Method, device and medium for predicting the operating efficiency of electric facilities in electric heating areas
By analyzing the power data and resident characteristic information of the electric heating station area, we build a machine learning model to identify inefficient electric heating projects, solve the problems of predicting the operating efficiency of electric heating projects and improving equipment utilization, provide scientific decision-making basis, and improve The implementation effect of electric heating project.
Patent Information
- Application Number
- CN202411011096.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-07-26
AI Technical Summary
Existing technology makes it difficult to predict the operating efficiency of electric heating projects and improve the utilization rate of supporting power engineering equipment for "coal-to-electricity" projects, resulting in inefficiencies in electric heating projects.
By obtaining the power data, transformer power data, distribution network infrastructure project data and resident characteristic information of the electric heating station area, we perform preprocessing and analysis to build a project operation efficiency evaluation model based on machine learning algorithms to identify inefficient electric heating projects and train Model to predict the operating efficiency of proposed construction projects.
It achieves accurate identification of inefficiencies in electric heating projects and extraction of key features, provides a scientific basis for decision-making, helps improve electric heating project plans, and improves project implementation effects and equipment utilization.
Smart Images

Figure CN118536682B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power analysis, and in particular to a method, device, equipment and medium for predicting the operating efficiency of power facilities in an electric heating area. Background Art
[0002] In some areas, the utilization rate of electric heating equipment is low and it is used seasonally, resulting in a low load rate of the supporting power grid and low project investment benefits. Existing research on electric heating mainly focuses on preliminary evaluation, and conducts economic and feasibility analysis when the project is established. With the continuous in-depth expansion of "coal to electricity" and residents' independent electric heating projects, the accumulation of electric heating project data is becoming more and more abundant, but these data have not been fully used to carry out post-evaluation of electric heating projects. It is difficult to predict the operating efficiency of electric heating projects to be implemented in the future, and it is difficult to effectively solve the problem of improving the utilization rate of supporting power engineering equipment for "coal to electricity". Summary of the invention
[0003] In order to overcome the problems existing in the related technologies, the present invention provides a method, device, equipment and medium for predicting the operating efficiency of power facilities in an electric heating area, so as to solve the technical problems that it is difficult to predict the operating efficiency of electric heating projects and difficult to improve the utilization rate of supporting power engineering equipment for "coal to electricity".
[0004] One or more embodiments of this specification provide a method for predicting the operating efficiency of electric power facilities in an electric heating area, comprising the following steps:
[0005] Obtaining electric heating user power data, transformer power data, distribution network infrastructure project data, resident characteristic information and electric heating related information in the electric heating area, and preprocessing the acquired data;
[0006] Determine the utilization rate of electric heating equipment based on the power data of electric heating users; determine the transformer load rate of the substation area based on the power data of transformers; determine the design value and actual payback period based on the data of distribution network infrastructure projects, and calculate the payback period deviation rate;
[0007] According to the utilization rate of the user's electric heating equipment, the load rate of the transformer in the substation and the deviation rate of the investment payback period, based on the preset inefficient electric heating project judgment conditions, the inefficient electric heating projects in the substation are determined to obtain the inefficient electric heating project set;
[0008] Construct a project operation efficiency evaluation model based on machine learning algorithm, input the pre-processed data and the inefficient project set of the substation into the project operation efficiency evaluation model to train the model, and obtain the trained project operation efficiency evaluation model according to the model convergence conditions until the model converges;
[0009] The resident characteristic information and electric heating related information of the planned electric heating project are input into the trained project operation efficiency evaluation model to determine the operation efficiency of the planned electric heating project.
[0010] One or more embodiments of this specification provide a device for predicting the operating efficiency of electric facilities in an electric heating area, including:
[0011] The data collection module is used to obtain the electric heating user power data, transformer power data, distribution network infrastructure project data, resident characteristic information and electric heating related information of the electric heating area;
[0012] A data preprocessing module, used for preprocessing the data acquired by the data acquisition module;
[0013] The first calculation module is used to determine the utilization rate of the user's electric heating equipment according to the electric heating user's power data; determine the transformer load rate of the substation area according to the transformer power data; determine the design value of the investment payback period and the actual investment payback period according to the distribution network infrastructure project data, and calculate the investment payback period deviation rate;
[0014] An inefficient project determination module is used to determine the inefficient electric heating projects in the substation based on the user electric heating equipment utilization rate, substation transformer load rate and investment payback period deviation rate calculated by the first calculation module, based on the preset inefficient electric heating project determination conditions, and obtain an inefficient electric heating project set;
[0015] The model building module is used to build a project operation efficiency evaluation model based on a machine learning algorithm. The pre-processed data and the inefficient electric heating project set are input into the project operation efficiency evaluation model to train the model. The model converges according to the model convergence conditions to obtain a trained project operation efficiency evaluation model.
[0016] The project operation efficiency evaluation module is used to input the resident characteristic information and electric heating related information of the planned electric heating project into the trained project operation efficiency evaluation model to determine the operation efficiency of the planned electric heating project.
[0017] One or more embodiments of the present specification provide a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method for predicting the operating efficiency of electric facilities in an electric heating area as described above when executing the computer program.
[0018] One or more embodiments of the present specification provide a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the steps of the method for predicting the operating efficiency of electric facilities in an electric heating area as described above.
[0019] The present invention provides a method, device, equipment and medium for predicting the operating efficiency of electric facilities in an electric heating area. The advantages are that by acquiring electric power data of the electric heating area, distribution network infrastructure project data and data affecting the operating efficiency of the project, the efficiency of a large number of electric heating projects is analyzed, inefficient projects are accurately identified, and key features that make the electric heating projects inefficient are extracted. Through these features, combined with the data affecting the operating efficiency of the project, a prediction model for the operating efficiency of the electric heating project is trained, and the implementation effect of the proposed new electric heating project is scientifically analyzed and assessed, providing technical support and decision-making basis for the selection of the scope of the implementation area of the electric heating project, the improvement planning of the electric heating project plan that has been put into operation, the preparation of the planning and construction plan for the proposed new project, and the formulation of government policies. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate one or more embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this specification. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 A flow chart of a method for predicting the operating efficiency of electric heating facilities in an electric heating area provided for one or more embodiments of this specification;
[0022] Figure 2 A flowchart of a method for predicting the operating efficiency of electric heating facilities in an electric heating area provided in one or more embodiments of this specification;
[0023] Figure 3 A block diagram of a device for predicting the operating efficiency of electric facilities in an electric heating area provided for one or more embodiments of this specification;
[0024] Figure 4 A schematic diagram of the structure of a computer device provided for one or more embodiments of this specification. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the technical solutions in one or more embodiments of this specification, the technical solutions in one or more embodiments of this specification will be clearly and completely described below in conjunction with the drawings in one or more embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on one or more embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the protection scope of the present invention.
[0026] The present invention is described in detail below in conjunction with specific implementation methods and the accompanying drawings.
[0027] Method Embodiment
[0028] According to an embodiment of the present invention, a method for predicting the operating efficiency of electric heating power facilities in an electric heating area is provided. Figure 1-2 As shown, Figure 1 The flowchart of the method for predicting the operating efficiency of electric heating power facilities in this embodiment is as follows: Figure 2 The flowchart of the method for predicting the operating efficiency of electric heating power facilities in the electric heating area provided in this embodiment is as follows. The method for predicting the operating efficiency of electric heating power facilities in the electric heating area according to the embodiment of the present invention includes:
[0029] Step S1, obtaining electric heating user power data, transformer power data, distribution network infrastructure project data, resident characteristic information and electric heating related information of the electric heating area.
[0030] In one embodiment, the electric heating area transformer power big data includes the area transformer capacity and the area heating season load curve;
[0031] The distribution network infrastructure project big data of the substation area includes: project planning information, project investment information, capacity expansion, and operation and maintenance costs;
[0032] The resident characteristics of the area include local energy use habits, local energy costs, and per capita disposable income;
[0033] The information related to electric heating in the substation includes government subsidy policies, equipment subsidies, main equipment types, and special electricity prices.
[0034] Step S2, preprocessing the data acquired in step S1.
[0035] In this embodiment, data preprocessing specifically includes cleaning, normalizing, and filling in missing values. Missing value filling can be achieved, for example, by using Lagrange interpolation, polynomial interpolation, or spline interpolation to fill in missing data within the uplink subframe time.
[0036] For example, for missing electricity consumption data, the mean value of the data in adjacent time periods is used to fill in the gaps. Secondly, all the data involving time are standardized in a unified format to ensure the consistency and comparability of the time data. For example, the time formatting method used is to convert the time data into the standard YYYY-MM-DD HH:MM format.
[0037] Step S3, determine the utilization rate of the user's electric heating equipment according to the electric heating user's power data; determine the transformer load rate of the substation according to the transformer power data; determine the design value of the investment payback period and the actual investment payback period according to the distribution network infrastructure project data, and then calculate the investment payback period deviation rate. The calculation details are as follows.
[0038] In this embodiment, the utilization rate of the user's electric heating equipment is determined according to the electric heating user's power data as follows:
[0039] Electric heating user power data includes the user's electric heating installed capacity value and the active power of the user's electric heating equipment. First, the maximum power capacity is determined based on the design parameters and installation configuration of the user's electric heating equipment, which can be obtained through the nameplate parameters of the equipment or the technical specifications provided by the manufacturer. For users who lack specific parameters, estimates can be made based on typical electric heating equipment capacity values. For example, the capacity of electric heating equipment for ordinary households is usually between 2 kW and 8 kW.
[0040] Then, through the smart meter and power monitoring system, the active power data of the user's electric heating equipment can be obtained in real time. Active power refers to the actual electrical power consumed by the equipment per unit time, usually in kilowatts (kW).
[0041] Then, the user's active power is divided by the user's reported capacity value to obtain the user's electric heating equipment utilization rate. The calculation formula is as follows:
[0042] ;
[0043] In the formula, Indicates the utilization rate of users' electric heating equipment, Indicates the user's active power. Indicates the capacity value reported by the user.
[0044] In this embodiment, the transformer load rate of the substation area is determined according to the transformer power data as follows:
[0045] Transformer power data includes the rated capacity of the transformer in the substation and the total active power of the transformer in the substation. First, the rated capacity of the transformer in the substation is the maximum rated capacity of the transformer, which is usually provided by the manufacturer and marked on the transformer nameplate. The rated capacity of the substation is expressed in kilovolt-amperes (kVA).
[0046] Then, through the power monitoring system and smart meters, the active power data of the substation transformer is obtained in real time to obtain the active power of the entire substation. Active power refers to the actual electric power consumed by the substation in unit time, usually in kilowatts (kW). Since the load value in some time periods of the day is greatly affected by photovoltaics, only the load curve from 20:00 to 21:00 every day is analyzed. Furthermore, the total active power of the substation transformer is divided by the rated capacity of the substation transformer to obtain the substation transformer load rate. The calculation formula is as follows:
[0047] ;
[0048] In the formula, Indicates the transformer load rate in the substation area. Indicates the active power of the transformer in the area. Indicates the rated capacity of the transformer in the substation.
[0049] In this embodiment, the design value of the payback period and the actual payback period are determined based on the distribution network infrastructure project data, and the payback period offset rate is calculated as follows:
[0050] According to the database of the power company, the big data of the electric heating distribution network infrastructure project is obtained, including but not limited to project planning information, project investment information, capacity expansion capacity, etc., to provide basic information for the subsequent investment payback period calculation.
[0051] According to the database of the power company, the estimated electricity consumption of the construction project in the heating season and the non-heating season is obtained. The electricity consumption of users during the heating season is usually high, while the electricity consumption of users during the non-heating season is relatively low. Therefore, it is necessary to obtain the estimated electricity consumption in the heating season and the non-heating season respectively.
[0052] Furthermore, based on the estimated electricity consumption in the heating season and the non-heating season, combined with the input cost and expected benefits, the design value of the investment payback period is calculated. The calculation formula is as follows:
[0053] ;
[0054] In the formula, Indicates n The annual electricity sales price, RMB / kWh; B Indicates n The amount of government subsidies in the year, RMB / kWh; P Indicates n The annual electricity purchase price, yuan / kWh; M Indicates the total investment amount; 、 They are expressed as the average number of days of use in the heating season and the non-heating season, respectively; 、 They are respectively expressed as heating season and non-heating season loads; t Indicates the daily usage time; C Represents the number of households.
[0055] Furthermore, the actual investment payback period is calculated based on the actual electricity consumption data of the actual construction project in the heating season and the non-heating season. The calculation formula is as follows:
[0056] ;
[0057] In the formula, It means that after the implementation of the electric heating project n Annual electricity value.
[0058] Then, according to the design value of the payback period and the actual payback period, the payback period deviation rate is calculated to evaluate the difference between the design value and the actual value. The calculation formula of the payback period deviation is as follows:
[0059] .
[0060] Step S4, according to the utilization rate of the user's electric heating equipment, the load rate of the transformer in the substation and the offset rate of the investment payback period, based on the preset inefficient electric heating project judgment conditions, determine the inefficient electric heating projects in the substation and obtain the inefficient electric heating project set.
[0061] In this embodiment, according to the preset inefficient electric heating project determination conditions, if any of the following conditions is met, the inefficient electric heating project in the substation area can be determined, and the project determination conditions include:
[0062] 1. Based on the calculated utilization rate of the user's electric heating equipment, if the proportion of time periods when the utilization rate of the user's electric heating equipment exceeds 50% is less than 20%, the user is judged to be an inefficient user; otherwise, the user is an efficient user; and if the proportion of inefficient users within the electric heating area exceeds 50%, the area is judged to be an inefficient electric heating project;
[0063] At this point, the utilization rate of electric heating equipment of users in the electric heating area, inefficient users and inefficient areas where inefficient users gather are obtained, and inefficient electric heating projects can be identified.
[0064] 2. According to the calculation results of the transformer load rate of the substation, if the proportion of time periods when the transformer load rate of the substation is greater than 50% is less than 20%, the substation is judged as an inefficient electric heating project, otherwise it is an efficient electric heating project. The transformer load rate data of all substations were statistically analyzed to obtain the transformer load rate of the electric heating substation and the inefficient electric heating project.
[0065] 3. If the payback period deviation rate is greater than 300%, the substation is judged to be an inefficient electric heating project.
[0066] Specifically, according to the electric heating equipment utilization curve, a project with a utilization rate of more than 50% and a proportion of more than 20% in the entire heating season is an efficient project, and a project with a utilization rate of less than 20% is an inefficient project; according to the transformer load rate curve of the substation, a project with a load rate of more than 50% and a proportion of more than 20% in the entire heating season is an efficient project, and a project with a load rate of less than 20% is an inefficient project; according to the payback period offset rate, a project with an offset rate of less than 300% is an efficient project, and a project with an offset rate of more than 300% is an inefficient project; the above three methods are used to obtain evaluation results of electric heating projects, and inefficient electric heating projects are obtained, and the inefficient electric heating projects are merged to establish a collection of inefficient electric heating projects.
[0067] Step S5, construct a project operation efficiency evaluation model based on a machine learning algorithm, input the preprocessed data and the inefficient electric heating project set into the project operation efficiency evaluation model to train the model, and obtain a trained project operation efficiency evaluation model according to the model convergence conditions until the model converges.
[0068] In this embodiment, a suitable machine learning algorithm can be selected, including but not limited to decision tree, random forest, support vector machine (SVM) or neural network, to construct an electric heating project operation efficiency evaluation model, and the characteristic information data of the electric heating project is obtained as a training set and input into the machine learning model for training. Through training, the model can identify and distinguish between inefficient and efficient projects.
[0069] Step S6, input the resident characteristic information and electric heating related information of the planned electric heating project into the trained project operation efficiency evaluation model to determine the operation efficiency of the planned electric heating project.
[0070] Furthermore, the trained machine learning model is used to evaluate the operating efficiency of the proposed electric heating project. The characteristic information data of the new project is input, the model is run, and the predicted results of the project operating efficiency are output. The evaluation results include multiple indicators such as the project's equipment utilization rate and investment payback period, so as to comprehensively measure the project's operating efficiency and determine whether the project is suitable for construction.
[0071] The method provided in this embodiment obtains electric power data of electric heating areas, distribution network infrastructure project data and data that affect the operating efficiency of projects, analyzes the efficiency of a large number of electric heating projects, accurately identifies inefficient projects, and extracts key features that make electric heating projects inefficient. These features are combined with data that affect the operating efficiency of projects to train a prediction model for the operating efficiency of electric heating projects, thereby providing a decision-making basis for scientifically analyzing and judging the implementation effects of electric heating projects, facilitating the selection of regional scopes for the implementation of electric heating projects, improving the planning of plans for electric heating projects that have already been put into operation, and providing technical support for the preparation of planning and construction plans, and government policy formulation.
[0072] The effectiveness and advantages of this method are illustrated by a specific case study.
[0073] This case takes the 2023-2024 electric heating area capacity expansion project in City A as an example. The actual situation in the area is as follows: Obtain the big data on electricity of electric heating users in the electric heating area, including the heating season load curves of all users, user reported capacity, and electricity bill information; obtain the big data on electricity of transformers in the electric heating area, including the transformer capacity of the area and the heating season load curve of the area; obtain the big data on distribution network infrastructure projects in the electric heating area, including project planning information, project investment information, and capacity expansion capacity; obtain the characteristic information of residents in the electric heating area, including local energy consumption habits, local energy consumption costs, and per capita disposable income; obtain electric heating-related information in the electric heating area, including government subsidy policies, equipment subsidies, main equipment types, and special electricity prices.
[0074] (1) Calculate the utilization rate of users’ electric heating equipment;
[0075] Divide the user's active power by the user's reported capacity value to obtain the user's electric heating equipment utilization rate. According to the calculated user's electric heating equipment utilization rate, the user is classified. If the proportion of time periods when the user's electric heating equipment utilization rate exceeds 50% is less than 20%, it is judged as an inefficient user; otherwise, it is an efficient user. If the proportion of inefficient users within the electric heating area exceeds 50%, it is judged as an inefficient project; otherwise, it is an efficient project. Perform statistical analysis on the electric heating equipment utilization data of all users to identify the proportion and distribution of inefficient projects. In this case, the proportion of time periods when the theoretical active power of user 8941 exceeds 50% is 34.43%, and the user is an efficient user; the proportion of time periods when the theoretical active power of user 9117 exceeds 50% is 39.69%, and the user is an efficient user; the proportion of time periods when the theoretical active power of user 9524 exceeds 50% is 40.44%, and the user is an efficient user. More than 50% of the users in this area are efficient users, so it is judged as an efficient electric heating project.
[0076] (2) Calculate the transformer load rate in the substation area:
[0077] Divide the active power of the substation by the rated capacity of the substation to obtain the transformer load rate of the electric heating substation. According to the calculation results, if the proportion of users whose transformer load rate exceeds 50% in the substation is less than 20%, the substation is judged to be an inefficient project; otherwise, it is an efficient project. Statistical analysis is performed on the transformer load rate data of all substations to identify the proportion and distribution of inefficient projects. For example: the proportion of time periods when the transformer load rate of substation 0003 exceeds 50% is 65.46%, and the substation is an efficient project; the proportion of time periods when the transformer load rate of substation 5352 exceeds 50% is 0.49%, and the substation is an inefficient project.
[0078] (3) Calculate the payback period deviation rate:
[0079] Taking the 2023-2024 electric heating area investment project in City A as an example, the average usage days in the heating season are 160 days, and the average usage days in the non-heating season are 205 days. The average load in the heating season is 75% of the maximum load, that is, 0.75×8=6kW, and the load in the non-heating season is 0.5kW. The profit is 0.1224 yuan, the daily heating electricity consumption time is about 16 hours, the total investment cost is 1 million yuan, and the number of households is 181. The design value of the investment payback period f(T) is calculated to be ≈2.66 years, and the actual investment payback period f(T) is ≈94.41 years. Since the ratio of the actual investment payback period to the design value of the investment payback period is greater than 300%, this area is an inefficient electric heating project.
[0080] (4) Determine the results of the project operation efficiency assessment:
[0081] Obtain the electric heating project sets of 7 cities, as well as the characteristic information of residents and the related information of electric heating, and use the machine learning model to train and predict, and determine the operation efficiency evaluation results of the electric heating projects to be built in H City, I City a Village, and I City b Village; among them, the valley section electricity price in H City is 0.22 yuan / kWh, the per capita disposable income of rural permanent residents is about 12,130 yuan, the government equipment subsidy accounts for 75%, the main equipment type is carbon crystal plate, and there is no operation subsidy, which is an inefficient project. The valley section electricity price in I City a Village is 0.17 yuan / kWh, the per capita disposable income of permanent residents is about 10,209 yuan, the government equipment subsidy accounts for 85%, the main equipment type is electric boiler, and there is no operation subsidy, which is an inefficient project; the per capita disposable income of permanent residents in I City b Village is about 21,000 yuan, and other variables are the same as those in I City a Village, which is an efficient project. The prediction results of the project operation efficiency evaluation model based on the method of this embodiment are consistent with the actual project operation efficiency results.
[0082] Device Embodiment
[0083] According to an embodiment of the present invention, a device for predicting the operating efficiency of electric heating power facilities in an electric heating area is provided. Figure 3 As shown, it is a block diagram of the electric heating area power facility operation efficiency prediction device provided by this embodiment. According to the electric heating area power facility operation efficiency prediction device of the embodiment of the present invention, it includes:
[0084] The data collection module 10 is used to obtain the electric heating user power data, transformer power data, distribution network infrastructure project data, resident characteristic information and electric heating related information of the electric heating area.
[0085] In one embodiment, the electric heating area transformer power big data includes the area transformer capacity and the area heating season load curve;
[0086] The distribution network infrastructure project big data of the substation area includes: project planning information, project investment information, capacity expansion, and operation and maintenance costs;
[0087] The resident characteristics of the area include local energy use habits, local energy costs, and per capita disposable income;
[0088] The information related to electric heating in the substation includes government subsidy policies, equipment subsidies, main equipment types, and special electricity prices.
[0089] The data preprocessing module 20 is used to preprocess the data acquired by the data acquisition module 10 .
[0090] In this embodiment, data preprocessing specifically includes cleaning, normalizing, and filling in missing values. Missing value filling can be achieved, for example, by using Lagrange interpolation, polynomial interpolation, or spline interpolation to fill in missing data within the uplink subframe time.
[0091] The first calculation module 30 is used to determine the utilization rate of the user's electric heating equipment according to the electric heating user's power data; determine the transformer load rate of the substation according to the transformer power data; determine the design value of the investment payback period and the actual investment payback period according to the distribution network infrastructure project data, and calculate the investment payback period deviation rate. The calculation details are as follows.
[0092] In this embodiment, the utilization rate of the user's electric heating equipment is determined according to the electric heating user's power data as follows:
[0093] The maximum power capacity is determined according to the design parameters and installation configuration of the user's electric heating equipment, and the active power data of the user's electric heating equipment is obtained in real time through the smart meter and power monitoring system. The calculation formula for the utilization rate of the user's electric heating equipment is as follows:
[0094] ;
[0095] In the formula, Indicates the utilization rate of users' electric heating equipment, Indicates the user's active power. Indicates the capacity value reported by the user.
[0096] In this embodiment, the transformer load rate of the substation area is determined according to the transformer power data as follows:
[0097] Transformer power data includes the rated capacity of the transformer in the substation and the total active power of the transformer in the substation. The maximum rated capacity of the transformer is determined, and the active power of the transformer in the substation is obtained in real time. The calculation formula for the load rate of the transformer in the substation is as follows:
[0098] ;
[0099] In the formula, Indicates the transformer load rate in the substation area. Indicates the active power of the transformer in the area. Indicates the rated capacity of the transformer in the substation.
[0100] In this embodiment, the design value of the payback period and the actual payback period are determined based on the distribution network infrastructure project data, and the payback period offset rate is calculated as follows:
[0101] According to the database of the power company, the big data of the electric heating distribution network infrastructure project is obtained, including but not limited to project planning information, project investment information, capacity expansion capacity, etc., to provide basic information for the subsequent investment payback period calculation.
[0102] According to the database of the power company, the estimated electricity consumption of the construction project in the heating season and the non-heating season is obtained. The electricity consumption of users during the heating season is usually high, while the electricity consumption of users during the non-heating season is relatively low. Therefore, it is necessary to obtain the estimated electricity consumption in the heating season and the non-heating season respectively.
[0103] Furthermore, based on the estimated electricity consumption in the heating season and the non-heating season, combined with the input cost and expected benefits, the design value of the investment payback period is calculated. The calculation formula is as follows:
[0104] ;
[0105] In the formula, Indicates n The annual electricity sales price, RMB / kWh; B Indicates n The amount of government subsidies in the year, RMB / kWh; P Indicates n The annual electricity purchase price, yuan / kWh; M Indicates the total investment amount; 、 They are expressed as the average number of days of use in the heating season and the non-heating season, respectively; 、 They are respectively expressed as heating season and non-heating season loads; t Indicates the daily usage time; C Represents the number of households.
[0106] Furthermore, the actual investment payback period is calculated based on the actual electricity consumption data of the actual construction project in the heating season and the non-heating season. The calculation formula is as follows:
[0107] ;
[0108] In the formula, It indicates the annual electricity consumption in the nth year after the implementation of the electric heating project.
[0109] Then, according to the design value of the payback period and the actual payback period, the payback period deviation rate is calculated to evaluate the difference between the design value and the actual value. The calculation formula of the payback period deviation is as follows:
[0110] .
[0111] The inefficient project determination module 40 is used to determine the inefficient electric heating projects in the substation based on the user's electric heating equipment utilization rate, the substation transformer load rate and the investment payback period deviation rate calculated by the first calculation module 30, based on the preset inefficient electric heating project determination conditions, and obtain the inefficient electric heating project set.
[0112] In this embodiment, according to the preset inefficient electric heating project determination conditions, if any of the following conditions is met, the inefficient electric heating project in the substation area can be determined, which specifically includes the following situations:
[0113] 1. Based on the calculated utilization rate of the user's electric heating equipment, if the proportion of time periods when the utilization rate of the user's electric heating equipment exceeds 50% is less than 20%, the user is judged to be an inefficient user; otherwise, the user is an efficient user; and if the proportion of inefficient users within the electric heating area exceeds 50%, the area is judged to be an inefficient electric heating project.
[0114] 2. According to the calculation results of the transformer load rate of the substation, if the proportion of time periods when the transformer load rate of the substation is greater than 50% is less than 20%, the substation is judged as an inefficient electric heating project, otherwise it is an efficient project. The transformer load rate data of all substations were statistically analyzed to obtain the transformer load rate of the electric heating substation and the inefficient electric heating project.
[0115] 3. If the payback period deviation rate is greater than 300%, the substation is judged to be an inefficient electric heating project.
[0116] The model building module 50 is used to build a project operation efficiency evaluation model based on a machine learning algorithm, input the preprocessed data and the inefficient electric heating project set into the project operation efficiency evaluation model to train the model, and obtain a trained project operation efficiency evaluation model according to the model convergence conditions until the model converges.
[0117] In this embodiment, a suitable machine learning algorithm can be selected, including but not limited to decision tree, random forest, support vector machine (SVM) or neural network, to construct an electric heating project operation efficiency evaluation model, and the characteristic information data of the electric heating project is obtained as a training set and input into the machine learning model for training. Through training, the model can identify and distinguish between inefficient and efficient projects.
[0118] The project operation efficiency evaluation module 60 is used to input the resident characteristic information and electric heating related information of the planned electric heating project into the trained project operation efficiency evaluation model to determine the operation efficiency of the planned electric heating project.
[0119] The device provided in this embodiment obtains electric power data of electric heating areas, distribution network infrastructure project data and data affecting the operating efficiency of projects through the data acquisition module 10, and combines the first calculation module 30 and the inefficient project judgment module 40 to analyze the efficiency of a large number of electric heating projects, accurately identify inefficient projects, and extract key features that make the electric heating projects inefficient. Through these features combined with the data affecting the operating efficiency of the project, a prediction model for the operating efficiency of electric heating projects constructed by the model construction module 50 is constructed, so as to provide a decision-making basis for scientific analysis and judgment of the implementation effect of electric heating projects, facilitate the selection of the scope of implementation of electric heating projects, the improvement planning of electric heating project plans that have been put into operation, and provide technical support for the preparation of planning and construction plans, and the formulation of government policies.
[0120] The embodiment of the present invention is an apparatus embodiment corresponding to the above-mentioned method embodiment. The specific operations of the processing steps of each module can be understood by referring to the description of the method embodiment, which will not be repeated here.
[0121] like Figure 4 As shown, the present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the method for predicting the operating efficiency of electric heating power facilities in the above-mentioned embodiment is implemented, or when the computer program is executed by a processor, the method for predicting the operating efficiency of electric heating power facilities in the above-mentioned embodiment is implemented. When the computer program is executed by the processor, the following method steps are implemented:
[0122] Step S1, obtaining electric heating user power data, transformer power data, distribution network infrastructure project data, resident characteristic information and electric heating related information of the electric heating area, and pre-processing the obtained data;
[0123] Step S2, determine the utilization rate of electric heating equipment according to the electric heating user power data; determine the transformer load rate of the substation according to the transformer power data; determine the design value of the investment payback period and the actual investment payback period according to the distribution network infrastructure project data, and calculate the investment payback period deviation rate.
[0124] Step S3, according to the utilization rate of the user's electric heating equipment, the load rate of the transformer in the substation and the offset rate of the investment payback period, based on the preset inefficient electric heating project judgment conditions, determine the inefficient electric heating projects in the substation and obtain the inefficient electric heating project set.
[0125] Step S5, construct a project operation efficiency evaluation model based on machine learning algorithm, input the preprocessed data and the inefficient project set in the substation into the project operation efficiency evaluation model to train the model, and obtain the trained project operation efficiency evaluation model according to the model convergence conditions until the model converges.
[0126] Step S6, input the resident characteristic information and electric heating related information of the planned electric heating project into the trained project operation efficiency evaluation model to determine the operation efficiency of the planned electric heating project.
[0127] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0128] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device or system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. The device and system embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0129] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or replace some or all of the technical features therein by equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and the contents not described in detail in the specification of the present invention belong to the common knowledge of those skilled in the art.
Claims
1. A method for predicting the operating efficiency of electric power facilities in an electric heating area, characterized in that: The following steps are involved: Obtaining electric heating user power data, transformer power data, distribution network infrastructure project data, resident characteristic information and electric heating related information in the electric heating area, and preprocessing the acquired data; Determine the utilization rate of electric heating equipment of users based on the electricity data of electric heating users; Determine the transformer load rate of the substation area according to the transformer power data; determine the design value of the investment payback period and the actual investment payback period according to the distribution network infrastructure project data, and calculate the investment payback period deviation rate; wherein, the determination of the user's electric heating equipment utilization rate according to the electric heating user's power data is specifically as follows: The maximum power capacity is determined according to the design parameters and installation configuration of the user's electric heating equipment, and the active power data of the user's electric heating equipment is obtained in real time through the smart meter and power monitoring system. The calculation formula for the utilization rate of the user's electric heating equipment is as follows: In the formula, Indicates the utilization rate of users' electric heating equipment, Indicates the user's active power. Indicates the capacity value reported by the user; The transformer load rate in the substation area is determined based on the transformer power data as follows: Transformer power data includes the rated capacity of the transformer in the substation and the total active power of the transformer in the substation. The maximum rated capacity of the transformer is determined, and the active power of the transformer in the substation is obtained in real time. The calculation formula for the load rate of the transformer in the substation is as follows: In the formula, Indicates the transformer load rate in the substation area. Indicates the active power of the transformer in the area. Indicates the rated capacity of the transformer in the substation; According to the utilization rate of the user's electric heating equipment, the load rate of the transformer in the substation and the offset rate of the investment payback period, based on the preset inefficient electric heating project determination conditions, the inefficient electric heating project in the substation is determined to obtain an inefficient electric heating project set; wherein, based on the preset inefficient electric heating project determination conditions, if any of the following conditions is met, the inefficient electric heating project in the substation is determined, and the determination conditions specifically include: Condition 1: Based on the utilization rate of the user's electric heating equipment, if the proportion of time periods when the utilization rate of the user's electric heating equipment exceeds 50% is less than 20%, the user is judged to be an inefficient user; otherwise, the user is an efficient user; and if the proportion of inefficient users within the electric heating area exceeds 50%, the area is judged to be an inefficient electric heating project; Condition 2: Based on the transformer load rate of the substation, if the proportion of time periods when the transformer load rate of the substation is greater than 50% is less than 20%, the electric heating project in the substation is judged to be an inefficient electric heating project, otherwise it is a high-efficiency project; Condition 3: According to the offset rate of the payback period, if the offset rate of the payback period is greater than 300%, the substation is judged to be an inefficient electric heating project; a project operation efficiency evaluation model based on a machine learning algorithm is constructed, and the pre-processed data and the substation inefficient project set are input into the project operation efficiency evaluation model to train the model, and the model converges according to the model convergence conditions to obtain a trained project operation efficiency evaluation model; The resident characteristic information and electric heating related information of the planned electric heating project are input into the trained project operation efficiency evaluation model to determine the operation efficiency of the planned electric heating project.
2. The method for predicting the operating efficiency of electric heating power facilities in an electric heating area according to claim 1, characterized in that: The preprocessing of the acquired data includes cleaning, normalizing and missing value filling of the acquired data.
3. The method for predicting the operating efficiency of electric heating power facilities in an electric heating area according to claim 1, characterized in that: Determining the design value of the payback period and the actual payback period according to the distribution network infrastructure project data and calculating the payback period deviation rate comprises the following steps: Obtain project planning information, project investment information, electricity fee information and government subsidy information for electric heating areas; Determine the design value of the investment payback period based on project planning information; Determine the actual investment payback period based on project investment information, electricity fee information and government subsidy information; Determine the deviation ratio of the payback period based on the designed payback period and the actual payback period; According to the deviation ratio of the payback period, the operation efficiency of the electric heating project based on the payback period is determined.
4. The method for predicting the operating efficiency of electric heating power facilities in an electric heating area according to claim 3, characterized in that: According to the project planning information, the calculation of the design value of the investment payback period is determined as follows: In the feasibility study stage of the electric heating project, the design value of the investment payback period is calculated based on the estimated electricity consumption in the heating season and the non-heating season, combined with the investment cost and expected benefits. The calculation formula is as follows: ; In the formula, Indicates n The annual electricity sales price, RMB / kWh; B Indicates n The amount of government subsidies in the year, RMB / kWh; P Indicates n The annual electricity purchase price, yuan / kWh; M Indicates the total investment amount; 、 They are expressed as the average number of days of use in the heating season and the non-heating season, respectively; 、 They are respectively expressed as heating season and non-heating season loads; t Indicates the daily usage time; C Representative number of households; According to the project investment information, electricity fee information and government subsidy information, the actual investment payback period is determined. The calculation is as follows: During the use of the electric heating project, the actual investment payback period is calculated based on the actual electricity consumption data of the construction project in the heating season and non-heating season. The calculation formula is as follows: ; In the formula, It represents the annual electricity value in the nth year after the implementation of the electric heating project; According to the design value of the payback period and the actual payback period, the payback period deviation rate is calculated. The calculation formula is as follows: 。 5. A device for predicting the operating efficiency of electric power facilities in an electric heating area, characterized in that: include: The data collection module is used to obtain the electric heating user power data, transformer power data, distribution network infrastructure project data, resident characteristic information and electric heating related information of the electric heating area; A data preprocessing module, used for preprocessing the data acquired by the data acquisition module; The first calculation module is used to determine the utilization rate of the user's electric heating equipment according to the electric heating user's power data; Determine the transformer load rate of the substation area according to the transformer power data; determine the design value of the investment payback period and the actual investment payback period according to the distribution network infrastructure project data, and calculate the investment payback period deviation rate; wherein, the determination of the user's electric heating equipment utilization rate according to the electric heating user's power data is specifically as follows: The maximum power capacity is determined according to the design parameters and installation configuration of the user's electric heating equipment, and the active power data of the user's electric heating equipment is obtained in real time through the smart meter and power monitoring system. The calculation formula for the utilization rate of the user's electric heating equipment is as follows: ; In the formula, Indicates the utilization rate of users' electric heating equipment, Indicates the user's active power. Indicates the capacity value reported by the user; The transformer load rate in the substation area is determined based on the transformer power data as follows: Transformer power data includes the rated capacity of the transformer in the substation and the total active power of the transformer in the substation. The maximum rated capacity of the transformer is determined, and the active power of the transformer in the substation is obtained in real time. The calculation formula for the load rate of the transformer in the substation is as follows: ; In the formula, Indicates the transformer load rate in the substation area. Indicates the active power of the transformer in the area. Indicates the rated capacity of the transformer in the substation; The inefficient project determination module is used to determine the inefficient electric heating project in the substation based on the user electric heating equipment utilization rate, the transformer load rate in the substation area and the investment payback period deviation rate calculated by the first calculation module, and obtain the inefficient electric heating project set based on the preset inefficient electric heating project determination conditions; the inefficient project determination module determines the inefficient electric heating project in the substation area according to the preset inefficient electric heating project determination conditions, if any of the following conditions is met, the determination conditions specifically include: Condition 1: Based on the utilization rate of the user's electric heating equipment, if the proportion of time periods when the utilization rate of the user's electric heating equipment exceeds 50% is less than 20%, the user is judged to be an inefficient user; otherwise, the user is an efficient user; and if the proportion of inefficient users within the electric heating area exceeds 50%, the project is judged to be an inefficient electric heating project; Condition 2: Based on the transformer load rate of the substation, if the proportion of time periods when the transformer load rate of the substation is greater than 50% is less than 20%, the electric heating project in the substation is judged to be an inefficient electric heating project, otherwise it is a high-efficiency project; Condition 3: According to the offset rate of the payback period, if the offset rate of the payback period is greater than 300%, the electric heating project corresponding to the substation is determined to be an inefficient electric heating project; a model building module is used to build a project operation efficiency evaluation model based on a machine learning algorithm, and the pre-processed data and the inefficient electric heating project set are input into the project operation efficiency evaluation model to train the model, and the model converges according to the model convergence conditions to obtain a trained project operation efficiency evaluation model; The project operation efficiency evaluation module is used to input the resident characteristic information and electric heating related information of the planned electric heating project into the trained project operation efficiency evaluation model to determine the operation efficiency of the planned electric heating project.
6. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, it implements the method for predicting the operating efficiency of electric facilities in an electric heating area as described in any one of claims 1 to 4.
7. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method for predicting the operating efficiency of electric facilities in an electric heating area as described in any one of claims 1 to 4 are implemented.