Relay satellite user data transmission status judgment method, system, and computer equipment

By monitoring ground link parameters and data transmission status, it can determine whether the relay satellite user data transmission is completed, solving the problem of delayed data transmission in the relay satellite system and ensuring data integrity and system efficiency.

CN118432697BActive Publication Date: 2024-10-11SHIFANG SATLINK (SUZHOU) AEROSPACE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410882203.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-10-11
Estimated Expiration
2044-07-03

AI Technical Summary

Technical Problem

In the relay satellite system, since the relay satellite and the low-orbit user satellite are not in the same orbital plane, the relay service time is limited, and the data transmission rate does not match, resulting in a delay in user satellite data transmission. A method is needed to determine Whether the data transfer is completed.

Method used

By obtaining ground link monitoring parameters, analyze the data sending end time, combine the transmission lag time and the total priority channel transmission rate, determine the scheduled end time, compare the local time with the scheduled end time, determine whether the data transmission is completed, and re-execute if necessary Data transmission status judgment steps.

Benefits of technology

Ensure the integrity of user data and promptly release ground links that have completed data transmission tasks to improve the efficiency of the relay satellite system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118432697B_ABST
    Figure CN118432697B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of satellite communication technology, and in particular discloses a method, system, and computer equipment for judging the data transmission status of a relay satellite user, including obtaining ground link monitoring parameters; establishing N corresponding judgment tasks for N working ground links respectively; the i-th judgment task includes repeatedly executing the data transmission status judgment step until the judgment result is that the i-th working ground link has completed data transmission, wherein i=1,2,3,...,N; the data transmission status judgment step includes: analyzing the ground link monitoring parameters, and determining a predetermined end time in combination with the data transmission end time of the i-th working ground link; comparing the local time with the predetermined end time; and determining that the i-th working ground link has completed data transmission in response to the comparison result that the local time is greater than the predetermined end time. The above method can confirm whether each working ground link has completed transmission, thereby releasing the ground link that has completed the data transmission task as soon as possible.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of satellite communication technology, and in particular to a method, system and computer equipment for judging the transmission status of user data of a relay satellite. Background Art

[0002] When a regenerative relay satellite receives return data from a low-orbit user satellite, it demodulates the radio frequency electromagnetic wave signal or laser signal from the low-orbit user satellite to obtain the data, and then modulates the data into an electromagnetic wave signal or laser signal again before transmitting it back to the ground. When a relay satellite sends forward data to a low-orbit user satellite, it also needs to go through the demodulation and modulation process.

[0003] Since the relay satellite and the low-orbit user satellite are not in the same orbital plane, data transmission can only be achieved when they can communicate with each other. Therefore, the time that the relay satellite provides services for a certain low-orbit user satellite is limited. After completing the relay service for low-orbit user satellite A, the relay satellite can use the same relay communication payload to provide relay services for another low-orbit user satellite B.

[0004] If the total data transmission rate of multiple low-orbit user satellites providing relay services in a certain period of time is higher than the transmission rate between the relay satellite and the relay satellite ground terminal station, the solution is to downlink the user satellite data with high priority in real time, and temporarily cache the user satellite data with low priority on the relay satellite for delayed downlink, and the length of this delay is not fixed. Since there may be a delay in downlinking data, it is necessary to design a method that can determine whether the user satellite data has been transmitted. Summary of the invention

[0005] Based on this, it is necessary to provide a method, system and computer device for judging the transmission status of user data of a relay satellite in order to determine whether the user satellite data has been transmitted.

[0006] A method for judging the data transmission status of a relay satellite user comprises acquiring ground link monitoring parameters; the ground link monitoring parameters comprise monitoring parameters corresponding to N groups of working ground links, wherein N is an integer greater than zero; N corresponding judgment tasks are respectively established for the N working ground links; the i-th judgment task comprises repeatedly executing a data transmission status judgment step until a judgment result is that the i-th working ground link has completed data transmission, wherein i=1, 2,3, ..., N; the data transmission status judgment step comprises: analyzing the ground link monitoring parameters, and determining a predetermined end time in combination with a data transmission end time of the i-th working ground link; comparing a local time with the predetermined end time; and determining that the i-th working ground link has completed data transmission in response to a comparison result that the local time is greater than the predetermined end time.

[0007] In one of the embodiments, after comparing the local time with the predetermined end time, the method further comprises re-executing the data transmission status determination step in response to a comparison result that the local time is less than or equal to the predetermined end time.

[0008] In one of the embodiments, analyzing the ground link monitoring parameters and determining the scheduled end time in combination with the data sending end time of the working ground link in the i-th article includes: determining the transmission lag time and the total transmission rate of the priority channel of the working ground link in the i-th article according to the ground link monitoring parameters; determining the transmission delay time according to the transmission lag time and the total transmission rate of the priority channel; determining the scheduled end time according to the transmission delay time and the data sending end time.

[0009] In one of the embodiments, the monitoring parameters corresponding to the working ground link of the ith item include a planned code rate and a priority, and determining the transmission delay time and the total transmission rate of the priority channel according to the ground link monitoring parameters includes, in response to receiving the latest frame of data from the working ground link of the ith item, determining the transmission delay time according to the difference between the local time and the timestamp carried by the latest frame of data; determining the working ground link with a higher priority than the working ground link of the ith item among the N working ground links as a priority channel; and determining the total transmission rate of the priority channel according to the sum of the planned code rates of each of the priority channels.

[0010] In one embodiment, the ground link monitoring parameters include a real-time code rate, and determining the transmission delay time based on the transmission lag time and the total transmission rate of the priority channel includes: comparing the total transmission rate of the priority channel and the real-time code rate; in response to a comparison result that the total transmission rate of the priority channel is less than or equal to the real-time code rate, setting the transmission lag time to the transmission delay time.

[0011] In one of the embodiments, after comparing the total transmission rate of the priority channel and the real-time code rate, the method further includes setting a preset buffer delay time as the transmission delay time in response to a comparison result that the total transmission rate of the priority channel is greater than the real-time code rate.

[0012] In one of the embodiments, the preset buffer delay time is determined according to the relay satellite buffer space.

[0013] A relay satellite user data transmission status judgment system comprises a channel monitoring module, which is used to monitor the ground link between a relay satellite ground terminal station and a relay satellite operation and control center, and collect ground link monitoring parameters; the ground link monitoring parameters include monitoring parameters corresponding to N groups of working ground links, wherein N is an integer greater than zero; a channel transmission status judgment module, which is connected to the channel monitoring module, is used to obtain the ground link monitoring parameters, and is also used to establish N judgment tasks for the N working ground links respectively; the i-th judgment task comprises repeatedly executing the data transmission status judgment step until the judgment result is that the i-th working ground link has completed data transmission, wherein i=1, 2,3, ..., N.

[0014] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the method for determining the transmission status of user data of a relay satellite described in any one of the above embodiments are implemented.

[0015] A computer program product includes a computer program, wherein when the computer program is executed by a processor, the steps of the method for determining the transmission status of user data of a relay satellite described in any one of the above embodiments are implemented.

[0016] The above-mentioned relay satellite user data transmission status judgment method can obtain the monitoring parameters corresponding to each working ground link in the data transmission state by real-time monitoring of each ground link. A judgment task is established for each working ground link, and the judgment task is used to judge whether the data transmission task in each working ground link is completed. For the judgment task of any working ground link, the data transmission status judgment step will be executed cyclically before the judgment is completed, until the judgment result is that the working ground link corresponding to the judgment task has completed the data transmission. In the data transmission status judgment step, the scheduled end time of any working ground link can be determined by analyzing the ground link monitoring parameters, and the local time and the scheduled end time are combined to judge whether the data transmission of the user data in the working ground link has been completed. Using the above-mentioned relay satellite user data transmission status judgment method to confirm whether the data transmission task in each working ground link is completed can not only ensure the integrity of the received user data, but also release the ground link that has completed the data transmission task as soon as possible to improve the working efficiency of the relay satellite system. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the implementation methods of this specification or the technical solutions in the prior art, the drawings required for use in the implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some implementation methods recorded in this specification. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0018] Figure 1 Schematic diagram of a relay satellite providing data relay services to a low-orbit user satellite;

[0019] Figure 2 This is a flow chart of a method for determining the state of user data transmission via a relay satellite in one of the embodiments of the present application;

[0020] Figure 3 This is a flow chart of a method for determining a scheduled end time in one of the embodiments of the present application;

[0021] Figure 4 This is a flow chart of a method for determining a transmission delay time and a total transmission rate of a priority channel in one embodiment of the present application;

[0022] Figure 5 This is a flow chart of a method for determining a predetermined end time according to a transmission delay time and a data transmission end time in one of the embodiments of the present application;

[0023] Figure 6 This is a schematic diagram of a method flow chart of the i-th judgment task in another embodiment of the present application;

[0024] Figure 7 This is a schematic diagram of the structure of a relay satellite user data transmission status determination system in one of the embodiments of the present application;

[0025] Figure 8 This is a schematic diagram of the system structure for implementing a method for determining the state of user data transmission of a relay satellite in one of the embodiments of the present application;

[0026] Fig. 9 This is a diagram of the internal structure of a computer device in one of the embodiments of the present application. DETAILED DESCRIPTION

[0027] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. The preferred embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to understand the disclosure of the present invention more thoroughly and comprehensively.

[0028] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0029] The way in which relay satellites in medium or high earth orbit provide data relay services for low-orbit user satellites is as follows: a data transmission link from low-orbit user satellites (such as remote sensing and meteorological satellites), relay satellite systems (including relay satellites, relay satellite ground terminal stations, relay satellite operation and control centers, etc.) to user centers can be called a return data link, which can transmit user data acquired by low-orbit user satellites back to the ground center via relay satellites. Conversely, a data transmission link from the user center, relay satellite system to low-orbit user satellites is called a forward data link, which can transmit remote control commands from the user center to low-orbit user satellites.

[0030] Figure 1 A schematic diagram of a relay satellite providing data relay services to a low-orbit user satellite, such as Figure 1 As shown, the communication link between the relay satellite and low-orbit user satellite 1 to low-orbit user satellite n can be called a user space link, the communication link between the relay satellite and the relay satellite ground terminal station can be called a satellite-to-ground link, and the communication link between the relay satellite ground terminal station and the relay satellite operation and control center and between the relay satellite operation and control center and user center 1 to user center n can be called ground links.

[0031] Relay satellites using regenerative forwarding technology can serve multiple low-orbit user satellites at the same time, receiving data from each low-orbit user satellite and forwarding the data to the ground terminal station. Since the relay satellite and the low-orbit user satellite are not on the same orbital plane, the transmission link between them will not last forever and will end at the set time. After the data transmission task is completed, the ground terminal station will release the corresponding ground link and package the received user data into a file and send it to the user center.

[0032] If a relay satellite carries multiple communication payloads, then a relay satellite can serve multiple low-orbit user satellites at the same time, and multiplex the data of multiple user satellites (that is, encapsulate the user satellite data of different formats into the same format) and then transmit it to the relay satellite ground terminal station through the satellite-to-ground link. Because the data format and processing steps of each user satellite are different, the relay satellite ground terminal station will separate the data of each user satellite according to the encapsulation information after receiving it, and then process it in parallel through multiple ground link channels. Therefore, the number of ground link channels of the relay satellite ground terminal station must not be less than the total number of communication payloads of the relay satellite.

[0033] Considering the manufacturing cost, the maximum code rate of the satellite-to-ground link between the relay satellite and the relay satellite ground terminal is designed to be lower than or even much lower than the sum of the maximum code rates of all communication payloads on the relay satellite. If the total data transmission rate of multiple low-orbit user satellites providing relay services in a certain period of time is higher than the transmission rate between the relay satellite and the relay satellite ground terminal, the data of some low-orbit user satellites will be temporarily cached in the buffer of the relay satellite.

[0034] The data in the buffer of the relay satellite will be transmitted to the relay satellite ground terminal station after a delay. That is, in some cases, the data of the low-orbit user satellite will not be transmitted to the relay satellite ground terminal station in real time. However, the length of this delay time is not fixed, and it is related to all the user satellites received at that time and the downlink status of the satellite-to-ground link. Since the relay satellite may have delayed downlink data, the number of ground link channels must not only be greater than the total number of all communication payloads of the relay satellite, but also a method is required to determine whether the delayed downlinked user satellite data has been transmitted.

[0035] The present application provides a method for judging the transmission status of user data of a relay satellite, which can judge whether the transmission of user data in a ground link channel has been completed, so as to release the corresponding ground link, and package the received data into a file for storage or send it to a user center.

[0036] In some embodiments, the relay satellite user data transmission state judgment method can be executed by a channel transmission state judgment module in a relay satellite user data transmission state judgment system. For example, the relay satellite user data transmission state judgment method can be stored in the channel transmission state judgment module in the form of a program or instruction, and the program or instruction can implement the relay satellite user data transmission state judgment method when executed. The device for implementing the relay satellite user data transmission state judgment method disclosed in the present application can be a device with a large amount of computing resources (for example, a computer, a server, cloud computing, etc.), or a device with limited computing resources (for example, a hardware circuit such as an FPGA chip board and an ASIC chip board).

[0037] Figure 2 This is a flowchart of a method for determining the state of user data transmission via a relay satellite in one of the embodiments of the present application. In one of the embodiments, the method for determining the state of user data transmission via a relay satellite may include the following steps S100 to S600.

[0038] Step S100: Acquire ground link monitoring parameters; the ground link monitoring parameters include monitoring parameters corresponding to N groups of working ground links, where N is an integer greater than zero.

[0039] In this embodiment, the ground link may refer to a communication link between a relay satellite ground terminal station and a relay satellite operation and control center, and a relay satellite system may include multiple ground links. One or more channel monitoring modules may be provided in the relay satellite system to perform real-time monitoring and data collection on one or more ground links.

[0040] One or more channel monitoring modules can be used to simultaneously monitor the working status of all ground link channels in the relay satellite ground terminal station. When any ground link receives a task plan for data transmission, the channel monitoring module corresponding to the ground link can collect monitoring parameters of the ground link. The data set consisting of the monitoring parameters corresponding to all ground links in working state can be used as ground link monitoring parameters. In this embodiment, the ground link in working state can be referred to as a working ground link, that is, the ground link monitoring parameters can include N groups of monitoring parameters corresponding to the working ground links, where N is an integer greater than zero.

[0041] Step S200: Establish N corresponding judgment tasks for N working ground links respectively.

[0042] After obtaining the ground link monitoring parameters, the number of ground links currently in operation can be determined, so that N corresponding judgment tasks can be established for each of the N working ground links. That is, an independent judgment task thread is established for each working ground link channel, and each thread runs independently without interfering with each other. Based on the N judgment tasks, the data transmission status corresponding to the N working ground links can be determined.

[0043] Step S300: The i-th judgment task includes repeatedly executing the data transmission status judgment step until the judgment result is that the i-th working ground link has completed data transmission, where i=1, 2, 3, ..., N.

[0044] The i-th judgment task can be used to judge the data transmission status of the i-th working ground link. Wherein, i=1, 2,3, ..., N. The judgment task can monitor the data transmission status of the working ground link by executing the data transmission status judgment step. In an embodiment of the present application, the data transmission status of the working ground link can include completed data transmission.

[0045] Any judgment task will continue to run in a loop before it is judged to be incomplete, until it is determined that the working ground link corresponding to the judgment task has completed data transmission. The condition for judging completion is that the judgment result is that the i-th working ground link has completed data transmission. When the judgment result is not that the i-th working ground link has completed data transmission, the judgment task will be deemed to be incomplete and the data transmission status judgment step will be re-executed. That is, the i-th judgment task will repeat the data transmission status judgment step to continuously monitor the data transmission status of the i-th working ground link until the judgment result for the i-th working ground link is that the i-th working ground link has completed data transmission.

[0046] In this embodiment, the data transmission status determination step may include the following steps S400 to S600.

[0047] Step S400: Analyze the ground link monitoring parameters and determine the scheduled end time in combination with the data transmission end time of the i-th working ground link.

[0048] The ground link monitoring parameters may include monitoring parameters corresponding to N groups of working ground links, and the monitoring parameters corresponding to the working ground links may be parameters related to ground link data transmission, such as bandwidth, code rate, delay, signal-to-noise ratio and other parameters. By analyzing the monitoring parameters of all ground links in working state and the monitoring parameters of the i-th working ground link, the delay of the i-th working ground link may be determined. After determining the delay of the i-th working ground link, the scheduled end time of data transmission in the i-th working ground link may be determined in combination with the end time of data transmission of the i-th working ground link.

[0049] Step S500: Compare the local time and the scheduled end time.

[0050] Step S600: In response to the comparison result that the local time is greater than the predetermined end time, it is determined that the i-th working ground link has completed data transmission.

[0051] By comparing the local time T with the scheduled end time, it can be determined whether the data transmission task of the i-th working ground link is completed. When the local time T is greater than the scheduled end time, that is, the current time is later than the scheduled end time, it can be indicated that the data transmission task of the i-th working ground link has been completed, so the judgment result output by the i-th judgment task can be that the i-th working ground link has completed data transmission. The above-mentioned relay satellite user data transmission status judgment method is used to confirm whether the data transmission task in each working ground link is completed, which can not only ensure the integrity of the received user data, but also release the ground link that has completed the data transmission task as soon as possible to improve the working efficiency of the relay satellite system.

[0052] In one of the embodiments, after comparing the local time with the predetermined end time, the method for determining the status of user data transmission of the relay satellite may further include the step of: in response to a comparison result that the local time is less than or equal to the predetermined end time, determining that the i-th working ground link has not completed data transmission.

[0053] When the local time T is less than or equal to the scheduled end time, that is, the current time is earlier than the scheduled end time, it can indicate that the data transmission task of the i-th working ground link is not completed. Therefore, the judgment result output by the i-th judgment task can be that the i-th working ground link has not completed data transmission.

[0054] When the judgment result of the i-th judgment task is that the i-th working ground link has not completed data transmission, the i-th judgment task will be deemed to be judged as incomplete. Before the judgment task is completed, the judgment task will continue to run in a loop until it is determined that the working ground link corresponding to the judgment task has completed data transmission. That is, the i-th judgment task will repeatedly execute the data transmission status judgment step to continuously monitor the data transmission status of the i-th working ground link until the judgment result for the i-th working ground link is that the i-th working ground link has completed data transmission.

[0055] Figure 3 This is a flow chart of a method for determining a predetermined end time in one of the embodiments of the present application. In one of the embodiments, analyzing the ground link monitoring parameters and determining the predetermined end time in combination with the data transmission end time of the i-th working ground link may include the following steps S410 to S430.

[0056] Step S410: Determine the transmission delay time and the total transmission rate of the priority channel of the i-th working ground link according to the ground link monitoring parameters.

[0057] Step S420: Determine the transmission delay time according to the transmission lag time and the total transmission rate of the priority channel.

[0058] Step S430: Determine the scheduled end time according to the transmission delay time and the data transmission end time.

[0059] The transmission delay time of the i-th working ground link can be determined according to the monitoring parameters of the i-th working ground link. The transmission delay time refers to the time required for data to travel from the sender to the receiver, including transmission delay, processing delay, and queue delay. The transmission delay time will affect the end time of data transmission in the ground link.

[0060] At the same time, since the code rate of the satellite-to-ground link is currently insufficient, the solution adopted is to transmit the user satellite data with high priority in real time, and temporarily cache the user satellite data with low priority on the relay satellite for delayed transmission. The data cached on the relay satellite will be transmitted to the relay satellite ground terminal station after a delay of a period of time. That is, in some cases, the data of the low-orbit user satellite will not be transmitted to the relay satellite ground terminal station in real time. It can be seen that the time for the i-th ground link to complete the data transmission task is affected by the delay of the communication link on the one hand, and on the other hand, it is also related to the time the data is cached in the buffer. Whether the data transmitted in the i-th ground link is stored in the buffer for delayed transmission or real-time transmission is related to the priority of each working ground link, the code rate of each working ground link and other parameters. Therefore, the total transmission rate of the priority channel is determined by analyzing the ground link monitoring parameters. Among them, the total transmission rate of the priority channel can be a parameter related to the ground link with a higher priority than the i-th ground link.

[0061] After determining the transmission lag time and the total transmission rate of the priority channel, the transmission delay time D can be determined according to the transmission lag time and the total transmission rate of the priority channel, that is, judging whether data is stored in the buffer in the i-th working ground link, to determine the transmission delay time D in the i-th working ground link. Furthermore, the scheduled end time can be determined based on the transmission delay time D and the data transmission end time Tendtime. The task plan received by the ground link may include the data transmission end time Tendtime, that is, the data transmission end time Tendtime is a pre-set data transmission time, which is the scheduled time for the user data in the i-th working ground link to complete the transmission without considering the delay of the communication link itself, the waiting time for the data to be cached in the buffer, etc.

[0062] Compare whether the local time T is later than the sum of the data transmission end time Tendtime (the end time in the task plan) and the transmission delay time D, that is, whether the local time T is greater than the data transmission end time Tendtime + the transmission delay time D. If the local time T is later than the data transmission end time Tendtime + the transmission delay time D, it means that the data transmission is over; if the local time T is not later than the data transmission end time Tendtime + the transmission delay time D, it means that the data transmission is not over yet, and the data transmission status judgment step is re-executed to continue a new round of judgment.

[0063] In the present application, by confirming the delay situation in the ground link, the waiting situation in the buffer zone, and the pre-set data transmission end time, the time is calculated to assist in judging whether the data transmission task in the ground link is completed.

[0064] The method for judging the transmission status of user data of a relay satellite provided in the present application determines whether the transmission of low-orbit user data in a ground link has been completed by designing a delay time, so as to ensure that the ground link can be released as soon as possible while the user data is completely received.

[0065] In one embodiment, the monitoring parameters corresponding to the i-th working ground link may include a planned code rate V and a priority P. Before the relay satellite provides relay services for the low-orbit user satellite, it will receive a mission plan. The mission plan may include the planned code rate V of the user satellite return data corresponding to each ground link channel and the priority P of the user data corresponding to the low-orbit user satellite. The planned code rate V and the priority P are usually changed only when the mission plan is issued to each channel.

[0066] Figure 4This is a flow chart of a method for determining the transmission delay time and the total transmission rate of the priority channel in one of the embodiments of the present application. In one of the embodiments, determining the transmission delay time and the total transmission rate of the priority channel based on the ground link monitoring parameters may include the following steps S411 to S415.

[0067] Step S411: In response to the i-th working ground link receiving the latest frame of data, the transmission delay time is determined according to the difference between the local time and the timestamp carried by the latest frame of data.

[0068] After the i-th ground link receives the latest frame of data, the difference between the local time and the timestamp of the latest frame of data is calculated as the transmission delay time Dr. The timestamp on each frame of the latest data received by the i-th ground link can be added by the relay satellite communication payload when receiving the frame of data sent by the low-orbit user satellite, indicating the moment when the relay satellite communication payload receives the frame of data. The transmission delay time Dr can be used to represent the delay between the reception of the frame of data by the relay satellite communication payload and the reception of the frame of data by the ground link channel. If the frame of data is not cached and delayed on the relay satellite for forwarding, the transmission delay time Dr is usually tens or even hundreds of milliseconds.

[0069] Step S413: Determine a working ground link with a higher priority than the i-th working ground link among the N working ground links as a priority channel.

[0070] Assuming that the relay satellite has a total of n communication payloads, and establishes communication links with n low-orbit user satellites at the same time, and transmits data to the ground terminal station through the satellite-to-ground link, the relay satellite ground system can be designed with n+k ground link channels. Among them, N ground links are in working state, N≤n+k. The low-orbit user satellites corresponding to the user data transmitted in the N working ground links have different priorities P. Compare the priorities P corresponding to the N working ground links, and determine the working ground link with a higher priority than the i-th working ground link among the N working ground links as the priority channel.

[0071] Step S415: Determine the total transmission rate of the priority channels according to the sum of the planned code rates of the priority channels.

[0072] The sum of the planned code rates V of each priority channel is calculated, and the sum of the planned code rates V of each priority channel is defined as the total transmission rate Vp of the priority channel. The calculation formula of the total transmission rate Vp of the priority channel can be:

[0073]

[0074] Where Vp represents the total transmission rate of the priority channel, and a=1, 2, 3, ..., N.

[0075] Since the current solution adopted when the code rate of the satellite-to-ground link is insufficient is to downlink the user satellite data with high priority in real time, and temporarily cache the user satellite data with low priority on the relay satellite for delayed downlink, therefore, in this embodiment, by comparing the priorities of each ground link, the total transmission rate Vp of the priority channel with a priority higher than the i-th working ground link is calculated, so that it can be determined whether the working data transmitted in the i-th working ground link is stored in the buffer waiting for downlink according to the total transmission rate Vp of the priority channel.

[0076] The method for judging the transmission status of user data of a relay satellite provided in the present application uses the relay satellite to attach a timestamp to the user satellite data to determine the delay between the reception of the frame data by the communication payload of the relay satellite and the reception of the frame data by the ground link channel, and comprehensively judges whether the user data transmitted in the i-th working ground link has been transmitted by comparing the priorities of each working ground link.

[0077] In one embodiment, the ground link monitoring parameter may further include a real-time code rate V0. In this embodiment, the real-time code rate V0 may be a satellite-to-ground link downlink code rate V0 of the ground terminal station. The satellite-to-ground link downlink code rate V0 may change during data transmission, but the frequency of change is not frequent. Therefore, the satellite-to-ground link downlink code rate V0 of the ground terminal station may be monitored regularly and updated when the satellite-to-ground link downlink code rate V0 changes.

[0078] Figure 5 This is a flow chart of a method for determining a predetermined end time based on a transmission delay time and a data sending end time in one of the embodiments of the present application. In one of the embodiments, determining the transmission delay time based on the transmission lag time and the total transmission rate of the priority channel may include the following steps S421 to S423.

[0079] Step S421: Compare the total transmission rate of the priority channel and the real-time code rate.

[0080] Step S423: In response to the comparison result that the total transmission rate of the priority channel is less than or equal to the real-time code rate, the transmission lag time is set as the transmission delay time.

[0081] After determining the total transmission rate Vp of the priority channel based on step S415, it is possible to determine whether the data transmitted in the i-th working ground link is waiting for downlink in the buffer by comparing whether the total transmission rate Vp of the priority channel is greater than the real-time code rate V0, that is, the downlink code rate V0 of the satellite-to-ground link. When the total transmission rate Vp of the priority channel is less than or equal to the real-time code rate V0, that is, the flow of other user satellite data with higher priority is less than or equal to the downlink code rate V0 of the satellite-to-ground link, it means that the current downlink code rate V0 of the satellite-to-ground link can meet the transmission rate of the user data with a priority equal to or higher than that in the i-th working ground link, and the corresponding user data of the i-th ground link channel is being downlinked. It can be seen that the only thing that affects the scheduled end time in the current i-th working ground link is the delay between the data receiving the frame data from the relay satellite communication payload to the ground link channel receiving the frame data, so the transmission lag time Dr can be set as the transmission delay time D.

[0082] In one of the embodiments, determining the transmission delay time according to the transmission lag time and the total transmission rate of the priority channel may further include the following step S425.

[0083] Step S425: In response to the comparison result that the total transmission rate of the priority channel is greater than the real-time code rate, the preset buffer delay time is set as the transmission delay time.

[0084] When the total transmission rate Vp of the priority channel is greater than the real-time code rate V0, that is, the flow of other user satellite data with higher priority is greater than the satellite-to-ground link downlink code rate V0, it means that the current satellite-to-ground link downlink code rate V0 cannot meet the transmission rate of user data with a priority equal to or higher than that in the i-th working ground link. Since the user data with higher priority should be transmitted first, the corresponding user data in the i-th working ground link will be stored in the buffer area, waiting for the user data with a priority higher than that transmitted in the i-th ground link to be transmitted, and then continue to be transmitted. It can be seen that the current i-th working ground link affects the scheduled end time not only from the delay between the data receiving the frame data from the relay satellite communication payload to the ground link channel receiving the frame data, but also the waiting time of the data in the buffer area. Therefore, the preset buffer delay time Dmax can be set as the transmission delay time D. In this embodiment, the preset buffer delay time Dmax can be the pre-designed waiting time of the data in the buffer area.

[0085] In one of the embodiments, the preset buffer delay time can be determined according to the relay satellite cache space. The relay satellite system can set the preset buffer delay time Dmax according to the size of the cache space in the relay satellite. Specifically, the preset buffer delay time Dmax can be calculated as follows: preset buffer delay time Dmax = relay satellite cache space capacity / code rate V of the i-th working ground link. Among them, the data storage unit of the relay satellite cache space capacity is bit (bit), and the measurement unit of the preset buffer delay time Dmax is second. In a preferred embodiment, the preset buffer delay time Dmax can be 120 seconds.

[0086] Figure 6 This is a method flow chart of the i-th judgment task in another embodiment of the present application. In one embodiment, after the judgment result is that the i-th working ground link has completed data transmission, the relay satellite user data transmission status judgment method may also include the following step S700.

[0087] Step S700: Release the i-th working ground link. By continuously monitoring and judging the data transmission status in the i-th working ground link in real time, it can be determined at the first time that the i-th working ground link has completed the transmission of the current user data. After the i-th working ground link completes the transmission of the current user data, the ground link can be released to ensure that the working link can provide data relay services for other low-orbit user satellites.

[0088] In one of the embodiments, after the judgment result is that the data transmission of the i-th working ground link has been completed, the method for judging the status of user data transmission of the relay satellite may also include the following steps: packaging the data received in the i-th working ground link to form a user satellite data file, storing the user satellite data file and / or transmitting the user satellite data file to the corresponding user center. The method for judging the status of user data transmission of the relay satellite provided in the present application judges whether the transmission of the low-orbit user data in the ground link is completed by using the timestamp information attached to the user data by the relay satellite and the designed delay time, so as to ensure that the ground link can be released as soon as possible while the user data is completely received.

[0089] It should be understood that, although the steps in the flowcharts of the accompanying drawings of the specification are displayed in sequence as indicated by the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts of the accompanying drawings of the specification may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0090] Based on the description of the above-mentioned relay satellite user data transmission status judgment method embodiment, the present application also provides a relay satellite user data transmission status judgment system. The system may include a system (including a distributed system), software (application), module, component, server, client, etc. using the method described in the embodiment of this specification and a device combined with necessary implementation hardware. Based on the same innovative concept, the system in one or more embodiments provided in the embodiment of the present application is as described in the following embodiments. Since the implementation scheme and method for solving the problem of the system are similar, the implementation of the specific system of the embodiment of this specification can refer to the implementation of the aforementioned method, and the repetitions will not be repeated. As used below, the term "unit" or "module" can be a combination of software and / or hardware that implements a predetermined function. Although the system described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.

[0091] The present application also provides a relay satellite user data transmission status judgment system, Figure 7 This is a structural diagram of a relay satellite user data transmission status judgment system in one of the embodiments of the present application. In one of the embodiments, the relay satellite user data transmission status judgment system may include a channel monitoring module 100 and a channel transmission status judgment module 200.

[0092] The channel monitoring module 100 can be used to monitor the ground link between the relay satellite ground terminal station and the relay satellite operation and control center to collect ground link monitoring parameters. Figure 7As shown, the channel monitoring module 100 may include multiple channel monitoring modules 110, and the number of channel monitoring modules 110 in the channel monitoring module 100 is not less than the number of ground links in the relay satellite system, so as to ensure the technical effect of one channel monitoring module 110 performing real-time monitoring on a ground link. The channel monitoring module 100 can simultaneously monitor the working status of all ground link channels in the relay satellite ground terminal station. When any ground link receives a task plan for data transmission, the channel monitoring module 110 corresponding to the ground link can collect the monitoring parameters of the ground link. The data set composed of the monitoring parameters corresponding to all ground links in working state can be used as the ground link monitoring parameters collected by the channel monitoring module 100. In this embodiment, the ground link in working state can be referred to as a working ground link, that is, the ground link monitoring parameters can include N groups of monitoring parameters corresponding to the working ground links, where N is an integer greater than zero.

[0093] The channel transmission status judgment module 200 can be connected to the channel monitoring module 100, the channel transmission status judgment module 200 can obtain the ground link monitoring parameters, and the channel transmission status judgment module 200 can also establish N judgment tasks for N working ground links. That is, the channel transmission status judgment module 200 can establish an independent judgment task thread for each working ground link channel, and each thread runs independently without interfering with each other. The i-th judgment task can be used to judge the data transmission status of the i-th working ground link. Wherein, i=1, 2, 3, ..., N. In this embodiment, the judgment task monitors the data transmission status of the working ground link by executing the data transmission status judgment step. Wherein, the data transmission status of the working ground link can include completed data transmission and incomplete data transmission.

[0094] Any judgment task will continue to run in a loop until it is determined that the working ground link corresponding to the judgment task has completed data transmission. That is, the i-th judgment task will repeatedly execute the data transmission status judgment step to continuously monitor the data transmission status of the i-th working ground link until the judgment result for the i-th working ground link is that the i-th working ground link has completed data transmission.

[0095] In one embodiment, after the channel transmission status judgment module 200 determines that the i-th working ground link has completed data transmission according to the i-th judgment task, it can release the i-th working ground link to ensure that the i-th working link can provide data relay services for other low-orbit user satellites. At the same time, after the channel transmission status judgment module 200 determines that the i-th working ground link has completed data transmission according to the i-th judgment task, it can also package the data received in the i-th working ground link to form a user satellite data file, so as to store the user satellite data file and / or transmit the user satellite data file to the corresponding user center.

[0096] It can be seen that in the relay satellite user data transmission status judgment system provided by the present application, the channel monitoring module 100 can monitor each ground link in real time and collect the monitoring parameters corresponding to the working ground link in the data transmission state. The channel transmission status judgment module 200 can obtain the ground link monitoring parameters, and the channel transmission status judgment module 200 can also establish a judgment task for each working ground link, and judge whether the data transmission task in the corresponding working ground link is completed through the judgment task.

[0097] For any judgment task of a working ground link, the data transmission status judgment step will be executed cyclically before the judgment is completed, until the judgment result is that the working ground link corresponding to the judgment task has completed data transmission. In the data transmission status judgment step, the scheduled end time of any working ground link can be determined by analyzing the ground link monitoring parameters, and the local time and the scheduled end time can be combined to determine whether the data transmission of user data in the working ground link has been completed. Using the above-mentioned relay satellite user data transmission status judgment system to confirm whether the data transmission tasks in each working ground link are completed can not only ensure the integrity of the received user data, but also release the ground link that has completed the data transmission task as soon as possible to improve the working efficiency of the relay satellite system.

[0098] In order to better illustrate the working process of the relay satellite user data transmission status judgment system, in this embodiment, Figure 6 and Figure 7 , showing a specific implementation of the present application, the description of which is relatively specific and detailed, but it should not be understood as limiting the scope of the patent of this application.

[0099] Assuming that the relay satellite has a total of n communication payloads, and simultaneously establishes communication links with n low-orbit user satellites, and transmits data to the ground terminal station through the satellite-to-ground link, the relay satellite ground system is designed with n+k ground link channels, of which N ground links are performing data transmission, N≤n+k.

[0100] The channel monitoring module 100 in the relay satellite user data transmission status judgment system will monitor the working status of the ground terminal station and all ground link channels at the same time. Among them, the multiple channel monitoring modules 110 in the channel monitoring module 100 can monitor each ground link respectively, collect the satellite-to-ground link downlink code rate V0, the user satellite return data code rate Vi corresponding to each ground link channel, and the transmission lag time Dr between the ground link channel receiving data time and the timestamp added by the relay satellite system in real time, and send these parameters to the channel transmission status judgment module 200.

[0101] The channel transmission status judgment module 200 in the relay satellite user data transmission status judgment system can establish an independent thread for each working ground link, and start the judgment process when the channel receives the task plan. It will continue to run in a loop before the judgment task is completed, and end after the transmission is judged to be completed and the ground link is released.

[0102] When executing the i-th judgment task, the following implementation process may be included. The channel monitoring module 110 may report the code rate V and priority P of all working ground link channels to the channel transmission state judgment module 200. At the same time, the channel monitoring module 110 may also report the satellite-to-ground link downlink rate V0 of the ground terminal station to the channel transmission state judgment module 200 in real time.

[0103] After receiving a new frame of data on the i-th ground link, the channel monitoring module 110 calculates the difference between the local time T and the timestamp of the new frame of data as the transmission delay time Dr of the i-th working ground link and reports it to the channel transmission status judgment module 200. The channel transmission status judgment module 200 judges whether the channel transmission task of the i-th working ground link is completed.

[0104] Specifically, the channel transmission state judgment module 200 can calculate the sum of the planned code rates of the N working ground links with a priority higher than the priority of the i-th working ground link, and determine the sum of the planned code rates as the priority channel transmission total rate Vp. The calculation formula of the priority channel transmission total rate Vp can be:

[0105]

[0106] Where Vp represents the total transmission rate of the priority channel, and a=1, 2, 3, ..., N.

[0107] The channel transmission status judgment module 200 compares whether the total transmission rate Vp of the priority channel calculated by the above formula is greater than the real-time code rate V0 of the satellite-to-ground link. When the total transmission rate Vp of the priority channel is greater than the real-time code rate V0 of the satellite-to-ground link, it means that the data flow of other higher-priority users is greater than the downlink code rate of the satellite-to-ground link, and the user data corresponding to the i-th working ground channel is cached on the relay satellite, so there is a cache waiting delay. At this time, the transmission delay time D is set to the preset buffer delay time Dmax set by the relay satellite system according to the size of the relay satellite cache space. When the total transmission rate Vp of the priority channel is not greater than the real-time code rate V0 of the satellite-to-ground link, it means that the user data corresponding to the i-th working ground link is being transmitted down, and at this time, the transmission delay time D is set to the transmission lag time Dr corresponding to the i-th working ground link.

[0108] The channel transmission status judgment module 200 judges whether the local time T exceeds the sum of the data transmission end time Tendtime and the transmission delay time D, that is, whether T is greater than Tendtime + D. If T>Tendtime + D, it means that the data transmission task in the i-th working ground link has been completed; if T≤Tendtime + D, it means that the data transmission task in the i-th working ground link has not been completed, and a new round of judgment will continue. After determining that the data transmission task in the i-th working ground link has been completed, the channel transmission status judgment module 200 can also release the i-th working ground link to ensure that the i-th working link can provide data relay services for other low-orbit user satellites; it can also package the data received in the i-th working ground link to form a user satellite data file to store the user satellite data file and / or transmit the user satellite data file to the corresponding user center.

[0109] It is understandable that the various embodiments of the above methods, systems, etc. in this specification are described in a progressive manner, and the same / similar parts between the various embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. For related parts, refer to the description of other method embodiments.

[0110] Figure 8 This is a schematic diagram of the system structure for implementing a method for determining the transmission status of user data in a relay satellite in one embodiment of the present application. Figure 8The relay satellite user data transmission status judgment system S00 may include a processing component S20, which further includes one or more processors, and a memory resource represented by a memory S22, for storing instructions that can be executed by the processing component S20, such as an application. The application stored in the memory S22 may include one or more instructions, and each module corresponds to a group of instructions. In addition, the processing component S20 is configured to execute instructions to execute the above-mentioned relay satellite user data transmission status judgment method.

[0111] The relay satellite user data transmission state judgment system S00 may further include: a power supply component S24 configured to perform power management of the relay satellite user data transmission state judgment system S00, a wired or wireless network interface S26 configured to connect the relay satellite user data transmission state judgment system S00 to a network, and an input / output (I / O) interface S28. The relay satellite user data transmission state judgment system S00 may operate based on an operating system stored in the memory S22, such as Windows Server, Mac OS X, Unix, Linux, FreeBSD or the like.

[0112] In an exemplary embodiment, a computer-readable storage medium including instructions is also provided, such as a memory S22 including instructions, and the above instructions can be executed by a processor of the relay satellite user data transmission status judgment system S00 to complete the above method. The storage medium can be a computer-readable storage medium, for example, the computer-readable storage medium can be a ROM, a random access memory (RAM), a CD-ROM, a magnetic tape, a floppy disk, an optical data storage device, etc.

[0113] In an exemplary embodiment, a computer program product is further provided. The computer program product includes instructions. The instructions can be executed by a processor of the relay satellite user data transmission status determination system S00 to complete the above method.

[0114] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Fig. 9 As shown, Fig. 9This is an internal structure diagram of a computer device in one of the embodiments of the present application. The computer device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data related to users and tasks used in the above-mentioned relay satellite user data transmission status judgment method. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a relay satellite user data transmission status judgment method can be implemented.

[0115] Those skilled in the art will understand that Fig. 9 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0116] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0117] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the hardware + program embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0118] It should be noted that the above-mentioned devices, electronic devices, servers, etc. may also include other implementation methods according to the description of the method embodiments, and the specific implementation methods may refer to the description of the relevant method embodiments. At the same time, the new embodiments composed of the mutual combination of the features between the various methods and device, equipment, and server embodiments still fall within the scope of implementation covered by this application, and will not be described one by one here.

[0119] In the description of this specification, the description with reference to the terms "some embodiments", "other embodiments", "ideal embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic descriptions of the above terms do not necessarily refer to the same embodiment or example.

[0120] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0121] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.

Claims

1. A method for determining the state of relay satellite user data transmission, characterized in that: include: Acquire ground link monitoring parameters; the ground link monitoring parameters include monitoring parameters corresponding to N groups of working ground links, where N is an integer greater than zero; Establishing N corresponding judgment tasks for the N working ground links respectively; The i-th judgment task includes repeatedly executing the data transmission status judgment step until the judgment result is that the i-th working ground link has completed data transmission, where i=1, 2, 3, ..., N; The data transmission status determination step comprises: Analyze the ground link monitoring parameters and determine the scheduled end time in combination with the data transmission end time of the working ground link described in the i-th item; The analyzing the ground link monitoring parameters and determining the predetermined end time in combination with the data transmission end time of the working ground link in the i-th item includes: Determine the transmission delay time of the working ground link and the total transmission rate of the priority channel of the i-th item according to the ground link monitoring parameters; Determine the transmission delay time according to the transmission lag time and the total transmission rate of the priority channel; Determine the predetermined end time according to the transmission delay time and the data transmission end time; comparing the local time to the scheduled end time; In response to a comparison result that the local time is greater than the predetermined end time, it is determined that the i-th working ground link has completed data transmission.

2. The method for determining the state of relay satellite user data transmission according to claim 1, characterized in that: After comparing the local time with the predetermined end time, the method further includes: In response to a comparison result that the local time is less than or equal to the predetermined end time, it is determined that the data transmission of the i-th working ground link has not been completed.

3. The method for determining the state of relay satellite user data transmission according to claim 1, characterized in that: The monitoring parameters corresponding to the working ground link in the i-th article include a planned code rate and a priority, and the determination of the transmission delay time and the total transmission rate of the priority channel according to the ground link monitoring parameters includes: In response to the working ground link in the i-th item receiving the latest frame of data, determining the transmission delay time according to the difference between the local time and the timestamp of the latest frame of data; Determine the working ground link with a higher priority than the i-th working ground link among the N working ground links as a priority channel; The total transmission rate of the priority channel is determined according to the sum of the planned code rates of the priority channels.

4. The method for determining the state of relay satellite user data transmission according to claim 1, characterized in that: The ground link monitoring parameter includes a real-time code rate, and the determining of the transmission delay time according to the transmission lag time and the priority channel transmission total rate includes: Comparing the priority channel transmission total rate and the real-time code rate; In response to a comparison result that the total transmission rate of the priority channel is less than or equal to the real-time code rate, the transmission lag time is set as the transmission delay time.

5. The method for determining the state of relay satellite user data transmission according to claim 4, characterized in that: After comparing the priority channel transmission total rate and the real-time code rate, the method further includes: In response to a comparison result that the total transmission rate of the priority channel is greater than the real-time code rate, a preset buffer delay time is set as the transmission delay time.

6. The method for determining the relay satellite user data transmission status according to claim 5, characterized in that: The preset buffer delay time is determined according to the relay satellite buffer space.

7. A relay satellite user data transmission status judgment system, characterized in that: include: A channel monitoring module is used to monitor the ground link between the relay satellite ground terminal station and the relay satellite operation and control center, and collect ground link monitoring parameters; the ground link monitoring parameters include monitoring parameters corresponding to N groups of working ground links, where N is an integer greater than zero; A channel transmission status judgment module is connected to the channel monitoring module, and is used to obtain the ground link monitoring parameters, and is also used to establish N judgment tasks for the N working ground links respectively; the i-th judgment task includes repeatedly executing the data transmission status judgment step until the judgment result is that the i-th working ground link has completed data transmission, where i=1, 2, 3, ..., N; The data transmission status determination step comprises: Analyze the ground link monitoring parameters and determine the scheduled end time in combination with the data transmission end time of the working ground link described in the i-th item; The analyzing the ground link monitoring parameters and determining the predetermined end time in combination with the data transmission end time of the working ground link in the i-th item includes: Determine the transmission delay time of the working ground link and the total transmission rate of the priority channel of the i-th item according to the ground link monitoring parameters; Determine the transmission delay time according to the transmission lag time and the total transmission rate of the priority channel; Determine the predetermined end time according to the transmission delay time and the data transmission end time; comparing the local time to the scheduled end time; In response to a comparison result that the local time is greater than the predetermined end time, it is determined that the i-th working ground link has completed data transmission.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method for determining the transmission status of user data of a relay satellite as claimed in any one of claims 1 to 6 are implemented.