Cooperative scheduling control method for multi-type resources based on GA-APSO algorithm
Optimizing the collaborative scheduling of multiple types of resources through the GA-APSO algorithm solves the problems of energy price fluctuations and clean power resource allocation in the existing technology, achieves optimization of energy consumption and carbon emissions, and improves energy utilization efficiency.
Patent Information
- Application Number
- CN202410993526.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2044-07-24
AI Technical Summary
Existing multi-type resource collaborative dispatching technology fails to effectively consider energy price fluctuations and clean power resource allocation, resulting in non-minimization of economic costs and difficulty in maximizing energy utilization.
A multi-type resource collaborative dispatch control method based on the GA-APSO algorithm is used to establish an economic objective function, a low-carbon objective function and a low-energy consumption objective function, and jointly solve them through the GA-APSO algorithm to optimize the resource allocation of the power system and balance the use of different resources. interest relationship.
It is possible to reduce energy consumption and carbon emissions, optimize energy allocation, improve energy utilization efficiency, and reduce energy waste while ensuring the stable operation of the power system.
Smart Images

Figure CN118521138B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a collaborative scheduling control method for multiple types of resources, and in particular to a collaborative scheduling control method for multiple types of resources based on a GA-APSO algorithm. Background Art
[0002] As the scale of renewable energy power generation and grid connection continues to expand, the uncertainty of power supply also increases, and the phenomenon of "abandoning wind and solar power" is prone to occur, resulting in energy waste. Through the coordinated scheduling of multiple types of resources, the absorption capacity of new energy power generation can be improved, energy waste can be reduced, and the healthy development of the renewable energy industry can be promoted. The power system involves multiple links such as energy supply, transmission, use and storage, and it is necessary to achieve resource complementarity and optimal configuration between systems and equipment at different levels. Source, network, load and storage resources are widely present in all links of the energy Internet, with the characteristics of a large number of participants, dispersed distribution and strong uncertainty on both the source and load sides.
[0003] The realization of multi-type resource coordinated scheduling realizes the maximum utilization of energy resources through various forms of interaction such as source-source complementarity, source-grid coordination, grid-load interaction, grid-storage interaction, and source-load interaction. The Chinese invention patent with the authorization announcement number CN116581815B discloses a source-grid-load coordinated distribution control system based on big data. By collecting historical power generation data and historical load data of wind power plants, photovoltaic power plants, and thermal power plants, the Copula function is used to realize the coordinated allocation of different types of power resources.
[0004] Although the above patent documents can realize the coordinated allocation of different types of power resources, they do not consider the economic attributes of different types of power resources when setting the objective function or constraint conditions. Fluctuations in energy prices may affect the economic feasibility of the coordinated dispatch of multiple types of resources. How to minimize economic costs while ensuring the stable operation of the power system and how to participate in demand response and utilize the price difference between peaks and valleys to minimize total costs are also one of the most practical issues that need to be considered. At the same time, with the transformation of the global energy structure and the proposal of the "dual carbon" goal, how to allocate more clean power resources when allocating power resources is also one of the issues that need to be considered. Summary of the invention
[0005] In order to overcome the deficiencies in the prior art, the present invention provides a collaborative scheduling control method for multiple types of resources based on a GA-APSO algorithm.
[0006] To achieve the above object, the present invention discloses a collaborative scheduling control method for multiple types of resources based on a GA-APSO algorithm, comprising the following steps:
[0007] (S1) Establishing economic objective function, low carbon objective function and low energy consumption objective function respectively;
[0008] The economic objective function is:
[0009] C 总 = C 运维 +C 购电 +C 购气 +C 购热 +C 购冷 +C 碳交易 +C xl - C 绿证 ,
[0010] In the above formula, C 总 is the actual daily carbon emissions, C 运维 For operation and maintenance costs, C 购电 The cost of purchasing electricity, C 购气 is the gas purchase cost, C 购热 is the heat purchase cost, C 购冷 For the cost of purchasing refrigeration, C 碳交易 is the carbon trading cost, C xl is the demand charge, C 绿证 for renewable energy quotas;
[0011] The low carbon objective function is:
[0012] ,
[0013] In the above formula, AEC is the actual carbon emissions, in kgCO 2 ; SCE standard coal carbon emission coefficient, unit is kgCO 2 / kg standard coal; NGSCF is the natural gas conversion coefficient to standard coal, unit is kg standard coal / m 3 ; NGFR is the gas flow rate, in units of GCEF is the grid carbon emission factor, in units of ; OPE is purchased electricity, in MW;
[0014] The low energy consumption objective function is:
[0015] ,
[0016] In the above formula, is the comprehensive energy consumption, is the standard coal conversion coefficient of natural gas, For the purchased natural gas consumed at all times, is the standard coal conversion coefficient of electric energy, d n Indicates that there are n time periods in a day, T indicates the length of the time period, The amount of electricity consumed at any given moment;
[0017] (S2) respectively establishing the electric balance constraint, the lithium bromide cooling power and the gas internal combustion engine constraint, the lithium bromide heating power and the gas internal combustion engine constraint, the cooling balance constraint, and the heat balance constraint;
[0018] The electrical balance constraint is:
[0019] ,
[0020] In the above formula, represents the purchased power at time t, represents the energy storage discharge power at time t, represents the photovoltaic power consumption at time t, represents the power generation of the gas internal combustion engine at time t, represents the electrical load at time t, represents the energy storage charging power at time t, represents the air conditioning power at time t, Indicates the charging pile power, Indicates the water storage cooling power, Indicates the ice storage electric power, represents the electrical power of the ground source heat pump, represents the electricity sales power at time t;
[0021] The constraints on the cooling power of lithium bromide and the gas internal combustion engine are:
[0022] ,
[0023] In the above formula, represents the cooling power of lithium bromide at time t, represents the gas flow rate of the internal combustion engine at time t, Indicates the heating efficiency of a gas internal combustion engine. Indicates the cooling efficiency of the lithium bromide unit;
[0024] The constraints on the heating power of lithium bromide and the gas internal combustion engine are:
[0025] ,
[0026] In the above formula, represents the heating power of lithium bromide at time t, Indicates the heating efficiency of the lithium bromide unit;
[0027] The cold balance constraint is:
[0028] ,
[0029] In the above formula, is the cooling efficiency at time t, is the air conditioning cooling efficiency at time t, It represents the cooling efficiency of water cooling at time t, represents the ice storage cooling efficiency at time t, shows the cooling load at time t;
[0030] The thermal balance constraint is:
[0031] ,
[0032] In the above formula, is the purchased heat power at time t, is the heating efficiency of lithium bromide at time t, is the heating efficiency of the gas boiler at time t, represents the heat load at time t, is the heating power of the ground source heat pump at time t;
[0033] (S3) The GA-APSO algorithm is used to jointly solve the problem.
[0034] Furthermore, in step (S1), the carbon trading cost C 碳交易 for:
[0035] ,
[0036] In the above formula, CEP is the carbon emission price, in yuan / t; ADCE is the actual daily carbon emissions; CEQ is the carbon emission quota;
[0037] ,
[0038] In the above formula, SCCEC is the standard coal carbon emission coefficient, NGTSCCC is the natural gas standard coal conversion coefficient, CEFOPG is the power grid carbon emission factor, and OE is purchased electricity.
[0039] Furthermore, in step (S1), the renewable energy quota C 绿证 for:
[0040] ,
[0041] In the above formula, TGC is the photovoltaic price, ADPPG is the actual daily photovoltaic power generation, and AOREGC is the renewable energy power generation allocation.
[0042] Furthermore, in step (S1), the demand electricity fee C xl for:
[0043] ,
[0044] is the demand electricity fee, unit: yuan / MW; It is the maximum value of the monthly historical threshold, unit: MW; The maximum value of the gateway power for the day obtained by optimization.
[0045] The collaborative scheduling control method for multiple types of resources based on the GA-APSO algorithm disclosed in the present invention has the following beneficial effects:
[0046] This scheme comprehensively considers the operating status of various equipment such as electric energy storage, central air conditioning, controllable loads, photovoltaics, and the mutual conversion of multiple energy flows, and constructs an evaluation model for energy consumption entities and an evaluation model for carbon emission entities from the perspective of energy conservation and carbon reduction. The GA-APSO algorithm can better coordinate multiple energy resources and systems, balance the interests between different resources, and achieve global optimization. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 It is the flow chart of GA-APSO algorithm;
[0048] Figure 2 This is a comparison chart of energy storage plans before and after executing the GA-APSO algorithm;
[0049] Figure 3 This is a comparison chart of purchased power before and after executing the GA-APSO algorithm;
[0050] Figure 4 This is a comparison chart of photovoltaic power consumption before and after executing the GA-APSO algorithm; DETAILED DESCRIPTION
[0051] The following is combined with Figure 1 To Attachment Figure 4 The principles and features of the present invention are described, and the examples given are only used to explain the present invention, rather than to limit the scope of the present invention.
[0052] The collaborative scheduling control method of multiple types of resources based on GA-APSO algorithm includes the following steps:
[0053] (S1) Establishing economic objective function, low carbon objective function and low energy consumption objective function respectively;
[0054] The economic objective function is:
[0055] C 总 = C 运维 +C 购电 +C 购气 +C 购热 +C 购冷 +C 碳交易 +C xl - C 绿证 ,
[0056] In the above formula, C 总 is the actual daily carbon emissions, C 运维 For operation and maintenance costs, C 购电 The cost of purchasing electricity, C 购气 is the gas purchase cost, C 购热 is the heat purchase cost, C 购冷 For the cost of purchasing refrigeration, C 碳交易 is the carbon trading cost, C xl is the demand charge, C 绿证 for renewable energy quotas;
[0057] In the above formula, the carbon trading cost C 碳交易 for:
[0058] ;
[0059] In the above formula, CEP is the carbon emission price, in yuan / t; ADCE is the actual daily carbon emissions; CEQ is the carbon emission quota;
[0060] ,
[0061] In the above formula, SCCEC is the standard coal carbon emission coefficient, NGTSCCC is the natural gas standard coal conversion coefficient, CEFOPG is the power grid carbon emission factor, and OE is purchased electricity.
[0062] In the above formula, renewable energy quota C 绿证 for:
[0063] ;
[0064] Demand Charge C xl for:
[0065] ,
[0066] is the demand charge, It is the maximum value of the monthly historical threshold. The maximum value of the gateway power for the day obtained by optimization.
[0067] The low carbon objective function is:
[0068] ,
[0069] In the above formula, AEC is the actual carbon emissions, in kgCO 2 ; SCE is the standard coal carbon emission coefficient; NGSCF is the natural gas standard coal conversion coefficient; NGFR is the gas flow rate; GCEF is the grid carbon emission factor; OPE is purchased electricity;
[0070] The low energy consumption objective function is:
[0071] ,
[0072] In the above formula, is the comprehensive energy consumption, is the standard coal conversion coefficient of natural gas, For the purchased natural gas consumed at all times, is the standard coal conversion coefficient of electric energy, d n Indicates that there are n time periods in a day, T indicates the length of the time period, The amount of electricity consumed at any given moment.
[0073] (S2) respectively establishing the electric balance constraint, the lithium bromide cooling power and the gas internal combustion engine constraint, the lithium bromide heating power and the gas internal combustion engine constraint, the cooling balance constraint, and the heat balance constraint;
[0074] The electrical balance constraint is:
[0075] ,
[0076] In the above formula, represents the purchased power at time t, represents the energy storage discharge power at time t, represents the photovoltaic power consumption at time t, represents the power generation of the gas internal combustion engine at time t, represents the electrical load at time t, represents the energy storage charging power at time t, represents the air conditioning power at time t, Indicates the charging pile power, Indicates the water storage cooling power, Indicates the ice storage power, represents the electrical power of the ground source heat pump, represents the electricity sales power at time t;
[0077] The constraints on the cooling power of lithium bromide and the gas internal combustion engine are:
[0078] ,
[0079] In the above formula, represents the cooling power of lithium bromide at time t, represents the gas flow rate of the internal combustion engine at time t, Indicates the heating efficiency of a gas internal combustion engine. Indicates the cooling efficiency of the lithium bromide unit;
[0080] The constraints on the heating power of lithium bromide and the gas internal combustion engine are:
[0081] ,
[0082] In the above formula, represents the heating power of lithium bromide at time t, Indicates the heating efficiency of the lithium bromide unit;
[0083] The cold balance constraint is:
[0084] ,
[0085] In the above formula, is the cooling efficiency at time t, is the air conditioning cooling efficiency at time t, It represents the cooling efficiency of water cooling at time t, represents the ice storage cooling efficiency at time t, shows the cooling load at time t;
[0086] The thermal balance constraint is:
[0087] ,
[0088] In the above formula, is the purchased heat power at time t, is the heating efficiency of lithium bromide at time t, is the heating efficiency of the gas boiler at time t, represents the heat load at time t, is the heating power of the ground source heat pump at time t;
[0089] (S3) The GA-APSO algorithm is used to jointly solve the problem.
[0090] GA algorithm has genetic operation, diverse population, good globality, but individuals have no memory and slow convergence, while APSO has memory, fast convergence but easy to mature prematurely and poor diversity. This makes it possible for the two algorithms to overcome limitations and achieve complementary advantages in performance. Adaptive chaotic particle swarm can make the initial solution more uniform, and adaptive weights and learning factors can increase the probability of the algorithm searching for diverse solutions in the later stage of evolution to a certain extent. Therefore, this improvement is introduced into the hybrid model in order to improve the performance of the algorithm. Specifically, the process of GA-APSO algorithm is as shown in the attached figure. Figure 1 shown.
[0091] Taking the historical data of a certain day in a certain park as an example, the charging and discharging curve of energy storage, the photovoltaic power consumption curve and the power purchase curve are obtained through the actual operating load and photovoltaic power generation. As can be seen in the figure, the horizontal axis is the time series of one day, in minutes, and the vertical axis is power, in kW.
[0092] Comparison of energy storage plans before and after algorithm optimization is shown in the attached figure. Figure 2 As shown in the figure, in the time period of 735min-915min, the photovoltaic power generation is high, but the photovoltaic grid-connected electricity price is low. At this time, the optimized energy storage plan increases the charging power, which can absorb more photovoltaic power generation while storing electricity. In the time period of 1005min-1365min when the electricity price is high and the load is high, the discharge power is increased to save the electricity purchase cost.
[0093] The comparison of purchased power before and after algorithm optimization is shown in the attached figure. Figure 3 As shown. Figure 3 It can be seen that the optimized electricity purchasing efficiency increases the purchased electricity power during the period when the load price is high and the electricity price is low, and stores energy to increase the charging power while using the load electricity. When the electricity price is high, the purchased electricity power is reduced or even not purchased, and the energy storage is used to discharge to transition to the period when the electricity price is relatively low.
[0094] Comparison of photovoltaic power consumption before and after algorithm optimization Figure 4 As shown. Figure 4 It can be seen that in the time period of 510min-555min, when the electricity price is relatively high and the photovoltaic power generation is high, the photovoltaic power consumption is increased and the power of purchased electricity is reduced. In the time period of 735min-915min, the photovoltaic power generation is high, but the on-grid electricity price is low. Increasing the photovoltaic power consumption, increasing the energy storage charging power after meeting the load power, and reducing the power of purchased electricity can reduce electricity costs.
[0095] Finally, by comparing the purchased electricity costs and on-grid income before and after optimization, the purchased electricity costs before optimization were 1,403.74 yuan, and the on-grid income was 2,263 yuan; after optimization, the purchased electricity costs were 1,294.548 yuan, and the on-grid income was 2,250.525 yuan. After optimization, the cost was saved by 95 yuan.
[0096] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A collaborative scheduling control method for multi-type resources based on GA-APSO algorithm, characterized in that: The following steps are involved: (S1) Establishing economic objective function, low carbon objective function and low energy consumption objective function respectively; The economic objective function is: C 总 = C 运维 +C 购电 +C 购气 +C 购热 +C 购冷 +C 碳交易 +C xl - C 绿证 , In the above formula, C 总 is the total economic cost, C 运维 For operation and maintenance costs, C 购电 The cost of purchasing electricity, C 购气 is the gas purchase cost, C 购热 is the heat purchase cost, C 购冷 For the cost of purchasing refrigeration, C 碳交易 is the carbon trading cost, C xl is the demand charge, C 绿证 for renewable energy quotas; The low carbon objective function is: In the above formula, AEC is the actual carbon emission, in kg; SCE is the standard coal carbon emission coefficient; NGSCF is the natural gas standard coal coefficient; NGFR is the gas flow; GCEF is the grid carbon emission factor; OPE is purchased electricity; The low energy consumption objective function is: , In the above formula, is the comprehensive energy consumption, is the standard coal conversion coefficient of natural gas, For the purchased natural gas consumed at all times, is the standard coal conversion coefficient of electric energy, d n Indicates that there are n time periods in a day, T indicates the length of the time period, The amount of electricity consumed at any given moment; (S2) respectively establishing the electric balance constraint, the lithium bromide cooling power and the gas internal combustion engine constraint, the lithium bromide heating power and the gas internal combustion engine constraint, the cooling balance constraint, and the heat balance constraint; The electrical balance constraint is: , in the above formula, represents the purchased power at time t, represents the energy storage discharge power at time t, express The photovoltaic power consumption at the moment, represents the power generation of the gas internal combustion engine at time t, represents the electrical load at time t, represents the energy storage charging power at time t, represents the air conditioning power at time t, Indicates the charging pile power, Indicates the water storage cooling power, Indicates the ice storage electric power, represents the electrical power of the ground source heat pump, represents the electricity sales power at time t; The constraints on the cooling power of lithium bromide and the gas internal combustion engine are: , In the above formula, represents the cooling power of lithium bromide at time t, represents the gas flow rate of the internal combustion engine at time t, Indicates the heating efficiency of a gas internal combustion engine. Indicates the cooling efficiency of the lithium bromide unit; The constraints on the heating power of lithium bromide and the gas internal combustion engine are: , In the above formula, represents the heating power of lithium bromide at time t, Indicates the heating efficiency of the lithium bromide unit; The cold balance constraint is: , in the above formula, is the cooling efficiency at time t, is the air conditioning cooling efficiency at time t, represents the water cooling efficiency at time t, represents the ice storage cooling efficiency at time t, represents the cooling load at time t; The thermal balance constraint is: , In the above formula, is the purchased heat power at time t, is the heating efficiency of lithium bromide at time t, is the heating efficiency of the gas boiler at time t, represents the heat load at time t, is the heating power of the ground source heat pump at time t; (S3) The GA-APSO algorithm is used to jointly solve the problem.
2. The collaborative scheduling control method for multiple types of resources based on the GA-APSO algorithm according to claim 1 is characterized in that: In step (S1), the carbon trading cost C 碳交易 for: , In the above formula, CEP is the carbon emission price, in yuan / t; ADCE is the actual daily carbon emissions; CEQ is the carbon emission quota; In the above formula, SCE is the standard coal carbon emission coefficient; NGSCF is the natural gas standard coal coefficient; GCEF is the power grid carbon emission factor; OPE is purchased electricity.
3. The collaborative scheduling control method for multiple types of resources based on the GA-APSO algorithm according to claim 1 is characterized in that: In step (S1), the renewable energy quota C 绿证 for: , In the above formula, TGC is the photovoltaic price, ADPPG is the actual daily photovoltaic power generation, and AOREGC is the renewable energy power generation allocation.
4. The collaborative scheduling control method for multiple types of resources based on the GA-APSO algorithm according to claim 1 is characterized in that: In step (S1), the demand electricity charge C xl for: , is the demand charge, It is the maximum value of the monthly historical threshold. The maximum value of the gateway power for the day obtained by optimization.
Citation Information
Patent Citations
A Big Data-Based Source-Grid-Load Coordinated Power Distribution Control System
CN116581815B
Multi-objective optimization method of combined cold heat and power supply system
CN110333660A
Comprehensive energy system optimized operation method considering carbon-green certificate transaction mechanism
CN113222465A
Low-carbon economic dispatching method considering heat supply network and P2G multi-park integrated energy system
CN114091913A
Comprehensive energy system optimization scheduling method considering carbon source sink effect
CN114357782A