By constructing a wind-solar-cascade hybrid pumped-storage day-ahead peak-shaving dispatching model, the problem of complex constraints and new energy consumption in adding pumped-storage power stations to cascade hydropower stations has been solved, achieving better peak-shaving and valley-filling effects on the power grid, and promoting Consumption of wind power and photovoltaics.
Patent Information
- Application Number
- CN202410973700.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-19
AI Technical Summary
It is difficult for the existing technology to effectively consider the complex hydraulic characteristics constraints of adding pumped storage power stations to cascade hydropower stations to promote the consumption of wind power and photovoltaic. It also lacks a day-ahead peak shaving dispatch method for wind-solar-hybrid pumped storage systems, which affects the peak shaving of the power grid. Valley filling pressure and grid connection and consumption of new energy.
A hybrid pump-storage day-ahead peak-shaving dispatching method is adopted. By constructing a wind-solar-cascade hybrid pump-storage day-ahead peak-shaving dispatching model, constraints on the coupling characteristics of hydraulic power, electricity and hydropower are established, linearized and solved, and the dispatch results are optimized. In order to minimize the peak-valley difference of the remaining load of the receiving end power grid.
It realizes the optimal dispatch of wind-solar-cascade hybrid pumped-storage system, promotes the consumption of wind power and photovoltaic, improves the peak-shaving and valley-filling effect of the power grid, and is more efficient than the water-wind-solar complementary power generation system.
Smart Images

Figure CN118508530B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of optimized dispatching of renewable energy power generation, and in particular to a hybrid pumped-storage day-ahead peak-shaving dispatching method, device, equipment and storage medium. Background Art
[0002] With the proposal of the dual carbon goals, the installed capacity and power generation of new energy sources such as wind power and photovoltaics are constantly increasing. Due to the inherent intermittent, volatile and uncertain nature of wind power and photovoltaics, direct access poses challenges to the safe and stable operation of the power grid. Using flexible power sources and new energy to form a complementary power generation system is an effective means to promote the grid connection and consumption of new energy.
[0003] Hydropower has developed rapidly due to its clean, environmentally friendly and flexible regulation characteristics, and is the second largest power supply resource in my country. The operation and dispatch of conventional hydropower can be mainly divided into medium- and long-term dispatch and short-term dispatch. In short-term dispatch, it often plays the role of peak load regulation of the power grid. Pumped storage, as a special form of hydropower, has a more flexible operation mode and regulation capability, and has received as much attention as short-term dispatch.
[0004] The increasing pressure of peak-shaving and valley-filling in the power grid and the uncertainty of wind power and photovoltaic output directly affect the economy and safety of day-ahead optimal dispatching. Existing literature has a lot of research on short-term peak-shaving of cascade hydropower stations and single traditional pumped-storage power stations, but there is little research on short-term peak-shaving of cascade hydropower stations with pumped-storage power stations.
[0005] Therefore, how to consider the complex hydraulic characteristics constraints of cascade hybrid pumped-storage power stations, promote the consumption of wind power and photovoltaics, and how to study the day-ahead peak-shaving scheduling method of wind-solar-hybrid pumped-storage systems are issues that technical personnel in this field urgently need to solve.
[0006] The information disclosed in this background technology section is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to those skilled in the art. Summary of the invention
[0007] The present invention provides a hybrid pumped storage day-ahead peak-shaving scheduling method, device, equipment and storage medium, thereby effectively solving the problems in the background technology.
[0008] In order to achieve the above object, the technical solution adopted by the present invention is: a hybrid pumped storage day-ahead peak-shaving dispatching method, comprising the following steps:
[0009] Taking the minimum peak-to-valley difference of the residual load of the receiving power grid as the objective function, a wind-solar-cascade hybrid pumped storage day-ahead peak-shaving dispatching model is constructed.
[0010] Establishing constraint conditions of the dispatching model, wherein the constraint conditions include: hydraulic characteristic constraint, power characteristic constraint, and hydroelectric coupling characteristic constraint after conventional cascade hydropower stations are equipped with pumped storage;
[0011] Linearizing the objective function and the constraint conditions;
[0012] The linearized scheduling model is solved to obtain an optimized scheduling result.
[0013] Furthermore, the objective function includes:
[0014] ;
[0015] ;
[0016] In the formula, is the peak-to-valley difference of the residual load of the receiving-end power grid; is the number of time periods in a scheduling cycle; and They are The remaining load and original load of the receiving-end power grid during the period; and They are PV and wind power output during the time period; The number of cascade hydropower stations participating in the dispatch; is the number of power stations with pumped storage units in the cascade hydropower stations; For the The total number of generating units of the hydropower station of the first level; For the Total number of pumped storage units in tier-1 hydropower stations; for Moment Hydropower Station No. Unit Output during the time period; and Divided into The first hydropower station Pumped storage units The power generation and pumping power during the period.
[0017] Furthermore, the hydraulic characteristic constraints include:
[0018] Water balance constraints:
[0019] ;
[0020] ;
[0021] In the formula, For power station exist The reservoir capacity at the end of the time period; The step length of the scheduling calculation period is 1h; For power station exist Inbound flow during the time period; For power station exist The outflow flow in the period, which is composed of power generation flow, abandoned water flow and pumped water flow; It is the water flow time lag between cascade hydropower stations; For power station Medium Unit exist The power generation flow during the period; For power station exist The amount of water abandoned during the period; For power station Middle Pumped storage units Power generation flow during the period; For power station Middle Pumped storage units Pumping flow rate during the period;
[0022] Storage capacity constraints:
[0023] ;
[0024] ;
[0025] ;
[0026] In the formula, and Power Station The upper and lower limits of storage capacity; and Power Station The actual storage capacity at the beginning and end of the dispatch period; and Power Station Target control storage capacity at the beginning and end of the dispatch period;
[0027] Traffic constraints:
[0028] ;
[0029] ;
[0030] ;
[0031] ;
[0032] ;
[0033] In the formula, For power station Outbound traffic limit; For power station Medium Unit exist 0-1 variable of the working status of the time period. If the unit is in the starting state, it is 1, otherwise it is in the stopping state, it is 0; and Power Station Middle Pumped storage units 0-1 variable of the working state of the time period. If it is 1, it is in the power generation or pumping state, otherwise it is in the shutdown state; and Power Station Medium Unit Upper and lower limits of power generation flow; and Power Station Middle The upper and lower limits of the power generation flow of each pumped storage unit; and Power Station Middle The upper and lower limits of pumping flow of each pumped storage unit; For power station Upper limit of water abandonment flow;
[0034] Water level constraints:
[0035] ;
[0036] ;
[0037] ;
[0038] ;
[0039] ;
[0040] In the formula, For power station exist The water level in front of the dam at the end of the time period; For power station The functional relationship between the water level in front of the dam and the reservoir capacity; For power station exist tailwater level at the end of the period; For power station The functional relationship between the tailwater level and the outflow flow; and Power Station Upper and lower limits of water level; and Power Station The actual water level in front of the dam at the beginning and end of the dispatch period; and Power Station Control the water level from beginning to end.
[0041] Furthermore, the power characteristic constraints include:
[0042] Output upper and lower limits of cascade hydropower stations:
[0043] ;
[0044] In the formula, and Hydropower Station Medium Unit Upper and lower limits of power generation;
[0045] Upper and lower limits of pumped storage unit output:
[0046] ;
[0047] ;
[0048] In the formula, and Power Station Middle The upper and lower limits of the power generation capacity of the pumped storage units; and Power Station Middle The upper and lower limits of the pumping power of each pumped storage unit;
[0049] Unit start and stop operation status constraints:
[0050] ;
[0051] ;
[0052] ;
[0053] ;
[0054] In the formula, and Power Station Medium Unit exist A 0-1 variable indicating whether the power-on and power-off operations are performed during the time period. If it is 1, it means that the power-on and power-off operations are performed, otherwise it is 0;
[0055] Minimum start-stop duration constraints for units:
[0056] ;
[0057] In the formula, and For power station Medium Unit Minimum start and stop times.
[0058] Furthermore, the water-electricity coupling characteristic constraints include:
[0059] ;
[0060] ;
[0061] ;
[0062] in, For power station Medium Unit power generation efficiency; For power station Medium Unit power generation efficiency; For power station Medium Unit Pumping efficiency.
[0063] Furthermore, linearizing the objective function includes:
[0064] ;
[0065] In the formula, R max and R min are the maximum and minimum values of the residual load of the receiving power grid respectively.
[0066] Furthermore, linearizing the constraint condition includes:
[0067] Linearize the water level-reservoir capacity relationship:
[0068] ;
[0069] ;
[0070] ;
[0071] In the formula, and is the correlation coefficient between water level and reservoir capacity;
[0072] The relationship between tailwater level and downstream flow is linearized.
[0073] Furthermore, solving the linearized scheduling model includes:
[0074] The dispatching model is solved by calling CPLEX solver using Yalmip to obtain the power generation and pumping output of each generator set in the cascade hydropower station and the additional pumped-storage power station.
[0075] The present invention also includes a hybrid pumped-storage day-ahead peak-shaving dispatching device, using the above method, including:
[0076] The dispatch model modeling unit is used to build a day-ahead peak-shaving dispatch model for wind-solar-cascade hybrid pumped storage with the minimum peak-to-valley difference of the residual load of the receiving power grid as the objective function;
[0077] A constraint unit, used to establish constraint conditions of the dispatching model, wherein the constraint conditions include: hydraulic characteristic constraint, power characteristic constraint, and hydroelectric coupling characteristic constraint of conventional cascade hydropower stations after adding pumped storage;
[0078] A linearization unit, used for linearizing the objective function and the constraint conditions;
[0079] The solving unit is used to solve the linearized scheduling model to obtain an optimized scheduling result.
[0080] The present invention also includes a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method described above is implemented.
[0081] The present invention also includes a storage medium on which a computer program is stored. When the computer program is executed by a processor, the method described above is implemented.
[0082] The beneficial effects of the present invention are as follows: the present invention takes minimizing the peak-to-valley difference of the residual load of the receiving power grid as the objective function, and takes the hydraulic characteristic constraints, power characteristic constraints, and hydropower coupling characteristic constraints of conventional cascade hydropower stations after adding pumped storage as constraints, to establish a wind-solar-cascade hybrid pumped storage day-ahead peak-shaving scheduling model, and finally solves the model to obtain the optimized scheduling result, which can provide a wind-solar-cascade hybrid pumped storage system power generation plan that meets the constraints, promote the consumption of wind power and photovoltaics, and achieve better "peak shaving" and increase the "valley filling" effect compared to the water-wind-solar complementary power generation system. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0084] Figure 1 is a flow chart of the method in Example 1;
[0085] Figure 2 It is a structural schematic diagram of the device in Example 1;
[0086] Figure 3 It is a flow chart of the method for day-ahead peak load regulation in a wind-solar-cascade hybrid pumped-storage combined power generation system in Example 2;
[0087] Figure 4 This is a diagram showing the day-ahead peak-shaving dispatching results of the wind-solar-cascade hybrid pumped-storage combined power generation system in Example 2;
[0088] Figure 5 This is a diagram showing the output results of the No. 1 hydropower station in the cascade hydropower station group in Example 2;
[0089] Figure 6 This is a diagram showing the output results of the No. 2 hydropower station in the cascade hydropower station group in Example 2;
[0090] Figure 7 This is a diagram showing the output results of the No. 3 hydropower station in the cascade hydropower station group in Example 2;
[0091] Figure 8 This is the output result diagram of the pumped storage unit in Example 2;
[0092] Fig. 9 It is the water level change diagram of reservoirs at all levels in Example 2;
[0093] Fig.10 A schematic diagram of the structure of a computer device. DETAILED DESCRIPTION
[0094] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0095] Embodiment 1:
[0096] like Figure 1 A hybrid pumped storage day-ahead peak-shaving dispatching method is shown, comprising the following steps:
[0097] Taking the minimum peak-to-valley difference of the residual load of the receiving power grid as the objective function, a wind-solar-cascade hybrid pumped storage day-ahead peak-shaving dispatching model is constructed.
[0098] Establish the constraints of the dispatching model, including: hydraulic characteristics constraints after conventional cascade hydropower stations are equipped with pumped storage, power characteristics constraints, and hydropower coupling characteristics constraints;
[0099] Linearize the objective function and constraints;
[0100] The linearized scheduling model is solved to obtain the optimized scheduling result.
[0101] By taking minimizing the peak-to-valley difference of the residual load of the receiving power grid as the objective function, and taking the hydraulic characteristic constraints, power characteristic constraints, and hydropower coupling characteristic constraints of conventional cascade hydropower stations after adding pumped storage as constraints, a wind-solar-cascade hybrid pumped storage day-ahead peak-shaving scheduling model is established. Finally, the model is solved to obtain the optimized scheduling result, which can provide a wind-solar-cascade hybrid pumped storage system power generation plan that meets the constraints, promote the consumption of wind power and photovoltaics, and achieve better "peak shaving" and increase the "valley filling" effect compared to the water-wind-solar complementary power generation system.
[0102] In this embodiment, the objective function includes:
[0103] ;
[0104] ;
[0105] In the formula, is the peak-to-valley difference of the residual load of the receiving-end power grid; is the number of time periods in a scheduling cycle; and They are The remaining load and original load of the receiving-end power grid during the period; and They are PV and wind power output during the time period; The number of cascade hydropower stations participating in the dispatch; is the number of power stations with pumped storage units in the cascade hydropower stations; For the The total number of generating units of the hydropower station of the first level; For the Total number of pumped storage units in tier-1 hydropower stations; for Moment Hydropower Station No. Unit Output during the time period; and Divided into The first hydropower station Pumped storage units The power generation and pumping power during the period.
[0106] Among them, hydraulic characteristic constraints include:
[0107] Water balance constraints:
[0108] ;
[0109] ;
[0110] In the formula, For power station exist The reservoir capacity at the end of the time period; The step length of the scheduling calculation period is 1h; For power station exist Inbound flow during the time period; For power station exist The outflow flow in the period, which is composed of power generation flow, abandoned water flow and pumped water flow; It is the water flow time lag between cascade hydropower stations; For power station Medium Unit exist The power generation flow during the period; For power station exist The amount of water abandoned during the period; For power station Middle Pumped storage units Power generation flow during the period; For power station Middle Pumped storage units Pumping flow rate during the period;
[0111] Storage capacity constraints:
[0112] ;
[0113] ;
[0114] ;
[0115] In the formula, and Power Station The upper and lower limits of storage capacity; and Power Station The actual storage capacity at the beginning and end of the dispatch period; and Power Station Target control storage capacity at the beginning and end of the dispatch period;
[0116] Traffic constraints:
[0117] ;
[0118] ;
[0119] ;
[0120] ;
[0121] ;
[0122] In the formula, For power station Outbound traffic limit; For power station Medium Unit exist 0-1 variable of the working status of the time period. If the unit is in the starting state, it is 1, otherwise it is in the stopping state, it is 0; and Power Station Middle Pumped storage units 0-1 variable of the working state of the time period. If it is 1, it is in the power generation or pumping state, otherwise it is in the shutdown state; and Power Station Medium Unit Upper and lower limits of power generation flow; and Power Station Middle The upper and lower limits of the power generation flow of each pumped storage unit; and Power Station Middle The upper and lower limits of pumping flow of each pumped storage unit; For power station Upper limit of water abandonment flow;
[0123] Water level constraints:
[0124] ;
[0125] ;
[0126] ;
[0127] ;
[0128] ;
[0129] In the formula, For power station exist The water level in front of the dam at the end of the time period; For power station The functional relationship between the water level in front of the dam and the reservoir capacity; For power station exist tailwater level at the end of the period; For power station The functional relationship between the tailwater level and the outflow flow; and Power Station Upper and lower limits of water level; and Power Station The actual water level in front of the dam at the beginning and end of the dispatch period; and Power Station Control the water level from beginning to end.
[0130] Power characteristic constraints include:
[0131] Output upper and lower limits of cascade hydropower stations:
[0132] ;
[0133] In the formula, and Hydropower Station Medium Unit Upper and lower limits of power generation;
[0134] Upper and lower limits of pumped storage unit output:
[0135] ;
[0136] ;
[0137] In the formula, and Power Station Middle The upper and lower limits of the power generation capacity of the pumped storage units; and Power Station Middle The upper and lower limits of the pumping power of each pumped storage unit;
[0138] Unit start and stop operation status constraints:
[0139] ;
[0140] ;
[0141] ;
[0142] ;
[0143] In the formula, and Power Station Medium Unit exist A 0-1 variable indicating whether the power-on and power-off operations are performed during the time period. If it is 1, it means that the power-on and power-off operations are performed, otherwise it is 0;
[0144] Minimum start-stop duration constraints for units:
[0145] ;
[0146] In the formula, and For power station Medium Unit Minimum start and stop times.
[0147] The constraints of hydroelectric coupling characteristics include:
[0148] ;
[0149] ;
[0150] ;
[0151] in, For power station Medium Unit Power generation efficiency; For power station Medium Unit Power generation efficiency; For power station Medium Unit Pumping efficiency.
[0152] In this embodiment, linearizing the objective function includes:
[0153] ;
[0154] In the formula, R max and R min are the maximum and minimum values of the residual load of the receiving power grid respectively.
[0155] The linearization of constraints includes:
[0156] Linearize the water level-reservoir capacity relationship:
[0157] ;
[0158] ;
[0159] ;
[0160] In the formula, and is the correlation coefficient between water level and reservoir capacity;
[0161] The relationship between tailwater level and downstream flow is linearized.
[0162] The linearized scheduling model is solved, including:
[0163] Yalmip is used to call the CPLEX solver to solve the scheduling model, and the power generation and pumping output of each generator set in the cascade hydropower station and the additional pumped-storage power station are obtained.
[0164] like Figure 2 As shown, this embodiment also includes a hybrid pumped storage day-ahead peak-shaving dispatching device, using the above method, including:
[0165] The dispatch model modeling unit is used to build a day-ahead peak-shaving dispatch model for wind-solar-cascade hybrid pumped storage with the minimum peak-to-valley difference of the residual load of the receiving power grid as the objective function;
[0166] The constraint unit is used to establish the constraint conditions of the dispatching model. The constraint conditions include: hydraulic characteristic constraints, power characteristic constraints, and hydropower coupling characteristic constraints of conventional cascade hydropower stations after adding pumped storage;
[0167] Linearization unit, used to linearize the objective function and constraints;
[0168] The solving unit is used to solve the linearized scheduling model to obtain the optimized scheduling result.
[0169] Embodiment 2:
[0170] In order to demonstrate the effectiveness of the wind-solar-cascade hybrid pumped-storage day-ahead peak-shaving scheduling method provided in this embodiment, it is described below in conjunction with specific application scenarios.
[0171] like Figure 3 As shown, this embodiment includes three cascade hydropower stations and one pumped storage power station, and the pumped storage power station is located at the first hydropower station.
[0172] Load: [0.5462; 0.5210; 0.5000; 0.4916; 0.4874; 0.4916; 0.5011; 0.5502; 0.6345; 0.8298; 0.9160; 0.9277; 0.7983; 0.7101; 0.7139; 0.7631; 0.8627; 0.9247; 0.9506; 0.9454; 0.9370; 0.8992; 0.8270; 0.6908]*1600 (MW);
[0173] Wind power output: [0.9; 0.8; 0.7; 0.6; 0.5; 0.4; 0.3; 0.2; 0.1; 0.1; 0.1; 0.15; 0.2; 0.3; 0.4; 0.5; 0.5; 0.55; 0.55; 0.6; 0.7; 0.8; 0.9]*100 (MW);
[0174] Photovoltaic output: [0; 0; 0; 0; 0; 0; 0.1288; 0.3800; 0.6013; 0.7559; 0.8466; 0.8655; 0.8317; 0.7329; 0.6662; 0.4929; 0.2605; 0.0601; 0.0201; 0; 0; 0; 0; 0]*100 (MW);
[0175] The method comprises the following steps:
[0176] S110: First, establish the objective function of the wind-solar-cascade hybrid pumped storage day-ahead peak-shaving dispatch as follows:
[0177] ;
[0178] ;
[0179] In the formula, is the peak-to-valley difference of the residual load of the receiving-end power grid; is the number of time periods in a scheduling cycle; and They are The remaining load and original load of the receiving-end power grid during the period; and They are PV and wind power output during the time period; The number of cascade hydropower stations participating in the dispatch; is the number of power stations with pumped storage units in the cascade hydropower stations; For the The total number of generating units of the hydropower station of the first level; For the Total number of pumped storage units in tier-1 hydropower stations; for Moment Hydropower Station No. Unit Output during the time period; and Divided into The first hydropower station Pumped storage units The power generation and pumping power during the period.
[0180] S120: Then establish hydraulic characteristic constraints including water balance constraints, reservoir capacity constraints, flow constraints, and water level constraints:
[0181] 1) Water balance constraints:
[0182] ;
[0183] ;
[0184] In the formula, For power station exist The reservoir capacity at the end of the time period; The step length of the scheduling calculation period is 1h; For power station exist Inbound flow during the time period; For power station exist The outflow flow in the period, which is composed of power generation flow, abandoned water flow and pumped water flow; It is the water flow time lag between cascade hydropower stations; For power station Medium Unit exist The power generation flow during the period; For power station exist The amount of water abandoned during the period; For power station Middle Pumped storage units Power generation flow during the period; For power station Middle Pumped storage units Pumping flow rate during the period;
[0185] Parameters of cascade hydropower stations are shown in Table 1:
[0186] Table 1 Parameters of cascade hydropower stations
[0187] Hydropower station number Water level (m) Maximum power generation (MW) Minimum power generation (MW) <![CDATA[Single maximum power generation flow rate (m 3 / s)]]> Minimum start-stop time of the unit (h) 1 2705~2709 45 10 43.32 2 2 2572~2574 60 13 53.4 2 3 2304 36 9 51.1 2
[0188] The parameters of the pumped storage power station are shown in Table 2:
[0189] Table 2 Pumped storage power station parameters
[0190] Pumped storage power station number Maximum power generation (MW) Minimum power generation (MW) Maximum pumping power (MW) Minimum pumping power (MW) <![CDATA[Maximum power generation flow rate (m 3 / s)]]> <![CDATA[Maximum pumping flow rate (m 3 / s)]]> 1 15 3 15 12 14.44 16.98
[0191] 2) Storage capacity constraints:
[0192] ;
[0193] ;
[0194] ;
[0195] In the formula, and Power Station The upper and lower limits of storage capacity; and Power Station The actual storage capacity at the beginning and end of the dispatch period; and Power Station Target control storage capacity at the beginning and end of the dispatch period;
[0196] 3) Traffic constraints:
[0197] ;
[0198] ;
[0199] ;
[0200] ;
[0201] ;
[0202] In the formula, For power station Outbound traffic limit; For power station Medium Unit exist 0-1 variable of the working status of the time period. If the unit is in the starting state, it is 1, otherwise it is in the stopping state, it is 0; and Power Station Middle Pumped storage units 0-1 variable of the working state of the time period. If it is 1, it is in the power generation or pumping state, otherwise it is in the shutdown state; and Power Station Medium Unit Upper and lower limits of power generation flow; and Power Station Middle The upper and lower limits of the power generation flow of each pumped storage unit; and Power Station Middle The upper and lower limits of pumping flow of each pumped storage unit; For power station Upper limit of water abandonment flow;
[0203] 4) Water level constraint:
[0204] ;
[0205] ;
[0206] ;
[0207] ;
[0208] ;
[0209] In the formula, For power station exist The water level in front of the dam at the end of the time period; For power station The functional relationship between the water level in front of the dam and the reservoir capacity; For power station exist tailwater level at the end of the period; For power station The functional relationship between the tailwater level and the outflow flow; and Power Station Upper and lower limits of water level; and Power Station The actual water level in front of the dam at the beginning and end of the dispatch period; and Power Station Control the water level from beginning to end.
[0210] Then, the power characteristic constraints are established, including the upper and lower limits of the output of cascade hydropower stations, the upper and lower limits of the output of pumped storage units, the constraints on the start and stop operation status of the units, and the constraints on the minimum start and stop duration of the units:
[0211] 1) Upper and lower limits of cascade hydropower station output:
[0212] ;
[0213] In the formula, and Hydropower Station Medium Unit Upper and lower limits of power generation;
[0214] 2) Upper and lower limits of pumped storage unit output:
[0215] ;
[0216] ;
[0217] In the formula, and Power Station Middle The upper and lower limits of the power generation capacity of the pumped storage units; and Power Station Middle The upper and lower limits of the pumping power of each pumped storage unit;
[0218] 3) Unit start-up and shutdown operation status constraints:
[0219] ;
[0220] ;
[0221] ;
[0222] ;
[0223] In the formula, and Power Station Medium Unit exist A 0-1 variable indicating whether the power-on and power-off operations are performed during the time period. If it is 1, it means that the power-on and power-off operations are performed, otherwise it is 0;
[0224] 4) Minimum start-up and shutdown duration constraints of the unit:
[0225] ;
[0226] In the formula, and For power station Medium Unit Minimum start and stop times.
[0227] Then the hydroelectric coupling characteristic constraints are established, including:
[0228] ;
[0229] ;
[0230] ;
[0231] in, For power station Medium Unit power generation efficiency; For power station Medium Unit power generation efficiency; For power station Medium Unit Pumping efficiency.
[0232] S130: Then, the scheduling model is solved using a linearization method, including:
[0233] 1) Linearization of objective function:
[0234] ;
[0235] 2) Linearization of water level-reservoir capacity relationship:
[0236] ;
[0237] ;
[0238] ;
[0239] in, and is the correlation coefficient between water level and reservoir capacity;
[0240] 3) Linearize the relationship between tailwater level and downstream flow.
[0241] S140: Finally, Yalmip is used to call the CPLEX solver to solve the wind-solar-cascade hybrid pumped storage day-ahead peak-shaving scheduling model, and the day-ahead peak-shaving scheduling scheme of the wind-solar-cascade hybrid pumped storage combined power generation system is obtained. Figure 4 . Figure 5 , Figure 6 , Figure 7 and Figure 8 The output results of No. 1 Hydropower Station, No. 2 Hydropower Station and No. 3 Hydropower Station in the cascade hydropower station group and the output results of the pumped storage units are shown respectively. Fig. 9The water level change diagram of reservoirs at all levels is shown.
[0242] In this embodiment, the changes in constraints on the complex cascade hydraulic connections after the addition of pumped-storage units to the cascade hydropower stations can be fully considered, while taking into account the consumption of wind power and photovoltaics. Compared with the water-wind-photovoltaic complementary power generation system, it can achieve better "peak shaving" and increase the "valley filling" effect.
[0243] See also Fig.10 A computer device 400 provided in an embodiment of the present application includes: a processor 410 and a memory 420, wherein the memory 420 stores a computer program executable by the processor 410, and when the computer program is executed by the processor 410, the above method is executed.
[0244] The embodiment of the present application further provides a storage medium 430 on which a computer program is stored. When the computer program is run by the processor 410, the above method is executed.
[0245] Among them, the storage medium 430 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable red-only memory (PROM), read-only memory (ROM), magnetic storage, flash memory, disk or optical disk.
[0246] In the description of the present invention, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. "Multiple" means two or more, unless otherwise clearly and specifically defined.
[0247] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0248] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0249] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present invention belong.
[0250] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples (non-exhaustive list) of computer-readable media include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0251] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0252] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0253] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A hybrid pumped storage day-ahead peak-shaving dispatching method, characterized in that: The steps include: Taking the minimum peak-to-valley difference of the residual load of the receiving power grid as the objective function, a wind-solar-cascade hybrid pumped storage day-ahead peak-shaving dispatching model is constructed. Establishing constraint conditions of the dispatching model, wherein the constraint conditions include: hydraulic characteristic constraint, power characteristic constraint, and hydroelectric coupling characteristic constraint after conventional cascade hydropower stations are equipped with pumped storage; Linearizing the objective function and the constraint conditions; Solving the linearized scheduling model to obtain an optimized scheduling result; The objective function includes: ; ; Where, F is the peak-to-valley difference of the residual load of the receiving power grid; T is the number of time periods in a dispatching cycle; and They are the residual load and original load of the receiving-end power grid during period t respectively; and are the photovoltaic and wind power outputs in period t respectively; I is the number of cascade hydropower stations participating in the dispatch; is the number of power stations with pumped storage units in the cascade hydropower stations; is the total number of units of the i-th-level hydropower station; is the total number of pumped storage units in the i-th-level hydropower station; is the number of the i-th hydropower station at time t. The output of the unit in period t; and It is divided into the power generation and pumping power of the nth pumped storage unit in the i-th hydropower station during period t; The hydraulic characteristic constraints include: Water balance constraints: ; ; In the formula, is the reservoir capacity of power station i at the end of period t; The step length of the scheduling calculation period is 1h; is the inflow flow of power station i in period t; is the outflow of power station i in period t, which is composed of power generation flow, abandoned water flow and pumped water flow; It is the water flow time lag between cascade hydropower stations; is the power generation flow of unit g in power station i during period t; is the water discharge of power station i in period t; is the power generation flow of the nth pumped storage unit in power station i during period t; is the pumping flow of the nth pumped storage unit in power station i during period t; Storage capacity constraints: ; ; ; In the formula, and are the upper and lower limits of the storage capacity of power station i respectively; and are the actual storage capacities of power station i at the beginning and end of the dispatch period, respectively; and are the target controlled storage capacities of power station i at the beginning and end of the dispatch period, respectively; Traffic constraints: ; ; ; ; ; In the formula, is the upper limit of outflow flow of power station i; is a 0-1 variable indicating the working state of unit g in power station i during period t. If the unit is in the on-state, it is 1; otherwise, if it is in the off-state, it is 0. and are 0-1 variables representing the working status of the nth pumped storage unit in power station i during period t. If it is 1, it is in the power generation or pumping state, otherwise it is in the shutdown state; and are the upper and lower limits of the power generation flow of unit g in power station i respectively; and They are the upper and lower limits of the power generation flow of the nth pumped storage unit in power station i; and They are the upper and lower limits of the pumping flow rate of the nth pumped storage unit in power station i; is the upper limit of the water discharge of power station i; Water level constraints: ; ; ; ; ; In the formula, is the water level in front of the dam of power station i at the end of period t; is the functional relationship between the water level in front of the dam and the reservoir capacity of power station i; is the tailwater level of power station i at the end of period t; is the functional relationship between the tailwater level and the outflow flow of power station i; and are the upper and lower limits of the water level of power station i respectively; and are the actual water levels in front of the dam at the beginning and end of the dispatch period of power station i, respectively; and are the initial and final controlled water levels of power station i respectively; The power characteristic constraints include: Output upper and lower limits of cascade hydropower stations: ; In the formula, and They are the upper and lower limits of the power generation capacity of unit g in hydropower station i; Upper and lower limits of pumped storage unit output: ; ; In the formula, and are the upper and lower limits of the power generation capacity of the nth pumped storage unit in power station i, respectively; and are the upper and lower limits of the pumping power of the nth pumped storage unit in power station i, respectively; Unit start and stop operation status constraints: ; ; ; ; In the formula, and They are 0-1 variables indicating whether the unit g in power station i is started or shut down during time period t. If it is 1, it means that the unit is started or shut down, otherwise it is 0. Minimum start-stop duration constraints for units: ; In the formula, and is the minimum start-up and shutdown time of unit g in power station i; The hydroelectric coupling characteristic constraints include: ; ; ; in, is the power generation efficiency of unit g in power station i; is the power generation efficiency of unit n in power station i; is the pumping efficiency of unit n in power station i.
2. The hybrid pumped storage day-ahead peak-shaving dispatching method according to claim 1, characterized in that: The linearization process of the objective function includes: ; In the formula, R max and R min are the maximum and minimum values of the residual load of the receiving power grid respectively.
3. The hybrid pumped storage day-ahead peak-shaving dispatching method according to claim 1, characterized in that: The linearization process of the constraint condition includes: Linearize the water level-reservoir capacity relationship: ; ; ; In the formula, and is the correlation coefficient between water level and reservoir capacity; The relationship between tailwater level and downstream flow is linearized.
4. The hybrid pumped storage day-ahead peak-shaving dispatching method according to claim 1, characterized in that: The solving the linearized scheduling model includes: The dispatching model is solved by calling CPLEX solver using Yalmip to obtain the power generation and pumping output of each generator set in the cascade hydropower station and the additional pumped-storage power station.
5. A hybrid pumped storage day-ahead peak-shaving dispatching device, characterized in that: Use of the method according to any one of claims 1 to 4, comprising: The dispatch model modeling unit is used to build a day-ahead peak-shaving dispatch model for wind-solar-cascade hybrid pumped storage with the minimum peak-to-valley difference of the residual load of the receiving power grid as the objective function; A constraint unit, used to establish constraint conditions of the dispatching model, wherein the constraint conditions include: hydraulic characteristic constraint, power characteristic constraint, and hydroelectric coupling characteristic constraint of conventional cascade hydropower stations after adding pumped storage; A linearization unit, used for linearizing the objective function and the constraint conditions; The solving unit is used to solve the linearized scheduling model to obtain an optimized scheduling result.
6. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 4 is implemented.
7. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.