A fast calculation method for flood inundation physical indicators of large reservoirs

By generating cross-section drawdown limit and inundation limit range polygons, and combining DEM and remote sensing data for spatial analysis, an inundation result table is formed, which solves the problem of low flood inundation calculation efficiency in the existing technology and achieves rapid physical indicators of flood inundation in large reservoirs. , efficient calculation.

CN118537510BActive Publication Date: 2024-10-18CHANGJIANG SPATIAL INFORMATION TECH ENG CO LTD (WUHAN) +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411001332.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-18
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

It is difficult for the existing technology to take into account the accuracy of the hydrological and hydrodynamic model and the simplicity of the static water surface model in the calculation of flood inundation range, resulting in low efficiency in calculating physical indicators of flood inundation under large-scale conditions and difficulty in meeting rapid analysis requirements.

Method used

By generating cross-section drawdown limit range and submergence limit range polygons, and combining DEM data and land use remote sensing interpretation data for spatial overlay analysis, the submerged area and affected population are counted for each section, forming a submergence results table, and quickly calculated based on actual water level data. Flooding physical indicators.

Benefits of technology

It realizes the rapid calculation of physical indicators of flood inundation, takes into account calculation accuracy and simplicity, improves calculation speed and efficiency, and is suitable for flood inundation analysis of large reservoirs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118537510B_ABST
    Figure CN118537510B_ABST
Patent Text Reader

Abstract

The present invention provides a method for quickly calculating flood inundation physical indicators for large reservoirs, including the following steps: generating cross-sectional drawdown limit range polygons and cross-sectional inundation limit range polygons for each river section; generating grid points with elevation, grid area, administrative division, section, and land type; generating building facility point data with section, administrative division, area, population, and elevation information; pre-processing inundation indicators by section, administrative division, and water level to form an inundation result table; inputting actual water level data into the inundation result table to obtain the flood inundation physical indicators of the river section under the actual water level data. The method of the present invention has the dual advantages of high calculation accuracy and simple calculation. The method of the present invention only needs to take the nearest value or interpolate in the inundation result table according to the actual water level to quickly calculate the flood inundation physical indicators, with fast calculation speed and high calculation efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water conservancy and hydropower, and more specifically, relates to a method for quickly calculating flood inundation physical indicators for large reservoirs. Background Art

[0002] There are many river systems, and there will be many flood disasters. The occurrence of floods will cause certain economic losses. The rapid and accurate calculation of flood inundation physical indicators is of great significance for assisting the planning and site selection of water conservancy and hydropower projects, land acquisition and resettlement, assisting flood control scheduling decisions, and disaster loss assessment. To calculate flood inundation physical indicators, it is necessary to first calculate the flood inundation range, and then conduct statistics based on the physical indicator survey results within the inundation range to output the flood inundation physical indicators.

[0003] Existing flood inundation range calculations are mainly based on DEM data, combined with a section-by-section flood evolution model constructed using hydrology and hydrodynamics, or calculated based on a static water surface line with a set fixed elevation. The former can more accurately simulate the water level changes in different river sections at different times, but it requires the construction of hydrological and hydraulic parameter conditions, and the calculation process is relatively complicated; the latter is based on the calculation of the inundation range under static water level, which is divided into passive inundation and active inundation. The calculation is relatively simple and practical, but since the water surface of a natural river is not an absolute horizontal plane, the inundation range calculated by this method has a large error.

[0004] In addition, in order to calculate the physical indicators of flood inundation, spatial overlay analysis is generally performed based on the flood inundation range line and the physical indicator survey data, and the physical indicator data within the flood inundation range line is queried, calculated and counted. However, when the flood inundation analysis range is larger, the amount of physical indicator data within the corresponding range is larger, especially for the calculation of physical indicators of flooding in large reservoirs, the amount of data reading, spatial analysis, statistical calculation and other operations is also larger, the query calculation efficiency will be significantly reduced, and it is difficult to meet the requirements of fast analysis and calculation.

[0005] At present, in terms of flood inundation range calculation, there is no complete technical solution to balance the relative accuracy advantages of hydrological and hydrodynamic models with the simplicity of static water surface model calculations, while improving the ability to quickly calculate physical flood inundation indicators under large-scale conditions. Summary of the invention

[0006] The purpose of the present invention is to provide a method for quickly calculating flood inundation physical indicators for large reservoirs. The method has the dual advantages of high calculation accuracy and simple calculation, and has fast calculation speed and high calculation efficiency for flood inundation physical indicators.

[0007] To achieve the above object, the present invention provides a method for quickly calculating flood inundation physical indicators for large reservoirs, comprising the following steps:

[0008] According to the river section data, the cross-section drawdown limit range polygon and the cross-section flooding limit range polygon of each river section are generated;

[0009] Using the drawdown limit range polygons of each section to clip the DEM grids above and below the water in the river, only the DEM grid points within the drawdown limit range polygons of each section are retained, and the clipped DEM grid points are spatially overlaid with the land use remote sensing interpretation data, the drawdown limit range polygons of the section, and the administrative division data to generate grid points with elevation, grid area, administrative division, section, and land type. When the grid point is lower than the current water level of the section to which it belongs, the grid point is considered to be submerged;

[0010] Based on the polygonal data of the building facilities in the reservoir area, the building facility point data with section, administrative division, area, population and elevation information are generated by converting polygons to point features. When the elevation of the building facility point is lower than the current water level of the section to which it belongs, the building facility is considered to be affected by flooding.

[0011] For each river section, according to the trend of gradually rising water levels, the inundated area of ​​each type of land within different administrative divisions under corresponding water level conditions, the number of buildings and facilities affected by the inundation, and the information on the affected population are counted one by one to form an inundation results table;

[0012] The actual water level data is input into the flooding result table to obtain the flood inundation physical index of the river section under the actual water level data.

[0013] Furthermore, the polygon enclosed by the highest water level contour line, the lowest water level contour line and the upstream and downstream section dividing lines of the river section is taken as the section drawdown limit range polygon.

[0014] Furthermore, the midpoint of each adjacent section on the river vector line is taken, a vertical line is drawn perpendicular to the direction of the river flow, and intersects with the contour line of the river section to obtain the section dividing line.

[0015] Furthermore, a polygon enclosed by the highest water level contour line of the river section and the dividing line between the upstream and downstream sections of the section is used as the section flooding limit range polygon.

[0016] Furthermore, the generation of building facility point data with section, administrative division, area, population, and elevation information includes the following steps:

[0017] Based on the polygonal data of the building facilities in the reservoir area, point features after polygon conversion are formed by converting polygons into point features, and the building facility point data is generated;

[0018] Perform spatial overlay analysis on the generated building facility point data, the cross-section drawdown limit range polygon, and the administrative division data to obtain the river cross-section polygon and administrative division information to which each building facility point belongs;

[0019] When the survey data contains the elevation of the corner points of building facilities, the minimum value of the corner elevation is assigned to the elevation field of the building facility data; when the survey data does not contain the elevation of the corner points of building facilities, the elevation of the DEM grid where the building facility is located is assigned to the elevation field;

[0020] Add the attribute of population affected by flooding to the building facility point data, and assign the internal population value of the building obtained from the survey to this attribute field; add the area field to the building facility point, and assign the polygon area of ​​the building facility to this attribute field; the necessary fields contained in each building facility point include: number, coordinates, elevation, area, internal population, section, and administrative division.

[0021] Furthermore, the point element after the polygon conversion falls inside the corresponding building facility polygon.

[0022] Furthermore, the formation of the flooding result table includes the following steps:

[0023] Overlaying the cross-section flooding limit range polygon with administrative division data to obtain the flooding-affected administrative district information of each cross-section;

[0024] Set the elevation interval and create a flooding result table including the section number, administrative division, flooding water level, flooding area of ​​each type of land, number of affected buildings and facilities, area of ​​affected buildings and facilities, and population; record all sections, their corresponding administrative divisions affected by flooding, and flooding water level sequence data in each flooded administrative area into the flooding result table;

[0025] The inundated area, affected population, number of affected buildings and facilities, and area of ​​affected buildings and facilities of each type of land are initialized to 0. The inundated water level sequence is accumulated one by one from the lowest water level of the section to the highest water level according to the elevation interval. The land use grid points are traversed. According to the section number and administrative division to which the land use grid points belong, when the elevation of the land use grid points is not higher than the inundation water level sequence of the section, the grid size data of the land use grid points are accumulated to the inundation area data of the land type corresponding to the inundation water level; the building facility points are traversed. According to the section number and administrative division to which the building facility points belong, when the elevation of the building facility points is not higher than the inundation water level sequence of the section, the number of affected buildings and facilities corresponding to the inundation is increased by one, the accumulated area occupied by the building facility points is added to the field of the affected building facility area corresponding to the inundation water level, and the internal population is accumulated to the field of the affected population corresponding to the inundation water level.

[0026] Furthermore, the flooding water level sequence is accumulated from the lowest water level of the section to the highest water level one by one according to the set elevation intervals.

[0027] Furthermore, obtaining the flood inundation physical indicator comprises the following steps:

[0028] Input the actual water level data into the flooding results table, and query the record of the flooding water level attribute of the corresponding section in each administrative division that is closest to the input actual water level data; or perform interpolation calculation based on the known water level data and the actual water level data to obtain the physical flood inundation indicators of the section under this condition.

[0029] Furthermore, it also includes the step of reviewing and checking the data in the flood results table: within a single administrative area affected by a single river section, if a certain flood indicator remains unchanged or shows a monotonically increasing trend as the flood water level increases, then the data in the flood results table is considered to be accurate.

[0030] Furthermore, the method also includes a step of performing a three-dimensional dynamic display of the flood analysis based on time axis control on the obtained flood inundation physical indicators.

[0031] Compared with the prior art, the present invention has the following technical effects:

[0032] The method for rapid calculation of flood inundation physical indicators for large reservoirs of the present invention can take into account the relative accuracy advantage of the hydrological and hydrodynamic model and the simplicity of calculation of the static water surface model by accessing the hydrological process data calculated by the hydrological and hydrodynamic model section by section and combining it with the static water surface (close to the natural water surface) of multiple segmented sections, so that the method of the present invention has the dual advantages of high calculation accuracy and simple calculation.

[0033] The method for rapidly calculating flood inundation physical indicators for large reservoirs of the present invention is based on preprocessing of inundation physical indicator data of discrete water level conditions of sections to form an inundation result table. The flood inundation physical indicators can be rapidly calculated by simply taking the nearest value or interpolating the value in the inundation result table according to the actual water level, with fast calculation speed and high calculation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0035] Figure 1 A flowchart of a method for quickly calculating flood inundation physical indicators for large reservoirs provided by an embodiment of the present invention;

[0036] Figure 2 A schematic diagram of a cross-section drop limit range polygon and a cross-section flood limit range polygon provided in an embodiment of the present invention;

[0037] Figure 3 A schematic diagram of grid point generation with elevation, grid area, administrative division, cross section, and land use type provided in an embodiment of the present invention;

[0038] Figure 4 A schematic diagram of generating building facility point data with information such as cross-section, administrative division, floor area, population, elevation, etc. provided by an embodiment of the present invention;

[0039] Figure 5 A schematic diagram of preprocessing flood indicators by section, by administrative area, and by water level provided by an embodiment of the present invention;

[0040] Figure 6 A grassland inundation index map of the Han-82 section at each water level (0.1m interval) in a neighborhood committee provided by an embodiment of the present invention;

[0041] Figure 7 A line graph of water level and grassland inundation index of the Han-82 section in a neighborhood committee provided in an embodiment of the present invention;

[0042] Figure 8 A flood index map of a village under the jurisdiction of a certain city at a certain flood process moment provided by an embodiment of the present invention;

[0043] Figure 9.1-Figure 9.4 The present invention provides a comparison of flood indicators at different times in a city and a three-dimensional display of detailed flooding. Figure 9.1 This is the flood index map of a city at 8:00 on September 29; Figure 9.2 This is the flood index map of a city on September 30; Figure 9.3 This is a visualization of the flooding in a certain town in a certain city at 8:00 on September 29 (houses were not flooded); Figure 9.4 This is a visualization of the flooding (houses have been flooded) in a certain town in a certain city at 8:00 on September 30. DETAILED DESCRIPTION

[0044] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0045] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "said" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0046] The embodiment of the present invention provides a method for quickly calculating flood inundation physical indicators for large reservoirs. The process is as follows: Figure 1 As shown, the following steps are included:

[0047] 1. Data preparation, i.e. data pre-collection

[0048] The pre-collected data include: administrative division polygon data (including province, city, county, township and village levels), river section data within the reservoir, water level extremes of each river section (lowest water level, highest water level), river vector lines within the reservoir, river surface and underwater DEM or contour data, reservoir area land use remote sensing interpretation data, reservoir area building facility survey data (polygon, elevation, including internal population), and water level process data of river sections in the reservoir area (i.e., water level data of each section at different times in chronological order within a time period).

[0049] 2. Spatial Data Preprocessing

[0050] The data collected in step 1 is preprocessed, mainly including the following steps:

[0051] 1) Generate cross-section water-fall limit range polygon and cross-section flood limit range polygon

[0052] For each adjacent section, take its midpoint on the river vector line, draw a vertical line perpendicular to the direction of river flow, and intersect it with the river contour data to obtain the section dividing line. For each section, the polygon set enclosed by the highest water level contour lines on both sides of the river section, the lowest water level contour lines, and the upstream and downstream section dividing lines of the section is used as the section drawdown limit range polygon; the polygon set enclosed by the highest water level contour lines on both sides of the river section and the upstream and downstream section dividing lines of the section is used as the section flooding limit range polygon. During the period of river flooding and normal reservoir storage, the water surface within the section flooding limit range polygon is approximated as a horizontal plane. Figure 2 shown.

[0053] 2) Generate grid points with elevation, grid area, administrative division, section, and land use type

[0054] Use the drawdown limit polygons of each section in step 1) to clip the above-water and underwater DEM grids of the river channel, and only retain the DEM grid points within the drawdown limit polygons of each section. Perform spatial overlay analysis on the clipped DEM grid points with the land use remote sensing interpretation data, the section drawdown limit polygons, and the administrative division data to obtain the land use type (such as cultivated land, gardens, woodlands, grasslands, etc.), administrative division, and section of each grid point, and record the grid point elevation and grid resolution information. Each DEM grid point contains necessary field information including: number, elevation, grid area, province, city, county, township, village, section, and land type. When a grid point is lower than the current water level of the section to which it belongs, the grid point is considered to be submerged. The grid area is the square of the grid resolution. For example Figure 3 shown.

[0055] 3) Generate building facility point data with information such as cross-section, administrative division, area, population, elevation, etc.

[0056] Based on the polygonal data of the building facilities in the reservoir area, point features after polygon conversion are formed by converting polygons to point features to generate building facility point data. To ensure logical consistency, the point features after polygon conversion should fall inside the corresponding building facility polygon.

[0057] The building facility point data are spatially overlaid with the cross-section drawdown limit range polygon and administrative division data to obtain the river section polygon and administrative division information to which each building facility point belongs.

[0058] When the survey data contains the elevation of the corner points of building facilities, the minimum value of the corner elevation is assigned to the elevation field of the building facility data; when the survey data does not contain the elevation of the corner points of building facilities, the elevation of the DEM grid where the building facility is located is assigned to the elevation field.

[0059] Add the attribute of the number of people affected by flooding to the building facility data, and assign the value of the internal population of the building obtained from the survey to this attribute field. Add the area field to the building facility, and assign the polygon area of ​​the building facility to this attribute field. The necessary fields contained in each building facility include: number, coordinates, elevation, area, internal population, section, province, city, county, township, and village. When the elevation of the building facility is lower than the current water level of the section to which it belongs, the building facility is considered to be affected by flooding, and the affected population is the number of people inside the building.

[0060] 3. Pre-process the inundation indicators by section, administrative area, and water level to form an inundation results table

[0061] For each river section, the inundated area of ​​each type of land, the number of buildings and facilities affected by the inundation, and the population affected are counted one by one from the lowest water level to the highest water level of the section according to a certain elevation interval. The specific algorithm is:

[0062] 1) Overlay the cross-section limit inundation polygon with the administrative division data to obtain the administrative district information affected by the inundation of each cross-section.

[0063] 2) Set the elevation interval and create a flooding results table, including necessary fields such as section number, administrative division (province, city, county, township, village), flooding water level, flooding area of ​​different types of land (arable land, forest land, garden land, grassland area), number of affected buildings and facilities, area of ​​affected buildings and facilities, and population affected.

[0064] 3) All sections, their corresponding administrative divisions affected by flooding, and the flooding water level sequence in each flooded administrative division are recorded in the flooding results table. The flooded area of ​​each type of land, the affected population, the number of affected buildings and facilities, and the affected building and facility area are initialized to 0. The flooding water level sequence starts from the lowest water level of the section and accumulates one by one to the highest water level according to the set elevation interval.

[0065] 4) Traverse the land use grid points, and according to the section number and administrative division to which the land use grid points belong, when the elevation of the land use grid points is not higher than the flooding water level sequence of the section, add the grid size data of the land use grid points to the flooding area data of the land type corresponding to the flooding water level.

[0066] 5) Traverse the building and facility points, according to the section number and administrative division to which the building and facility points belong. When the elevation of the building and facility points is not higher than the inundation water level sequence of the section, add one to the number of affected building facilities corresponding to the inundation, add the accumulated land area of ​​the building and facility points to the field of affected building and facility area corresponding to the inundation water level, and add the internal population to the field of affected population corresponding to the inundation water level.

[0067] Through the algorithm of this embodiment, only one traversal of the grid point and building facility point data is required to generate the flood index preprocessing results, that is, to obtain the flood result table. Figure 5As shown, in step 1), the submerged administrative divisions involved in section Di include four villages, A, B, C, and D, and other sections are omitted; in step 2), the elevation interval is set to 1 m, and other submerged land types are omitted; in step 3), for each administrative district submerged by section Di, the water level is recorded at intervals of 1 m from the lowest water level of 155 m to the highest water level of 161 m, and all other fields are initialized to 0; in step 4), grid Si belongs to forest land, and in village A of section Di, the elevation is 160 m, which is not higher than the submerged water levels of 160 m and 161 m. Its grid area of ​​4 is accumulated in the corresponding forest land area table; in step 5), building facility Ji belongs to village B of section Di, and 1 is accumulated in the corresponding table of affected building facility quantity, 120 is accumulated in the affected building facility area, and 2 is accumulated in the affected population.

[0068] At the same time, for the land use and housing preprocessing results, within the single administrative division affected by a single section, as the flooding water level increases, a certain flooding index must remain unchanged or show a monotonically increasing trend, that is, the water level and the flooding index are plotted into a line graph, and the line should show a monotonically increasing trend. This rule can be used to review the flooding index preprocessing results to find anomalies in the processing results. In the actual calculation process, due to thread conflicts, data reading and writing anomalies, etc., the flooding result table formed may not be 100% accurate. Therefore, it is necessary to check according to this rule. If this rule is violated, the corresponding data in the flooding result table needs to be recalculated to ensure the accuracy of the data in the flooding result table.

[0069] 4. Analyze and calculate the inundation of each section based on the actual water level process data, obtain the physical index data of flood inundation, and summarize it by administrative division level

[0070] When it is necessary to perform inundation analysis and calculation based on events such as river flooding or reservoir water storage, input the actual water level process data of each section of the river in the reservoir area. For the inundation index of each section at any time, query the record of the inundation water level attribute of the corresponding section in each administrative division that is closest to the input actual water level data in the inundation result table, or perform interpolation calculation based on the known water level and the actual water level, and you can get the flood inundation physical index of the section under this condition, including the area of ​​various types of land, the population affected by inundation, and the number and area of ​​buildings and facilities affected by inundation. The inundation index of all sections is hierarchically summarized according to administrative divisions, and the inundation physical index of each administrative division at that time can be obtained. For example, the inundation physical index of the township level is the sum of the inundation physical index of all the village levels under it, and the inundation physical index of the county level is the sum of the inundation physical index of all the township levels under it.

[0071] In order to realize the dynamic display of flood inundation physical index analysis and enrich the interactive mode, the method of the embodiment of the present invention further includes step 5, three-dimensional GIS dynamic display of flood analysis based on time axis control

[0072] For the calculation results of inundation analysis, a 3D GIS-based inundation analysis result display function is provided, including:

[0073] 1) Provide control controls based on the timeline engine, including play, pause, speed, stop play control buttons and drag controls with timeline scales. Based on this control, the display of flood information at any time within the start and end time of the flood process can be dynamically controlled and positioned, including changes in water surface water level and flood range in the three-dimensional scene and dynamic changes in flood indicators on the interface.

[0074] 2) In the 3D terrain scene, for each section of the river, the water texture and light and shadow effects are rendered within the polygon of the section's flooding limit range to generate an approximate horizontal plane within the section. Based on the real water level process data, the control of the timeline engine is responded to to dynamically display the ups and downs of the water surface. With the help of the occlusion relationship of the 3D terrain and real-life 3D data, the changes in the flooding range are simulated. The water level of any section can be adjusted interactively to display the overall flooding index of the section at different heights.

[0075] 3) Provide a filtering and viewing function based on administrative division inundation indicators. By responding to the control of the timeline engine, the inundation statistical indicators of any level of administrative division at any time and the inundation indicators of the next level of administrative division (if any) can be displayed in a paused state. For the selected administrative division, the 3D scene automatically locates the administrative division, superimposes the administrative division polygon, and the annotations of the affected building facilities within the administrative division. By clicking the building facility point annotation icon, a pop-up window can be displayed to display the building facility details.

[0076] The method of the embodiment of the present invention can not only take into account the relative accuracy advantages of the hydrological and hydrodynamic models and the simple calculation advantages of the static water surface model, but also realize the fast and efficient calculation of the inundation physical indicators. For any flood process data, it provides a three-dimensional dynamic display function of the inundation physical indicators based on the timeline engine, supports flexible statistics of multi-level administrative divisions of provinces, cities, counties, and villages, and provides a richer interactive experience.

[0077] A method for quickly calculating flood inundation physical indicators for a large reservoir according to an embodiment of the present invention is described below by taking a large reservoir as an example, and the method includes the following steps:

[0078] (1) Data preparation: A large reservoir involves two provincial administrative regions. Vector polygon data of the zoning of provinces, cities, counties and villages at all levels around the reservoir area of ​​a large reservoir are collected. The cross-sectional data of the reservoir river are provided by relevant water conservancy professionals. A large reservoir involves two parts, A reservoir and B reservoir. There are 119 cross-sections in A reservoir and 25 cross-sections in B reservoir. The extreme water level data of each section can be obtained by taking the historical extreme values ​​of hydrological observations, or by calculating the combination of floods based on different water inflow frequencies through the hydrological and hydrodynamic models. The DEM data or contour data of the river channel are divided into above-water and underwater parts. The data sources, resolutions and spatial reference systems are often different. Therefore, necessary coordinate conversion and fusion processing of overlapping parts or hollow parts are required. For overlapping parts, the one with higher surveying and mapping accuracy can be taken. For hollow parts, spatial interpolation can be performed.

[0079] (2) Spatial data preprocessing: Generate the cross-section drawdown limit range polygon and the inundation limit range polygon based on the data prepared in step (1). Since the water surface of a natural river channel is a continuous curved surface with high upstream and low downstream, this step approximates the continuous curved surface through segmented horizontal planes to improve accuracy. It can be seen that the smaller the interval between cross-section divisions and the larger the number, the higher the approximation degree and the higher the calculation accuracy.

[0080] Generate grid points with elevation, grid area, administrative division, section, and land use type. First, use the polygons of the drawdown limit range of each section for clipping, which can eliminate irrelevant flooded areas and greatly reduce the amount of data processing. The extraction of other auxiliary information is achieved using the spatial overlay analysis function in GIS. In this embodiment, the original resolution of the above-water and underwater DEM is 1m, so the grid area field of each grid point is 1m 2 When the resolutions of DEMs above or below water or from different sources are inconsistent, the grid areas need to be calculated separately.

[0081] Generate building facility point data with information such as section, administrative division, area, population, elevation, etc. The number of building facilities around the reservoir is generally small. In extreme cases, when the number of building facility points is large, you can also first use the polygons of the drawdown limit range of each section to clip, remove data irrelevant to the flooded area, and reduce the amount of data.

[0082] (3) Pre-process the inundation indicators for each section, administrative district, and water level to obtain an inundation results table: This embodiment calculates the inundation physical indicator results for each section at each inundation water level within the administrative division affected by the inundation, from the lowest water level to the highest water level of the section, at intervals of 0.1m. Taking the section numbered "Han-82" as an example, the administrative districts affected by the inundation include five villages, namely Village A, a neighborhood committee, Village B, Village C, and Village D, which are under the jurisdiction of a town in a district of a city in a province. The minimum water level of the section is 159.8 meters and the maximum water level is 175m. Taking a neighborhood committee as an example, the local results of the inundation physical indicators are as follows: Figure 6 shown.

[0083] It can be seen that as the water level increases, the grassland flooded area gradually increases, and the line graph of water level and flooding index shows a monotonically increasing trend, such as Figure 7 As shown, it conforms to the established rules.

[0084] (4) According to the actual water level process data, the inundation analysis and calculation of each section is carried out to obtain the physical indicators of flood inundation, and the indicators are summarized by administrative divisions: the actual water level process data of the flood at a certain moment is accessed, and according to the actual water level of each section at that moment, the inundation indicators of each section under the respective water level conditions in each administrative division are summarized by level, so as to obtain the physical indicators of flood inundation such as the population affected by inundation, the area of ​​various types of land, the number and area of ​​houses affected by inundation, etc. Figure 8 As shown, in the area selection section, select a province or city to view the flooding indicators of the villages under its jurisdiction.

[0085] (5) 3D GIS dynamic display function of flooding analysis based on time axis control: Figure 9.1-Figure 9.4 As shown, it shows the comparison of inundation indicators of a city at two different times, 8:00 on September 29 and 8:00 on September 30, during a flood from September 1 to October 1, as well as the three-dimensional display details of the water surface inundation at a house in a town. Figure 9.1 The timeline control and multi-level administrative division selection interface are visible. Through the timeline control, you can drag arbitrarily within the flood time range, and calculate and display the flood index of any administrative division at the corresponding time in real time. At the same time, each section is drawn with the flood limit range polygon, and the water level height at the corresponding time is displayed in real time. With the help of three-dimensional terrain occlusion relationship, flood analysis and display are realized. Specific flooding effects are as follows: Figure 9.3 , Figure 9.4 As shown in the figure, due to the rising water level, the houses in the picture are submerged by the water surface. Click the house icon to query the detailed properties of the submerged house. After the water level rose, the number of houses and facilities in the submerged indicators on September 30 was larger than that on September 29, which is in line with the law.

[0086] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention patent shall be subject to the attached claims.

Claims

1. A rapid calculation method for flood inundation physical indicators for large reservoirs, characterized by: The following steps are involved: According to the river section data, the cross-section drawdown limit range polygon and the cross-section flooding limit range polygon of each river section are generated; The polygon formed by the highest water level contour line, the lowest water level contour line and the dividing line between the upstream and downstream sections of the river section is used as the polygon of the cross-section drawdown limit range; the polygon formed by the highest water level contour line and the dividing line between the upstream and downstream sections of the river section is used as the polygon of the cross-section flooding limit range; Using the drawdown limit range polygons of each section to clip the DEM grids above and below the water in the river, only the DEM grid points within the drawdown limit range polygons of each section are retained, and the clipped DEM grid points are spatially overlaid with the land use remote sensing interpretation data, the drawdown limit range polygons of the section, and the administrative division data to generate grid points with elevation, grid area, administrative division, section, and land type. When the grid point is lower than the current water level of the section to which it belongs, the grid point is considered to be submerged; Based on the polygonal data of the building facilities in the reservoir area, the building facility point data with section, administrative division, area, population and elevation information are generated by converting polygons to point features. When the elevation of the building facility point is lower than the current water level of the section to which it belongs, the building facility is considered to be affected by flooding. For each river section, according to the trend of gradually rising water levels, the inundated area of ​​each type of land within different administrative divisions under corresponding water level conditions, the number of buildings and facilities affected by the inundation, and the information on the affected population are counted one by one to form an inundation results table; The formation of the flooding results table includes the following steps: Overlaying the cross-section flooding limit range polygon with administrative division data to obtain the flooding-affected administrative district information of each cross-section; Set the elevation interval and create a flooding result table including the section number, administrative division, flooding water level, flooding area of ​​each type of land, number of affected buildings and facilities, area of ​​affected buildings and facilities, and population; record all sections, their corresponding administrative divisions affected by flooding, and flooding water level sequence data in each flooded administrative area into the flooding result table; Initialize the inundated area, affected population, number of affected buildings and facilities, and area of ​​affected buildings and facilities of each type of land to 0. The inundated water level sequence is accumulated one by one from the lowest water level of the section to the highest water level according to the elevation interval. Traverse the land use grid points. According to the section number and administrative division to which the land use grid points belong, when the elevation of the land use grid points is not higher than the inundated water level sequence of the section, the grid size data of the land use grid points is accumulated to the inundated area data of the land type corresponding to the inundation water level; traverse the building and facility points. According to the section number and administrative division to which the building and facility points belong, when the elevation of the building and facility points is not higher than the inundation water level sequence of the section, add one to the number of affected buildings and facilities corresponding to the inundation, add the accumulated area of ​​the building and facility points to the field of the affected building and facility area corresponding to the inundation water level, and accumulate the internal population to the field of the affected population corresponding to the inundation water level; The actual water level data is input into the flooding result table to obtain the flood inundation physical index of the river section under the actual water level data.

2. The method for rapid calculation of flood inundation physical indicators for large reservoirs as claimed in claim 1, characterized in that: For each adjacent section, take its midpoint on the river vector line, draw a vertical line perpendicular to the river flow direction, and intersect it with the river section contour line to obtain the section dividing line.

3. The method for rapid calculation of flood inundation physical indicators for large reservoirs as claimed in claim 1, characterized in that: The generation of building facility point data with section, administrative division, area, population, and elevation information includes the following steps: Based on the polygonal data of the building facilities in the reservoir area, point features after polygon conversion are formed by converting polygons into point features, and the building facility point data is generated; Perform spatial overlay analysis on the generated building facility point data, the cross-section drawdown limit range polygon, and the administrative division data to obtain the river cross-section polygon and administrative division information to which each building facility point belongs; When the survey data contains the elevation of the corner points of building facilities, the minimum value of the corner elevation is assigned to the elevation field of the building facility data; when the survey data does not contain the elevation of the corner points of building facilities, the elevation of the DEM grid where the building facility is located is assigned to the elevation field; Add the attribute of population affected by flooding to the building facility point data, and assign the internal population value of the building obtained from the survey to this attribute field; add the area field to the building facility point, and assign the polygon area of ​​the building facility to this attribute field; the necessary fields contained in each building facility point include: number, coordinates, elevation, area, internal population, section, and administrative division.

4. The method for rapid calculation of flood inundation physical indicators for large reservoirs as claimed in claim 3 is characterized in that: The point element after the polygon conversion falls inside the corresponding building facility polygon.

5. The method for rapid calculation of flood inundation physical indicators for large reservoirs as claimed in claim 1, characterized in that: The flooding water level sequence starts from the lowest water level of the section and accumulates one by one to the highest water level according to the set elevation intervals.

6. The method for rapid calculation of flood inundation physical indicators for large reservoirs as claimed in claim 1, characterized in that: Obtaining the flood inundation physical indicator includes the following steps: Input the actual water level data into the flooding results table, and query the record of the flooding water level attribute of the corresponding section in each administrative division that is closest to the input actual water level data; or perform interpolation calculation based on the known water level data and the actual water level data to obtain the physical flood inundation indicators of the section under this condition.

7. The method for rapid calculation of flood inundation physical indicators for large reservoirs as claimed in claim 1, characterized in that: It also includes the step of reviewing and checking the data in the flood results table: within a single administrative area affected by a single river section, if a certain flood indicator remains unchanged or shows a monotonically increasing trend as the flood water level increases, the data in the flood results table are considered accurate.

8. The method for rapid calculation of flood inundation physical indicators for large reservoirs according to any one of claims 1 to 7, characterized in that: The method also includes a step of performing a three-dimensional dynamic display of the flood analysis based on time axis control on the obtained flood inundation physical indicators.

Citation Information

Patent Citations

  • Flood risk deduction method and system and electronic equipment

    CN116976670A

  • Real-time and efficient basin flood inundation simulation method

    CN117574628A