A construction engineering safety monitoring and early warning method
By collecting and analyzing the height data of operators, adjusting the height and lifting rate of the construction project safety monitoring and early warning device in real time, the problem of the inability to dynamically adjust the alarm height in the existing technology is solved, improving the effectiveness and safety of early warnings, and adapting to variety a group of operators.
Patent Information
- Application Number
- CN202410488894.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-04-23
AI Technical Summary
The existing construction project safety monitoring and early warning devices cannot dynamically adjust the alarm height according to the operator's height, resulting in a warning blind spot and affecting the early warning effect of the operator.
By collecting height data of operators in the early warning area, generating a height interval comparison table, calculating the horizontal line of sight and visible height of each height interval, adjusting the height range of the alarm device in real time, ensuring that the alarm device is always within the operator's sight, and according to The height interval and density dynamically adjust the lifting and falling rate.
The dynamic height adjustment of the alarm device is realized, the effectiveness and safety of early warning is improved, and operators of different heights are adapted to reduce misoperation and accidents due to obstruction of vision, and the work efficiency is improved.
Smart Images

Figure CN118430147B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering safety monitoring, and in particular to a construction engineering safety monitoring and early warning method. Background Art
[0002] With the acceleration of urbanization, the scale and number of construction projects are increasing, and the problem of project safety is becoming increasingly prominent. A system that can realize automatic monitoring and timely warning can reduce the incidence of safety accidents and protect the lives of workers. Safety monitoring and early warning of construction site are of great significance to ensure construction safety and prevent accidents. With the development of the construction industry, construction site safety management is becoming increasingly important.
[0003] The patent with the patent publication number CN215215560U discloses an early warning device for safety management of construction projects, including a support plate, a sleeve and a base plate, and also includes a fixing structure for fixing after movement, a limiting structure for limiting the height and an alarm structure for warning. Universal wheels are installed around the bottom end of the base plate, sleeves are installed on both sides of the top of the base plate, and the inner sliding connection of the sleeve is connected with a lifting rod, and the opposite side of the lifting rod is evenly provided with a limiting bolt, a fixing box is installed at the top of the sleeve, a support plate is installed at the top of the lifting rod, and the alarm structure is installed at the middle position of the support plate. The patent drives the screw to rotate through the forward and reverse motors, thereby driving the sleeve to move up and down on the outer wall of the screw, thereby driving the slide plate to make the warning plate move up and down to warn, and at the same time, the alarm light moves up and down to warn, so that the warning effect is better;
[0004] However, in construction projects, the position of the alarm device is usually fixed. Although its warning height can be adjusted, it is impossible to dynamically adjust the warning height of the alarm device according to the height of the operators in the warning area, resulting in a warning blind spot in the alarm device, which affects the warning effect on the operators. Based on this, a construction project safety monitoring and early warning method is proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a construction project safety monitoring and early warning method, which solves the technical problem that the warning height of the alarm device cannot be dynamically adjusted according to the height of the operators in the warning area, resulting in the existence of a warning blind spot in the alarm device and affecting the warning effect on the operators.
[0006] The purpose of the present invention can be achieved through the following technical solutions:
[0007] A construction engineering safety monitoring and early warning method comprises the following steps:
[0008] Step 1: Collect the height values of each operator in the warning area;
[0009] Step 2: Obtain a height range comparison table corresponding to the warning area through the height values corresponding to each operator;
[0010] Step 3: According to the eye heights corresponding to the operators in each height range in the warning area, the horizontal sight heights corresponding to each height range are obtained;
[0011] Step 4: According to the horizontal sight height corresponding to each height interval, obtain the visual height corresponding to each height interval;
[0012] Step 5: According to the height value of the real-time operator in the warning area, obtain the corresponding real-time warning height range in the warning area;
[0013] Step 6: Control the alarm device to rise and fall within this height range through the control module.
[0014] As a further solution of the present invention: a specific method of obtaining a height range comparison table corresponding to the warning area is:
[0015] The same height value among the height values corresponding to each operator in the warning area is marked as the same height status value; each height status value is sorted in ascending order according to its size, and each two adjacent height status values are combined into a height interval, so as to obtain a height intervals corresponding to the warning area, a≥1.
[0016] As a further solution of the present invention: the specific method of obtaining the horizontal sight line height corresponding to each height interval is:
[0017] S1: Randomly select a height interval from each height interval as the target interval, and mark the eye height of each operator in the target interval as Gb, where b is the number of operators in the target interval, b≥1;
[0018] S2: Obtain the number c of eye heights Gb corresponding to each operator that meet the preset conditions. When c is greater than or equal to Y2, the average value of Gb is used as the horizontal sight line height B1 corresponding to the target interval. Otherwise, the average of the maximum and minimum values in Gb is used as the horizontal sight line height B1 corresponding to the target interval, and Y2 is the preset value.
[0019] S3: Repeat steps S1-S2 to calculate the horizontal sight line height Ba corresponding to each height interval.
[0020] As a further solution of the present invention: the preset condition is: the absolute value of the difference between Gb and its mean is less than the preset value Y1, and Y1 is the preset value.
[0021] As a further solution of the present invention: the specific method of obtaining the visual height corresponding to each height interval is:
[0022] The sum of the horizontal sight line height Ba corresponding to each height interval and the preset value Y3 is marked as the visible height Ka corresponding to each height interval, that is, the preset value Y3 here is 20 cm.
[0023] As a further solution of the present invention: the specific method of obtaining the corresponding real-time warning height range in the warning area is:
[0024] The height status value Wr of the real-time operator in the warning area, r≥1, is obtained, and the maximum value R1 of the horizontal line of sight height Wq corresponding to each height interval is obtained, which is used as the upper limit of the real-time warning height range. At the same time, the initial height C0 of the alarm device is obtained, and it is used as the lower limit of the real-time warning height range, and then the corresponding real-time warning height range [C0, R1] in the warning area is obtained, where r≥q≥1.
[0025] As a further solution of the present invention: the height interval corresponding to the visual height corresponding to the interval upper limit value corresponding to each warning height interval is used to obtain the rated speed of the alarm device, and the warning duration is obtained according to the warning height range;
[0026] According to the personnel ratio coefficient corresponding to the warning height interval, the warning duration corresponding to each warning height interval is obtained;
[0027] According to the altitude value corresponding to the warning altitude interval and the warning duration corresponding to each warning altitude interval, the ascending and descending rate value corresponding to each warning altitude interval of the alarm device is obtained.
[0028] As a further solution of the present invention: the specific method of obtaining the warning height range is:
[0029] Obtaining the visible height Ka and the initial height C0 of the alarm device corresponding to each height interval, sorting the visible height Ka and the initial height C0 of the alarm device corresponding to each height interval in ascending order according to their numerical values, and forming a warning height interval with every two adjacent visible heights, thereby obtaining multiple warning height intervals;
[0030] The absolute value of the difference between the visible altitude values corresponding to the two ends of each warning altitude interval is taken as the corresponding interval altitude value in each warning altitude interval, and is marked as QGa respectively.
[0031] As a further solution of the present invention: the specific method of obtaining the personnel proportion coefficient corresponding to each warning height interval is:
[0032] Obtain the number of real-time operating personnel corresponding to each warning height interval, obtain the ratio of the number of people in each interval to the total number of people and use it as the personnel ratio coefficient ZBa corresponding to each warning height interval, obtain the warning lifting height value VS according to the real-time warning height range [C0, R1], mark the rated speed of the alarm device as v0, and calculate the lifting time LT corresponding to the alarm device according to the formula VS / v0=LT; calculate the warning time YTa corresponding to each warning height interval through the formula LT×ZBa=YTa.
[0033] As a further solution of the present invention, the ascending and descending rate values corresponding to each warning altitude interval of the alarm device are obtained, and the specific steps are as follows:
[0034] The absolute value of the difference between the visible altitude values corresponding to the two ends of each warning altitude interval is taken as the corresponding interval altitude value in each warning altitude interval, and they are marked as QGa respectively. Through QGa / YTa=QVa, the ascent and descent rate value QVa corresponding to each warning altitude interval is obtained in time.
[0035] Beneficial effects of the present invention:
[0036] (1) The present invention obtains a real-time warning height range and inputs the real-time warning height range into a control module. The control module adjusts the height of the alarm device according to the range to ensure that the alarm device is always within the operator's line of sight. Regardless of how the operator's height changes, the early warning system can dynamically adjust the height of the alarm device to improve on-site safety and early warning effects. The early warning system is more universal and can adapt to a wider range of user groups by taking into account the diversity of the height of the operators and adjusting the height of the early warning light accordingly. The height data of the operators is monitored in real time and the height of the early warning light is dynamically adjusted, which can reduce misoperation or accidents caused by obstructed vision, thereby improving overall work efficiency.
[0037] (2) The present invention calculates the corresponding lifting and lowering rate values of the alarm device in each warning height interval according to the interval height value and the warning duration corresponding to the warning height interval, thereby ensuring that the alarm device dynamically adjusts its height and lifting and lowering rate according to the height and density of the operators, so as to optimize the warning effect and safety performance. The corresponding lifting and lowering rates of the alarm device in each warning height interval are different, which is conducive to ensuring that as many operators in each height interval can see the warning light as possible, increasing the probability of each alarm device being seen in each warning height interval, and further improving the warning effect of the alarm device. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] The present invention will be further described below in conjunction with the accompanying drawings.
[0039] Figure 1 It is a schematic diagram of the framework structure of a construction engineering safety monitoring and early warning method of the present invention. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] Embodiment 1
[0042] See also Figure 1 As shown, the present invention is a construction engineering safety monitoring and early warning method comprising the following steps:
[0043] Step 1: Collect the height data of each operator in the warning area. The height data refers to the height value of each operator in the warning area. The specific acquisition method is: before the operation starts, obtain the height value of the operator in the warning area through questionnaire survey, on-site measurement, access control infrared sensing or other methods;
[0044] Step 2: Analyze the height values corresponding to each operator in the warning area to obtain a height range comparison table corresponding to the warning area. The specific acquisition method is as follows;
[0045] Mark the height values corresponding to each operator in the warning area as Hi, mark the same height value as the same height status value, and then obtain the height status value Hj corresponding to the height value Hi; sort the height status values in ascending order according to the size of the height status value, where j is the number corresponding to the high status value, i≥j≥1, such as [150cm,159cm] and [160cm,169cm];
[0046] Each two adjacent height status values are combined into a height interval, and then a height intervals corresponding to the warning area are obtained, where a=j-1, a≥1;
[0047] Step 3: Obtain the eye heights corresponding to operators in each height range in the warning area, and analyze them to obtain the horizontal sight heights corresponding to each height range. The specific method is as follows:
[0048] S1: Randomly select a height interval from each height interval as the target interval;
[0049] The eye heights corresponding to each operator in the target interval are marked as Gb, where b is the number of operators corresponding to the target interval, i≥b≥1;
[0050] S2: Obtain the number c of the eye heights Gb corresponding to each operator whose absolute value of the difference with the mean of Gb is less than a preset value Y1. When c is greater than or equal to the preset value Y2, the mean of Gb is used as the horizontal sight line height B1 corresponding to the target interval;
[0051] When c is less than the preset value Y2, the average of the maximum and minimum values in Gb is obtained as the horizontal sight height B1 corresponding to the target interval, that is, (G max +G min ) / 2=B1,where G max is the maximum value in Gb, G min It is the minimum value in Gb. The specific values of Y1 and Y2 are determined by relevant staff according to needs;
[0052] S3: Repeat steps S1-S2 to calculate the horizontal sight line height Ba corresponding to each height interval;
[0053] It should be noted that when obtaining the eye height of the operator, three-dimensional scanning technology or special eye height measurement equipment can be used to obtain more accurate eye height data of the operator. This is an existing and mature technology, so it will not be described in detail here;
[0054] Step 4: According to the horizontal sight height corresponding to each height range, analyze and obtain the visual height corresponding to each height range. The specific method is as follows:
[0055] The sum of the horizontal sight height Ba corresponding to each height interval and the preset value Y3 is marked as the visual height Ka corresponding to each height interval;
[0056] The preset value Y3 is obtained as follows: Ergonomic research shows that the visual area of the human body is within 20 cm above the horizontal line of sight, that is, the preset value Y3 here is 20 cm;
[0057] Step 5: Obtain the height value of the real-time operator in the warning area, and analyze and obtain the corresponding real-time warning height range in the warning area. The specific method is as follows:
[0058] The height values of each real-time operator in the warning area are marked as We, and the same height value is marked as the same height state value, so as to obtain the corresponding height state value Wr, e≥r≥1;
[0059] Obtain each height state value Wr to obtain the horizontal sight height corresponding to each height interval, and mark it as Wq, where e≥r≥q≥1, obtain the maximum value R1 in Wq, and use it as the upper limit of the real-time warning height range, and at the same time obtain the initial height C0 of the alarm device, and use it as the lower limit of the real-time warning height range, and then obtain the corresponding real-time warning height range [C0, R1] in the warning area;
[0060] Step 6: Input the real-time warning height range corresponding to the operator in the warning area into the control module, and control the alarm device to rise and fall within this height range through the control module;
[0061] The height values of real-time operators in the warning area are obtained through on-site measuring equipment, and the same height values are classified into the same height status value Wr to simplify the subsequent analysis process. The visual height corresponding to each height interval is calculated, and the standard eye height of the operator corresponding to each height interval is obtained by using three-dimensional scanning technology or special eye height measurement equipment. That is, the horizontal line of sight height. According to ergonomic research, the main visual area is usually within 20 cm above the horizontal line of sight height. The visual height corresponding to each height interval is obtained, and the height status value of the real-time operator in the warning area is obtained through on-site measuring equipment. According to each height status value, the corresponding horizontal line of sight height data is found, and the maximum value R1 is found from all horizontal line of sight heights as the upper limit value of the real-time warning height range. The initial height C0 of the alarm device The real-time warning height range is obtained as the lower limit value of the real-time warning height range, and the real-time warning height range is input into the control module. The control module adjusts the height of the alarm device according to this range to ensure that the alarm device is always within the operator's line of sight. Regardless of how the operator's height changes, the early warning system can dynamically adjust the height of the alarm device to improve on-site safety and early warning effects. Real-time monitoring of the height data of the operating personnel and dynamic adjustment of the height of the warning light can reduce misoperation or accidents caused by obstructed vision, thereby improving overall work efficiency.
[0062] Embodiment 2
[0063] As the second embodiment of the present invention, when the present application is implemented, compared with the first embodiment, the difference between the technical solution of the present embodiment and the first embodiment is that in the present embodiment; the specific method of obtaining the warning height interval is to obtain the visible height Ka and the initial height C0 of the alarm device corresponding to each height interval, and sort them in ascending order according to the numerical values of the visible height Ka and the initial height C0 of the alarm device corresponding to each height interval, and form a warning height interval with each adjacent two visible heights, and then obtain the number of real-time operating personnel corresponding to each warning height interval, obtain the ratio of the number of people in each interval to the total number of people and use it as the personnel proportion coefficient ZBa corresponding to each warning height interval;
[0064] The height interval corresponding to the visual height corresponding to the upper limit value of each warning height interval is used to obtain the rated speed of the alarm device, and the warning duration is obtained according to the warning height range;
[0065] According to the personnel ratio coefficient corresponding to the warning height interval, the warning duration corresponding to each warning height interval is obtained. The specific method is as follows:
[0066] According to the real-time warning altitude range [C0, R1], the warning lifting altitude value VS is obtained, the rated speed of the alarm device is marked as v0, and the lifting time LT corresponding to the alarm device is calculated according to the formula VS / v0=LT;
[0067] The corresponding warning duration YTa in each warning height range is calculated by the formula LT×ZBa=YTa;
[0068] According to the altitude values corresponding to each warning altitude interval and the warning duration corresponding to each warning altitude interval, the ascending and descending rate values corresponding to each warning altitude interval of the alarm device are obtained. The specific steps are as follows:
[0069] The absolute value of the difference between the visible altitude values corresponding to the two ends of each warning altitude interval is taken as the corresponding interval altitude value in each warning altitude interval, and is marked as QGa. Through QGa / YTa=QVa, the ascending and descending rate value QVa corresponding to each warning altitude interval is obtained in time;
[0070] By calculating the corresponding lifting and lowering rate values of the alarm device in each warning height interval according to the interval height value and warning duration corresponding to the warning height interval, it can be ensured that the alarm device dynamically adjusts its height and lifting rate according to the height and density of the operators, so as to optimize the warning effect and safety performance. The different lifting and lowering rates of the alarm device in each warning height interval are beneficial to ensure that operators in each height interval can see the warning light as much as possible, increase the probability of seeing each alarm device in each warning height interval, and further improve the warning effect of the alarm device.
[0071] Embodiment 3
[0072] As the third embodiment of the present invention, when the present application is specifically implemented, compared with the first and second embodiments, the technical solution of this embodiment is to combine the solutions of the first and second embodiments mentioned above for implementation.
[0073] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and thresholds in the formula are set by technicians in this field according to actual conditions.
[0074] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A construction engineering safety monitoring and early warning method, characterized in that: The following steps are involved: Step 1: Collect the height values of each operator in the warning area; Step 2: Obtain a height range comparison table corresponding to the warning area through the height values corresponding to each operator; Step 3: According to the eye heights corresponding to the operators in each height range in the warning area, the horizontal sight heights corresponding to each height range are obtained; Step 4: Obtain the visual height corresponding to each height interval according to the horizontal sight height corresponding to each height interval; Step 5: According to the height value of the real-time operator in the warning area, obtain the corresponding real-time warning height range in the warning area; Step 6: Control the alarm device to rise and fall within this height range through the control module; The specific method of obtaining the height range comparison table corresponding to the warning area is as follows; Mark the same height values among the height values corresponding to the operators in the warning area as the same height status value; sort the height status values in ascending order according to the size of each height status value, and form a height interval with each two adjacent height status values, so as to obtain a height interval corresponding to the warning area, a≥1; The specific method for obtaining the horizontal sight height corresponding to each height interval is: S1: Randomly select a height interval from each height interval as the target interval, and mark the eye height of each operator in the target interval as Gb, where b is the number of operators in the target interval, b≥1; S2: Obtain the number c of eye heights Gb corresponding to each operator that meet the preset conditions. When c is greater than or equal to Y2, the average value of Gb is used as the horizontal sight line height B1 corresponding to the target interval. Otherwise, the average of the maximum and minimum values in Gb is used as the horizontal sight line height B1 corresponding to the target interval, and Y2 is the preset value. S3: Repeat steps S1-S2 to calculate the horizontal sight line height Ba corresponding to each height interval; The specific method for obtaining the visual height corresponding to each height range is: The sum of the horizontal sight line height Ba corresponding to each height interval and the preset value Y3 is marked as the visual height Ka corresponding to each height interval, that is, the preset value Y3 is 20 cm; The specific method for obtaining the corresponding real-time warning altitude range in the warning area is: The height status value Wr of the real-time operator in the warning area, r≥1, is obtained, and the maximum value R1 of the horizontal line of sight height Wq corresponding to each height interval is obtained, which is used as the upper limit of the real-time warning height range. At the same time, the initial height C0 of the alarm device is obtained, and it is used as the lower limit of the real-time warning height range, and then the corresponding real-time warning height range [C0, R1] in the warning area is obtained, where r≥q≥1.
2. A construction engineering safety monitoring and early warning method according to claim 1, characterized in that: The preset condition is that the absolute value of the difference between Gb and its mean is less than a preset value Y1, and Y1 is a preset value.
3. A construction engineering safety monitoring and early warning method according to claim 1, characterized in that: The height interval corresponding to the visual height corresponding to the upper limit value of each warning height interval is used to obtain the rated speed of the alarm device, and the warning duration is obtained according to the warning height range. The specific method is as follows: According to the personnel ratio coefficient corresponding to the warning height interval, the warning duration corresponding to each warning height interval is obtained; According to the altitude value corresponding to the warning altitude interval and the warning duration corresponding to each warning altitude interval, the ascending and descending rate value corresponding to each warning altitude interval of the alarm device is obtained.
4. A construction engineering safety monitoring and early warning method according to claim 3, characterized in that: The specific method of obtaining the warning altitude range is: Obtaining the visible height Ka and the initial height C0 of the alarm device corresponding to each height interval, sorting the visible height Ka and the initial height C0 of the alarm device corresponding to each height interval in ascending order according to their numerical values, and forming a warning height interval with every two adjacent visible heights, thereby obtaining multiple warning height intervals; The absolute value of the difference between the visible altitude values corresponding to the two ends of each warning altitude interval is taken as the corresponding interval altitude value in each warning altitude interval, and is marked as QGa respectively.
5. A construction engineering safety monitoring and early warning method according to claim 4, characterized in that: The specific method of obtaining the personnel ratio coefficient corresponding to each warning height interval is as follows; Obtain the number of real-time operators corresponding to each warning height interval a, obtain the ratio of the number of people in each interval to the total number of people and use it as the personnel ratio coefficient ZBa corresponding to each warning height interval, obtain the warning lifting height value VS according to the real-time warning height range [C0, R1], mark the rated speed of the alarm device as v0, and calculate the lifting time LT corresponding to the alarm device according to the formula VS / v0=LT; The warning duration YTa corresponding to each warning height interval is calculated using the formula LT×ZBa=YTa.
6. A construction engineering safety monitoring and early warning method according to claim 5, characterized in that: The specific steps to obtain the corresponding ascent and descent rate values of the alarm device in each warning altitude interval are as follows: The absolute value of the difference between the visible altitude values corresponding to the two ends of each warning altitude interval is taken as the corresponding interval altitude value in each warning altitude interval, and they are marked as QGa respectively. Through QGa / YTa=QVa, the ascent and descent rate value QVa corresponding to each warning altitude interval is obtained in time.
Citation Information
Patent Citations
Early warning device for safety management of constructional engineering
CN215215560U
Simulation training device for skiing on diving platform
CN112915512A
Early warning protection system under high-voltage line
CN117593848A
Ship height exceeding alarm device
CN214671106U
Central signal voice alarm device
CN218378638U