A method and device for determining fault of power equipment in a machine room
By acquiring and comparing the normal operation data range and real-time data of the power equipment, judging the alarm signal and degree, and formulating targeted maintenance strategies, solving the problem of long and low credibility in the determination of power equipment in the computer room, and achieving rapid and reliable fault warning and resource optimization.
Patent Information
- Application Number
- CN202410910025.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-09
AI Technical Summary
The computer room power equipment fault determination takes a long time, and the traditional method has low credibility, which leads to waste of maintenance resources and the inability to warn early, affecting the safe operation of the computer room.
By obtaining the normal operation data range of the power equipment, collecting operation data in real time, determining whether an alarm signal is generated, determining the degree of alarm, and formulating targeted maintenance strategies based on the degree of alarm, recording data to warn in the alarm database or early warning database.
It improves the credibility and efficiency of fault determination, avoids waste of maintenance resources, and provides early warning of possible faulty equipment to ensure safe operation of the computer room.
Smart Images

Figure CN118503766B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of fault determination of power equipment in a computer room, and in particular to a method and a device for determining fault of power equipment in a computer room. Background Art
[0002] Computer room power equipment, such as power distribution, UPS, precision air conditioning, etc., are core components of the computer room infrastructure. The normal operation of the computer room power equipment is the basis for ensuring the normal operation of the computer room.
[0003] In order to ensure the operation of the power equipment in the computer room, the operating parameters of the power equipment in the computer room can be collected in real time, and whether the power equipment in the computer room has a fault can be determined by monitoring whether the operating parameters are abnormal. The power equipment in the computer room has the following characteristics: (1) There are many operating parameters. For example, the measurement point data items of the operating parameters of the power distribution equipment and precision air conditioners range from 500 to 2000 items; (2) The operating environment is complex, and it will be affected by electrostatic interference of the equipment, transmission line quality and other reasons, resulting in abnormal data collection. Therefore, the traditional fault judgment method is time-consuming, and once there is data abnormality, the equipment is judged to be faulty, and the equipment is repaired, which easily leads to a waste of maintenance resources. In addition, the data is easily affected by the external environment and has low credibility. It is impossible to give an early warning of the operation of the equipment, which affects the safe operation of the computer room. Summary of the invention
[0004] In view of the above-mentioned problems existing in the prior art, the purpose of the present invention is to provide a fault judgment method and device for power equipment in a computer room, which generates an alarm signal, determines the alarm degree, formulates a maintenance strategy according to the alarm degree, and performs targeted maintenance on the power equipment to avoid waste of maintenance resources. The alarm data is recorded in an alarm library or an early warning library, so that power equipment that may fail can be warned, and the fault judgment is time-saving and highly reliable.
[0005] The technical solution adopted by the present invention is to provide a method for determining the fault of power equipment in a machine room, the method comprising:
[0006] Acquiring the operating data of the power equipment during normal operation to obtain a safe operating data range;
[0007] Collecting real-time operating data of the power equipment to obtain first operating data;
[0008] Determining whether to generate an alarm signal based on the safe operation data range and the first operation data;
[0009] When it is determined that the alarm signal is generated, determining the alarm level;
[0010] According to the alarm level, a maintenance strategy is formulated.
[0011] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by comparing the safe operation data range and the first operation data, it is determined whether to generate alarm data, and the determination time is short. When it is determined that an alarm signal is generated, the alarm degree is determined, that is, the severity of the fault is determined, and a maintenance strategy is formulated according to the equipment alarm degree, and the power equipment is repaired in a targeted manner to avoid waste of maintenance resources.
[0012] In an optional implementation manner, the step of determining whether to generate an alarm signal based on the safe operation data range and the first operation data includes:
[0013] When the first operating data is within the safe operating data range, the alarm signal is not generated;
[0014] When the first operating data is outside the safe operating data range, determining the magnitude of the maximum value between the first operating data and the safe operating data range;
[0015] Obtaining a difference between the first operating data and a maximum value of the safe operating data range, and if an absolute value of the difference is greater than or equal to M, generating the alarm signal, and recording the first operating data in an alarm library;
[0016] Obtaining a difference between the first operating data and the maximum value of the safe operating data range, and if the absolute value of the difference is less than M, not generating the alarm signal, and recording the first operating data in an early warning library; wherein M is a natural number greater than 0;
[0017] The maintenance strategy of the power equipment is determined according to the alarm library and the early warning library.
[0018] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: when the first operating data is outside the safe operating data range, whether to generate an alarm signal is determined based on the difference with the maximum value of the safe operating data range. Therefore, it is not simply considered that the power equipment has a fault when abnormal operating data appears, which improves the credibility of equipment fault judgment.
[0019] In an optional implementation, the step of determining the maintenance strategy of the power equipment according to the alarm library and the early warning library includes:
[0020] Periodically collecting real-time operating data of the power equipment to obtain second operating data;
[0021] Matching the second operation data with the data in the alarm library and the early warning library;
[0022] If the matching degree is higher than d, the alarm level of the second operation data is determined; wherein d is a natural number greater than 0;
[0023] Formulate the maintenance strategy according to the alarm level;
[0024] Compared with the existing technology, the technical effect achieved by adopting this technical solution is as follows: the operation data of the equipment is periodically collected and matched with the data in the alarm library and the early warning library. If the matching degree is high, the alarm signal can be directly generated, and then the maintenance strategy can be formulated according to the alarm degree. The judgment time is short, and the credibility is continuously improved as the data in the alarm library and the early warning library are continuously improved.
[0025] In an optional implementation, when it is determined that the alarm signal is generated, the step of determining the alarm level includes:
[0026] Obtaining the operating data of the power equipment during the collection time to obtain the equipment operating data range;
[0027] By matching the safety operation data range with the equipment operation data range, at least one alarm operation data is obtained;
[0028] Record the number of occurrences of the alarm operation data and the length of time the alarm operation data appears;
[0029] The alarm level is determined according to the number of occurrences and the time length of the alarm operation data.
[0030] Compared with the existing technology, the technical effect achieved by adopting this technical solution is as follows: the alarm degree is determined according to the number of occurrences and the length of time of the alarm operation data, that is, when abnormal data occurs, it is necessary to judge the severity of the equipment failure in combination with the number of occurrences and the length of time of the abnormal data. The judgment conditions are reasonable and the judgment results are highly credible.
[0031] In an optional implementation manner, the step of determining the alarm level according to the number of occurrences and the time length of the alarm operation data includes:
[0032] If the number of occurrences of the alarm operation data is greater than or equal to a, and the duration of the occurrence of the alarm operation data is greater than or equal to b, then the alarm level is high;
[0033] If the number of occurrences of the alarm operation data is less than a, and the occurrence time of the alarm operation data is greater than or equal to b, and / or the number of occurrences of the alarm operation data is greater than or equal to a, and the occurrence time length of the alarm operation data is less than b, then the alarm level is medium;
[0034] If the number of occurrences of the alarm operation data is less than a, and the length of time for the alarm operation data to appear is less than b, then the alarm level is low; wherein a is a positive integer, and b is a natural number greater than 0.
[0035] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: only when the number of occurrences of the alarm operation data is greater than or equal to a, and the duration of occurrence of the alarm operation data is greater than or equal to b, will it be identified as a high alarm level. The alarm levels are divided into three levels: high, medium and low. The judgment conditions are reasonable, which improves the credibility of the judgment results.
[0036] In an optional implementation manner, the step of formulating a maintenance strategy according to the alarm level includes:
[0037] When the alarm level is high, the power equipment has failed, and whether to repair the power equipment is determined according to the repair success rate;
[0038] When the alarm level is medium, preventive maintenance is performed on the power equipment;
[0039] When the alarm level is low, the alarm operation data of the power equipment is recorded in the early warning library, and it is periodically determined whether the alarm level of the data in the early warning library increases. If the alarm level increases, the power equipment is repaired or preventively maintained.
[0040] Compared with the existing technology, the technical effects achieved by adopting this technical solution are: when the alarm level is high, the equipment is repaired in a targeted manner to avoid wasting maintenance resources; when the alarm level is medium, preventive maintenance is carried out on the power equipment to avoid greater safety hazards caused by failure of the power equipment; when the alarm level is low, the data is recorded in the early warning library, and the alarm level is monitored periodically to see if it changes, so as to promptly discover the hidden dangers of the equipment.
[0041] In an optional implementation manner, when the alarm level is high, the power equipment has failed, and the step of determining whether to repair the power equipment according to the repair success rate includes:
[0042] Establishing an equipment maintenance database to obtain the causes of failures in the historical maintenance records of the power equipment;
[0043] Obtaining the maintenance cost and maintenance time required for the fault cause described in the historical maintenance record;
[0044] Calculating the maintenance success rate according to the maintenance cost and the maintenance time;
[0045] Whether to repair the power equipment is determined based on the repair success rate.
[0046] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: according to the fault causes in the historical maintenance records, the corresponding maintenance cost and maintenance time are obtained, the maintenance success rate is calculated, and whether the power equipment is worth repairing is determined by the maintenance success rate.
[0047] In an optional implementation manner, the step of determining whether to repair the power equipment according to the repair success rate includes:
[0048] When the maintenance success rate is greater than or equal to c, the power equipment is maintained;
[0049] When the repair success rate is less than c, the power equipment is replaced.
[0050] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: whether the power equipment is worth repairing is judged based on the repair success rate, and the power equipment is directly replaced when the repair success rate is less than c, thereby avoiding increasing repair costs and repair time and causing waste of resources.
[0051] In an optional embodiment, the operating data includes at least one of power distribution data, HVAC data and voltage data of the power equipment.
[0052] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: the operating data of the power equipment includes at least one of the power distribution data, HVAC data and voltage data, and a determination step can be performed if one of the operating data is abnormal, thereby ensuring the accuracy of the determination and avoiding omissions.
[0053] The present invention further provides a fault determination device for a power equipment in a computer room, the determination device being used to implement the fault determination method as described in any one of the above embodiments, the determination device comprising:
[0054] An acquisition module, the acquisition module is used to acquire the operation data of the power equipment during normal operation;
[0055] A collection module, the collection module is used for real-time operation data of the power equipment;
[0056] A judgment module, the judgment module is used to determine whether to generate the alarm signal;
[0057] A determination module, the determination module is used to determine the alarm level;
[0058] An execution module is used to formulate the maintenance strategy.
[0059] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: the determination device of the embodiment of the present invention implements the steps of the determination method of any embodiment of the present invention, and thus has all the beneficial effects of the determination method of any technical solution of the present invention, which will not be repeated here.
[0060] The beneficial effects of the embodiments of the present invention are as follows: 1) by comparing the first operation data with the safe operation data range, it is determined whether to generate an alarm signal according to the difference between the maximum value of the first operation data and the safe operation data range. It is not that the power equipment is considered to be faulty simply because of the abnormal operation data, which improves the credibility of the equipment fault judgment; 2) the alarm degree is determined according to the number of occurrences and the length of time of the alarm operation data, that is, when abnormal data appears, it is necessary to combine the number of occurrences and the length of time of the abnormal data to judge the severity of the equipment fault. Both judgment conditions must be met at the same time. The judgment conditions are reasonable and the judgment result has high credibility; 3) the equipment is repaired in a targeted manner to avoid wasting maintenance resources, and the power equipment can be preventively repaired to avoid greater safety hazards caused by the failure of the power equipment; 4) when the alarm degree is low, the data is recorded in the early warning library, and the alarm degree is periodically monitored to see if it changes, so as to timely discover the hidden dangers of the equipment; 5) according to the cause of the fault in the historical maintenance record, the corresponding maintenance cost and maintenance time are obtained, the maintenance success rate is calculated, and whether the power equipment is worth repairing is determined by the maintenance success rate, so as to avoid increasing the maintenance cost and maintenance time and causing waste of resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] Figure 1 A schematic flow chart of a method for determining a fault of a power equipment in a computer room provided by an embodiment of the present invention is shown;
[0062] Figure 2 Shows Figure 1 Schematic diagram of the process of step S300;
[0063] Figure 3 Shows Figure 2 Schematic diagram of the process of step S350;
[0064] Figure 4 Shows Figure 1 Schematic diagram of the process of step S400;
[0065] Figure 5 Shows Figure 4 Schematic diagram of the process of step S440;
[0066] Figure 6 Shows Figure 1 Schematic diagram of the process of step S500;
[0067] Figure 7 Shows Figure 6 Schematic diagram of the process of step S510;
[0068] Figure 8 A schematic diagram of a fault determination device for power equipment in a computer room provided by an embodiment of the present invention.
[0069] Description of reference numerals:
[0070] 100 - determination device; 110 - acquisition module; 120 - collection module; 130 - determination module; 140 - determination module; 150 - execution module. DETAILED DESCRIPTION
[0071] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0072] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.
[0073] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0074] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.
[0075] See attached Figure 1 As shown, a method for determining a fault of a power equipment in a machine room, the method comprising:
[0076] S100, obtaining operation data of the power equipment during normal operation, and obtaining a safe operation data range;
[0077] S200, collecting real-time operation data of the power equipment to obtain first operation data;
[0078] S300, judging whether to generate an alarm signal based on the safe operation data range and the first operation data;
[0079] S400, when it is determined that an alarm signal is generated, determining the alarm level;
[0080] S500. Develop a maintenance strategy based on the alarm severity.
[0081] In step S100, the power equipment in the computer room is usually composed of main equipment and supporting equipment. The main equipment includes computing equipment and communication equipment. The computing equipment can be divided into servers and storage devices, and the supporting equipment can be divided into air conditioners, management systems, and power supply and distribution equipment. The safe operation data range is the safe operation data obtained within a certain period of time after the power equipment works normally in the computer room and runs alone for a certain period of time. The safe operation data is fluctuating, and a safe operation data curve is obtained. The upper and lower limits of the curve are taken to obtain the safe operation data range.
[0082] In step S200, the first operating data is a real-time detection of the operating power equipment, and the detected operating data is recorded as the first operating data.
[0083] Specifically, a comparison is made between the first operating data and the safe operating data to determine whether an alarm signal is generated. When it is determined that an alarm signal is generated, the alarm degree is determined, that is, the severity of the fault is determined. A maintenance strategy is formulated based on the equipment alarm degree, and the power equipment is repaired in a targeted manner to avoid wasting maintenance resources.
[0084] See attached Figure 2 As shown, in step S300, in a specific embodiment, the step of determining whether to generate an alarm signal based on the safe operation data range and the first operation data includes:
[0085] S310: When the first operating data is within the safe operating data range, no alarm signal is generated;
[0086] S320, when the first operating data is outside the safe operating data range, determining the maximum value between the first operating data and the safe operating data range;
[0087] S330, obtaining a difference between the first operating data and the maximum value of the safe operating data range, and if the absolute value of the difference is greater than or equal to M, generating an alarm signal, and recording the first operating data in an alarm database;
[0088] S340, obtaining a difference between the first operation data and the maximum value of the safe operation data range, and if the absolute value of the difference is less than M, no alarm signal is generated, and the first operation data is recorded in the early warning library; wherein M is a natural number greater than 0;
[0089] S350: Determine a maintenance strategy for the power equipment according to the alarm library and the early warning library.
[0090] Specifically, when the first operating data is within the safe operating data range, no alarm signal is generated, indicating that the power equipment is in a safe operating state.
[0091] Specifically, when the first operating data is outside the safe operating data range, it indicates that the power equipment may fail. At this time, the difference between the first operating data and the maximum value of the safe operating data range is determined. The specific calculation method is as follows:
[0092] For example, M is 20, S represents the safety operation data, and W represents the first operation data;
[0093] like , an alarm signal is generated, indicating that the operating data of the power equipment is greatly abnormal, and the power equipment is likely to have failed, and the degree of the failure needs to be further determined, and the first operating data W is recorded in the alarm library;
[0094] like , no alarm signal is generated, indicating that the operating data of the power equipment is abnormal, but the power equipment has not yet failed, and the first operating data is recorded in the early warning library.
[0095] This method does not simply detect abnormal operating data and then conclude that there is a fault in the power equipment, but requires further judgment of the maximum value of the abnormal operating data and the safe operating data range, thereby improving the credibility of the power equipment fault judgment.
[0096] See attached Figure 3 As shown, in step S350, the step of determining the maintenance strategy of the power equipment according to the alarm library and the early warning library specifically includes:
[0097] S351, periodically collecting real-time operation data of the power equipment to obtain second operation data;
[0098] S352, matching the second operation data with the data in the alarm library and the early warning library;
[0099] S353. If the matching degree is higher than d, determine the alarm level of the second operation data; wherein d is a natural number greater than 0;
[0100] S354. Formulate maintenance strategies based on the alarm severity;
[0101] Specifically, the real-time operation data of the power equipment is collected periodically to obtain the second operation data, and the second operation data is matched with the data stored in the alarm library and the early warning library, with a matching degree of 70%. If the matching degree is higher than 70%, the alarm signal is regenerated, the alarm degree is determined, and a maintenance strategy is formulated according to the alarm degree. Therefore, the judgment time is short, and the judgment credibility is continuously improved as the data in the alarm library and the early warning library are continuously improved.
[0102] See attached Figure 4 As shown, in a specific embodiment, when it is determined that an alarm signal is generated, the step of determining the alarm level includes:
[0103] S410, obtaining the operation data of the power equipment during the collection time, and obtaining the equipment operation data range;
[0104] S420, obtaining at least one alarm operation data by matching the safe operation data range with the prepared operation data range;
[0105] S430, recording the number of occurrences of the alarm operation data, and recording the duration of the occurrence of the alarm operation data;
[0106] S440: Determine the alarm level according to the number of occurrences and duration of the alarm operation data.
[0107] For example, in step S430, the safe operation data range is set to 20-60, the collection time is 20 minutes, the equipment operation data of the power equipment within 20 minutes is obtained, the equipment operation data range is matched with the safe operation data range, and the equipment operation data less than 20 or greater than 60 is the alarm operation data. If the alarm operation data appears once within 20 minutes, the number of occurrences is recorded as one, and if the alarm operation data appears twice, the number of occurrences is recorded as two. The duration of the alarm operation data is recorded. For example, the time when the alarm operation data begins to be less than 20 or greater than 60 is 10:10, and the time when the alarm operation data returns to the safe operation data range of 20-60 is 10:15, then the duration of the alarm operation data is 5 minutes.
[0108] The alarm degree is determined based on the number of occurrences and the length of time of the alarm operation data. That is, when abnormal data occurs, it is necessary to combine the two judgment conditions of the number of occurrences and the length of time of the abnormal data to judge the severity of the equipment failure. The more reasonable the judgment conditions are, the more accurate the judgment is, and the more credible the judgment result is.
[0109] See attached Figure 5 As shown, in step S440, the step of determining the alarm level according to the number of occurrences and the duration of the alarm operation data includes:
[0110] S441. If the number of occurrences of the alarm operation data is greater than or equal to a, and the duration of the occurrence of the alarm operation data is greater than or equal to b, the alarm level is high;
[0111] S442: If the number of occurrences of the alarm operation data is less than a, and the length of time for the alarm operation data to appear is greater than or equal to b, and / or the number of occurrences of the alarm operation data is greater than or equal to a, and the length of time for the alarm operation data to appear is less than b, then the alarm level is medium;
[0112] S443. If the number of occurrences of the alarm operation data is less than a, and the length of time for the alarm operation data to appear is less than b, then the alarm level is low; wherein a is a positive integer, and b is a natural number greater than 0.
[0113] For example, a is 3, b is 5 minutes, A represents the number of occurrences of alarm operation data, and B represents the duration of occurrence of alarm operation data;
[0114] If A ≥ 3 and B ≥ 5min, the alarm level is high;
[0115] If A<3 and B≥5min or A≥3 and B is less than 5min, the alarm level is medium;
[0116] If A<3 and B<5min, the alarm level is low.
[0117] Specifically, both the time length and the number of occurrences have corresponding determination indicators. When the number of occurrences is too large and the duration is too long, the power equipment is determined to have a high alarm level.
[0118] See attached Figure 6 As shown, in a specific embodiment, the steps of formulating a maintenance strategy according to the alarm level include:
[0119] S510, when the alarm level is high, the power equipment has failed, and whether to repair the power equipment is determined according to the repair success rate;
[0120] S520: When the alarm level is medium, perform preventive maintenance on the power equipment;
[0121] S530. When the alarm level is low, the alarm operation data of the power equipment is recorded in the early warning library, and it is periodically determined whether the alarm level of the data in the early warning library increases. If the alarm level increases, the power equipment is repaired or preventively maintained.
[0122] Specifically, when the alarm level is high, targeted maintenance is carried out on the equipment to avoid wasting maintenance resources; when the alarm level is medium, preventive maintenance is carried out on the power equipment. Preventive maintenance includes various inspections of the equipment to avoid greater safety hazards caused by failures of the power equipment; when the alarm level is low, the data is recorded in the early warning database, and the alarm level is monitored periodically to see if it changes, so as to promptly discover hidden dangers in the equipment.
[0123] Specifically, when the alarm level is low, the alarm operation data is recorded in the early warning library, the power equipment corresponding to the alarm operation data recorded in the early warning library is obtained, the operation data of the power equipment is periodically collected, and it is determined whether the alarm level of the equipment has increased. If the alarm level increases from low to medium or high, the power equipment is repaired or preventively maintained. Therefore, the power equipment with a low alarm level before can be locked in the early warning library, and the power equipment can be monitored in key areas to determine whether the alarm level of the power equipment has increased, so as to promptly discover potential faults and formulate maintenance strategies.
[0124] See attached Figure 7 As shown, in a specific embodiment, when the alarm level is high, the power equipment has failed, and the step of determining whether to repair the power equipment according to the repair success rate includes:
[0125] S511. Establish an equipment maintenance database to obtain the fault causes in the historical maintenance records of the power equipment;
[0126] S512, obtaining the maintenance cost and maintenance time required for the fault cause in the historical maintenance records;
[0127] S513, calculating the repair success rate according to the repair cost and the repair time;
[0128] S514: Determine whether to repair the power equipment according to the repair success rate.
[0129] Specifically, an equipment maintenance database is established, which records the causes of failures, maintenance costs and maintenance times of historical maintenance of power equipment. The maintenance success rate is obtained based on the maintenance time and maintenance cost. When the alarm level is high, it indicates that the equipment has failed and needs maintenance. Further, based on the maintenance success rate, it is determined whether to repair the power equipment.
[0130] In a specific embodiment, the step of judging whether to repair the power equipment according to the repair success rate includes:
[0131] When the maintenance success rate is greater than or equal to c, the power equipment is maintained;
[0132] When the repair success rate is less than c, the power equipment is replaced.
[0133] Specifically, c is 60%. When the repair success rate is greater than or equal to 60%, the power equipment is repaired. When the repair success rate is less than 60%, the equipment is replaced to avoid increasing repair costs and repair time and causing waste of resources.
[0134] In a specific embodiment, the operation data includes at least one of power distribution data, HVAC data, and voltage data of the power equipment.
[0135] Specifically, the power equipment in the computer room includes distribution cabinets, air conditioners, UPS power supplies, etc. The operating data of the power equipment includes at least one item of power distribution data, HVAC data and voltage data. If one of the operating data is abnormal, the power equipment fault judgment process can be carried out to ensure the accuracy of the judgment and avoid omissions.
[0136] See attached Figure 8 As shown, the present invention further provides a fault determination device for power equipment in a computer room, the determination device 100 is used to implement the fault determination method as in any one of the above embodiments, and the determination device 100 includes:
[0137] An acquisition module 110, the acquisition module 110 is used to acquire operation data of the power equipment during normal operation;
[0138] Collection module 120, collection module 120 is used for real-time operation data of power equipment;
[0139] A determination module 130, the determination module 130 is used to determine whether to generate an alarm signal;
[0140] A determination module 140, the determination module 140 is used to determine the alarm level;
[0141] The execution module 150 is used to formulate a maintenance strategy.
[0142] The determination device 100 of the embodiment of the present invention implements the steps of the determination method of any embodiment of the present invention, and thus has all the beneficial effects of the determination method of any technical solution of the present invention, which will not be described in detail here.
[0143] The above description is intended to be illustrative rather than restrictive, and those skilled in the art may make changes, modifications, substitutions and variations to the above embodiments within the scope of the present disclosure. Moreover, the above examples (or one or more of them) may be used in combination with each other, and it is contemplated that these embodiments may be combined with each other in various combinations or permutations.
Claims
1. A method for determining a fault of a power equipment in a machine room, characterized in that: The determination method comprises: Acquiring the operating data of the power equipment during normal operation to obtain a safe operating data range; Collecting real-time operating data of the power equipment to obtain first operating data; Determining whether to generate an alarm signal based on the safe operation data range and the first operation data; When it is determined that the alarm signal is generated, determining the alarm level; Obtaining the operating data of the power equipment during the collection time to obtain the equipment operating data range; By matching the safety operation data range with the equipment operation data range, at least one alarm operation data is obtained; Record the number of occurrences of the alarm operation data and the length of time the alarm operation data appears; Determining the alarm level according to the number of occurrences and the time length of the alarm operation data; If the number of occurrences of the alarm operation data is greater than or equal to a, and the duration of the occurrence of the alarm operation data is greater than or equal to b, then the alarm level is high; If the number of occurrences of the alarm operation data is less than a, and the length of time the alarm operation data appears is greater than or equal to b, and / or the number of occurrences of the alarm operation data is greater than or equal to a, and the length of time the alarm operation data appears is less than b, then the alarm level is medium; If the number of occurrences of the alarm operation data is less than a, and the duration of occurrence of the alarm operation data is less than b, then the alarm level is low; wherein a is a positive integer, and b is a natural number greater than 0; Formulate maintenance strategies based on the alarm severity; When the alarm level is high, the power equipment has failed, and whether to repair the power equipment is determined according to the repair success rate; When the alarm level is medium, preventive maintenance is performed on the power equipment; When the alarm level is low, the alarm operation data of the power equipment is recorded in the early warning library, and it is periodically determined whether the alarm level of the data in the early warning library increases. If the alarm level increases, the power equipment is repaired or preventively maintained.
2. A method for determining a fault of a power equipment in a computer room according to claim 1, characterized in that: The step of determining whether to generate an alarm signal based on the safe operation data range and the first operation data includes: When the first operating data is within the safe operating data range, the alarm signal is not generated; When the first operating data is outside the safe operating data range, determining the magnitude of the first operating data and the maximum value of the safe operating data range; Obtaining a difference between the first operating data and a maximum value of the safe operating data range, and if an absolute value of the difference is greater than or equal to M, generating the alarm signal, and recording the first operating data in an alarm library; Obtaining a difference between the first operating data and the maximum value of the safe operating data range, and if the absolute value of the difference is less than M, not generating the alarm signal, and recording the first operating data in the early warning library; wherein M is a natural number greater than 0; The maintenance strategy of the power equipment is determined according to the alarm library and the early warning library.
3. A method for determining a fault of a power equipment in a computer room according to claim 2, characterized in that: The step of determining the maintenance strategy of the power equipment according to the alarm library and the early warning library comprises: Periodically collecting real-time operating data of the power equipment to obtain second operating data; Matching the second operation data with the data in the alarm library and the early warning library; If the matching degree is higher than d, the alarm level of the second operation data is determined; wherein d is a natural number greater than 0; The maintenance strategy is formulated according to the alarm level.
4. A method for determining a fault of a power equipment in a computer room according to claim 1, characterized in that: When the alarm level is high, the power equipment has failed, and the step of determining whether to repair the power equipment according to the repair success rate includes: Establishing an equipment maintenance database to obtain the causes of failures in the historical maintenance records of the power equipment; Obtaining the maintenance cost and maintenance time required for the fault cause described in the historical maintenance record; Calculating the maintenance success rate according to the maintenance cost and the maintenance time; Whether to repair the power equipment is determined based on the repair success rate.
5. A method for determining a fault of a power equipment in a computer room according to claim 4, characterized in that: The step of judging whether to repair the power equipment according to the repair success rate comprises: When the maintenance success rate is greater than or equal to c, the power equipment is maintained; When the repair success rate is less than c, the power equipment is replaced.
6. A method for determining a fault of a power equipment in a computer room according to claim 1, characterized in that: The operation data includes at least one of power distribution data, HVAC data and voltage data of the power equipment.
7. A fault determination device for power equipment in a machine room, characterized in that: The determination device is used to implement the fault determination method according to any one of claims 1 to 6, and the determination device comprises: An acquisition module, the acquisition module is used to acquire the operation data of the power equipment during normal operation; A collection module, the collection module is used for real-time operation data of the power equipment; A judgment module, the judgment module is used to determine whether to generate the alarm signal; A determination module, the determination module is used to determine the alarm level; An execution module is used to formulate the maintenance strategy.