abnormal information is sent to the inspection personnel account for timely inspection and determination of the problem. The use of the present invention can ensure that the inspection personnel conduct a detailed inspection, and the inspection data upload is timely and accurate, so as to ensure the completion quality of the inspection work as much as possible. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 The present invention is a flow chart of a method for intelligently monitoring inspection data of wind power generation equipment.
[0045] Figure 2 The present invention is a flow chart for determining radio frequency identification content and inspection duration in an intelligent monitoring method for inspection data of wind power generation equipment.
[0046] Figure 3 The present invention is a flow chart of information reading by an RFID reader in a method for intelligently monitoring inspection data of wind power generation equipment.
[0047] Figure 4 The present invention is a flow chart for checking the inspection duration and filling time in an intelligent monitoring method for inspection data of wind power generation equipment.
[0048] Figure 5 The present invention is a flow chart for determining abnormal information and timely checking items in an intelligent monitoring method for inspection data of wind power generation equipment.
[0049] Figure 6 The figure is a structural diagram of an intelligent monitoring system for inspection data of wind power generation equipment. DETAILED DESCRIPTION
[0050] In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0051] The specific implementation of the present invention is described in detail below in conjunction with specific embodiments.
[0052] like Figure 1 As shown, an embodiment of the present invention provides a method for intelligently monitoring inspection data of wind power generation equipment, the method comprising the following steps:
[0053] S100, retrieving inspection task information, wherein the inspection task information includes a plurality of wind power generation equipment, and each wind power generation equipment corresponds to an inspection item;
[0054] S200, sending the inspection task information to the inspection personnel account, determining the radio frequency identification content and the inspection duration based on the inspection personnel account and the inspection task information, and each wind power generation equipment corresponds to one inspection duration;
[0055] S300, determining the inspection personnel account, inspection start time and inspection end time based on the RFID reader installed on the wind power generation equipment;
[0056] S400, receiving inspection data uploaded by the inspection personnel account, the inspection data including item values and upload time, and checking the inspection duration and filling time;
[0057] S500, analyzing the inspection data, determining abnormal information and timely inspection items, and sending the abnormal information to the inspection personnel account for timely inspection to determine the problem.
[0058] It should be noted that, in order to ensure the stable operation of wind power generation equipment, the daily maintenance and inspection of wind power generation equipment is one of the important tasks of wind farm operation and maintenance. In the prior art, an inspection plan is prepared in advance, and the inspection personnel conduct on-site inspections according to the inspection plan to check whether the wind power generation equipment is operating safely and stably. However, it is difficult to monitor the inspection work of the inspection personnel well and ensure the quality of the inspection work. The embodiments of the present invention are intended to solve the above problems.
[0059] In the embodiment of the present invention, the inspection task information prepared in advance will be retrieved first, and the inspection task information includes several wind power generation equipment, and each wind power generation equipment corresponds to an inspection item. Then the inspection task information will be sent to the inspection personnel account to facilitate the inspection personnel to perform inspection operations. At the same time, the embodiment of the present invention will automatically determine the radio frequency identification content and inspection duration according to the inspection personnel account and the inspection task information, so that each wind power generation equipment corresponds to an inspection duration. It should be noted that the inspection personnel wear an RFID electronic tag when conducting an inspection. Preferably, the RFID electronic tag can be attached to a reflective vest. The RFID electronic tag records the radio frequency identification content. Each inspection personnel account corresponds to a radio frequency identification content. The RFID electronic tag is an ultra-high frequency electronic tag with an effective range of 3-5 meters. In this way, when the inspection personnel approach the wind power generation equipment, the RFID reader installed on the wind power generation equipment can determine the inspection personnel account, the inspection start time and the inspection end time. In addition, when inspectors conduct inspections, they need to upload and submit inspection data in a timely manner. The inspection data includes item values and upload time. Each inspection item corresponds to an item value and upload time. Then, the embodiment of the present invention will automatically check the inspection duration and filling time to ensure that the inspectors have conducted a detailed inspection and that the inspection data upload is timely and accurate, so as to ensure the quality of the inspection work as much as possible. Finally, the embodiment of the present invention will also analyze the inspection data, determine abnormal information and check items in a timely manner, and send the abnormal information to the inspector account, so that the inspectors can conduct timely inspections and determine problems on site, greatly improving the efficiency of problem solving.
[0060] like Figure 2 As shown, as a preferred embodiment of the present invention, the step of determining the RFID content and the inspection duration based on the inspection personnel account and the inspection task information specifically includes:
[0061] S201, determining the radio frequency identification content and the inspection personnel level coefficient K according to the inspection personnel account;
[0062] S202, determining the standard duration T0 of each wind power generation equipment according to the inspection items in the inspection task information;
[0063] S203, determining the inspection time T1 of each wind power generation equipment according to the inspection personnel grade coefficient K and the standard time T0, where T1 = K*T0.
[0064] In the embodiment of the present invention, a personnel account information library and an inspection item time library are established in advance, the personnel account information library contains all staff accounts, each staff account corresponds to a radio frequency identification content and an inspection personnel grade coefficient K, the inspection item time library contains all inspection items, each inspection item corresponds to a predicted inspection duration. In this way, the radio frequency identification content and the inspection personnel grade coefficient K can be automatically determined according to the inspection personnel account, and the standard duration T0 of each wind power generation equipment can be determined according to the inspection items in the inspection task information. The standard duration T0 is obtained by accumulating several corresponding predicted inspection durations. Finally, the inspection duration of each wind power generation equipment is determined according to the inspection personnel grade coefficient and the standard duration. The higher the grade of the inspection personnel, the lower the corresponding grade coefficient, and the shorter the required inspection duration.
[0065] like Figure 3 As shown, as a preferred embodiment of the present invention, the step of determining the patrol personnel account, patrol start time and patrol end time based on the RFID reader installed on the wind power generation equipment specifically includes:
[0066] S301, when the RFID reader installed on the wind power generation equipment communicates wirelessly with the RFID electronic tag, the radio frequency identification content in the RFID electronic tag is read, and the wind power generation equipment and the RFID reader correspond one to one;
[0067] S302, determining whether there is a corresponding patrol personnel account according to the radio frequency identification content, and if there is a corresponding account, recording the start time of wireless communication, recording the disconnection time of wireless communication, and determining the patrol start time and patrol end time.
[0068] In the embodiment of the present invention, each wind power generation device is equipped with an RFID reader, and each RFID reader has its own ID information. When the RFID reader installed on the wind power generation device communicates wirelessly with the RFID electronic tag, it indicates that a staff member has come nearby and reads the radio frequency identification content in the RFID electronic tag. Then, it is determined whether there is a corresponding patrol personnel account based on the radio frequency identification content. If there is a corresponding account, it indicates that the patrol personnel are conducting an inspection and recording the start time of the wireless communication. After that, it is also necessary to record the disconnection time of the wireless communication. In this way, the start time and end time of the inspection can be determined by the staff.
[0069] like Figure 4 As shown, as a preferred embodiment of the present invention, the step of checking the inspection duration and the filling time specifically includes:
[0070] S401, retrieve the inspection start time, inspection end time and inspection task information corresponding to the inspection personnel account of the inspection data;
[0071] S402, determining the actual inspection duration according to the inspection start time and the inspection end time, comparing the actual inspection duration with the corresponding inspection duration, and generating inspection duration verification information;
[0072] S403, judging whether the filled-in time is valid according to the upload time of the inspection data, and the corresponding inspection start time and inspection end time, and generating the filled-in time verification information.
[0073] In the embodiment of the present invention, the filling time of the inspection duration and the item value will be checked. Specifically, the inspection start time, inspection end time and inspection task information corresponding to the inspection personnel account that sends the inspection data will be retrieved, and the corresponding inspection duration will be determined according to the inspection task information. Then, the actual inspection duration will be determined according to the inspection start time and the inspection end time, and the actual inspection duration will be compared with the corresponding inspection duration to generate inspection duration verification information. The inspection duration verification information is used to reflect whether the actual inspection duration meets the basic requirements, for example, the basic requirement is that the actual inspection duration is greater than 90% of the inspection duration. Then, whether the filling time is valid will be determined based on the upload time of the inspection data and the corresponding inspection start time and inspection end time. The filling time will be valid only if and only if the upload time of the inspection data is within the range of the inspection start time and the inspection end time.
[0074] like Figure 5 As shown, as a preferred embodiment of the present invention, the steps of analyzing the inspection data, determining abnormal information and timely checking items specifically include:
[0075] S501, inputting the item values in the inspection data and the corresponding inspection items into the item anomaly library for matching;
[0076] S502, outputting abnormal items and corresponding timely inspection items, wherein the item abnormality library contains all inspection items, each inspection item corresponds to a number of abnormal value ranges, and each abnormal value range corresponds to a timely inspection item.
[0077] In the embodiment of the present invention, an item abnormality library is established in advance, and the item abnormality library contains all inspection items, each inspection item corresponds to a number of abnormal value ranges, and each abnormal value range corresponds to a timely inspection item. In this way, the item value in the inspection data and the corresponding inspection item are input into the item abnormality library for matching, and the abnormal item and the corresponding timely inspection item will be automatically determined, and then the timely inspection item will be sent to the inspection personnel account.
[0078] like Figure 6 As shown, an embodiment of the present invention further provides an intelligent monitoring system for inspection data of wind power generation equipment, the system comprising:
[0079] The inspection task information module 100 is used to retrieve the inspection task information, wherein the inspection task information includes a number of wind power generation equipment, and each wind power generation equipment corresponds to an inspection item;
[0080] Inspection duration determination module 200, used to send inspection task information to the inspection personnel account, determine the RFID content and inspection duration based on the inspection personnel account and inspection task information, and each wind power generation equipment corresponds to an inspection duration;
[0081] The inspection information collection module 300 is used to determine the inspection personnel account, inspection start time and inspection end time based on the RFID reader installed on the wind power generation equipment;
[0082] The inspection data verification module 400 is used to receive the inspection data uploaded by the inspection personnel account, the inspection data includes the item value and the upload time, and to verify the inspection duration and the filling time;
[0083] The abnormal data checking module 500 is used to analyze the inspection data, determine the abnormal information and timely check items, and send the abnormal information to the inspection personnel account for timely inspection to determine the problem.
[0084] As a preferred embodiment of the present invention, the inspection duration determination module 200 includes:
[0085] A grade coefficient determination unit, used to determine the radio frequency identification content and the grade coefficient K of the inspector according to the inspector account;
[0086] A standard time determination unit, used to determine the standard time T0 of each wind power generation equipment according to the inspection items in the inspection task information;
[0087] The inspection time determination unit is used to determine the inspection time T1 of each wind power generation equipment according to the inspection personnel grade coefficient K and the standard time T0, where T1 = K*T0.
[0088] As a preferred embodiment of the present invention, the inspection information collection module 300 includes:
[0089] A radio frequency content reading unit, used to read the radio frequency identification content in the RFID electronic tag when the RFID reader installed on the wind power generation equipment communicates wirelessly with the RFID electronic tag, and the wind power generation equipment and the RFID reader correspond one to one;
[0090] The inspection time recording unit is used to determine whether there is a corresponding inspection personnel account according to the radio frequency identification content. If there is a corresponding account, the start time of wireless communication is recorded, the disconnection time of wireless communication is recorded, and the inspection start time and inspection end time are determined.
[0091] As a preferred embodiment of the present invention, the inspection data verification module 400 includes:
[0092] A related information retrieving unit, used to retrieve the inspection start time, inspection end time and inspection task information corresponding to the inspection personnel account of the inspection data;
[0093] An inspection duration verification unit is used to determine the actual inspection duration according to the inspection start time and the inspection end time, compare the actual inspection duration with the corresponding inspection duration, and generate inspection duration verification information;
[0094] The filling time verification unit is used to determine whether the filling time is valid according to the upload time of the inspection data, and the corresponding inspection start time and inspection end time, and generate filling time verification information.
[0095] The above only describes in detail the preferred embodiments of the present invention, which is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0096] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be performed in other orders. Moreover, at least a portion of the steps in each embodiment may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.
[0097] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0098] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the disclosure in the specification and examples. This application is intended to cover any variations, uses or adaptations of the present disclosure, which follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present disclosure are indicated by the claims.
Claims
1. A method for intelligent monitoring of inspection data of wind power generation equipment, characterized in that: The method comprises the following steps: Retrieving inspection task information, wherein the inspection task information includes a plurality of wind power generation equipment, and each wind power generation equipment corresponds to an inspection item; The inspection task information is sent to the inspection personnel account, and the RFID content and inspection duration are determined based on the inspection personnel account and the inspection task information. Each wind turbine generator corresponds to one inspection duration. When the inspection personnel conducts the inspection, they wear an RFID electronic tag, and the RFID electronic tag records the RFID content. Each inspection personnel account corresponds to one RFID content. Determine the inspection personnel account, inspection start time and inspection end time based on the RFID reader installed on the wind power generation equipment; Receive inspection data uploaded by the inspection personnel account, the inspection data includes item values and upload time, and verify the inspection duration and filling time; Analyze the inspection data, identify abnormal information and timely check items, and send abnormal information to the inspection personnel account for timely inspection to determine the problem; The step of determining the RFID content and the inspection duration based on the inspection personnel account and the inspection task information specifically includes: determining the RFID content and the inspection personnel grade coefficient K according to the inspection personnel account; determining the standard duration T0 of each wind power generation equipment according to the inspection items in the inspection task information; determining the inspection duration T1 of each wind power generation equipment according to the inspection personnel grade coefficient K and the standard duration T0, T1=K*T0; Among them, the step of verifying the inspection duration and the filled-in time specifically includes: retrieving the inspection start time, inspection end time and inspection task information corresponding to the inspection personnel account of the inspection data; determining the actual inspection duration based on the inspection start time and the inspection end time, comparing the actual inspection duration with the corresponding inspection duration, and generating inspection duration verification information; determining whether the filled-in time is valid based on the upload time of the inspection data, and the corresponding inspection start time and inspection end time, and generating filling-in time verification information.
2. The method for intelligent monitoring of inspection data of wind power generation equipment according to claim 1, characterized in that: The RFID electronic tag is an ultra-high frequency electronic tag with an operating range of 3-5 meters.
3. The method for intelligent monitoring of inspection data of wind power generation equipment according to claim 1, characterized in that: The step of determining the inspection personnel account, inspection start time and inspection end time based on the RFID reader installed on the wind power generation equipment specifically includes: When the RFID reader installed on the wind power generation equipment communicates wirelessly with the RFID electronic tag, the radio frequency identification content in the RFID electronic tag is read, and the wind power generation equipment and the RFID reader correspond one to one; Determine whether there is a corresponding patrol personnel account based on the radio frequency identification content. If there is a corresponding account, record the start time of wireless communication and the disconnection time of wireless communication to determine the start time and end time of the patrol.
4. The method for intelligent monitoring of inspection data of wind power generation equipment according to claim 1, characterized in that: The steps of analyzing the inspection data, determining abnormal information and timely checking items specifically include: Input the item values in the inspection data and the corresponding inspection items into the item anomaly library for matching; Output abnormal items and corresponding timely inspection items, the item abnormality library contains all inspection items, each inspection item corresponds to a number of abnormal value ranges, and each abnormal value range corresponds to a timely inspection item.
5. An intelligent monitoring system for inspection data of wind power generation equipment, characterized in that: The system comprises: An inspection task information module is used to retrieve inspection task information, wherein the inspection task information includes a number of wind power generation equipment, and each wind power generation equipment corresponds to an inspection item; The inspection duration determination module is used to send the inspection task information to the inspection personnel account, determine the RFID content and inspection duration based on the inspection personnel account and the inspection task information, and each wind power generation equipment corresponds to an inspection duration; when the inspection personnel conducts the inspection, they wear an RFID electronic tag, and the RFID electronic tag records the RFID content, and each inspection personnel account corresponds to an RFID content; Inspection information collection module, used to determine the inspection personnel account, inspection start time and inspection end time based on the RFID reader installed on the wind power generation equipment; The inspection data verification module is used to receive the inspection data uploaded by the inspection personnel account, the inspection data includes the item value and the upload time, and to verify the inspection duration and the filling time; The abnormal data inspection module is used to analyze the inspection data, determine the abnormal information and timely inspection items, and send the abnormal information to the inspection personnel account for timely inspection to determine the problem; The inspection duration determination module includes: a grade coefficient determination unit, which is used to determine the radio frequency identification content and the grade coefficient K of the inspector according to the inspector account; a standard duration determination unit, which is used to determine the standard duration T0 of each wind power generation equipment according to the inspection items in the inspection task information; and an inspection duration determination unit, which is used to determine the inspection duration T1 of each wind power generation equipment according to the grade coefficient K of the inspector and the standard duration T0, where T1=K*T0; Among them, the inspection data verification module includes: a relevant information retrieval unit, which is used to retrieve the inspection start time, inspection end time and inspection task information corresponding to the inspection personnel account of the inspection data; an inspection duration verification unit, which is used to determine the actual inspection duration based on the inspection start time and the inspection end time, and compare the actual inspection duration with the corresponding inspection duration to generate inspection duration verification information; a filling time verification unit, which is used to determine whether the filling time is valid based on the upload time of the inspection data, and the corresponding inspection start time and inspection end time, and generate filling time verification information.
6. The wind power generation equipment inspection data intelligent monitoring system according to claim 5 is characterized in that: The inspection information collection module includes: A radio frequency content reading unit, used to read the radio frequency identification content in the RFID electronic tag when the RFID reader installed on the wind power generation equipment communicates wirelessly with the RFID electronic tag, and the wind power generation equipment and the RFID reader correspond one to one; The inspection time recording unit is used to determine whether there is a corresponding inspection personnel account according to the radio frequency identification content. If there is a corresponding account, the start time of wireless communication is recorded, the disconnection time of wireless communication is recorded, and the inspection start time and inspection end time are determined.
Citation Information
Patent Citations
Intelligent inspection system
CN105825556A
Inspection system and method of power distribution network equipment based on RFID
CN108492395A
Management method and device for equipment inspection process, electronic equipment and storage medium
CN114298343A
Intelligent chemical safety production patrol control system
CN115202312A
Inspection management method and device, inspection mobile terminal equipment and inspection system
CN116258460A