Air cooling control method, device, medium and electronic equipment in hollow plate processing
By adjusting the air-cooling wind speed of the hollow board in real time and determining the appropriate air-cooling wind speed range according to the surface temperature and ambient temperature, the problem of difficulty in adjusting the wind speed during the air-cooling setting process is solved, and the adaptive adjustment of the air-cooling wind speed is realized to ensure that the hollow board Styling quality and production efficiency.
Patent Information
- Application Number
- CN202410611491.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-16
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-05-16
AI Technical Summary
During the air-cooling shaping process of hollow panels, changes in ambient temperature make it difficult to adjust the air-cooling speed and maintain a reasonable cooling speed, which may lead to poor shaping quality or internal defects.
By obtaining the surface temperature and ambient temperature of the target semi-finished product, the appropriate air-cooling wind speed range is determined, and the air-cooling wind speed is adjusted in real time until a reasonable cooling speed range is reached to ensure adaptive dynamic adjustment of the air-cooling wind speed and avoid abnormal cooling speed.
It realizes the adaptive adjustment of air-cooling wind speed, ensures the stability of the shaping quality of the hollow board, reduces the risk of internal defects, and improves production efficiency and product quality.
Smart Images

Figure CN118463491B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of hollow plate processing, and in particular to an air cooling control method, device, medium and electronic equipment in hollow plate processing. Background Art
[0002] Hollow board, also called hollow grid board, Wantong board, corrugated board, double wall board, English name is PP plate sheet, is a new type of hollow structure material with light weight, non-toxic, pollution-free, waterproof, shockproof, anti-aging, corrosion-resistant and rich colors. Compared with cardboard structure products, hollow board has the advantages of moisture resistance and corrosion resistance. At present, the conventional processing flow of hollow board is: put the inorganic material into the mixing bucket for stirring, and then put it into the extruder through the feed hopper. After being formed by the forming mold, it is transported along the conveying cylinder. During the transportation process, it will enter the drying and heating link to heat it to maintain a certain shape. Further, it will enter the air cooling and shaping link to use the air cooling device to cool it to shape it. Finally, it will be cut by the cutting mechanism to form the required hollow board.
[0003] Among them, in the air cooling and shaping process, the air cooling speed of the hollow plate is adjusted mainly through the multi-stage gear adjustment method of the air cooling device, so that better cooling and shaping can be carried out. However, once the ambient temperature changes, the air cooling speed needs to be adjusted for better cooling and shaping. It is difficult to adjust the air cooling speed to meet the quality requirements of hollow plate shaping through the gear adjustment method. Summary of the invention
[0004] In order to facilitate adjustment to an air cooling speed that meets the quality requirements of hollow board shaping, the present application provides an air cooling control method, device, medium and electronic equipment in hollow board processing.
[0005] In a first aspect of the present application, a method for controlling air cooling in hollow plate processing is provided, which specifically comprises:
[0006] Obtaining the cooling rate of the surface temperature of a target semi-finished product at the current time, wherein the target semi-finished product is a hollow plate semi-finished product in an air-cooling finalizing stage;
[0007] Determine whether the cooling speed is within a preset reasonable cooling speed range, and if not, obtain the current surface temperature and current ambient temperature of the target semi-finished product;
[0008] Determining a first suitable wind speed range for air-cooling and shaping the target semi-finished product according to the current surface temperature and the current ambient temperature;
[0009] The actual air cooling wind speed for air cooling the target semi-finished product is obtained. If the actual air cooling wind speed is not within the first suitable wind speed range, the air cooling power of the target semi-finished product is adjusted until the adjusted actual air cooling wind speed is within the first suitable wind speed range, and the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time is repeated.
[0010] By adopting the above technical scheme, if the cooling speed is not within a reasonable cooling speed range, it means that there is a high risk of internal defects in the target semi-finished product after the shaping is completed, and countermeasures need to be taken to adjust the cooling speed of the target semi-finished product during the air cooling and shaping process. Furthermore, according to the current surface temperature of the target semi-finished product and the current ambient temperature, the first suitable wind speed range for air cooling and shaping the target semi-finished product under the current environment is determined. If the actual air cooling speed is not within the first suitable wind speed range, it means that the actual air cooling speed is too large or too small compared to the first suitable wind speed range, which leads to the abnormal cooling speed of the target semi-finished product. Then, the wind speed for air cooling and shaping of the target semi-finished product is adjusted to restore it to the first suitable wind speed range. Finally, the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time is repeated to realize adaptive dynamic adjustment of the air cooling speed, so as to facilitate adjustment to the air cooling speed that meets the shaping quality requirements of the hollow board, that is, the air cooling speed that avoids the occurrence of internal defects in the produced hollow board.
[0011] Optionally, the method further includes:
[0012] Determine a first suitable conveying speed range of the conveying cylinder where the target semi-finished product is located under the first suitable wind speed range;
[0013] If the actual air cooling wind speed is within the first suitable wind speed range and the current conveying speed of the conveying drum is not within the first suitable conveying speed range, determine the suitable natural cooling time range of the target semi-finished product between the drying and heating stage and the air cooling and shaping stage according to the drying end temperature of the target semi-finished product at the end of the drying and heating stage and the current ambient temperature;
[0014] Determine the conveying distance between the drying and heating step and the air cooling and shaping step, and determine the corresponding second appropriate conveying speed range according to the conveying distance and the reasonable natural cooling time range;
[0015] According to the remaining delivery time and the completion progress of the production batch to which the target semi-finished product belongs, determine the minimum conveying speed of the conveying cylinder where the target semi-finished product is located, the smaller the remaining delivery time and the completion progress, the greater the corresponding minimum conveying speed;
[0016] When the minimum conveying speed is within the second suitable conveying speed range, the starting speed of the second suitable conveying speed range is adjusted to the minimum conveying speed to obtain a final conveying speed range; and when the minimum conveying speed is not within the second suitable conveying speed range, the second suitable conveying speed range is determined as the final conveying speed range;
[0017] The cooling speed is adjusted according to the final conveying speed range and the first appropriate conveying speed range.
[0018] By adopting the above technical solution, if the actual air-cooling wind speed is within the first suitable wind speed range and the current conveying speed of the conveying drum is not within the first suitable conveying speed range, it means that the abnormal cooling speed of the surface temperature of the current target semi-finished product is most likely caused by the unreasonable conveying speed of the conveying drum. Then determine the second suitable conveying speed range and the minimum conveying speed of the conveying drum, and then determine the final conveying speed range, that is, the conveying speed range that avoids abnormal natural cooling after the drying and heating link. Finally, according to the final conveying speed range and the first suitable conveying speed range, adjust the cooling speed to avoid the current air-cooled finalized target semi-finished product from continuing to have abnormal cooling problems, and at the same time avoid the next cooling abnormality of the hollow plate semi-finished product during the process of being transported from the drying and heating link to the air-cooling finalization link.
[0019] Optionally, adjusting the cooling speed according to the final conveying speed range and the first suitable conveying speed range specifically includes:
[0020] If the final conveying speed range intersects with the first suitable conveying speed range, determining a target conveying speed based on the intersection result, and adjusting the current conveying speed to the target conveying speed;
[0021] If the final conveying speed range does not intersect with the first suitable conveying speed range, adjusting the current conveying speed to be within the final conveying speed range, and re-determining a second suitable wind speed range for air cooling the target semi-finished product according to the final conveying speed range;
[0022] According to the second suitable wind speed range, the actual air cooling wind speed is adjusted to adjust the cooling speed.
[0023] By adopting the above technical scheme, if there is an intersection, the intersection result is determined as the target conveying speed, and the current conveying speed is adjusted to this target conveying speed, thereby avoiding the current target semi-finished product that is air-cooled and finalized to continue to have cooling abnormalities (abnormal cooling speed) problems, while avoiding the next hollow board semi-finished product that is transported from the drying and heating stage to the air-cooling and finalizing stage. The cooling abnormality can also be improved, and the production efficiency of the hollow board can be avoided, and delivery delays can be avoided. If there is no intersection, the actual air cooling wind speed at the current time is adjusted to the second suitable wind speed range, thereby realizing the adjustment of the cooling speed, eliminating the cooling abnormality problem, and avoiding internal defects of the hollow board.
[0024] Optionally, obtaining a qualified rate of a production batch to which the target semi-finished product belongs, and if the qualified rate is lower than a preset first threshold, determining a defective product having the largest proportion among all the defective products of the production batch;
[0025] When the qualified rate is lower than the preset second threshold, the production link with the first number is selected as the first screening link according to the production links of the hollow board from front to back. The lower the qualified rate, the smaller the corresponding first number, and the first threshold is greater than the second threshold.
[0026] According to the defective product, determine a first key investigation link from each of the first investigation links, and send an investigation reminder corresponding to the first key investigation link to a terminal of a maintenance personnel;
[0027] When the qualified rate is not lower than the second threshold, according to the production links of the hollow board from back to front, the production link with the second number is selected as the second screening link, and the lower the qualified rate, the larger the corresponding second number;
[0028] According to the defective product, a second key inspection link is determined from each of the second inspection links, and an inspection reminder corresponding to the second key inspection link is sent to the terminal of the maintenance personnel.
[0029] By adopting the above technical solution, if the qualified rate is lower than the first threshold, it means that the qualified rate of the hollow board of this production batch is not compliant, which may be due to equipment failure or parameter setting problems in a certain production link. Then, if the qualified rate is lower than the second threshold, it means that the situation of waste products in this production batch is relatively serious, and there are a large number of waste products. Then, according to the order of the production links of the hollow board from front to back, the production link that has a greater impact on the quality of the hollow board produced and has more waste products is selected, that is, the first investigation link, and then finally and reasonably determine the object of the final investigation to improve the pertinence of the investigation; if the qualified rate is not lower than the second threshold, it means that the qualified rate of this production batch is unqualified but not more serious. According to the order of the production links of the hollow board from back to front, the second number of production links is selected as the second investigation link, that is, the production link with a later order, less impact on the quality of the hollow board produced, and relatively fewer waste products, so as to select the production link with a higher investigation priority to improve the pertinence of the investigation.
[0030] Optionally, determining a first key investigation link from each of the first investigation links according to the defective product, specifically includes:
[0031] Obtaining a first historical number of disability and a first historical induced defect of each of the first screening links, wherein the first historical number of disability is the number of historical production batches of defective products caused by the corresponding first screening link, and the first historical induced defect is a historical defective product induced by the corresponding first screening link;
[0032] Calculate a first weight for each of the first screening links, where the first weight is a ratio of a first historical number of disability cases for each of the first screening links to a sum of the first historical number of disability cases for all of the first screening links;
[0033] Counting the first occurrence times of each of the first historical induced defects corresponding to each of the first troubleshooting links, and selecting the third first historical induced defect from each of the first historical induced defects in the corresponding first troubleshooting links in descending order of the first occurrence times to determine it as a first easily induced defect;
[0034] Calculating a second weight of the first easily induced defect corresponding to each of the first troubleshooting links, where the second weight is a ratio of a first occurrence number of the first easily induced defect corresponding to each of the first troubleshooting links to a sum of first occurrence numbers of all corresponding first easily induced defects;
[0035] Based on the first weight of each of the first inspection links and the corresponding second weight of the defective product, a first key inspection link is determined from each of the first inspection links.
[0036] By adopting the above technical solution, the more times the first historical disability is caused, the more likely the corresponding first screening link is to produce defects in the production batch, and then the first weight of each first screening link is determined, thereby characterizing the possibility that the first screening link causes defects in the production batch. Furthermore, the greater the number of first occurrences, the more likely the corresponding first historical induced defects will appear in the resulting defective products in the corresponding first screening link, and then the second weight of the first easily induced defect corresponding to each first screening link is determined. According to the first weight of each first screening link and the second weight of the corresponding defective product, the probability of each first screening link inducing the defective product in this production batch is judged, and finally the first key screening link is determined, thereby improving the pertinence of the screening.
[0037] Optionally, determining a first key inspection link from each of the first inspection links based on the first weight of each of the first inspection links and the corresponding second weight of the defective product specifically includes:
[0038] Calculate the product of the first weight of each first screening link and the corresponding second weight of the defective product;
[0039] The maximum product is selected from each of the products, and the first investigation link corresponding to the maximum product is determined as the first key investigation link.
[0040] By adopting the above technical solution, the product of the first weight of each first screening link and the second weight of the corresponding defective product is calculated, that is, the combined weight of each first screening link and the corresponding defective product. The larger the product, the greater the probability that the corresponding first weight induces the occurrence of this defective product in the hollow board. Then the first screening link corresponding to the maximum product is determined as the first key screening link, that is, the production link with the highest probability of inducing this defective product in the hollow board. This makes the screening more targeted and improves the screening efficiency of the production link that causes serious defective products.
[0041] Optionally, determining a second key investigation link from each of the second investigation links according to the defective product, specifically includes:
[0042] Obtaining a second historical number of disability and a second historical induced defect of each second screening link, where the second historical number of disability is the number of historical production batches of defective products caused by the corresponding second screening link, and the second historical induced defect is a historical defective product induced by the corresponding second screening link;
[0043] Calculate the third weight of each second screening link, where the third weight is the ratio of the second historical number of disability cases of each second screening link to the sum of the second historical number of disability cases of all second screening links;
[0044] Counting the second occurrence times of each of the second historical induced defects corresponding to each of the second troubleshooting links, and selecting the second historical induced defect with the third number from each of the second historical induced defects in the corresponding second troubleshooting links in descending order of the second occurrence times to determine it as a second easily induced defect;
[0045] Calculating a fourth weight of the second easily induced defect corresponding to each of the second troubleshooting links, where the fourth weight is a ratio of a second number of occurrences of the second easily induced defect corresponding to each of the second troubleshooting links to a sum of second number of occurrences of all corresponding second easily induced defects;
[0046] Based on the third weight of each of the second inspection links and the corresponding fourth weight of the defective product, a second key inspection link is determined from each of the second inspection links.
[0047] By adopting the above technical solution, the more the second historical disability times are, the more likely the corresponding second screening link is to produce defects in the production batch, and then the third weight of each second screening link is determined, thereby characterizing the possibility that the second screening link causes defects in the production batch. Furthermore, the greater the second occurrence times are, the more likely the corresponding second historical induced defects are to appear in the resulting defective products in the corresponding second screening link, and then the fourth weight of the second easily induced defect corresponding to each second screening link is determined. According to the third weight of each second screening link and the fourth weight of the corresponding defective product, the probability of each second screening link inducing the defective product in this production batch is judged, and finally the second key screening link is determined, thereby improving the pertinence of the screening.
[0048] In a second aspect of the present application, there is provided an air cooling control device for hollow plate processing, specifically comprising:
[0049] A speed acquisition module, used to acquire the cooling speed of the surface temperature of the target semi-finished product at the current time, wherein the target semi-finished product is a hollow plate semi-finished product in the air cooling and shaping stage;
[0050] A temperature acquisition module, used to determine whether the cooling speed is within a preset reasonable cooling speed range, and if not, to acquire the current surface temperature and current ambient temperature of the target semi-finished product;
[0051] A wind speed determination module, used to determine a first suitable wind speed range for air cooling and shaping the target semi-finished product according to the current surface temperature and the current ambient temperature;
[0052] The wind speed adjustment module is used to obtain the actual wind speed for cooling the target semi-finished product. If the actual wind speed for cooling the target semi-finished product is not within the first suitable wind speed range, the wind cooling power of the target semi-finished product is adjusted until the adjusted actual wind speed is within the first suitable wind speed range, and the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time is repeated.
[0053] By adopting the above technical solution, the speed acquisition module acquires the cooling speed of the surface temperature of the target semi-finished product. When the cooling speed is not within a reasonable cooling speed range, the temperature acquisition module acquires the current surface temperature and the current ambient temperature. Then the wind speed determination module determines the first suitable wind speed range according to the current surface temperature and the current ambient temperature. Finally, the wind speed adjustment module adjusts the actual air cooling speed according to the first suitable wind speed range to make it within the first suitable wind speed range.
[0054] In a third aspect of the present application, a computer-readable storage medium is provided, in which a computer program is stored. When the computer program is loaded and executed by a processor, the method steps described in any one of the first aspects are performed.
[0055] In a fourth aspect of the present application, an electronic device is provided, specifically comprising:
[0056] A processor, a memory, and a computer program stored in the memory and capable of running on the processor, wherein the processor is used to load and execute the computer program stored in the memory so that the electronic device performs the method as described in any one of the first aspects.
[0057] To sum up, the present application includes at least one of the following beneficial technical effects: if the cooling speed is not within a reasonable cooling speed range, it means that there is a high risk of internal defects in the target semi-finished product after the shaping is completed, and countermeasures need to be taken to adjust the cooling speed of the target semi-finished product during the air cooling and shaping process. Furthermore, according to the current surface temperature of the target semi-finished product and the current ambient temperature, the first suitable wind speed range for air cooling and shaping the target semi-finished product under the current environment is determined. If the actual air cooling speed is not within the first suitable wind speed range, it means that the actual air cooling speed is too large or too small compared to the first suitable wind speed range, which leads to the abnormal cooling speed of the target semi-finished product. Then, the wind speed for air cooling and shaping of the target semi-finished product is adjusted to restore it to the first suitable wind speed range. Finally, the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time is repeated to realize adaptive dynamic adjustment of the air cooling speed, so as to facilitate adjustment to the air cooling speed that meets the quality requirements of hollow board shaping. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1It is a flow chart of an air cooling control method in hollow plate processing provided in an embodiment of the present application;
[0059] Figure 2 It is a flow chart of another air cooling control method in hollow plate processing provided in an embodiment of the present application;
[0060] Figure 3 It is a structural schematic diagram of an air cooling control device in hollow plate processing provided in an embodiment of the present application;
[0061] Figure 4 It is a structural schematic diagram of another air cooling control device for hollow plate processing provided in an embodiment of the present application.
[0062] Explanation of the accompanying drawings: 11. Speed acquisition module; 12. Temperature acquisition module; 13. Wind speed determination module; 14. Wind speed adjustment module; 15. Cooling adjustment module; 16. Troubleshooting reminder module. DETAILED DESCRIPTION
[0063] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.
[0064] In the description of the embodiments of the present application, words such as "illustrative", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "illustrative", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "illustrative", "for example" or "for example" is intended to present related concepts in a concrete way.
[0065] See also Figure 1 The present application embodiment discloses a flow chart of a method for controlling air cooling in hollow plate processing, which can be implemented by a computer program or run on an air cooling control device for hollow plate processing based on the von Neumann system. The computer program can be integrated into an application or run as an independent tool application, specifically including:
[0066] S101: Obtaining the cooling rate of the surface temperature of the target semi-finished product at the current time.
[0067] Specifically, the target semi-finished product is a hollow plate semi-finished product in the air-cooling and shaping stage, that is, a semi-finished product that has finished the drying and heating stage in the hollow plate production line and entered the air-cooling and shaping stage. The cooling rate refers to the drop in surface temperature per unit time of the target semi-finished product during air-cooling and shaping. Further, the surface temperature of the target semi-finished product at the current time is obtained by a preset infrared thermometer. In an embodiment of the present application, the surface temperature of the target semi-finished product is measured once per unit time during the air-cooling and shaping process of the target semi-finished product, and then the surface temperature of the last measurement at the current time is subtracted from the surface temperature at the current time to determine the cooling rate of the surface temperature of the target semi-finished product at the current time. Among them, the unit time can be 1 second, and in other embodiments, the unit time can also be 1 minute. It should be noted that the greater the cooling rate, the faster the surface temperature of the target semi-finished product drops, which will make the temperature gradient of the target semi-finished product too large, generate thermal stress, and cause internal defects in the hollow plate that is finally shaped.
[0068] In addition, an air cooling control method in hollow plate processing disclosed in an embodiment of the present application is applied to a server, and the server receives data information of the surface temperature sent by an infrared thermometer, and finally determines the cooling speed. The server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers. In other embodiments, it can also be applied to the air cooling device in the air cooling and shaping link of the hollow plate production line, and is used to adaptively adjust the air cooling wind speed of the air cooling device for the target semi-finished product, so that the final hollow plate has fewer internal defects and higher quality. The air cooling device can be a fan device.
[0069] S102: Determine whether the cooling speed is within a preset reasonable cooling speed range; if not, obtain the current surface temperature and current ambient temperature of the target semi-finished product.
[0070] Specifically, the reasonable cooling speed range refers to the cooling speed range in which the hollow plate will not produce internal defects after cooling and finalizing. The technicians conduct experiments at different cooling speeds to observe the cooling effect, deformation, internal stress and product quality of the hollow plate to obtain test results. According to the test results, the cooling speed is gradually adjusted to finally determine the reasonable cooling speed range. After the cooling speed at the current time is determined, if the cooling speed is not within the reasonable cooling speed range, it means that there is a high risk of internal defects after the target semi-finished product is finalized, and countermeasures need to be taken to adjust the cooling speed of the target semi-finished product during the air-cooling finalizing process. Then, the current ambient temperature of the workshop where the air-cooling finalizing link is located is obtained through the preset temperature sensor, and the current surface temperature of the target semi-finished product is obtained through the preset infrared thermometer.
[0071] S103: Determine a first suitable wind speed range for air-cooling the target semi-finished product according to the current surface temperature and the current ambient temperature.
[0072] Specifically, since both the current surface temperature and the current ambient temperature will affect the effect of the air-cooling device on the air-cooling of the target semi-finished product, for example, if the current surface temperature is too high, the cooling effect of the smaller air-cooling speed is poor; when the current ambient temperature is too high, the cooling effect of the smaller air-cooling speed is poor, so in the embodiment of the present application, the appropriate air-cooling speed range during air-cooling finalization is determined specifically according to the current surface temperature and the current ambient temperature, that is, the first appropriate wind speed range, and the first appropriate wind speed range is the air-cooling speed range interval with good air-cooling cooling effect and normal cooling speed. A feasible determination method is: the first appropriate wind speed range corresponding to the combination of the current surface temperature and the current ambient temperature is matched through the appropriate wind speed range matching table preset in the database, and the appropriate wind speed range matching table includes the appropriate wind speed range corresponding to the combination of different surface temperatures and ambient temperatures. Among them, the technicians conduct air-cooling finalization tests at different surface temperatures and ambient temperatures, observe the cooling effect, deformation, internal stress and product quality of the hollow plate, and obtain the test results. According to the test results, the air-cooling speed is gradually adjusted, and the data in the appropriate wind speed range matching table is finally determined.
[0073] S104: Obtain the actual air cooling wind speed for air cooling the target semi-finished product. If the actual air cooling wind speed is not within the first suitable wind speed range, adjust the air cooling power of the target semi-finished product until the adjusted actual air cooling wind speed is within the first suitable wind speed range, and repeat the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time.
[0074] Specifically, after the first suitable wind speed range is determined, the actual wind speed of the wind cooling device for cooling the target semi-finished product at the current time is obtained through a preset wind speed sensor. If the actual wind cooling speed is not within the first suitable wind speed range, it means that the actual wind cooling speed is too large or too small compared to the first suitable wind speed range, which leads to abnormal cooling speed of the target semi-finished product. Then adjust the wind cooling power of the target semi-finished product, that is, adjust the power of the wind cooling device, and then adjust the wind cooling speed of the target semi-finished product. For example, if the actual wind cooling speed is too large, it is necessary to lower the power of the wind cooling device so that the wind cooling speed of the target semi-finished product is reduced to the first suitable wind speed range. When the actual wind cooling speed after adjustment is within the first suitable wind speed range, it means that the wind cooling speed has returned to normal, and the target semi-finished product is cooled and shaped normally, reducing the risk of internal defects in the hollow plate after shaping. Finally, repeat the step of obtaining the cooling rate of the surface temperature of the target semi-finished product at the current time, that is, during the air-cooling shaping process, continue to monitor the cooling rate of the surface temperature of the target semi-finished product. Once an abnormality occurs, redetermine the appropriate air-cooling speed under the current environment based on the surface temperature and ambient temperature of the target semi-finished product that may change, and finally realize adaptive dynamic adjustment of the air-cooling speed of the air-cooling device, so as to facilitate maintaining the air-cooling speed at always meeting the quality requirements of the hollow board shaping.
[0075] In other embodiments, the first suitable conveying speed range corresponding to the first suitable wind speed range is matched through a preset conveying speed matching table, which is a suitable conveying speed range of the conveying cylinder that avoids abnormal cooling of the target semi-finished product under the premise of the first suitable wind speed range. The conveying speed matching table includes different suitable wind speed ranges and corresponding suitable conveying speed ranges, which are determined based on experiments by technicians, and can be specifically referred to step S103.
[0076] If the actual air-cooling wind speed is within the first suitable wind speed range and the current conveying speed of the conveying drum is not within the first suitable conveying speed range, it means that the abnormal cooling speed of the current target semi-finished product surface temperature is most likely caused by the unreasonable conveying speed of the conveying drum. For example, if the conveying speed is too fast, the cooling speed will be too low, and the conveying speed needs to be readjusted. Then, the drying end temperature of the target semi-finished product at the end of the drying and heating stage is selected from the temperature data historically received from the server, that is, the surface temperature at the end of the drying and heating. Among them, after the drying and heating stage is completed, the target semi-finished product will be transported by the conveying drum to the air-cooling and shaping stage, and it will be in a state of natural cooling during the conveying process. The current conveying speed of the conveying drum is obtained by a rotary encoder installed on the driving shaft of the conveying drum.
[0077] Furthermore, by matching the appropriate natural cooling time range corresponding to the combination of the drying end temperature and the current ambient temperature in the preset cooling time matching table, a suitable natural cooling time range is obtained to avoid cooling abnormalities in the transportation process from the drying and heating link to the air cooling and shaping link. The cooling time matching table includes different combinations of drying end temperatures and ambient temperatures and the corresponding appropriate natural cooling time ranges, all of which are determined based on experiments by technicians. The distance sensor is then used to obtain the transportation distance from the drying and heating link to the air cooling and shaping link, and the transportation distance is then divided by the starting cooling time and the end cooling time of the appropriate natural cooling time range to obtain the corresponding transportation speed, and finally the second appropriate transportation speed range is determined.
[0078] Furthermore, the receiving personnel's terminal sends the remaining delivery time and the completion progress of this production batch. The smaller the remaining delivery time, the shorter the remaining production time of this production batch. The minimum speed matching table preset in the database matches the minimum delivery speed corresponding to the combination of the remaining delivery time and the completion progress. The minimum speed matching table includes different combinations of remaining delivery time and completion progress and the corresponding minimum delivery speeds, which is set by the personnel based on experience. The smaller the remaining delivery time and the completion progress, the greater the corresponding minimum delivery speed in order to improve production efficiency and ensure on-time delivery.
[0079] If the minimum conveying speed is within the second suitable conveying speed range, the starting speed of the second suitable conveying speed range is adjusted to the minimum conveying speed to obtain the final conveying speed range. The conveying speed in this final conveying speed range can not only avoid abnormal natural cooling after the drying and heating process, but also ensure production efficiency. If the minimum conveying speed is not within the second suitable conveying speed range, the second suitable conveying speed range is determined as the final conveying speed range in order to ensure the quality of the hollow board.
[0080] Furthermore, the first suitable conveying speed range is intersected with the final conveying speed range. If the two intersect, the intersection result is determined as the target conveying speed, and finally the current conveying speed is adjusted to the target conveying speed to adjust the cooling speed, thereby avoiding the current target semi-finished product that is air-cooled and finalized from continuing to have cooling abnormalities (abnormal cooling speed) problems, and at the same time avoiding the next natural cooling abnormality of the hollow board semi-finished product during transportation from the drying and heating link to the air cooling and finalization link. In addition, it can also improve the production efficiency of the hollow board and avoid delivery delays.
[0081] If there is no intersection between the two, the current conveying speed of the conveying cylinder is adjusted to the final conveying speed range, and the second suitable wind speed range corresponding to the final conveying speed range is matched from the above conveying speed matching table, and the suitable wind speed range for air cooling and shaping of the target semi-finished product to avoid cooling abnormalities is re-determined under this final conveying speed range. The actual air cooling wind speed at the current time is adjusted to the second suitable wind speed range, thereby adjusting the cooling speed, eliminating the cooling abnormality problem, and avoiding internal defects of the hollow plate.
[0082] See also Figure 2 The present application embodiment discloses a flow chart of another air cooling control method in hollow plate processing, which can be implemented by a computer program or run on an air cooling control device in hollow plate processing based on the von Neumann system. The computer program can be integrated into an application or run as an independent tool application, specifically including:
[0083] S201: Obtain the cooling rate of the surface temperature of the target semi-finished product at the current time.
[0084] S201: Determine whether the cooling speed is within a preset reasonable cooling speed range. If not, obtain the current surface temperature and current ambient temperature of the target semi-finished product.
[0085] S203: Determine a first suitable wind speed range for air-cooling the target semi-finished product according to the current surface temperature and the current ambient temperature.
[0086] S204: Obtain the actual air cooling wind speed for air cooling the target semi-finished product. If the actual air cooling wind speed is not within the first suitable wind speed range, adjust the air cooling power of the target semi-finished product until the adjusted actual air cooling wind speed is within the first suitable wind speed range, and repeat the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time.
[0087] For details, please refer to steps S101-S104, which will not be described in detail here.
[0088] S205: Obtain the qualified rate of the production batch to which the target semi-finished product belongs. If the qualified rate is lower than a preset first threshold, determine the defective product with the largest proportion among all the defective products in the production batch.
[0089] Specifically, after all hollow boards in the production batch to which the target semi-finished product belongs are produced, the qualified rate of this production batch is received from the terminal of the quality inspector, and the terminal can be a smart phone or a personal computer. The qualified rate is compared with the preset first threshold value, which is the critical value for judging whether the qualified rate of the hollow boards is compliant. If the qualified rate is lower than the first threshold value, it means that the qualified rate of the hollow boards in this production batch is not compliant. It may be that there is a problem with the equipment failure or parameter setting in a certain production link, resulting in a large number of unqualified hollow boards produced. Then the quality inspector counts the largest proportion of all unqualified defective products and sends them to the server through the terminal. The server determines the largest proportion of defective products.
[0090] S206: When the qualified rate is lower than the preset second threshold, the first production link is selected as the first screening link according to the production links of the hollow board from front to back.
[0091] Specifically, the qualified rate is continued to be compared with the second threshold value, and the second threshold value is a critical value for judging the qualified rate of this production batch. If the qualified rate is lower than the second threshold value, it means that the situation of the residual products in this production batch is relatively serious, and there are a large number of residual products. Then, according to the order of the production links of the hollow board from front to back, in the embodiment of the present application, it is the order of the links such as the inorganic material feeding link, the mold extrusion molding link, the drying and heating link, the air cooling and shaping link to the cutting link. The production link of the first number is selected from each production link to be determined as the first investigation link, that is, the production link with the front sequence, the greater impact on the quality of the hollow board output, and the more residual products appear, the lower the qualified rate, the smaller the corresponding first number, so as to reasonably select the production link with a higher priority for investigation, and improve the pertinence of the investigation. For example, there is a problem in the feeding link of the most upstream production link, and a large number of residual products will be produced in the end. Among them, the first threshold value is greater than the second threshold value. In addition, the server receives the hollow board production process information sent by the terminal of the personnel, and the information of the production link of the hollow board includes the production link with a sequential order.
[0092] S207: According to the defect of the defective product, a first key inspection link is determined from each first inspection link, and an inspection reminder corresponding to the first key inspection link is sent to the terminal of the maintenance personnel.
[0093] Specifically, from the historical quality inspection records of completed production batches, the number of historical production batches that have defective products due to a single first screening link is counted, that is, the first historical number of disability. The greater the number of first historical disability, the more likely the corresponding first screening link is to produce defects in the production batch. At the same time, the specific defective defects induced by the corresponding first screening link are determined in the historical production batches that have defective products due to a single first screening link, that is, the first historical induced defects. Further, the first weight of each first screening link is calculated, that is, the ratio of the first historical number of disability of each first screening link to the sum of the first historical number of disability of all first screening links.
[0094] Furthermore, from the historical quality inspection records, the first occurrence times of each first historical induced defect corresponding to each first screening link are counted. The larger the first occurrence times, the more likely the corresponding first historical induced defect will appear in the resulting defective products in the corresponding first screening link. Then, in descending order of the first occurrence times, the third number of first historical induced defects are selected from each first historical induced defect of the corresponding first screening link, and all are determined as the first easy-to-induce defect. The historical quality inspection records include the production batches where defects occurred in the past, the defective product conditions, etc.
[0095] Furthermore, the second weight of each first easily induced defect corresponding to each first troubleshooting link is calculated, and the second weight is the ratio of the first occurrence number of the first easily induced defect corresponding to each first troubleshooting link to the sum of the first occurrence numbers of all corresponding first easily induced defects.
[0096] Finally, based on the first weight of each first investigation link and the second weight of the corresponding defective product, the first key investigation link is determined from each first investigation link. The specific process is: calculate the product of the first weight of each first investigation link and the second weight of the corresponding defective product, that is, the combined weight of each first investigation link and the corresponding defective product. The larger the product, the greater the probability that the corresponding first weight induces the occurrence of this defective product in the hollow board. Further, the maximum product is selected from each product, and the first investigation link corresponding to the maximum product is determined as the first key investigation link, that is, the production link with the highest probability of inducing this defective product in the hollow board. Finally, the investigation reminder corresponding to this first key investigation link is sent to the terminal of the maintenance personnel, so that the investigation is more targeted, thereby improving the investigation efficiency of the production link, and quickly determining the inducement that leads to the serious defective product situation.
[0097] In other embodiments, during the production of the next production batch of hollow boards, if the produced hollow boards have this defective product, the real-time production screen of each first screening link will be displayed on the terminal screen in split screens. The larger the product corresponding to the first screening link, the closer it is to the center of the field of view of the terminal screen when displayed, and the larger the displayed screen size, which makes it convenient for personnel to quickly determine whether the defective product is a normal defective product or an abnormal defective product. If a problem occurs in a certain first screening link, it is an abnormal defective product, and production is stopped for inspection; if all the first screening links are normal, it is a normal defective product, and production is temporarily continued.
[0098] S208: When the qualified rate is not lower than the second threshold value, the second numbered production link is selected as the second screening link in the order of the production links of the hollow board from back to front.
[0099] Specifically, if the qualified rate is not lower than the second threshold and lower than the first threshold, it means that the defective products of this production batch are unqualified but not serious. According to the order of the production links of the hollow board from back to front, the production link with the second number is selected as the second inspection link, that is, the production link with a later order, less impact on the quality of the output hollow board and relatively fewer defective products, the lower the qualified rate, the larger the corresponding second number, so as to reasonably select the production link with a higher inspection priority and improve the targeted inspection.
[0100] S209: According to the defect of the defective product, determine the second key inspection link from each second inspection link, and send an inspection reminder corresponding to the second key inspection link to the terminal of the maintenance personnel.
[0101] A feasible implementation method is: obtaining the second historical number of disability and the second historical induced defect of each second screening link, the second historical number of disability is the number of historical production batches of defective products caused by the corresponding second screening link, and the second historical induced defect is the historical defect of defective products induced by the corresponding second screening link; calculating the third weight of each second screening link, the third weight is the ratio of the second historical number of disability of each second screening link to the sum of the second historical number of disability of all second screening links; counting the second number of occurrences of each second historical induced defect corresponding to each second screening link, and selecting the third number of second historical induced defects from each second historical induced defect of the corresponding second screening link in descending order of the second number of occurrences to determine as the second easy-to-induce defect; calculating the fourth weight of the second easy-to-induce defect corresponding to each second screening link, the fourth weight is the ratio of the second number of occurrences of the second easy-to-induce defect corresponding to each second screening link to the sum of the second number of occurrences of all the corresponding second easy-to-induce defects; based on the third weight of each second screening link and the fourth weight of the corresponding defective product, determining the second key screening link from each second screening link.
[0102] For details, please refer to step S207, which will not be described in detail here.
[0103] The implementation principle of the air cooling control method in the hollow plate processing in the embodiment of the present application is: if the cooling speed is not within a reasonable cooling speed range, it means that there is a high risk of internal defects in the target semi-finished product after the shaping is completed, and countermeasures need to be taken to adjust the cooling speed of the target semi-finished product during the air cooling and shaping process. Furthermore, according to the current surface temperature of the target semi-finished product and the current ambient temperature, the first suitable wind speed range for air cooling and shaping the target semi-finished product under the current environment is determined. If the actual air cooling speed is not within the first suitable wind speed range, it means that the actual air cooling speed is too large or too small compared to the first suitable wind speed range, which leads to the abnormal cooling speed of the target semi-finished product. Then, the wind speed for air cooling and shaping the target semi-finished product is adjusted to restore it to the first suitable wind speed range. Finally, the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time is repeated to realize adaptive dynamic adjustment of the air cooling speed, so as to facilitate adjustment to the air cooling speed that meets the quality requirements of the hollow plate shaping.
[0104] The following are device embodiments of the present application, which can be used to execute the method embodiments of the present application. For details not disclosed in the device embodiments of the present application, please refer to the method embodiments of the present application.
[0105] See also Figure 3 , is a schematic diagram of the structure of the air cooling control device for hollow plate processing provided in the embodiment of the present application. The air cooling control device for hollow plate processing can be implemented as all or part of the device through software, hardware or a combination of both. The device includes a speed acquisition module 11, a temperature acquisition module 12, a wind speed determination module 13 and a wind speed adjustment module 14.
[0106] The speed acquisition module 11 is used to acquire the cooling speed of the surface temperature of the target semi-finished product at the current time, and the target semi-finished product is a hollow plate semi-finished product in the air cooling and shaping stage;
[0107] The temperature acquisition module 12 is used to determine whether the cooling speed is within a preset reasonable cooling speed range, and if not, to obtain the current surface temperature and current ambient temperature of the target semi-finished product;
[0108] A wind speed determination module 13 is used to determine a first suitable wind speed range for air cooling and shaping the target semi-finished product according to the current surface temperature and the current ambient temperature;
[0109] The wind speed adjustment module 14 is used to obtain the actual wind speed for cooling the target semi-finished product. If the actual wind speed is not within the first suitable wind speed range, the wind cooling power of the target semi-finished product is adjusted until the adjusted actual wind speed is within the first suitable wind speed range, and the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time is repeated.
[0110] Optional, such as Figure 4 As shown, the device also includes a cooling adjustment module 15, which is specifically used for:
[0111] Determine a first suitable conveying speed range of the conveying cylinder where the target semi-finished product is located under a first suitable wind speed range;
[0112] If the actual air cooling wind speed is within the first suitable wind speed range and the current conveying speed of the conveying drum is not within the first suitable conveying speed range, the suitable natural cooling time range of the target semi-finished product between the drying and heating stage and the air cooling and shaping stage is determined according to the drying end temperature of the target semi-finished product at the end of the drying and heating stage and the current ambient temperature;
[0113] Determine the conveying distance between the drying and heating stage and the air cooling and shaping stage, and determine the corresponding second appropriate conveying speed range according to the conveying distance and the reasonable natural cooling time range;
[0114] According to the remaining delivery time and completion progress of the production batch to which the target semi-finished product belongs, the minimum conveying speed of the conveying cylinder where the target semi-finished product is located is determined. The smaller the remaining delivery time and completion progress, the greater the corresponding minimum conveying speed;
[0115] When the minimum conveying speed is within the second suitable conveying speed range, the starting speed of the second suitable conveying speed range is adjusted to the minimum conveying speed to obtain the final conveying speed range; and when the minimum conveying speed is not within the second suitable conveying speed range, the second suitable conveying speed range is determined as the final conveying speed range;
[0116] The cooling speed is adjusted according to the final conveying speed range and the first appropriate conveying speed range.
[0117] Optionally, the cooling adjustment module 15 is specifically used for:
[0118] If the final conveying speed range intersects with the first suitable conveying speed range, a target conveying speed is determined based on the intersection result, and the current conveying speed is adjusted to the target conveying speed;
[0119] If the final conveying speed range does not intersect with the first suitable conveying speed range, the current conveying speed is adjusted to be within the final conveying speed range, and the second suitable wind speed range for air cooling the target semi-finished product is re-determined based on the final conveying speed range;
[0120] According to the second suitable wind speed range, the actual air cooling wind speed is adjusted to adjust the cooling speed.
[0121] Optionally, the device further includes a troubleshooting reminder module 16, which is specifically used to:
[0122] Obtaining the qualified rate of the production batch to which the target semi-finished product belongs, and if the qualified rate is lower than a preset first threshold, determining the defective product with the largest proportion among all the defective products in the production batch;
[0123] When the qualified rate is lower than the preset second threshold, the production link with the first number is selected as the first screening link according to the production links of the hollow board from front to back. The lower the qualified rate, the smaller the corresponding first number, and the first threshold is greater than the second threshold.
[0124] According to the defect of the defective product, the first key investigation link is determined from each first investigation link, and an investigation reminder corresponding to the first key investigation link is sent to the terminal of the maintenance personnel;
[0125] When the qualified rate is not lower than the second threshold, the production link with the second number is selected as the second screening link in the order of the production links of the hollow board from back to front. The lower the qualified rate, the larger the corresponding second number.
[0126] According to the defect of the residual product, the second key inspection link is determined from each second inspection link, and an inspection reminder corresponding to the second key inspection link is sent to the terminal of the maintenance personnel.
[0127] Optionally, the troubleshooting reminder module 16 is specifically used for:
[0128] Obtain the first historical number of disability and the first historical induced defect of each first screening link, where the first historical number of disability is the number of historical production batches of defective products caused by the corresponding first screening link, and the first historical induced defect is the historical defect of defective products induced by the corresponding first screening link;
[0129] Calculate the first weight of each first screening link, where the first weight is the ratio of the first historical number of disability cases of each first screening link to the sum of the first historical number of disability cases of all first screening links;
[0130] Counting the first occurrence times of each first historical induced defect corresponding to each first screening link, and selecting the first historical induced defect with the third number from each first historical induced defect of the corresponding first screening link in descending order of the first occurrence times to determine it as the first easily induced defect;
[0131] Calculate the second weight of the first easily induced defect corresponding to each first screening link, where the second weight is the ratio of the first occurrence number of the first easily induced defect corresponding to each first screening link to the sum of the first occurrence numbers of all corresponding first easily induced defects;
[0132] Based on the first weight of each first inspection link and the second weight of the corresponding defective product, a first key inspection link is determined from each first inspection link.
[0133] Optionally, the troubleshooting reminder module 16 is specifically used for:
[0134] Calculate the product of the first weight of each first screening link and the second weight of the corresponding defective product;
[0135] Select the maximum product from all the products, and determine the first investigation link corresponding to the maximum product as the first key investigation link.
[0136] Optionally, the troubleshooting reminder module 16 is specifically used for:
[0137] Obtain the second historical number of disability and the second historical induced defect of each second screening link, where the second historical number of disability is the number of historical production batches of defective products caused by the corresponding second screening link, and the second historical induced defect is the historical defect of defective products induced by the corresponding second screening link;
[0138] Calculate the third weight of each second screening link, where the third weight is the ratio of the second historical number of disability of each second screening link to the sum of the second historical number of disability of all second screening links;
[0139] Counting the second occurrence times of each second historical induced defect corresponding to each second screening link, and selecting the second historical induced defect with the third number from each second historical induced defect of the corresponding second screening link in descending order of the second occurrence times to determine it as the second easily induced defect;
[0140] Calculating a fourth weight of the second easily induced defect corresponding to each second screening link, where the fourth weight is a ratio of the second occurrence number of the second easily induced defect corresponding to each second screening link to the sum of the second occurrence numbers of all corresponding second easily induced defects;
[0141] Based on the third weight of each second screening link and the corresponding fourth weight of the defective product, the second key screening link is determined from each second screening link.
[0142] It should be noted that the air cooling control device for hollow plate processing provided in the above embodiment only uses the division of the above functional modules as an example when executing the air cooling control method for hollow plate processing. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the equipment is divided into different functional modules to complete all or part of the functions described above. In addition, the air cooling control device for hollow plate processing provided in the above embodiment and the air cooling control method for hollow plate processing belong to the same concept. The implementation process is detailed in the method embodiment, which will not be repeated here.
[0143] An embodiment of the present application further discloses a computer-readable storage medium, and the computer-readable storage medium stores a computer program, wherein when the computer program is executed by a processor, an air cooling control method in hollow plate processing of the above embodiment is adopted.
[0144] Among them, the computer program can be stored in a computer-readable medium, the computer program includes computer program code, the computer program code can be in the form of source code, object code, executable file or certain middleware, etc. The computer-readable medium includes any entity or device that can carry the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the computer-readable medium includes but is not limited to the above-mentioned components.
[0145] Among them, through this computer-readable storage medium, an air cooling control method in the processing of a hollow plate in the above embodiment is stored in a computer-readable storage medium, and is loaded and executed on a processor to facilitate the storage and application of the above method.
[0146] An embodiment of the present application further discloses an electronic device, wherein a computer program is stored in a computer-readable storage medium, and when the computer program is loaded and executed by a processor, the above-mentioned air cooling control method in hollow plate processing is adopted.
[0147] The electronic device may be a desktop computer, a laptop computer, a cloud server or other electronic device, and the electronic device includes but is not limited to a processor and a memory. For example, the electronic device may also include input and output devices, a network access device, and a bus.
[0148] Among them, the processor can adopt a central processing unit (CPU). Of course, according to actual usage, other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. can also be adopted. The general-purpose processor can adopt a microprocessor or any conventional processor, etc., and this application does not impose any restrictions on this.
[0149] Among them, the memory can be an internal storage unit of the electronic device, such as a hard disk or memory of the electronic device, or it can be an external storage device of the electronic device, such as a plug-in hard disk, a smart memory card (SMC), a secure digital card (SD) or a flash memory card (FC) equipped on the electronic device. Moreover, the memory can also be a combination of an internal storage unit and an external storage device of the electronic device. The memory is used to store computer programs and other programs and data required by the electronic device. The memory can also be used to temporarily store data that has been output or is to be output, and this application does not impose any restrictions on this.
[0150] Among them, through this electronic device, the air cooling control method in the hollow plate processing of the above embodiment is stored in the memory of the electronic device, and is loaded and executed on the processor of the electronic device for easy use.
[0151] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of other embodiments of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field not recorded in the present disclosure. The description and examples are only regarded as exemplary, and the scope and spirit of the present disclosure are defined by the claims.
Claims
1. A method for controlling air cooling in hollow plate processing, characterized in that: The method comprises: Obtaining the cooling rate of the surface temperature of a target semi-finished product at the current time, wherein the target semi-finished product is a hollow plate semi-finished product in an air-cooling finalizing stage; Determine whether the cooling speed is within a preset reasonable cooling speed range, and if not, obtain the current surface temperature and current ambient temperature of the target semi-finished product; Determining a first suitable wind speed range for air-cooling and shaping the target semi-finished product according to the current surface temperature and the current ambient temperature; Acquire the actual air cooling wind speed for air cooling the target semi-finished product, and if the actual air cooling wind speed is not within the first suitable wind speed range, adjust the air cooling power of the target semi-finished product until the adjusted actual air cooling wind speed is within the first suitable wind speed range, and repeat the step of acquiring the cooling speed of the surface temperature of the target semi-finished product at the current time; Obtaining a qualified rate of a production batch to which the target semi-finished product belongs, and if the qualified rate is lower than a preset first threshold, determining a defective product having the largest proportion among all defective products of the production batch; When the qualified rate is lower than the preset second threshold, the production link with the first number is selected as the first screening link according to the production links of the hollow board from front to back. The lower the qualified rate, the smaller the corresponding first number, and the first threshold is greater than the second threshold. According to the defective product, determine a first key investigation link from each of the first investigation links, and send an investigation reminder corresponding to the first key investigation link to a terminal of a maintenance personnel; When the qualified rate is not lower than the second threshold, according to the production links of the hollow board from back to front, the production link with the second number is selected as the second screening link, and the lower the qualified rate, the larger the corresponding second number; According to the defective product, a second key troubleshooting link is determined from each of the second troubleshooting links, and an inspection reminder corresponding to the second key troubleshooting link is sent to a terminal of a maintenance personnel; according to the defective product, a first key troubleshooting link is determined from each of the first troubleshooting links, specifically including: Obtaining a first historical number of disability and a first historical induced defect of each of the first screening links, wherein the first historical number of disability is the number of historical production batches of defective products caused by the corresponding first screening link, and the first historical induced defect is a historical defective product induced by the corresponding first screening link; Calculate a first weight for each of the first screening links, where the first weight is a ratio of a first historical number of disability cases for each of the first screening links to a sum of the first historical number of disability cases for all of the first screening links; Counting the first occurrence times of each of the first historical induced defects corresponding to each of the first troubleshooting links, and selecting the third first historical induced defect from each of the first historical induced defects in the corresponding first troubleshooting links in descending order of the first occurrence times to determine it as a first easily induced defect; Calculating a second weight of the first easily induced defect corresponding to each of the first troubleshooting links, where the second weight is a ratio of a first occurrence number of the first easily induced defect corresponding to each of the first troubleshooting links to a sum of first occurrence numbers of all corresponding first easily induced defects; Based on the first weight of each of the first inspection links and the corresponding second weight of the defective product, a first key inspection link is determined from each of the first inspection links.
2. The air cooling control method in hollow plate processing according to claim 1, characterized in that: The method further comprises: Determine a first suitable conveying speed range of the conveying cylinder where the target semi-finished product is located under the first suitable wind speed range; If the actual air cooling wind speed is within the first suitable wind speed range and the current conveying speed of the conveying drum is not within the first suitable conveying speed range, determine the suitable natural cooling time range of the target semi-finished product between the drying and heating stage and the air cooling and shaping stage according to the drying end temperature of the target semi-finished product at the end of the drying and heating stage and the current ambient temperature; Determine the conveying distance between the drying and heating step and the air cooling and shaping step, and determine the corresponding second suitable conveying speed range according to the conveying distance and the suitable natural cooling time range; According to the remaining delivery time and the completion progress of the production batch to which the target semi-finished product belongs, determine the minimum conveying speed of the conveying cylinder where the target semi-finished product is located, the smaller the remaining delivery time and the completion progress, the greater the corresponding minimum conveying speed; When the minimum conveying speed is within the second suitable conveying speed range, the starting speed of the second suitable conveying speed range is adjusted to the minimum conveying speed to obtain a final conveying speed range; and when the minimum conveying speed is not within the second suitable conveying speed range, the second suitable conveying speed range is determined as the final conveying speed range; The cooling speed is adjusted according to the final conveying speed range and the first appropriate conveying speed range.
3. The air cooling control method in hollow plate processing according to claim 2, characterized in that: The adjusting the cooling speed according to the final conveying speed range and the first suitable conveying speed range specifically includes: If the final conveying speed range intersects with the first suitable conveying speed range, determining a target conveying speed based on the intersection result, and adjusting the current conveying speed to the target conveying speed; If the final conveying speed range does not intersect with the first suitable conveying speed range, adjusting the current conveying speed to be within the final conveying speed range, and re-determining a second suitable wind speed range for air cooling the target semi-finished product according to the final conveying speed range; According to the second suitable wind speed range, the actual air cooling wind speed is adjusted to adjust the cooling speed.
4. The air cooling control method in hollow plate processing according to claim 1, characterized in that: The determining of the first key inspection link from each of the first inspection links based on the first weight of each of the first inspection links and the corresponding second weight of the defective product specifically includes: Calculate the product of the first weight of each first screening link and the corresponding second weight of the defective product; The maximum product is selected from each of the products, and the first investigation link corresponding to the maximum product is determined as the first key investigation link.
5. The air cooling control method in hollow plate processing according to claim 1, characterized in that: Determining the second key investigation link from each of the second investigation links according to the defective product, specifically includes: Obtaining a second historical number of disability and a second historical induced defect of each second screening link, where the second historical number of disability is the number of historical production batches of defective products caused by the corresponding second screening link, and the second historical induced defect is a historical defective product induced by the corresponding second screening link; Calculate the third weight of each second screening link, where the third weight is the ratio of the second historical number of disability cases of each second screening link to the sum of the second historical number of disability cases of all second screening links; Counting the second occurrence times of each of the second historical induced defects corresponding to each of the second troubleshooting links, and selecting the second historical induced defect with the third number from each of the second historical induced defects in the corresponding second troubleshooting links in descending order of the second occurrence times to determine it as a second easily induced defect; Calculating a fourth weight of the second easily induced defect corresponding to each of the second troubleshooting links, where the fourth weight is a ratio of a second number of occurrences of the second easily induced defect corresponding to each of the second troubleshooting links to a sum of second number of occurrences of all corresponding second easily induced defects; Based on the third weight of each of the second inspection links and the corresponding fourth weight of the defective product, a second key inspection link is determined from each of the second inspection links.
6. An air cooling control device in hollow plate processing, used to implement the air cooling control method in hollow plate processing according to any one of claims 1 to 5, characterized in that: include: A speed acquisition module (11) is used to acquire the cooling speed of the surface temperature of a target semi-finished product at a current time, wherein the target semi-finished product is a hollow plate semi-finished product in an air-cooling finalizing stage; A temperature acquisition module (12) is used to determine whether the cooling speed is within a preset reasonable cooling speed range, and if not, to acquire the current surface temperature and current ambient temperature of the target semi-finished product; A wind speed determination module (13) is used to determine a first suitable wind speed range for air cooling and shaping the target semi-finished product according to the current surface temperature and the current ambient temperature; A wind speed adjustment module (14) is used to obtain the actual wind speed for cooling the target semi-finished product, and if the actual wind speed is not within the first suitable wind speed range, adjust the wind cooling power of the target semi-finished product until the adjusted actual wind speed is within the first suitable wind speed range, and repeat the step of obtaining the cooling speed of the surface temperature of the target semi-finished product at the current time.
7. A computer-readable storage medium, wherein a computer program is stored in the computer-readable storage medium, characterized in that: When the computer program is loaded and executed by a processor, the method according to any one of claims 1 to 5 is adopted.
8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and capable of running on the processor, characterized in that: When the processor loads and executes the computer program, the method according to any one of claims 1 to 5 is adopted.
