A grounding construction method for photovoltaic power station system in rocky desertification areas

By using pile foundation, external guide grounding trenches and steel strands in the photovoltaic power station area in the stone desertification area, combined with aerial resistance testing, the problems of incomplete grounding network and large resistance are solved, and efficient grounding construction is achieved. Suitable for the construction of photovoltaic power plants in the stone desertification area.

CN118472740BActive Publication Date: 2024-11-26CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410919879.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-26
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

The grounding network of the photovoltaic power station site in the stone desertification area is difficult to form a complete closure, resulting in a large grounding resistance and cannot meet the grounding requirements. Geological reasons make it difficult to excavate the grounding trench.

Method used

A grounding construction method for photovoltaic power stations in the stone desertification area is adopted, including pile foundation drilling and casting, excavation of external lead trench, connection of steel strands, laying of external lead plating, welding and acceptance of vertical ground pole , combined with aerial photography and construction diagrams, the grounding resistance test is carried out, and the grounding length of the main grounding network is reduced and construction efficiency is improved.

Benefits of technology

It has achieved the meeting of grounding resistance requirements, reduced construction difficulty and number of personnel, improved work efficiency, and is suitable for high-quality, high-speed and efficient development of photovoltaic power generation projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118472740B_ABST
    Figure CN118472740B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of installation of photovoltaic combined cables or wires, and provides a grounding construction method for a photovoltaic power station system in a rocky desertification region, comprising the following steps: S1, drilling and pouring of pile foundations; S2, excavation of external grounding trenches; S3, connection of steel strands; S4, laying of external grounding flat steel and vertical grounding electrodes; S5, welding of vertical grounding and external grounding; S6, acceptance and backfilling; S7, grounding resistance testing. The present invention adopts the method of connecting the grounding main grid and the bracket to form a grounding grid system, and extending the grounding grid to connect the vertical grounding electrode, which can not only meet the grounding resistance requirements, but also effectively reduce the grounding length of the main grounding grid, reduce the construction difficulty and the number of construction personnel, and based on the unique grounding method, the grounding resistance test operation is quick and convenient, greatly improving the work efficiency, which is of great significance to the high-quality, high-speed and efficient development of photovoltaic power generation projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a grounding construction method for a photovoltaic power station system in a rocky desertification region, and belongs to the technical field of installation of photovoltaic combined cables or wires. Background Art

[0002] With the vigorous construction of photovoltaic power stations, there are fewer and fewer areas with good orientation, flat terrain, and small slope for the construction of photovoltaic power stations, while areas with certain development difficulties such as mountains, fish ponds, tea gardens, and rocky desertification are gradually becoming the focus of photovoltaic power station construction. The main function of lightning protection grounding is to protect the safety of people and equipment. When lightning occurs, lightning protection grounding can effectively guide the lightning current to the ground, thereby reducing the potential rise and electromagnetic effect generated by the lightning current inside the building. Lightning protection grounding is a very important protective measure. When building a photovoltaic power station, the installation of a lightning protection grounding system should be considered. The Chinese utility model patent with patent number CN201621170618.3 discloses a photovoltaic power station lightning protection grounding system and a photovoltaic field lightning protection grounding device, which can avoid the risk of mountain photovoltaic power stations being easily struck by lightning, and can achieve the role of lightning protection in the process of power supply, so as to achieve the purpose of safe power transmission. The Chinese utility model patent with patent number CN202322345190.8 discloses a lightning protection grounding device for a photovoltaic power station, which can adjust the lightning protection angle of the lightning rod through the cooperation of the adjustment circular plate, the limit circular hole and the limit column in the adjustment mechanism.

[0003] However, the inventor of the present invention has found that the prior art has the following problems: most of the rocky desertification areas belong to mountainous areas, and the photovoltaic arrays built in this area are generally scattered, with large distances between the arrays, making it impossible to form a complete closed grounding network for the entire site; the arrays in isolated areas are often large in grounding resistance due to their small area, making it difficult to meet the grounding requirements;

[0004] Due to geological reasons, it is difficult to dig grounding trenches in rocky desertification areas. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides a system grounding construction method for photovoltaic power station sites in rocky desertification areas. The system grounding construction method for photovoltaic power station sites in rocky desertification areas can reduce the grounding length of the main grounding grid, save costs and improve efficiency.

[0006] The present invention is achieved through the following technical solutions.

[0007] The present invention provides a method for grounding a photovoltaic power station system in a rocky desertification region, comprising the following steps:

[0008] S1. Drilling and pouring of pile foundation: After the construction is ready, drilling construction is carried out according to the pile positioning diagram, and concrete pouring of the pile foundation is carried out;

[0009] S2. Excavation of external grounding trench: excavate trenches from the photovoltaic power station area to the line where the vertical grounding electrode is to be buried;

[0010] S3. Steel strand connection: Use steel strands to connect the support base metal components;

[0011] S4. Laying of external grounding flat steel and vertical grounding electrode: Lay the flat steel in the external grounding trench, and place the grounding electrode on the center line of the trench and drive it into the ground;

[0012] S5. Vertical grounding and external grounding welding: Weld the clip made by bending the flat steel into an arc shape onto the vertical grounding electrode;

[0013] S6. Acceptance and backfilling: After welding is completed and anti-corrosion treatment is carried out, backfilling is carried out in layers and compacted;

[0014] S7. Grounding resistance test: After the grounding grid is installed, the distance value is used as the resistance value to calculate the predicted value after aerial photography and mapping, and the predicted value is compared with the measured value to measure the resistance.

[0015] The step S7 uses the following steps to measure the resistance:

[0016] S71, Aerial photography and mapping: Use drones to take aerial photos of the installation area and identify the locations of the support foundation metal components, vertical grounding electrodes and steel strands. Combined with the pile location map, the installation location map is established from a completely bird's-eye view.

[0017] S72, installing test contacts: selecting at least four groups of bracket basic metal components in the middle of the bracket basic metal component distribution area to install electrical test contacts, and synchronously marking the electrical test contacts on the installation position diagram;

[0018] S73, calculating the distance: calculating the distance between each electrical test point and the vertical grounding electrode along the support base metal component and the steel strand according to the installation position diagram, and using the distance value as the resistance value to calculate the voltage and current of each vertical grounding electrode when the preset voltage is input to each electrical test point;

[0019] S74, power-on measurement: energize the electrical test contacts one by one, and measure the voltage and current of each vertical ground electrode (3);

[0020] S75, comparison calculation: compare the voltage calculated in step S73 with the voltage calculated in step S74, and compare the current calculated in step S73 with the current calculated in step S74, and determine whether the difference exceeds a preset range. If so, proceed to the next step, otherwise return to a normal result;

[0021] S76, simulation positioning: analyzing the abnormal segment by changing the distance value segment by segment, the distance value of the resistance value corresponding to the abnormal segment is different from the distance value corresponding to the installation position diagram.

[0022] In step S1, the improved piles are buried 10 cm into the soil.

[0023] In step S2, the grounding trench is excavated to a depth of 0.5-1 m and a width of 0.5 m, and the width of the upper part of the trench is greater than the width of the bottom part of the trench.

[0024] In step S4, the vertical grounding electrode is driven into the ground to a depth of 2-2.5 m. If the vertical grounding electrode cannot be driven into the designed depth due to geological problems, it is buried at another location.

[0025] In step S5, the flat steel for external grounding is welded by lap welding.

[0026] The welding contact area between the flat steel and the vertical grounding electrode is 20~30cm 2 .

[0027] After the welding parts of the external grounding are cleaned, asphalt paint is applied to the welding parts for anti-corrosion treatment.

[0028] In step S6, the debris on the bottom of the ditch and the floor is cleaned before backfilling, and after backfilling, water is poured on the backfill soil to absorb moisture. The debris includes garbage, mortar, and gravel.

[0029] In step S7, the grounding resistance is less than 4Ω.

[0030] The beneficial effects of the present invention are: by connecting the grounding main grid and the bracket to form a unified grounding grid system, and extending the grounding grid to connect the vertical grounding electrode, not only can the grounding resistance requirements be met, but also the grounding length of the main grounding grid can be effectively reduced, the construction difficulty and the number of construction personnel can be reduced, and based on the unique grounding method, the grounding resistance test operation is quick and convenient, which greatly improves work efficiency, and is of great significance to the high-quality, high-speed and efficient development of photovoltaic power generation projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 is a schematic diagram of a process of at least one embodiment of the present invention;

[0032] Figure 2 It is a schematic diagram of the construction connection structure of the present invention;

[0033] Figure 3 yes Figure 1 Specific flow chart of step S7 in FIG.

[0034] In the figure: 1-photovoltaic panel, 2-steel wire, 3-vertical grounding electrode. DETAILED DESCRIPTION

[0035] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.

[0036] The first embodiment of the present invention relates to Figure 1-2 A method for grounding a photovoltaic power station system in a rocky desertification region is shown, comprising the following steps:

[0037] S1. Drilling and pouring of pile foundation: After the construction is ready, drilling construction is carried out according to the requirements of the pile positioning map, and concrete pouring of the pile foundation is carried out; during the construction preparation, it is necessary to check the construction machinery and tools, and complete the training on the use of tools before construction;

[0038] S2. Excavation of external grounding trench: digging trenches from the photovoltaic power station area to the line where the vertical grounding electrode 3 is to be buried; areas that cannot be excavated by machinery need to be excavated manually;

[0039] S3, Steel strand connection: Use steel strand 2 to effectively connect the support base metal components; connect the photovoltaic support with the external grounding grid to form a photovoltaic power station grounding grid system;

[0040] S4. Laying of external grounding flat steel and vertical grounding electrode: Lay the flat steel in the external grounding trench, and place the grounding body on the center line of the trench and drive it into the ground; the flat steel and vertical grounding electrode 3 need to be constructed according to the drawings;

[0041] S5. Vertical grounding and external grounding welding: The clip formed by bending the flat steel into an arc is welded on the vertical grounding electrode 3 to ensure the contact area between the flat steel and the vertical grounding electrode 3;

[0042] S6. Acceptance and backfilling: After welding is completed and anti-corrosion treatment is carried out, and the supervisor and relevant departments have jointly accepted the results, the soil can be backfilled in layers and compacted;

[0043] S7. Grounding resistance test: After the grounding grid is installed, the distance value is used as the resistance value to calculate the predicted value after aerial photography and mapping, and the predicted value is compared with the measured value to measure the resistance.

[0044] The second embodiment of the present invention is basically the same as the first embodiment, mainly in that a preferred embodiment of resistance measurement is adopted as follows Figure 3 The following steps are shown to perform resistance measurements:

[0045] S71, aerial photography and mapping: Use a drone to take aerial photos of the installation area, identify the location of the support foundation metal components, the vertical grounding electrode 3 and the steel strand 2, and create an installation location map in a completely bird's-eye view in combination with the pile positioning map;

[0046] S72, installing test contacts: selecting at least four groups of bracket basic metal components in the middle of the bracket basic metal component distribution area to install electrical test contacts, and synchronously marking the electrical test contacts on the installation position diagram;

[0047] S73, calculating the distance: calculating the distance between each electrical test point and the vertical grounding electrode 3 along the support base metal component and the steel strand 2 according to the installation position diagram, and using the value of the distance as the resistance value to calculate the voltage and current of each vertical grounding electrode 3 when the preset voltage is input to each electrical test point;

[0048] S74, power-on measurement: power on the electrical test contacts one by one, and measure the voltage and current of each vertical grounding electrode 3;

[0049] S75, comparison calculation: compare the voltage calculated in step S73 with the voltage calculated in step S74, and compare the current calculated in step S73 with the current calculated in step S74, and determine whether the difference exceeds a preset range. If so, proceed to the next step, otherwise return to a normal result;

[0050] S76, simulation positioning: analyzing the abnormal segment by changing the distance value segment by segment, the distance value of the resistance value corresponding to the abnormal segment is different from the distance value corresponding to the installation position diagram.

[0051] Generally speaking, according to the resistance law R=ρL / S, the resistance R is proportional to its length L and resistivity ρ, and inversely proportional to its cross-sectional area S. When the resistivity ρ and the cross-sectional area S are relatively unchanged, the resistance R is only related to its length L. Therefore, in this embodiment, the resistance value calculated in step S73 is mainly used for the comparative calculation of "comparing the predicted value with the measured value" in the subsequent step. Since the voltage and current are both proportional to the resistance, when the resistance R is replaced by the formula represented by the length L and substituted into the voltage and current formula for calculation, the resistivity ρ and the cross-sectional area S can be proposed as separate calculation items. The power of the separate calculation item is linearly proportional to the number of parallel branches T, that is, the separate calculation item is (ρ / S) ^(T+1). Therefore, directly using the distance value (that is, the length L) instead of the resistance value (that is, the resistance R) for calculation not only does not affect the result of the comparative calculation, but also can effectively reduce the meaningless calculation amount caused by considering the resistivity ρ and the cross-sectional area S, and can reduce the overall calculation error caused by floating-point multiplication and division. There are two methods for calculating the resistivity ρ and the cross-sectional area S mentioned above. One is to multiply them when comparing and calculating the difference in step S75. The other is to make corrections in advance within the preset range of the difference, that is, the corrected preset range of the difference ΔP=Δp*(ρ / S) ^(T+1), wherein ρ is the resistivity, S is the cross-sectional area, T is the number of parallel circuits, and Δp is the theoretical preset range of the difference of the current or voltage. The theoretical preset range of the difference is consistent with the preset range of the difference in the previous method.

[0052] The third embodiment of the present invention is basically the same as the first embodiment, mainly in that it is further optimized. In step S1, the improved pile should be buried 10 cm in the soil to ensure effective contact between the improved pile and the soil.

[0053] In step S2, the grounding trench is excavated to a depth of 0.5-1m and a width of 0.5m to ensure the buried depth of the flat steel. The width of the upper part of the trench is greater than the width of the bottom of the trench, which is convenient for workers to lay and weld the flat steel.

[0054] In step S4, the vertical grounding electrode 3 is driven into the ground to a depth of 2-2.5 m, ensuring that the field grounding system can smoothly discharge the lightning current into the earth.

[0055] When the vertical grounding electrode 3 cannot be driven into the designed depth due to geological problems, it can be buried at another location. Since the vertical grounding electrode 3 can effectively reduce the grounding resistance of the entire grounding system, the number of buried electrodes must meet the design requirements.

[0056] In step S5, the flat steel for external grounding is welded by lap welding in order to meet the process design requirements, and the lap welding connection is more solid and will not cause risk factors such as broken welds.

[0057] The welding contact area between the flat steel and the vertical grounding electrode 3 is 20-30cm2 First, it is to ensure the reliable connection between the flat steel and the vertical grounding electrode 3, and more importantly, to reduce the grounding resistance there.

[0058] After cleaning the welding parts of the external grounding, apply asphalt paint on the welding parts for anti-corrosion treatment to prevent long-term erosion and corrosion by rainwater, which may cause rust at the parts and increase the contact resistance due to poor contact.

[0059] Before backfilling, clean up the garbage, mortar, gravel and other debris on the bottom of the ditch and the floor to meet the construction and environmental protection requirements. After backfilling, water the backfill soil to absorb moisture and ensure that the soil has a certain humidity.

[0060] In step S7, the grounding resistance is less than 4Ω, which is a process requirement. The number of vertical grounding electrodes 3 is calculated by the following formula to ensure that the resistance of the entire grounding grid meets the process requirement:

[0061]

[0062] Where ρ is the soil resistivity , L is the length of the vertical grounding electrode (m), and d is the diameter of the circular conductor (m).

Claims

1. A grounding construction method for a photovoltaic power station system in a rocky desertification area, characterized in that: The steps include: S1. Drilling and pouring of pile foundation: After the construction is ready, drilling construction is carried out according to the pile positioning diagram, and concrete pouring of the pile foundation is carried out; S2. Excavation of external grounding trench: excavate a trench from the photovoltaic power station area to the line where the vertical grounding electrode (3) is to be buried; S3, steel strand connection: Use steel strand (2) to connect the support base metal components; S4. Laying of external grounding flat steel and vertical grounding electrode: Lay the flat steel in the external grounding trench, and place the grounding electrode on the center line of the trench and drive it into the ground; S5. Vertical grounding and external grounding welding: a clip made of flat steel bent into an arc is welded to the vertical grounding electrode (3); S6. Acceptance and backfilling: After welding is completed and anti-corrosion treatment is carried out, backfilling is carried out in layers and compacted; S7. Grounding resistance test: After the grounding grid is installed, the distance value is used as the resistance value to calculate the predicted value after aerial photography and mapping. The predicted value is compared with the measured value, and the resistance is measured using the following steps: S71, aerial photography and mapping: use a drone to take aerial photos of the installation area, identify the location of the support base metal components, the vertical grounding electrode (3) and the steel strand (2), and create an installation location map in a completely bird's-eye view in combination with the pile location map; S72, installing test contacts: selecting at least four groups of bracket basic metal components in the middle of the bracket basic metal component distribution area to install electrical test contacts, and synchronously marking the electrical test contacts on the installation position diagram; S73, calculating the distance: calculating the distance between each electrical test contact and the vertical grounding electrode (3) along the support base metal component and the steel strand (2) according to the installation position diagram, and using the value of the distance as the resistance value to calculate the voltage and current of each vertical grounding electrode (3) when a preset voltage is input to each electrical test contact; S74, power-on measurement: energize the electrical test contacts one by one, and measure the voltage and current of each vertical ground electrode (3); S75, comparison calculation: compare the voltage calculated in step S73 with the voltage calculated in step S74, and compare the current calculated in step S73 with the current calculated in step S74, and determine whether the difference exceeds a preset range. If so, proceed to the next step, otherwise return to a normal result; S76, simulation positioning: analyzing the abnormal segment by changing the distance value segment by segment, the distance value of the resistance value corresponding to the abnormal segment is different from the distance value corresponding to the installation position diagram.

2. The method for grounding a photovoltaic power station system in a rocky desertification region according to claim 1, characterized in that: In step S1, the improved pile is buried 10 cm into the soil.

3. The method for grounding a photovoltaic power station system in a rocky desertification region according to claim 1, characterized in that: In step S2, the grounding trench is excavated to a depth of 0.5-1 m and a width of 0.5 m, and the width of the upper part of the trench is greater than the width of the bottom part of the trench.

4. The method for grounding a photovoltaic power station system in a rocky desertification region according to claim 1, characterized in that: In step S4, the vertical grounding electrode (3) is driven into the ground to a depth of 2 to 2.5 m; if the vertical grounding electrode (3) cannot be driven into the designed depth due to geological problems, it is buried at another location.

5. The method for grounding a photovoltaic power station system in a rocky desertification region according to claim 1, characterized in that: In step S5, the flat steel for external grounding is welded by lap welding.

6. The method for grounding a photovoltaic power station system in a rocky desertification region according to claim 5, characterized in that: The welding contact area between the flat steel and the vertical grounding electrode (3) is 20-30 cm2.

7. The method for grounding a photovoltaic power station system in a rocky desertification region according to claim 6, characterized in that: After the welding parts of the external grounding are cleaned, asphalt paint is applied to the welding parts for anti-corrosion treatment.

8. The method for grounding a photovoltaic power station system in a rocky desertification region according to claim 1, characterized in that: In step S6, the debris on the bottom of the ditch and the floor is cleaned before backfilling, and after backfilling, water is poured on the backfill soil to absorb moisture. The debris includes garbage, mortar, and gravel.

9. The method for grounding a photovoltaic power station system in a rocky desertification region according to claim 1, characterized in that: In step S7, the grounding resistance is less than 4Ω.