A digital refiner pulping system optimization control method

By dividing the classification into sub-time periods in the grinding mill pulping system, analyzing the working status data and slurry flow rate differences, and optimizing the filling speed, the problem that the grinding pulping system cannot accurately reflect the operating status is solved, and the pulping effect of the mill is improved. and control accuracy.

CN118454883BActive Publication Date: 2024-10-29山东创宇能源科技股份有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410938858.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-10-29
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

When the existing mill pulping system processes slag, due to discrete differences between parameters and historical data, it cannot accurately reflect the operating status of the mill, resulting in poor optimization control effects.

Method used

By obtaining the historical and current working status data of the mill, it divides different categories into sub-time periods, calculates the concentration value and changing trend of the data, and combines the particle distribution histogram and the slurry flow rate difference to optimize the filling speed to improve the pulping effect of the mill. .

Benefits of technology

It achieves accurate characterization and optimal control of the operating status of the mill, improving the overall performance and efficiency of the mill pulping system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118454883B_ABST
    Figure CN118454883B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of crushing optimization control, and specifically to a method for optimizing and controlling a digital mill pulping system. The method divides a historical time period into different categories of sub-time periods, and obtains a data median value based on the state difference of each type of working state data at all moments in each category of sub-time period in the historical time period and the changing trend of the state difference; obtains a working state index based on the difference between the state difference of the working state data at the target moment and the data median value of the working state data in the category sub-time period to which the target moment belongs, the asymmetry of the particle distribution histogram, and the difference in slurry flow at the target moment and at the moment in the historical time period, and optimizes the mill filling speed in combination with the difference in mill filling speed between the historical time period and the target moment. The present invention analyzes the working state data, slurry flow and mill filling speed at the target moment and the historical time period to improve the effect of optimizing and controlling the mill pulping system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mill pulverization optimization control, and in particular to a digital mill pulping system optimization control method. Background Art

[0002] Cities produce a lot of garbage every day. Landfilling or directly incinerating the garbage is not environmentally friendly. Domestic garbage can be used as raw materials for thermal power generation after incineration. The slag after incineration can be recycled, such as producing environmentally friendly bricks or mortar. Incineration slag is an inevitable by-product of the garbage incineration process. Slag treatment can improve economic benefits while protecting the environment. The slag needs to be crushed multiple times during the slag treatment process. The effect of slag crushing greatly affects the subsequent treatment effect. Therefore, it is necessary to adjust the parameter settings of the mill according to the grinding effect of the slag to optimize the mill control and improve the grinding effect.

[0003] The existing method determines the abnormal situation of the mill operation state through the discrete difference between the parameters of the mill when it is working and the historical data, and then adjusts the mill parameters; the material content of the slag after waste incineration itself is not fixed. Although the same mill parameters are set, there will be differences in the parameters when the mill is working, resulting in the discrete difference between the parameters when the mill is working and the historical data cannot accurately reflect the operating state of the mill, and thus the effect of optimizing the control of the mill pulping system is poor. Summary of the invention

[0004] In order to solve the technical problem that the discrete difference between the parameters and historical data during the operation of the mill cannot accurately reflect the operating state of the mill, resulting in poor optimization control effect of the mill pulping system, the purpose of the present invention is to provide a digital mill pulping system optimization control method, and the technical scheme adopted is as follows:

[0005] The present invention proposes a digital refiner pulping system optimization control method, the method comprising:

[0006] Obtain the state difference of each working state data of the mill at each moment in the historical time period and the current time period, as well as the particle distribution histogram of the current time period; select the target moment from the current time period;

[0007] Divide the historical time period into different categories of sub-time periods; obtain the data set value of each type of work status data in each category of sub-time period according to the state difference of each type of work status data at all times in each category of sub-time period in the historical time period and the change trend of the state difference;

[0008] According to the difference between the state difference of all working state data at the target moment and the data set value of each working state data in the sub-time period of the category to which the target moment belongs, the asymmetry degree of the particle distribution histogram, and the difference between the slurry flow rate at the target moment and each moment in the historical time period, the working state index of the mill at the target moment is obtained;

[0009] The filling speed of the mill is optimized according to the difference between the filling speed of the mill in the historical time period and the target time, and the working state index.

[0010] Furthermore, the method of dividing the historical time period into sub-time periods of different categories includes:

[0011] Obtaining a change trend value of each type of working status data at each moment in the historical time period according to the difference between the state difference values ​​of each type of working status data at each moment in the historical time period and its adjacent moments;

[0012] The average value of the change trend values ​​of all working status data at each moment in the historical time period is recorded as the comprehensive change value of the corresponding moment; each preset period in the historical time period is divided into two sub-time periods based on the comprehensive change value; for each sub-time period, the average value of the comprehensive change values ​​of all moments in the sub-time period is recorded as the judgment reference value of the corresponding sub-time period; for the sub-time period of each preset cycle, the sub-time period corresponding to the smallest judgment reference value is recorded as the first category sub-time period, and the sub-time period corresponding to the largest judgment reference value is recorded as the second category sub-time period.

[0013] Furthermore, the method for obtaining the change trend value of each working status data at each moment in the historical time period includes:

[0014] Any moment is selected from the historical time period as the analysis moment, and the difference between the state difference values ​​of each working state data at the analysis moment and its adjacent previous moment and adjacent next moment is taken as the state proximity difference of each working state data at the analysis moment; the difference between the two state proximity differences of each working state data at the analysis moment is normalized to obtain the change trend value of each working state data at the analysis moment.

[0015] Furthermore, the method for obtaining the data set value of each type of working status data in each category sub-time period includes:

[0016] The change trend value of each type of working status data at each moment in the first category sub-time period in the historical time period is recorded as the discrete initial value of each type of working status data at the corresponding moment; any second category sub-time period is selected from the historical time period as the target period, and for each type of working status data, the target period is matched with the working status data of the remaining second category sub-time periods in the historical time period except the target period by using the dynamic time warping algorithm, so as to obtain the matching data of the working status data at each moment in the target period; the variance of the working status data at each moment in the target period and the matching data thereof is recorded as the discrete initial value of the working status data at the corresponding moment;

[0017] A negative correlation mapping is performed on the discrete initial value of each working status data at each moment in the historical time period to obtain the discrete final value of each working status data at the corresponding moment; the average of the product of the state difference of each working status data at all moments in the same category sub-time period in the historical time period and the discrete final value is taken as the data set value of each working status data in each category sub-time period.

[0018] Furthermore, the method for obtaining the working status index of the mill at the target time includes:

[0019] Based on the number of moments included in each category sub-time period, determine the category sub-time period to which the target moment belongs;

[0020] Obtain an abnormal fluctuation index at the target moment according to the difference between the state difference value of all work state data at the target moment and the data set value of each work state data in the sub-time period of the category to which the target moment belongs, and the change trend value of all work state data at the target moment;

[0021] Obtaining a pulping effect index at the target moment according to the asymmetry of the particle distribution histogram and the difference between the slurry flow rate at the target moment and each moment in the historical time period;

[0022] According to the abnormal fluctuation index and the pulping effect index, the working status index at the target moment is obtained.

[0023] Furthermore, the method for determining the category sub-time period to which the target moment belongs includes:

[0024] The average number of moments included in all second-category sub-time periods in the historical time period is recorded as the startup length; the number of moments included in the time period between the start time of the current time period and the target time is counted and recorded as the benchmark length; it is determined whether the benchmark length is less than or equal to the startup length, if so, the target time belongs to the second-category sub-time period, if not, the target time belongs to the first-category sub-time period.

[0025] Furthermore, the method for obtaining the abnormal fluctuation index at the target moment includes:

[0026] The standard deviation of each work status data at all moments in each category sub-time period in the historical time period is recorded as the discrete standard index of each work status data in each category sub-time period; the difference between the state difference value of each work status data at the target moment and the median value of the data set in the category sub-time period to which the target moment belongs is used as the numerator, and the discrete standard index of the corresponding work status data in the sub-time period to which the target moment belongs is used as the denominator to obtain the ratio as the deviation index of each work status data at the target moment;

[0027] According to the deviation index and the change trend value of each working status data at the target moment, the initial fluctuation index of each working status data at the target moment is obtained; the cumulative sum of the initial fluctuation indexes of all working status data at the target moment is normalized to obtain the abnormal fluctuation index at the target moment.

[0028] Furthermore, the method for obtaining the pulping effect index at the target moment includes:

[0029] Obtain the skewness of the particle distribution histogram; record the cumulative sum of the differences between the target moment and the slurry flow at each moment in the historical time period as the flow difference value; negatively correlate the absolute value of the skewness and the product of the flow difference value to obtain the pulping effect index at the target moment.

[0030] Furthermore, the method for optimizing the filling speed of the mill according to the difference between the filling speed of the mill in the historical time period and the target time, and the working state index, comprises:

[0031] According to the difference between the mill filling speed in the historical time period and the target time, and the working state indicator, the adjustment degree at the target time is obtained;

[0032] The last moment in the current time period is recorded as the current moment; when the working status index at the target moment is less than or equal to the preset abnormal threshold, the mill filling speed at the current moment remains unchanged; when the working status index at the target moment is greater than the preset abnormal threshold, it is determined whether the skewness of the particle distribution histogram is less than 0. If so, the difference between constant 1 and the adjustment degree is used as the adjustment coefficient at the target moment; if not, the sum of constant 1 and the adjustment degree is used as the adjustment coefficient at the target moment; the mill filling speed at the target moment is weighted using the adjustment coefficient at the target moment to obtain the optimized filling speed at the current moment.

[0033] Furthermore, the method for obtaining the particle distribution histogram of the current time period includes:

[0034] Obtain the number of particles of each diameter at each sampling moment in the current time period; record the average of the number of particles of the same diameter at all sampling moments in the current time period as the average number of particles of each diameter; construct a particle distribution histogram of the current time period from each diameter of the particles and the average number of particles of each diameter.

[0035] The present invention has the following beneficial effects:

[0036] In the embodiment of the present invention, there is a large difference in the state difference of the working state data of the start-up stage and the stable stage of the mill. In order to improve the accuracy of subsequent analysis, the historical time period is divided into different categories of sub-time periods; according to the change trend of each type of working state data in the historical time period and the fluctuation of the working state data itself, that is, the state difference distribution, the average level of the state difference of each type of working state data, that is, the data median value, is quantified, and then the normal fluctuation range of the state difference of each type of working state data is determined; the target time is determined by the difference between the state difference of the working state data at the target time and the data median value of each type of working state data in the category sub-time period to which the target time belongs. The position of the state difference of each working state data in the normal fluctuation range is recorded, but the material diversity in the slag itself and the difference in data changes have a low degree of representation of the working state of the mill. Combined with the asymmetry of the particle distribution histogram and the difference in slurry flow between the target moment and the moment in the historical time period, the slurry effect is quantified to further determine the working state index of the mill, so that the working state index can accurately present the operating state of the mill; considering the operating state of the mill, combined with the direct difference in the mill filling speed between the historical time period and the target moment, the filling speed of the mill is optimized to improve the effect of optimizing the control of the mill slurry system. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0038] Figure 1 A flowchart of the steps of a digital refiner pulping system optimization control method provided by an embodiment of the present invention;

[0039] Figure 2 A flowchart of a method for obtaining a working status indicator of a grinding mill at a target time provided by an embodiment of the present invention;

[0040] Figure 3A schematic diagram of a computer device for a digital refiner pulping system optimization control device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0041] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the digital refiner pulping system optimization control method proposed by the present invention, its specific implementation method, structure, characteristics and effects, in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0042] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0043] The specific scheme of the digital refiner pulping system optimization control method provided by the present invention is described in detail below with reference to the accompanying drawings.

[0044] Embodiment 1:

[0045] The present invention proposes a digital refiner pulping system optimization control method, please refer to Figure 1 , which shows a flowchart of the steps of a digital refiner pulping system optimization control method provided by an embodiment of the present invention, the method comprising:

[0046] Step S1: Obtain the state difference of each working state data of the mill at each moment in the historical time period and the current time period, and the particle distribution histogram of the current time period; select the target moment from the current time period.

[0047] When the mill is working, various sensors are used to obtain the actual value of each working state data at each moment in the historical time period and the current time period, and the preset value of each working state data of the mill at each moment in the historical time period and the current time period is set, and the difference between the preset value and the actual value of each working state data at each moment is recorded as the state difference of each working state data at the corresponding moment. A particle size detector is installed at the mill discharge port to collect the number of particles of each diameter among all particles at the mill discharge port at each sampling moment in the current time period.

[0048] In the embodiment of the present invention, the working state data includes: mill surface temperature, grinding wheel speed, mill load and filler speed; the filler flow rate represents the speed of adding materials to the mill, adding materials to the mill once at intervals, and adding materials to the mill is water or air. Specifically, an infrared sensor is used to obtain the surface temperature of the mill, a pressure sensor is installed inside the mill to obtain the mill load, a Hall effect sensor is installed at the grinding wheel position of the mill to obtain the grinding wheel speed, and a speed sensor is installed near the feed port of the mill to obtain the material flow rate. In other embodiments of the present invention, other sensors can also be used to obtain working state data, which is not limited here. It should be noted that in the embodiment of the present invention, the preset value of the grinding wheel speed is an empirical value of 53 revolutions per minute, the preset value of the filler flow rate is an empirical value of 5 meters per minute, and the two working state data are fixed; the preset value of the mill load has a value range of between 64 Newtons and 69 Newtons, and the preset value of the mill surface temperature has a value range of between 79 degrees Celsius and 83 degrees Celsius. The specific values ​​of the mill load and the mill surface temperature at each moment need to be selected according to the specific operation of the mill. Each working state data is normalized to unify the dimension. The normalization method may be function transformation and maximum and minimum normalization. Subsequent calculations are performed using the normalized working state data.

[0049] Preferably, the method for obtaining the particle distribution histogram is: record the average of the number of particles of the same diameter at all sampling moments in the current time period as the average number of particles of each diameter; construct the particle distribution histogram of the current time period from each diameter of the particles and the average number of particles of each diameter. It should be noted that the horizontal axis of the particle distribution histogram is the particle diameter, and the vertical axis is the average number of particles of each particle diameter; the interval between two adjacent sampling moments is 5 minutes, which can be set by the implementer.

[0050] It should be noted that the working status data of the mill will show a certain periodic change with the working hours of the workers. The embodiment of the present invention uses the daily working hours as the cycle for analysis; the historical time period contains multiple preset cycles, and the duration of the current time period is less than or equal to a preset cycle. The duration of the historical time period takes the empirical value of 7 days, and the duration of each preset cycle takes the empirical value of 1 day. The collection frequency of the working status data is once every 10 seconds, which can be set by the implementer according to the specific situation.

[0051] It should be noted that in this scheme, the historical time period is selected as the time period when the mill works normally and the pulping effect is good. Then, the data of each working state at all times in the historical time period can be considered as correct data.

[0052] Step S2: Divide the historical time period into different category sub-time periods; obtain the data set value of each working status data in each category sub-time period according to the state difference of each working status data at all times in each category sub-time period in the historical time period and the change trend of the state difference.

[0053] Put the slag into the mill, add steel balls as abrasives, and crush the slag by rotating the mill. When controlling the mill, it is necessary to feedback and adjust it based on the working status of the mill. According to the working load of the mill, the abnormal state of the mill can be divided into "under-grinding" and "full grinding". The working state data of the mill and the particle situation at the discharge port can be analyzed to determine the state of the mill.

[0054] The "under-grinding" operation of the mill refers to an abnormal operating state in which there is less material in the mill. This operating state occurs for a period of time after the mill has just started running. "Under-grinding" operation is not allowed during the mill operation control process. Due to the small amount of material stored in the mill, the number of times the steel balls hit the mill barrel wall increases, increasing the mill loss and failure probability, and reducing the mill production efficiency. At this time, the mill feed rate should be increased accordingly until the mill returns to normal operation.

[0055] The "saturated grinding" operation of the mill refers to an abnormal operating state in which there is too much material in the mill. At this time, the material in the mill is piled up, and the grinding media and the material in the mill cannot be fully ground, resulting in poor mill efficiency. The "saturated grinding" operation state should be avoided during the operation of the mill. If it continues for a long time, it will not only cause energy waste and mill failure, but also affect the final product quality. At this time, the feed rate of the mill should be reduced immediately. After the mill returns to stability, the feed rate of the mill should be adjusted to keep the mill running stably.

[0056] Usually, the working condition of the mill is adjusted according to some parameters set when the mill is working. Since there will be a certain load when the mill is working, there will be a certain difference between the actual value of the working status data and the preset value. This difference belongs to the normal fluctuation range. According to the above logic, the content of different substances in the slag, for example, the wear resistance of the slag is greatly increased when iron material appears. At the same time, the state of the mill itself will be affected by many factors, resulting in a certain lag in the influence of the mill. Therefore, it is necessary to determine the working state of the mill when adjusting the parameters.

[0057] Step S210: Divide the historical time period into sub-time periods of different categories.

[0058] According to the fluctuation distribution of the working state data at all times in the historical time period, i.e., the state difference, and the changing trend of the state difference, the normal fluctuation range of each working state data is obtained. The grinding mill has different changes in different working stages. When calculating the fluctuation range of normal data changes, it is necessary to consider its own changes in different time stages. The "under-grinding" situation may occur in the startup stage and is not easy to avoid. Therefore, the changes in the working state data in the startup stage may be different from those in other stages. Therefore, the historical time period needs to be divided into different categories of sub-time periods.

[0059] Step S211: obtaining a change trend value of each type of working status data at each moment in the historical time period according to the difference between the state difference values ​​of each type of working status data at each moment in the historical time period and its adjacent moments.

[0060] Preferably, the method for obtaining the change trend value in the embodiment of the present invention is: select any moment in the historical time period as the analysis moment, and use the difference between the state difference values ​​of each work state data at the analysis moment and the previous moment and the next moment respectively as the state proximity difference of each work state data at the analysis moment; normalize the difference between the two state proximity differences of each work state data at the analysis moment to obtain the change trend value of each work state data at the analysis moment. It should be noted that the change trend value analysis is not performed for each work state data at the first moment and the last moment in the historical time period.

[0061] Assuming that the analysis time is the i-th time in the historical time period, in a specific implementation of the embodiment of the present invention, the change trend value at the analysis time is expressed by the formula:

[0062]

[0063] In the formula, is the change trend value of each working status data at the i-th moment in the historical time period; is the state difference of each working state data at the i-th moment in the historical time period; is the state difference of each working state data at the i-1th moment in the historical time period; is the state difference of each working state data at the i+1th moment in the historical time period; is the absolute value function; Norm is the normalization function. In the embodiment of the present invention, the Norm function is used to implement the normalization process. In the embodiment of the present invention, other normalization methods may also be selected, such as function conversion, maximum and minimum normalization, etc., which are not limited here. It should be noted that when the change trend value The larger the value is, the more obvious the unsteady fluctuation is in the local range of each working state data at the i-th moment in the historical time period, that is, the analysis moment. The method for obtaining the change trend value at each moment in the historical time period is the same as the method for obtaining the change trend value at the analysis moment.

[0064] Step S212: record the average value of the change trend values ​​of all working status data at each moment in the historical time period as the comprehensive change value of the corresponding moment; divide each preset period in the historical time period into two sub-time periods based on the comprehensive change value; for each sub-time period, record the average value of the comprehensive change values ​​of all moments in the sub-time period as the judgment reference value of the corresponding sub-time period; for the sub-time period of each preset cycle, record the sub-time period corresponding to the smallest judgment reference value as the first category sub-time period, and record the sub-time period corresponding to the largest judgment reference value as the second category sub-time period.

[0065] The change trend value shows the degree of unsteady fluctuation of each working state data at each moment. Since "under-grinding" may occur in the startup phase and is not easy to avoid, the fluctuation of the working state data in the startup phase is large, while the fluctuation of the working state data in the stable phase after the startup phase is small. This embodiment considers the fluctuation of all working state data at each moment to obtain the comprehensive change value at each moment, and uses it to divide the preset period. The first category sub-time period is the stable phase of the preset period, and the second category sub-time period is the startup phase of the preset period.

[0066] In the embodiment of the present invention, the method for dividing the preset period into two sub-time periods is: using the maximum inter-class variance method for the comprehensive change values ​​of all moments in each preset period to obtain the segmentation change value, taking the continuous time period consisting of the moments corresponding to the comprehensive change values ​​less than or equal to the segmentation change value as the first sub-time period, and taking the remaining time periods in the preset period except the first sub-time period as the second sub-time period. Among them, the maximum inter-class variance method is a well-known technology for those skilled in the art and will not be described in detail here.

[0067] In other embodiments of the present invention, within each preset period, the absolute value of the difference between the comprehensive change values ​​of each two adjacent moments is calculated and recorded as the change difference between the corresponding two moments, the moment corresponding to the smallest comprehensive change value of the two moments corresponding to the largest change difference is recorded as the division moment, and the time period between the start moment of the preset period and the division moment is taken as the first sub-time period; the remaining time periods within the preset period except the first sub-time period are taken as the second sub-time period.

[0068] Step S220: according to the state difference of each type of work state data at all times in each type of sub-time period in the historical time period and the change trend of the state difference, obtain the data set value of each type of work state data in each type of sub-time period.

[0069] According to the changing trend of each work status data in the historical time period and the fluctuation of the work status data itself, that is, the state difference distribution, the average level of the state difference of each work status data, that is, the data median, is quantified, and then the normal fluctuation range of the state difference of each work status data is determined.

[0070] Preferably, the method for obtaining the data center value is: the change trend value of each type of work status data at each moment in the first category sub-time period within the historical time period is recorded as the discrete initial value of each type of work status data at the corresponding moment; any second category sub-time period is selected from the historical time period and recorded as the target segment, and for each type of work status data, the target segment is matched with the work status data of the remaining second category sub-time periods except the target segment in the historical time period using the dynamic time warping algorithm to obtain the matching data of the work status data at each moment in the target segment; the variance of the work status data at each moment in the target segment and its matching data is recorded as the discrete initial value of the work status data at the corresponding moment; the discrete initial value of each type of work status data at each moment in the historical time period is negatively correlated and mapped to obtain the discrete final value of each type of work status data at the corresponding moment; the mean of the product of the state difference value and the discrete final value of each type of work status data at all moments in the same category sub-time period within the historical time period is taken as the data center value of each type of work status data in each category sub-time period.

[0071] It should be noted that the fluctuation of each working state data in the stable stage is caused by the uneven slag material in the mill. When calculating the state difference distribution, attention should be paid to the data with stable changes. The fluctuation of the state difference of each working state data in the startup stage is relatively obvious. When analyzing the fluctuation range of the state difference of each working state data in the startup stage, that is, the second category sub-time period, the stage comparison under different preset cycles should be considered. In the embodiment of the present invention, the dynamic time warping algorithm is used to match each working state data in the second category sub-time period in the historical time period. Among them, the dynamic time warping algorithm is a well-known technology for those skilled in the art and will not be repeated here. In each category sub-time period, the state difference is the self-change of each working state data at each moment, which is the main body of the quantitative data fluctuation. The discrete initial value is used to adjust the self-change of the working state data; the smaller the discrete initial value at the moment in the first category sub-time period, the more stable the data fluctuation in the local range of each working state data at each moment, the smaller the discrete initial value at the moment in the second category sub-time period, the closer each working state data in the startup stage of different preset cycles in the historical time period, and the more concentrated the state difference distribution of each working state data. Therefore, it is necessary to perform negative correlation mapping on the discrete initial value machine.

[0072] In a specific implementation of the embodiment of the present invention, the data set value of each type of working status data in each category sub-time period is expressed by a formula:

[0073]

[0074] In the formula, is the data set value of each working status data in the c-th category sub-time period; A is the total number of preset cycles in the historical time period; The total number of moments in the cth category sub-time period of the ath preset period of the historical time period; is the discrete initial value of the bth moment in the cth category sub-time period of the ath preset period of the historical time period; The state difference at the bth moment in the cth category sub-time period of the ath preset period of the historical time period; is a preset positive number, and takes the empirical value of 0.1, which is used to prevent the denominator from being 0, resulting in meaningless fractions; c takes 1 and 2. In the embodiment of the present invention, the reciprocal of the discrete initial value is taken to achieve negative correlation mapping, and the exp (-x) function can also be used for negative correlation mapping.

[0075] It should be noted that the larger the data concentration value of each type of work status data in each category sub-time period, the more concentrated the distribution of the state difference value of each type of work status data at all times in each category sub-time period in the historical time period, the greater the possibility that the data center value represents the average level of the state difference value of each type of work status data, and the higher the accuracy of obtaining the normal fluctuation range of the state difference value of each type of work status data.

[0076] Get the standard deviation of the state difference of each working state data at all times in the c-th category sub-time period in the historical time period , then the normal fluctuation range of each working status data in the c-th category sub-time period is It should be noted that It is the average level of the state difference of each working state data in each category sub-time period; since the mill load is certain for each working state data, the state difference of each working state data in each category sub-time period is normally distributed.

[0077] Step S3: According to the difference between the state difference of all working state data at the target moment and the difference in the data set value of each working state data in the sub-time period of the category to which the target moment belongs, the asymmetry of the particle distribution histogram, and the difference in slurry flow rate between the target moment and each moment in the historical time period, the working state index of the mill at the target moment is obtained.

[0078] The difference between the state difference of all working state data at the target moment and the data set value of each working state data in the sub-time period of the category to which the target moment belongs is used to determine the position of the state difference of each working state data at the target moment in the normal fluctuation range, and then determine the abnormal working state of the mill at the current moment, that is, the abnormal fluctuation index. The abnormal fluctuation index only analyzes the data change difference through the working state data of the mill, but the material diversity of the slag itself and the data change difference have a low degree of characterization of the working state of the mill. In this case, the working state of the mill is further determined by combining the slurry effect in the mill discharge port. The slurry effect is quantified by the asymmetry of the particle distribution histogram and the difference in slurry flow at the target moment and each moment in the historical time period.

[0079] See also Figure 2 , which shows a flowchart of the steps of a method for obtaining a working status index of a mill at a target time provided by an embodiment of the present invention, the method comprising:

[0080] Step S310: Determine the category sub-time period to which the target time belongs based on the number of time periods included in each category sub-time period.

[0081] Preferably, the method for determining the category sub-time period to which the target moment belongs is: recording the average of the number of moments included in all second-category sub-time periods in the historical time period as the startup length; counting the number of moments included in the time period between the start time of the current time period and the target time, and recording it as the benchmark length; judging whether the benchmark length is less than or equal to the startup length, if so, the target moment belongs to the second-category sub-time period, if not, the target moment belongs to the first-category sub-time period.

[0082] It should be noted that the second category sub-time period represents the startup phase of the preset cycle and is located at the beginning of the preset cycle. In this scheme, the current time period is at most one preset cycle. Therefore, whether the target time is in the startup phase of the current time period is determined by whether the benchmark length is less than or equal to the startup length.

[0083] Step S320: Obtain the abnormal fluctuation index at the target moment according to the difference between the state difference of all work state data at the target moment and the data set value of each work state data in the category sub-time period to which the target moment belongs, as well as the change trend value of all work state data at the target moment.

[0084] Preferably, the method for obtaining the abnormal fluctuation index at the target moment is as follows: the standard deviation of each working status data at all moments in each category sub-time period in the historical time period is recorded as the discrete standard index of each working status data in each category sub-time period; the difference between the state difference value of each working status data at the target moment and the data concentration value of the category sub-time period to which the target moment belongs is used as the numerator, and the discrete standard index of the corresponding working status data in the sub-time period to which the target moment belongs is used as the denominator to obtain the ratio, which is used as the deviation index of each working status data at the target moment; according to the deviation index and the change trend value of each working status data at the target moment, the initial fluctuation index of each working status data at the target moment is obtained; the cumulative sum of the initial fluctuation indexes of all working status data at the target moment is normalized to obtain the abnormal fluctuation index at the target moment.

[0085] In a specific implementation of the embodiment of the present invention, a method for obtaining an abnormal fluctuation index at a target time includes:

[0086]

[0087] In the formula, is the abnormal fluctuation index at the target time; k is the target time; H is the number of types of working status data; is the state difference under the h-th working state data at the target moment; is the data set value of the hth type of working status data in the sub-time period of the category to which the target moment belongs; It is the discrete standard index of the hth type of working status data in the sub-time period of the category to which the target moment belongs; is the change trend value of the kth working status data at the target moment; is the deviation standard of the h-th working status data at the target time; is the initial fluctuation index of the h-th working state data at the target time; Norm is the normalization function; is the absolute value function.

[0088] It should be noted that the trend value The local discrete trend of the hth working state data at the target moment is presented; due to the diversity of slag materials, the wear resistance of different materials is different, resulting in local fluctuations in the working state data at each moment. When is larger, the local time fluctuation of the h-th working state data at the target time may be caused by the material difference of the slag. The design logic of the reference normal distribution standard deviation is used to determine the position of the state difference of the h-th working state data in the normal fluctuation range at the target time; when When the value is larger, the possibility that the state difference of the h-th working state data at the target time deviates from the normal fluctuation range is greater, and when the change trend value When the value is larger, that is, the h-th working state data at the target time fluctuates steadily and the change direction is far away from the middle level of the normal fluctuation range. , the working state data of the mill at the target time is abnormally fluctuating, and the abnormal fluctuation index The bigger.

[0089] Step S330: Obtain the pulping effect index at the target moment according to the asymmetry of the particle distribution histogram and the difference between the slurry flow rate at the target moment and each moment in the historical time period.

[0090] The abnormal fluctuation index only analyzes the data change difference through the working status data of the mill, but the material diversity in the slag itself and the data change difference have a low degree of characterization of the working status of the mill. Combined with the slurry effect in the mill discharge port, the pulping effect index is obtained to improve the accuracy of determining the working status of the mill.

[0091] An electromagnetic flow sensor is installed at the discharge port of the mill to collect the slurry flow at the discharge port at each moment; the sampling frequency of the slurry flow is the same as the sampling frequency of the working status data.

[0092] Preferably, the method for obtaining the pulping effect index is: obtaining the skewness of the particle distribution histogram; recording the cumulative sum of the differences between the target moment and the slurry flow rate at each moment in the historical time period as the flow rate difference value; performing negative correlation mapping on the absolute value of the skewness and the product of the flow rate difference value to obtain the pulping effect index at the target moment. Among them, the method for obtaining the skewness of the histogram is a well-known method and will not be repeated here.

[0093] It should be noted that if the pulping effect of the mill is good, the particle distribution histogram should be close to the normal distribution, and the skewness of the particle distribution histogram It should be close to 0; when the absolute value of the skewness of the particle distribution histogram is smaller, the better the grinding effect of the mill on the slag is, and the better the pulping effect is; this scheme considers that the data collected in the historical time period is correct data, and when the slurry flow rate at the target time is closer to the time in the historical time period, the better the pulping effect is. Therefore, the absolute value of the skewness of the particle distribution histogram and the flow difference value are negatively correlated with the pulping effect index.

[0094] The pulping effect index at the target time in the embodiment of the present invention is expressed by the formula:

[0095]

[0096] In the formula, is the pulping effect index at the target moment; k is the target moment; p is the skewness of the particle distribution histogram; Z is the total number of moments in the historical time period; is the slurry flow rate of the mill at the target time; is the slurry flow rate of the mill at the zth moment in the historical time period; is the flow difference value; exp is the exponential function with the natural constant e as the base; is an absolute value function. In this embodiment, negative correlation mapping is achieved through the exp(-x) function.

[0097] Step S340: acquiring the working status index at the target time according to the abnormal fluctuation index and the pulping effect index.

[0098] The abnormal fluctuation index presents the abnormality of the working status data at the target moment. The larger the abnormal fluctuation index is, the more obvious the abnormality of the working status data is, and the greater the possibility that the mill is in abnormal operation at the target moment; the pulping effect index presents the pulping effect of the mill at the target moment. The larger the pulping effect index is, the smaller the possibility that the mill is in abnormal operation at the target moment. Therefore, the abnormal fluctuation index is positively correlated with the working status index, and the pulping effect index is negatively correlated with the working status index. In the embodiment of the present invention, the ratio of the abnormal fluctuation index to the pulping effect index at the target moment is used as the lower working status index at the target moment; the correlation between the abnormal fluctuation index and the pulping effect index and the working status index can also be constructed through other basic mathematical operations, such as the difference, which is not limited or elaborated here.

[0099] Step S4: Optimize the filling speed of the mill according to the difference between the filling speed of the mill in the historical time period and the target time, and the working status index.

[0100] According to the difference between the mill filling speed in the historical time period and the target time, and the working state index, the adjustment degree at the target time is obtained. In a specific implementation of the embodiment of the present invention, the adjustment degree at the target time is expressed by the formula:

[0101]

[0102] In the formula, is the adjustment degree at the target moment; k is the current moment; Set working status indicators for the target time; The mill filling speed at the target time; is the mill filling speed during the historical time period; is the absolute value function; Norm is the normalization function.

[0103] It should be noted that the working status indicator The larger the value, the more obvious the abnormality of the working status data at the target time, and the greater the degree of adjustment required; in this scheme, the data in the historical time period is considered to be correct data, and the mill filling speed C in the historical time period is suitable for the mill operation. The larger the value, the less suitable the mill filling speed is for the mill at the target time, and the greater the degree of adjustment required. Therefore, the difference in mill filling speed between the historical time period and the target time, and the working status index are positively correlated with the degree of adjustment.

[0104] The diversity of domestic waste will lead to the diversity of slag material content. Different materials have different wear resistance, so the same mill parameters and the same slag input may lead to different subsequent results. The speed of the mill generally does not need to be adjusted. The slag feeding conditions and the corresponding medium conditions can be adjusted to achieve optimal control of the mill pulping system. In the embodiment of the present invention, the mill filling speed, that is, the speed of adding materials into the mill, is selected for control.

[0105] In the embodiment of the present invention, a target moment is selected from the current time period, the second to last moment in the current time period is taken as the target moment, and the last moment in the current time period is recorded as the current moment. The state of the mill itself is affected by many factors, which may cause a certain hysteresis in the influence of the mill. In this scheme, the data of the target moment k is used to adjust the filling speed of the mill in the time period between the k+1 moment, that is, the current moment and the k+2 moment. Among them, the k+2 moment is a future moment.

[0106] When the working status index at the target moment is less than or equal to the preset abnormal threshold, the mill is in a normal working state, and the mill filling speed at the current moment remains unchanged; when the working status index at the target moment is greater than the preset abnormal threshold, determine whether the skewness of the particle distribution histogram is less than 0. If so, take the difference between constant 1 and the adjustment degree as the adjustment coefficient at the target moment; if not, take the sum of constant 1 and the adjustment degree as the adjustment coefficient at the target moment; take the product of the adjustment coefficient at the target moment and the mill filling speed at the target moment as the optimized filling speed at the current moment.

[0107] It should be noted that, in the embodiment of the present invention, the skewness of the particle distribution histogram presents the asymmetry of the histogram. When the mill is "under-grinded", there is less material in the mill, and the grinding is too sufficient to make the diameter of most particles small. The particle distribution histogram is right-skewed, and the skewness of the particle distribution histogram is positive. The mill feed should be increased accordingly, and the filling speed should be increased; when the mill is "saturated", the slag in the mill is not ground sufficiently, and the particle diameter index is relatively large, then the particle distribution histogram is left-skewed, and the skewness of the particle distribution histogram is negative. The mill feed should be reduced immediately, and the filling speed should be reduced. The preset abnormal threshold takes the empirical value of 0.6, and the implementer can set it according to the specific situation.

[0108] So far, the present invention is completed.

[0109] In summary, in an embodiment of the present invention, the historical time period is divided into different categories of sub-time periods, and the data median value is obtained according to the state difference of each type of working state data at all moments in each category of sub-time period in the historical time period and the changing trend of the state difference; the working state index is obtained according to the difference between the state difference of the working state data at the target moment and the data median value of the working state data in the category sub-time period to which the target moment belongs, the asymmetry of the particle distribution histogram, and the difference in slurry flow at the target moment and the moment in the historical time period, and the filling speed of the mill is optimized in combination with the difference in mill filling speed between the historical time period and the target moment. The present invention analyzes the working state data, slurry flow and mill filling speed at the target moment and the historical time period to improve the effect of optimizing the control of the mill pulping system.

[0110] Embodiment 2:

[0111] Figure 3 A computer device schematic diagram of a digital refiner pulping system optimization control device provided by an embodiment of the present invention. For example, Figure 3 As shown, the computer device includes: a memory 501, a processor 502, and a computer program 503 stored in the memory 501 and running on the processor 502, wherein when the processor 502 executes the computer program 503, the computer device can execute any one of the digital refiner pulping system optimization control methods introduced above.

[0112] In addition, an embodiment of the present application also protects a device, which may include a memory and a processor, wherein the memory stores executable program code, and the processor is used to call and execute the executable program code to execute a digital grinding mill pulping system optimization control method provided in an embodiment of the present application.

[0113] In this embodiment, the functional modules of the device can be divided according to the above method example. For example, each functional module can be corresponded, or two or more functions can be integrated into one processing module. The above integrated module can be implemented in the form of hardware. It should be noted that the division of modules in this embodiment is schematic and is only a logical function division. There may be other division methods in actual implementation.

[0114] It should be understood that the device provided in this embodiment is used to execute the above-mentioned digital refiner pulping system optimization control method, and thus can achieve the same effect as the above-mentioned implementation method.

[0115] In the case of an integrated unit, the device may include a processing module and a storage module. When the device is applied to a device, the processing module may be used to control and manage the actions of the device. The storage module may be used to support the device to execute mutual program codes, etc.

[0116] The processing module may be a processor or a controller, which may implement or execute various exemplary logic blocks, modules and circuits disclosed in the present application. The processor may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of digital signal processing (DSP) and a microprocessor, etc. The storage module may be a memory.

[0117] It should be noted that the sequence of the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0118] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

[0119] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A digital refiner pulping system optimization control method, characterized in that: The method includes: Obtain the state difference of each working state data of the mill at each moment in the historical time period and the current time period, as well as the particle distribution histogram of the current time period; select the target moment from the current time period; Divide the historical time period into different categories of sub-time periods; obtain the data set value of each type of work status data in each category of sub-time period according to the state difference of each type of work status data at all times in each category of sub-time period in the historical time period and the change trend of the state difference; According to the difference between the state difference of all working state data at the target moment and the data set value of each working state data in the sub-time period of the category to which the target moment belongs, the asymmetry degree of the particle distribution histogram, and the difference between the slurry flow rate at the target moment and each moment in the historical time period, the working state index of the mill at the target moment is obtained; The filling speed of the mill is optimized according to the difference between the filling speed of the mill in the historical time period and the target time, and the working state index.

2. The method for optimizing and controlling a digital pulping system according to claim 1, characterized in that: The method for dividing the historical time period into sub-time periods of different categories includes: Obtaining a change trend value of each type of working status data at each moment in the historical time period according to the difference between the state difference values ​​of each type of working status data at each moment in the historical time period and its adjacent moments; The average value of the change trend values ​​of all working status data at each moment in the historical time period is recorded as the comprehensive change value of the corresponding moment; each preset period in the historical time period is divided into two sub-time periods based on the comprehensive change value; for each sub-time period, the average value of the comprehensive change values ​​of all moments in the sub-time period is recorded as the judgment reference value of the corresponding sub-time period; for the sub-time period of each preset cycle, the sub-time period corresponding to the smallest judgment reference value is recorded as the first category sub-time period, and the sub-time period corresponding to the largest judgment reference value is recorded as the second category sub-time period.

3. The method for optimizing and controlling a digital pulping system according to claim 2, characterized in that: The method for obtaining the change trend value of each working status data at each moment in the historical time period includes: Any moment is selected from the historical time period as the analysis moment, and the difference between the state difference values ​​of each working state data at the analysis moment and its adjacent previous moment and adjacent next moment is taken as the state proximity difference of each working state data at the analysis moment; the difference between the two state proximity differences of each working state data at the analysis moment is normalized to obtain the change trend value of each working state data at the analysis moment.

4. The method for optimizing and controlling a digital pulping system according to claim 3, characterized in that: The method for obtaining the data set value of each type of working status data in each category sub-time period includes: The change trend value of each type of working status data at each moment in the first category sub-time period in the historical time period is recorded as the discrete initial value of each type of working status data at the corresponding moment; any second category sub-time period is selected from the historical time period as the target period, and for each type of working status data, the target period is matched with the working status data of the remaining second category sub-time periods in the historical time period except the target period by using the dynamic time warping algorithm, so as to obtain the matching data of the working status data at each moment in the target period; the variance of the working status data at each moment in the target period and the matching data thereof is recorded as the discrete initial value of the working status data at the corresponding moment; A negative correlation mapping is performed on the discrete initial value of each working status data at each moment in the historical time period to obtain the discrete final value of each working status data at the corresponding moment; the average of the product of the state difference of each working status data at all moments in the same category sub-time period in the historical time period and the discrete final value is taken as the data set value of each working status data in each category sub-time period.

5. The method for optimizing and controlling a digital pulping system according to claim 3, characterized in that: The method for obtaining the working status index of the grinding mill at the target time includes: Based on the number of moments included in each category sub-time period, determine the category sub-time period to which the target moment belongs; Obtain an abnormal fluctuation index at the target moment according to the difference between the state difference value of all work state data at the target moment and the data set value of each work state data in the sub-time period of the category to which the target moment belongs, and the change trend value of all work state data at the target moment; Obtaining a pulping effect index at the target moment according to the asymmetry of the particle distribution histogram and the difference between the slurry flow rate at the target moment and each moment in the historical time period; According to the abnormal fluctuation index and the pulping effect index, the working status index at the target moment is obtained.

6. A digital refiner pulping system optimization control method according to claim 5, characterized in that: The method for determining the category sub-time period to which the target moment belongs includes: The average number of moments included in all second-category sub-time periods in the historical time period is recorded as the startup length; the number of moments included in the time period between the start time of the current time period and the target time is counted and recorded as the benchmark length; it is determined whether the benchmark length is less than or equal to the startup length, if so, the target time belongs to the second-category sub-time period, if not, the target time belongs to the first-category sub-time period.

7. The method for optimizing and controlling a digital pulping system according to claim 5, characterized in that: The method for obtaining the abnormal fluctuation index at the target time includes: The standard deviation of each work status data at all moments in each category sub-time period in the historical time period is recorded as the discrete standard index of each work status data in each category sub-time period; the difference between the state difference value of each work status data at the target moment and the median value of the data set in the category sub-time period to which the target moment belongs is used as the numerator, and the discrete standard index of the corresponding work status data in the sub-time period to which the target moment belongs is used as the denominator to obtain the ratio as the deviation index of each work status data at the target moment; According to the deviation index and the change trend value of each working status data at the target moment, the initial fluctuation index of each working status data at the target moment is obtained; the cumulative sum of the initial fluctuation indexes of all working status data at the target moment is normalized to obtain the abnormal fluctuation index at the target moment.

8. The method for optimizing and controlling a digital pulping system according to claim 5, characterized in that: The method for obtaining the pulping effect index at the target moment includes: Obtain the skewness of the particle distribution histogram; record the cumulative sum of the differences between the target moment and the slurry flow at each moment in the historical time period as the flow difference value; negatively correlate the absolute value of the skewness and the product of the flow difference value to obtain the pulping effect index at the target moment.

9. The method for optimizing and controlling a digital pulping system according to claim 1, characterized in that: The method for optimizing the filling speed of the mill according to the difference between the filling speed of the mill in the historical time period and the target time, and the working state index, comprises: According to the difference between the mill filling speed in the historical time period and the target time, and the working state indicator, the adjustment degree at the target time is obtained; The last moment in the current time period is recorded as the current moment; when the working status index at the target moment is less than or equal to the preset abnormal threshold, the mill filling speed at the current moment remains unchanged; when the working status index at the target moment is greater than the preset abnormal threshold, it is determined whether the skewness of the particle distribution histogram is less than 0. If so, the difference between constant 1 and the adjustment degree is used as the adjustment coefficient at the target moment; if not, the sum of constant 1 and the adjustment degree is used as the adjustment coefficient at the target moment; the mill filling speed at the target moment is weighted using the adjustment coefficient at the target moment to obtain the optimized filling speed at the current moment.

10. The method for optimizing and controlling a digital pulping system according to claim 1, characterized in that: The method for obtaining the particle distribution histogram of the current time period includes: Obtain the number of particles of each diameter at each sampling moment in the current time period; record the average of the number of particles of the same diameter at all sampling moments in the current time period as the average number of particles of each diameter; construct a particle distribution histogram of the current time period from each diameter of the particles and the average number of particles of each diameter.

Citation Information

Patent Citations

  • Vertical mill operation regulation and control system based on data mining and method thereof

    CN106990763A

  • Coal mill combined operation control method, device and equipment and storage medium

    CN111389575A