A horizontal layering-medium and deep hole combined mining equipment and method
Through the horizontal layering-medium and deep hole combined mining equipment and methods, automatic installation and removal of blasting pipes, combined with the subsequent filling method of medium and deep holes, the problems of low mining efficiency and safety are solved, and efficient and safe ore mining is achieved.
Patent Information
- Application Number
- CN202410559804.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-05-08
AI Technical Summary
Existing mining methods are used in the mining of large inclined and thick ore bodies where the surrounding rock is stable and the ore body is broken. The small structural parameters of the stope lead to low ore mining efficiency, low safety and high labor intensity of blasting work, and the stability of the blasting pipe in the hole. Hard to guarantee.
Horizontal layering-medium and deep hole combined mining equipment is used to automatically install and remove the blasting pipe through the drill pipe and driving assembly. Combined with the limit assembly and elastic elements, the blasting pipe can be installed quickly and stably, and the blasting pipe can be subsequently filled through the medium and deep hole. method to improve mining efficiency.
It improves mining efficiency and safety, reduces labor costs, ensures the stability of the blasting tube in the blast hole, and greatly improves ore mining efficiency and safety.
Smart Images

Figure CN118462174B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of mining technology, and in particular to a horizontal layering-medium-deep hole combined mining equipment and method. Background Art
[0002] At present, the mining methods for inclined thick ore bodies (ore body inclination angle 30-50°, thickness greater than 15m) with stable surrounding rock and broken ore bodies are mainly upward horizontal layering, upward horizontal approach or downward horizontal approach filling mining. The advantages of the above three commonly used mining methods mainly include: 1. High safety during mining. For layering or approach mining, the structural parameters of each stope are small. Therefore, the exposed area of the broken ore body is small, and the safety during mining is better; 2. The recovery rate of ore is high; 3. The depletion rate of ore is low.
[0003] However, due to the small mining field structural parameters during the ore body mining process of the above-mentioned mining methods, the ore mining efficiency is low and the mining field production capacity is weak, which restricts the economic benefits of the enterprise; at the same time, the mining blasting work requires drilling many blasting holes before blasting, and then the staff manually place the blasting tubes in the holes, which has low safety and high labor intensity of the staff, resulting in low pipe burial efficiency, and the stability of the blasting tube cannot be guaranteed after it is placed in the hole. Summary of the invention
[0004] The purpose of the present invention is to solve the problems existing in the prior art and to propose a horizontal layering-medium-deep hole combined mining equipment and method.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A horizontal layering-medium-deep hole combined mining equipment, comprising a base, and also comprising:
[0007] A support, the support is fixed on the base, and a displacement mechanism is provided on the support;
[0008] A drive assembly, the drive assembly being arranged on the displacement mechanism and connected to a drill rod for drilling a blasthole;
[0009] A blasting tube installation assembly, which is disposed in the drill pipe and is used to install the blasting tube body into the blast hole opened in the drill pipe; and
[0010] A material storage box is arranged on the base through a support plate and is used to replenish the bursting tube body to the bursting tube installation assembly.
[0011] Preferably, the displacement mechanism includes a first motor fixed on a support, a screw connected to an output shaft of the first motor and rotatably connected to the support, and a moving seat threadedly connected to the screw, and the driving assembly is arranged on the moving seat.
[0012] Preferably, the driving assembly includes a second motor fixed on the moving seat, a driving gear connected to the output shaft of the second motor and rotatably connected to the moving seat, and a driven gear arranged on the drill rod, and the drill rod is rotatably connected to the moving seat.
[0013] Preferably, the drill rod comprises a rod body and a drill bit arranged at the end of the rod body, the drill bit is circumferentially provided with a plurality of arcuate pieces, a rotating rod is arranged between the arcuate pieces and the rod body, and the rotating rod is provided with a torsion spring for driving the arcuate pieces to reset and rotate.
[0014] Preferably, the blasting tube installation assembly includes a moving tube slidably connected in the rod body, the end of the moving tube movably abuts against the arc-shaped piece, the top of the moving tube is provided with a feed port connected to the lower end opening of the storage box, a push block slidably connected in the moving tube and movably abuts against the blasting tube body, a first elastic element is provided between the push block and the moving tube, a limiting assembly is provided between the push block and the moving tube, a screw rod threadedly connected to the moving tube is rotatably connected to the support, synchronous wheels are provided on the screw and the lead screw, and a synchronous belt is provided between the two synchronous wheels.
[0015] Preferably, the limit assembly includes a movable groove provided on the push block, a limit rod being slidably connected in the movable groove, a second elastic element being arranged between the limit rod and the inner wall of the movable groove, an extrusion slope being provided at one end of the limit rod away from the second elastic element, a limit hole matching with the limit rod being provided on the movable tube, a force-bearing rod being slidably connected in the movable tube and movably resisting against the extrusion slope of the limit rod, a third elastic element being arranged between the force-bearing rod and the movable tube, and an end of the force-bearing rod away from the limit rod being movably resisting against the arc-shaped piece.
[0016] Preferably, the movable tube is rotatably connected to a winding drum coaxially arranged with the screw rod, a pull rope is wound around the winding drum, the end of the pull rope away from the winding drum passes through the movable tube and is connected to a push block, the push block is provided with a partition for sealing the lower end opening of the storage box, the screw rod is provided with a guide groove, and the inner wall of the winding drum is fixed with a guide strip sliding in the guide groove.
[0017] Preferably, the blasting tube body includes a blasting tube and a front ring and a rear ring which are sleeved on the front and rear sides of the blasting tube, the front ring and the rear ring are movably provided with elastic expansion plates, the end of the blasting tube is provided with a plastic-wrapped curing agent, the rear ring is provided with a fourth elastic element, the end of the fourth elastic element away from the rear ring is provided with a buffer plate, and the buffer plate is provided with a puncture needle for puncturing plastic.
[0018] Preferably, it further comprises an adjusting seat, on which a hinge plate is arranged, and the hinge plate is rotatably connected to the base via a pin shaft, and an electric push rod is arranged between the adjusting seat and the base.
[0019] The present invention also discloses a horizontal layering-medium-deep hole combined mining method, which uses a horizontal layering-medium-deep hole combined mining equipment and includes the following steps:
[0020] S1: First, determine the middle section height and segment height of the ore body, where the middle section height is 50-60m and the segment height is 10-15m. In each segment, divide the mine room and pillars along the ore body direction. The mine room and pillars are arranged perpendicular to the ore body direction. The mine room is trapezoidal in shape and the pillars are inverted trapezoidal in shape. Construct an off-vein segmental lane in the footwall of the ore body, and construct a stope connection road from the segmental lane to each mine room and pillar. Construct a vein lane close to the footwall of the ore body to serve several stopes in the same layer in the mine room.
[0021] S2: First, dig the mine room: divide each trapezoidal mine room into several layers, with a layer height of 3-4m. The stope is arranged vertically to the ore body, and multiple trapezoidal mine rooms can be constructed at the same time;
[0022] In the same trapezoidal mine room, each layer of ore body is mined from bottom to top, and multiple stopes are mined simultaneously in each layer by using the method of mining one by one. After each stope is mined, the goaf is filled with tailings cemented filling body;
[0023] For the mining area adjacent to the inverted trapezoidal pillar, high-strength filling body is used to fill the goaf. The high-strength filling body must be able to maintain self-stability when the inverted trapezoidal pillar adopts medium-deep hole mining.
[0024] After all the stopes adjacent to the inverted trapezoidal pillars are filled, an arched high-strength area is formed to ensure that the filling body does not collapse during the mining process of the inverted trapezoidal pillars. The stopes not adjacent to the inverted trapezoidal pillars are filled with low-strength filling bodies, which must be able to maintain self-stability during the mining of the adjacent stopes.
[0025] S3: Subsequently mining the pillar: First, construct a prospecting tunnel from the upper segment of the inverted trapezoidal pillar to be mined to the upper wall of the ore body;
[0026] Long anchor rods are used for support in the prospecting tunnel, forming an anchor-reinforced roof at the top of the next segmented inverted trapezoidal pillar to ensure safe mining of the inverted trapezoidal pillar.
[0027] After the roof support is completed, a prospecting tunnel is constructed at the bottom of the inverted trapezoidal pillar to be mined to the upper wall of the ore body. The deep holes in the prospecting tunnel are used for blasting and mining is carried out from the upper wall to the lower wall of the ore body. After the inverted trapezoidal pillar is mined, the goaf is filled. For the inverted trapezoidal pillars whose trapezoidal mine rooms on both sides have been mined, multiple inverted trapezoidal pillars can be constructed at the same time.
[0028] S4: When drilling a blasthole, first adjust the drill rod angle, and control the electric push rod to apply force to the base, so that the base rotates relative to the hinge plate, thereby adjusting the drilling angle of the drill rod;
[0029] Then, the first motor and the second motor are controlled to operate. When the second motor operates, the output shaft of the second motor drives the driving gear to mesh with the driven gear, so that the driven gear drives the drill rod to rotate. When the first motor operates, its output shaft drives the screw to rotate, and the moving seat threadedly connected to the screw drives the drill rod to move axially. When the drill rod moves forward, the arc-shaped piece at the drill bit at its end is no longer pushed by the moving tube. Several arc-shaped pieces on the drill bit are aligned with each other before drilling into the ore body, so that the drill rod moves forward when it rotates to perform the drilling operation;
[0030] When the screw rotates, the screw is driven to rotate through the synchronous wheel and the synchronous belt. When the screw rotates, the moving tube connected to the screw with a thread moves. The moving tube moves in the opposite direction to the drill rod. When the screw moves, the winding drum is driven to rotate through the guide bar. The winding drum pulls the push block through the pull rope. The push block drives the partition to move relative to the moving tube, and the push block squeezes the first elastic element.
[0031] When the medium-deep hole blasthole drilled by the drill rod meets the depth, the partition no longer blocks the lower end opening of the storage box, and the blasting tube body in the storage box falls into the moving tube through the feeding port, and the limiting rod on the push block is aligned with the limiting hole of the moving tube. The limiting rod is inserted into the limiting hole under the elastic force of the second elastic element, and the position of the push block and the moving tube is limited, completing the loading work of the blasting tube body;
[0032] Then the first motor is controlled to drive the screw rod to run in the reverse direction, so that the drill rod moves to the outside of the medium-deep hole blasthole, and the moving tube moves to the drill rod. During this process, the winding drum releases the pull rope, and the pull rope no longer generates pulling force on the push block;
[0033] After the drill rod is moved out of the medium-deep hole, the moving tube moves to the initial position inside the drill rod, the end of the moving tube and the force-bearing rod at the end abut against the arc-shaped piece at the end of the drill rod, and the arc-shaped piece is overturned by force and no longer closes the end of the drill rod;
[0034] After the force-bearing rod is abutted by the arc-shaped piece, it moves and exerts a force on the extrusion slope of the limit rod. The limit rod is forced to move upward and no longer limits the moving tube. The push block, which is no longer pulled by the pull rope, is reset under the elastic force of the first elastic element. During the reset process of the push block, the partition blocks the bottom opening of the storage box, and the push block pushes the blasting tube body in the moving tube, so that the blasting tube body moves out of the drill pipe and enters the medium-deep hole blast hole;
[0035] The buffer plate at the end of the blasting tube body entering the medium-deep hole first abuts against the inner wall of the deep hole, and the buffer plate moves to squeeze the fourth elastic element to buffer and reduce the impact on the blasting tube body. When the buffer plate moves, the piercing needle punctures the plastic wrapping the curing agent, so that the curing agent leaks out and fills the gap between the blasting tube body and the inner wall of the hole. At the same time, the elastic expansion plates on the front ring and the rear ring abut against the inner wall of the hole to strengthen the connection between the blasting tube body and the medium-deep hole.
[0036] Repeat the above operation to quickly carry out the drilling of multiple medium-deep hole blastholes and the installation of the blasting tube body.
[0037] Compared with the prior art, the present invention provides a horizontal layering-medium-deep hole combined mining equipment and method, which has the following beneficial effects:
[0038] 1. The horizontal layering-medium and deep hole combined mining equipment and method automatically completes the feeding and discharging installation of the blasting tube when drilling the blasthole with the drill rod, without manual intervention, with high safety. The blasting and rock drilling processes are connected in series, which can reduce labor costs and better meet production needs, effectively improving mining efficiency.
[0039] 2. The horizontal layering-medium and deep hole combined mining equipment and method limits the positional relationship between the push block and the movable tube by setting a limit assembly, so that only after the drill rod moves out of the medium and deep hole blasthole, the movable tube moves to the initial position inside the drill rod, and the blasting tube body moves to the closest position to the blasthole at this time, the restriction between the push block and the movable tube is automatically released, and the push block quickly ejects the blasting tube body close to the blasthole, thereby realizing the rapid installation and installation effect of the blasting tube body.
[0040] 3. The horizontal layering-medium and deep hole combined mining equipment and method, through the blasting tube body entering the medium and deep hole blast hole, the buffer plate at the end thereof first abuts against the inner wall deep in the channel, and the buffer plate moves to squeeze the fourth elastic element to buffer and reduce the impact on the blasting tube body. When the buffer plate moves, the piercing needle punctures the plastic wrapping the curing agent, so that the curing agent leaks out and fills the gap between the blasting tube body and the inner wall of the channel. At the same time, the elastic expansion plates on the front ring and the rear ring abut against the inner wall of the channel to strengthen the connection between the blasting tube body and the medium and deep hole blast hole, effectively avoiding the blasting tube from loosening in the blast hole, improving the stability of the blasting tube in the blast hole, and thus ensuring the blasting effect.
[0041] 4. The horizontal layering-medium-deep hole combined mining equipment and method greatly improves the efficiency of ore mining by dividing the ore room pillars along the ore body in each section and mining the pillars with the medium-deep hole subsequent filling mining method. Compared with the traditional upward horizontal layering, upward horizontal approach or downward horizontal approach filling mining method, the amount of ore blasted in one time is about 12-60m 3 The amount of ore that can be mined in one blast using the medium-deep hole and subsequent backfill mining method is about 200 to 250 m3. 3 The ore-falling efficiency is greatly improved. At the same time, high-proportion filling bodies are used to fill the adjacent goaf of the pillars to form an artificially built arch reinforcement area in the broken ore body, ensuring the smooth construction of medium-deep hole blasting in the broken ore body and effectively ensuring the safety of the pillar recovery process. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 It is a structural schematic diagram of the present invention;
[0043] Figure 2 It is a schematic diagram of the structure of the blasting tube body of the present invention when it is not ejected;
[0044] Figure 3 For the present invention Figure 2 A partial enlarged structural diagram of the middle part;
[0045] Figure 4 It is a schematic diagram of the structure of the blasting tube body of the present invention when it is ejected;
[0046] Figure 5 It is a schematic diagram of the structure of the blasting tube body of the present invention when loading;
[0047] Figure 6 It is a structural schematic diagram of the screw and the winding drum of the present invention;
[0048] Figure 7 It is a structural schematic diagram of the end of the blasting tube body of the present invention;
[0049] Figure 8 It is a structural schematic diagram of the division of the mine room and the mine pillar of the present invention;
[0050] Fig. 9 The mining structure of the mine room of the present invention is shown in FIG. Figure 1 ;
[0051] Fig.10 The mining structure of the mine room of the present invention is shown in FIG. Figure 2 ;
[0052] Fig.11 Schematic diagram of the pillar mining structure of the present invention Figure 1 ;
[0053] Fig.12Schematic diagram of the pillar mining structure of the present invention Figure 2 .
[0054] In the figure: 1, base; 101, support plate; 2, support; 201, first motor; 202, screw; 203, moving seat; 3, drill rod; 301, rod body; 302, drill bit; 3021, arc piece; 3022, rotating rod; 4, blasting tube body; 401, blasting tube; 402, front ring; 403, rear ring; 404, elastic expansion piece; 405, curing agent; 5, storage box; 6, second motor; 601, driving gear; 602, driven gear; 7, moving tube; 701, feeding port; 702, push block; 7021, partition; 703, first elastic element; 8, screw; 801, guide groove; 9, synchronous wheel; 1 0. Movable groove; 1001. Limit rod; 1002. Second elastic element; 11. Limit hole; 12. Force rod; 121. Third elastic element; 13. Winding drum; 131. Pull rope; 132. Guide strip; 14. Buffer plate; 141. Fourth elastic element; 142. Needle; 15. Adjustment seat; 151. Articulated plate; 152. Electric push rod; 16. Ore body; 161. Trapezoidal mine room; 162. Inverted trapezoidal pillar; 163. Vein lane; 164. Mining field connecting road; 165. Sectional lane; 166. High-strength filling body; 167. Low-strength filling body; 168. Prospecting lane; 169. Medium-deep hole blast hole; 17. Anchor rod. DETAILED DESCRIPTION
[0055] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0056] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0057] Example 1: Reference Figure 1 , Figure 2 , Figure 4 and Figure 5 , a horizontal layering-medium-deep hole combined mining equipment, comprising a base 1, and also comprising:
[0058] Support 2, support 2 is fixed on base 1, and a displacement mechanism is arranged on support 2;
[0059] A driving assembly, the driving assembly is arranged on the displacement mechanism, and the driving assembly is connected to a drill rod 3 for drilling a blasthole;
[0060] A blasting tube installation assembly, which is disposed in the drill rod 3 and is used to install a blasting tube body 4 into a blast hole formed in the drill rod 3; and
[0061] The material storage box 5 is arranged on the base 1 through the support plate 101, and is used to replenish the bursting tube body 4 to the bursting tube installation assembly.
[0062] Specifically, by controlling the operation of the displacement mechanism and the driving assembly, the driving assembly drives the drill rod 3 to rotate, and the displacement mechanism drives the rotating drill rod 3 to construct blastholes. The blasting tube installation assembly automatically completes the feeding and discharging installation of the blasting tube body 4 during the drilling process, without the need for manual intervention, with high safety. The blasting and rock drilling processes are connected in series, which can reduce labor costs while better meeting production needs and effectively improve mining efficiency.
[0063] Example 2: Reference Figure 1 , Figure 2 , Figure 4 and Figure 5 , a horizontal layering-medium and deep hole combined mining equipment, based on Example 1, further, the displacement mechanism includes a first motor 201 fixed on the support 2, a screw rod 202 connected to the output shaft of the first motor 201 and rotatably connected to the support 2, and a moving seat 203 threadedly connected to the screw rod 202, and the driving assembly is arranged on the moving seat 203.
[0064] Furthermore, the driving assembly includes a second motor 6 fixed on the moving seat 203, a driving gear 601 connected to the output shaft of the second motor 6 and rotatably connected to the moving seat 203, and a driven gear 602 arranged on the drill rod 3, and the drill rod 3 is rotatably connected to the moving seat 203.
[0065] Specifically, by controlling the operation of the first motor 201 and the second motor 6, when the second motor 6 is running, the output shaft of the second motor 6 drives the driving gear 601 to engage with the driven gear 602 for transmission, so that the driven gear 602 drives the drill rod 3 to rotate, and when the first motor 201 is running, its output shaft drives the screw rod 202 to rotate, and the movable seat 203 threadedly connected to the screw rod 202 drives the drill rod 3 to move axially, so that the drill rod 3 moves forward when rotating to perform drilling operations.
[0066] Example 3: Reference Figure 1 , Figure 2 , Figure 4 and Figure 5, a horizontal layering-medium and deep hole combined mining equipment, based on Example 2, further, the drill rod 3 includes a rod body 301 and a drill bit 302 arranged at the end of the rod body 301, and a plurality of arc-shaped pieces 3021 are circumferentially arranged on the drill bit 302, and a rotating rod 3022 is arranged between the arc-shaped piece 3021 and the rod body 301, and the rotating rod 3022 is provided with a torsion spring for driving the arc-shaped piece 3021 to reset and rotate.
[0067] Specifically, when the drill rod 3 is working, a blasthole is excavated through the drill bit 302 at the end. The front end of the drill bit 302 is closed by a plurality of arc-shaped pieces 3021, and the arc-shaped pieces 3021 can be pushed and flipped from the inside to the outside, so as to facilitate the delivery of the blasting tube body 4 at the end of the drill rod 3. When the drill rod 3 is drilling, the arc-shaped pieces 3021 are squeezed from the outside and will not flip, so as to prevent ore from entering the inside of the drill rod 3.
[0068] Example 4: Reference Figure 1-6 , a horizontal layering-medium and deep hole combined mining equipment, based on Example 3, further, the blasting tube installation assembly includes a moving tube 7 slidably connected in the rod body 301, the end of the moving tube 7 is movably abutted against the arc-shaped piece 3021, and the top of the moving tube 7 is provided with a feeding port 701 connected to the lower end opening of the storage box 5, and a push block 702 movably abutted against the blasting tube body 4 is slidably connected in the moving tube 7, a first elastic element 703 is arranged between the push block 702 and the moving tube 7, and a limiting assembly is arranged between the push block 702 and the moving tube 7, a screw 8 threadedly connected to the moving tube 7 is rotatably connected on the support 2, and synchronous wheels 9 are arranged on the screw 8 and the lead screw 202, and a synchronous belt is arranged between the two synchronous wheels 9.
[0069] Furthermore, the limiting assembly includes a movable groove 10 provided on the push block 702, a limiting rod 1001 being slidably connected in the movable groove 10, a second elastic element 1002 being arranged between the limiting rod 1001 and the inner wall of the movable groove 10, an extrusion slope being provided at one end of the limiting rod 1001 away from the second elastic element 1002, a limiting hole 11 cooperating with the limiting rod 1001 being provided on the movable tube 7, a force-bearing rod 12 being slidably connected in the movable tube 7 and movably resisting against the extrusion slope of the limiting rod 1001, a third elastic element 121 being arranged between the force-bearing rod 12 and the movable tube 7, and one end of the force-bearing rod 12 away from the limiting rod 1001 movably resisting against the arc-shaped piece 3021.
[0070] Furthermore, a winding drum 13 coaxially arranged with the screw rod 8 is rotatably connected to the movable tube 7, and a pull rope 131 is wound around the winding drum 13. The end of the pull rope 131 away from the winding drum 13 passes through the movable tube 7 and is connected to the push block 702. The push block 702 is provided with a partition 7021 for sealing the lower end opening of the storage box 5. A guide groove 801 is opened on the screw rod 8, and a guide strip 132 sliding in the guide groove 801 is fixedly provided on the inner wall of the winding drum 13.
[0071] Specifically, when the displacement mechanism and the driving assembly are working, the drill rod 3 is rotated and moved forward to perform the drilling operation. The arc-shaped pieces 3021 on the drill bit 302 are aligned with each other before drilling into the ore body 16. When the screw rod 202 rotates, the screw rod 8 is driven to rotate through the synchronous wheel 9 and the synchronous belt. When the screw rod 8 rotates, the moving tube 7 threadedly connected thereto moves. The moving tube 7 moves in the opposite direction to the drill rod 3. When the screw 8 moves, the winding drum 13 is driven to rotate through the guide bar 132. The winding drum 13 pulls the push block 702 through the pull rope 131. The push block 702 drives the partition plate 7021 to move relative to the moving tube 7. The push block 702 squeezes the first elastic element 703. When the medium-deep hole blast hole 169 drilled by the drill rod 3 meets the requirements, the middle-deep hole 169 is driven to rotate through the synchronous wheel 9 and the synchronous belt. After the depth is reached, the partition 7021 no longer blocks the lower end opening of the storage box 5, and the blasting tube body 4 in the storage box 5 falls into the moving tube 7 through the feeding port 701, and the limiting rod 1001 on the pushing block 702 is aligned with the limiting hole 11 of the moving tube 7, and the limiting rod 1001 is inserted into the limiting hole 11 under the elastic force of the second elastic element 1002, and the position of the pushing block 702 and the moving tube 7 is limited, completing the loading work of the blasting tube body 4; then the first motor 201 is controlled to drive the screw rod 202 to run in the reverse direction, so that the drill rod 3 moves to the outside of the blasthole, and the moving tube 7 moves to the drill rod 3. In this process, the winding drum 13 releases the pull rope 131, and the pull rope 131 no longer exerts pressure on the pushing block 702 After the drill rod 3 is moved out of the blast hole, the mobile tube 7 moves to the initial position inside the drill rod 3, and the end of the mobile tube 7 and the force-bearing rod 12 at the end abut against the arc-shaped piece 3021 at the end of the drill rod 3. The arc-shaped piece 3021 is overturned by the force and no longer closes the end of the drill rod 3, so as to prevent the arc-shaped piece 3021 from hindering the subsequent ejection of the blasting tube body 4; the force-bearing rod 12 is moved after being abutted by the arc-shaped piece 3021 and exerts a force on the extrusion slope of the limiting rod 1001. The limiting rod 1001 is forced to move upward and no longer limits the mobile tube 7. The push block 702, which is no longer pulled by the pull rope 131, is reset under the elastic force of the first elastic element 703. During the reset process of the push block 702, the partition 7021 opens to the bottom of the storage box 5 The push block 702 pushes the blasting tube body 4 in the mobile tube 7 to move the blasting tube body 4 out of the drill rod 3 and into the blast hole. The positional relationship between the push block 702 and the mobile tube 7 is limited by setting a limit assembly, so that only after the drill rod 3 is moved out of the blast hole, the mobile tube 7 moves to the initial position inside the drill rod 3. At this time, the blasting tube body 4 moves to the closest position to the blast hole to avoid the phenomenon of stuck hole. The restriction between the push block 702 and the mobile tube 7 is automatically released, and the push block 702 quickly ejects the blasting tube body 4 close to the blast hole, so as to achieve fast and accurate installation of the blasting tube body 4 and ensure the installation effect.
[0072] Example 5: Reference Figure 2 , Figure 4 , Figure 5 and Figure 7 , a horizontal layering-medium and deep hole combined mining equipment, based on Example 4, further, the blasting tube body 4 includes a blasting tube 401 and a front ring 402 and a rear ring 403 which are sleeved on the front and rear sides of the blasting tube 401, and elastic expansion plates 404 are movably provided on the front ring 402 and the rear ring 403, and a plastic-wrapped curing agent 405 is provided at the end of the blasting tube 401, and a fourth elastic element 141 is provided on the rear ring 403, and a buffer plate 14 is provided at the end of the fourth elastic element 141 away from the rear ring 403, and a piercing needle 142 for puncturing plastic is provided on the buffer plate 14.
[0073] Specifically, by sleeve-arranging the front ring 402 and the rear ring 403 on the outer side of the blasting tube 401, the outer diameter of the blasting tube 401 is increased, so that the blasting tube 401 contacts the inner wall of the blasting hole through the front ring 402 and the rear ring 403, so as to avoid the blasting tube 401 from being damaged. The buffer plate 14 at the end of the blasting tube body 4 ejected into the blasting hole first contacts the inner wall of the deep hole, and the buffer plate 14 is forced to move and squeeze the fourth elastic element 141, so as to resist the impact of the blasting tube body 4 ejected into the blasting hole. To achieve cushioning and shock absorption, when the buffer plate 14 moves, the plastic wrapping the curing agent 405 is punctured by the needle 142, so that the curing agent 405 leaks out and fills the gap between the blasting tube body 4 and the inner wall of the channel. At the same time, the elastic expansion sheet 404 on the front ring 402 and the rear ring 403 abuts against the inner wall of the channel, thereby strengthening the connection stability between the blasting tube body 4 and the medium-deep hole blast hole 169, effectively avoiding the blasting tube from loosening in the blast hole, improving the stability of the blasting tube in the blast hole, and thus ensuring the blasting effect.
[0074] Example 6: Reference Figure 1 , Figure 2 , Figure 4 and Figure 5 A horizontal layering-medium and deep hole combined mining equipment, based on Example 5, further includes an adjusting seat 15, on which a hinge plate 151 is provided, and the hinge plate 151 is rotatably connected to the base 1 through a pin shaft, and an electric push rod 152 is provided between the adjusting seat 15 and the base 1.
[0075] Specifically, when drilling a blast hole, first adjust the angle of the drill rod 3, and control the operation of the electric push rod 152 so that the electric push rod 152 applies a force to the base 1, causing the base 1 to rotate relative to the hinge plate 151, thereby adjusting the drilling angle of the drill rod 3, so that the equipment is suitable for drilling blast holes at different angles and has strong applicability.
[0076] Reference Figure 1-12 A horizontal layering-medium-deep hole combined mining method, using a horizontal layering-medium-deep hole combined mining equipment, includes the following steps:
[0077] S1: First, determine the middle section height and segment height of the ore body 16, where the middle section height is 50-60m and the segment height is 10-15m. In each segment, divide the mine room and the pillars along the direction of the ore body 16. The mine room and the pillars are arranged perpendicular to the direction of the ore body 16. The shape of the mine room is trapezoidal, and the shape of the pillars is inverted trapezoidal. Construct an off-vein segmented tunnel 165 in the lower wall of the ore body 16, and construct a stope connection road 164 from the segmented tunnel 165 to each mine room and pillar. Construct a vein-along tunnel 163 adjacent to the lower wall of the ore body 16 to serve several stopes in the same layer in the mine room.
[0078] S2: First, mining chambers: Each trapezoidal chamber 161 is divided into several layers, with a layer height of 3-4m. The stope is arranged vertically to the ore body 16, and multiple trapezoidal chambers 161 can be constructed at the same time;
[0079] In the same trapezoidal ore room 161, each layer of the ore body 16 is mined from bottom to top, and multiple stopes are mined simultaneously in each layer by using the method of mining one by one. After each stope is mined, the goaf is filled with tailings cemented filling body;
[0080] For the mining area adjacent to the inverted trapezoidal pillar 162, a high-strength filling body 166 is used to fill the goaf. The high-strength filling body 166 needs to be able to maintain self-stability when the inverted trapezoidal pillar 162 adopts a medium-deep hole to drop the ore;
[0081] After all the stopes adjacent to the inverted trapezoidal pillars 162 are filled, an arched high-strength area is formed to ensure that the filling body does not collapse during the mining process of the inverted trapezoidal pillars 162. The stopes not adjacent to the inverted trapezoidal pillars 162 are filled with low-strength filling bodies 167, which must meet the requirements of maintaining self-stability during the mining of the adjacent stope ore bodies 16;
[0082] S3: Subsequently mining the ore pillar: First, construct an exploration tunnel 168 to the upper wall of the ore body 16 in the upper segment of the inverted trapezoidal ore pillar 162 to be mined;
[0083] Long anchor rods 17 are used for support in the prospecting tunnel 168, and a roof reinforced by anchor rods 17 is formed on the top of the next segmented inverted trapezoidal pillar 162 to ensure safe mining of the inverted trapezoidal pillar 162;
[0084] After the roof support is completed, a prospecting tunnel 168 is constructed at the bottom of the inverted trapezoidal pillar 162 to be mined to the upper wall of the ore body 16. A medium-deep hole blast hole 169 is constructed in the prospecting tunnel 168 to blast the ore, and the ore is mined backward from the upper wall to the lower wall of the ore body 16. After the inverted trapezoidal pillar 162 is mined, the goaf is filled. For the inverted trapezoidal pillars 162 whose trapezoidal mine rooms 161 on both sides have been mined, multiple inverted trapezoidal pillars 162 can be constructed at the same time;
[0085] S4: When drilling a blasthole, first adjust the angle of the drill rod 3, and control the operation of the electric push rod 152 so that the electric push rod 152 applies a force to the base 1, so that the base 1 rotates relative to the hinge plate 151, thereby adjusting the drilling angle of the drill rod 3;
[0086] Then, the first motor 201 and the second motor 6 are controlled to operate. When the second motor 6 operates, the output shaft of the second motor 6 drives the driving gear 601 to mesh with the driven gear 602, so that the driven gear 602 drives the drill rod 3 to rotate. When the first motor 201 operates, its output shaft drives the screw rod 202 to rotate, and the moving seat 203 threadedly connected to the screw rod 202 drives the drill rod 3 to move axially. When the drill rod 3 moves forward, the arc-shaped piece 3021 at the drill bit 302 at its end is no longer pushed by the moving tube 7. The arc-shaped pieces 3021 on the drill bit 302 are aligned with each other before drilling into the ore body 16, so that the drill rod 3 moves forward when rotating to perform the drilling operation.
[0087] When the screw rod 202 rotates, the screw rod 8 is driven to rotate through the synchronous wheel 9 and the synchronous belt. When the screw rod 8 rotates, the moving tube 7 threadedly connected thereto moves. The moving tube 7 moves in the opposite direction to the drill rod 3. When the screw rod 8 moves, the winding drum 13 is driven to rotate through the guide bar 132. The winding drum 13 pulls the push block 702 through the pull rope 131. The push block 702 drives the partition plate 7021 to move relative to the moving tube 7. The push block 702 squeezes the first elastic element 703.
[0088] When the medium-deep hole 169 drilled by the drill rod 3 meets the depth, the partition 7021 no longer blocks the lower end opening of the storage box 5, and the blasting tube body 4 in the storage box 5 falls into the mobile tube 7 through the feed port 701, and the limiting rod 1001 on the push block 702 is aligned with the limiting hole 11 of the mobile tube 7. The limiting rod 1001 is inserted into the limiting hole 11 under the elastic force of the second elastic element 1002, and the position of the push block 702 and the mobile tube 7 is limited, completing the loading work of the blasting tube body 4;
[0089] Then, the first motor 201 is controlled to drive the screw rod 202 to run in the reverse direction, so that the drill rod 3 moves to the outside of the medium-deep hole 169, and the moving tube 7 moves to the drill rod 3. During this process, the winding drum 13 releases the pull rope 131, and the pull rope 131 no longer generates a pulling force on the push block 702;
[0090] After the drill rod 3 moves out of the medium-deep hole blast hole 169, the movable tube 7 moves to the initial position inside the drill rod 3, and the end of the movable tube 7 and the force-bearing rod 12 at the end abut against the arc-shaped piece 3021 at the end of the drill rod 3. The arc-shaped piece 3021 is overturned by force and no longer closes the end of the drill rod 3.
[0091] After the force-bearing rod 12 is abutted by the arc-shaped piece 3021, it moves and exerts a force on the extrusion slope of the limit rod 1001. The limit rod 1001 is forced to move upward and no longer limits the mobile tube 7. The push block 702, which is no longer pulled by the pull rope 131, is reset under the elastic force of the first elastic element 703. During the reset process of the push block 702, the partition plate 7021 blocks the bottom opening of the storage box 5, and the push block 702 pushes the blasting tube body 4 in the mobile tube 7, so that the blasting tube body 4 moves out of the drill pipe 3 and enters the medium-deep hole 169;
[0092] The buffer plate 14 at the end of the blasting tube body 4 entering the medium-deep hole blast hole 169 first abuts against the inner wall of the deep hole, and the buffer plate 14 moves to squeeze the fourth elastic element 141 to buffer and reduce the impact on the blasting tube body 4. When the buffer plate 14 moves, the plastic wrapped with the curing agent 405 is punctured by the puncture needle 142, so that the curing agent 405 leaks out and fills the gap between the blasting tube body 4 and the inner wall of the hole. At the same time, the elastic expansion sheet 404 on the front ring 402 and the rear ring 403 abuts against the inner wall of the hole, strengthening the connection between the blasting tube body 4 and the medium-deep hole blast hole 169;
[0093] Repeat the above operation to quickly drill multiple medium-length blastholes 169 and install the blasting tube body 4.
[0094] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A horizontal layering-medium-deep hole combined mining equipment, comprising a base (1), characterized in that: Also includes: A support (2), the support (2) being fixedly mounted on the base (1), and a displacement mechanism being arranged on the support (2); A drive assembly, the drive assembly being arranged on the displacement mechanism, the drive assembly being connected to a drill rod (3) for drilling a blasthole; a blasting tube installation assembly, the blasting tube installation assembly being arranged in a drill rod (3) and being used for installing a blasting tube body (4) into a blast hole opened in the drill rod (3); and A material storage box (5), the material storage box (5) being arranged on the base (1) via a support plate (101) and being used to replenish the bursting tube body (4) to the bursting tube installation assembly; The displacement mechanism comprises a first motor (201) fixedly mounted on a support (2), a screw rod (202) connected to an output shaft of the first motor (201) and rotatably connected to the support (2), and a moving seat (203) threadedly connected to the screw rod (202), wherein the driving assembly is arranged on the moving seat (203); The driving assembly comprises a second motor (6) fixedly mounted on the moving seat (203), a driving gear (601) connected to the output shaft of the second motor (6) and rotatably connected to the moving seat (203), and a driven gear (602) mounted on the drill rod (3), wherein the drill rod (3) is rotatably connected to the moving seat (203); The drill rod (3) comprises a rod body (301) and a drill bit (302) arranged at the end of the rod body (301); a plurality of arc-shaped pieces (3021) are arranged on the drill bit (302) in a circumferential manner; a rotating rod (3022) is arranged between the arc-shaped piece (3021) and the rod body (301); and a torsion spring for driving the arc-shaped piece (3021) to return and rotate is arranged on the rotating rod (3022); The blasting tube installation assembly comprises a moving tube (7) slidably connected in the rod body (301), the end of the moving tube (7) movably abuts against the arc-shaped sheet (3021), the top of the moving tube (7) is provided with a feeding port (701) which is connected to the lower end opening of the storage box (5), a push block (702) slidably connected in the moving tube (7) and movably abuts against the blasting tube body (4), a first elastic element (703) is provided between the push block (702) and the moving tube (7), a limit position assembly is provided between the push block (702) and the moving tube (7), a screw rod (8) threadedly connected to the moving tube (7) is rotatably connected on the support (2), a synchronous wheel (9) is provided on the screw rod (8) and the lead screw (202), and a synchronous belt is provided between the two synchronous wheels (9); The limit assembly comprises a movable groove (10) provided on the push block (702), a limit rod (1001) being slidably connected in the movable groove (10), a second elastic element (1002) being arranged between the limit rod (1001) and the inner wall of the movable groove (10), an extrusion slope being provided at one end of the limit rod (1001) away from the second elastic element (1002), a limit hole (11) being provided on the movable tube (7) and cooperating with the limit rod (1001), a force rod (12) being slidably connected in the movable tube (7) and movably abutting against the extrusion slope of the limit rod (1001), a third elastic element (121) being arranged between the force rod (12) and the movable tube (7), and an end of the force rod (12) away from the limit rod (1001) being movably abutting against the arc-shaped sheet (3021); The movable tube (7) is rotatably connected to a winding drum (13) coaxially arranged with the screw rod (8); a pull rope (131) is wound around the winding drum (13); one end of the pull rope (131) away from the winding drum (13) passes through the movable tube (7) and is connected to a push block (702); a partition plate (7021) for blocking the lower opening of the material storage box (5) is provided on the push block (702); a guide groove (801) is provided on the screw rod (8); and a guide strip (132) sliding in the guide groove (801) is fixedly provided on the inner wall of the winding drum (13).
2. The horizontal layering-medium-deep hole combined mining equipment according to claim 1 is characterized in that: The blasting tube body (4) comprises a blasting tube (401) and a front ring (402) and a rear ring (403) sleeved on the front and rear sides of the blasting tube (401); the front ring (402) and the rear ring (403) are both movably provided with elastic expansion plates (404); a plastic-wrapped curing agent (405) is provided at the end of the blasting tube (401); a fourth elastic element (141) is provided on the rear ring (403); a buffer plate (14) is provided at one end of the fourth elastic element (141) away from the rear ring (403); and a puncture needle (142) for puncturing plastic is provided on the buffer plate (14).
3. The horizontal layering-medium-deep hole combined mining equipment according to claim 2 is characterized in that: It also comprises an adjustment seat (15), on which a hinge plate (151) is arranged, and the hinge plate (151) is rotatably connected to the base (1) via a pin shaft, and an electric push rod (152) is arranged between the adjustment seat (15) and the base (1).
4. A horizontal layering-medium-deep hole combined mining method, using the horizontal layering-medium-deep hole combined mining equipment described in claim 3, characterized in that: The following steps are involved: S1: First, determine the middle section height and segment height of the ore body (16), wherein the middle section height is 50-60m and the segment height is 10-15m. In each segment, a mine room and a pillar are divided along the strike of the ore body (16). The mine room and the pillar are arranged perpendicular to the strike of the ore body (16). The mine room is in a trapezoidal shape and the pillar is in an inverted trapezoidal shape. A segmented tunnel (165) outside the vein is constructed in the footwall of the ore body (16). A stope connection road (164) is constructed from the segmented tunnel (165) to each mine room and pillar. A vein tunnel (163) is constructed adjacent to the footwall of the ore body (16) to serve several stopes in the same layer in the mine room. S2: First, mining chambers: Each trapezoidal chamber (161) is divided into several layers, each layer height is 3-4m, and the stope is arranged vertically along the ore body (16). Multiple trapezoidal chambers (161) can be constructed simultaneously; In the same trapezoidal mining room (161), each layer of the ore body (16) is mined from bottom to top, and multiple stopes are mined simultaneously in each layer by using a method of mining one by one, and after each stope is mined, the goaf is filled with tailings cemented filling body; For the mining area adjacent to the inverted trapezoidal pillar (162), a high-strength filling body (166) is used to fill the goaf. The high-strength filling body (166) needs to be able to maintain self-stability when the inverted trapezoidal pillar (162) uses a medium-deep hole to drop the ore; After all the stopes adjacent to the inverted trapezoidal pillar (162) are filled, an arched high-strength area is formed to ensure that the filling body does not collapse during the mining process of the inverted trapezoidal pillar (162). The stopes not adjacent to the inverted trapezoidal pillar (162) are filled with low-strength filling bodies (167). The low-strength filling bodies (167) must meet the requirements of maintaining self-stability when the ore bodies (16) of the adjacent stopes are mined; S3: Subsequently mining the ore pillar: First, construct an exploration tunnel (168) to the upper wall of the ore body (16) in the upper segment of the inverted trapezoidal ore pillar (162) to be mined; Long anchor rods (17) are used for support in the prospecting tunnel (168), and a roof reinforced by anchor rods (17) is formed on the top of the next segmented inverted trapezoidal pillar (162), so as to ensure safe mining of the inverted trapezoidal pillar (162); After the roof support is completed, a prospecting tunnel (168) is constructed at the bottom of the inverted trapezoidal pillar (162) to be mined to the upper wall of the ore body (16), and medium-deep blastholes (169) are constructed in the prospecting tunnel (168) to blast the ore, and the ore is mined backward from the upper wall to the lower wall of the ore body (16). After the inverted trapezoidal pillar (162) is mined, the goaf is filled. For the inverted trapezoidal pillars (162) whose trapezoidal mine rooms (161) on both sides have been mined, multiple inverted trapezoidal pillars (162) can be constructed simultaneously; S4: When drilling a blasthole, first adjust the angle of the drill rod (3), and control the operation of the electric push rod (152) so that the electric push rod (152) applies a force to the base (1), so that the base (1) rotates relative to the hinge plate (151), thereby adjusting the drilling angle of the drill rod (3); Subsequently, the first motor (201) and the second motor (6) are controlled to operate. When the second motor (6) is in operation, the output shaft of the second motor (6) drives the driving gear (601) to mesh with the driven gear (602) for transmission, so that the driven gear (602) drives the drill rod (3) to rotate. When the first motor (201) is in operation, its output shaft drives the screw rod (202) to rotate, and the moving seat (203) threadedly connected to the screw rod (202) drives the drill rod (3) to move axially. When the drill rod (3) moves forward, the arc-shaped piece (3021) at the end drill bit (302) is no longer pushed by the moving tube (7). The arc-shaped pieces (3021) on the drill bit (302) are aligned with each other before drilling into the ore body (16), so that the drill rod (3) moves forward when rotating to perform a drilling operation. When the screw rod (202) rotates, the screw rod (8) is driven to rotate through the synchronous wheel (9) and the synchronous belt. When the screw rod (8) rotates, the moving tube (7) threadedly connected thereto moves. The moving tube (7) moves in the opposite direction to the drill rod (3). When the screw rod (8) moves, the winding drum (13) is driven to rotate through the guide bar (132). The winding drum (13) pulls the push block (702) through the pull rope (131). The push block (702) drives the partition plate (7021) to move relative to the moving tube (7). The push block (702) squeezes the first elastic element (703). When the medium-long blasthole (169) drilled by the drill rod (3) meets the required depth, the partition (7021) no longer blocks the lower opening of the storage box (5), and the blasting tube body (4) in the storage box (5) falls into the movable tube (7) through the feed port (701), and the limiting rod (1001) on the push block (702) is aligned with the limiting hole (11) of the movable tube (7). The limiting rod (1001) is inserted into the limiting hole (11) under the elastic force of the second elastic element (1002), thereby limiting the positions of the push block (702) and the movable tube (7), and completing the loading of the blasting tube body (4); Then, the first motor (201) is controlled to drive the screw rod (202) to run in the reverse direction, so that the drill rod (3) moves toward the outside of the medium-deep hole blast hole (169), and the moving tube (7) moves toward the drill rod (3). During this process, the winding drum (13) releases the pull rope (131), and the pull rope (131) no longer generates a pulling force on the push block (702); After the drill rod (3) moves out of the medium-deep hole blasthole (169), the movable tube (7) moves to the initial position inside the drill rod (3), the end of the movable tube (7) and the force-bearing rod (12) at the end abut against the arc-shaped piece (3021) at the end of the drill rod (3), and the arc-shaped piece (3021) is overturned by the force and no longer closes the end of the drill rod (3); After the force-bearing rod (12) is abutted by the arc-shaped piece (3021), it moves and exerts a force on the extrusion slope of the limiting rod (1001). The limiting rod (1001) is forced to move upward and no longer limits the movable tube (7). The push block (702) is no longer pulled by the pull rope (131) and is reset under the elastic force of the first elastic element (703). During the reset process of the push block (702), the partition (7021) blocks the bottom opening of the material storage box (5), and the push block (702) pushes the blasting tube body (4) in the movable tube (7), so that the blasting tube body (4) moves out of the drill rod (3) and enters the medium-deep hole blast hole (169); The buffer plate (14) at the end of the blasting tube body (4) entering the medium-deep hole blasting hole (169) first abuts against the inner wall of the deep hole, and the buffer plate (14) moves to squeeze the fourth elastic element (141) to buffer and reduce the impact on the blasting tube body (4). When the buffer plate (14) moves, the plastic wrapping the curing agent (405) is punctured by the puncture needle (142), so that the curing agent (405) leaks out and fills the gap between the blasting tube body (4) and the inner wall of the hole. At the same time, the elastic expansion plates (404) on the front ring (402) and the rear ring (403) abut against the inner wall of the hole, thereby strengthening the connection between the blasting tube body (4) and the medium-deep hole blasting hole (169); The above operation is repeated to quickly perform the drilling work of a plurality of medium-length blastholes (169) and the installation of the blasting tube body (4).