An electromagnetic compatibility experiment monitoring system
By designing an electromagnetic compatibility experimental monitoring system to simulate the actual working status and external environmental parameters of the test product, the problem of lack of systematic analysis in the existing technology is solved, the accuracy of the electromagnetic compatibility experiment is improved, and a comprehensive electromagnetic compatibility test is provided. .
Patent Information
- Application Number
- CN202410549767.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-05-06
AI Technical Summary
The existing technology lacks systematic analysis of the internal layout and external working environment of the product being tested, resulting in insufficient electromagnetic compatibility experimental configurations and affecting experimental accuracy.
An electromagnetic compatibility experimental monitoring system is designed, including a shielded room, test product module, artificial power network, isolation transformer, EMC measurement module and test environment control module. By simulating the actual working status of the test product and external environmental parameters, the system is performance analysis and debugging to improve the accuracy of electromagnetic compatibility experiments.
This system improves the accuracy of electromagnetic compatibility experiments by simulating the actual working status and external environmental parameters of test products, ensuring the electromagnetic compatibility testing of test products under various working conditions, and provides detailed electromagnetic compatibility analysis, including Radiation, conduction, radiation resistance, conduction resistance, electrostatic discharge and transient voltage testing.
Smart Images

Figure HDA0004823907100000011 
Figure HDA0004823907100000021 
Figure HDA0004823907100000022
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electromagnetic compatibility experiments, and in particular to an electromagnetic compatibility experiment monitoring system. Background Art
[0002] Electromagnetic compatibility (EMC) refers to the ability of a device or system to operate in accordance with requirements in its electromagnetic environment and not produce intolerable electromagnetic interference to any device in its environment. Therefore, EMC includes two requirements: (EMI) on the one hand means that the electromagnetic interference generated by the device to the environment during normal operation cannot exceed a certain limit; (EMS) on the other hand means that the device has a certain degree of immunity to the electromagnetic interference in the environment, that is, electromagnetic sensitivity.
[0003] At present, in electromagnetic compatibility experiments, there is a lack of the function of systematically analyzing the internal layout and external working environment of the tested product and then planning the electromagnetic compatibility experiment configuration. The internal layout includes the connection of auxiliary function devices of various simulators in actual working status, and the external working environment includes the adjustment of ambient temperature, humidity and pressure parameters.
[0004] Therefore, it is necessary to propose an electromagnetic compatibility experiment monitoring system to solve the above technical problems existing in the prior art. Summary of the invention
[0005] The present invention provides an electromagnetic compatibility experiment monitoring system, which has the beneficial effects of improving the internal layout of the test product to simulate the actual working state, and comprehensively considering the parameter debugging of the external working environment of the test product to improve the accuracy of the electromagnetic compatibility experiment, and solves the problem of the lack of a function of systematically analyzing the internal layout and external working environment of the tested product in the electromagnetic compatibility experiment and then planning the electromagnetic compatibility experiment configuration.
[0006] The present invention provides the following technical solution: an electromagnetic compatibility experiment monitoring system, comprising:
[0007] Shielded room, used to provide a closed test environment for electromagnetic compatibility experiments;
[0008] Test product module, used to simulate the actual working state of the test product;
[0009] An artificial power supply network, used to supply power to the test product module;
[0010] An isolation transformer, used to connect the power grid and the artificial power network and perform bidirectional electromagnetic interference isolation;
[0011] An EMC measurement module is used to measure the electromagnetic interference radiated / conducted by the test product and the voltage / current change of the test product;
[0012] The test environment control module is used to control the working temperature, humidity and atmospheric pressure parameters of the test product module.
[0013] As an optional solution of the electromagnetic compatibility experiment monitoring system described in the present invention, the actual working environment of the simulated test product includes:
[0014] Retrieve the corresponding electromagnetic compatibility standard according to the category of the test product and determine whether the test product is a complete device or a component of a complete device;
[0015] If the test product is a complete device, directly connect the test product to the artificial power network;
[0016] If the test product is a component of a complete device, obtain at least one composition scheme of the connection functional equipment required for the test product to operate according to the product description of the test product;
[0017] Select a group of schemes with the least number of functional devices to be connected from at least one composition scheme, select corresponding functional devices and test products according to the scheme for assembly, and then connect the test product and the connected functional devices to the artificial power network.
[0018] As an optional solution of the electromagnetic compatibility experiment monitoring system described in the present invention, the operating temperature, humidity and atmospheric pressure parameters of the control test product module include:
[0019] Obtain the specified operating temperature range, humidity range and atmospheric pressure range of the test product or the combination of the test product and the connected functional equipment;
[0020] Control the humidity and atmospheric pressure of the test environment to the middle values of the above humidity and atmospheric pressure ranges respectively;
[0021] Mark the electronic components of the test product or the test product and the connected functional equipment as a1, a2, a3...an;
[0022] The operating temperature gradient is divided for each electronic component, and a temperature adjustment scheme is designed to carry out electromagnetic compatibility experiments under different combinations of operating temperature gradients.
[0023] As an optional solution of the electromagnetic compatibility experiment monitoring system described in the present invention, the division of the working temperature gradients of each electronic component includes:
[0024] Obtain the operating temperature range ta1min-ta1max of the electronic component a1, and set a modified operating temperature range ta1min'-ta1max', wherein ta1min' is greater than or equal to ta1min and is an integer multiple of 1°C, and ta1max' is less than or equal to ta1max and is an integer multiple of 1°C;
[0025] In the corrected operating temperature range ta1min'-ta1max', with a temperature interval of 1°C, the operating temperature gradients ta11, ta12, ta13, ... ta1n of the electronic component a1 are obtained, wherein ta11 is equal to ta1min', and ta1n is equal to ta1max';
[0026] Similarly, the operating temperature gradients ta21, ta22, ta23, ... ta2n of the electronic component a2 are obtained;
[0027] Obtaining the operating temperature gradients ta31, ta32, ta33, ..., ta3n of the electronic component a3;
[0028] …
[0029] Obtain the operating temperature gradients tan1, tan2, tan3, ..., tann of the electronic component an.
[0030] As an optional solution of the electromagnetic compatibility experiment monitoring system described in the present invention, the designed temperature adjustment solution includes:
[0031] Establish a coordinate system with the electronic component marks a1-an as the x-axis and the temperature gradient of 1°C as the y-axis, and place the operating temperature gradient of each electronic component into the coordinate system;
[0032] Determine the minimum value among ta1n, ta2n, ta3n, ... tann and set it as the initial temperature adjustment value T0;
[0033] Based on T0, 1°C is added to set it as the first positive temperature adjustment value T1, based on T1, 1°C is added to set it as the second positive temperature adjustment value T2...Based on Tn-1, 1°C is added to set it as the nth positive temperature adjustment value Tn, and Tn is equal to the maximum value among ta1n, ta2n, ta3n...tann;
[0034] Based on T0, subtract 1°C and set it as the first negative temperature adjustment value T-1; based on T-1, subtract 1°C and set it as the second negative temperature adjustment value T-2… Based on Tn-1, subtract 1°C and set it as the nth negative temperature adjustment value Tn, and Tn is equal to the minimum value among ta11, ta21, ta31…tan1.
[0035] As an optional solution of the electromagnetic compatibility experiment monitoring system described in the present invention, the designed temperature adjustment solution also includes:
[0036] First, control the overall temperature of the test product or the test product and the connected functional equipment to reach T0, then heat up the electronic components corresponding to T1 to T1, then heat up the electronic components corresponding to T2 to T2, and finally heat up the electronic components corresponding to Tn to Tn;
[0037] Then, the electronic components corresponding to T-1 are cooled down to T-1 respectively, and the electronic components corresponding to T-2 are cooled down to T-2 respectively... and the electronic components corresponding to Tn are cooled down to Tn respectively.
[0038] As an optional solution of the electromagnetic compatibility experiment monitoring system described in the present invention, it also includes two test modes:
[0039] EMI test mode, used to test the test product's ability to generate electromagnetic interference;
[0040] The EMS test mode is used to test the test product's ability to resist electromagnetic interference.
[0041] As an optional solution of the electromagnetic compatibility experimental monitoring system described in the present invention, the EMI test mode specifically includes:
[0042] Radiation test, used to test the intensity of electromagnetic radiation generated by the test product in the working environment;
[0043] Conduction test is used to test the strength of electromagnetic interference conducted by the test product to other devices through the conduction path of power line / signal line / ground line;
[0044] The EMS test mode specifically includes:
[0045] Radiation resistance test, used to test the sensitivity of the test product to electromagnetic field interference within the working environment;
[0046] The conduction resistance test is used to test the sensitivity of the test product to receive electromagnetic interference through the conduction path of power line / signal line / ground line;
[0047] Electrostatic discharge test, used to test the sensitivity of the test product in an electrostatic discharge environment;
[0048] Transient voltage test is used to test the sensitivity of the test product under changing voltage conditions.
[0049] As an optional solution of the electromagnetic compatibility experiment monitoring system described in the present invention, the specific test steps of the radiation test include:
[0050] Connect the working circuit in the order of power grid - isolation transformer - artificial power network - test product module;
[0051] Install a near-field probe at the RF input port of the EMC measurement module to form a measurement circuit, and place the near-field probe within 1-2 cm around each test port of the test product to perform spectrum analysis on the electromagnetic waves radiated by the test product;
[0052] The test port includes at least one of the test product housing / AC power line / DC power line / ground line / signal line / process control line;
[0053] The specific test steps of the conduction test include:
[0054] Connect the working circuit in the order of power grid - isolation transformer - artificial power network - test product module;
[0055] The RF input port of the EMC measurement module is connected to the test product through a limiter, a RF switch, and a cable in sequence to form a measurement circuit, and a spectrum analysis is performed on the electromagnetic waves transmitted by the test product through the conduction path.
[0056] As an optional solution of the electromagnetic compatibility experiment monitoring system described in the present invention, the specific test steps of the radiation resistance test include:
[0057] Based on the conduction test, an antenna is used to generate a simulated electromagnetic field and a spectrum analysis is performed on the electromagnetic waves transmitted by the test product through the conduction path;
[0058] The specific test steps of the anti-conduction test include:
[0059] On the basis of the above conduction test, a conduction interference simulation device is installed between the artificial power supply network and the test product module, and a spectrum analysis is performed on the electromagnetic waves conducted by the test product through the conduction path;
[0060] The specific test steps of the electrostatic discharge test include:
[0061] Based on the above conduction test, use an electrostatic discharge generator to generate static electricity and apply it to the test product, and analyze the voltage / current changes of the test product;
[0062] The specific test steps of the transient voltage test include:
[0063] On the basis of the conduction test, a voltage drop generating device is installed between the artificial power supply network and the test product, and the voltage / current changes of the test product are analyzed.
[0064] The present invention has the following beneficial effects:
[0065] 1. This electromagnetic compatibility test monitoring system takes into account the internal layout of the test product to simulate the actual working state of the test product and improve the accuracy of the electromagnetic compatibility test. First, it is determined whether the test product belongs to a complete device / system or a partial structure of a complete device / system, and then it is analyzed whether the test product needs to be connected to a functional device to achieve standard operation.
[0066] 2. This electromagnetic compatibility experiment monitoring system takes into account the external working environment of the test product to simulate various working conditions that may occur in the test product, thereby improving the accuracy of the electromagnetic compatibility experiment. First, for parameters such as working humidity and atmospheric pressure that are not very different in actual situations, the intermediate values are selected for simulation. Mainly considering that temperature changes have a great impact on the electromagnetic compatibility experiment of the test product, and considering that a test product may have a large number of basic electronic components, each of which has a different working temperature standard range, the working temperature range of each electronic component is analyzed, and a representative temperature gradient is established for certain permutations and combinations. And considering the experimental conditions of the most critical working state and the most sensitive working state of the electromagnetic compatibility experiment, an optimized temperature adjustment scheme is made. On the one hand, a representative temperature combination of each electronic component is designed; on the other hand, considering the temperature control power consumption of the overall area of the internal structure of the test product and the local area where each electronic component is located, and in order to maintain the stable operation of the test product, the temperature difference of the internal electronic components in the area should not be too large, the overall temperature is first raised to the maximum value allowed, and then each area is adjusted separately, and the joint temperature rise is maintained as much as possible during the separate adjustment process.
[0067] 3. This electromagnetic compatibility experimental monitoring system provides experimental configuration solutions for various EMC standard test contents including radiation test, conduction test, anti-radiation test, anti-conduction test, electrostatic discharge test, and transient voltage test. BRIEF DESCRIPTION OF THE DRAWINGS
[0068] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate exemplary embodiments, features, and aspects of the disclosure and, together with the description, serve to explain the principles of the disclosure.
[0069] Figure 1 It is the principle diagram of the temperature regulation scheme of the present invention.
[0070] Figure 2 This is a schematic diagram of the radiation test of the present invention.
[0071] Figure 3 It is a schematic diagram of the conduction test of the present invention.
[0072] Figure 4 This is a schematic diagram of the radiation resistance test of the present invention.
[0073] Figure 5 It is a schematic diagram of the anti-conduction test of the present invention.
[0074] Figure 6 It is a schematic diagram of the electrostatic discharge test of the present invention.
[0075] Figure 7 This is a schematic diagram of the transient voltage test of the present invention. DETAILED DESCRIPTION
[0076] Various exemplary embodiments, features and aspects of the present disclosure will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.
[0077] The word “exemplary” is used exclusively herein to mean “serving as an example, example, or illustration.” Any embodiment described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments.
[0078] In addition, in order to better illustrate the present disclosure, numerous specific details are given in the following specific embodiments. It should be understood by those skilled in the art that the present disclosure can also be implemented without certain specific details. In some examples, methods, means, components and circuits well known to those skilled in the art are not described in detail in order to highlight the subject matter of the present disclosure.
[0079] Embodiment 1
[0080] An electromagnetic compatibility experiment monitoring system, comprising:
[0081] Shielded room, used to provide a closed test environment for electromagnetic compatibility experiments;
[0082] Test product module, used to simulate the actual working state of the test product;
[0083] Artificial power network, used to supply power to the test product module;
[0084] Isolation transformer, used to connect the power grid and artificial power network and perform bidirectional electromagnetic interference isolation;
[0085] EMC measurement module, used to measure the electromagnetic interference radiated / conducted by the test product and the voltage / current changes of the test product;
[0086] The test environment control module is used to control the working temperature, humidity and atmospheric pressure parameters of the test product module.
[0087] In this embodiment: the electromagnetic compatibility experiment is carried out in a shielded room, which can be an EMC darkroom of various types, and can block the interference of the electromagnetic field outside the shielded room on the electromagnetic compatibility experiment. It is generally composed of a shielding body, a shielding door, a waveguide window, a filter, an absorbing material and other structures, which are conventional technical means and are not described in detail here.
[0088] When conducting electromagnetic compatibility experiments, the isolation transformer is installed between the power grid and the artificial power network. Its function is to isolate electromagnetic interference in both directions, thereby ensuring that the electromagnetic interference data measured in the experiment comes only from the test product. The artificial power network and the isolation transformer can be selected according to the experimental configuration. For example, the isolation transformer can be selected as GBK-1000VA AC isolation transformer, which is a conventional technical means and will not be described here.
[0089] The EMC measurement module can be selected as an ER series EMI measurement receiver, which has a variety of measurement modes and functions. It can be used to install near-field probes to measure electromagnetic fields radiated in space, and can also be connected to circuits through cable connectors to measure electromagnetic waves and circuit voltage and current.
[0090] The test product module and the measurement environment control module can work together to simulate the actual operation of the test product under various working conditions.
[0091] The implementation of each step will be described in detail below.
[0092] As an optional implementation scheme of the present application, optionally, the actual working environment of the simulated test product includes:
[0093] Retrieve the corresponding electromagnetic compatibility standard according to the category of the test product and determine whether the test product is a complete device or a component of a complete device;
[0094] If the test product is a complete device, directly connect the test product to the artificial power network;
[0095] If the test product is a component of a complete device, obtain at least one composition scheme of the connection functional equipment required for the test product to operate according to the product description of the test product;
[0096] Select a group of schemes with the least number of functional devices to be connected from at least one composition scheme, select corresponding functional devices and test products according to the scheme for assembly, and then connect the test product and the connected functional devices to the artificial power network.
[0097] In this embodiment, the electromagnetic compatibility test product range is very wide, and the electronic equipment that can be measured ranges from various large-scale equipment, systems to individual electronic components. Therefore, if it is judged that the test product is a partial structure of a complete device or system, in order to achieve its standard operation, it is necessary to connect the necessary, minimum number, and most representative functional devices.
[0098] In addition, if the product manual stipulates that the test product requires protective devices or protective measures, the corresponding protective devices must be installed before conducting electromagnetic compatibility tests.
[0099] If the test product is a lamp, the electromagnetic compatibility standard is IEC55015, which specifies the relevant requirements and test standards for electromagnetic compatibility experiments for lamps. For lamps, there is no need to connect additional functional devices such as relays and circuit breakers, and protective devices such as lampshades are not necessary.
[0100] As an optional embodiment of the present application, optionally, controlling the operating temperature, humidity and atmospheric pressure parameters of the test product module includes:
[0101] Obtain the specified operating temperature range, humidity range and atmospheric pressure range of the test product or the combination of the test product and the connected functional equipment;
[0102] Control the humidity and atmospheric pressure of the test environment to the middle values of the above humidity and atmospheric pressure ranges respectively;
[0103] Mark the electronic components of the test product or the test product and the connected functional equipment as a1, a2, a3...an;
[0104] The operating temperature gradient is divided for each electronic component, and a temperature adjustment scheme is designed to carry out electromagnetic compatibility experiments under different combinations of operating temperature gradients.
[0105] In this embodiment: the basic standards of electronic equipment usually include operating temperature, humidity, atmospheric pressure and power supply voltage. The power supply voltage can be controlled by an artificial network module, and the humidity and atmospheric pressure can usually be achieved by the adjustment function of the shielded room. For humidity and atmospheric pressure, the intermediate value can be selected as described above, or some extreme working conditions can be considered according to the test product category, and then the extreme value within the standard range can be selected for battery compatibility testing.
[0106] Temperature is an important factor affecting battery compatibility experiments, considering that the test product or the functional equipment has a large number of electronic components, different electronic components such as electronic circuits with specific functions, including amplifiers, radio receivers, oscillators, etc., or separate packages, including resistors, capacitors, inductors, transistors, diodes, etc., or groups of different complexities, including various integrated circuits such as operational amplifiers, resistors, logic gates, etc. These complex electronic components have different operating temperature standards.
[0107] Therefore, in order to optimize the accuracy of the electromagnetic compatibility experiment, taking into account various actual working conditions, the operating temperature range of each electronic component is divided into gradients, and certain arrangements and combinations are performed to test the electromagnetic compatibility under various temperature combinations.
[0108] Embodiment 2
[0109] See also Figure 1 As an optional implementation scheme of the present application, optionally, dividing the operating temperature gradient of each electronic component includes:
[0110] Obtain the operating temperature range ta1min-ta1max of the electronic component a1, and set a modified operating temperature range ta1min'-ta1max', wherein ta1min' is greater than or equal to ta1min and is an integer multiple of 1°C, and ta1max' is less than or equal to ta1max and is an integer multiple of 1°C;
[0111] In the corrected operating temperature range ta1min'-ta1max', with a temperature interval of 1°C, the operating temperature gradients ta11, ta12, ta13, ... ta1n of the electronic component a1 are obtained, wherein ta11 is equal to ta1min', and ta1n is equal to ta1max';
[0112] Similarly, the operating temperature gradients ta21, ta22, ta23, ... ta2n of the electronic component a2 are obtained;
[0113] Obtaining the operating temperature gradients ta31, ta32, ta33, ..., ta3n of the electronic component a3;
[0114] …
[0115] Obtain the operating temperature gradients tan1, tan2, tan3, ..., tann of the electronic component an.
[0116] Design temperature regulation solutions include:
[0117] Establish a coordinate system with the electronic component marks a1-an as the x-axis and the temperature gradient of 1°C as the y-axis, and place the operating temperature gradient of each electronic component into the coordinate system;
[0118] Determine the minimum value among ta1n, ta2n, ta3n, ... tann and set it as the initial temperature adjustment value T0;
[0119] Based on T0, 1°C is added to set it as the first positive temperature adjustment value T1, based on T1, 1°C is added to set it as the second positive temperature adjustment value T2...Based on Tn-1, 1°C is added to set it as the nth positive temperature adjustment value Tn, and Tn is equal to the maximum value among ta1n, ta2n, ta3n...tann;
[0120] Based on T0, subtract 1°C and set it as the first negative temperature adjustment value T-1; based on T-1, subtract 1°C and set it as the second negative temperature adjustment value T-2… Based on Tn-1, subtract 1°C and set it as the nth negative temperature adjustment value Tn, and Tn is equal to the minimum value among ta11, ta21, ta31…tan1.
[0121] Designing a temperature regulation solution also includes:
[0122] First, control the overall temperature of the test product or the test product and the connected functional equipment to reach T0, then heat up the electronic components corresponding to T1 to T1, then heat up the electronic components corresponding to T2 to T2, and finally heat up the electronic components corresponding to Tn to Tn;
[0123] Then, the electronic components corresponding to T-1 are cooled down to T-1 respectively, and the electronic components corresponding to T-2 are cooled down to T-2 respectively... and the electronic components corresponding to Tn are cooled down to Tn respectively.
[0124] In this embodiment: In actual situations, a test product has a large number of electronic components. It is unrealistic to measure all possible operating temperatures of all electronic components and then perform permutations and combinations to measure all possibilities. Therefore, electromagnetic compatibility experiments usually require measuring the most critical state or the most sensitive working state of the test product.
[0125] Furthermore, the temperature control of each electronic component can be achieved by a plurality of temperature control units installed at corresponding positions, and the temperature control unit itself is also provided with a shielding layer to avoid electromagnetic interference.
[0126] The temperature control scheme is also designed taking into account the power consumption of individual temperature adjustment of each area and overall temperature adjustment of all areas, the power consumption required to maintain heating is greater than the power consumption of cooling, and in order to maintain stable operation of the test product, the temperature difference between the areas where the internal electronic components are located should not be too large.
[0127] The specific test steps are as follows: first, the standard operating temperature range specified for each electronic component is obtained to divide the operating temperature gradient as a measurement standard.
[0128] Let's take an example. For example, if the test product is set to have three electronic components a1, a2, and a3, and the operating temperature range of a1 is 1-2°C, a2 is 2.5-4°C, and a3 is 2-5.5°C, then the operating temperature gradient of a1 is 1°C, 2°C, a2 is 3°C, 4°C, and a3 is 2°C, 3°C, 4°C, and 5°C. The test product can be some kind of precision instrument that is limited to operate in a low temperature environment.
[0129] Then establish a plane coordinate system, such as Figure 1 As shown, the equally spaced coordinate points on the x-axis are a1, a2 and a3, and the y-axis is 1°C, 2°C, 3°C, 4°C and 5°C.
[0130] In order to adjust the temperature of each electronic component as much as possible, reduce regional differences and try to adopt the adjustment method of heating up first and then cooling down. Set the initial temperature adjustment value T0, which is the minimum value of the highest operating temperature gradient of each electronic component. In the above example, T0 = 2°C, T1 = 3°C, T2 = 4°C, T3 = 5°C, T-1 = 1°C.
[0131] The specific temperature adjustment plan is to first control the overall temperature of each electronic component of the test product to 2°C, forming a "2-2-2" layout of a1, a2, and a3. Then, the temperature corresponding to T1, that is, a2 and a3, is locally increased to 3°C to form "2-3-2" as the first temperature combination of the electromagnetic compatibility experiment, which also plays the role of minimizing regional temperature differences.
[0132] Then, a2 and a3 corresponding to T2 are jointly increased to 4°C to form "2-4-4" as the temperature combination for the second electromagnetic compatibility experiment.
[0133] Then the corresponding T3a3 is raised to 5°C alone to form "2-4-5" as the temperature combination of the third electromagnetic compatibility experiment, which is also the most critical working state.
[0134] Then, the temperature a1 corresponding to T-1 is controlled to 1°C, forming "1-4-5" as the temperature combination of the fourth electromagnetic compatibility experiment, which is also another most critical working state.
[0135] Embodiment 3
[0136] See also Figure 2-Figure 7 , an electromagnetic compatibility experimental monitoring system, also includes two test modes:
[0137] EMI test mode, used to test the ability of the test product to generate electromagnetic interference;
[0138] EMS test mode is used to test the ability of the test product to resist electromagnetic interference.
[0139] EMI test modes include:
[0140] Radiation testing is used to test the intensity of electromagnetic radiation generated by the test product in the working environment;
[0141] Conduction test is used to test the strength of electromagnetic interference conducted by the test product to other devices through the conduction path of power line / signal line / ground line;
[0142] EMS test modes include:
[0143] Radiation resistance test, used to test the sensitivity of the test product to electromagnetic field interference within the working environment;
[0144] The conduction resistance test is used to test the sensitivity of the test product to receive electromagnetic interference through the conduction path of the power line / signal line / ground line;
[0145] Electrostatic discharge test, used to test the sensitivity of the test product in an electrostatic discharge environment;
[0146] Transient voltage test is used to test the sensitivity of the test product under changing voltage conditions.
[0147] The specific test steps of radiation testing include:
[0148] Connect the working circuit in the order of power grid - isolation transformer - artificial power network - test product module;
[0149] Install a near-field probe at the RF input port of the EMC measurement module to form a measurement circuit, and place the near-field probe within 1-2 cm around each test port of the test product to perform spectrum analysis on the electromagnetic waves radiated by the test product;
[0150] The test port includes at least one of the test product housing / AC power line / DC power line / ground line / signal line / process control line;
[0151] The specific test steps of the conduction test include:
[0152] Connect the working circuit in the order of power grid - isolation transformer - artificial power network - test product module;
[0153] The RF input port of the EMC measurement module is connected to the test product through a limiter, a RF switch, and a cable in sequence to form a measurement circuit, and a spectrum analysis is performed on the electromagnetic waves transmitted by the test product through the conduction path.
[0154] The specific test steps for radiation resistance testing include:
[0155] Based on the conduction test, an antenna is used to generate a simulated electromagnetic field and a spectrum analysis is performed on the electromagnetic waves transmitted by the test product through the conduction path;
[0156] The specific test steps for the conduction resistance test include:
[0157] On the basis of the conduction test, a conduction interference simulation device is installed between the artificial power supply network and the test product module, and the spectrum analysis of the electromagnetic waves transmitted by the test product through the conduction path is performed;
[0158] The specific test steps of electrostatic discharge test include:
[0159] Based on the conduction test, an electrostatic discharge generator is used to generate static electricity and apply it to the test product, and the voltage / current changes of the test product are analyzed;
[0160] The specific test steps of transient voltage test include:
[0161] On the basis of the conduction test, a voltage drop generating device is installed between the artificial power network and the test product, and the voltage / current changes of the test product are analyzed.
[0162] In this embodiment, two EMC electromagnetic compatibility tests, EMI and EMS, are included.
[0163] Specifically, the radiation test process can measure the intensity of electromagnetic radiation generated by the test product to the surrounding area. The near-field probe can detect electromagnetic waves within the periphery of the test product, which is specifically applied to the spectrum analyzer function of the EMC measurement module. And the measurement range of the near-field probe should cover the parts where electromagnetic interference may occur, including each test port.
[0164] During the conduction test, the strength of the electromagnetic interference transmitted by the test product through the conduction path can be measured. The function of the limiter is to cut off the interference at the top or bottom of the output waveform, cut off the positive pulse in the output signal, and only leave the negative pulse and overvoltage protection. If a strong output signal or interference may damage a component, a limiting circuit can be connected in front of this component.
[0165] The RF switch should be turned off before the working circuit is turned on, and the RF switch should be turned on after the test product is powered on to generate electromagnetic interference. The cable head can be equipped with a connector to connect to the test product.
[0166] The radiation resistance test process can detect whether the test product can work normally in a strong electromagnetic field environment. The electromagnetic field is simulated by installing antennas and antenna towers in the shielding room, and propagated to the test product in space. By measuring the spectrum of the electromagnetic waves it conducts, its radiation resistance can be analyzed.
[0167] For the anti-conduction test, a conducted interference simulation device such as the ES-4516A single-phase pulse group surge generator and the ES-435B three-phase pulse group generator is installed between the artificial power network and the test product module to conduct electromagnetic interference through the cable.
[0168] The electrostatic discharge test can detect whether the test product can work normally under electrostatic conditions. It is necessary to install an electrostatic discharge generator such as the ES-ESD-20 electrostatic discharge generator at the contact position of the test product. The voltage and current changes of the working circuit of the test product are measured by the oscilloscope function of the EMC measurement module to measure its anti-static ability.
[0169] Transient voltage test can detect whether the test product can work normally under rapidly changing voltage conditions. It is necessary to install a device that can output transient voltage changes, such as ES-1130B three-phase voltage drop generator, between the test product module and the artificial power network.
[0170] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0171] In the several embodiments provided in this application, it should be understood that the disclosed device can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of the above units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed.
[0172] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0173] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0174] If the above-mentioned integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a memory, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the above-mentioned methods of each embodiment of the present application. The aforementioned memory includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or CD-ROM and other media that can store program codes.
[0175] A person skilled in the art can understand that all or part of the steps in the various methods of the above embodiments can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable memory, and the memory can include: a flash drive, a read-only memory (English: Read-Only Memory, abbreviated as: ROM), a random access memory (English: Random Access Memory, abbreviated as: RAM), a magnetic disk or an optical disk, etc.
[0176] The embodiments of the present application are introduced in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and core idea of the present application. At the same time, for general technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
Claims
1. An electromagnetic compatibility experiment monitoring system, characterized in that: include: Shielded room, used to provide a closed test environment for electromagnetic compatibility experiments; Test product module, used to simulate the actual working state of the test product; An artificial power supply network, used to supply power to the test product module; An isolation transformer, used to connect the power grid and the artificial power network and perform bidirectional electromagnetic interference isolation; An EMC measurement module is used to measure the electromagnetic interference radiated / conducted by the test product and the voltage / current change of the test product; A test environment control module, used to control the operating temperature, humidity and atmospheric pressure parameters of the test product module; The operating temperature, humidity and atmospheric pressure parameters of the control test product module include: Obtaining the operating temperature range, humidity range and atmospheric pressure range specified for the test product or the combination of the test product and the connected functional device; Control the humidity and atmospheric pressure of the test environment to the middle values of the above humidity and atmospheric pressure ranges respectively; Mark the test product or each electronic component in the test product and the connected functional device as a1, a2, a3, ..., an; Divide the working temperature gradient of each electronic component, and design a temperature adjustment scheme to conduct electromagnetic compatibility experiments under different combinations of the working temperature gradients; the dividing the working temperature gradient of each electronic component includes: Obtain the operating temperature range ta1min-ta1max of the electronic component a1, and set a modified operating temperature range ta1min'-ta1max', wherein ta1min' is greater than or equal to ta1min and is an integer multiple of 1°C, and ta1max' is less than or equal to ta1max and is an integer multiple of 1°C; In the corrected operating temperature range ta1min'-ta1max', with a temperature interval of 1°C, the operating temperature gradients ta11, ta12, ta13, ... ta1n of the electronic component a1 are obtained, wherein ta11 is equal to ta1min', and ta1n is equal to ta1max'; Similarly, the operating temperature gradients ta21, ta22, ta23, ... ta2n of the electronic component a2 are obtained; Obtaining the operating temperature gradients ta31, ta32, ta33, ..., ta3n of the electronic component a3; …… Obtaining the operating temperature gradients tan1, tan2, tan3, ... tann of the electronic component an; the temperature adjustment scheme includes: Establish a coordinate system with the electronic component marks a1-an as the x-axis and the temperature gradient of 1°C as the y-axis, and place the operating temperature gradient of each electronic component into the coordinate system; Determine the minimum value among ta1n, ta2n, ta3n, ... tann and set it as the initial temperature adjustment value T0; Based on T0, 1°C is added to set it as the first positive temperature adjustment value T1, based on T1, 1°C is added to set it as the second positive temperature adjustment value T2...Based on Tn-1, 1°C is added to set it as the nth positive temperature adjustment value Tn, and Tn is equal to the maximum value among ta1n, ta2n, ta3n...tann; Based on T0, 1°C is reduced to set as the first negative temperature adjustment value T-1, based on T-1, 1°C is reduced to set as the second negative temperature adjustment value T-2... Based on Tn-1, 1°C is reduced to set as the nth negative temperature adjustment value Tn, Tn is equal to the minimum value among ta11, ta21, ta31...tan1; the temperature adjustment scheme also includes: First, the overall temperature of the test product or the test product and the connected functional equipment is controlled to reach T0, and then the temperature of each electronic component corresponding to T1 is raised to T1, and then the temperature of each electronic component corresponding to T2 is raised to T2, and then the temperature of each electronic component corresponding to Tn is raised to Tn; Then, the electronic components corresponding to T-1 are cooled down to T-1 respectively, and the electronic components corresponding to T-2 are cooled down to T-2 respectively... and the electronic components corresponding to Tn are cooled down to Tn respectively.
2. The electromagnetic compatibility experiment monitoring system according to claim 1, characterized in that: The actual working environment of the simulated test product includes: Retrieve the corresponding electromagnetic compatibility standard according to the category of the test product and determine whether the test product is a complete device or a component of a complete device; If the test product is a complete device, directly connect the test product to the artificial power network; If the test product is a component of a complete device, obtain at least one composition scheme of the connection functional equipment required for the test product to operate according to the product description of the test product; Select a group of schemes with the least number of functional devices to be connected from at least one composition scheme, select corresponding functional devices and test products according to the scheme for assembly, and then connect the test product and the connected functional devices to the artificial power network.
3. The electromagnetic compatibility experiment monitoring system according to claim 1, characterized in that: Two test modes are also included: EMI test mode, used to test the test product's ability to generate electromagnetic interference; The EMS test mode is used to test the test product's ability to resist electromagnetic interference.
4. The electromagnetic compatibility experiment monitoring system according to claim 3, characterized in that: The EMI test mode specifically includes: Radiation test, used to test the intensity of electromagnetic radiation generated by the test product in the working environment; Conduction test is used to test the strength of electromagnetic interference conducted by the test product to other devices through the conduction path of power line / signal line / ground line; The EMS test mode specifically includes: Radiation resistance test, used to test the sensitivity of the test product to electromagnetic field interference within the working environment; The conduction resistance test is used to test the sensitivity of the test product to receive electromagnetic interference through the conduction path of power line / signal line / ground line; Electrostatic discharge test, used to test the sensitivity of the test product in an electrostatic discharge environment; Transient voltage test is used to test the sensitivity of the test product under changing voltage conditions.
5. The electromagnetic compatibility experiment monitoring system according to claim 4, characterized in that: The specific test steps of the radiation test include: Connect the working circuit in the order of power grid - isolation transformer - artificial power network - test product module; Install a near-field probe at the RF input port of the EMC measurement module to form a measurement circuit, and place the near-field probe within 1-2 cm around each test port of the test product to perform spectrum analysis on the electromagnetic waves radiated by the test product; The test port includes at least one of the test product housing / AC power line / DC power line / ground line / signal line / process control line; The specific test steps of the conduction test include: Connect the working circuit in the order of power grid - isolation transformer - artificial power network - test product module; The RF input port of the EMC measurement module is connected to the test product through a limiter, a RF switch, and a cable in sequence to form a measurement circuit, and a spectrum analysis is performed on the electromagnetic waves transmitted by the test product through the conduction path.
6. The electromagnetic compatibility experiment monitoring system according to claim 5, characterized in that: The specific test steps of the radiation resistance test include: Based on the conduction test, an antenna is used to generate a simulated electromagnetic field and a spectrum analysis is performed on the electromagnetic waves transmitted by the test product through the conduction path; The specific test steps of the anti-conduction test include: On the basis of the above conduction test, a conduction interference simulation device is installed between the artificial power supply network and the test product module, and a spectrum analysis is performed on the electromagnetic waves conducted by the test product through the conduction path; The specific test steps of the electrostatic discharge test include: Based on the conduction test, an electrostatic discharge generator is used to generate static electricity and apply it to the test product, and the voltage / current changes of the test product are analyzed; The specific test steps of the transient voltage test include: On the basis of the conduction test, a voltage drop generating device is installed between the artificial power supply network and the test product, and the voltage / current changes of the test product are analyzed.
Citation Information
Patent Citations
Power equipment test method based on transformer substation electromagnetic interference and temperature and humidity simulation
CN109307815A
Circuit board operation test system and test method thereof
CN116540067A
EMI power supply filter reliability test system and method
CN117452103A
Electromagnetic compatibility testing device
CN217931869U
Conduction immunity testing device
JP2005189082A
