Method and device for evaluating active voltage support capability of energy storage power station
By constructing a voltage active support capability index system and a PID search optimization algorithm, the voltage active support capability of the energy storage power station is evaluated, which solves the difficult evaluation problem in the existing technology and improves the stability and risk resistance of the power system.
Patent Information
- Application Number
- CN202410561111.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-05-08
AI Technical Summary
It is difficult to effectively evaluate the voltage active support capability of energy storage power stations with existing technology, which affects the voltage stability of the grid and the risk resistance of the power system.
Construct an indicator system for the voltage active support capability of the energy storage power station, calculate each indicator value by obtaining operating data and voltage crossover curves, and use the PID search optimization algorithm to obtain the index weight value, and finally calculate the voltage active support performance value to evaluate the energy storage power station. Active support capabilities.
It achieves a comprehensive, objective and reliable assessment of the voltage active support capability of energy storage power stations, optimizes the design and operation strategies of energy storage power stations, and improves the safety and stability of the power system.
Smart Images

Figure CN118505037B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of electric energy technology, and in particular to a method and device for evaluating the active voltage support capability of an energy storage power station. Background Art
[0002] Energy storage power stations can effectively balance the load of the power grid and improve the stability and reliability of the power system by storing and releasing electric energy. In the process of large-scale access of new energy to the power grid, the voltage active support capability of energy storage power stations is of great significance for maintaining the stability of the power grid voltage and avoiding voltage fluctuations and flicker. In addition, energy storage power stations can also serve as a "buffer" for the power system, playing a regulating role when there is an imbalance in power supply and demand, and improving the risk resistance of the power system.
[0003] However, the voltage active support capability of energy storage power stations is affected by many factors, including energy storage technology, power station scale, grid connection conditions, etc. Different energy storage technologies have different voltage regulation ranges and response speeds, while power station scale and grid connection conditions determine the interaction mode and capability between energy storage power stations and the grid. Therefore, there is an urgent need for a method that can evaluate the voltage active support capability of energy storage power stations. Summary of the invention
[0004] The present disclosure provides a method and device for evaluating the active voltage support capability of an energy storage power station, so as to at least solve the above technical problems existing in the prior art.
[0005] According to a first aspect of the present disclosure, a method for evaluating the active voltage support capability of an energy storage power station is provided, the method comprising:
[0006] According to the needs of energy storage power stations for active voltage support capabilities, an indicator system for active voltage support capabilities of energy storage power stations is established;
[0007] Acquiring the operating data and voltage ride-through curve of the energy storage power station, and calculating each indicator value in the indicator system according to the operating data and the voltage ride-through curve;
[0008] The PID search optimization algorithm is used to obtain the indicator weight value of each indicator;
[0009] The voltage active support performance value of the energy storage power station is calculated according to each indicator value and the corresponding indicator weight value; the voltage active support performance value is used to evaluate the active support capability of the energy storage power station.
[0010] In one practicable embodiment, the indicator system includes primary indicators and secondary indicators under the primary indicators;
[0011] The first-level indicators include: voltage indicator, power indicator and regulation indicator;
[0012] The secondary indicators under the voltage indicator include: voltage fluctuation indicator, voltage deviation indicator and voltage stability indicator;
[0013] The secondary indicators under the power index include: prediction qualification rate index, prediction error index, real-time reactive power margin index, active power reduction index, reactive power low penetration current coefficient index and reactive power high penetration current coefficient index;
[0014] The secondary indicators under the adjustment indicator include: an adjustment accuracy indicator, a control response time indicator and a control adjustment time indicator.
[0015] In one practicable embodiment, each indicator value in the indicator system is calculated according to the operating data and the voltage ride-through curve, including:
[0016] The voltage fluctuation index is calculated in the following way:
[0017]
[0018] The voltage deviation index is calculated in the following way,
[0019]
[0020] Where D is the voltage fluctuation index, Δu is the difference between two adjacent extreme voltages on the voltage RMS curve, U is the grid connection point voltage, and U N is the rated voltage of the grid connection point, ΔU is the voltage deviation index;
[0021] The voltage stability index is calculated in the following way,
[0022]
[0023] Among them, S k Characterizes transient voltage stability, S k The larger the value, the smaller the transient voltage stability of the node. k The smaller the value, the smaller the voltage fluctuation amplitude or duration scale during the fault period, and the higher the transient voltage stability of the node; V i,0 represents the voltage of node i during normal operation; represents the voltage of node i at time t after fault k occurs; m represents the number of nodes in the system; c represents the start time of the fault; and r represents the end time of the fault.
[0024] In one practicable embodiment, each indicator value in the indicator system is calculated according to the operating data and the voltage ride-through curve, including:
[0025] The prediction pass rate index is calculated in the following way:
[0026]
[0027] The forecast error index is calculated in the following way,
[0028]
[0029] Among them, Q R is the prediction index of qualified rate, E rms is the prediction error index of the energy storage power station, N is the number of all samples; P Mi is the actual power at time i; P Pi is the predicted power at time i; S op is the total operating capacity of the wind farm; B i To predict the pass rate criteria;
[0030] The index value of the real-time reactive power margin index is calculated in the following way:
[0031]
[0032] The active power reduction index limit is set to 0% to 100%;
[0033] The reactive low current coefficient index meets the following requirements:
[0034] ΔI t ≥K1(0.9-U t )I N ,(0≤U t ≤0.9)
[0035] The reactive high current coefficient index meets the following requirements:
[0036] ΔI t ≥K3×(U t -1.1)×I N ,(1.1≤U t ≤1.3)
[0037] Among them, K1 is the reactive low-through current coefficient index, K3 is the reactive high-through current coefficient index, Q is the reactive margin index, ΔI t The dynamic reactive current increment injected into the energy storage power station, U t is the voltage per unit value of the energy storage power station grid connection point, I N is the rated current of the energy storage power station, n is the number of units in the energy storage power station, s i is the converter capacity of the i-th unit, p i is the active power output of the i-th unit, Q c is the capacity of the reactive power compensation device of the energy storage station, Q N is the rated reactive capacity of the energy storage station.
[0038] In one practicable embodiment, each indicator value in the indicator system is calculated according to the operating data and the voltage ride-through curve, including:
[0039] The following formula is used to calculate the adjustment accuracy index:
[0040]
[0041] Among them, ΔQ is the regulation accuracy index, Q t is the final reactive steady-state value after reactive power regulation; Q2 is the command target value; Q N is the rated power;
[0042] The control response time index is calculated in the following way,
[0043] t qres =t1-t0
[0044] Among them, t qres is the control response time indicator, t0 is the start time of set value control; t1 is the time when the reactive power change reaches 90% of the set step value for the first time;
[0045] The control adjustment time index is calculated in the following way,
[0046] t qreg =t2-t0
[0047] Among them, t qreg To control the regulation time index, t2 is the starting time when the reactive power continues to operate within ±5% of the set step value.
[0048] In one possible implementation, it also includes:
[0049] The values of each indicator are standardized in the following way;
[0050]
[0051] Among them, y i is the standardized value, x i is the original indicator value, max{x} is the upper limit of the indicator, and min{x} is the lower limit of the indicator.
[0052] In one practicable embodiment, a PID search optimization algorithm is used to obtain the indicator weight value of each indicator, including:
[0053] Obtain the experts' weight evaluation matrix for all indicators in the indicator system;
[0054] In combination with the preset objective function, the PID search optimization algorithm is used to solve the weight evaluation matrix to obtain the weight value of each indicator.
[0055] In one embodiment, the objective function is
[0056]
[0057] in, is the kth expert's evaluation index v j The weight range of are the lower and upper limits of the value, a is the number of indicators, w j is the final weight of a indicators.
[0058] In one possible implementation, the voltage active support performance value of the energy storage power station is calculated in the following manner:
[0059]
[0060] Among them, S is the voltage active support performance value of the energy storage power station, W is the weight value of each indicator, Y is the active support performance value of each indicator, w b is the weight value of energy storage station b, δ b is the index value of energy storage power station b.
[0061] According to a second aspect of the present disclosure, a device for evaluating the active voltage support capability of an energy storage power station is provided, the device comprising:
[0062] A construction module is used to construct an indicator system for the active voltage support capability of an energy storage power station according to the needs of the energy storage power station for the active voltage support capability;
[0063] An acquisition module, used to acquire the operating data and voltage ride-through curve of the energy storage power station, and calculate each indicator value in the indicator system according to the operating data and the voltage ride-through curve;
[0064] The obtaining module is used to obtain the indicator weight value of each indicator by using the PID search optimization algorithm;
[0065] The calculation module is used to calculate the voltage active support performance value of the energy storage power station according to each indicator value and the corresponding indicator weight value; the voltage active support performance value is used to evaluate the active support capability of the energy storage power station.
[0066] According to a third aspect of the present disclosure, there is provided an electronic device, including:
[0067] at least one processor; and
[0068] a memory communicatively connected to the at least one processor; wherein,
[0069] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method described in the present disclosure.
[0070] According to a fourth aspect of the present disclosure, a non-transitory computer-readable storage medium storing computer instructions is provided, wherein the computer instructions are used to cause the computer to execute the method described in the present disclosure.
[0071] The disclosed method and device for evaluating the active voltage support capability of an energy storage power station, this application constructs an index system for the active voltage support capability of an energy storage power station, refines the indexes to construct an evaluation index system, and can reflect the active voltage support capability of an energy storage power station; a PID search optimization algorithm is used to solve the problem of inconsistent opinions among evaluators, and the obtained index weights are more objective and reliable, and the final active voltage support performance value is presented in the form of an evaluation value, which is highly intuitive. This application conducts a comprehensive evaluation of the active voltage support capability of an energy storage power station, which not only helps to optimize the design and operation strategy of the energy storage power station, but also can provide a strong guarantee for the safe and stable operation of the power system.
[0072] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present disclosure, nor is it intended to limit the scope of the present disclosure. Other features of the present disclosure will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] The above and other objects, features and advantages of the exemplary embodiments of the present disclosure will become readily understood by reading the detailed description below with reference to the accompanying drawings. In the accompanying drawings, several embodiments of the present disclosure are shown in an exemplary and non-limiting manner, in which:
[0074] In the drawings, the same or corresponding reference numerals represent the same or corresponding parts.
[0075] Figure 1 A schematic diagram of the implementation process of the method for evaluating the active voltage support capability of an energy storage power station according to an embodiment of the present disclosure is shown;
[0076] Figure 2 A schematic diagram of a low voltage ride-through voltage response curve of an energy storage power station according to an embodiment of the present disclosure is shown;
[0077] Figure 3 A schematic diagram of a low voltage ride-through reactive power response curve of an energy storage power station according to an embodiment of the present disclosure is shown;
[0078] Figure 4 A schematic diagram showing the structure of the indicator system of the embodiment of the present disclosure is shown;
[0079] Figure 5 A schematic diagram of the implementation process of the PID search optimization algorithm according to the embodiment of the present disclosure is shown;
[0080] Figure 6A schematic diagram of the structure of a device for evaluating the active voltage support capability of an energy storage power station according to an embodiment of the present disclosure is shown;
[0081] Figure 7 A schematic diagram of the structure of an electronic device according to an embodiment of the present disclosure is shown. DETAILED DESCRIPTION
[0082] In order to make the purpose, features, and advantages of the present disclosure more obvious and easy to understand, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present disclosure.
[0083] A method and device for evaluating the active voltage support capability of an energy storage power station provided by the present application are described below in conjunction with the accompanying drawings.
[0084] like Figure 1 As shown, the present application provides a method for evaluating the active voltage support capability of an energy storage power station, the method comprising:
[0085] S101, constructing an indicator system for active voltage support capability of energy storage power stations according to the needs of energy storage power stations for active voltage support capability;
[0086] It can be understood that in this application, the historical operation data of the energy storage power station is collected, and an indicator system for the active voltage support capability of the energy storage power station is constructed through the historical operation data. The historical operation data in this application is collected based on the active support capability requirements of the power grid, and the operation data includes sampling point voltage data and voltage recording data.
[0087] S102, obtaining operation data and a voltage ride-through curve of the energy storage power station, and calculating each indicator value in the indicator system according to the operation data and the voltage ride-through curve;
[0088] It is understandable that in this application, it is first necessary to obtain the operating data and voltage ride-through curve of the energy storage power station, wherein the voltage ride-through curve can be obtained through power system testing, such as Figure 2 As shown, the voltage ride-through curve in this application includes a low voltage ride-through voltage response curve of an energy storage power station, such as Figure 3 The low voltage ride-through reactive power response curve of the energy storage power station shown in the figure. Low voltage ride-through refers to the minimum voltage value at which the power electronic device can maintain grid-connected operation when the grid voltage drops. Voltage ride-through capability is an important indicator to measure the operating stability of power electronic devices in the event of grid failure. The voltage ride-through curve is usually drawn with the grid voltage as the horizontal axis and the output current of the power electronic device as the vertical axis.
[0089] The voltage ride-through curve is of great significance in the power generation system. If the power electronic device cannot maintain grid-connected operation, it will have a serious impact on the power system. Power electronic devices with low voltage ride-through capability can continue to operate when the grid fails, thus ensuring the stability and reliability of the power system. In addition, the voltage ride-through capability can also improve the power supply quality of the power system and reduce power outages caused by voltage drops and other reasons.
[0090] S103, using a PID search optimization algorithm to obtain an indicator weight value for each indicator;
[0091] It is understandable that this application invites multiple experts to conduct weighted evaluation of the indicators of the active voltage support capability of the energy storage power station. Considering the complexity of the problem, the experts have inconsistent opinions on the weight coefficients of the evaluation indicators and cannot give a definite value, but a value range matrix can be obtained.
[0092] According to the set objective function, this application adopts a PID (Proportional Integral Derivative) neural network based on a sparrow search algorithm to solve the objective function, thereby obtaining the indicator weight value of each indicator.
[0093] S104, calculating the voltage active support performance value of the energy storage power station according to each indicator value and the corresponding indicator weight value; the voltage active support performance value is used to evaluate the active support capability of the energy storage power station.
[0094] Finally, the voltage active support performance value of the energy storage power station is calculated according to each indicator value and the corresponding indicator weight value, and the voltage active support performance value is used to evaluate the active support capability of the energy storage power station.
[0095] This application constructs an index system for the active voltage support capability of energy storage power stations, refines the indexes to construct an evaluation index system, and can reflect the active voltage support capability of energy storage power stations; it uses a PID search optimization algorithm to solve the problem of inconsistent opinions among evaluators, and the resulting index weights are more objective and reliable, and the final active voltage support performance value is presented in the form of an evaluation value, which is highly intuitive. This application conducts a comprehensive evaluation of the active voltage support capability of energy storage power stations, which not only helps to optimize the design and operation strategies of energy storage power stations, but also can provide strong guarantees for the safe and stable operation of power systems.
[0096] In some embodiments, the indicator system includes primary indicators and secondary indicators under the primary indicators;
[0097] The first-level indicators include: voltage indicator, power indicator and regulation indicator;
[0098] The secondary indicators under the voltage indicator include: voltage fluctuation indicator, voltage deviation indicator and voltage stability indicator;
[0099] The secondary indicators under the power index include: prediction qualification rate index, prediction error index, real-time reactive power margin index, active power reduction index, reactive power low penetration current coefficient index and reactive power high penetration current coefficient index;
[0100] The secondary indicators under the adjustment indicator include: an adjustment accuracy indicator, a control response time indicator and a control adjustment time indicator.
[0101] Specifically, Figure 4 As shown in the figure, the index system is specifically an evaluation index system for the voltage active support capability of energy storage power stations, including voltage index, power index and regulation index; among them, voltage index includes voltage fluctuation index, voltage deviation index and voltage stability index; power index includes prediction qualification rate index, prediction error index, real-time reactive power margin index, active power reduction index, reactive power low penetration current coefficient index and reactive power high penetration current coefficient index; regulation index includes regulation accuracy index, control response time index and control regulation time index.
[0102] In some optional embodiments, calculating each indicator value in the indicator system according to the operating data and the voltage ride-through curve includes:
[0103] The voltage fluctuation index is calculated in the following way:
[0104]
[0105] Among them, it can be concluded that the voltage fluctuation index value is 0.2%. The voltage fluctuation index limit is set to 0-1%.
[0106] The voltage deviation index is calculated in the following way. The voltage deviation index ΔU reflects the degree of deviation of the actual operating voltage from the system nominal voltage.
[0107]
[0108] Among them, the voltage steady-state deviation index limit is set to -3% to 7%.
[0109] Where D is the voltage fluctuation index, Δu is the difference between two adjacent extreme voltages on the voltage RMS curve, U is the grid connection point voltage, and U N is the rated voltage of the grid connection point, ΔU is the voltage deviation index;
[0110] It should be noted that the practical standard for judging voltage stability is: three-phase permanent ground short circuit, the fault is removed after 0.1s, and the bus voltage recovers to above 0.75pu 1s after the fault is removed. Set the voltage lower limit V L =0.75pu, the upper limit of voltage is defined as the voltage V0 of the node during normal operation. sThe failure occurs at time t q Time for fault removal, t r If the voltage is still lower than 0.75pu at the moment, it is considered that the transient voltage is unstable. When the voltage during the recovery process exceeds the voltage during normal operation, it is considered that the voltage at this time is equal to the voltage during normal operation to avoid the impact of overcompensation on the index calculation. For a system with m nodes, after fault k occurs, the average value of the voltage-time area of all nodes is defined as:
[0111]
[0112] Among them, V i,0 represents the voltage of node i during normal operation; represents the voltage of node i at time t after fault k occurs. Considering the voltage fluctuation during fault recovery, the voltage-time area cannot be simply measured by the product of the maximum voltage deviation and the recovery time. r ] is divided into r small Δt intervals, and formula (3) can be rewritten as:
[0113]
[0114] The voltage stability index is 2.0378. k The value of characterizes the transient voltage stability, S k The larger the value, the smaller the transient voltage stability of the node. k The smaller the value, the smaller the voltage fluctuation amplitude or duration scale during the fault period, and the higher the transient voltage stability of the node. The voltage stability limit is set to 0 to 3. c represents the start time of the fault; r represents the end time of the fault.
[0115] In some optional embodiments, the short-term predicted monthly qualified rate Q of the energy storage power station is used R It represents the prediction qualification rate index, and the short-term prediction root mean square error E of the energy storage power station rms Represents the prediction error index, reflecting the accuracy of power prediction:
[0116]
[0117] Where N is the number of all samples; P Mi is the actual power at time i; P Pi is the predicted power at time i; S op The standard requires that the monthly qualified rate of short-term forecast of wind farms should be greater than 70%, and the root mean square error of short-term forecast should be less than 20%.
[0118] The real-time reactive power margin index Q is defined as the ratio of the real-time reactive power that can be generated by the wind / solar / storage station (including the sum of the real-time reactive power that can be generated by all generators and the capacity of the reactive compensation device) to the sum of the rated capacity of the reactive sources of the wind / solar / storage station:
[0119]
[0120] Where M is the number of units in the energy storage power station; Q N is the rated reactive capacity of the energy storage station; Q c is the capacity of the reactive power compensation device of the energy storage station; i is the converter capacity of the i-th unit; p i is the real-time active power output of the i-th unit. The real-time reactive power margin limit is set to 0% to 100%.
[0121] Active power reduction can increase the reactive capacity of the inverter by reducing the active output when the reactive capacity of the inverter is limited. The active power reduction index is used to measure the ability of the inverter to increase reactive power by reducing active power. The active power reduction index limit is set to 0% to 100%.
[0122] When the voltage drops, the energy storage station is required to respond to the voltage change and provide reactive power support. The dynamic reactive current increment should satisfy the formula:
[0123] ΔI t ≥K1×(0.9-U t )×I N ,(0≤U t ≤0.9) (9)
[0125] Among them, ΔI t is the dynamic reactive current increment injected into the energy storage power station; K1 is the reactive low-through current coefficient; U t I is the voltage per unit value of the grid connection point of the electrochemical energy storage power station; N It is the rated current of the AC side of the electrochemical energy storage power station. According to national standards, the reactive low-through current coefficient index K1 should be in the range of 1.5 to 3.
[0126] When the voltage rises, the photovoltaic / storage station is required to respond to the voltage change and provide reactive power support. The dynamic reactive current increment should satisfy the formula:
[0127] ΔI t ≥K3×(U t -1.1)×I N ,(1.1≤U t ≤1.3) (10)
[0129] Among them, K3 is the reactive high-through current coefficient. According to national standards, the reactive low-through current coefficient index K3 should not be less than 1.5.
[0130] In some optional embodiments, the calculation formula for defining the adjustment accuracy index is:
[0131]
[0132] Among them, Q t is the final reactive steady-state value after reactive power regulation; Q2 is the command target value; Q N is the rated power. According to national standards, the reactive power control deviation should not be greater than 2% of the rated power. The application analysis shows that the regulation accuracy value is 0.11%.
[0133] The calculation formula for the control response time indicator is:
[0134] t qres =t1-t0 (12)
[0136] Among them, t0 is the start time of the set value control; t1 is the time when the reactive power change reaches 90% of the set step value for the first time. The control response time should not exceed 30ms. The control response time obtained by the analysis of this application is 21.0ms.
[0137] The calculation formula of the control adjustment time index is:
[0138] t qreg =t2-t0 (13)
[0140] Among them, t2 is the start time when the reactive power continues to operate within ±5% of the set step value. The control adjustment time should not exceed 60ms. The control adjustment time obtained by the analysis of this application is 48.9ms.
[0141] In some optional embodiments, before using the PID search optimization algorithm to obtain the indicator weight value of each indicator, it also includes: standardizing each indicator value; specifically,
[0142] Through data analysis of energy storage power stations, the values of various indicators are obtained:
[0143] X=(x1,x2,L,x 12 ) (14)
[0145] In the formula, x1 to x 14 There are 12 evaluation index values for voltage fluctuation to control regulation time.
[0146] The maximum and minimum normalization method is used for standardization, and the indicators are mapped to the interval [0,1]. The formula is:
[0147]
[0148] Among them, y i is the standardized value, x i is the original value, max{x} is the upper limit of the indicator, and min{x} is the lower limit of the indicator. When the indicator value exceeds the specified limit, the indicator is unqualified and the standardized value is defined as 0.
[0149] The evaluation index of the active voltage support capability of energy storage power stations can be divided into positive indicators and negative indicators. The larger the value of the positive indicator, the stronger the reactive power support capability of the station; while the negative indicator is the opposite of the positive indicator. Because there are negative indicators in the evaluation indicators, after standardization, the indicators should be processed in the same direction and the negative indicators should be converted into positive indicators. Assume that y i It is a negative indicator. Since the evaluation indicators are standardized, the negative indicators can be processed in the same direction:
[0150] y' i =1-y i (16)
[0151] The index values after standardization are:
[0152] Y=(y1,y2,L,y 12 ) (17)
[0153] For example, the maximum and minimum normalization and equidirectional methods are used for standardization, and the values of each indicator after standardization are:
[0154] Y=(0.8,0.75,0.3207,1,0.5,0.7071,0,0.98,1,0.978,0.3,0.185) (18)
[0155] In some optional embodiments, a PID search optimization algorithm is used to obtain the indicator weight value of each indicator, including:
[0156] Obtain the experts' weight evaluation matrix for all indicators in the indicator system;
[0157] The PID search optimization algorithm is used in combination with the preset objective function to solve the weight evaluation matrix and obtain the weight value of each indicator.
[0158] Specifically, Figure 5 As shown in the figure, the basic principle of the PID search optimization algorithm is: first, assuming that the number of decision variables in the group is d, the upper and lower limits of the variables are u and l, considering the population size is n, and the maximum number of iterations is T, the algorithm can be initialized as:
[0159] x ij=(u j -l j )·r1+l j , i=1,2,L,n; j=1,2,L,d (19)
[0160] After initialization, the best individual x*(t) at iteration t is the individual corresponding to the overall historical minimum, then the overall deviation e of multiple iterations t is k (t) is:
[0161] e k (t) = x * (t-1)-x(t-1) (20)
[0162] In order to facilitate calculation and iterative update, when the number of iterations is t, the overall deviation of the previous iteration is expressed as e k-1 (t) indicates that the overall deviation of the first two iterations is given by e k-2 (t). By deriving e k (t-1)+x*(t)-x*(t-1) replaces x*(t)-x(t-1) as the final e k-1 (t):
[0163] e k-1 (t) = e k (t-1)+x * (t)-x * (t-1) (21)
[0164] For the PID search optimization algorithm, when the number of iterations is t, the output value Δu(t) of PID regulation is:
[0165] Δu(t)=K p ·r2·[e k (t)-e k-1 (t)]+K i ·r3·e k (t)+K d ·r4·[e k (t)-2e k-1 (t)+e k-2 (t)] (22)
[0166] Where r2, r3 and r4 are vectors of random numbers from 0 to 1 in n rows and 1 column; K p , K i and K d are the adjustment coefficients for proportional, integral and differential respectively.
[0167] In the PID algorithm, an output adjustment value of 0 means that the actual value has reached the set value. However, if the controlled object is not adjusted, the real value will deviate from the set value. Therefore, in order to prevent this phenomenon, a constant is usually added to the original adjustment value. Similarly, for the PID search optimization algorithm, all solutions are very close to the optimal solution, which may cause the algorithm to fall into a local optimum. Therefore, a conditional factor called zero output is added to the original Δu(t):
[0168] o(t)=(cos(1-t / T)+λr5·L)·e k (t) (23)
[0169] Where r5 is a vector of random numbers from 0 to 1 in n rows and d columns; λ is the adjustment factor calculated in the following formula, and L is the Levy distribution calculated in the following formula:
[0170]
[0171] Where u and v are matrices of random numbers with n rows and d columns that obey the standard normal distribution, respectively; β is a constant.
[0172] The population update formula is defined as:
[0173] x(t+1)=x(t)+η·Δu(t)+(1-η)·o(t) (25)
[0174] Where η is a matrix with n rows and 1 column, expressed as:
[0175] η=r6cos(t / T) (26)
[0176] where r6 is a matrix of 0 to 1 random numbers in n rows and 1 column.
[0177] Use the PID search algorithm to solve the evaluation weight matrix. Suppose there are n experts p1, p2, …, p n The d (d=12) indicators of the active voltage support capability of the energy storage power station are evaluated by weight, and the evaluation weight matrix is:
[0178]
[0179] In one embodiment, 16 experts are invited to evaluate the weights of 12 indicators of the active voltage support capability of the energy storage power station. Considering the complexity of the problem, the experts have inconsistent opinions on the weight coefficients of the 12 evaluation indicators and cannot give a definite value, but a value range matrix B is given:
[0180]
[0181] Considering the complexity of the problem, experts have inconsistent opinions on the weight coefficients of the d evaluation indicators. It is impossible to give a definite value, but a range of values can be given. is the kth expert's evaluation index v j The weight range of are the lower and upper limits of the values respectively. Now we need to obtain the final weight w of a index through negotiation j , and minimize the objections of each expert:
[0182]
[0183] In the formula, For all experts, the evaluation index v j The minimum value of For all experts, the evaluation index v j The maximum value of .
[0184] The PID search optimization algorithm is used to solve the objective function and obtain the weight value of each indicator:
[0185] W=[w1 w2 L w a ] (30)
[0186] In some optional embodiments, the voltage active support performance value of the energy storage power station is calculated in the following manner:
[0187]
[0188] Among them, S is the voltage active support performance value of the energy storage power station, W is the weight value of each indicator, Y is the active support performance value of each indicator, w b is the weight value of energy storage station b, δ b is the index value of energy storage power station b.
[0189] This enables the evaluation of the active voltage support capability of the energy storage power station.
[0190] The method for evaluating the active voltage support capability of an energy storage power station provided in the present application, after constructing an index system for the energy storage power station, calculates the values of each index in the index system based on operating data and a voltage crossing curve. The present application adopts a PID search optimization algorithm to comprehensively evaluate the active voltage support capability of the energy storage power station, which is more objective, reliable and highly accurate.
[0191] like Figure 6 As shown, an embodiment of the present application provides a device for evaluating the voltage active support capability of an energy storage power station, the device comprising:
[0192] A construction module 601 is used to construct an indicator system for the active voltage support capability of an energy storage power station according to the needs of the energy storage power station for the active voltage support capability;
[0193] An acquisition module 602 is used to acquire the operating data and voltage ride-through curve of the energy storage power station, and calculate each indicator value in the indicator system according to the operating data and the voltage ride-through curve;
[0194] The obtaining module 603 is used to obtain the indicator weight value of each indicator by using the PID search optimization algorithm;
[0195] The calculation module 604 is used to calculate the voltage active support performance value of the energy storage power station according to each indicator value and the corresponding indicator weight value; the voltage active support performance value is used to evaluate the active support capability of the energy storage power station.
[0196] The working principle of the energy storage power station voltage active support capability evaluation device provided in the present application is as follows: a construction module 601 constructs an index system of the voltage active support capability of the energy storage power station according to the needs of the energy storage power station for the voltage active support capability; an acquisition module 602 acquires the operating data and the voltage ride-through curve of the energy storage power station, and calculates each index value in the index system according to the operating data and the voltage ride-through curve; an obtaining module 603 uses a PID search optimization algorithm to obtain the index weight value of each index; a calculation module 604 calculates the voltage active support performance value of the energy storage power station according to each index value and the corresponding index weight value; the voltage active support performance value is used to evaluate the active support capability of the energy storage power station.
[0197] According to an embodiment of the present disclosure, the present disclosure also provides an electronic device and a readable storage medium.
[0198] Figure 7 A schematic block diagram of an example electronic device 700 that can be used to implement an embodiment of the present disclosure is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or required herein.
[0199] like Figure 7As shown, the device 700 includes a computing unit 701, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 702 or a computer program loaded from a storage unit 708 into a random access memory (RAM) 703. In the RAM 703, various programs and data required for the operation of the device 700 can also be stored. The computing unit 701, the ROM 702, and the RAM 703 are connected to each other via a bus 704. An input / output (I / O) interface 705 is also connected to the bus 704.
[0200] A number of components in the device 700 are connected to the I / O interface 705, including: an input unit 706, such as a keyboard, a mouse, etc.; an output unit 707, such as various types of displays, speakers, etc.; a storage unit 708, such as a disk, an optical disk, etc.; and a communication unit 709, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 709 allows the device 700 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0201] The computing unit 701 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 701 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 701 performs the various methods and processes described above, such as the energy storage power station voltage active support capability assessment method. For example, in some embodiments, the energy storage power station voltage active support capability assessment method may be implemented as a computer software program, which is tangibly included in a machine-readable medium, such as a storage unit 708. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 700 via the ROM 702 and / or the communication unit 709. When the computer program is loaded into the RAM 703 and executed by the computing unit 701, one or more steps of the energy storage power station voltage active support capability assessment method described above may be performed. Alternatively, in other embodiments, the computing unit 701 may be configured to execute the method for evaluating the voltage active supporting capability of an energy storage power station in any other appropriate manner (for example, by means of firmware).
[0202] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0203] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0204] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0205] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0206] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.
[0207] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.
[0208] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.
[0209] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present disclosure, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0210] The above is only a specific embodiment of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A method for evaluating the active voltage support capability of an energy storage power station, characterized in that: The method comprises: According to the needs of energy storage power stations for active voltage support capabilities, an indicator system for active voltage support capabilities of energy storage power stations is established; Acquiring the operating data and voltage ride-through curve of the energy storage power station, and calculating each indicator value in the indicator system according to the operating data and the voltage ride-through curve; The PID search optimization algorithm is used to obtain the indicator weight value of each indicator; According to each indicator value and the corresponding indicator weight value, the voltage active support performance value of the energy storage power station is calculated; the voltage active support performance value is used to evaluate the active support capability of the energy storage power station; The indicator system includes primary indicators and secondary indicators under the primary indicators; The first-level indicators include: voltage indicator, power indicator and regulation indicator; The secondary indicators under the voltage indicator include: voltage fluctuation indicator, voltage deviation indicator and voltage stability indicator; The secondary indicators under the power index include: prediction qualification rate index, prediction error index, real-time reactive power margin index, active power reduction index, reactive power low penetration current coefficient index and reactive power high penetration current coefficient index; The secondary indicators under the adjustment indicators include: adjustment accuracy indicator, control response time indicator and control adjustment time indicator; The index values in the index system are calculated based on the operating data and the voltage ride-through curve, including: The voltage fluctuation index is calculated in the following way: The voltage deviation index is calculated in the following way, Where D is the voltage fluctuation index, Δu is the difference between two adjacent extreme voltages on the voltage RMS curve, U is the grid connection point voltage, and U N is the rated voltage of the grid connection point, ΔU is the voltage deviation index; The voltage stability index is calculated in the following way, Among them, S k Characterizes transient voltage stability, S k The larger the value, the smaller the transient voltage stability of the node. k The smaller the value, the smaller the voltage fluctuation amplitude or duration scale during the fault period, and the higher the transient voltage stability of the node; V i,0 represents the voltage of node i during normal operation; represents the voltage of node i at time t after fault k occurs; m represents the number of nodes in the system; c represents the time when the fault starts; r represents the time when the fault ends; The index values in the index system are calculated based on the operating data and the voltage ride-through curve, including: The prediction pass rate index is calculated in the following way: The forecast error index is calculated in the following way, Among them, Q R is the prediction index of qualified rate, E rms is the prediction error index of the energy storage power station, N is the number of all samples; P Mi is the actual power at time i; P Pi is the predicted power at time i; S op is the total operating capacity of the wind farm; B i To predict the pass rate criteria; The index value of the real-time reactive power margin index is calculated in the following way: The active power reduction index limit is set to 0% to 100%; The reactive low current coefficient index meets the following requirements: ΔI t ≥K1(0.9-U t )I N ,(0≤U t ≤0.9) The reactive high current coefficient index meets the following requirements: ΔI t ≥K3×(U t -1.1)×I N ,(1.1≤U t ≤1.3) Among them, K1 is the reactive low-through current coefficient index, K3 is the reactive high-through current coefficient index, Q is the reactive margin index, ΔI t The dynamic reactive current increment injected into the energy storage power station, U t is the voltage per unit value of the energy storage power station grid connection point, I N is the rated current of the energy storage power station, n is the number of units in the energy storage power station, s i is the converter capacity of the i-th unit, p i is the active power output of the i-th unit, Q c is the capacity of the reactive power compensation device of the energy storage station, Q N is the rated reactive capacity of the energy storage station; The index values in the index system are calculated based on the operating data and the voltage ride-through curve, including: The following formula is used to calculate the adjustment accuracy index: Among them, ΔQ is the regulation accuracy index, Q t is the final reactive steady-state value after reactive power regulation; Q2 is the command target value; Q N is the rated power; The control response time index is calculated in the following way, t qres =t1-t0 Among them, t qres To control the response time index, t0 is the start time of the set value control; t1 is the time when the reactive power change reaches 90% of the set step value for the first time; The control adjustment time index is calculated in the following way, t qreg =t2-t0 Among them, t qreg To control the regulation time index, t2 is the start time when the reactive power continuously operates within ±5% of the set step value; The PID search optimization algorithm is used to obtain the indicator weight value of each indicator, including: Obtain the experts' weight evaluation matrix for all indicators in the indicator system; The weight evaluation matrix is solved by using a PID search optimization algorithm in combination with a preset objective function to obtain a weight value for each indicator; The objective function is in, is the kth expert's evaluation index v j The weight range of are the lower and upper limits of the value, a is the number of indicators, w j is the final weight of a indicators.
2. The method according to claim 1, characterized in that Also includes: The values of each indicator are standardized in the following way; Among them, y i is the standardized value, x i is the original indicator value, max{x} is the upper limit of the indicator, and min{x} is the lower limit of the indicator.
3. The method according to claim 1, characterized in that The voltage active support performance value of the energy storage power station is calculated in the following way: Among them, S is the voltage active support performance value of the energy storage power station, W is the weight value of each indicator, Y is the active support performance value of each indicator, w b is the weight value of energy storage station b, δ b is the index value of energy storage power station b.
4. A device for evaluating the voltage active support capability of an energy storage power station, characterized in that: The device comprises: A construction module is used to construct an indicator system for the active voltage support capability of an energy storage power station according to the needs of the energy storage power station for the active voltage support capability; An acquisition module, used to acquire the operating data and voltage ride-through curve of the energy storage power station, and calculate each indicator value in the indicator system according to the operating data and the voltage ride-through curve; The obtaining module is used to obtain the indicator weight value of each indicator by using the PID search optimization algorithm; A calculation module, used to calculate the voltage active support performance value of the energy storage power station according to each indicator value and the corresponding indicator weight value; the voltage active support performance value is used to evaluate the active support capability of the energy storage power station; The indicator system includes primary indicators and secondary indicators under the primary indicators; The first-level indicators include: voltage indicator, power indicator and regulation indicator; The secondary indicators under the voltage indicator include: voltage fluctuation indicator, voltage deviation indicator and voltage stability indicator; The secondary indicators under the power index include: prediction qualification rate index, prediction error index, real-time reactive power margin index, active power reduction index, reactive power low penetration current coefficient index and reactive power high penetration current coefficient index; The secondary indicators under the adjustment indicators include: adjustment accuracy indicator, control response time indicator and control adjustment time indicator; The index values in the index system are calculated based on the operating data and the voltage ride-through curve, including: The voltage fluctuation index is calculated in the following way: The voltage deviation index is calculated in the following way, Where D is the voltage fluctuation index, Δu is the difference between two adjacent extreme voltages on the voltage RMS curve, U is the grid connection point voltage, and U N is the rated voltage of the grid connection point, ΔU is the voltage deviation index; The voltage stability index is calculated in the following way, Among them, S k Characterizes transient voltage stability, S k The larger the value, the smaller the transient voltage stability of the node. k The smaller the value, the smaller the voltage fluctuation amplitude or duration scale during the fault period, and the higher the transient voltage stability of the node; V i,0 represents the voltage of node i during normal operation; represents the voltage of node i at time t after fault k occurs; m represents the number of nodes in the system; c represents the time when the fault starts; r represents the time when the fault ends; The index values in the index system are calculated based on the operating data and the voltage ride-through curve, including: The prediction pass rate index is calculated in the following way: The forecast error index is calculated in the following way, Among them, Q R is the prediction index of qualified rate, E rms is the prediction error index of the energy storage power station, N is the number of all samples; P Mi is the actual power at time i; P Pi is the predicted power at time i; S op is the total operating capacity of the wind farm; B i To predict the pass rate criteria; The index value of the real-time reactive power margin index is calculated in the following way: The active power reduction index limit is set to 0% to 100%; The reactive low current coefficient index meets the following requirements: ΔI t ≥K1(0.9-U t )I N ,(0≤U t ≤0.9) The reactive high current coefficient index meets the following requirements: ΔI t ≥K3×(U t -1.1)×I N ,(1.1≤U t ≤1.3) Among them, K1 is the reactive low-through current coefficient index, K3 is the reactive high-through current coefficient index, Q is the reactive margin index, ΔI t The dynamic reactive current increment injected into the energy storage power station, U t is the voltage per unit value of the energy storage power station grid connection point, I N is the rated current of the energy storage power station, n is the number of units in the energy storage power station, s i is the converter capacity of the i-th unit, p i is the active power output of the i-th unit, Q c is the capacity of the reactive power compensation device of the energy storage station, Q N is the rated reactive capacity of the energy storage station; The index values in the index system are calculated based on the operating data and the voltage ride-through curve, including: The following formula is used to calculate the adjustment accuracy index: Among them, ΔQ is the regulation accuracy index, Q t is the final reactive steady-state value after reactive power regulation; Q2 is the command target value; Q N is the rated power; The control response time index is calculated in the following way, t qres =t1-t0 Among them, t qres To control the response time index, t0 is the start time of the set value control; t1 is the time when the reactive power change reaches 90% of the set step value for the first time; The control adjustment time index is calculated in the following way, t qreg =t2-t0 Among them, t qreg To control the regulation time index, t2 is the start time when the reactive power continuously operates within ±5% of the set step value; The PID search optimization algorithm is used to obtain the indicator weight value of each indicator, including: Obtain the experts' weight evaluation matrix for all indicators in the indicator system; The weight evaluation matrix is solved by using a PID search optimization algorithm in combination with a preset objective function to obtain a weight value for each indicator; The objective function is in, is the kth expert's evaluation index v j The weight range of are the lower and upper limits of the value, a is the number of indicators, w j is the final weight of a indicators.
