Plant power management method, system, medium and equipment terminal based on big data

By using big data technology to predict electricity consumption, optimize electricity prices, and monitor equipment status, it solves the problem that existing power management methods cannot effectively reduce the power load of equipment with poor energy efficiency, and achieves efficient management of power resources in the factory and guarantees production stability.

CN118469755BActive Publication Date: 2024-10-11JIANGMEN SAIWEI POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410914912.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-11
Estimated Expiration
2044-07-09

AI Technical Summary

Technical Problem

Existing power management methods cannot effectively reduce the power load of equipment with poor energy efficiency in the factory area, resulting in high carbon emissions and failure risks. They are also unable to optimize the power consumption of equipment in each area, affecting production stability.

Method used

Adopt a factory area power management method based on big data, predict electricity consumption through the trained regional power consumption prediction model, optimize electricity prices, monitor equipment operating status, formulate maintenance plans, reduce failure risks, and divide the factory area into sub-regions for power consumption quotas Optimization and power resource allocation.

Benefits of technology

It achieves precise management of power consumption in the factory, reduces waste of power resources and carbon emissions, improves equipment operation stability and production efficiency, and avoids failures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118469755B_ABST
    Figure CN118469755B_ABST
Patent Text Reader

Abstract

The present invention discloses a plant area power management method, system, storage medium and equipment terminal based on big data, which relates to the field of power management technology. After obtaining the power consumption data of the power-consuming equipment, an abnormality is constructed. If the abnormality exceeds the abnormal threshold, the corresponding equipment is used as the target equipment and marked on the electronic map; the power consumption in the sub-area is predicted by the trained regional power consumption prediction model, and the load degree is generated by the predicted power consumption data. If the load degree exceeds the expectation, the current electricity price in each sub-area is optimized to obtain the optimized electricity price; the operating status data of the target equipment is monitored and obtained, and the fault degree is constructed by the operating status data of the target equipment. If the fault degree exceeds the expectation, a maintenance plan is formulated for each faulty equipment and the maintenance frequency is constrained. When the power load and operating load of some equipment are high, the risk of failure of such equipment is reduced, and the stability of the production volume in the plant area is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric energy management technology, and specifically to a plant area electric energy management method, system, storage medium and equipment terminal based on big data. Background Art

[0002] Power management based on big data refers to a series of management strategies and measures set by power companies or related units for user power consumption with the support of big data technology, aiming to improve energy efficiency, reduce energy consumption and costs, and optimize the allocation and use of power resources. The following is a clear introduction to the concept of power management: Power management is to achieve effective monitoring, control and management of power resources within an enterprise or unit by integrating, analyzing and optimizing power usage data. It involves multiple aspects such as the configuration, operation, maintenance of power equipment and the management of personnel's work status.

[0003] When the power consumption in the factory is high, in order to reduce the waste of power resources, it is necessary to manage the power in the factory and optimize the power distribution of each device in the factory more reasonably. In the existing power management method, it is usually necessary to screen out the equipment with poor energy efficiency in the factory, and then maintain or replace such equipment to save power resources without affecting the production volume. However, this power management method does not plan the power consumption of equipment in each area, especially when the current energy efficiency in the factory is relatively poor and the carbon emissions are already high. In order not to affect the production volume, the power load of some equipment will not be reduced during power management, and it may also be in a state of continuous high-load operation. In this case, it is easy to cause the risk of failure of high-load equipment, and the expected effect cannot be achieved when performing power management.

[0004] To this end, the present invention provides a plant power management method, system, storage medium and equipment terminal based on big data. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] In view of the deficiencies of the prior art, the present invention provides a plant power management method, system, storage medium and equipment terminal based on big data. The power consumption in the sub-area is predicted by the trained regional power consumption prediction model, and the load degree is generated by the predicted power consumption data. If the load degree exceeds expectations, the current electricity price in each sub-area is optimized to obtain the optimized electricity price; the operating status data of the target equipment is monitored and obtained, and the fault degree is constructed by the operating status data of the target equipment. If the fault degree exceeds expectations, a maintenance plan is formulated for each faulty equipment and the maintenance frequency is constrained. When the power load and operating load of some equipment are high, the risk of failure of such equipment is reduced, and the stability of production in the plant is guaranteed, thereby solving the technical problems raised in the background.

[0007] (II) Technical solution

[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0009] The plant power management method based on big data includes: constructing a plant efficiency data set from the production status data of the plant, constructing an energy efficiency index from the plant efficiency data set , if the energy efficiency obtained is If the energy efficiency threshold is not exceeded, data collection instructions are issued to the outside;

[0010] Divide the plant into several sub-areas, analyze the impact of equipment operation data on production in each sub-area, and construct the power demand in each sub-area through the correlation between different sub-areas , based on demand Mark sub-areas and optimize the electricity quota in each sub-area;

[0011] When the allocated electric energy in the sub-area is not used up, the unused electric energy is stored, and the abnormal degree of power consumption is constructed after obtaining the power consumption data of the power-consuming equipment. , if the abnormality If the abnormal threshold is exceeded, the corresponding device will be taken as the target device and marked on the electronic map;

[0012] The trained regional power consumption prediction model is used to predict the power consumption in the sub-region, and the load degree is generated from the predicted power consumption data. , if the load Exceeding expectations, optimizing the current electricity price in each sub-region and obtaining the optimized electricity price;

[0013] Monitor and obtain the operating status data of the target device, and construct the fault degree based on the operating status data of the target device. If the fault degree exceeds expectations, a maintenance plan is formulated for each faulty device and a maintenance frequency constraint is formed, and the faulty device is maintained at the maintenance node; wherein, a maintenance plan is formulated for each faulty device and a maintenance frequency constraint is formed, as follows:

[0014] ;

[0015] in, n is the number of repairs of the faulty equipment, It is i Maintenance to j The time interval between maintenance is the average value of the time interval, is the failure degree of the equipment, The abnormality of the device.

[0016] Furthermore, an electronic map covering the factory is constructed, the production status of the factory is monitored when the factory is in operation, and indicators are collected during the evaluation period, including at least the carbon emissions and production energy efficiency ratio of the factory at each evaluation node, and a plant efficiency data set is constructed after aggregation.

[0017] Furthermore, the energy efficiency of the plant during operation and production is constructed from the plant efficiency data set. , among which, in carbon emissions Energy efficiency ratio Under dimensionless conditions, according to the following formula:

[0018] ;

[0019] in, For the factory i The energy efficiency ratio on the evaluation node is For the i Carbon emissions at the evaluation nodes, is the weight coefficient, .

[0020] Furthermore, the factory area is divided into several different sub-areas, and the power consumption data of various equipment in the sub-areas and the data of their opening periods are collected. The power consumption data obtained in each sub-area is aggregated to construct a set of equipment power consumption data;

[0021] Monitor and obtain the operating status, power consumption data and production data of each device in the sub-area. Take the power consumption data of each device as the independent variable and the production data of the plant as the dependent variable. Perform multiple linear regression analysis and obtain the corresponding linear regression equation. Take the regression coefficient corresponding to the independent variable as the impact value. .

[0022] Furthermore, based on the power consumption data in several time periods, correlation analysis is performed between different devices in the same sub-area to obtain the correlation coefficient between two devices, and the central value of each device is calculated based on the correlation coefficient. :

[0023] ;

[0024] in, is the collection of all devices in the sub-area. n is the number of devices, Yes Equipment With equipment The correlation coefficient between .

[0025] Furthermore, the center value After marking each device, the power demand in each sub-area is constructed under dimensionless conditions. , as follows:

[0026] ;

[0027] Weight coefficient: , ; For the i The center value of each device, For the i The impact value of each device, n is the number of devices.

[0028] Furthermore, an energy storage device is placed in each sub-area. If the power consumption in the current cycle in the sub-area does not exceed the optimized quota, the energy storage device is used to store the remaining quota power and use it after the power consumption exceeds the optimized quota. After obtaining the power consumption data of the power-consuming equipment at each monitoring node, the power consumption data is used to construct the abnormality degree of power consumption. , as follows:

[0029] ;

[0030] in, is the number of monitoring nodes, For monitoring nodes i The power consumption on is the corresponding target value, It is a monitoring point i To the monitoring point j The difference in power consumption between is the mean of the power consumption difference, and the weight coefficient is: , .

[0031] Furthermore, the operating status data and power consumption data of the equipment in each sub-area are obtained and used as sample data; the recurrent neural network is trained by the sample data to obtain the trained regional power consumption prediction model; at each prediction node, the trained regional power consumption prediction model is used to predict the power consumption in the sub-area, and the obtained predicted power consumption data are summarized to construct a load power consumption data set.

[0032] Furthermore, after obtaining the optimized quotas on each prediction node in the sub-region, the load degree is generated from the predicted power consumption data in the load power consumption data set. , under dimensionless conditions, according to the following method:

[0033] ;

[0034] in, is the weight coefficient, For the i The power consumption on the predicted nodes is is the quota target value of electricity consumption;

[0035] If the load When the load threshold is exceeded, the historical and predicted electricity consumption data in each sub-area are obtained, and the current electricity price is optimized using the particle swarm optimization algorithm to reduce the load of electricity in the sub-area as the optimization goal.

[0036] Furthermore, historical operation data and real-time operation data of the target device are obtained during the fault monitoring period, and the operation status set of the target device is obtained by summarizing; the fault degree is constructed based on the operation status data of the target device. If the fault degree If the fault level exceeds the preset threshold, a maintenance instruction will be issued to the outside.

[0037] Furthermore, after obtaining the operating temperature of different monitoring nodes of the target device and power factor After that, linear normalization is performed on both of them, and the corresponding data values ​​are mapped to the interval The fault degree is constructed according to the following formula :

[0038] ;

[0039] Weight coefficient: , , is the number of monitoring nodes; For the i The operating temperature of each monitoring node, is the mean operating temperature, is the qualified target value of the operating temperature, is the variance of operating temperature; For the i The power factor of each monitoring node, is the mean value of the power factor, is the qualified target value of power factor, is the variance of the power factor.

[0040] The plant power management system based on big data includes an energy efficiency analysis unit, which constructs a plant efficiency data set based on the production status data of the plant, and constructs an energy efficiency , if the energy efficiency obtained is If the energy efficiency threshold is not exceeded, data collection instructions are issued to the outside;

[0041] The power consumption optimization unit divides the factory into several sub-areas, analyzes the impact of equipment operation data on production in each sub-area, and constructs the power demand in each sub-area through the correlation between different sub-areas. , based on demand Mark sub-areas and optimize the electricity quota in each sub-area;

[0042] The abnormality analysis unit stores the unused electric energy when the allocated electric energy in the sub-area is not used up, and constructs the abnormality degree of electric energy after obtaining the electric energy consumption data of the electric equipment. , if the abnormality If the abnormal threshold is exceeded, the corresponding device will be taken as the target device and marked on the electronic map;

[0043] The electricity price optimization unit uses the trained regional power consumption prediction model to predict the power consumption in the sub-region and generates the load degree based on the predicted power consumption data. , if the load Exceeding expectations, optimizing the current electricity price in each sub-region and obtaining the optimized electricity price;

[0044] The fault analysis unit monitors and obtains the operating status data of the target device, and constructs the fault degree based on the operating status data of the target device. If the fault degree If the number of faulty devices exceeds expectations, a maintenance plan is formulated for each faulty device and constraints are imposed on the maintenance frequency, and the faulty devices are maintained at the maintenance nodes.

[0045] A plant area power management equipment terminal, comprising at least one processor;

[0046] A memory is used to store executable instructions, where the instructions are executed by the at least one processor so that the at least one processor performs the steps of the plant power management method based on big data.

[0047] A computer-readable storage medium stores a computer program, and the computer program is executed by a processor to perform steps of a plant power management method based on big data.

[0048] (III) Beneficial effects

[0049] The present invention provides a plant area power management method, system, storage medium and equipment terminal based on big data, which have the following beneficial effects:

[0050] 1. Based on energy efficiency Determine the current production volume and power consumption ratio to determine whether there is any abnormality in the power consumption. If there is any abnormality, manage the power consumption in the factory to reduce the waste of power resources and reduce carbon emissions.

[0051] 2. Select important and unimportant equipment in the sub-areas, so that the power consumption can be allocated more reasonably according to the demand. Comprehensively evaluate the importance of the equipment in the sub-area. By judging the importance of the equipment in the sub-area, it is possible to allocate electricity consumption to each sub-area and manage electricity more reasonably.

[0052] 3. Based on abnormality Determine whether there is any abnormality in the current power consumption of the electrical equipment. If there is an abnormality, it will be used as the target equipment. When necessary, the target equipment can be periodically tested and maintained to restore the power consumption of the target equipment to normal. When performing power management on the equipment in the factory, it can reduce the waste of power resources.

[0053] 4. After training the regional power consumption prediction model, the predicted power consumption data is obtained, which can predict the power consumption in the sub-region in advance. If the subsequent power demand is high, the power resources in each sub-region can be allocated and optimized in advance to avoid power shortages in some sub-regions.

[0054] 5. Construct load level from forecast data , based on load Determine whether the power load in the sub-area is high. If the load is high, it can be processed. When performing power management, the power load level of each sub-area can be reduced.

[0055] 6. Adjust the internal electricity price in each sub-region through the optimization algorithm, allocate power resources more reasonably among the sub-regions, avoid excessive imbalance in the power load in each sub-region when managing electric energy, and ensure the production volume in the factory.

[0056] 7. According to the degree of fault Determine whether the target device has an operating fault. If it is determined that the target device has an operating fault, it can be maintained regularly to avoid the fault from getting worse and ensure the normal operation of the device.

[0057] 8. Keep the maintenance frequency and the degree of equipment failure correlated to ensure that when the degree of equipment failure is high, it can get more attention. When managing the power in the factory, when the power load and operating load of some equipment are high, reduce the risk of failure of such equipment, and ensure the stability of production in the factory. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 It is a schematic diagram of the process flow of the plant area power management method of the present invention;

[0059] Figure 2 This is a schematic diagram of the structure of the plant power management system of the present invention;

[0060] Figure 3 It is a schematic diagram of the structure of the plant power management terminal of the present invention. DETAILED DESCRIPTION

[0061] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0062] See also Figure 1 The present invention provides a plant power management method based on big data, comprising:

[0063] Step 1: Construct a plant efficiency data set from the plant's production status data, and construct energy efficiency from the plant efficiency data set , if the energy efficiency obtained is If the energy efficiency threshold is not exceeded, data collection instructions are issued to the outside;

[0064] The step 1 includes the following contents:

[0065] Step 101: After determining the coverage area of ​​the plant, an electronic map covering the plant is constructed, an evaluation cycle is pre-set, the production status of the plant is monitored when the plant is in operation and production, and indicators are collected during the evaluation cycle, including at least the carbon emissions and production energy efficiency ratio of the plant at each evaluation node, and a plant efficiency data set is constructed after aggregation;

[0066] Step 102: Construct the energy efficiency of the plant during operation and production from the plant efficiency data set , among which, in carbon emissions Energy efficiency ratio Under dimensionless conditions, according to the following formula:

[0067] ;

[0068] in, For the factory i The energy efficiency ratio on the evaluation node is For the i Carbon emissions at the evaluation nodes, is the weight coefficient, ;

[0069] Combine historical data and management expectations of the factory's production status to pre-set energy efficiency thresholds; if the energy efficiency obtained is If it does not exceed the energy efficiency threshold, it means that the current plant operation status is poor, the energy consumption is high, and adjustments are needed. At this time, a data collection instruction is issued to the outside;

[0070] When using, combine the contents in steps 101 and 102:

[0071] When it is necessary to manage the various equipment in the factory, first monitor the production status data in the factory as a whole and build the corresponding energy efficiency , based on energy efficiency Judge the current production volume and power consumption ratio to determine whether the current power consumption is excessive or whether there is any abnormality in the power consumption. If there is any abnormality, it is necessary to manage the power consumption in the factory to reduce the waste of power resources and reduce carbon emissions.

[0072] Combined with the above application and the contents of the prior art:

[0073] When the power consumption in the factory is high, in order to reduce the waste of power resources, it is necessary to manage the power in the factory and optimize the power distribution of each device in the factory more reasonably. In the existing power management method, it is usually necessary to screen out the equipment with poor energy efficiency in the factory, and then maintain or replace such equipment to save power resources without affecting the production volume. However, this power management method does not plan the power consumption of equipment in each area, especially when the current energy efficiency in the factory is relatively poor and the carbon emissions are already high. In order not to affect the production volume, the power load of some equipment will not be reduced during power management, and it may also be in a state of continuous high-load operation. In this case, it is easy to cause the risk of failure of high-load equipment, and the expected effect cannot be achieved when power management is carried out.

[0074] Step 2: Divide the plant into several sub-areas, analyze the impact of equipment operation data on production in each sub-area, and construct the power demand in each sub-area through the correlation between different sub-areas. , based on demand Mark sub-areas and optimize the electricity quota in each sub-area;

[0075] The step 2 includes the following contents:

[0076] Step 201: Mark the production lines, warehouses, office areas and other areas of the factory on the electronic map, and divide the factory into several different sub-areas according to different functions, collect the power consumption data of various equipment in the sub-areas and the data of the opening time period, summarize the power consumption data in each sub-area, and construct a set of equipment power consumption data;

[0077] Step 202: Monitor and obtain the operating status of each device in the sub-area, power consumption data and production data in the plant area, use the power consumption data of each device as the independent variable and the production data in the plant area as the dependent variable, perform multiple linear regression analysis and obtain the corresponding linear regression equation, and use the regression coefficient corresponding to the independent variable as the impact value. ;

[0078] When in use, linear regression analysis is performed to determine the degree of influence of power consumption data on production volume, and the importance of the equipment is determined based on the analysis results;

[0079] Step 203: Based on the power consumption data in several time periods, a correlation analysis is performed between different devices in the same sub-area to obtain the correlation coefficient between two devices, and the center value of each device is calculated based on the correlation coefficient. :

[0080] ;

[0081] in, is the collection of all devices in the sub-area. n is the number of devices, Yes Equipment With equipment The correlation coefficient between

[0082] Center value After marking each device, the power demand in each sub-area is constructed under dimensionless conditions. , as follows:

[0083] ;

[0084] Weight coefficient: , ; For the i The center value of each device, For the i The impact value of each device, n is the number of devices, where the weight coefficient can be obtained by referring to the hierarchical analysis method;

[0085] Demand Mark the sub-areas and refer to the demand in each sub-area Differently, the power consumption quota in each sub-area can be adjusted, and the adjusted power consumption quota can be used as the optimized quota. For example, the multi-objective optimization algorithm can be referred to to optimize and adjust each power consumption quota;

[0086] When using, combine the contents in steps 201 to 203:

[0087] There are several devices in the sub-area. After judging the influence of each device on the production volume, the important and unimportant devices can be screened out in the sub-area, so that the power consumption can be allocated more reasonably. After analyzing the correlation between different devices and calculating the central value of each device, the importance of each device is further analyzed. The demand degree is generated based on the central value and influence value. , according to the demand It is possible to comprehensively evaluate the importance of the equipment in the sub-area. By judging the importance of the equipment in the sub-area, it is possible to be more reasonable in allocating power consumption to each sub-area and managing power.

[0088] Step 3: When the allocated electric energy in the sub-area is not used up, the unused electric energy is stored, and the abnormal degree of power consumption is constructed after obtaining the power consumption data of the power-consuming equipment. , if the abnormality If the abnormal threshold is exceeded, the corresponding device will be taken as the target device and marked on the electronic map;

[0089] The step three includes the following contents:

[0090] Step 301: placing electric energy storage equipment in each sub-area, for example, using a microgrid and an energy storage system to store electric energy. If the power consumption in the current cycle in the sub-area does not exceed the optimized quota, the electric energy storage equipment is used to store the remaining quota power, and the power consumption is used after the power consumption exceeds the optimized quota, thereby realizing efficient utilization of distributed energy resources through an intelligent control system;

[0091] During use, in order to reduce electricity waste and utilize it rationally, when the electricity in the sub-area is not fully used up, the unused electricity will be reserved, and when the load is too high, the reserved electricity will be used to smooth the high load, thereby reducing the electricity load in the sub-area.

[0092] Step 302: After obtaining the power consumption data of the power-consuming equipment at each monitoring node, the power consumption abnormality degree is constructed from the power consumption data. , according to the degree of abnormality, select the abnormal power consumption equipment, under dimensionless conditions, in the following way:

[0093] ;

[0094] in, is the number of monitoring nodes, For monitoring nodes i The power consumption on is the corresponding target value, It is a monitoring point i To the monitoring point j The difference in power consumption between is the mean of the power consumption difference, and the weight coefficient is: , ; The weight coefficient can be obtained by referring to the hierarchical analysis method, or it can be kept consistent with the previous value;

[0095] Combine historical data and power management expectations for corresponding equipment to set abnormal thresholds in advance; if the abnormality is If the abnormal threshold is exceeded, it means that the power consumption of the corresponding device is abnormal, and it is marked as the target device on the electronic map;

[0096] When using, combine the contents in steps 301 and 302:

[0097] Monitor and obtain the power consumption data of each device, and build anomaly degree based on the power consumption data , according to the degree of abnormality Determine whether there is any abnormality in the current power consumption of the electrical equipment. If there is an abnormality, it will be used as the target equipment. When necessary, the target equipment can be periodically tested and maintained to restore the power consumption of the target equipment to normal. When performing power management on the equipment in the factory, it can reduce the waste of power resources.

[0098] Step 4: Use the trained regional power consumption prediction model to predict the power consumption in the sub-region, and generate the load degree from the predicted power consumption data. , if the load Exceeding expectations, optimizing the current electricity price in each sub-region and obtaining the optimized electricity price;

[0099] The step three includes the following contents:

[0100] Step 401: Obtain the operating status data and power consumption data of the equipment in each sub-area and use them as sample data; use a recurrent neural network to build an initial model, train the initial model with the sample data, and obtain a trained regional power consumption prediction model; at each prediction node, use the trained regional power consumption prediction model to predict the power consumption in the sub-area, and aggregate the obtained predicted power consumption data to build a load power consumption data set;

[0101] When in use, after training and obtaining the regional power consumption prediction model, the predicted power consumption data is obtained, and the power consumption in the sub-region can be predicted in advance. If the subsequent power demand is high, the power resources in each sub-region can be allocated and optimized in advance to avoid power shortages in some sub-regions.

[0102] Step 402: After obtaining the optimized quotas on each prediction node in the sub-region, the load degree is generated from the predicted power consumption data in the load power consumption data set. , under dimensionless conditions, according to the following method:

[0103] ;

[0104] in, is the weight coefficient, and its value falls into , which can be obtained through simulation software analysis or by referring to the hierarchical analysis method; For the i The power consumption on the predicted nodes is is the quota target value of electricity consumption;

[0105] According to historical data and the management of power load in the sub-area, the load threshold is pre-set; the load degree obtained is judged Whether the load threshold is exceeded. If the load If the load threshold is exceeded, it means that the power load in the current sub-area is large. At this time, the power load in each sub-area needs to be adjusted and an adjustment instruction needs to be issued to the outside.

[0106] When in use, after predicting the power consumption data in each sub-area, the load degree is constructed based on the predicted data. , based on load It is determined whether the power load in the sub-area is high. If the load is high, it can be processed, so as to reduce the power load level of each sub-area when performing power management.

[0107] Step 403: after receiving the adjustment instruction, the historical and predicted data of electricity consumption in each sub-region are obtained, and the reduction of the load degree of electricity consumption in the sub-region is taken as the optimization goal. The current electricity price is optimized using the particle swarm optimization algorithm, and the adjusted electricity price in each sub-region is obtained, and the adjusted electricity price is implemented to balance the load of the power grid;

[0108] When using, combine the contents in steps 401 to 403:

[0109] As a way to reduce the power load, the internal electricity price in each sub-area is adjusted through an optimization algorithm, and the power resources are allocated more reasonably among the sub-areas. When managing electric energy, it is avoided that the power load in each sub-area is too unbalanced, thereby ensuring the production volume within the factory.

[0110] Step 5: Monitor and obtain the operating status data of the target device, and construct the fault degree based on the operating status data of the target device. If the fault degree If the number of faults exceeds expectations, a maintenance plan is formulated for each faulty device and a maintenance frequency constraint is imposed, and the faulty device is maintained at the maintenance node;

[0111] The step five includes the following contents:

[0112] Step 501: Set a fault monitoring period. During the fault monitoring period, historical and real-time operation data of the target device can be obtained based on the fault monitoring of vibration analysis and thermal imaging, including operation voltage, current parameters, operation temperature and power factor, etc., and the operation status set of the target device can be obtained in a summary manner.

[0113] Step 502: Construct the fault degree from the running status data of the target device , according to the fault degree Evaluate the health status of the target device, where the operating temperature of different monitoring nodes of the target device is obtained and power factor After that, linear normalization is performed on both of them, and the corresponding data values ​​are mapped to the interval The fault degree is constructed according to the following formula :

[0114] ;

[0115] Weight coefficient: , , is the number of monitoring nodes; For the i The operating temperature of each monitoring node, is the mean operating temperature, is the qualified target value of the operating temperature, is the variance of operating temperature; For the i The power factor of each monitoring node, is the mean value of the power factor, is the qualified target value of power factor, is the variance of the power factor.

[0116] If the fault If the fault degree exceeds the preset threshold, it means that the target device may have an operating fault and it is considered as a faulty device and needs maintenance. At this time, a maintenance instruction is issued to the outside.

[0117] When in use, after screening out the target device, monitor the operating data of the target device and construct the fault degree from the monitoring data. , according to the fault degree Determine whether the target device has an operating fault. If, after evaluation, it is determined that the target device has an operating fault, it can be maintained regularly to avoid the fault from getting worse and ensure the normal operation of the device.

[0118] Step 503: After receiving the maintenance instruction, a maintenance plan is formulated for each faulty device and a maintenance frequency constraint is imposed in the following manner:

[0119] ;

[0120] in, n is the number of repairs of the faulty equipment, It is i Maintenance to j The time interval between maintenance is the average value of the time interval, is the failure degree of the equipment, is the abnormality of the equipment;

[0121] Perform maintenance on faulty equipment at maintenance nodes that meet the constraints, including regular inspections, preventive maintenance, and emergency repairs to ensure reliable operation of the equipment;

[0122] When using, combine the contents in steps 501 to 503:

[0123] After screening out faulty equipment in the factory, the maintenance frequency of the faulty equipment is constrained according to the degree of fault, so that the maintenance frequency and the degree of equipment failure remain relevant, ensuring that when the degree of equipment failure is high, it can receive more attention. When managing power in the factory, when the power load and operating load of some equipment are high, the risk of failure of such equipment is reduced, thus ensuring the stability of production in the factory.

[0124] The analytic hierarchy process, or AHP for short, is a decision analysis method that decomposes the elements related to the decision problem into levels such as goals, criteria, and plans, and conducts qualitative and quantitative analysis on this basis. The core of this method is to regard a complex multi-objective decision problem as a system, and then decompose the goal into multiple goals or criteria, and then decompose it into several levels of multiple indicators (or criteria, constraints). Through the fuzzy quantification method of qualitative indicators, the hierarchical single ranking (weight) and total ranking can be calculated, thus providing a systematic method for multi-indicator and multi-plan optimization decision-making.

[0125] See also Figure 2 The present invention provides a plant power management system based on big data, including:

[0126] Energy efficiency analysis unit, which constructs the plant efficiency data set from the production status data of the plant, and constructs the energy efficiency from the plant efficiency data set , if the energy efficiency obtained is If the energy efficiency threshold is not exceeded, data collection instructions are issued to the outside;

[0127] The power consumption optimization unit divides the factory into several sub-areas, analyzes the impact of equipment operation data on production in each sub-area, and constructs the power demand in each sub-area through the correlation between different sub-areas. , based on demand Mark sub-areas and optimize the electricity quota in each sub-area;

[0128] The abnormality analysis unit stores the unused electric energy when the allocated electric energy in the sub-area is not used up, and constructs the abnormality degree of electric energy after obtaining the electric energy consumption data of the electric equipment. , if the abnormality If the abnormal threshold is exceeded, the corresponding device will be taken as the target device and marked on the electronic map;

[0129] The electricity price optimization unit uses the trained regional power consumption prediction model to predict the power consumption in the sub-region and generates the load degree based on the predicted power consumption data. , if the load Exceeding expectations, optimizing the current electricity price in each sub-region and obtaining the optimized electricity price;

[0130] The fault analysis unit monitors and obtains the operating status data of the target device, and constructs the fault degree based on the operating status data of the target device. If the fault degree If the number of faulty devices exceeds expectations, a maintenance plan is formulated for each faulty device and constraints are imposed on the maintenance frequency, and the faulty devices are maintained at the maintenance nodes.

[0131] See also Figure 3Based on the same inventive concept, according to another aspect of the present invention, the present invention also provides a plant power management equipment terminal, including at least one processor; a memory for storing executable instructions, the instructions are executed by the at least one processor to enable at least one of the processors to perform the steps of the plant power management method based on big data.

[0132] See also Figure 3 Based on the same inventive concept, according to another aspect of the present invention, the present invention also provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the plant power management method based on big data are executed.

[0133] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0134] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0135] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0136] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only some logical function divisions. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0137] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0138] In addition, each functional unit in each embodiment of the present application may be integrated into one processor, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0139] If the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, and other media that can store program codes.

[0140] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A plant power management method based on big data, characterized by: include, The plant efficiency data set is constructed from the production status data of the plant, and the energy efficiency is constructed from the plant efficiency data set. , if the energy efficiency obtained is If the energy efficiency threshold is not exceeded, data collection instructions are issued to the outside; Divide the plant into several sub-areas, analyze the impact of equipment operation data on production in each sub-area, and construct the power demand in each sub-area through the correlation between different sub-areas , based on demand Mark the sub-areas and optimize the power quota in each sub-area; based on the power consumption data in several time periods, perform correlation analysis between different devices in the same sub-area, obtain the correlation coefficient between two devices, and calculate the center value of each device based on the correlation coefficient : ; in, is the collection of all devices in the sub-area. is the number of devices, Yes Equipment With equipment The correlation coefficient between After marking each device, the power demand in each sub-area is constructed under dimensionless conditions. , as follows: ; Weight coefficient: , ; is the center value of the ith device, is the impact value of the ith device, is the number of devices; When the allocated electric energy in the sub-area is not used up, the unused electric energy is stored, and the abnormal degree of power consumption is constructed after obtaining the power consumption data of the power-consuming equipment. , if the abnormality If the abnormal threshold is exceeded, the corresponding device will be taken as the target device and marked on the electronic map; The trained regional power consumption prediction model is used to predict the power consumption in the sub-region, and the load degree is generated from the predicted power consumption data. , if the load If the current electricity price in each sub-region exceeds the expectation, the optimized electricity price is optimized; after obtaining the optimized quota on each prediction node in the sub-region, the load degree is generated by the predicted electricity data in the load electricity data set. , under dimensionless conditions, according to the following method: ; in, is the weight coefficient, For the The power consumption on the predicted nodes is is the quota target value of electricity consumption; If the load When the load threshold is exceeded, the historical and predicted data of electricity consumption in each sub-area are obtained, and the current electricity price is optimized using the particle swarm optimization algorithm with the goal of reducing the load of electricity consumption in the sub-area as the optimization goal; Monitor and obtain the operating status data of the target device, and construct the fault degree based on the operating status data of the target device. If the fault degree If the number of faults exceeds expectations, a maintenance plan is formulated for each faulty device and a maintenance frequency constraint is imposed. The faulty device is maintained at the maintenance node. The maintenance frequency constraint is as follows: ; in, is the number of repairs of the faulty equipment, It is Maintenance to The time interval between maintenance is the average value of the time interval, is the failure degree of the equipment, The abnormality of the device.

2. The plant power management method based on big data according to claim 1 is characterized by: Construct an electronic map covering the factory area, monitor the production status of the factory area when the factory area is in operation and production, collect indicators during the evaluation period, including at least the carbon emissions and production energy efficiency ratio of the factory area at each evaluation node, and then summarize and construct a plant efficiency data set.

3. The plant power management method based on big data according to claim 2 is characterized in that: The energy efficiency of the plant during operation and production is constructed from the plant efficiency data set , among which, in carbon emissions Energy efficiency ratio Under dimensionless conditions, according to the following formula: ; in, For the factory The energy efficiency ratio on the evaluation node is For the Carbon emissions at the evaluation nodes, is the weight coefficient, .

4. The plant power management method based on big data according to claim 3 is characterized in that: The factory area is divided into several different sub-areas, and the power consumption data of each device in the sub-area and its opening time period data are collected. The power consumption data obtained in each sub-area is aggregated to construct a set of equipment power consumption data; Monitor and obtain the operating status, power consumption data and production data of each device in the sub-area. Take the power consumption data of each device as the independent variable and the production data of the plant as the dependent variable. Perform multiple linear regression analysis and obtain the corresponding linear regression equation. Take the regression coefficient corresponding to the independent variable as the impact value. .

5. The plant power management method based on big data according to claim 4 is characterized in that: An energy storage device is placed in each sub-area. If the power consumption in the sub-area in the current cycle does not exceed the optimized quota, the energy storage device is used to store the remaining quota power and use it after the power consumption exceeds the optimized quota; After obtaining the power consumption data of the power-consuming equipment at each monitoring node, the power consumption data is used to construct the abnormality degree of power consumption. , as follows: ; in, is the number of monitoring nodes, For monitoring nodes The power consumption on is the corresponding target value, It is a monitoring point To the monitoring point The difference in power consumption between is the mean of the power consumption difference, and the weight coefficient is: , .

6. The plant power management method based on big data according to claim 5 is characterized by: The operating status data and power consumption data of the equipment in each sub-area are obtained and used as sample data; the recurrent neural network is trained with the sample data to obtain the trained regional power consumption prediction model; at each prediction node, the trained regional power consumption prediction model is used to predict the power consumption in the sub-area, and the obtained predicted power consumption data are summarized to construct a load power consumption data set.

7. The plant power management method based on big data according to claim 6 is characterized by: Acquire historical operation data and real-time operation data of the target device during the fault monitoring cycle, and summarize and obtain the operation status set of the target device; Construct the fault severity from the operating status data of the target device If the fault degree If the fault level exceeds the preset threshold, a maintenance instruction will be issued to the outside.

8. The plant power management method based on big data according to claim 7 is characterized by: After obtaining the operating temperature of different monitoring nodes of the target device and power factor After that, linear normalization is performed on both of them, and the corresponding data values ​​are mapped to the interval The fault degree is constructed according to the following formula : ; Weight coefficient: , , is the number of monitoring nodes; is the operating temperature of the ith monitoring node, is the mean operating temperature, Qualified target value of operating temperature, is the variance of operating temperature; is the power factor of the ith monitoring node, is the mean value of the power factor, is the qualified target value of power factor, is the variance of the power factor.

9. A plant power management system based on big data, applying the plant power management method according to any one of claims 1 to 8, characterized in that: include, Energy efficiency analysis unit, which constructs a plant efficiency data set from the production status data of the plant, and constructs energy efficiency from the plant efficiency data set , if the energy efficiency obtained is If the energy efficiency threshold is not exceeded, data collection instructions are issued to the outside; The power consumption optimization unit divides the factory into several sub-areas, analyzes the impact of equipment operation data on production in each sub-area, and constructs the power demand in each sub-area through the correlation between different sub-areas. , based on demand Mark sub-areas and optimize the electricity quota in each sub-area; The abnormality analysis unit stores the unused electric energy when the allocated electric energy in the sub-area is not used up, and constructs the abnormality degree of electric energy after obtaining the electric energy consumption data of the electric equipment. , if the abnormality If the abnormal threshold is exceeded, the corresponding device will be taken as the target device and marked on the electronic map; The electricity price optimization unit uses the trained regional power consumption prediction model to predict the power consumption in the sub-region and generates the load degree based on the predicted power consumption data. , if the load Exceeding expectations, optimizing the current electricity price in each sub-region and obtaining the optimized electricity price; The fault analysis unit monitors and obtains the operating status data of the target device, and constructs the fault degree based on the operating status data of the target device. If the fault degree If the number of faulty devices exceeds expectations, a maintenance plan is formulated for each faulty device and constraints are imposed on the maintenance frequency, and the faulty devices are maintained at the maintenance nodes.

10. A plant power management equipment terminal, characterized in that: include, at least one processor; A memory for storing executable instructions, wherein the instructions are executed by at least one of the processors to enable at least one of the processors to perform the steps of the method according to any one of claims 1 to 8.

11. A computer-readable storage medium storing a computer program, characterized in that: The computer program is used by a processor to execute the steps of the method according to any one of claims 1 to 8.