A dynamic load distribution method and system based on load center of gravity offset

By collecting and preprocessing data on the equipment, a load center of gravity offset model is established, and electrical inertia simulation and random simulation methods are used for dynamic load distribution, which solves the problem of vehicle safety threatened by the cargo center of gravity offset and improves the accuracy of load distribution. The accuracy and real-time performance ensure the safe operation of the vehicle.

CN118504292BActive Publication Date: 2024-10-01ZHEJIANG SHANGJIA MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410954577.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-10-01
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

The existing technology fails to effectively solve the problem that the shift in the center of gravity of the cargo threatens the safety of vehicle operation, especially the situation that may lead to collapse and displacement during high-speed operation.

Method used

By installing data acquisition equipment on the equipment, we collect and preprocess data in static and running states, establish a load center of gravity offset model, and use electrical inertia simulation and random simulation methods for dynamic load distribution to ensure that it can be used in any wheel failure situation. Accurately distribute loads to improve real-time performance and accuracy.

Benefits of technology

It improves the accuracy and real-time performance of load distribution, ensures the safe operation of the vehicle when the center of gravity shifts, and avoids dangerous situations caused by the shift of the center of gravity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118504292B_ABST
    Figure CN118504292B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of load distribution, and discloses a dynamic load distribution method and system based on load gravity center offset. The method installs a data acquisition device on the equipment required for dynamic load distribution, collects various data in the static state of the equipment and during the operation of the equipment, and pre-processes the collected data; at the same time, based on the pre-processed data in the static state of the equipment and during the operation of the equipment, a load gravity center offset model is established, and based on the established load gravity center offset model, dynamic load distribution is performed through electric inertia simulation and random simulation methods, and the dynamic load distribution mode after any wheel failure in all states is determined. At the same time, based on the dynamic load distribution mode after any wheel failure in all states, load prediction and distribution are performed in real time during the operation of the equipment, thereby improving the real-time and accuracy of dynamic load distribution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of load distribution, and in particular to a dynamic load distribution method and system based on load gravity center offset. Background Art

[0002] In actual operation, the total center of gravity of the cargo in the container often shifts. Even if there is no center of gravity shift during initial loading, collapse and displacement may occur during high-speed operation. Moreover, when the center of gravity of the cargo in the container deviates from the lateral center line of the container or the total weight of the two containers loaded longitudinally is not equal, causing the center of gravity of the cargo to deviate from the longitudinal center line of the container, it will greatly threaten the operating safety of the container vehicle.

[0003] Existing technologies such as Chinese patent application CN105022866B construct a three-dimensional vehicle model; determine the constraints and motion relationships between the components of the three-dimensional model; determine the spatial center of mass of the vehicle based on the state information of the hoisting load, the constraints and the motion relationships; and determine the parameters of the components that meet the stability requirements based on the spatial center of mass, so that the hoisting load is distributed to the components according to a set ratio. However, the influence of the center of gravity offset is not considered, which has great limitations. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the deficiencies in the prior art, the present invention provides a dynamic load distribution method and system based on load center of gravity offset, which has the advantages of accurate, real-time and dynamic distribution, and solves the problem of vehicle operation safety threatened by center of gravity offset.

[0006] (II) Technical solution

[0007] In order to solve the above technical problem that the center of gravity shift threatens the safety of vehicle operation, the present invention provides the following technical solutions:

[0008] The present invention discloses a dynamic load distribution method based on load gravity center offset, which specifically comprises the following steps:

[0009] S1. Installing a data acquisition device on the equipment that needs to perform dynamic load distribution, and collecting various data of the equipment in a static state and during the operation of the equipment through the installed data acquisition device;

[0010] The data collected by the data collection device in the static state of the equipment and in the process of equipment operation include: equipment weight, equipment speed, number of equipment drive shafts, equipment wheel mass and equipment wheel radius;

[0011] S2. Preprocessing the collected data of the device in a stationary state and during the operation of the device to obtain the preprocessed data of the device in a stationary state and during the operation of the device;

[0012] S3. Based on the pre-processed data of the equipment in a static state and during the operation of the equipment, a load center of gravity offset model is established;

[0013] S4. Based on the established load center of gravity offset model, dynamic load distribution is performed through electric inertia simulation and random simulation methods to determine the dynamic load distribution method after any wheel fails in all states;

[0014] S5. Based on the dynamic load distribution method determined after any wheel fails in all states, load prediction and distribution are performed in real time during the equipment operation process.

[0015] The present invention installs a data acquisition device on a device that needs to perform dynamic load distribution, and collects various data of the device in a static state and during the operation of the device, and pre-processes the collected data; at the same time, a load center of gravity offset model is established based on the pre-processed data of the device in a static state and during the operation of the device, and based on the established load center of gravity offset model, dynamic load distribution is performed through electric inertia simulation and random simulation methods, and a dynamic load distribution mode after any wheel fails in all states is determined; at the same time, based on the determined dynamic load distribution mode after any wheel fails in all states, load prediction and distribution are performed in real time during the operation of the device, thereby improving the real-time and accuracy of dynamic load distribution.

[0016] Preferably, the preprocessing of the data collected in the static state of the device and in the process of device operation comprises the following steps:

[0017] Traverse the various data collected when the device is in a stationary state and when the device is running, and locate the data with missing content in the various data when the device is in a stationary state and when the device is running;

[0018] When there is missing content in the data of the device in the static state, the data is directly deleted;

[0019] Identify the missing content in the data during the operation of the equipment, and use different methods to process it based on the importance of the data, which are mainly divided into the following types:

[0020] When the missing content includes the weight of the equipment, the mass of the equipment wheels, or the number of the equipment drive shafts, the data is directly deleted;

[0021] When the missing content includes the equipment speed or the equipment wheel radius, the missing data is supplemented, including: selecting two adjacent groups of data of the missing data, calculating the average value of the two adjacent groups of data, and using the calculated average value as the supplementary data of the missing data;

[0022] The data after traversal, deletion and supplementation are set as the data in the static state of the pre-processed device and in the process of device operation.

[0023] The present invention traverses, deletes and supplements various data collected when the device is in a static state and during the device operation, removes missing data in various data collected when the device is in a static state and during the device operation, and improves the accuracy of dynamic load distribution data.

[0024] Preferably, the establishment of the load center of gravity offset model based on the preprocessed data in the static state of the equipment and in the process of equipment operation comprises the following steps:

[0025] S31, calculating the load gravity center offset based on various data in the static state of the preprocessed equipment;

[0026] S32. Based on various data during the operation of the preprocessed equipment and the calculated load center of gravity offset, a load center of gravity offset model is established.

[0027] Preferably, the calculation of the load gravity center offset based on the pre-processed data in the static state of the equipment includes the following steps:

[0028] Set the center of gravity of the device in a static state to ;

[0029] The calculation formula for the center of gravity offset of the equipment after loading cargo in a stationary state is as follows;

[0030] (1)

[0031] in, Indicates the center of gravity offset of the equipment after loading cargo in a stationary state. Indicates the weight of the device when it is at rest. Indicates the weight of the loaded cargo.

[0032] Preferably, the load center of gravity offset model is established based on various data in the operation process of the preprocessed equipment and the calculated load center of gravity offset:

[0033] The calculation formula of the load center of gravity offset model for various data during the operation of the preprocessed equipment is as follows:

[0034] (2)

[0035] in, Indicates the load center of gravity offset during the operation of the equipment when no cargo is loaded. Indicates the load center of gravity offset during the operation of the equipment when loading cargo. It indicates the centrifugal force generated by the equipment speed V during the operation of the equipment. Indicates the vibration inertia force of the equipment, Represents the suspension stiffness of device y.

[0036] The present invention establishes a load center of gravity offset model by calculating the center of gravity offset of the equipment in a static state and various data during the operation of the equipment after preprocessing. The center of gravity offset generated during the operation of the equipment is calculated by the established load center of gravity offset model, thereby ensuring the accuracy of the load center of gravity offset calculation.

[0037] Preferably, the dynamic load distribution based on the established load center of gravity offset model by electric inertia simulation and random simulation method comprises the following steps:

[0038] S41. Calculate the equivalent inertia of the drive shaft of the equipment during the operation of the equipment based on the electrical inertia simulation method;

[0039] S42, dynamic load distribution based on random simulation method;

[0040] The equipment is set to have only two wheel states during operation: normal operation and complete failure;

[0041] It is assumed that the probability of complete failure of each wheel during operation of the equipment is equal, and no two wheels fail completely at the same time.

[0042] Preferably, the calculation of the equivalent inertia of the driving shaft of the device during the operation of the device based on the electrical inertia simulation method includes the following steps:

[0043] The weight reduction due to the center of gravity shift is:

[0044] (3)

[0045] in, Indicates the weight reduction caused by the shift of the center of gravity. Indicates the shortest distance from the center of gravity to the drive axis of the equipment;

[0046] The formula for the equivalent inertia of the equipment drive shaft is as follows:

[0047] (4)

[0048] (5)

[0049] in, Indicates the device speed, Indicates the wheel radius of the equipment. Indicates the angular velocity of the device, Indicates the quality of the equipment wheel, Indicates the number of drive axes of the device. Indicates the moment of inertia of the equipment wheels, Indicates the total equivalent inertia of the equipment;

[0050] From formula (4) and formula (5);

[0051] (6).

[0052] Preferably, the dynamic load distribution based on the random simulation method comprises the following steps:

[0053] S421, set the equipment operation process state set S={ , , ..., },in Indicates the first state of the equipment operation process, where Indicates the gth state of the device operation process; action set A={ , , ..., }in Indicates the first action in the first state of the equipment operation process, indicating that the first wheel in the first state is completely ineffective, where Indicates the jth state of the gth state in the operation process of the equipment;

[0054] S422, calculating the initial probability based on the set device operation process state set and action set, and calculating the state transition probability at the next moment;

[0055] The state transition probability at the next moment is calculated as follows:

[0056] The probability distribution of state transition at the next moment:

[0057] in, is the probability distribution of state transition at the next moment, Indicates the equipment operation process status After being processed by the reward function, the device reaches the running process state The probability of represents the reward function, , Indicates status Execute an action The reward value at time

[0058] S423, collecting all possible states that may appear at the next moment to construct a population;

[0059] Set the population set to:

[0060] Among them, B is the population set, is the g-th population;

[0061] S424, constructing a population based on possible states and constructing a feasible dynamic load distribution method;

[0062] Set the dynamic load distribution method set to:

[0063] in, represents the load of the 2nth wheel in the gth state;

[0064] Set the maximum load on each wheel to , the minimum load on each wheel is , set the total wheel load to the total equivalent inertia of the equipment;

[0065] in, is any real number between the maximum load and the minimum load;

[0066] It is assumed that when a wheel fails completely during the operation of the equipment, the load borne by the completely failed wheel will be evenly distributed to other normally functioning wheels adjacent to it through dynamic load distribution;

[0067] Set the objective function: = ;

[0068] in, represents the load of the i-th wheel in the i-th state after dynamic load distribution, represents the load of the i-th wheel in the i-th state before dynamic load distribution, represents the load of the i+1th wheel in the i-th state before dynamic load distribution, and d is the number of wheels adjacent to the i+1th wheel;

[0069] S425, determining whether other adjacent wheels operating normally will exceed the maximum load of the wheels after dynamic load distribution;

[0070] When the adjacent wheels in normal working order exceed the maximum load of the wheels after dynamic load distribution;

[0071] Distribute the excess wheel load to other adjacent wheels in normal working order based on a dynamic load distribution method;

[0072] Iterate the dynamic load distribution method until the loads of all wheels in normal working order are within the normal load range;

[0073] The normal load range is: less than the maximum load and greater than or equal to the minimum load;

[0074] S426: Summarize and determine the dynamic load distribution method after any wheel fails in all states.

[0075] The present invention calculates the equivalent inertia of the driving shaft of the equipment during the operation of the equipment based on the electric inertia simulation method, calculates the weight reduction caused by the center of gravity offset, and performs dynamic load distribution based on the random simulation method. By calculating the probability of all possible states occurring at the next moment, the dynamic load distribution is calculated and performed for each wheel, thereby improving the real-time and accuracy of the dynamic load distribution.

[0076] The present invention discloses a dynamic load distribution system based on load gravity center offset, comprising a data acquisition device, a data processing module, a load gravity center offset model building module and a dynamic load distribution module;

[0077] The data acquisition device is used to collect various data when the device is in a stationary state and during the operation of the device;

[0078] The data processing module is used to pre-process various data collected when the device is in a stationary state and when the device is running;

[0079] The load gravity center offset model is used to build a model based on various data in the static state of the equipment and in the operation process of the equipment after preprocessing;

[0080] The dynamic load distribution module is used to dynamically distribute the load of each wheel during the operation of the equipment.

[0081] (III) Beneficial effects

[0082] Compared with the prior art, the present invention provides a dynamic load distribution method and system based on load center of gravity offset, which has the following beneficial effects:

[0083] 1. The invention traverses, deletes and supplements various data collected when the device is in a static state and during the operation of the device, thereby removing missing data from various data collected when the device is in a static state and during the operation of the device, thereby improving the accuracy of dynamic load distribution data.

[0084] 2. The invention establishes a load center of gravity offset model through the center of gravity offset of the equipment in a static state and various data during the operation of the equipment after preprocessing. The center of gravity offset generated during the operation of the equipment is calculated by the established load center of gravity offset model, thereby ensuring the accuracy of the load center of gravity offset calculation.

[0085] 3. The invention calculates the equivalent inertia of the driving shaft of the equipment during operation of the equipment based on the electric inertia simulation method, calculates the weight reduction caused by the center of gravity offset, and performs dynamic load distribution based on the random simulation method. By calculating the probabilities of all possible states occurring at the next moment, the invention calculates and distributes the dynamic load for each wheel, thereby improving the real-time and accuracy of the dynamic load distribution. BRIEF DESCRIPTION OF THE DRAWINGS

[0086] Figure 1 It is a schematic diagram of the structure of the process of the dynamic load distribution method based on load gravity center offset of the present invention;

[0087] Figure 2 It is a schematic diagram of the main forces when the dynamic load distribution device with load gravity center offset of the present invention is accelerated;

[0088] Figure 3 It is a schematic diagram of the main forces when the dynamic load distribution device with load gravity center offset of the present invention is physically decelerated;

[0089] Figure 4 It is a schematic diagram of the change of the center of gravity of the dynamic load distribution device with load center of gravity offset during static loading of the present invention. DETAILED DESCRIPTION

[0090] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0091] As shown in FIG1 , this embodiment discloses a dynamic load distribution method based on load gravity center offset, which specifically includes the following steps:

[0092] S1. Installing a data acquisition device on the equipment that needs to perform dynamic load distribution, and collecting various data of the equipment in a static state and during the operation of the equipment through the installed data acquisition device;

[0093] The data collected by the data collection device in the static state of the equipment and in the process of equipment operation include: equipment weight, equipment speed, number of equipment drive shafts, equipment wheel mass and equipment wheel radius;

[0094] S2. Preprocessing the collected data of the device in a stationary state and during the operation of the device to obtain the preprocessed data of the device in a stationary state and during the operation of the device;

[0095] Preprocessing the collected data in the static state and during the operation of the equipment includes the following steps:

[0096] Traverse the various data collected when the device is in a stationary state and when the device is running, and locate the data with missing content in the various data when the device is in a stationary state and when the device is running;

[0097] When there is missing content in the data of the device in the static state, the data is directly deleted;

[0098] Identify the missing content in the data during the operation of the equipment, and use different methods to process it based on the importance of the data, which are mainly divided into the following types:

[0099] When the missing content includes the weight of the equipment, the mass of the equipment wheels, or the number of the equipment drive shafts, the data is directly deleted;

[0100] When the missing content includes the equipment speed or the equipment wheel radius, the missing data is supplemented, including: selecting two adjacent groups of data of the missing data, calculating the average value of the two adjacent groups of data, and using the calculated average value as the supplementary data of the missing data;

[0101] Further, the data after traversal, deletion and supplementation are set as the data in the static state of the device and in the operation process of the device after preprocessing;

[0102] S3. Based on the pre-processed data of the equipment in a static state and during the operation of the equipment, a load center of gravity offset model is established;

[0103] Based on the pre-processed data of the equipment in the static state and during the equipment operation, the load center of gravity offset model is established, which includes the following steps:

[0104] S31, calculating the load gravity center offset based on various data in the static state of the preprocessed equipment;

[0105] Set the center of gravity of the device in a static state to ;

[0106] The calculation formula for the center of gravity offset of the equipment after loading cargo in a stationary state is as follows;

[0107] (1)

[0108] in, Indicates the center of gravity offset of the equipment after loading cargo in a stationary state. Indicates the weight of the device when it is at rest. Indicates the weight of the loaded cargo;

[0109] As shown in Figure 4, when statically loaded, the weight at the front of the equipment increases and the overall center of gravity moves forward.

[0110] S32, establishing a load center of gravity offset model based on various data during the operation of the preprocessed equipment and the calculated load center of gravity offset;

[0111] As shown in Figure 2-Figure 3, the various data of the equipment during operation after preprocessing, the load center of gravity offset model calculation formula is as follows:

[0112] (2)

[0113] in, Indicates the load center of gravity offset during the operation of the equipment when no cargo is loaded. Indicates the load center of gravity offset during the operation of the equipment when loading cargo. It indicates the centrifugal force generated by the equipment speed V during the operation of the equipment. Indicates the vibration inertia force of the equipment, represents the suspension stiffness of device y;

[0114] Figure 2 shows the main forces acting on the equipment during acceleration, where: the driving wheel is subjected to the driving torque of the motor shaft, and the friction with the ground constitutes a driving force pointing to the front of the vehicle, while the vehicle body is subjected to the reverse torque of the motor housing, which creates a tendency for the vehicle body to flip backward (tilt), the rear of the vehicle is pressed down, the supporting force of the ground increases, and the change in the supporting force is directed upward.

[0115] Figure 3 shows the main forces acting on the equipment during deceleration, where the stopping torque from the driving wheel to the motor shaft and the friction with the ground form a resistance directed toward the rear of the vehicle, while the vehicle body receives a reverse torque from the motor housing, which creates a tendency for the vehicle body to flip forward (lower its head), the rear of the vehicle is lifted, the support force from the ground is reduced, and the change in the support force is directed downward.

[0116] S4. Based on the established load center of gravity offset model, dynamic load distribution is performed through electric inertia simulation and random simulation methods to determine the dynamic load distribution method after any wheel fails in all states;

[0117] Based on the established load center of gravity offset model, dynamic load distribution through electrical inertia simulation and random simulation method includes the following steps:

[0118] It is assumed that there are multiple equipment drive shafts during the operation of the equipment, the speed of each equipment drive shaft is consistent, and there are 2 wheels on each equipment drive shaft;

[0119] S41. Calculate the equivalent inertia of the drive shaft of the equipment during the operation of the equipment based on the electrical inertia simulation method;

[0120] The weight reduction due to the center of gravity shift is:

[0121] (3)

[0122] in, Indicates the weight reduction caused by the shift of the center of gravity. Indicates the shortest distance from the center of gravity to the drive axis of the equipment;

[0123] The formula for the equivalent inertia of the equipment drive shaft is as follows:

[0124] (4)

[0125] (5)

[0126] in, Indicates the device speed, Indicates the wheel radius of the equipment. Indicates the angular velocity of the device, Indicates the quality of the equipment wheel, Indicates the number of drive axes of the device. Indicates the moment of inertia of the equipment wheels, Indicates the total equivalent inertia of the equipment;

[0127] Furthermore, from equation (4) and equation (5);

[0128] (6)

[0129] S42, dynamic load distribution based on random simulation method;

[0130] The equipment is set to have only two wheel states during operation: normal operation and complete failure;

[0131] It is assumed that the probability of complete failure of each wheel during operation is equal, and no two wheels fail completely at the same time;

[0132] Dynamic load distribution based on stochastic simulation method includes the following steps:

[0133] S421, set the equipment operation process state set S={ , , ..., },in Indicates the first state of the equipment operation process, where Indicates the gth state of the device operation process; action set A={ , , ..., }in Indicates the first action in the first state of the equipment operation process, indicating that the first wheel in the first state is completely ineffective, where Indicates the jth state of the gth state in the operation process of the equipment;

[0134] S422, calculating the initial probability based on the set device operation process state set and action set, and calculating the state transition probability at the next moment;

[0135] The state transition probability at the next moment is calculated as follows:

[0136] The probability distribution of state transition at the next moment:

[0137] in, is the probability distribution of state transition at the next moment, Indicates the equipment operation process status After being processed by the reward function, the device reaches the running process state The probability of represents the reward function, , Indicates status Execute an action The reward value at time

[0138] S423, collecting all possible states that may appear at the next moment to construct a population;

[0139] Set the population set to:

[0140] Among them, B is the population set, is the g-th population;

[0141] S424, constructing a population based on possible states and constructing a feasible dynamic load distribution method;

[0142] Set the dynamic load distribution method set to:

[0143] in, represents the load of the 2nth wheel in the gth state;

[0144] Set the maximum load on each wheel to , the minimum load on each wheel is , set the total wheel load to the total equivalent inertia of the equipment;

[0145] in, is any real number between the maximum load and the minimum load;

[0146] It is assumed that when a wheel fails completely during the operation of the equipment, the load borne by the completely failed wheel will be evenly distributed to other normally functioning wheels adjacent to it through dynamic load distribution;

[0147] Set the objective function: = ;

[0148] in, represents the load of the i-th wheel in the i-th state after dynamic load distribution, represents the load of the i-th wheel in the i-th state before dynamic load distribution, represents the load of the i+1th wheel in the i-th state before dynamic load distribution, and d is the number of wheels adjacent to the i+1th wheel;

[0149] S425, determining whether other adjacent wheels operating normally will exceed the maximum load of the wheels after dynamic load distribution;

[0150] When the adjacent wheels in normal working order exceed the maximum load of the wheels after dynamic load distribution;

[0151] Distribute the excess wheel load to other adjacent wheels in normal working order based on a dynamic load distribution method;

[0152] Iterate the dynamic load distribution method until the loads of all wheels in normal working order are within the normal load range;

[0153] The normal load range is: less than the maximum load and greater than or equal to the minimum load;

[0154] S426, summarizing and determining a dynamic load distribution method after any wheel fails in all states;

[0155] S5. Based on the dynamic load distribution method determined after any wheel fails in all states, load prediction and distribution are performed in real time during the equipment operation process.

[0156] The present invention discloses a dynamic load distribution system based on load gravity center offset, comprising a data acquisition device, a data processing module, a load gravity center offset model building module and a dynamic load distribution module;

[0157] The data acquisition device is used to collect various data when the device is in a stationary state and during the operation of the device;

[0158] The data processing module is used to pre-process various data collected when the device is in a stationary state and when the device is running;

[0159] The load gravity center offset model is used to build a model based on various data in the static state of the equipment and in the operation process of the equipment after preprocessing;

[0160] The dynamic load distribution module is used to dynamically distribute the load of each wheel during the operation of the equipment.

[0161] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A dynamic load distribution method based on load center of gravity offset, characterized in that: The following steps are involved: S1. Installing a data acquisition device on the equipment that needs to perform dynamic load distribution, and collecting various data of the equipment in a static state and during the operation of the equipment through the installed data acquisition device; The data collected by the data collection device in the static state of the equipment and in the process of equipment operation include: equipment weight, equipment speed, number of equipment drive shafts, equipment wheel mass and equipment wheel radius; S2. Preprocessing the collected data of the device in a stationary state and during the operation of the device to obtain the preprocessed data of the device in a stationary state and during the operation of the device; S3. Based on the pre-processed data of the equipment in the static state and during the equipment operation, a load center of gravity offset model is established, which specifically includes: S31. Calculate the load gravity center offset based on the pre-processed data of the equipment in the static state: Set the center of gravity of the device in a static state to e; The calculation formula for the center of gravity offset of the equipment after loading cargo in a stationary state is as follows; Where e' represents the center of gravity offset of the equipment after loading cargo in a stationary state, M represents the weight of the equipment in a stationary state, and M 货 Indicates the weight of the loaded cargo; S32. Based on various data during the operation of the preprocessed equipment and the calculated load gravity center offset, a load gravity center offset model is established: Where y represents the load center of gravity offset during the operation of the equipment when no cargo is loaded, y' represents the load center of gravity offset during the operation of the equipment when cargo is loaded, and F V Indicates the centrifugal force generated by the equipment speed V during the operation of the equipment, F Z Indicates the vibration inertia force of the equipment, K y represents the suspension stiffness of device y; S4. Based on the established load center of gravity offset model, dynamic load distribution is performed through electric inertia simulation and random simulation methods to determine the dynamic load distribution method after any wheel fails in all states, specifically including: It is assumed that there are multiple equipment drive shafts during the operation of the equipment, the speed of each equipment drive shaft is consistent, and there are 2 wheels on each equipment drive shaft; S41. Calculate the equivalent inertia of the equipment drive shaft during equipment operation based on the electrical inertia simulation method, including: The weight reduction due to the center of gravity shift is: Among them, ΔM represents the weight reduction caused by the center of gravity shift, and f represents the shortest distance from the center of gravity to the drive shaft of the equipment; The formula for the equivalent inertia of the equipment drive shaft is as follows: V=ω×R (5) Wherein, V represents the speed of the equipment, R represents the radius of the equipment wheel, ω represents the angular velocity of the equipment, m represents the mass of the equipment wheel, n represents the number of the equipment drive shafts, J represents the rotational inertia of the equipment wheel, and J' represents the total equivalent inertia of the equipment; From formula (4) and formula (5); J'=(-ΔM+M+n×2m)R 2 +n×2J (6) S42, dynamic load distribution based on random simulation method; The equipment is set to have only two wheel states during operation: normal operation and complete failure; It is assumed that the probability of complete failure of each wheel during operation is equal, and no two wheels fail completely at the same time; S5. Based on the dynamic load distribution method determined after any wheel fails in all states, load prediction and distribution are performed in real time during the equipment operation process.

2. A dynamic load distribution method based on load gravity center offset according to claim 1, characterized in that: The preprocessing of the collected data in the static state of the device and during the operation of the device includes the following steps: Traverse the various data collected when the device is in a stationary state and when the device is running, and locate the data with missing content in the various data when the device is in a stationary state and when the device is running; When there is missing content in the data of the device in the static state, the data is directly deleted; Identify the missing content in the data during the operation of the equipment, and use different methods to process it based on the importance of the data, which are mainly divided into the following types: When the missing content includes the weight of the equipment, the mass of the equipment wheels, or the number of the equipment drive shafts, the data is directly deleted; When the missing content includes the equipment speed or the equipment wheel radius, the missing data is supplemented, including: selecting two adjacent groups of data of the missing data, calculating the average value of the two adjacent groups of data, and using the calculated average value as the supplementary data of the missing data; The data after traversal, deletion and supplementation are set as the data in the static state of the pre-processed device and in the process of device operation.

3. The method for dynamic load distribution based on load center of gravity offset according to claim 1, characterized in that: The dynamic load distribution based on the random simulation method comprises the following steps: S421, set the equipment operation process state set S = {s1, s2, ..., s g }, where s1 represents the first state of the equipment operation process, where s g Indicates the gth state of the equipment operation process; action set A = {a 11 , a 12 , ..., a gj }where a 11 Indicates the first action in the first state of the equipment operation process, indicating that the first wheel in the first state is completely ineffective, where a gj Indicates the jth state of the gth state in the operation process of the equipment; S422, calculating the initial probability based on the set device operation process state set and action set, and calculating the state transition probability at the next moment; The state transition probability at the next moment is calculated as follows: The probability distribution of state transition at the next moment: P:S×Q,P(s1,a 11 ,s2):s1×Q(s1,a 11 )→s2; Among them, P is the probability distribution of state transition at the next moment, P(s1,a 11 , s2) represents the probability that the device operation process state s1 reaches the device operation process state s2 after being processed by the reward function. Q represents the reward function, which satisfies: Q=S×A,Q(s1,a 11 )=s1×a 11 , Among them, Q(s1,a 11 ) indicates that state s1 executes action a 11 The reward value at time S423, collecting all possible states that may appear at the next moment to construct a population; Set the population set to: B = {b1, b2, ..., b g }; Among them, B is the population set, b g is the g-th population; S424, constructing a population based on possible states and constructing a feasible dynamic load distribution method; Set the dynamic load distribution method set to: in, represents the load of the 2nth wheel in the gth state; Set the maximum load of each wheel to l imax , the minimum load on each wheel is l imin , set the total wheel load to the total equivalent inertia of the equipment; in, is any real number between the maximum load and the minimum load; It is assumed that when a wheel fails completely during the operation of the equipment, the load borne by the completely failed wheel will be evenly distributed to other normally functioning wheels adjacent to it through dynamic load distribution; Set the objective function: in, represents the load of the i-th wheel in the i-th state after dynamic load distribution, represents the load of the i-th wheel in the i-th state before dynamic load distribution, represents the load of the i+1th wheel in the i-th state before dynamic load distribution, and d is the number of wheels adjacent to the i+1th wheel; S425, determining whether other adjacent wheels operating normally will exceed the maximum load of the wheels after dynamic load distribution; When the adjacent wheels in normal working order exceed the maximum load of the wheels after dynamic load distribution; Distribute the excess wheel load to other adjacent wheels in normal working order based on a dynamic load distribution method; Iterate the dynamic load distribution method until the loads of all wheels in normal working order are within the normal load range; The normal load range is: less than the maximum load and greater than or equal to the minimum load; S426: Summarize and determine the dynamic load distribution method after any wheel fails in all states.

4. A system for implementing the dynamic load distribution method based on load gravity center offset according to any one of claims 1 to 3, characterized in that: It includes data acquisition equipment, data processing module, load center of gravity offset model building module and dynamic load distribution module; The data acquisition device is used to collect various data when the device is in a stationary state and during the operation of the device; The data processing module is used to pre-process various data collected by the equipment in a stationary state and during the operation of the equipment; The load gravity center offset model is used to build a model based on various data in the static state of the equipment and in the operation process of the equipment after preprocessing; The dynamic load distribution module is used to dynamically distribute the load of each wheel during the operation of the equipment.