A test device and test method for removing existing tunnel lining or in-situ excavation

By designing a test device for existing tunnels, simulating its structural demolition and surrounding rock expansion, and monitoring and analyzing data in real time, the problem that existing technology cannot meet the construction needs of existing tunnels is solved, and the disturbance of demolition or expansion is realized. Regular exploration and pre-reinforcement suggestions improve construction safety and efficiency.

CN118443355BActive Publication Date: 2024-10-18RES INST OF HIGHWAY MINIST OF TRANSPORT
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410826789.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-10-18
Estimated Expiration
2044-06-25

AI Technical Summary

Technical Problem

Existing tunnel similar model test devices and methods are mainly aimed at new tunnel projects and cannot meet the needs of structural stability analysis of existing tunnels and determination of construction parameters for dismantling and excavation. Moreover, the reconstruction, expansion and disease treatment of existing tunnels are difficult to construct. and security risks.

Method used

A test device is designed that includes an existing tunnel reproduction module, a rail transport module, a pre-reinforcement and dismantling module, and an information monitoring module. The intelligent control module monitors and analyzes data in real time to simulate the structural dismantling and surrounding rock expansion of the existing tunnel. , to obtain the disturbance range and pre-reinforcement recommended parameters for demolition or excavation expansion.

Benefits of technology

It realizes the exploration of the disturbance rules of existing tunnel demolition or in-situ expansion, provides the basis for structural stability analysis and construction parameters, reduces construction risks, and improves the safety and efficiency of reconstruction, expansion, and disease treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118443355B_ABST
    Figure CN118443355B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of tunnel demolition test, and in particular to an existing tunnel lining demolition or in-situ excavation test device and test method, comprising: an existing tunnel reproduction module, which is arranged in a test frame and simulates an existing tunnel and external surrounding rock, and a reaction force component is arranged in the module to provide stress boundary conditions for a model test; a track conveying module, which is arranged in a similar tunnel structure and comprises a plurality of tracks laid in parallel at the bottom of the similar tunnel, and movable plug-ins are slidably connected on the tracks; the beneficial effects of the present invention are as follows: the present application takes the demolition and excavation of an existing tunnel as a research object, simulates the structural demolition and surrounding rock excavation of an existing tunnel based on the existing tunnel reproduction module, and an information monitoring module monitors the test data in real time, and realizes the exploration of the disturbance law of demolition or excavation by analyzing the monitoring data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel demolition testing, and in particular to a test device and a test method for demolition or in-situ excavation of an existing tunnel lining. Background Art

[0002] With the continuous increase in investment in transportation infrastructure construction, the scale of domestic tunnels in service has also shown an increasing trend year by year. Some tunnels that were built a long time ago have low design technical indicators and insufficient traffic capacity, which cannot meet traffic needs, thus affecting the traffic capacity of the road and restricting economic development; some old tunnels have lining damage and other defects due to long service life and harsh geological and climatic conditions, which endanger operational safety. Reconstruction, expansion and defect treatment are an effective means to improve the service capacity of tunnels, but the reconstruction, expansion and defect treatment of some tunnels require the demolition of existing tunnel structures and even the excavation of surrounding rocks.

[0003] The reconstruction of existing tunnel projects is different from that of new tunnel projects. There are obvious differences between the two types of projects in terms of stratum stress state and disturbance control standards. For example, the stratum stress of a new tunnel is in its original state, and the stratum stress field can be well inverted based on the survey. However, the stress field of a completed tunnel becomes more complex under the condition of constant changes in time and space, and the stability of the surrounding rock and structure has more uncertainty. The secondary lining of a new tunnel is often constructed after the deformation of the surrounding rock is relatively stable, and it is far away from the construction surface and is relatively less disturbed by the construction. When dismantling the structure of an existing tunnel and expanding the surrounding rock, the stability of the adjacent structure needs to be considered, which is more difficult to control and more dangerous. The existing tunnel similarity model test device and method are mainly developed for new tunnel projects, and cannot meet the needs of structural stability analysis of existing tunnels and determination of construction parameters for dismantling and expanding.

[0004] Therefore, developing a test device and test method for removing existing tunnel lining or in-situ excavation not only has urgent research value, but also has good economic benefits and industrial application potential, which is the driving force and basis for the completion of the present invention. Summary of the invention

[0005] In order to overcome the above-mentioned defects of the prior art, the inventors conducted in-depth research and completed the present invention after paying a lot of creative work.

[0006] Specifically, the purpose of the present invention is to provide a test device and a test method to obtain the specific disturbance range of the demolition or expansion of an existing tunnel, so as to provide a basis for the subsequent support range and support form.

[0007] To achieve the above object, the present invention provides the following technical solutions:

[0008] An existing tunnel lining removal and in-situ excavation test device, comprising:

[0009] The existing tunnel reproduction module is arranged in the test framework to simulate the existing tunnel and external surrounding rock. The reaction force component is set in the module to provide stress boundary conditions for the model test;

[0010] The track conveying module is arranged in a similar tunnel structure, and includes a plurality of tracks laid in parallel at the bottom of the similar tunnel, and movable plug-ins are slidably connected on the tracks;

[0011] Pre-reinforcement and demolition modules are used to reinforce and demolish similar tunnels. They are plugged into the movable plug-in and move to the working position through the cooperation of the movable plug-in and the track.

[0012] The information monitoring module is distributed in the above three modules, monitors the surrounding rock and tunnel data information during the test, monitors the action and position information of the pre-reinforcement and removal modules, and transmits the information to the intelligent control module;

[0013] The intelligent control module, including an industrial computer and supporting information transmission components, receives the monitoring information sent by the monitoring control module and analyzes the information, and intelligently controls the track transportation and pre-reinforcement and removal modules.

[0014] In the present invention, as an improvement, the existing tunnel reproduction module is composed of a similar tunnel, similar surrounding rock and a model box from the inside to the outside. The model box is located in a steel structure frame. The similar surrounding rock in the box provides a reaction force through a loading mechanism mounted on the steel structure frame. The similar tunnel is a multi-layer cylindrical structure that penetrates the similar surrounding rock. The similar tunnel, similar surrounding rock and similar boundary conditions are all prepared or set according to similar criteria.

[0015] In the present invention, as an improvement, the movable plug-in in the track conveying module is connected to the driving motor through a transmission chain or a screw rod.

[0016] In the present invention, as an improvement, the pre-reinforcement and demolition module includes a pre-reinforcement robotic arm, a demolition robotic arm and an exhaust duct, and the three are staggered and installed on the movable plug-in. The pre-reinforcement robotic arm includes a front support, a middle robotic arm and a rear plug-in end. The demolition robotic arm includes a front demolition component, a middle robotic arm and a rear plug-in end. The front demolition component includes a cutting saw and a drill.

[0017] In the present invention, as an improvement, the information monitoring module includes a displacement sensor assembly, a stress sensor assembly and a video monitor assembly, wherein the displacement sensor assembly is installed inside similar surrounding rocks and on the surface of similar tunnel structures, the stress sensor assembly is scattered inside similar surrounding rocks, inside similar tunnels and at the reinforced end of the pre-reinforced robotic arm, and the video monitor assembly is installed on the movable plug-in of the track conveying module.

[0018] A test method for an existing tunnel lining removal and in-situ excavation test device comprises the following steps:

[0019] (1) Complete the model design and material preparation according to the similarity principle, fill the prepared similar surrounding rock into the model box, and load the similar surrounding rock to the preset stress state through the loading mechanism;

[0020] (2) Excavate similar surrounding rocks according to the simulated engineering background, embed similar tunnels and preset initial defects, and pre-embed displacement and stress sensor components;

[0021] (3) Assembling the rail conveyor module and the pre-reinforcement and removal module, installing the video monitor assembly, and connecting the modules and assemblies to the intelligent control module;

[0022] (4) Based on the design schemes of the demolition section, surrounding rock excavation section, and the reinforcement sections on both sides or one side of the demolition section or excavation section of similar tunnel structures, the intelligent control module controls the track conveying module to convey the pre-reinforcement and demolition modules and the video monitor assembly to the predetermined working position;

[0023] (5) Calculate and set the measurement threshold of the stress sensor located at the secondary lining of the similar tunnel structure in the information monitoring module through the intelligent control module;

[0024] (6) The intelligent control module controls the pre-reinforcement robot arm to extend and support the inner side of the reinforcement section, the removal robot arm performs the removal action, and the exhaust duct continues to exhaust air;

[0025] (7) The information monitoring module monitors the test data in real time and transmits it to the intelligent control module. After analyzing the data, the intelligent control module adjusts the support force of the pre-reinforced mechanical arm based on the monitoring data;

[0026] (8) The intelligent control module analyzes the monitoring data and outputs disturbance patterns and recommended pre-reinforcement parameters for demolition or in-situ excavation of existing tunnels.

[0027] In the present invention, as an improvement, the calculation of the measurement threshold includes:

[0028] 1) Calculate the surrounding rock load of similar models;

[0029] 2) Determine the load sharing ratio of the support structure according to the actual surrounding rock grade and tunnel section size;

[0030] 3) Calculate the load-bearing conditions of similar secondary linings according to the load sharing ratio;

[0031] 4) The critical bearing value of similar secondary lining is used as the monitoring threshold for stability control of similar tunnels.

[0032] In the present invention, as an improvement, constructing a disturbance law map of the demolition or in-situ excavation of an existing tunnel includes:

[0033] Several monitoring sections are set up in a certain range within the demolition or surrounding rock expansion section of similar tunnels and on both sides or one side. Each monitoring section is circumferentially set with similar surrounding rock internal stress and displacement monitoring points and similar tunnel structure between stress and displacement monitoring points;

[0034] Based on the data information fed back from the stress and displacement monitoring points, the monitoring data analysis curves of similar tunnels are drawn to determine the scope and degree of disturbance caused by partial demolition or expansion of similar tunnels on the adjacent similar surrounding rock and similar tunnel structures, and the pre-reinforcement scope and strength of the actual tunnel project are calculated based on the similarity criteria.

[0035] In the present invention, as an improvement, adjusting the supporting force of the pre-reinforced mechanical arm based on the monitoring data includes:

[0036] The intelligent control module judges the input stress monitoring value. When it is judged that the stress monitoring value is greater than the threshold, a signal is sent to the pre-reinforcement mechanical arm to increase the supporting force until the stress monitoring value drops to or below the threshold, and then a signal is transmitted to the pre-reinforcement mechanical arm to stabilize the supporting force.

[0037] When the stress monitoring value is greater than the threshold again, the intelligent control module repeats the above control action until the similar tunnel structure is dismantled or the similar surrounding rock is excavated.

[0038] Through the intelligent control system, stress and displacement monitoring curves are drawn, the unloading disturbance law is analyzed, the peak support force of the pre-reinforcement robot and the boundary where the stress of similar tunnel structures exceeds the threshold are recorded, and the recommended parameters for pre-reinforcement are determined.

[0039] Compared with the prior art, the present invention has the following beneficial effects:

[0040] (1) This application takes the demolition and excavation of existing tunnels as the research object. Based on the existing tunnel reproduction module, the structural demolition and surrounding rock excavation of the existing tunnel are simulated. The information monitoring module monitors the test data in real time. By analyzing the monitoring data, the disturbance law of demolition or excavation is explored.

[0041] (2) This application can derive the influence law of unloading disturbances such as the removal of existing tunnel linings and the expansion of surrounding rocks, and provide support for the structural stability analysis of tunnel reconstruction and expansion, disease treatment and other projects. The monitoring sensors in the device can provide real-time feedback to the intelligent controller on the degree of unloading disturbances generated during the removal and expansion operations. After analyzing the data, the intelligent control module dispatches the pre-reinforcement robot arm to make corresponding actions to ensure the overall stability of the test model, thereby providing a data basis for actual engineering protection.

[0042] (3) This application adjusts the support parameters in real time according to the monitoring data during the demolition of similar tunnels or the expansion of surrounding rock, forms a protection plan for local unloading disturbances in the tunnel, and provides data reference for subsequent construction protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.

[0044] Figure 1 It is a schematic diagram of the structure of a similar tunnel and similar surrounding rock in the test device of the present invention;

[0045] Figure 2 It is a structural schematic diagram of the test frame and the model box of the present invention;

[0046] Figure 3 It is a structural schematic diagram of the pre-reinforced mechanical arm of the present invention;

[0047] Figure 4 It is a structural schematic diagram of the pre-reinforcement and removal module of the present invention;

[0048] Figure 5 This is a schematic diagram of the layout of the tunnel part of the information monitoring module of the present invention;

[0049] Figure 6 It is a schematic diagram of the arrangement of the surrounding rock part of the information monitoring module of the present invention;

[0050] Figure 7 It is a schematic diagram of the longitudinal section monitoring data change curve of the present invention;

[0051] Figure 8 for Figure 7 Schematic diagram of displacement changes at the four monitoring sections 1-1, 2-2, 3-3, and 4-4;

[0052] In the figure, 1. similar tunnel, 2. similar surrounding rock, 3. model box, 4. test frame, 5. actuator, 6. track, 7. movable plug-in, 8. pre-reinforcement robot arm, 9. demolition robot arm, 10. industrial computer. DETAILED DESCRIPTION

[0053] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.

[0054] A test device for removing the lining of an existing tunnel or for in-situ excavation, comprising a similar tunnel 1 and a similar surrounding rock 2, wherein a model box 3 is arranged outside the similar surrounding rock 2 for fixing the similar surrounding rock and providing boundary conditions for the model test, such as Figure 1 As shown, the similar tunnel 1 is wrapped inside the similar surrounding rock 2 and is a multi-layer cylindrical structure penetrating the similar surrounding rock. The specific hierarchical structure is the same as the actual engineering tunnel structure. The similar tunnel 1 has tunnel ports and drainage pressure limiting ports at both ends. The similar tunnel 1, similar surrounding rock 2 and boundary conditions are all prepared or set according to similar criteria.

[0055] like Figure 2 As shown, the model box 3 is installed in the steel structure test frame 4, and the actuators 5 mounted on the steel structure test frame 4 are distributed outside the model box 3 to simulate the boundary stress of the surrounding rock.

[0056] The test device also includes a track conveying module, which has a track 6 and a movable plug-in 7 slidably installed on the track. The track 6 is laid on the bottom surface of the similar tunnel 1 along the longitudinal direction of the tunnel. The bottom of the movable plug-in 7 has a sliding groove matching the track 6, and the top is a plug-in block or a plug-in groove in the plug-in structure. The movable plug-in 7 is connected to the drive motor through a transmission chain or a screw rod, and is driven by the drive motor to slide on the track 6.

[0057] The test device also includes a pre-reinforcement and removal module, an information monitoring module and an intelligent control module, wherein the pre-reinforcement and removal module includes a pre-reinforcement mechanical arm 8, a removal mechanical arm 9 and an exhaust pipe, such as Figure 3 and Figure 4 As shown, the pre-reinforcement robot arm 8 and the demolition robot arm 9 both include a bottom plug-in end and a middle robot arm. In the pre-reinforcement robot arm 8, the top is a support structure, which is a support reinforcement plate or a support robot claw, and is supported on the pre-reinforcement section of the inner wall of the tunnel. The middle robot arm and the top support structure are driven by a motor to extend or adjust the support angle and position. In the demolition robot arm 9, the top is a disassembly structure, including a cutting saw and a drill, wherein the two can be installed in the same demolition robot arm, and the working positions of the two can be adjusted by rotation. The bottom plug-in ends of the pre-reinforcement robot arm 8 and the demolition robot arm 9 are matched with the top plug-in structure of the movable plug-in 7.

[0058] A plurality of tracks 6 are arranged in parallel, and a plurality of movable plug-ins 7 are arranged on each track 6. To achieve a tunnel demolition simulation effect, a pre-reinforcement robot arm 8, a demolition robot arm 9 and an exhaust duct are staggeredly installed on different movable plug-ins 7 on the plurality of tracks.

[0059] In the information monitoring module, displacement sensor components are distributed inside similar surrounding rocks and on the surfaces of various layers of similar tunnel structures; stress sensor components are distributed inside similar surrounding rocks, in the initial support of similar tunnels and before the secondary lining, and at the reinforcement end of the pre-reinforcement robotic arm; and the video monitor component is installed on the movable plug-in of the track conveying module to monitor the working process of each component on the move.

[0060] The intelligent control module includes an industrial computer 10, a display and supporting signal transmission lines. The signal transmission lines are connected to the various monitoring sensors in the monitoring control module. The data and information monitored by the monitoring sensors are transmitted to the industrial computer, which analyzes the data and transmits feedback control signals to the drive motor and the robot arm power motor.

[0061] Test methods for removal of existing tunnel lining or in-situ excavation include:

[0062] The model design and material preparation are completed according to the similarity principle, the prepared similar surrounding rock is filled into the model box, and the similar surrounding rock is loaded to a preset stress state through a loading mechanism.

[0063] Excavate similar surrounding rocks according to the simulated engineering background, embed similar tunnels and preset initial defects, and embed stress and displacement sensors. Stress and displacement sensors are installed in similar surrounding rocks and on the surface of tunnel structures, such as Figure 5 and 6 As shown in the figure, in a similar model, several monitoring sections are set along the longitudinal direction of the tunnel, covering the lining removal section, the section to be reinforced and part of the lining section other than the section to be reinforced. In each monitoring section, the displacement and stress sensors are arranged in a circumferentially divergent manner in the similar surrounding rock, between the tunnel structure surface and the surrounding rock, and between the initial support and the secondary lining. The stress sensors are also distributed at the reinforcement end of the pre-reinforcement mechanical arm.

[0064] Assemble the track conveyor modules, pre-reinforcement and removal modules, install the video monitor components, and connect the modules and components to the intelligent control module.

[0065] The demolition section of similar tunnel structure or the surrounding rock excavation section is calibrated according to the designed similar model test plan.

[0066] The intelligent control module is used to control the track conveying module to convey the pre-reinforcement and removal modules and the video monitor assembly to the predetermined working position, including: the pre-reinforcement mechanical arm, the removal mechanical arm and the exhaust duct are staggeredly inserted on the movable plug-in, the pre-reinforcement mechanical arm is distributed on one side or both sides of the removal mechanical arm along the longitudinal direction of the tunnel, the exhaust duct is arranged at the reserved exhaust outlet, and the movable plug-in is driven by the intelligent control module to convey the pre-reinforcement mechanical arm, the removal mechanical arm and the exhaust duct to the predetermined working position respectively, including conveying the removal mechanical arm to the removal section, and the pre-reinforcement mechanical arm to the sections to be reinforced on both sides of the removal section. The pre-reinforcement mechanical arm is provided with multiple reinforcement ends, and the supporting structures of the multiple reinforcement ends are respectively supported at different tunnel positions along the tunnel circumference.

[0067] The measurement threshold of the similar secondary lining stress sensor in the information monitoring module is calculated and set through the intelligent control module. The contact pressure threshold between the secondary lining and the support is used as the contact pressure reference value to maintain the stability of the surrounding rock and surrounding lining during lining removal. When the stress of the similar secondary lining in the unremoved section exceeds the threshold, there will be a risk of instability, falling off or collapse.

[0068] The intelligent control module controls the pre-reinforcement robotic arm to extend and support on the inner side of the reinforcement section. The demolition robotic arm performs the demolition action, and the exhaust duct continues to exhaust air. At this time, the monitoring control module monitors the stress and displacement of similar surrounding rocks and similar tunnels.

[0069] The information monitoring module monitors the test process in real time and transmits the data to the intelligent control module. After analyzing the data, the intelligent control module adjusts the supporting force of the pre-reinforced robotic arm based on the monitoring data.

[0070] The intelligent control module analyzes the monitoring data and outputs disturbance pattern maps and pre-reinforcement recommended parameters for demolition or in-situ excavation of existing tunnels.

[0071] The demolition of local tunnel structures and the expansion of surrounding rock excavation will lead to an increase in the load-bearing ratio of adjacent structures. When the load increase exceeds the load-bearing ratio of the supporting structure, it can be considered that there is a safety hazard in the tunnel structure and the supporting structure needs to be reinforced. The stress state of the secondary lining is the most intuitive reflection of the stability of the tunnel structure. Therefore, the critical value of the secondary lining load-bearing ratio is used as the control threshold of tunnel stability.

[0072] The identification of the stable state of the tunnel structure under load is mainly achieved by monitoring force and displacement. There is a mapping relationship between force and displacement in the mathematical and physical model. Since the stiffness of the secondary lining is relatively large, the monitoring of force is more convenient and accurate. The contact pressure between the initial support and the secondary lining is reflected in the test. The contact pressure is used to calibrate the stability control threshold of the tunnel structure. The specific calculation is as follows:

[0073] By investigating the design parameters of existing tunnels, the parameters of the experimental similarity model are determined, including the bulk density of the surrounding rock. γ0. Elastic modulus E 0. Poisson's ratio μ 0. Cohesion c 0. Internal friction angle φ 0, tunnel section size[ L ], initial support density γ 1. Elastic modulus E 1. Poisson's ratio μ 1. Thickness t 1. Secondary lining bulk density γ 2. Elastic modulus E 2. Poisson's ratio μ 2 and thickness t 2;

[0074] Similar surrounding rock load Q ]for:

[0075] ;

[0076] Determine the load sharing ratio of the support structure according to the surrounding rock grade and tunnel section size ρ ;

[0077] According to the load sharing ratio of the supporting structure, the contact pressure borne by the secondary lining is obtained. P ]:

[0078] ;

[0079] The critical bearing value (contact pressure critical value) of similar secondary lining is used as the control threshold for stability monitoring of similar tunnels.

[0080] The adjustment of the pre-reinforced robot arm is based on the data analysis of the similar second lining stress sensor and the pre-reinforced robot arm stress sensor by the industrial computer.

[0081] In the initial state, the bearing capacity of the similar secondary lining is greater than the stress it is subjected to. At this time, the pre-reinforcement mechanical arm of the section to be reinforced does not generate supporting force. As the similar tunnel structure is demolished or the similar surrounding rock is excavated, the intelligent control module judges the feedback stress monitoring value. When the stress monitoring value is greater than the load sharing ratio of the similar secondary lining, that is, the control threshold, the similar tunnel support structure is calibrated to be reinforced, and a signal is sent to the pre-reinforcement mechanical arm to increase the supporting force until the stress monitoring value drops to or below the control threshold, and the signal is transmitted to the pre-reinforcement mechanical arm to stabilize the current supporting force.

[0082] As similar tunnels are partially demolished or similar surrounding rock excavation actions are carried out, the stress monitoring value will continue to change. When the stress monitoring value is greater than the control threshold again, the intelligent control module repeats the above control action until the simulation test is completed.

[0083] Through the intelligent control system, stress and displacement monitoring curves are drawn, the unloading disturbance law is analyzed, the peak support force of the pre-reinforcement robot and the boundary where the stress of similar tunnel structures exceeds the threshold are recorded, and the recommended parameters for pre-reinforcement are determined.

[0084] Output of disturbance patterns of existing tunnel demolition or in-situ excavation includes:

[0085] Several monitoring sections are set up in a certain range in similar tunnel demolition or surrounding rock expansion sections and on both sides or one side, such as Figure 7 As shown, the monitoring sections are arranged from the demolished or expanded section to one side or both sides at equal intervals or according to a certain rule, and each monitoring section is circumferentially provided with stress and displacement monitoring points inside similar surrounding rocks and stress and displacement monitoring points between similar tunnel structures, and each corresponding monitoring point is installed with a displacement sensor and a stress sensor;

[0086] The analysis curves include time-history curves, longitudinal section curves, and cross-sectional curves of stress and displacement, among which the time-history curves of stress and displacement show how the data of each monitoring point changes with time (test process), the longitudinal section change curves of stress and displacement show how the monitoring data of corresponding points in different sections change with distance at the same time, and the cross-sectional curves of stress and displacement show the monitoring data of different contour positions in the same section at the same time. Combined with the above analysis curves, the disturbance range and degree of the partial demolition or expansion of similar tunnels on the adjacent similar surrounding rocks and similar structures are determined, and the pre-reinforcement range and strength of the actual tunnel project are calculated based on the comprehensive similarity criteria.

[0087] Embodiment 1:

[0088] A local lining removal simulation test was conducted on an existing two-lane highway tunnel under Class IV surrounding rock conditions. The secondary lining load bearing ratio was considered to be 30%. Based on the tunnel engineering background, the following simulation test steps were implemented.

[0089] Construct existing tunnel and surrounding rock models and set necessary surrounding rock boundary conditions;

[0090] Similar surrounding rock is set up and placed in the model box. The side wall of the model box is divided into multiple independent adjustment plates according to the setting position of the actuator. An actuator is set on the outer side of each plate. The actuator is mounted on the outer steel structure frame to apply load for the simulation of the boundary conditions of similar surrounding rock. The similar surrounding rock is excavated according to the simulated engineering background, embedded in the initial support and secondary lining of the similar tunnel, and the initial disease is preset, and the stress and displacement sensors are embedded.

[0091] Tracks are laid underneath the interior of similar tunnels. Multiple tracks are arranged and laid in parallel from the middle of the tunnel to both sides. Movable plug-ins are installed on the tracks. The movable plug-ins are steel structures or organic material components with insertion slots. The bottom of the movable plug-in is slidably connected to the track. A pre-reinforcement robotic arm, a demolition robotic arm, an exhaust duct and a video monitor assembly are inserted on the movable plug-in. The video monitor assembly is located on the outermost track. Five reinforced ends of the pre-reinforcement robotic arm are arranged on the same robotic arm.

[0092] Each monitor in the information monitoring module is connected to the industrial computer in the intelligent control module.

[0093] Calculate the contact pressure of the secondary lining of the tunnel and use the contact pressure to calibrate the tunnel structure stability control threshold;

[0094] Based on the design documents and geological data of the existing tunnel, the test object parameters are obtained, including the bulk density of the surrounding rock. γ 0. Elastic modulus E 0. Poisson's ratio μ 0. Cohesion c 0 and internal friction angle φ 0, the surrounding rock load is determined by the above parameters [ Q ]:

[0095] ;

[0096] According to the load sharing ratio of the supporting structure, the contact pressure borne by the secondary lining is obtained. P ]:

[0097] ;

[0098] Extract the critical value of contact pressure of the numerical model at the secondary lining monitoring point of the corresponding model test P This is the control threshold of the stability of the secondary lining structure in the model test.

[0099] According to the designed demolition section or surrounding rock expansion section of the similar tunnel structure, two sets of pre-reinforcement mechanical arms, one set of demolition mechanical arms and one set of exhaust pipes are respectively inserted into the movable plug-in, wherein the two sets of pre-reinforcement mechanical arms are respectively located on both sides of the demolition mechanical arms, and the industrial computer controls the movable plug-in to send the pre-reinforcement mechanical arms, demolition mechanical arms and exhaust pipes to the reinforcement section, demolition section and exhaust outlet respectively;

[0100] After reaching the designated position, the exhaust duct is fixed and the pre-reinforcement robotic arm is extended until all five reinforcement ends are supported and fit against the inner wall of a similar tunnel. The support force is monitored by the stress sensor at the reinforcement end, and the parameters are sent to the industrial computer. The demolition robotic arm is extended, and the demolition components at the demolition end destroy and demolish the tunnel structure. The exhaust duct is exhausted during the tunnel demolition process.

[0101] During the demolition process, displacement sensors and stress sensors monitor the displacement and stress at distributed locations, including the displacement and force of similar surrounding rocks and similar tunnels. When the monitored lining force is greater than the control threshold, the industrial computer controls the pre-reinforcement mechanical arm to increase the supporting force and reinforce the support structure.

[0102] The disturbance law of tunnel demolition is determined based on the test data monitored during the demolition process, including:

[0103] Taking the lining removal section as the center and extending to both sides, the removal section, reinforcement section and the lining section outside the reinforcement section are selected as the monitoring section selection range. Within this range, a section is selected longitudinally as the monitoring section. In the monitoring section, displacement and stress sensors are arranged radially in the surrounding rock, and sensors are arranged circumferentially between the lining and the surrounding rock and between the primary support and the secondary lining of the lining.

[0104] The intelligent control system draws the time-history curve of stress and displacement, the longitudinal section curve of stress and displacement, and the cross-sectional curve of stress and displacement based on the monitoring data.

[0105] Combining the above regular curves and the displacement sensor data in the surrounding rock, the disturbance range and degree of the local demolition or expansion of similar tunnels on the adjacent similar surrounding rock and similar structures are determined, and the pre-reinforcement range and strength of the actual tunnel project are calculated based on the comprehensive similarity criteria.

[0106] The unloading disturbance law is analyzed, the peak value of the support force of the pre-reinforcement manipulator and the boundary where the stress of similar tunnel structures exceeds the threshold are recorded, and the recommended parameters for pre-reinforcement are determined.

[0107] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.

Claims

1. A test method for removing the existing tunnel lining or in-situ excavation, characterized in that: The test method uses a test device comprising: The existing tunnel reproduction module is arranged in the test framework to simulate the existing tunnel and external surrounding rock. The reaction force component is set in the module to provide stress boundary conditions for the model test; The track conveying module is arranged in a similar tunnel structure, and includes a plurality of tracks laid in parallel at the bottom of the similar tunnel, and movable plug-ins are slidably connected on the tracks; Pre-reinforcement and demolition modules are used to reinforce and demolish similar tunnels. They are plugged into the movable plug-in and move to the working position through the cooperation of the movable plug-in and the track. The information monitoring module is distributed in the above three modules, monitors the surrounding rock and tunnel data information during the test, monitors the action and position information of the pre-reinforcement and removal modules, and transmits the information to the intelligent control module; Intelligent control module, including industrial computer and supporting information transmission components, receives monitoring information sent by monitoring control module and analyzes the information, and intelligently controls track transportation and pre-reinforcement and removal modules; The pre-reinforcement and removal module includes a pre-reinforcement robot arm, a removal robot arm and an exhaust duct; The information monitoring module includes a displacement sensor component, a stress sensor component and a video monitor component; The test method comprises the following steps: (1) Complete the model design and material preparation according to the similarity principle, fill the prepared similar surrounding rock into the model box, and load the similar surrounding rock to the preset stress state through the loading mechanism; (2) Excavate similar surrounding rocks according to the simulated engineering background, embed similar tunnels and preset initial defects, and pre-embed displacement and stress sensor components; (3) Assembling the rail conveyor module and the pre-reinforcement and removal module, installing the video monitor assembly, and connecting the modules and assemblies to the intelligent control module; (4) Based on the design schemes of the demolition section, surrounding rock excavation section, and the reinforcement sections on both sides or one side of the demolition section or excavation section of similar tunnel structures, the intelligent control module controls the track conveying module to convey the pre-reinforcement and demolition modules and the video monitor assembly to the predetermined working position; (5) Calculate and set the measurement threshold of the stress sensor located at the secondary lining of the similar tunnel structure in the information monitoring module through the intelligent control module; (6) The intelligent control module controls the pre-reinforcement robot arm to extend and support the inner side of the reinforcement section, the removal robot arm performs the removal action, and the exhaust duct continues to exhaust air; (7) The information monitoring module monitors the test data in real time and transmits it to the intelligent control module. After analyzing the data, the intelligent control module adjusts the support force of the pre-reinforced mechanical arm based on the monitoring data; (8) The intelligent control module analyzes the monitoring data and outputs disturbance patterns and recommended pre-reinforcement parameters for demolition or in-situ excavation of existing tunnels.

2. The existing tunnel lining removal or in-situ excavation test method according to claim 1 is characterized by: The existing tunnel reproduction module consists of a similar tunnel, similar surrounding rock and a model box from the inside to the outside. The model box is located in a steel structure frame. The similar surrounding rock in the box provides reaction force through a loading mechanism mounted on the steel structure frame. The similar tunnel is a multi-layer cylindrical structure that penetrates the similar surrounding rock. The similar tunnel, similar surrounding rock and similar boundary conditions are all prepared or set according to similar criteria.

3. The existing tunnel lining removal or in-situ excavation test method according to claim 1 is characterized by: The movable plug-in in the track conveying module is connected to the driving motor through a transmission chain or a lead screw.

4. The existing tunnel lining removal or in-situ excavation test method according to claim 1 is characterized by: The pre-reinforcement robot arm, the demolition robot arm and the exhaust duct are staggered and installed on the movable plug-in. The pre-reinforcement robot arm includes a front support, a middle robot arm and a rear plug-in end. The demolition robot arm includes a front demolition component, a middle robot arm and a rear plug-in end. The front demolition component includes a cutting saw and a drill.

5. The existing tunnel lining removal or in-situ excavation test method according to claim 1 is characterized by: The displacement sensor components are installed inside similar surrounding rocks and on the surface of similar tunnel structures, the stress sensor components are scattered inside similar surrounding rocks, similar tunnels and the reinforced end of the pre-reinforced robotic arm, and the video monitor component is installed on the active plug-in of the track conveying module.

6. The existing tunnel lining removal or in-situ excavation test method according to claim 1 is characterized in that: The calculation of the measurement threshold includes: 1) Calculate the surrounding rock load of similar models; 2) Determine the load sharing ratio of the support structure according to the actual surrounding rock grade and tunnel section size; 3) Calculate the load-bearing conditions of similar secondary linings according to the load sharing ratio; 4) The critical bearing value of similar secondary lining is used as the monitoring threshold for stability control of similar tunnels.

7. The existing tunnel lining removal or in-situ excavation test method according to claim 1 is characterized in that: Constructing disturbance patterns for demolition or in-situ excavation of existing tunnels includes: Several monitoring sections are set up in a certain range within the demolition or surrounding rock expansion section of similar tunnels and on both sides or one side. Each monitoring section is circumferentially set with similar surrounding rock internal stress and displacement monitoring points and similar tunnel structure between stress and displacement monitoring points; Based on the data information fed back from the stress and displacement monitoring points, the monitoring data analysis curves of similar tunnels are drawn to determine the scope and degree of disturbance caused by partial demolition or expansion of similar tunnels on the adjacent similar surrounding rock and similar tunnel structures, and the pre-reinforcement scope and strength of the actual tunnel project are calculated based on the similarity criteria.

8. The existing tunnel lining removal or in-situ excavation test method according to claim 1 is characterized in that: Adjusting the support force of the pre-reinforced robotic arm based on monitoring data includes: The intelligent control module judges the input stress monitoring value. When it is judged that the stress monitoring value is greater than the threshold, a signal is sent to the pre-reinforcement mechanical arm to increase the supporting force until the stress monitoring value drops to or below the threshold, and a signal is transmitted to the pre-reinforcement mechanical arm to stabilize the supporting force. When the stress monitoring value is greater than the threshold again, the intelligent control module repeats the above control action until the similar tunnel structure is dismantled or the similar surrounding rock is excavated; Through the intelligent control system, stress and displacement monitoring curves are drawn, the unloading disturbance law is analyzed, the peak support force of the pre-reinforcement robot and the boundary where the stress of similar tunnel structures exceeds the threshold are recorded, and the recommended parameters for pre-reinforcement are determined.

Citation Information

Patent Citations

  • Similarity model test apparatus for simulating tunnel construction

    CN104833537A

  • Monitoring method and system for tunnel drilling and blasting method in-situ reconstruction and extension project

    CN116878577A