A dam anti-seepage reinforcement system and a dam anti-seepage effect detection method

Through the dam anti-seepage reinforcement system and detection methods, the problems of dam seepage and anti-seepage detection have been solved, the stability and discharge capacity of the dam body have been improved, and the safety and efficiency of the reservoir have been ensured.

CN118516951BActive Publication Date: 2024-10-22SICHUAN HENGXIN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411000082.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-22
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

Existing technology cannot effectively prevent dam seepage and cannot accurately detect the overall anti-seepage effect of the dam, resulting in a decrease in dam stability and discharge capacity.

Method used

The dam anti-seepage reinforcement system is adopted, including dam crest reinforcement components, dam body reinforcement components and dam slope reinforcement components. It is reinforced through structural reinforcement such as grouting curtain body, longitudinal reinforcement body and sand and gravel layer, combined with detection methods such as seepage analysis, stability analysis, Reservoir deformation observation and chute water line calculation enable detection and improvement of the overall anti-seepage effect of the dam.

Benefits of technology

It significantly improves the anti-seepage effect of the dam, enhances the stability and discharge capacity of the dam body, ensures the flood control safety and water supply efficiency of the reservoir, and at the same time provides the ability to accurately detect the overall anti-seepage condition of the dam.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118516951B_ABST
    Figure CN118516951B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of dam construction engineering. The present invention discloses a dam anti-seepage reinforcement system and a method for detecting the anti-seepage effect of the dam. The dam anti-seepage reinforcement system includes a dam reinforcement and remediation component, and the dam reinforcement and remediation component includes two parts: a dam top reinforcement component and a dam body reinforcement component. The present invention is provided with a dam body longitudinal reinforcement body and a grouting curtain body, the grouting curtain body penetrates into the bottom of the dam foundation, the dam body longitudinal reinforcement body includes a slot-cast concrete core wall and a vertical formwork cast-in-place concrete core wall, the slot-cast concrete core wall penetrates into the bedrock of the dam foundation, and the dam body is anti-seepage reinforced by using the dam body longitudinal reinforcement body at the dam axis, connecting the dam shoulders on both sides of the dam on the left and right, and connecting with the grouting curtain body in the dam foundation in the middle, so as to control the seepage of the dam body and the dam foundation, reduce the dam body infiltration line, and prevent the dam body from being damaged by seepage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a dam anti-seepage reinforcement system, in particular to a dam anti-seepage reinforcement system and a method for detecting the anti-seepage effect of the dam, and belongs to the technical field of dam construction engineering. Background Art

[0002] A reservoir dam refers to a dike that blocks water from a river. The dikes that block water from reservoirs, rivers, etc. are the main structures in water conservancy projects. After long-term use, the dam will seep and needs to be reinforced.

[0003] Since the dam is prone to leakage during long-term use, it is necessary to reinforce the dam against seepage. In the prior art, a reservoir dam risk prevention and reinforcement anti-seepage device disclosed in announcement number CN220132845U can provide anti-seepage protection for one side of the dam body through the setting of a concrete anti-seepage layer to prevent the dam body from becoming unstable due to water seepage. In this device, multiple sets of fixed shells are installed on one side of the concrete anti-seepage layer through the installation components. The inner cavity of the fixed shell is slidably connected to the water retaining plate. When the flood scours the dam body, it will first scour the water retaining plate. The water retaining plate will move and squeeze the compression spring when it is impacted to buffer the water potential, thereby offsetting part of the impact force exerted by the flood on the dam body, effectively reinforcing and protecting the dam body. However, since the dam body can not only be used to block floods, but its main function is to block water, part of the dam body is located below the water level, that is, the dam slopes on both sides of the dam body will be slowly infiltrated and eroded due to long-term immersion in water, so the water retaining plate set by CN220132845U cannot play a good anti-seepage role. In addition, for a complete dam, the inlet section of the spillway of the dam body will be seriously blocked due to long-term use, which reduces the discharge capacity and also causes excessive pressure on the dam body due to accumulated water, which can easily cause infiltration of the dam body. In addition, long-term use causes damage to part of the concrete structure of the dam body, and the water stop at the joint fails.

[0004] In addition, after the dam is reinforced for anti-seepage, the anti-seepage effect of the dam needs to be tested regularly. In the prior art, the patent with the announcement number CN108643248B discloses a method for detecting the leakage of the anti-seepage curtain of the dam foundation, including: determining the hole position of the inclined hole to be drilled, the hole position is arranged on the extension line of the axis of the anti-seepage curtain at the dam head on both sides of the dam, a certain safety distance b from the dam body, and the inclined hole forms an inclination angle β of 10° to 80° relative to the horizontal plane; leveling the drilling site and pouring a concrete base, and placing the drilling rig in the drilling site; configuring a guide pipe at the orifice of the inclined hole to suppress the inclination of the inclined hole; in the process of drilling the inclined hole by driving the drill rod with the drilling rig, measuring the inclination of the drilled inclined hole in sections and correcting the deviation, and performing a water pressure test in sections to check the permeability of the anti-seepage curtain, so as to continuously complete the inclination measurement, correction and water pressure test of the entire section of the inclined hole. This patent can perform relatively accurate leakage detection on the whole anti-seepage curtain on the basis of avoiding damage to the dam body or the anti-seepage core wall structure. However, this patent can only detect the anti-seepage effect of the anti-seepage curtain, and cannot achieve anti-seepage detection of the whole dam, that is, it cannot accurately reflect the specific anti-seepage effect after anti-seepage reinforcement. Secondly, in the several experimental methods for quality inspection of levee anti-seepage projects published in the Journal of Yangtze River Scientific Research Institute, Vol. 30, No. 12, two methods for anti-seepage detection of levees are disclosed, namely, the use of borehole pressure water injection detection test and geophysical non-destructive detection test, but they are only for anti-seepage detection at points and surfaces. Although the detection range of geophysical non-destructive detection test is wider than that of borehole pressure water injection detection, it still cannot achieve overall detection of levees. Summary of the invention

[0005] The purpose of the present invention is to provide a dam anti-seepage reinforcement system and a method for detecting the dam anti-seepage effect in order to solve at least one technical problem that the above-mentioned prior art cannot play a good anti-seepage role and cannot achieve anti-seepage detection of the dam as a whole.

[0006] The present invention achieves the above-mentioned purpose through the following technical solutions: a dam anti-seepage reinforcement system and a method for detecting the anti-seepage effect of a dam, comprising a dam reinforcement and regulation component, the dam reinforcement and regulation component comprising a dam top reinforcement component, a dam body reinforcement component and a dam slope reinforcement component, the dam top reinforcement component is arranged at the top of the dam body, the dam body reinforcement component is longitudinally arranged on the axis of the dam, the dam slope reinforcement components are respectively arranged on both sides of the dam body, the dam body comprises a main dam and an auxiliary dam, and the auxiliary dam is located on both sides of the main dam;

[0007] The dam top reinforcement components include wave-breaking walls and spillways. The upper end of the dam body is connected to the dam top abutment. The wave-breaking walls are cast on the dam top abutment. A spillway is opened on the surface of the dam top abutment.

[0008] The dam body reinforcement assembly includes a dam body longitudinal reinforcement body and a grouting curtain body. The grouting curtain body is located below the dam body longitudinal reinforcement body and the grouting curtain body penetrates into the bottom of the dam foundation. The dam body longitudinal reinforcement body includes a slot-cast concrete core wall and a formwork cast-in-place concrete core wall. The slot-cast concrete core wall penetrates into the bedrock of the dam foundation, and the formwork cast-in-place concrete core wall is connected to the top of the slot-cast concrete core wall.

[0009] The dam slope reinforcement components include an upstream dam slope and a downstream dam slope. The upstream dam slope and the downstream dam slope have the same structure and are laid in a stepped manner on the upstream and downstream slopes of the dam body respectively. The upstream dam slope is composed of a number of concrete hexagonal blocks, bottom-laid butt joint blocks and upper pressure butt joint blocks.

[0010] As a further solution of the present invention: the slot-cast concrete core wall includes a steel truss, a pre-embedded grouting pipe, a concrete pouring duct and a concrete wall. The steel truss is welded by transverse frame rods, longitudinal frame rods and inclined frame rods, and the steel truss is placed in a slot excavated by the central axis of the dam. The pre-embedded grouting pipe and the concrete pouring duct are both inserted in the steel truss, and the concrete wall is formed by pouring concrete inside the steel truss. The pre-embedded grouting pipes are equidistantly distributed in the steel truss arranged in each slot, and the concrete pouring duct is symmetrically arranged between the pre-embedded grouting pipes. A horizontal fixing bracket is welded to the upper horizontal frame of the steel truss, and a slot positioning channel steel is welded to the upper end of the pre-embedded grouting pipe, and the slot positioning channel steel is clamped on the horizontal fixing bracket.

[0011] As a further solution of the present invention: the slot-cast concrete core wall and the formwork cast-in-place concrete core wall are cast together in a concave-convex groove shape, a number of dowel bars are vertically inserted at the joints of the slot-cast concrete core wall and the formwork cast-in-place concrete core wall, a waterstop copper sheet is clamped at the joints of the formwork cast-in-place concrete core wall, and the waterstop copper sheet is filled with foam plastic, and a PVC rod is clamped at the bending part of the waterstop copper sheet at the joints of the formwork cast-in-place concrete core wall.

[0012] As a further solution of the present invention, the wall thickness of the slot-cast concrete core wall and the formwork-cast concrete core wall of the longitudinal reinforcement of the dam body is calculated as follows:

[0013]

[0014] Where: Calculate thickness for reinforcement; is the reinforcement body permeability coefficient; is the permeability coefficient of the downstream dam shell; is the coefficient; is the allowable hydraulic gradient of the reinforcement; is the allowable hydraulic gradient of the downstream dam shell; is the upstream water depth; is the downstream water depth,H d is the downstream precipitation depth.

[0015] As a further solution of the present invention: the wave-breaking wall is "L"-shaped reinforced concrete, and a cable groove is provided on the inner side of the bottom end of the wave-breaking wall, a rainwater grate is laid at the upper opening of the cable groove, the wave-breaking wall is close to one side of the upstream dam slope, and the spillway on the other side of the wave-breaking wall is connected to a plurality of leakage holes, and the opening of the leakage holes is located on one side of the downstream dam slope, and a plurality of reinforcing bars and stirrups are embedded in the reinforced concrete, and the reinforcing bars are tied to the stirrups.

[0016] As a further solution of the present invention: a sand and gravel layer is laid between the upstream dam slope and the upstream slope of the dam body, a sand and gravel layer is laid between the downstream dam slope and the downstream slope of the dam body, and the gaps in the sand and gravel layers are filled with small-grained gravel blocks, and the surfaces of the upstream dam slope and the downstream dam slope are sprayed with a polyurea spray layer.

[0017] As a further solution of the present invention: a plurality of reinforced concrete frames are laid on the upstream dam slope, and the concrete hexagonal blocks, bottom-laid docking blocks and upper-pressure docking blocks are respectively laid in the frames formed by each reinforced concrete frame, the bottom-laid docking blocks are laid at the lower ends of the concrete hexagonal blocks, the upper-pressure docking blocks are laid at the upper ends of the concrete hexagonal blocks, and the upper-pressure docking blocks are laid above the bottom-laid docking blocks in a stacked manner, the bottom-laid docking blocks are provided with docking through holes, the inner side surfaces of the upper-pressure docking blocks are connected with T-shaped docking steel bars, and the front ends of the T-shaped docking steel bars pass through the docking through holes and are buried in the sand and gravel layer.

[0018] As a further solution of the present invention: the inner side surface of the concrete hexagonal block is connected with an outward-expanded steel bar, and the outward-expanded steel bar is inserted in the sand and gravel layer, the sides of the concrete hexagonal block, the bottom laying docking block and the upper pressure docking block are all provided with inner grooves, the inner side surfaces of the concrete hexagonal block, the bottom laying docking block and the upper pressure docking block are all provided with through holes, and the through holes are connected with the inner grooves.

[0019] As a further solution of the present invention: the upstream slope of the dam body is also paved with an upstream horseway, which is located in the middle part of the upstream dam slope, and a flat sand and gravel cushion layer is laid between the upstream horseway and the upstream slope of the dam body; the downstream slope of the dam body is also paved with a downstream horseway, which is located in the middle part of the downstream dam slope, and a hand-placed large pebble layer is laid between the downstream horseway and the downstream slope of the dam body.

[0020] As a further solution of the present invention: a drainage prism is laid at the bottom end of the downstream dam slope of the main dam. The drainage prism is composed of prism stones, precast concrete blocks and a crushed stone filter layer. The precast concrete blocks are laid on the surface of the prism stones, and the crushed stone filter layer is laid between the prism stones and the slope of the main dam.

[0021] As a further solution of the present invention: the dam top base is composed of a crushed stone leveling layer, a crushed stone base layer and an asphalt concrete surface layer, and the crushed stone leveling layer, the crushed stone base layer and the asphalt concrete surface layer are laid in sequence from bottom to top.

[0022] As a further solution of the present invention: the reinforcement system also includes reinforcement and renovation of the spillway, the bottom drain hole, the water intake project, the traffic project and the housing construction project of the dam body, and the reinforcement system also includes termite detection on the dam body, wherein:

[0023] The spillway is reinforced and improved. The spillway includes two overflow weirs on the left and right sides. The left and right overflow weirs are removed and rebuilt with C reinforced concrete. Drain holes are set in the retaining wall at the fish mouth of the spillway.

[0024] Strengthen and renovate the vent tunnel, expand the entrance gate room of the vent tunnel; replace the trash rack, emergency gate slot, gate leaf, embedded parts, and opening and closing equipment; and carry out anti-seepage treatment on the tunnel body;

[0025] The water intake project is reinforced and renovated. The water intake project consists of three parts: the water intake pump station, the water intake lock chamber, and the water intake. For the water intake pump station, the water pump is replaced and the pump room is rebuilt. For the water intake lock chamber, the gate is replaced and the lock room is rebuilt. For the water intake, the metal electromechanical equipment is replaced;

[0026] Traffic engineering reinforcement and renovation, construction of a new dam foot patrol road, and renovation of the existing dam foot patrol road; construction of a new wharf and demolition and reconstruction of the right spillway highway bridge;

[0027] Strengthen and renovate housing construction projects, build new intelligent buildings, and renovate the water intake lock chambers of water intake projects;

[0028] For termite detection, we use a combination of green biological and information-based prevention and control technologies to conduct a three-year termite monitoring and control cycle. We install two sets of termite monitoring systems. In the first two years, the termite observation station and termite monitoring device are replaced every two months, and termite control is carried out every two months.

[0029] A method for detecting the anti-seepage effect of a dam anti-seepage reinforcement system, wherein the detection method analyzes and calculates dam seepage, dam stability, reservoir deformation, reservoir flood regulation and chute water surface line, and specifically includes:

[0030] S1. Dam seepage analysis. Seepage calculation takes the largest cross section of the dam body, conducts leakage analysis according to Darcy's law of hydraulics, and uses finite element method for seepage calculation analysis;

[0031] Applying Darcy's law and assuming that the permeability gradient of each point in any vertical water-passing section is equal, for a rectangular soil body on an impermeable foundation, the average flow velocity across the section is V=-Kd y / d x ;

[0032] Single width flow: q=Vy=-K y d y / d x ;

[0033] Integrate from upstream to downstream:

[0034]

[0035] in, is the permeability coefficient; d y / d x is the integral of the water-passing section; L is the length of the seepage path; H1 is the height of the upstream water section; H2 is the height of the downstream water section; y is the water-passing section;

[0036] S2. Dam stability analysis: the stability calculation adopts the Bishop method which does not take into account the inter-slab forces;

[0037] S3. Reservoir deformation observation and analysis: Several horizontal displacement measurement points and several settlement displacement measurement points are set on the top of the dam body. The horizontal displacement observation adopts the sight line method, and the observation instrument is

[0038] J07--7806 theodolite, C32 automatic level is used for settlement and displacement observation. Data of each measuring point is collected at regular intervals, and deformation line graphs are drawn in combination with displacement observation data over the years. The deformation of the reservoir is analyzed based on the graphs.

[0039] S4. Flood regulation calculation. The principle of reservoir flood regulation calculation is: without considering flood forecast and pre-emption of flood control storage capacity, when the reservoir water level is higher than the normal storage level, the spillway is open and free to discharge flood;

[0040] The discharge capacity of the spillway is calculated as follows:

[0041]

[0042] Where: is the water flow rate; is the lateral contraction coefficient; m is the flow coefficient; b is the width of the spillway orifice; n is the number of orifices; g is a fixed parameter;

[0043]

[0044] in: is the shape coefficient of the side pier, the side pier is a right angle type; is the shape coefficient of the middle pier; H0 is the total water head of the starting calculation section; b is the width of the spillway orifice;

[0045] S5. Calculation of the chute water surface line. The water depth h1 of the starting section is calculated according to the following formula:

[0046]

[0047] Where: H0 is the total water head of the starting calculation section; q is the single width flow of the starting calculation section; θ is the bottom slope angle of the chute; is the velocity coefficient of the initial calculation section; g is a fixed parameter;

[0048] The chute water surface line is calculated by the following segmented summation method:

[0049]

[0050] Where: θ is the bottom slope angle of the chute; h1 is the water depth at the starting end; h2 is the water depth at the end; ɑ1 is the correction coefficient at the starting end; ɑ2 is the correction coefficient at the end; ν1 is the flow velocity at the starting end; ν2 is the flow velocity at the end; g is a fixed parameter; is the average friction slope within the segment; is the water level difference between the starting water depth and the ending water depth, is the bottom slope of the chute;

[0051] The aerated water depth is calculated according to the following formula:

[0052]

[0053] Where: h, h b are the water depth of the calculated section of the chute and the water depth after aeration, respectively; v is the flow velocity of the calculated section of the chute without aeration; ζ is the correction coefficient.

[0054] The beneficial effects of the present invention are:

[0055] By respectively arranging the upstream dam slope and the downstream dam slope on both sides of the dam body, the slope surface of the dam body can be reinforced for anti-seepage, so as to improve the anti-seepage effect of the dam body. In addition, a sand and gravel layer, a polyurea spray coating sprayed on the upstream dam slope, and concrete hexagonal blocks laid on the surface of the downstream dam slope can be poured with grouting concrete to firmly attach the upstream dam slope and the downstream dam slope to the slope surfaces on both sides of the dam body, so as to provide anti-seepage protection for the dam body. In addition, the anti-seepage reinforcement effect can be further enhanced by spraying the polyurea spray coating. By laying the hollow concrete hexagonal blocks, the slope surface can be covered and compacted, so as to prevent soil and water loss, and also to avoid the growth of more weeds on the slope surface.

[0056] A dam body longitudinal reinforcement body and a grouting curtain body are provided. The grouting curtain body goes deep into the bottom of the dam foundation. The dam body longitudinal reinforcement body includes a slot-cast concrete core wall and a vertical formwork cast-in-place concrete core wall. The slot-cast concrete core wall goes deep into the bedrock of the dam foundation. The dam body is reinforced with a dam body longitudinal reinforcement body at the dam axis to prevent seepage. The dam body is connected to the abutments on both sides of the dam on the left and right, and connected to the grouting curtain body in the dam foundation in the middle, so as to control the seepage of the dam body and the dam foundation, reduce the dam body infiltration line, and prevent the dam body from being damaged by seepage.

[0057] After the reinforcement system of the present invention is implemented, it can not only improve the flood control standard of the reservoir and eliminate the hidden dangers that endanger the safety of the hub project, but also enable the reservoir to achieve the original design benefits in terms of water supply and irrigation. It protects the life and property safety of the people downstream of the reservoir, and will promote the sustainable development of the economy in the downstream supply area, with good social benefits; in view of the fact that the reservoir is a comprehensive utilization reservoir with comprehensive benefits such as irrigation, flood control, and environment, its operation safety must be guaranteed, and the risk elimination and reinforcement project can not only eliminate the hidden dangers of reservoir safety, but also promote the local social and economic development, and play a role in promoting the improvement of people's living standards;

[0058] 4. By adopting the detection method of this application, through the analysis and calculation of the dam seepage, dam stability, reservoir deformation, reservoir flood control and spillway water surface line of the dam, it is possible to perform an analysis based on the specific data obtained by the calculation, thereby achieving a comprehensive detection of the overall anti-seepage situation of the dam, and at the same time, it is also possible to ensure that the detection results are more accurate with the support of the calculation data. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 It is a schematic diagram of the top view structure of the dam body of the present invention;

[0060] Figure 2 This is a schematic diagram of the cross-section structure of the main dam of the present invention;

[0061] Figure 3 It is a schematic diagram of the cross-sectional structure of the auxiliary dam of the present invention;

[0062] Figure 4 It is a schematic diagram of the local structure of the dam body of the present invention;

[0063] Figure 5 This is a plan view of the pre-buried grouting pipe and the concrete pouring conduit of the present invention;

[0064] Figure 6 This is a schematic diagram of the vertical installation structure of the pre-buried grouting pipe of the present invention;

[0065] Figure 7 This is a schematic diagram of the top view of the steel truss structure of the present invention;

[0066] Figure 8 It is a schematic diagram of the side view structure of the steel truss of the present invention;

[0067] Fig. 9 This is a schematic diagram of the longitudinal reinforcement structure of the dam body of the present invention;

[0068] Fig.10 It is a schematic diagram of the cross-sectional structure of the longitudinal reinforcement body of the dam body of the present invention;

[0069] Fig.11 This is a schematic diagram of the splicing structure of the cast-in-place concrete core wall of the present invention;

[0070] Fig.12 This is a schematic diagram of the structure of the water-stop copper sheet of the present invention;

[0071] Fig.13 For the present invention Figure 4 Schematic diagram of the structure at A in the middle;

[0072] Fig.14 It is a schematic diagram of the structure of the concrete hexagonal block of the present invention;

[0073] Fig.15 This is a schematic diagram of the bottom paving butt joint block structure of the present invention;

[0074] Fig.16 This is a schematic diagram of the structure of the upper press docking block of the present invention;

[0075] Fig.17 This is a schematic diagram of the cross-sectional structure of the joint portion of the concrete hexagonal block of the present invention;

[0076] Fig.18 This is a schematic diagram of the cross-sectional structure of the wave-breaking wall of the present invention;

[0077] Fig.19 This is a schematic diagram of the reinforcement structure of the wave-breaking wall of the present invention;

[0078] Fig. 20 This is a schematic diagram of the frame beam regulation structure of the present invention;

[0079] Fig.21 This is a schematic diagram of the reinforced concrete frame structure of the present invention;

[0080] Fig. 22 This is a schematic diagram of the upstream bridleway structure of the present invention;

[0081] Fig.23 This is a schematic diagram of the downstream horseway structure of the present invention;

[0082] Fig.24 It is a schematic diagram of the cross-sectional structure of the dam top base platform of the present invention;

[0083] Fig.25 This is a schematic diagram of the drainage prism structure of the present invention;

[0084] Fig.26 Schematic diagram of the detection scheme of the present invention.

[0085] In the figure: 1. Main dam, 11. Slotted concrete core wall, 1101. Steel truss, 1102. Pre-buried grouting pipe, 1103. Concrete casting conduit, 1104. Concrete wall, 1105. Slotted positioning channel steel, 1106. Horizontal rack, 1107. Longitudinal rack, 1108. Horizontal fixed bracket, 1109. Inclined rack, 12. Grouting curtain body, 13. Formwork cast-in-place concrete core wall, 1301. Inserted reinforcement, 14. Water-stop copper sheet, 1401. Foam plastic, 1402. PVC rod, 15. Dam top base, 16. Spillway, 17. Spillway, 18. Upstream horseway, 181. Flat gravel cushion, 19. Downstream horseway, 191. Hand swing pebble layer, 110, drainage prism, 11001, prism stone, 11002, concrete precast block, 11003, crushed stone filter layer, 111, crushed stone leveling layer, 112, crushed stone base layer, 113, asphalt concrete surface layer, 2, wave-breaking wall, 21, reinforced concrete, 22, cable groove, 23, rainwater grate, 24, reinforcing ribs, 25, stirrups, 3, upstream dam slope, 31, concrete hexagonal block, 32, bottom paving docking block, 33, upper pressure docking block, 34, external expansion steel bar, 35, docking perforation, 36, T-type docking steel bar, 37, reinforced concrete frame, 4, downstream dam slope, 5, sand and pebble layer, 6, small-grained crushed stone block, 7, inner groove, 8, through hole, 9, polyurea spray coating, 10, auxiliary dam. DETAILED DESCRIPTION

[0086] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0087] Embodiment 1, as Figures 1 to 25 As shown, a dam anti-seepage reinforcement system and a method for detecting the anti-seepage effect of the dam include a dam reinforcement and regulation component, the dam reinforcement and regulation component includes a dam top reinforcement component, a dam body reinforcement component and a dam slope reinforcement component, the dam top reinforcement component is arranged at the top of the dam body, the dam slope reinforcement components are arranged on both sides of the dam body, the dam body includes a main dam 1 and an auxiliary dam 10, and the auxiliary dam 10 is located on both sides of the main dam 1;

[0088] The dam top reinforcement assembly includes a wave-breaking wall 2 and a spillway 16. The upper end of the dam body is connected to a dam top base 15. The wave-breaking wall 2 is cast on the dam top base 15. The spillway 16 is opened on the surface of the dam top base 15.

[0089] The dam body reinforcement assembly includes a dam body longitudinal reinforcement body and a grouting curtain body 12. The grouting curtain body 12 is located below the dam body longitudinal reinforcement body and penetrates into the bottom of the dam foundation. The dam body longitudinal reinforcement body includes a slot-cast concrete core wall 11 and a vertical formwork cast-in-place concrete core wall 13. The slot-cast concrete core wall 11 penetrates into the bedrock of the dam foundation. The vertical formwork cast-in-place concrete core wall 13 is connected to the slot-cast concrete core wall 11. The dam body is reinforced for anti-seepage by using the dam body longitudinal reinforcement body at the dam axis, connected to the dam shoulders on both sides of the dam on the left and right, and connected to the grouting curtain body 12 in the dam foundation in the middle, so as to control the seepage of the dam body and the dam foundation, reduce the dam body infiltration line, and prevent the dam body from being damaged by seepage.

[0090] The dam slope reinforcement components include an upstream dam slope 3 and a downstream dam slope 4. The upstream dam slope 3 and the downstream dam slope 4 have the same structure and are laid in a stepped manner on the upstream and downstream slopes of the dam body respectively. The upstream dam slope 3 is composed of a number of concrete hexagonal blocks 31, bottom-laid docking blocks 32 and upper pressure docking blocks 33.

[0091] Embodiment 2: In addition to all the technical features of Embodiment 1, this embodiment also includes:

[0092] The slotted concrete core wall 11 comprises a steel truss 1101, a pre-buried grouting pipe 1102, a concrete pouring conduit 1103 and a concrete wall 1104. The steel truss 1101 is welded by a transverse frame rod 1106, a longitudinal frame rod 1107 and a diagonal frame rod 1109, and the steel truss 1101 is placed in a slot excavated by the central axis of the dam. The pre-buried grouting pipe 1102 and the concrete pouring conduit 1103 are both inserted in the steel truss 1101, and the steel truss 1101 is internally connected to the steel truss. A concrete wall 1104 is formed by pouring concrete, the pre-buried grouting pipes 1102 are evenly distributed in the steel trusses 1101 provided in each slot, and the concrete pouring conduits 1103 are symmetrically arranged between the pre-buried grouting pipes 1102, a horizontal fixing bracket 1108 is welded on the upper horizontal frame of the steel trusses 1101, a notch positioning channel steel 1105 is welded on the upper end of the pre-buried grouting pipes 1102, and the notch positioning channel steel 1105 is clamped on the horizontal fixing bracket 1108;

[0093] The slot-cast concrete core wall 11 and the formwork cast-in-place concrete core wall 13 are cast together in a concave-convex groove shape, and a number of dowel bars 1301 are vertically inserted at the joint of the slot-cast concrete core wall 11 and the formwork cast-in-place concrete core wall 13. A water-stop copper sheet 14 is stuck at the joint of the formwork cast-in-place concrete core wall 13, and the water-stop copper sheet 14 is filled with foam plastic 1401, and a PVC rod 1402 is stuck at the bending part of the water-stop copper sheet 14 at the joint of the formwork cast-in-place concrete core wall 13.

[0094] The wall thickness of the slot-cast concrete core wall 11 and the formwork-cast concrete core wall 13 of the longitudinal reinforcement of the dam body is calculated as follows:

[0095]

[0096] Where: Calculate thickness for reinforcement; is the reinforcement body permeability coefficient; is the permeability coefficient of the downstream dam shell; is the coefficient; is the allowable hydraulic gradient of the reinforcement; is the allowable hydraulic gradient of the downstream dam shell; is the upstream water depth; is the downstream water depth, H d is the downstream precipitation depth.

[0097] The wave-breaking wall 2 is an "L"-shaped reinforced concrete 21, and a cable groove 22 is provided on the inner side of the bottom end of the wave-breaking wall 2, and a rainwater grate 23 is laid at the upper opening of the cable groove 22. The wave-breaking wall 2 is close to one side of the upstream dam slope 3, and the spillway 16 on the other side of the wave-breaking wall 2 is connected to a plurality of leakage holes 17, and the opening of the leakage holes 17 is located on one side of the downstream dam slope 4. A plurality of reinforcing ribs 24 and stirrups 25 are embedded in the reinforced concrete 21, and the reinforcing ribs 24 are tied to the stirrups 25.

[0098] A sand and gravel layer 5 is laid between the upstream dam slope 3 and the upstream slope of the dam body, a sand and gravel layer 5 is laid between the downstream dam slope 4 and the downstream slope of the dam body, and the gaps in the sand and gravel layer 5 are filled with small-grained gravel blocks 6. The surfaces of the upstream dam slope 3 and the downstream dam slope 4 are sprayed with a polyurea spray layer 9, which plays an anti-seepage protection role for the dam body, and the anti-seepage reinforcement effect can be further enhanced by spraying the polyurea spray layer 9.

[0099] A plurality of reinforced concrete frames 37 are laid on the upstream dam slope 3, and the concrete hexagonal blocks 31, the bottom-laid docking blocks 32 and the upper-pressure docking blocks 33 are respectively laid in the frames formed by each reinforced concrete frame 37, the bottom-laid docking blocks 32 are laid on the lower ends of the concrete hexagonal blocks 31, the upper-pressure docking blocks 33 are laid on the upper ends of the concrete hexagonal blocks 31, and the upper-pressure docking blocks 33 are laid in a stacked manner above the bottom-laid docking blocks 32, the bottom-laid docking blocks 32 are provided with docking through holes 35, the inner side surfaces of the upper-pressure docking blocks 33 are connected with T-shaped docking steel bars 36, and the front ends of the T-shaped docking steel bars 36 pass through the docking through holes 35 and are buried in the gravel layer 5, so that the bottom-laid docking blocks 32 and the upper-pressure docking blocks 33 can be aligned and connected by the T-shaped docking steel bars 36 passing through the docking through holes 35.

[0100] The inner side of the concrete hexagonal block 31 is connected with an outward-expanded steel bar 34, and the outward-expanded steel bar 34 is inserted in the sand and gravel layer 5. The sides of the concrete hexagonal block 31, the bottom paving docking block 32 and the upper pressure docking block 33 are all provided with inner grooves 7. The inner sides of the concrete hexagonal block 31, the bottom paving docking block 32 and the upper pressure docking block 33 are all provided with through holes 8, and the through holes 8 are connected with the inner grooves 7, so that the outward-expanded steel bar 34 can be fixed to achieve the fixed installation of a single concrete hexagonal block 31. In addition, since the openings of the two inner grooves 7 are butt-jointed at the docking surfaces of the concrete hexagonal block 31, the bottom paving docking block 32 or the upper pressure docking block 33, the dam slope soil enters the inner groove 7 during paving to achieve the reinforcement of the docking points of the concrete hexagonal block 31, the bottom paving docking block 32 or the upper pressure docking block 33, which can also play a role in anti-seepage reinforcement.

[0101] The upstream slope of the dam body is also paved with an upstream horseway 18, which is located in the middle part of the upstream dam slope 3, and a flat sand and gravel cushion layer 181 is laid between the upstream horseway 18 and the upstream slope of the dam body. The downstream slope of the dam body is also paved with a downstream horseway 19, which is located in the middle part of the downstream dam slope 4, and a hand-placed large pebble layer 191 is laid between the downstream horseway 19 and the downstream slope of the dam body.

[0102] A drainage prism 110 is laid at the bottom end of the downstream dam slope 4 of the main dam 1. The drainage prism 110 is composed of prism stones 11001, precast concrete blocks 11002 and a crushed stone filter layer 11003. The precast concrete blocks 11002 are laid on the surface of the prism stones 11001, and the crushed stone filter layer 11003 is laid between the prism stones 11001 and the slope surface of the main dam 1.

[0103] The dam top base 15 is composed of a crushed stone leveling layer 111, a crushed stone base layer 112 and an asphalt concrete surface layer 113, and the crushed stone leveling layer 111, the crushed stone base layer 112 and the asphalt concrete surface layer 113 are laid in sequence from bottom to top.

[0104] The upstream slope of the main dam is lined with C25 concrete hexagonal blocks to the upstream horseway 18, which is at an elevation of 391.00m, with a slope ratio of 1:2.5; a C25 concrete foundation beam is set at an elevation of 391.00m; the downstream slope is lined with rectangular frame beams + C25 concrete prefabricated hollow hexagonal blocks, with a frame spacing of 5.0*5.0m; the downstream horseway 19 is rebuilt into a cobblestone road with a width of 7.0m, and the cultural characters "Huacheng Reservoir" are added to the downstream slope of the main dam; the drainage prism is rebuilt with dry block stones, the top of the prism is at an elevation of 377.53m, and 0.6m thick C25 concrete prefabricated blocks are laid on the outside;

[0105] The upstream slope of the auxiliary dam is lined with C25 concrete hexagonal blocks to 2.5m below the dead water level, i.e. at an elevation of 391.80, with a slope ratio of 1:2.5; a C25 concrete foundation beam is set at an elevation of 391.80m; the downstream slope of the auxiliary dam is lined with rectangular frame beams + C25 concrete prefabricated hollow hexagonal blocks, with a frame spacing of 5.0*5.0m;

[0106] The C25 concrete hexagonal blocks used in the upstream slopes of the main dam and the auxiliary dam are concrete slabs, and the thickness of the concrete slabs is determined by the following formula:

[0107]

[0108] Where: t is the thickness of the concrete panel (m); η is the coefficient, which can be taken as 0.075 for the open-jointed plate; 0.10 for the upper open-jointed plate and the lower closed-jointed plate; H is the calculated wave height, which is 1.80m; γ b is the density of the concrete slab (kN / m³), with a value of 23.324kN / m³; γ is the density of water (kN / m³), with a value of 9.8kN / m³; L is the wavelength (m), with a value of 10.38m; B is the length of the guard plate along the slope direction (perpendicular to the water edge) (m), with a value of 114.36; m is the slope gradient, with a value of 2.5;

[0109] The concrete longitudinal reinforcement used in the dam body is arranged along the axis of the dam, with a total length of 770m, a maximum wall depth of 50m, a wall thickness of 60cm, and a wall bottom that penetrates 2.0m into the bedrock.

[0110] The concrete reinforcement of earth-rock dams is subject to a large permeability gradient, and its durability is mainly controlled by seepage erosion. The service life of the concrete reinforcement can be estimated according to the following empirical formula:

[0111]

[0112] Where: a is the volume of water that seeps through concrete when the concrete strength is reduced by 50%. Generally, a=1.5~1.8, and a=1.6 is taken; C is the unit cement dosage of concrete (kg / m 3 ), take c=245kg / m 3 ; L is the seepage diameter, i.e. the wall thickness (m), L=0.6m; k is the permeability coefficient of the wall (m / year), k=0.0142m / year (4.5xl0 -8 cm / s); J is the hydraulic gradient of seepage through the wall, and J=80.

[0113] According to the Unified Standard for Reliability Design of Water Conservancy and Hydropower Engineering Structures (GB50199-2013), the design reference period for the structure of a Class 3 backwater building should be 100 years. According to the above formula, the service life of the reinforcement is more than 100 years, and the durability meets the requirements.

[0114] The design indicators of reinforced concrete are as follows: 28-day cubic compressive strength greater than 10.0MPa, elastic modulus less than 10000MPa, permeability coefficient not greater than 4.5x10 -8 cm / s, impermeability grade W6, permeability gradient allowed is greater than 80;

[0115] The stress review of the reinforcement body is conducted according to the basic load combination and divided into three situations: completion of construction, water storage operation, and sudden drop in water level.

[0116] During the construction completion period, the reinforcement body is placed "uniformly" in the dam body, playing the role of bearing the upstream and downstream loads and resisting deformation. The reinforcement body is in a passive stress state. Therefore, the upstream and downstream homogeneous dam bodies both act on the wall in the form of passive earth pressure;

[0117] Upstream static earth pressure:

[0118]

[0119] Where: g is a fixed parameter; k 1a is the upstream static earth pressure parameter; H1 is the upstream wall height;

[0120] Downstream static earth pressure:

[0121]

[0122] Where: g is a fixed parameter; k 2a is the downstream static earth pressure parameter;

[0123] Because the dam body is a homogeneous earth dam, the internal friction angle of the downstream dam body filling material is consistent with that of the upstream dam body, so:

[0124]

[0125] Therefore, the stress safety factor at the completion of construction is , then:

[0126]

[0127] Theoretically, the stress safety factor during the construction completion period is =1.0, but due to the difference in physical and mechanical properties of the upstream and downstream dam bodies, the actual It is close to 1.0, which is why the reinforcement body still has slight deformation during the construction completion period. However, in any case, the horizontal thrust of the upstream and downstream dam bodies during the construction completion period can basically achieve force balance relative to the reinforcement body.

[0128] During the water storage operation period, the reinforcement body is subject to the horizontal thrust of the upstream water load and the active earth pressure of the upstream soil, and tends to change downstream. At the same time, it is also subject to the passive earth pressure of the downstream soil.

[0129] ① Horizontal thrust of water load

[0130]

[0131] ② Horizontal thrust of upstream soil (active earth pressure)

[0132]

[0133] in

[0134]

[0135] β1 is the toe of the upstream dam slope, β1=15.3°

[0136] Calculate k ´ 1a =0.404

[0137]

[0138] ③ Passive earth pressure of the downstream dam body on the reinforcement body

[0139]

[0140] According to the earth pressure formula, combined with the dam slope conditions, the slope foot angle β takes a negative value, and the reinforcement is a vertical structure, so the passive earth pressure formula can be simplified as follows:

[0141]

[0142] β2 is the foot of the downstream dam slope, β2=19.0°

[0143] Where: k' is the passive earth pressure reduction coefficient, which is related to the friction angle of the dam body. There is a direct relationship. According to the value in Table C.3-1 in Appendix C of the Technical Guidelines for Longitudinal Reinforced Core Wall Earth-Rock Dams, k´=0.95.

[0144] After calculation, k 2p =0.98.

[0145] Passive horizontal thrust of the downstream dam body on the reinforcement body:

[0146]

[0147] Safety factor of force during water storage operation for:

[0148]

[0149] This indicates that the huge horizontal thrust generated by the upstream water load during the water storage operation period causes the core wall of the reinforcement to tend to deform downstream, but the downstream dam body provides resistance to the reinforcement. This resistance (passive horizontal pressure) is 1.14 times the upstream thrust. The reinforcement has a strong "backing" support. Therefore, the reinforcement is safe during water level rise and water storage period (ignoring the bottom fixed end constraint).

[0150] During the sudden drop in reservoir water level, when the reservoir water level drops suddenly, the reinforcement body tends to shift upstream, and the effect of the downstream rockfill on the wall changes from the passive earth pressure in the original water storage period to active earth pressure, and the upstream dam body becomes passive earth pressure on the wall. The most dangerous working condition is that the upstream water load is unloaded and the upstream dam body has not yet been drained and is in a saturated state as a whole;

[0151] ① The upstream saturated dam body is a passive area, and its passive earth pressure is:

[0152]

[0153] in:

[0154]

[0155] Where: 1m is the saturated density of the upstream dam body. At this time, φ1 adopts the saturated undrained strength index, k´ is taken as 0.64, g is a fixed parameter, and k is calculated to be 1p ´=0.82

[0156]

[0157] ② Active earth pressure of the downstream dam body on the reinforcement body:

[0158]

[0159] in

[0160]

[0161] Safety factor of force during water level drop period :

[0162]

[0163] This indicates that the active horizontal thrust generated by the downstream dam body under the condition of sudden water level drop causes the core wall of the reinforcement to tend to deform upstream, but it obtains the resistance of the upstream saturated dam body to the reinforcement. This resistance (passive horizontal pressure) is 2.61 times the upstream thrust. The reinforcement also has a strong "backing" support behind it (i.e. the upstream side). The reinforcement is also safe under this condition (ignoring the bottom fixed end constraint).

[0164] Embodiment 3: In addition to all the technical features of Embodiment 1, this embodiment also includes:

[0165] The reinforcement system also includes reinforcement and renovation of the spillway, drain hole, water intake project, transportation project and housing construction project of the dam body, and the reinforcement system also includes termite detection of the dam body, including:

[0166] The spillway is reinforced and improved. The spillway includes two overflow weirs on the left and right sides. The left and right overflow weirs are removed and rebuilt with C25 reinforced concrete. Drainage holes are set in the retaining wall at the fish mouth of the spillway.

[0167] Strengthen and renovate the vent tunnel, expand the entrance gate room of the vent tunnel; replace the trash rack, emergency gate slot, gate leaf, embedded parts, and opening and closing equipment; and carry out anti-seepage treatment on the tunnel body;

[0168] The water intake project is reinforced and renovated. The water intake project consists of three parts: the water intake pump station, the water intake lock chamber, and the water intake. For the water intake pump station, the water pump is replaced and the pump room is rebuilt. For the water intake lock chamber, the gate is replaced and the lock room is rebuilt. For the water intake, the metal electromechanical equipment is replaced;

[0169] Traffic engineering reinforcement and renovation, construction of a new dam foot patrol road, and renovation of the existing dam foot patrol road; construction of a new wharf and demolition and reconstruction of the right spillway highway bridge;

[0170] Strengthen and renovate housing construction projects, build new intelligent buildings, and renovate the water intake lock chambers of water intake projects;

[0171] For termite detection, we use green biological + information-based prevention and control technology to conduct a three-year termite monitoring and control cycle. We install two sets of termite monitoring systems. In the first two years, the termite observation station and termite monitoring device are replaced every two months, and termite control is carried out every two months.

[0172] The reinforcement and remediation of the venting pit specifically includes:

[0173] The venting bottom tunnel is located in the bedrock of the auxiliary dam and is designed as a pressure tunnel, consisting of an inlet section, a tunnel section and an outlet section;

[0174] For the inlet section, the inlet section is 34 meters long, with a bottom plate elevation of 377.80m. It consists of an inlet culvert, a trumpet gradient section and a shaft lock chamber section. The culvert is 20m long, 6.2m high and 3.2m wide, lined with 50cm thick C15 concrete, and backfilled with C10 concrete on the outside. C10 concrete "eight" retaining walls are set on the left and right sides of the water inlet. The trumpet mouth gradient section is 9.5m long, and the front is connected to the shaft lock chamber by the culvert and gradient. The inlet is 3m wide, 6.2m high, and 1.8m high at the outlet. The cavity in the trumpet is supported by 4 C20 reinforced concrete beams at an elevation of 388.5m. A 75-degree inclined trash rack is set in front of the trumpet mouth, and a 50-80cm thick C20 reinforced concrete lining is inspected at an elevation of 395m. A φ50 platform is set behind the door to lift the trash rack C20 reinforced concrete column. The vertical shaft lock chamber is 6m long and 3m wide, and the gate well is a 4cm diameter vent. The well is 29.8m high and 23m inside the mountain. A maintenance platform is set up at the top of the well at an elevation of 409.8m, and it is connected to the top of the auxiliary dam by a traffic bridge. The bridge is 16m long, 2.5m wide, and has two spans. The middle pier is a gate-type C20 reinforced concrete frame, 5m high. The bridge deck is 15cm thick C20 reinforced concrete, and φ50 steel pipe galvanized railings are set on both sides. A starting and closing platform is set up at an elevation of 414.8m, and an antique flying eaves pavilion lockhouse is built on it. The metal flat gate is 1.8×1.8m steel, and it is opened and closed by a winch.

[0175] For the tunnel body section, the tunnel body is a circular pressure hole with a diameter of 1.8m. The total length is 274m, the gradient is I=1 / 500, the entrance is a square to round gradient section of 5m, reinforced concrete lining, 30cm thick. The design is divided into 26 sections, with permanent joints between sections, rubber water stop strips for water stop, and consolidation grouting for the tunnel body.

[0176] For the exit section, the exit section is 57 meters long and consists of reinforced concrete pressure pipes, cone valves, operating rooms, energy dissipation pools, culverts and drop sections. The tunnel exit working door is a φ1.4m cone valve, and the valve body is arranged at a 45-degree angle. Energy dissipation pools are used. The energy dissipation pool is rectangular, with a length and width of 5.6m and a height of 6m. The reinforced concrete lining of the pool wall is 50cm thick, the upper part is a concrete gravity retaining wall, and the pool bottom plate is 50cm thick.

[0177] Import section renovation

[0178] (1) Entrance lock house

[0179] The entrance gate of the vent hole is expanded according to the original building form. It adopts a double-layer hexagonal pavilion with a column spacing of 1.8m and an area of ​​about 35m 2 The main structure of the pavilion is made of reinforced concrete and covered with glazed tiles. Except for the doors and windows added to the pavilion columns, the rest are all painted with iron oxide red three times and polyurethane five times; the pavilion columns are painted with bright red paint three times.

[0180] (2) Inlet gate

[0181] The maintenance platform of the venting bottom hole is above the verified flood level and is open. The space meets the needs of equipment maintenance, so only the door slot and embedded parts are dismantled and rebuilt, and the gate is replaced;

[0182] Cave body renovation

[0183] (1) Venting tunnel grouting

[0184] ① Grouting requirements According to the "Specifications for the Design of Hydraulic Tunnels" (SL279-2016), the spacing of consolidation grouting holes is 2m, with a total of 6 grouting holes arranged symmetrically, and a total footage of 12m; the grouting pressure is 1-2 times the internal water pressure; the borehole external insertion angle is controlled at 10 to 15 degrees; the shallow consolidation grouting holes are drilled by pneumatic drills, and when the bedrock section length of the grouting hole is less than 6m, the entire hole can be grouted at one time. The plane hole layout forms include plum blossom, square and hexagonal shapes; the grouting material is mainly cement slurry. In areas with developed rock joints and fissures, when the slurry consumption is large, cement mortar is often used instead. When grouting, start with thin slurry and gradually thicken it until the end standard is reached.

[0185] ② Grouting location: The grouting axis of the auxiliary dam is directly opposite to the tunnel (grouting of the auxiliary dam is stopped at 1.5m away from the tunnel), grouting at one location;

[0186] (2) Spraying polyurea elastic material on the vent tunnel. The polyurea elastomer material model is SPUA-SKJ. The spraying length is 287m. The specific construction steps include:

[0187] (1) Base surface treatment

[0188] The inner lining surface of the area to be sealed is ground with a grinding wheel. The floating slurry is required to be ground off to expose the concrete aggregate without leaving any steps. After the grinding wheel treatment, the base layer is checked. The uneven parts, holes and cracks of the base layer are filled and smoothed with epoxy resin putty thick polymer cement mortar, and then polished after the smoothing material is solidified;

[0189] The tunnel is constructed in sections. After grinding, it is cleaned with high-pressure air. No foam board residue, concrete ash and dust should be left to form a fresh base surface.

[0190] (2) Primer construction

[0191] Use epoxy primer, apply the first coat and then use epoxy putty to repair defects. After the putty is dry, apply the second coat of epoxy primer (sealed putty). After the surface is dry, apply polyurethane primer within 48 hours;

[0192] (3) Edge protection

[0193] After the primer is applied, in order to avoid contamination of the concrete surface other than the spraying working surface and to protect the cleanliness of the polyurea spraying surface, it is necessary to stick kraft paper or other materials on both sides of the polyurea spraying for edge protection, and cover the areas that do not need to be sprayed with kraft paper;

[0194] (4) Polyurea spraying construction

[0195] Before spraying polyurea, test spraying should be carried out to determine the spraying effect, such as the spraying speed, gel time, etc. When the polyurea is sprayed to the base layer, it is almost gelled. The gel time of 5 to 10 seconds for the coating to be completely cured is more reasonable. When the gel time is longer, the polyurea spraying will flow, resulting in uneven polyurea thickness. Before spraying, it is necessary to confirm whether the discharge volume and mixing ratio are normal. The reference dosage is 1.2 kg / ㎡ of paint per millimeter.

[0196] Spray the same position 2 to 4 times, spray continuously vertically and horizontally to the required thickness; keep the spray gun nozzle 60 to 100 cm vertically to the spraying surface, and move the gun at 3 / 4 to 4 / 5 of a gun, and control the travel speed at about one step every 2 seconds; spray as thinly as possible for the first time. After spraying the first time at the same position, wait for the coating to solidify for about 1 minute before spraying the second time;

[0197] The thickness of polyurea coating shall not be less than 3mm.

[0198] Spraying environment: It is best to be carried out at a temperature of 10~50℃ and a relative humidity of less than 85%.

[0199] During spraying construction, the surface should be flat, without pores, bubbles or wrinkles; the coating thickness should be uniform, and there should be no water or dust between layers to ensure good adhesion of each layer.

[0200] (5) Polyurea trimming

[0201] After spraying, trim the edge of the polyurea in time to achieve a smooth and beautiful effect;

[0202] (6) Protection

[0203] After the construction is completed, pay attention to maintenance and take protective measures in the bottom spraying area to avoid damage to the sprayed polyurea;

[0204] Exit section renovation

[0205] (1) Outlet cone valve chamber

[0206] The conical valve chamber adopts a single-layer four-corner pavilion with a column spacing of 3.6m and an area of ​​about 25m 2 The main structure of the pavilion is made of reinforced concrete and covered with glazed tiles. Except for the doors and windows added to the pavilion columns, the rest are all painted with iron oxide red three times and polyurethane five times. The pavilion columns are painted with bright red paint three times.

[0207] (2) Export energy dissipation facilities

[0208] ①Structural design of energy dissipation facilities

[0209] 1) Cone valve outlet first-stage stilling pool

[0210] The outlet of the cone valve at the end of the venting facility is connected to the energy dissipation pool, which adopts a well-type energy dissipation method. The energy dissipation pool is cast-in-place with C30 reinforced concrete. The clear dimensions of the energy dissipation pool are 10.0m long, 6.5m wide, 5.2m deep (net depth 2.49m), and the bottom plate is 0.6m thick; the bottom plate elevation is 376.62m, and the side walls on both sides of the energy dissipation pool are straight walls with a thickness of 0.8m. Anchor rods are inserted between the side walls and the rock mass. The anchor rods are Φ25 cement mortar anchor rods (L=2m), and the elevation of the side walls on both sides is 379.16m; the energy dissipation pool is connected to the original open channel;

[0211] 2) Secondary energy dissipation pool

[0212] The end of the open channel is connected to the stilling pool, which adopts the bottom flow energy dissipation method. The bottom plate of the stilling pool is cast in place with C30 reinforced concrete. The clearance size of the stilling pool is 6.0m long, 8.0m wide, 1.0m deep, and the bottom plate thickness is 0.6m; the bottom plate elevation is 365.40m, and the side walls on both sides of the stilling pool adopt C25 concrete gravity retaining wall structure. The side wall dimensions are top width 0.5m, bottom width 1.83m, back slope 1:0.3, foundation height 0.6m, tooth wall width 0.4m, and the elevation of the side walls on both sides is 368. 50m; in order to prevent scouring and water from flowing everywhere, the energy dissipation pool is connected to the highway culvert through an open channel; the open channel bottom plate is cast-in-place with C30 reinforced concrete, the bottom plate thickness is 0.4m, and the outlet bottom plate elevation is 366.40m; the side walls on both sides are C25 concrete gravity retaining wall structure, the side wall dimensions are top width 0.5m, bottom width 1.53m, back slope 1:0.3, foundation height 0.6m, tooth wall width 0.4m; the open channel outlet width is 8.0m, the tail end width is 11.60m, and it is connected to the road box culvert;

[0213] ② Calculation of energy dissipation at the cone valve outlet

[0214] The outlet water flow is treated for energy dissipation; the treatment method is: the outlet of the cone valve is connected to the well-type energy dissipation pool, and after the well-type energy dissipation, it is returned to the downstream channel;

[0215] To ensure that the tail of the discharge hole will not be damaged during emergency discharge and can work normally to ensure the safety of the dam, the energy dissipation of the diversion and discharge hole in this stage is designed according to the maximum discharge flow rate.

[0216] The calculation formula for well-type energy dissipation is:

[0217]

[0218] Where: L, D are well length and well depth respectively; Fr0 is the inlet Froude coefficient; h0 is the inlet water depth, 1.4m; ν0 is the outlet water velocity; g is a fixed parameter;

[0219] After calculation, the reservoir is emptied at normal water level, with a flow rate of 28.45m 3 / s (maximum flow rate 11.38m / s), the stilling pool depth is 2.0m, the pool length is 4.60m. As the water flow of the cone valve spreads far, for safety reasons and to meet the installation and layout requirements of the cone valve while being subject to the location of the area, the stilling pool depth is 5.2m, width is 6.5m, and the pool length is 10m.

[0220] ③Energy dissipation and anti-scouring hydraulic calculation

[0221] 1) Hydraulic calculation of energy dissipation section

[0222] According to the "Hydraulic Calculation Manual", the downstream energy dissipation and anti-scouring adopts the bottom flow energy dissipation method. After the downstream flood falls into the energy dissipation pool, it flows into the through-road box culvert through the open channel;

[0223] a The conjugate water depth h2 of the free water jump is calculated according to the following formula

[0224]

[0225] The above formula L is applicable to Fr1=5.5~9.0. When Fr1=1.7~9.0, it can be used

[0226]

[0227] Where: Fr1 is the Froude number of the contraction section; h1 is the water depth of the contraction section, m; v1 is the flow velocity of the contraction section, m / s; L is the length of the free water jump, m; the calculation results are shown in Table 1:

[0228] Table 1 is the calculation results of free water jump conjugate water depth and water jump

[0229]

[0230] b Calculation of excavated stilling pool

[0231] According to the "Hydraulic Calculation Manual", the depth d and length Lk of the excavated energy dissipation pool of equal width rectangular section are calculated according to the following formula:

[0232]

[0233] Where: σ is the water jump flooding, which can be taken as σ=1.05; h2 is the water depth after the critical water jump occurs in the pool, m; ht is the water depth downstream of the stilling pool outlet, m; ΔZ is the water level drop at the tail outlet of the stilling pool, m; Q is the flow rate, m 3 / s; b is the width of the stilling pool, m; φ is the velocity coefficient of the stilling pool outlet section, which can be taken as φ=0.95; L k is the length of the stilling pool; g is a fixed parameter; the calculation results are shown in Table 2:

[0234] Table 2 Calculation results of excavated stilling pool

[0235]

[0236] According to the calculation results and the terrain conditions at the energy dissipation pool, the designed energy dissipation pool depth is 1.0m and the energy dissipation pool length is 6.0m.

[0237] ④Tailrace hydraulic calculation

[0238] According to the hydraulic calculation of the stilling pool, the downstream water depth is 1.09m. In order to ensure that the flow capacity of the tailwater channel reaches 28.48m 3 / s, so the downstream water depth is 1.49m and the channel flow capacity meets the requirements.

[0239] According to the channel hydraulic calculation in the "Hydraulic Calculation Manual", the channel water depth is calculated according to the following formula: H=h / 4+0.2+h.

[0240] In the formula: H is the channel height, m; h is the channel water depth, m; the calculated channel height is 2.0625m, so the channel height is taken as 2.1m.

[0241] ⑤Side wall (retaining wall) stability calculation

[0242] A. The anti-sliding stability safety factor of the retaining wall is calculated as follows:

[0243]

[0244] Where: K C is the anti-sliding stability safety factor; ΣW is the sum of all vertical forces acting on the wall (kN); ΣP is the sum of all horizontal forces acting on the wall (kN); f is the friction coefficient between the bottom plate and the wall foundation, which is taken as 0.5;

[0245] B. The anti-tilt stability safety factor of the retaining wall is calculated as follows:

[0246]

[0247] Where: K0 is the anti-tilting stability safety factor; Mv is the anti-tilting stability safety factor (kN·m); M H is the anti-overturning moment (kN·m);

[0248] C. The compressive stress at the base of the retaining wall is calculated as follows:

[0249]

[0250] Where: max、min is the maximum and minimum compressive stress of the base (kPa); ΣG is the vertical load (kN); A is the base area (m 2 );ΣM is the moment of the load on the centroidal axis of the bottom plate (kN·m);ΣW is the section coefficient of the bottom plate (m 3 );

[0251] 3) Calculation parameters and load combinations

[0252] Calculate load combinations according to code requirements, including basic load combinations and special load combinations;

[0253] The load combinations for the stability calculation of retaining walls are shown in Table 3:

[0254] Table 3 is the load combination table of gravity retaining wall

[0255]

[0256] Calculation results: Anti-sliding stability and anti-overturning stability calculations are carried out according to the above method. The calculation results are shown in Table 4 below:

[0257] Table 4 is the calculation results of the anti-sliding and anti-overturning stability of the gravity retaining wall

[0258]

[0259] From the calculation results in the table, it can be seen that the anti-slip and anti-tilt safety factors of the gravity retaining wall under various working conditions meet the requirements of the specifications, so the retaining wall structure design meets the requirements of the specifications.

[0260] Culvert renovation of the exit section of the highway

[0261] The current status of the outlet of the discharge tunnel is a culvert with the bottom elevation of 367.20m and the elevation of the dam foot at 366.80m. When the reservoir releases water or it rains, it will cause water accumulation and backflow to the dam foot, affecting the discharge of water and the safety of the dam.

[0262] The original culvert was rebuilt into a box culvert. The design of the box culvert was in accordance with the General Specification for Highway Bridge and Culvert Design (JTG / D60-2015). The road involved in the reconstruction of the box culvert was a Class IV highway, and no design flood frequency was required. In addition, since the maximum inflow through the box culvert was the emptying bottom hole, the design flood frequency was 28m. 3 / s flow rate determines the size of the box culvert. The box culvert adopts a double-hole form, with a single span net width of 5.0m and a height of 3.6m. The box culvert body is cast in C30 reinforced concrete, with a side wall height of 4.6m and a thickness of 0.45m; the top of the culvert is 0.5m thick and the bottom plate is 0.5m thick; the culvert foundation is 0.1m thick C20 concrete, with a 0.5-0.9m thick gravel cushion layer underneath, and a 17m long gradient diversion wall is set at the outlet, using C20 concrete block stone.

[0263] Traffic engineering reinforcement specifically includes:

[0264] Road reinforcement

[0265] This project built two roads with a total length of 393 meters, of which the newly built road on the left bank downstream of the dam is 193 meters long and 2.5 meters wide; the road on the right bank downstream of the dam is 200 meters long and 4.0 meters wide. Both roads are paved with asphalt.

[0266] The pavement design is based on the construction experience of similar projects at home and abroad, and the geological conditions, climate conditions, road construction materials and traffic volume along the route. The asphalt concrete pavement structure is selected with reasonable structure, technical feasibility, noise reduction, convenient construction and convenient maintenance.

[0267] Among them, the upper layer: 5cm asphalt concrete surface layer (AC-13); base layer: 20cm5% cement stabilized gravel base layer; cushion layer: 5cm gravel leveling layer; total thickness: 50cm; soil base rebound modulus is not less than 25Mpa;

[0268] Pier reinforcement

[0269] Two new cruise ship piers with a total area of ​​189m 2 The wharf structure is in the form of steps, which are cast in place with C25 concrete. The steps are 0.8m wide and 0.2m high. A C25 reinforced concrete column is set every 4m on the steps. It is 0.5m high, 0.2m wide and 0.2m thick. The wharf is suitable for berthing boats with 1 to 4 people, and the height from the platform to the water surface does not exceed 0.5m.

[0270] Reconstruction of the right spillway arch bridge

[0271] The existing bridge at the right spillway chute section is a 1-11m top-supported solid-web arch bridge. The bridge was built a long time ago and is currently damaged in many places, and it cannot meet the needs of reservoir flood discharge. This design considers demolition and reconstruction. According to the requirements of the "General Specification for Highway Bridge and Culvert Design" (JTG / D60-2015), the bridge to be rebuilt is located on Huazi Road, which is a fourth-class highway. The span of the bridge to be rebuilt is 20m, which is a medium bridge, and the design flood standard is once in 50 years. Because this bridge is located in the spillway chute section, the design flood standard is once in 100 years. The proposed bridge span adopts a 1-20m prestressed concrete simply supported hollow slab bridge, the bridge width is 6m, the total length of the bridge is 32m, the abutment adopts a gravity abutment, and the foundation is expanded.

[0272] (1) Superstructure

[0273] The bridge span is arranged as 1×20m prefabricated hollow slab beams, using 2 middle beams, 2 side beams, and a total of 4 hollow slab beams;

[0274] The structural system of this bridge is a simply supported structure. The 20m-span hollow slab beam is designed as a Class A prestressed concrete component. The transverse connection between hollow slabs adopts tongue-and-groove joint concrete connection. The design calculation adopts plane bar structure calculation software. The cast-in-place layer of the bridge deck participates in the structural force. The transverse load distribution coefficient adopts the hinged plate method. The longitudinal prestressed steel bundle of the hollow slab beam is a web bundle.

[0275] (2) Lower structure design

[0276] The abutments are gravity abutments with enlarged foundations;

[0277] (3) Design parameters

[0278] 1) Concrete: gravity density γ = 26.0 kN / m 3 , elastic modulus is E=3.45×104MPa;

[0279] 2) Asphalt concrete: gravity density γ = 24.0 kN / m 3 ;

[0280] 3) Prestressed steel bars: elastic modulus Ep = 1.95 × 105 MPa, relaxation rate ρ = 0.035, relaxation coefficient ξ = 0.3;

[0281] 4) Anchor: Anchor deformation and steel bar shrinkage are calculated as 6mm (one end); the friction coefficient of the metal bellows is μ=0.25, and the deviation coefficient is κ=0.0015.

[0282] Housing construction reinforcement specifically includes:

[0283] New intelligent building

[0284] The newly built intelligent building at Huacheng Reservoir is a single 3-story frame structure office building with a design service life of 50 years, a structural safety level of Level 2, a building fortification intensity of 6 degrees (one group), a seismic fortification category of Class C, a site category of Class II, a design characteristic period of 0.35S, and a design basic acceleration value of 0.05g. Design service life: 50 years; building height 11.63m; 3 floors above ground; building area: 560.88㎡

[0285] Roof type: (from top to bottom): crushed stone, pebble concrete 1 (40.0mm) + SBS modified asphalt waterproof membrane (4.0mm) + cement mortar (20.0mm) + extruded polystyrene foam (without skin) (60.0mm) + cement mortar (20.0mm) + fly ash ceramsite concrete (density 1100) (20.0mm) + reinforced concrete (120.0mm);

[0286] External wall type (including non-light-transmitting curtain wall): clay porous brick (KP1 type) (200.0mm) + cement mortar (20.0mm) + rock wool tape (80-120) (35.0mm);

[0287] Overhead or cantilevered floor slabs with bottom exposed to outdoor air: cement mortar (20.0mm) + rock wool tape (80-120) (35.0mm) + reinforced concrete (120.0mm) + lime cement mortar (20.0mm);

[0288] External window type (including light-transmitting curtain wall): Insulated metal profile Kf=5.8W / (m2·K), frame area 20% (6 high light transmittance Low-E+12 air+6 transparent), heat transfer coefficient 2.70W / m2.K, glass solar thermal conductivity 0.46, air tightness 6 level, visible light transmittance 0.68;

[0289] The established termite monitoring system is based on the biological habits of termites. The multiple activity traces of termites, especially the foraging activity ant paths, are distributed radially, with semicircular and circular feeding rings, and the longest can reach 100 meters. Due to the serious damage caused by termites in the reservoir, it is planned to install two monitoring systems on the dam and set up 16 termite observation stations, with a distance of 80 meters between each observation station; the termite observation station will be replaced every two months;

[0290] Bury termite monitoring devices on the reservoir to assist in monitoring termite damage and further determine the type and level of damage of termites;

[0291] For termite control, termite control biological trapping bags are buried at multiple points on the embankment. The embankment area is 62,800 square meters. The first time, 2 square meters per bag is buried on the embankment to induce a large number of termite workers to leave the nest and quickly eat the biological trapping bags. Later, according to the gradual reduction of termite damage, the number of bags buried last time is reduced by 10%;

[0292] Termite control biological trapping bag 5g / bag, contains termite pheromone and termite pathogenic bacteria, the working principle is to use the attractant pheromone and tracer pheromone to lure termites to feed on the biological trapping bag, and pass the pathogenic bacteria in the biological trapping bag to the termite colony, causing an epidemic of pathogenic bacteria in the termite colony, thereby causing large-scale death of termite colonies; the biological trapping bag for termite control is non-toxic to humans (livestock) and natural enemies of termites, is environmentally friendly, and does not damage dams;

[0293] According to the treatment steps for dangerous reservoirs, termite paths and nests are injected and sprayed with residual spray; the drug Brevicococcus used is a national green control product with no residue on soil and water quality;

[0294] (1) First time: In accordance with the steps for the treatment of dangerous reservoirs, termite paths and nests were grouted before grouting, and 31,400 packages of biological missiles for termite control were buried;

[0295] (2) Second time: After grouting, residual spraying of drugs was carried out on the embankment to repel living termites from moving on the embankment, and 28,260 packages of termite control biological missiles were buried;

[0296] (3) The third time: Two termite monitoring systems were installed on the embankment, 16 termite observation stations were buried, and 58 termite traps were buried;

[0297] (4) The fourth to eleventh time: burying termite biological missiles on the embankment at a rate of 10%, burying termite traps, and replacing termite observation stations;

[0298] (5) Twelfth to Sixteenth: Bury termite traps and replace termite observation stations; continue to monitor termite damage.

[0299] Embodiment 4, as Fig.26 As shown, a method for detecting the anti-seepage effect of a dam is provided. The method analyzes and calculates the dam seepage, dam stability, reservoir deformation, reservoir flood control and chute water surface line, and specifically includes:

[0300] S1. Dam seepage analysis. Seepage calculation takes the largest cross section of the dam body, conducts leakage analysis according to Darcy's law of hydraulics, and uses finite element method for seepage calculation analysis;

[0301] Applying Darcy's law and assuming that the permeability gradient of each point in any vertical water-passing section is equal, for a rectangular soil body on an impermeable foundation, the average flow velocity across the section is V=-Kd y / d x ;

[0302] Single width flow: q=Vy=-K y d y / d x ;

[0303] Integrate from upstream to downstream:

[0304]

[0305] in, is the permeability coefficient, d y / d x is the integral of the water-passing section, L is the length of the seepage path, H1 is the height of the upstream water section, H2 is the height of the downstream water section, and y is the water-passing section;

[0306] S2. Dam stability analysis and anti-sliding stability review adopt the earth-rock dam stability and seepage analysis system AUTOBANK7.7 jointly developed by Hohai University and Yellow River Survey, Planning and Design Co., Ltd. (formerly the Yellow River Conservancy Commission Survey, Planning and Design Institute of the Ministry of Water Resources). Stability calculation adopts the Bishop method that does not take into account the inter-slab forces;

[0307] S3. Observation and analysis of reservoir deformation. Several horizontal displacement measuring points and several settlement displacement measuring points are set on the top of the dam body. The horizontal displacement observation adopts the sight line method, and the observation instrument is the J07--7806 theodolite. The settlement displacement observation adopts the C32 automatic level. The data of each measuring point is collected at a certain interval, and the deformation line graph is drawn in combination with the displacement observation data of previous years. The deformation of the reservoir is analyzed according to the graph;

[0308] S4. Flood regulation calculation. The principle of reservoir flood regulation calculation is: without considering flood forecast and pre-emptied flood control storage capacity, when the reservoir water level is higher than the normal water level (i.e. the elevation of the spillway crest) by 405.80m, the spillway is open and free to discharge flood;

[0309] The discharge capacity of the spillway is calculated according to Formula A.2.3 of the Spillway Design Code (SL253-2000):

[0310]

[0311] Where: is the water flow rate, m 3 / s; is the lateral contraction coefficient, m is the discharge coefficient, b is the width of the spillway orifice, n is the number of orifices, and g is a fixed parameter;

[0312]

[0313] in: is the shape coefficient of the side pier, the side pier is a right angle type; is the shape coefficient of the middle pier; H0 is the total water head of the starting calculation section (including the flow velocity), , m; b is the width of the spillway opening.

[0314] S5. Calculation of the chute water surface line. According to the Spillway Design Code SL253-2018, the water depth h1 of the starting calculation section is calculated according to the following formula:

[0315]

[0316] Where: H0 is the total water head of the starting calculation section, m; q is the single width flow of the starting calculation section, m 3 / sm; θ is the slope angle of the chute bottom; is the velocity coefficient of the initial calculation section; g is a fixed parameter;

[0317] The chute water surface line is calculated by the following segmented summation method:

[0318]

[0319] Where: θ is the bottom slope angle of the chute; h1 is the water depth at the starting end; h2 is the water depth at the end; ɑ1 is the correction coefficient at the starting end; ɑ2 is the correction coefficient at the end; ν1 is the flow velocity at the starting end; ν2 is the flow velocity at the end; g is a fixed parameter; is the average friction slope within the segment; is the water level difference between the starting water depth and the ending water depth, is the bottom slope of the chute;

[0320] According to the Hydraulic Design Manual, the aerated water depth is calculated according to the following formula:

[0321]

[0322] Where: h, h b are the water depth of the calculated section of the chute and the water depth after aeration, m; v is the flow velocity of the calculated section of the chute without aeration, m / s; ζ is the correction coefficient.

[0323] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0324] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A dam anti-seepage reinforcement system, comprising a dam reinforcement and regulation component, characterized in that: The dam reinforcement and regulation components include a dam top reinforcement component, a dam body reinforcement component and a dam slope reinforcement component, wherein the dam top reinforcement component is arranged at the top of the dam body, the dam body reinforcement component is arranged longitudinally on the axis of the dam, and the dam slope reinforcement components are respectively arranged on both sides of the dam body, wherein the dam body includes a main dam (1) and an auxiliary dam (10); The dam top reinforcement assembly comprises a wave-breaking wall (2) and a water spillway (16); the upper end of the dam body is connected to a dam top base (15); the wave-breaking wall (2) is cast on the dam top base (15); and a water spillway (16) is provided on the surface of the dam top base (15); The dam body reinforcement assembly comprises a dam body longitudinal reinforcement body and a grouting curtain body (12), wherein the grouting curtain body (12) is located below the dam body longitudinal reinforcement body and the grouting curtain body (12) penetrates into the bottom of the dam foundation, and the dam body longitudinal reinforcement body comprises a slot-cast concrete core wall (11) and a formwork cast-in-place concrete core wall (13), wherein the slot-cast concrete core wall (11) penetrates into the bedrock of the dam foundation, and the formwork cast-in-place concrete core wall (13) is connected to the top of the slot-cast concrete core wall (11); The dam slope reinforcement assembly comprises an upstream dam slope (3) and a downstream dam slope (4), the upstream dam slope (3) and the downstream dam slope (4) having the same structure, and the upstream dam slope (3) and the downstream dam slope (4) are respectively laid on the upstream and downstream slope surfaces of the main dam (1) in a stepped manner, and the upstream dam slope (3) is composed of a plurality of concrete hexagonal blocks (31), bottom-laid butt joint blocks (32) and upper-pressed butt joint blocks (33) spliced ​​together; The slot-cast concrete core wall (11) comprises a steel truss (1101), a pre-buried grouting pipe (1102), a concrete casting conduit (1103) and a concrete wall (1104); the steel truss (1101) is welded from a transverse frame rod (1106), a longitudinal frame rod (1107) and a diagonal frame rod (1109); the steel truss (1101) is placed in a slot excavated by the central axis of the dam; the pre-buried grouting pipe (1102) and the concrete casting conduit (1103) are both inserted in the steel truss (1101); and the steel truss (1101) A concrete wall (1104) is formed by pouring concrete inside, the pre-buried grouting pipes (1102) are evenly distributed in the steel trusses (1101) provided at each slot, and the concrete pouring conduits (1103) are symmetrically arranged between the pre-buried grouting pipes (1102), a horizontal fixing bracket (1108) is welded to the upper horizontal frame of the steel trusses (1101), a notch positioning channel steel (1105) is welded to the upper end of the pre-buried grouting pipes (1102), and the notch positioning channel steel (1105) is clamped on the horizontal fixing bracket (1108); The slot-cast concrete core wall (11) and the formwork cast-in-place concrete core wall (13) are butt-jointed and cast together in a concave-convex groove shape; a plurality of dowel bars (1301) are vertically inserted at the joint between the slot-cast concrete core wall (11) and the formwork cast-in-place concrete core wall (13); a water-stop copper sheet (14) is clamped at the joint of the formwork cast-in-place concrete core wall (13); the water-stop copper sheet (14) is filled with foam plastic (1401); and a PVC rod (1402) is clamped at the bending portion of the water-stop copper sheet (14) at the joint of the formwork cast-in-place concrete core wall (13).

2. A dam anti-seepage reinforcement system according to claim 1, characterized in that: The wall thickness of the slot-cast concrete core wall (11) and the formwork-cast concrete core wall (13) of the longitudinal reinforcement of the dam body is calculated according to the following formula: Where: δ is the calculated thickness of the reinforcement; K e is the permeability coefficient of the reinforcement body; K2 is the permeability coefficient of the downstream dam shell; α is the coefficient; i ce is the allowable hydraulic gradient of the reinforcement; i c2 is the allowable hydraulic gradient of the downstream dam shell; H1 is the upstream water depth; H2 is the downstream water depth, H d is the downstream precipitation depth.

3. A dam anti-seepage reinforcement system according to claim 1, characterized in that: The wave-breaking wall (2) is an "L"-shaped reinforced concrete (21), and a cable groove (22) is provided on the inner side of the bottom end of the wave-breaking wall (2), and a rainwater grate (23) is laid at the upper opening of the cable groove (22). The wave-breaking wall (2) is close to the side of the upstream dam slope (3), and the drain channel (16) on the other side of the wave-breaking wall (2) is connected to a plurality of drainage holes (17), and the opening of the drainage holes (17) is located on the side of the downstream dam slope (4). A plurality of reinforcing ribs (24) and stirrups (25) are embedded in the reinforced concrete (21), and the reinforcing ribs (24) are tied to the stirrups (25).

4. A dam anti-seepage reinforcement system according to claim 1, characterized in that: A sand and gravel layer (5) is paved between the upstream dam slope (3) and the upstream slope of the dam body, a sand and gravel layer (5) is paved between the downstream dam slope (4) and the downstream slope of the dam body, and the gaps in the sand and gravel layer (5) are filled with small-grained gravel blocks (6), and the surfaces of the upstream dam slope (3) and the downstream dam slope (4) are sprayed with a polyurea spray layer (9).

5. A dam anti-seepage reinforcement system according to claim 4, characterized in that: A plurality of reinforced concrete frames (37) are laid on the upstream dam slope (3), and the concrete hexagonal blocks (31), bottom-laid docking blocks (32) and upper-pressure docking blocks (33) are respectively laid in the frames formed by each reinforced concrete frame (37), the bottom-laid docking blocks (32) are laid on the lower end of the concrete hexagonal blocks (31), the upper-pressure docking blocks (33) are laid on the upper end of the concrete hexagonal blocks (31), and the upper-pressure docking blocks (33) are laid in a stacked manner above the bottom-laid docking blocks (32), the bottom-laid docking blocks (32) are provided with docking through holes (35), the inner side surface of the upper-pressure docking blocks (33) is connected to a T-shaped docking steel bar (36), and the front end of the T-shaped docking steel bar (36) passes through the docking through holes (35) and is buried in the sand and gravel layer (5).

6. A dam anti-seepage reinforcement system according to claim 5, characterized in that: The inner side surface of the concrete hexagonal block (31) is connected to an outwardly expanded steel bar (34), and the outwardly expanded steel bar (34) is inserted into the sand and gravel layer (5). The sides of the concrete hexagonal block (31), the bottom paving docking block (32) and the upper pressure docking block (33) are all provided with inner grooves (7). The inner side surfaces of the concrete hexagonal block (31), the bottom paving docking block (32) and the upper pressure docking block (33) are all provided with through holes (8), and the through holes (8) are connected to the inner grooves (7).

7. The dam anti-seepage reinforcement system according to claim 1, characterized in that: The upstream slope of the dam body is also paved with an upstream horseway (18), the upstream horseway (18) is located in the middle of the upstream dam slope (3), and a flat sand and gravel cushion layer (181) is laid between the upstream horseway (18) and the upstream slope of the dam body. The downstream slope of the dam body is also paved with a downstream horseway (19), the downstream horseway (19) is located in the middle of the downstream dam slope (4), and a hand-laid large pebble layer (191) is laid between the downstream horseway (19) and the downstream slope of the dam body.

8. The dam anti-seepage reinforcement system according to claim 1, characterized in that: A drainage prism (110) is laid at the bottom end of the downstream dam slope (4) of the main dam (1), and the drainage prism (110) is composed of prism stones (11001), prefabricated concrete blocks (11002) and a crushed stone filter layer (11003). The prefabricated concrete blocks (11002) are laid on the surface of the prism stones (11001), and the crushed stone filter layer (11003) is laid between the prism stones (11001) and the slope surface of the main dam (1).

9. A dam anti-seepage reinforcement system according to claim 1, characterized in that: The dam top base (15) is composed of a crushed stone leveling layer (111), a crushed stone base layer (112) and an asphalt concrete surface layer (113), and the crushed stone leveling layer (111), the crushed stone base layer (112) and the asphalt concrete surface layer (113) are laid in sequence from bottom to top.

10. The dam anti-seepage reinforcement system according to claim 1, characterized in that: The reinforcement system also includes reinforcement and renovation of the spillway, drain hole, water intake project, transportation project and housing construction project of the dam body, and the reinforcement system also includes termite detection of the dam body, including: The spillway is reinforced and improved. The spillway includes two overflow weirs on the left and right sides. The left and right overflow weirs are removed and rebuilt with C25 reinforced concrete. Drainage holes are set in the retaining wall at the fish mouth of the spillway. Strengthen and renovate the vent tunnel, expand the entrance gate room of the vent tunnel; replace the trash rack, emergency gate slot, gate leaf, embedded parts, and opening and closing equipment; and carry out anti-seepage treatment on the tunnel body; The water intake project is reinforced and renovated. The water intake project consists of three parts: the water intake pump station, the water intake lock chamber, and the water intake. For the water intake pump station, the water pump is replaced and the pump room is rebuilt. For the water intake lock chamber, the gate is replaced and the lock room is rebuilt. For the water intake, the metal electromechanical equipment is replaced; Traffic engineering reinforcement and improvement, construction of a new dam foot patrol road, and improvement of the existing dam foot patrol road; construction of a new wharf and demolition and reconstruction of the right spillway highway bridge; Strengthen and renovate housing construction projects, build new intelligent buildings, and renovate the water intake lock chambers of water intake projects; For termite detection, we use a combination of green biological and information-based prevention and control technologies to conduct a three-year termite monitoring and control cycle. We install two sets of termite monitoring systems. In the first two years, the termite observation station and termite monitoring device are replaced every two months, and termite control is carried out every two months.

11. A method for detecting the anti-seepage effect of a dam based on a dam anti-seepage reinforcement system according to any one of claims 1 to 10, characterized in that: The detection method analyzes and calculates dam seepage, dam stability, reservoir deformation, reservoir flood control and chute water surface line, specifically including: S1. Dam seepage analysis. Seepage calculation takes the largest cross section of the dam body, conducts leakage analysis according to Darcy's law of hydraulics, and uses finite element method for seepage calculation analysis; Applying Darcy's law and assuming that the permeability gradient of each point in any vertical water-passing section is equal, for a rectangular soil body on an impermeable foundation, the average flow velocity across the section is V = -Kd y / d x ; Single width flow: q = Vy = -K y d y / d x ; Integrate from upstream to downstream: Where k is the permeability coefficient; d y / d x is the integral of the water-passing section; L is the length of the seepage path; H1 is the height of the upstream water section; H2 is the height of the downstream water section; y is the water-passing section; S2. Dam stability analysis: the stability calculation adopts the Bishop method which does not take into account the inter-slab forces; S3. Observation and analysis of reservoir deformation. Several horizontal displacement measuring points and several settlement displacement measuring points are set on the top of the dam body. The horizontal displacement observation adopts the sight line method, and the observation instrument is the J07--7806 theodolite. The settlement displacement observation adopts the C32 automatic level. The data of each measuring point is collected at a certain interval, and the deformation line graph is drawn in combination with the displacement observation data of previous years. The deformation of the reservoir is analyzed based on the graph; S4. Flood regulation calculation. The principle of reservoir flood regulation calculation is: without considering flood forecast and pre-emption of flood control storage capacity, when the reservoir water level is higher than the normal storage level, the spillway is open and free to discharge flood; The discharge capacity of the spillway is calculated as follows: Where: Q is the water flow rate; ε is the lateral contraction coefficient; m is the flow coefficient; b is the width of the spillway orifice; n is the number of orifices; g is a fixed parameter; Among them: k is the shape coefficient of the side pier, which is a right-angle type; ζ0 is the shape coefficient of the middle pier; H0 is the total water head of the starting calculation section; b is the width of the spillway orifice; S5. Calculation of the chute water surface line. The water depth h1 of the starting section is calculated according to the following formula: Where: H0 is the total water head of the starting calculation section; q is the single width flow of the starting calculation section; θ is the slope angle of the chute bottom; φ is the velocity coefficient of the starting calculation section; g is a fixed parameter; The chute water surface line is calculated by the following segmented summation method: Where: θ is the bottom slope angle of the chute; h1 is the water depth at the starting end; h2 is the water depth at the end; ɑ1 is the correction coefficient at the starting end; ɑ2 is the correction coefficient at the end; ν1 is the flow velocity at the starting end; ν2 is the flow velocity at the end; g is a fixed parameter; is the average friction slope in the segment; ΔL 1-2 is the water level difference between the starting end and the end, i is the bottom slope of the chute; the aeration depth is calculated according to the following formula: Where: h, h b are the water depth of the calculated section of the chute and the water depth after aeration, respectively; v is the flow velocity of the calculated section of the chute without aeration; ζ is the correction coefficient.