A method and system for predicting risks in liquid bulk cargo loading and unloading operations
By calculating the temperature change value and the stability value of pumping equipment, combined with the oil storage tank risk prediction model, the risk problem of equipment and storage tanks caused by the condensation of liquid bulk cargo in the winter port environment is solved, and the control of pumping equipment and storage tanks is realized. Stability monitoring and risk warning ensure the safety and efficiency of loading and unloading operations.
Patent Information
- Application Number
- CN202410917736.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-10
AI Technical Summary
In the winter port environment, the condensation of liquid bulk cargo leads to a decrease in the efficiency of pumping equipment and uneven pressure in storage tanks, which increases the risk of deformation and rupture. It is difficult to effectively predict and prevent with existing technology.
By calculating the temperature change value and the stability value of the pumping equipment, combined with the oil storage tank risk value prediction model, the stability and risks of the pumping equipment and storage tanks are determined, alarm reminders are triggered and preventive measures are taken.
Reduce the possibility of equipment damage and accidents, extend the service life of equipment, ensure the safety and efficiency of the loading and unloading process, and prevent leakage accidents caused by tank rupture.
Smart Images

Figure CN118469302B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cargo management, and more specifically, to a method and system for predicting risks in liquid bulk cargo loading and unloading operations. Background Art
[0002] The movement of liquid bulk cargo inside the port must pass through metering equipment, sampling equipment, and loading and unloading equipment. However, due to the large number of liquid bulk cargo types, each type of cargo has different physical and chemical properties, so the loading and unloading process plans and processes are slightly different. The loading and unloading process operations of the oil terminal mainly include: unloading from ship to tank, loading from ship, ship-to-ship direct loading, and vehicle-to-ship direct loading. Unloading from ship to tank mainly uses the pressure of the ship pump to unload and directly deliver the oil products to the port storage tank; loading from ship pumps the oil products in the storage tank to the cabin by setting up a loading pump; ship-to-ship direct loading is to directly ship the cargo oil of the fully loaded ship to the empty oil tanker berthed in advance through a reasonable process; vehicle-to-ship direct loading is to load the oil products in the arriving railway tank car directly into the oil tanker or load the oil products in the oil tanker directly into the tank car through reasonable scheduling. Among them, unloading and tanking operations and loading operations are the most common liquid bulk loading and unloading operations in ports. When unloading and tanking operations are performed, due to the limited tank capacity, the oil needs to be stored in multiple tanks. The low temperature in the port in winter can easily cause the oil to condense. After the oil condenses, its fluidity decreases, which may cause blockage in the pipeline, resulting in the inability to transport the oil smoothly. In addition, pumping equipment is difficult to handle high-viscosity or solidified oils, which may lead to a decrease in the efficiency of the pumping equipment. The condensed oil may form a solid or high-viscosity layer inside the tank, affecting the normal flow of the oil and the uniform distribution of pressure in the tank, which may cause excessive local pressure and increase the risk of deformation and rupture of the tank. In order to solve the above problems, a technical solution is now provided. Summary of the invention
[0003] In order to overcome the above-mentioned defects of the prior art, the present invention provides a method and system for predicting the risks of liquid bulk loading and unloading operations, which calculates the temperature change value, then calculates the stability value of the pumping equipment, and determines whether the stability of the pumping equipment is qualified, and then calculates the risk value of the oil storage tank based on the oil storage tank risk value prediction model, and determines whether the oil storage tank has the risk of deformation and rupture, which helps to reduce the possibility of equipment damage and accidents, so as to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] A method for predicting risks in liquid bulk cargo loading and unloading operations comprises the following steps:
[0006] S1, obtaining first data of the temperature of the port area and second data of the pumping equipment when it is working;
[0007] S2. Acquire the third data of the oil storage tank;
[0008] S3, extracting the first data, importing the first data into a temperature change value calculation formula, and calculating the temperature change value;
[0009] S4, extracting the temperature change value and the second data, importing the temperature change value and the second data into a pumping equipment stability value calculation model, and calculating the pumping equipment stability value;
[0010] S5, extracting the stability value of the pumping equipment, and comparing the stability value of the pumping equipment with the preset stability value of the pumping equipment. If the stability value of the pumping equipment is greater than or equal to the preset stability value of the pumping equipment, the stability of the pumping equipment is qualified; if the stability value of the pumping equipment is less than the preset stability value of the pumping equipment, the stability of the pumping equipment is unqualified, and the first alarm reminder will be triggered;
[0011] S6, extracting the pumping equipment stability value, the pumping equipment stability value and the third data, importing the pumping equipment stability value, the pumping equipment stability value and the third data into the oil storage tank risk value prediction model, and calculating the oil storage tank risk value;
[0012] S7. Extract the oil storage tank risk value, and compare the oil storage tank risk value with the preset oil storage tank risk value. If the oil storage tank risk value is less than the preset oil storage tank risk value, the oil storage tank does not have the risk of deformation or rupture; if the oil storage tank risk value is greater than or equal to the preset oil storage tank risk value, the oil storage tank does have the risk of deformation or rupture, and the second alarm reminder will be triggered.
[0013] As a further solution of the present invention, in S2, third data of the oil storage tank is obtained, and the third data includes a pressure change value and a temperature change value in the oil storage tank.
[0014] As a further solution of the present invention, the pressure change value in the oil storage tank in the third data is extracted by setting the time interval within the oil storage tank to deliver the oil, and the pressure change value in the oil storage tank is extracted by the time interval. The calculation formula for the pressure change value in the oil storage tank at a time interval is: , where: For the The pressure change value in the oil storage tank at a time interval, For the The pressure value in the oil storage tank at each time interval, For the The pressure value in the oil storage tank at a time interval.
[0015] As a further solution of the present invention, in S4, the temperature change value and the second data are imported into the pumping equipment stability value calculation model to calculate the pumping equipment stability value, and the specific steps are:
[0016] S41, extracting the temperature change value and the real-time temperature of the oil product at the inlet and outlet of the pumping equipment and the actual real-time delivery flow rate of the oil product at the outlet of the pumping equipment in the second data;
[0017] S42, importing the temperature change value, the real-time temperature of the oil product at the inlet and outlet of the pumping equipment, and the actual real-time delivery flow rate of the oil product at the outlet of the pumping equipment into the pumping equipment stability value calculation model to calculate the pumping equipment stability value. The formula of the pumping equipment stability value calculation model is:
[0018] ;
[0019] Where: is the stable value of the pumping equipment, Working hours of pumping equipment, is the temperature change value, It is the actual maximum oil delivery flow rate at the outlet of the pumping equipment. for The actual real-time delivery flow of oil products at the outlet of the pumping equipment at all times, It is the actual maximum oil delivery flow rate at the outlet of the pumping equipment. The maximum temperature of the oil at the inlet and outlet of the pumping equipment. for The oil temperature at the inlet and outlet of the pumping equipment at all times, It is the lowest temperature of the oil at the inlet and outlet of the pumping equipment.
[0020] As a further solution of the present invention, in S6, the pumping equipment stability value, the pumping equipment stability value and the third data are imported into the oil storage tank risk value prediction model to calculate the oil storage tank risk value, and the specific steps are:
[0021] S61, extracting the pumping equipment stability value, the pumping equipment stability value, the oil storage tank internal pressure change value and the temperature change value in the third data;
[0022] S62, importing the pumping equipment stability value, the pumping equipment stability value, the oil storage tank pressure change value and the temperature change value in the third data into the oil storage tank risk value prediction model to calculate the oil storage tank risk value. The formula of the oil storage tank risk value prediction model is:
[0023] ;
[0024] Where: is the risk value of the oil storage tank, is the stable value of the pumping equipment, The time it takes to deliver oil to the oil storage tank, is the temperature change value, is the maximum pressure change value in the oil storage tank, For the The pressure change value in the oil storage tank at a time interval, is the minimum pressure change value in the oil storage tank, is the maximum temperature change value in the oil storage tank, For the The temperature change value in the oil storage tank at a time interval, It is the minimum temperature change value in the oil storage tank.
[0025] A liquid bulk cargo loading and unloading operation risk prediction system is used to implement the above-mentioned liquid bulk cargo loading and unloading operation risk prediction method, including a data collection module, a temperature change value calculation module, a pumping equipment stability analysis module, a storage tank risk prediction module, a first discrimination module and a second discrimination module; the data collection module is used to obtain first data of the port area temperature, second data when the pumping equipment is working and third data of the oil storage tank; the temperature change value calculation module is used to import the first data into the temperature change value calculation formula to calculate the temperature change value; the pumping equipment stability analysis module is used to import the temperature change value and the second data into the pumping equipment stability value calculation model to calculate the pumping equipment stability value; the storage tank risk prediction module is used to import the pumping equipment stability value, the pumping equipment stability value and the third data into the oil storage tank risk value prediction model to calculate the oil storage tank risk value; the first discrimination module is used to judge whether the pumping equipment stability is qualified; the second discrimination module is used to judge whether the oil storage tank has the risk of deformation and rupture.
[0026] The technical effects and advantages of a method and system for predicting risks of liquid bulk loading and unloading operations of the present invention are as follows: the present invention uses first data, second data and third data to import the first data into a temperature change value calculation formula to calculate the temperature change value, import the temperature change value and the second data into a pumping equipment stability value calculation model to calculate the pumping equipment stability value, and judge whether the pumping equipment stability is qualified, which helps to reduce the possibility of equipment damage and extend the service life of the equipment; then import the pumping equipment stability value, the pumping equipment stability value and the third data into an oil storage tank risk value prediction model to calculate the oil storage tank risk value, and judge whether the oil storage tank has the risk of deformation and rupture, which can identify and prevent possible risks in advance, ensure the safety of the entire loading and unloading operation process, and prevent leakage accidents caused by equipment failure or tank rupture. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1A schematic flow chart of a method for predicting risks in liquid bulk cargo loading and unloading operations provided in Example 1 of the present invention;
[0028] Figure 2 This is a schematic diagram of the structure of a liquid bulk cargo loading and unloading operation risk prediction system provided in Example 2 of the present invention. DETAILED DESCRIPTION
[0029] The following will be combined with the accompanying drawings in the present invention to clearly and completely describe the technical solution in the present invention. Obviously, the described technical solution is only a part of the present invention, not all of it. Based on the technical solution in the present invention, all other technical solutions obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0030] Example 1
[0031] Figure 1 FIG. 1 is a flow chart showing a method for predicting the risk of liquid bulk cargo loading and unloading operations provided by the first embodiment of the present invention. Figure 1 As shown, a risk prediction method for liquid bulk cargo loading and unloading operations in this embodiment includes the following steps:
[0032] S1, obtaining first data of the temperature of the port area and second data of the pumping equipment when it is working;
[0033] S2. Acquire the third data of the oil storage tank;
[0034] S3, extracting the first data, importing the first data into a temperature change value calculation formula, and calculating the temperature change value;
[0035] S4, extracting the temperature change value and the second data, importing the temperature change value and the second data into a pumping equipment stability value calculation model, and calculating the pumping equipment stability value;
[0036] S5, extracting the stability value of the pumping equipment, and comparing the stability value of the pumping equipment with the preset stability value of the pumping equipment. If the stability value of the pumping equipment is greater than or equal to the preset stability value of the pumping equipment, the stability of the pumping equipment is qualified; if the stability value of the pumping equipment is less than the preset stability value of the pumping equipment, the stability of the pumping equipment is unqualified, and the first alarm reminder will be triggered;
[0037] S6, extracting the pumping equipment stability value, the pumping equipment stability value and the third data, importing the pumping equipment stability value, the pumping equipment stability value and the third data into the oil storage tank risk value prediction model, and calculating the oil storage tank risk value;
[0038] S7. Extract the oil storage tank risk value, and compare the oil storage tank risk value with the preset oil storage tank risk value. If the oil storage tank risk value is less than the preset oil storage tank risk value, the oil storage tank does not have the risk of deformation or rupture; if the oil storage tank risk value is greater than or equal to the preset oil storage tank risk value, the oil storage tank does have the risk of deformation or rupture, and the second alarm reminder will be triggered.
[0039] Through the first data, the second data and the third data, the first data is imported into the temperature change value calculation formula to calculate the temperature change value, the temperature change value and the second data are imported into the pumping equipment stability value calculation model to calculate the pumping equipment stability value, and it is judged whether the pumping equipment stability is qualified, and then the pumping equipment stability value, the pumping equipment stability value and the third data are imported into the oil storage tank risk value prediction model to calculate the oil storage tank risk value, and it is judged whether the oil storage tank has the risk of deformation and rupture, which helps to reduce the possibility of equipment damage and accidents.
[0040] In S1, the first data of the port area temperature and the second data when the pumping equipment is working are obtained; the first data includes the real-time ambient temperature of the port area and the oil temperature when not transported; the second data includes the real-time temperature of the oil at the inlet and outlet of the pumping equipment and the actual real-time delivery flow of the oil at the outlet of the pumping equipment.
[0041] The temperature of the oil when not being transported is measured by a temperature sensor; the real-time temperature of the oil at the inlet and outlet of the pumping equipment is measured by installing a temperature sensor on the pipelines on the inlet and outlet sides of the pumping equipment; the actual real-time delivery flow of the oil at the outlet of the pumping equipment is measured by installing a flow meter on the pipelines on the inlet and outlet sides of the pumping equipment.
[0042] In S2, third data of the oil storage tank is obtained, and the third data includes a pressure change value and a temperature change value in the oil storage tank.
[0043] As a further solution of the present invention, the pressure change value in the oil storage tank in the third data is extracted by setting the time interval within the oil storage tank to deliver the oil, and the pressure change value in the oil storage tank is extracted by the time interval. The calculation formula for the pressure change value in the oil storage tank at a time interval is: , where: For the The pressure change value in the oil storage tank at a time interval, For the The pressure value in the oil storage tank at each time interval, For the The pressure value in the oil storage tank at a time interval.
[0044] The temperature change value in the oil storage tank in the third data is extracted by setting the time interval within the oil storage tank to transport the oil, and the temperature change value in the oil storage tank is extracted by the time interval. The calculation formula for the temperature change value in the oil storage tank at a time interval is: , where: For the The temperature change value in the oil storage tank at a time interval, For the The temperature value in the oil storage tank at each time interval, For the The temperature value inside the oil storage tank at a time interval.
[0045] In S3, the real-time ambient temperature of the port area and the oil product temperature when not transported in the first data are extracted, and the real-time ambient temperature of the port area and the oil product temperature when not transported are introduced into the temperature change value calculation formula to calculate the temperature change value. The temperature change value calculation formula is:
[0046] ;
[0047] Where: is the temperature change value, It is the time from when the oil arrives at the port to when it is transported to the oil storage tank. is the maximum real-time ambient temperature of the port area, In the port area Real-time ambient temperature at all times, is the minimum real-time ambient temperature of the port area, is the maximum oil temperature when not transported, for The oil temperature when not being transported, It is the minimum oil temperature when not being delivered.
[0048] By calculating the real-time ambient temperature of the port area and the changes in the temperature of the oil products when not being transported, temperature fluctuations can be accurately monitored, which is crucial to ensuring the stability of equipment and storage tanks, especially in winter when the temperature changes drastically. By calculating the temperature change value, possible risks can be identified and warned in advance. When the temperature changes too much, an alarm will be issued to prompt you to take appropriate measures to prevent damage to the pumping equipment and storage tanks. By real-time monitoring and adjusting the operating parameters of the equipment, the efficient operation of the pumping equipment can be maintained in the case of temperature changes, avoiding the loss of efficiency caused by temperature changes. By calculating the temperature change value, it is helpful to take measures in advance to prevent the storage tanks from being damaged under extreme temperature conditions.
[0049] In S4, the temperature change value and the second data are imported into the pumping equipment stability value calculation model to calculate the pumping equipment stability value. The specific steps are:
[0050] S41, extracting the temperature change value and the real-time temperature of the oil product at the inlet and outlet of the pumping equipment and the actual real-time delivery flow rate of the oil product at the outlet of the pumping equipment in the second data;
[0051] S42, importing the temperature change value, the real-time temperature of the oil product at the inlet and outlet of the pumping equipment, and the actual real-time delivery flow rate of the oil product at the outlet of the pumping equipment into the pumping equipment stability value calculation model to calculate the pumping equipment stability value. The formula of the pumping equipment stability value calculation model is:
[0052] ;
[0053] Where: is the stable value of the pumping equipment, Working hours of pumping equipment, is the temperature change value, It is the actual maximum oil delivery flow rate at the outlet of the pumping equipment. for The actual real-time delivery flow of oil products at the outlet of the pumping equipment at all times, It is the actual maximum oil delivery flow rate at the outlet of the pumping equipment. The maximum temperature of the oil at the inlet and outlet of the pumping equipment. for The oil temperature at the inlet and outlet of the pumping equipment at all times, It is the lowest temperature of the oil at the inlet and outlet of the pumping equipment.
[0054] By acquiring temperature change values and operating data of pumping equipment in real time, the system can dynamically calculate the stability of pumping equipment; by calculating the stability value of pumping equipment, it can identify potential risks in equipment operation, and when the stability value is lower than the safety threshold, it will issue an early warning to prompt preventive maintenance to prevent equipment failure; by monitoring and analyzing the stability value of pumping equipment, managers can dynamically adjust the operating parameters of the equipment to ensure that the equipment operates in the best condition; it can effectively prevent the decline in equipment efficiency due to temperature changes and flow fluctuations, and by maintaining stable equipment operation, it can reduce equipment wear and failure frequency and extend the service life of the equipment.
[0055] In S6, the pumping equipment stability value, the pumping equipment stability value and the third data are imported into the oil storage tank risk value prediction model to calculate the oil storage tank risk value. The specific steps are:
[0056] S61, extracting the pumping equipment stability value, the pumping equipment stability value, the oil storage tank internal pressure change value and the temperature change value in the third data;
[0057] S62, importing the pumping equipment stability value, the pumping equipment stability value, the oil storage tank pressure change value and the temperature change value in the third data into the oil storage tank risk value prediction model to calculate the oil storage tank risk value. The formula of the oil storage tank risk value prediction model is:
[0058] ;
[0059] Where: is the risk value of the oil storage tank, is the stable value of the pumping equipment, The time it takes to deliver oil to the oil storage tank, is the temperature change value, is the maximum pressure change value in the oil storage tank, For the The pressure change value in the oil storage tank at a time interval, is the minimum pressure change value in the oil storage tank, is the maximum temperature change value in the oil storage tank, For the The temperature change value in the oil storage tank at a time interval, It is the minimum temperature change value in the oil storage tank.
[0060] By considering the stability of the pumping equipment, temperature changes, pressure and temperature changes in the tank, a comprehensive risk assessment is provided. By calculating the risk value, when the risk value exceeds the set safety threshold, the system automatically issues an early warning and can take preventive measures in advance to prevent deformation, rupture or other accidents of the tank. Based on the risk prediction results, managers can dynamically adjust the operating parameters of the equipment and tanks to ensure safe and efficient operation, improve the utilization efficiency of the equipment and tanks, and extend their service life. Through accurate risk prediction and early warning, the safety of operating personnel is protected, the occurrence of oil leakage and environmental pollution incidents is prevented, and the environmental safety of port operations is ensured.
[0061] A liquid bulk cargo loading and unloading operation risk prediction system is used to implement the above-mentioned liquid bulk cargo loading and unloading operation risk prediction method, including a data collection module, a temperature change value calculation module, a pumping equipment stability analysis module, a storage tank risk prediction module, a first discrimination module and a second discrimination module; the data collection module is used to obtain first data of the port area temperature, second data when the pumping equipment is working and third data of the oil storage tank; the temperature change value calculation module is used to import the first data into the temperature change value calculation formula to calculate the temperature change value; the pumping equipment stability analysis module is used to import the temperature change value and the second data into the pumping equipment stability value calculation model to calculate the pumping equipment stability value; the storage tank risk prediction module is used to import the pumping equipment stability value, the pumping equipment stability value and the third data into the oil storage tank risk value prediction model to calculate the oil storage tank risk value; the first discrimination module is used to judge whether the pumping equipment stability is qualified; the second discrimination module is used to judge whether the oil storage tank has the risk of deformation and rupture.
[0062] The data collection module is connected to the temperature change value calculation module, the temperature change value calculation module is respectively connected to the pumping equipment stability analysis module and the storage tank risk prediction module, the pumping equipment stability analysis module is connected to the storage tank risk prediction module, the pumping equipment stability analysis module is connected to the first discrimination module, and the storage tank risk prediction module is connected to the second discrimination module.
[0063] The first discrimination module includes a first discrimination unit and a first alarm unit; the first discrimination unit is used to extract the stability value of the pumping equipment, and compare the stability value of the pumping equipment with the preset stability value of the pumping equipment. If the stability value of the pumping equipment is greater than or equal to the preset stability value of the pumping equipment, the stability of the pumping equipment is qualified; if the stability value of the pumping equipment is less than the preset stability value of the pumping equipment, the stability of the pumping equipment is unqualified; the first alarm unit is used to trigger a first alarm reminder when the stability of the pumping equipment is unqualified.
[0064] The second discrimination module includes a second discrimination unit and a second alarm unit; the second discrimination unit is used to extract the oil storage tank risk value, and compare the oil storage tank risk value with the preset oil storage tank risk value. If the oil storage tank risk value is less than the preset oil storage tank risk value, the oil storage tank does not have the risk of deformation and rupture; if the oil storage tank risk value is greater than or equal to the preset oil storage tank risk value, the oil storage tank has the risk of deformation and rupture; the second alarm unit is used to trigger the second alarm reminder when the oil storage tank has the risk of deformation and rupture.
[0065] The embodiment of the present invention uses the first data, the second data and the third data to import the first data into the temperature change value calculation formula to calculate the temperature change value, import the temperature change value and the second data into the pumping equipment stability value calculation model to calculate the pumping equipment stability value, and judge whether the pumping equipment stability is qualified, which helps to reduce the possibility of equipment damage and extend the service life of the equipment; then the pumping equipment stability value, the pumping equipment stability value and the third data are imported into the oil storage tank risk value prediction model to calculate the oil storage tank risk value, and judge whether the oil storage tank has the risk of deformation and rupture, which can identify and prevent possible risks in advance, ensure the safety of the entire loading and unloading operation process, prevent leakage accidents caused by equipment failure or tank rupture, help improve the safety and efficiency of liquid bulk loading and unloading operations in ports in winter, reduce operating costs, and ensure operation safety.
[0066] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
[0067] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for predicting risks in liquid bulk cargo loading and unloading operations, characterized in that: The steps include: S1, obtaining first data of the temperature of the port area and second data of the pumping equipment when it is working; S2. Acquire the third data of the oil storage tank; S3, extracting the first data, importing the first data into a temperature change value calculation formula, and calculating the temperature change value; S4, extracting the temperature change value and the second data, importing the temperature change value and the second data into a pumping equipment stability value calculation model, and calculating the pumping equipment stability value; S5, extracting the stability value of the pumping equipment, and comparing the stability value of the pumping equipment with the preset stability value of the pumping equipment. If the stability value of the pumping equipment is greater than or equal to the preset stability value of the pumping equipment, the stability of the pumping equipment is qualified; if the stability value of the pumping equipment is less than the preset stability value of the pumping equipment, the stability of the pumping equipment is unqualified, and the first alarm reminder will be triggered; S6, extracting the pumping equipment stability value, the pumping equipment stability value and the third data, importing the pumping equipment stability value, the pumping equipment stability value and the third data into the oil storage tank risk value prediction model, and calculating the oil storage tank risk value; S7, extracting the oil storage tank risk value, and comparing the oil storage tank risk value with a preset oil storage tank risk value. If the oil storage tank risk value is less than the preset oil storage tank risk value, then there is no risk of deformation or rupture of the oil storage tank; If the oil storage tank risk value is greater than or equal to the preset oil storage tank risk value, the oil storage tank is at risk of deformation and rupture, and the second alarm will be triggered; In S2, the third data of the oil storage tank is obtained, and the third data includes the pressure change value and the temperature change value in the oil storage tank; the pressure change value in the oil storage tank in the third data is extracted by setting the time interval within the oil delivery time of the oil storage tank. The calculation formula for the pressure change value in the oil storage tank at a time interval is: , where: For the The pressure change value in the oil storage tank at a time interval, For the The pressure value in the oil storage tank at each time interval, For the The pressure value in the oil storage tank at each time interval; In S4, the temperature change value and the second data are imported into the pumping equipment stability value calculation model to calculate the pumping equipment stability value. The specific steps are: S41, extracting the temperature change value and the real-time temperature of the oil product at the inlet and outlet of the pumping equipment and the actual real-time delivery flow rate of the oil product at the outlet of the pumping equipment in the second data; S42, importing the temperature change value, the real-time temperature of the oil product at the inlet and outlet of the pumping equipment, and the actual real-time delivery flow rate of the oil product at the outlet of the pumping equipment into the pumping equipment stability value calculation model to calculate the pumping equipment stability value. The formula of the pumping equipment stability value calculation model is: ; Where: is the stable value of the pumping equipment, Working hours of pumping equipment, is the temperature change value, It is the actual maximum oil delivery flow rate at the outlet of the pumping equipment. for The actual real-time delivery flow of oil products at the outlet of the pumping equipment at all times, It is the actual maximum oil delivery flow rate at the outlet of the pumping equipment. The maximum temperature of the oil at the inlet and outlet of the pumping equipment. for The oil temperature at the inlet and outlet of the pumping equipment at all times, It is the lowest temperature of the oil at the inlet and outlet of the pumping equipment; In S6, the pumping equipment stability value, the pumping equipment stability value and the third data are imported into the oil storage tank risk value prediction model to calculate the oil storage tank risk value. The specific steps are: S61, extracting the pumping equipment stability value, the pumping equipment stability value, the oil storage tank internal pressure change value and the temperature change value in the third data; S62, importing the pumping equipment stability value, the pumping equipment stability value, the oil storage tank pressure change value and the temperature change value in the third data into the oil storage tank risk value prediction model to calculate the oil storage tank risk value. The formula of the oil storage tank risk value prediction model is: ; Where: is the risk value of the oil storage tank, is the stable value of the pumping equipment, The time it takes to deliver oil to the oil storage tank, is the temperature change value, is the maximum pressure change value in the oil storage tank, For the The pressure change value in the oil storage tank at a time interval, is the minimum pressure change value in the oil storage tank, is the maximum temperature change value in the oil storage tank, For the The temperature change value in the oil storage tank at a time interval, It is the minimum temperature change value in the oil storage tank.
