A method for monitoring the operation of an automated production line of high-strength protective coatings

By analyzing the preparation variation parameters and impact characteristics of the production link, and adjusting the timing prediction model, the problem of being unable to accurately capture the impact of the production link in the existing technology is solved, and accurate monitoring and early problem discovery of the high-strength protective coating production line are achieved.

CN118551230BActive Publication Date: 2024-10-18XIAMEN HUITENGSHENG ENERGY SAVING MATERIALS CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411028283.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-10-18
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

Existing time series prediction models cannot accurately capture the impact of different production links on the performance of high-strength protective coatings, resulting in insufficient accuracy in automated production line operation monitoring.

Method used

By obtaining the monitoring data vector and performance data vector of each production batch, the preparation variation parameters and impact accumulation coefficients of the production link are analyzed, the initial weight coefficient and sensitivity coefficient are calculated, and the timing prediction algorithm is adjusted to obtain a more accurate timing prediction model.

Benefits of technology

Achieve more accurate monitoring of the high-strength protective coating automated production line, detect production problems early, and ensure product quality and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118551230B_ABST
    Figure CN118551230B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of manufacturing production monitoring, and specifically to an operation monitoring method for an automated production line of high-strength protective coatings. The present invention first obtains a sample set; further obtains the preparation change parameters of a target data vector; further obtains the cumulative influence coefficient of the target data vector; further obtains the initial weight coefficient of the target data vector; further obtains the sensitivity coefficient of the target link; further obtains the modified weight coefficient of the target data vector; further adjusts the preset timing prediction algorithm to obtain a timing prediction model; and finally monitors the automated production line of high-strength protective coatings according to the timing prediction model. The present invention analyzes the preparation changes in the production links, combines the cumulative impact characteristics in the production process, and analyzes the weight of each monitoring data vector from a local and overall perspective, to obtain a timing prediction model suitable for production monitoring of high-strength protective coatings, so as to discover production problems earlier and ensure product production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of manufacturing production monitoring, and in particular to an operation monitoring method for an automated production line of a high-strength protective coating. Background Art

[0002] The operation monitoring method of the high-strength protective coating automated production line is of great significance to the production management of the enterprise. Through real-time monitoring and data analysis of the high-strength protective coating automated production line, the operation status of the production line can be better understood, problems can be discovered and adjusted in a timely manner, which will help improve production efficiency, product quality and safety, reduce production costs, and promote the sustainable development of the enterprise.

[0003] During the production process of different batches of high-strength protective coatings, differences in the same preparation links lead to differences in the performance of high-strength protective coatings. However, different production links have different impacts on subsequent production links and product performance. The existing time series prediction model cannot accurately capture this feature, resulting in insufficient accuracy of the time series prediction model and inability to monitor the operation of the automated production line. Summary of the invention

[0004] In order to solve the technical problem that the existing time series prediction model cannot capture the impact of different production links on product performance, affecting the production monitoring of high-strength protective coatings, the purpose of the present invention is to provide an operation monitoring method for an automated production line of high-strength protective coatings. The technical solution adopted is as follows:

[0005] A method for monitoring the operation of an automated production line of a high-strength protective coating, the method comprising:

[0006] In the preset sample set, the monitoring data vector of each production link in each production batch of the high-strength protective coating is obtained, and the performance data vector of each batch of the high-strength protective coating is obtained; the monitoring data vector of any production link in any production batch is selected as the target data vector, the corresponding target performance data vector, and the corresponding production link as the target link;

[0007] According to the outlier characteristics of the target data vector in all monitoring data vectors in the same production link, the preparation change parameter of the target data vector is obtained; according to the distribution characteristics of the preparation change parameter of the monitoring data vector in the target link, combined with the change characteristics of the preparation change parameter of the monitoring data vector in the adjacent production links, the influence cumulative coefficient of the target data vector is obtained;

[0008] According to the correlation characteristics of the target data vector to the target performance data vector, combined with the impact accumulation coefficient, the initial weight coefficient of the target data vector is obtained; according to all the initial weight coefficients corresponding to the target link, the sensitivity coefficient of the target link is obtained; according to the sensitivity coefficient, combined with the initial weight coefficient, the modified weight coefficient of the target data vector is obtained;

[0009] According to the modified weight coefficient of the monitoring data vector of each production link of each production batch, the preset time series prediction algorithm is adjusted to obtain the time series prediction model; the high-strength protective coating automated production line is monitored according to the time series prediction model.

[0010] Furthermore, the method for obtaining the preparation variation parameter includes:

[0011] According to the difference characteristics between the target data vector and the average values ​​of all monitoring data vectors corresponding to the target link, the preparation change parameters of the target data vector are obtained.

[0012] Furthermore, the calculation method of the preparation variation parameter includes:

[0013] The average value of all monitoring data vectors in the target link is obtained as a comparison vector; the difference between the target data vector and the comparison vector is obtained as a difference vector; the ratio of the modulus of the difference vector to the modulus of the comparison vector is used as an outlier parameter; and the prepared variation parameter of the target data vector is obtained after normalizing the outlier parameter.

[0014] Furthermore, the method for obtaining the impact accumulation coefficient includes:

[0015] Obtaining the skewness of the prepared change parameter of all monitoring data vectors corresponding to the target link, and obtaining the influence weight coefficient according to the skewness;

[0016] Obtaining a difference between the preparation change parameter corresponding to the next production link adjacent to the target data vector and the preparation change parameter of the target data vector as an influencing factor;

[0017] Taking the absolute value of the average value of all the influencing factors in the production batch to which the target data vector belongs as the influencing correction factor;

[0018] According to the influence weight coefficient, the influence factor and the influence correction factor, the influence cumulative coefficient of the target data vector is obtained; the influence weight coefficient and the influence factor are both positively correlated with the influence cumulative coefficient; the influence correction factor is negatively correlated with the influence cumulative coefficient.

[0019] Furthermore, the calculation method of the influence weight coefficient includes:

[0020] The skewness is negatively correlated and normalized to serve as the corresponding influence weight coefficient.

[0021] Furthermore, the calculation method of the impact accumulation coefficient includes:

[0022] The ratio of the product of the influence factor of the target data vector and the influence weight coefficient to the influence correction factor is used as the influence accumulation coefficient of the target data vector.

[0023] Furthermore, the method for obtaining the initial weight coefficient includes:

[0024] Acquire the associated parameter of the target data vector according to the modulus of the target data vector, the modulus of the target performance data vector, and the impact accumulation coefficient; the modulus of the target data vector is positively correlated with the associated parameter, the modulus of the target performance data vector is negatively correlated with the associated parameter, and the impact accumulation coefficient is positively correlated with the associated parameter;

[0025] The associated parameters are normalized using all the associated parameters corresponding to the target link and used as the initial weight coefficient of the target data vector.

[0026] Furthermore, the method for obtaining the sensitivity coefficient includes:

[0027] The average of the initial weight coefficients of the target link corresponding to all production batches is taken as the sensitivity coefficient of the target link.

[0028] Furthermore, the method for acquiring the time series prediction model includes:

[0029] Based on the preset time series prediction algorithm, the trend item and the seasonal item of the monitoring data vector of all production links in all production batches are obtained, and the trend item and the seasonal item are weighted using the corresponding modified weight coefficient to obtain the time series prediction model.

[0030] Furthermore, the preset time series prediction algorithm is a SARIMA algorithm.

[0031] The present invention has the following beneficial effects:

[0032] The present invention first obtains the monitoring data vector of each production link in each production batch of high-strength protective coatings, as well as the performance data vector of each batch of high-strength protective coatings, to provide a data basis for the subsequent analysis process; further, according to the outlier characteristics of the target data vector in all monitoring data vectors of the same production link, the preparation change parameters of the target data vector are analyzed from the perspective of the preparation change of the production link to obtain the preparation change parameters of the target data vector, to provide a basis for the subsequent analysis; further, from the perspective of the overall preparation change parameter distribution of the target link, and integrating the cumulative impact characteristics of the production link, the impact cumulative coefficient of the target data vector is obtained, for the subsequent analysis of the importance of each target data vector and the sensitivity of the target link, and finally a time series prediction model is obtained to prepare for monitoring the automated production line; further, according to the target data vector The correlation characteristics of the target performance data vector are measured, combined with the cumulative impact coefficient, and the importance of the target data vector to the target performance data vector is measured from a local perspective to obtain the initial weight coefficient, in preparation for further corrections in the future; further, from the overall perspective of all the initial weight coefficients corresponding to the target link, the sensitivity of the target link is measured to obtain the sensitivity coefficient, and the initial weight coefficient is corrected using the sensitivity coefficient to obtain the corrected weight coefficient of the target data vector, so that the corrected weight coefficient can better represent the importance of the target data vector, and the subsequent time series prediction model is more accurate; finally, according to the corrected weight coefficient of the monitoring data vector of each production link of each production batch, the preset time series prediction algorithm is adjusted to obtain the time series prediction model, and the time series prediction model is used to monitor the automated production line of high-strength protective coatings. The present invention analyzes the preparation changes in the production links, combines the cumulative impact characteristics in the production process, and analyzes the weight of each monitoring data vector from a local and overall perspective to obtain a time series prediction model suitable for the production monitoring of high-strength protective coatings, so as to discover production problems earlier and ensure product production. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0034] Figure 1 A flow chart of an operation monitoring method of an automated production line of high-strength protective coatings provided by one embodiment of the present invention;

[0035] Figure 2 A flow chart of a method for obtaining an impact accumulation coefficient provided by an embodiment of the present invention;

[0036] Figure 3A schematic diagram of a computer device for monitoring the operation of an automated production line of high-strength protective coatings provided in accordance with an embodiment of the present invention. DETAILED DESCRIPTION

[0037] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the operation monitoring method of a high-strength protective coating automated production line proposed by the present invention, its specific implementation method, structure, characteristics and effects, in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0038] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0039] The following is a detailed description of a specific scheme of an operation monitoring method for an automated production line of high-strength protective coatings provided by the present invention in conjunction with the accompanying drawings.

[0040] See also Figure 1 , which shows a flow chart of an operation monitoring method of a high-strength protective coating automated production line provided by an embodiment of the present invention, specifically comprising:

[0041] Step S1: In the preset sample set, obtain the monitoring data vector of each production link in each production batch of high-strength protective coating, and obtain the performance data vector of each batch of high-strength protective coating; select the monitoring data vector of any production link in any production batch as the target data vector, the corresponding target performance data vector, and the corresponding production link as the target link.

[0042] In the embodiment of the present invention, firstly, in the preset sample set, the monitoring data vector of each production link in each production batch of high-strength protective coating is obtained, and the performance data vector of each batch of high-strength protective coating is obtained to provide a data basis for the subsequent analysis process. And the monitoring data vector of any production link in any production batch is selected as the target data vector, the corresponding target performance data vector, and the corresponding production link as the target link, and the monitoring data vectors are analyzed one by one.

[0043] It should be noted that since the high-strength protective coating products produced in each production batch are packaged after production is completed, the production process is consistent, so in the preset sample set, there only needs to be one high-strength protective coating product from each production batch. The number of samples in the specific sample set can be determined by the implementer and is not limited here.

[0044] It should be noted that both the monitoring data vector and the performance data vector are multidimensional data vectors. In one embodiment of the present invention, the dimensions of the monitoring data vector include: stirring environment temperature, stirring speed, intermediate material component quality and output mixed material quality; the dimensions of the performance data vector include: test temperature, gel time, surface dry time and elastomer performance; in other embodiments of the present invention, the implementer can adjust it according to actual needs; in the data vector, the arrangement order of each data indicator is arbitrary, but the sorting method in different data vectors is the same.

[0045] It should be noted that due to the different number of production links of different types of high-strength protective coatings, the data dimensions and performance testing dimensions that need to be monitored may also vary. Therefore, one type of protective coating product has a sample set, corresponding to the acquisition time series prediction model; at the same time, in order to avoid the influence of data units of different data dimensions, all data are normalized.

[0046] Step S2: According to the outlier characteristics of the target data vector in all monitoring data vectors of the same production link, the preparation change parameters of the target data vector are obtained; according to the distribution characteristics of the preparation change parameters of the monitoring data vector in the target link, combined with the change characteristics of the preparation change parameters of the monitoring data vectors in adjacent production links, the impact cumulative coefficient of the target data vector is obtained.

[0047] In the embodiment of the present invention, considering that the production links of the same type of high-strength protective coatings are the same, the differences in product performance data are mainly reflected in the monitoring data of each production link, so it is necessary to analyze from the perspective of preparation changes in the production link; considering that the outlier characteristics of the target data vector in all monitoring data vectors of the same production link represent the change characteristics of the preparation link, the preparation change parameters of the target data vector are obtained according to the outlier characteristics of the target data vector in all monitoring data vectors of the same production link, providing a basis for subsequent analysis.

[0048] Preferably, in one embodiment of the present invention, considering that the greater the difference between a certain monitoring data vector and the average value of all monitoring data vectors of the same production link, the more obvious the outlier characteristics of the monitoring data vector are, and the greater the change in the preparation link is, the preparation change parameters of the target data vector are obtained based on the difference characteristics between the target data vector and the average values ​​of all monitoring data vectors corresponding to the target link.

[0049] Preferably, in one embodiment of the present invention, the average value of all monitoring data vectors in the target link is obtained as the comparison vector; the difference between the target data vector and the comparison vector is obtained as the difference vector; the ratio of the modulus of the difference vector to the modulus of the comparison vector is used as the outlier parameter; the outlier parameter is normalized to obtain the preparation change parameter of the target data vector. The calculation formula of the preparation change parameter includes:

[0050] ;

[0051] in, Indicates the serial number of the production batch; Indicates the serial number of the production link; Indicates Production batch No. Preparation change parameters of the target data vector corresponding to each production link; Indicates Production batch No. The outlier parameter of the target data vector corresponding to the production link, , Indicates Production batch No. The target data vector corresponding to each production link, Indicates The mean of all monitoring data vectors corresponding to each production link is also the comparison vector; Indicates Production batch No. The difference vector corresponding to each production link, Represents the vector modulus operator; Represents the standard normalization function, and the normalization range is the outlier parameters corresponding to all production links of all production batches.

[0052] In the calculation formula of the preparation change parameter, the larger the difference vector is, the greater the difference between the target data vector and the average value of all monitoring data vectors corresponding to the target link is, the more obvious the outlier feature is, and the larger the preparation change parameter is.

[0053] In other embodiments of the present invention, the implementer may also calculate the Euclidean distance of data of the same dimension based on the Euclidean distance and sum the Euclidean distances of all dimensions to measure the outlier characteristics of the target data vector; other basic mathematical operations or function mappings may also be used to implement relevant mappings, which are technical means well known to those skilled in the art and will not be elaborated here.

[0054] It should be noted that the average value of all vectors is a data vector composed of the average values ​​of each dimension.

[0055] In the embodiment of the present invention, it is also taken into account that the high-strength protective coating will be affected by the adjacent production links during the production process, that is, when the intermediate product of the previous production link does not meet the standard, it will affect the preparation process of the next production link and the quality of the output intermediate product, and ultimately affect the performance of the high-strength protective coating, which is manifested in the change characteristics of the preparation change parameters of the monitoring data vectors of the adjacent production links; and the change of the preparation change parameters of the adjacent production links is to analyze the impact of a certain production link from a local perspective. In order to obtain a more accurate cumulative impact coefficient, it is analyzed from the perspective of overall characteristics. Therefore, according to the distribution characteristics of the preparation change parameters of the monitoring data vector in the target link, combined with the change characteristics of the preparation change parameters of the monitoring data vector of the adjacent production links, the cumulative impact coefficient of the target data vector is obtained, so as to prepare for the subsequent analysis of the importance of each target data vector and the sensitivity of the target link, and finally obtain the time series prediction model to monitor the automated production line.

[0056] Preferably, in one embodiment of the present invention, the method for obtaining the impact accumulation coefficient includes:

[0057] See also Figure 2 , which shows a flow chart of a method for obtaining an impact accumulation coefficient provided by an embodiment of the present invention:

[0058] Step S101: Obtain the skewness of the prepared change parameters of all monitoring data vectors corresponding to the target link, and obtain the influence weight coefficient according to the skewness.

[0059] Taking into account that the smaller the skewness of the preparation change parameters of all monitoring data vectors corresponding to the target link, the more concentrated the preparation change parameters of the monitoring data vectors corresponding to the target link are on the right side of the mean, which means that the preparation change parameters corresponding to the target link are generally larger, and the preparation change parameters of the target data vector are more likely to be larger. At the same time, in order to facilitate weighted correction, in one embodiment of the present invention, the skewness is negatively correlated and normalized to obtain the influence weight coefficient.

[0060] It should be noted that, in one embodiment of the present invention, the skewness is multiplied by -1 and the product is normalized using the sigmoid function; in other embodiments of the present invention, the implementer may also use a box plot to analyze the overall distribution characteristics of all preparation variation parameters corresponding to the target link, wherein when the distribution is symmetrical, the median line is roughly in the middle of the box, and the lengths of the left and right whiskers are close; when the distribution is positively skewed, the median line is close to the bottom of the box, and the right whisker is longer; when the distribution is negatively skewed, the median line is close to the top of the box, and the left whisker is longer; other basic mathematical operations or mapping functions may also be used for relevant mapping, which are all technical means well known to those skilled in the art and will not be elaborated here.

[0061] Step S102: Obtain the difference between the preparation change parameter corresponding to the next adjacent production link of the target data vector and the preparation change parameter of the target data vector as an influencing factor.

[0062] Considering that the greater the difference between the preparation change parameters corresponding to the next adjacent production link and the preparation change parameters of the current link, the greater the influence of the current link on the next adjacent link, and the more obvious the cumulative influence characteristics, the difference between the preparation change parameters corresponding to the next adjacent production link of the target data vector and the preparation change parameters of the target data vector is obtained as the influencing factor.

[0063] Step S103: taking the absolute value of the average value of all influencing factors in the production batch to which the target data vector belongs as the influencing correction factor.

[0064] In order to measure the relative size of the influencing factors, the absolute value of the average value of all influencing factors in the production batch to which the target data vector belongs is taken as the influencing correction factor.

[0065] Step S104: Obtain the impact accumulation coefficient of the target data vector according to the impact weight coefficient, the impact factor and the impact correction factor; the impact weight coefficient and the impact factor are both positively correlated with the impact accumulation coefficient; the impact correction factor is negatively correlated with the impact accumulation coefficient.

[0066] The impact weight coefficient represents the possibility of the target data vector affecting the next production link from the perspective of the overall preparation change parameter distribution, and the impact weight coefficient is positively correlated with the impact accumulation coefficient; the impact factor represents the possibility of the target data vector affecting the next production link from a local perspective, and the impact factor is positively correlated with the impact accumulation coefficient; in order to measure the relative size of the impact factor with the help of the impact correction factor, the impact correction factor needs to be negatively correlated with the impact accumulation coefficient.

[0067] In one embodiment of the present invention, the ratio of the product of the influence factor of the target data vector and the influence weight coefficient to the influence correction factor is used as the influence accumulation coefficient of the target data vector.

[0068] The calculation formula for the impact accumulation coefficient includes:

[0069] ;

[0070] in, Indicates the serial number of the production batch; Indicates the serial number of the production link; Indicates Production batch No. The cumulative impact coefficient corresponding to each production link; Indicates Production batch No. The influencing factor of the target data vector corresponding to each production link, ; Indicates Production batch No. Preparation change parameters of the target data vector corresponding to each production link; Indicates Production batch No. Preparation change parameters of the target data vector corresponding to each production link; Represents the sigmoid function; Indicates The skewness of all brake variation parameters corresponding to each production link; Indicates The absolute value of the mean of all influencing factors corresponding to each production link; Indicates taking the absolute value; Indicates division by zero argument, .

[0071] In the calculation formula of the impact accumulation coefficient, The larger it is, the greater the impact of the abnormal deviation of the target data vector on the next production link, the more obvious the cumulative effect, and the greater the cumulative coefficient; The larger the value is, the more all the preparation change parameters corresponding to the target link are distributed on the right side of the mean. The target link is more likely to affect the next production link. The influencing factors obtained from the local perspective are corrected from the perspective of overall distribution to improve the accuracy of the cumulative coefficient of influence. Indicates The absolute value of the mean of all influencing factors corresponding to each production link is used to measure the relative size of the influencing factors.

[0072] It should be noted that in other embodiments of the present invention, other basic mathematical operations or function mappings may also be used to implement relevant mappings, which are technical means well known to those skilled in the art and will not be elaborated herein.

[0073] Among them, a positive correlation means that the dependent variable will increase as the independent variable increases, and the dependent variable will decrease as the independent variable decreases. The specific relationship can be a multiplication relationship, an addition relationship, or the power of an exponential function, which is determined by actual application; a negative correlation means that the dependent variable will decrease as the independent variable increases, and the dependent variable will increase as the independent variable decreases. It can be a subtraction relationship, a division relationship, etc., which is determined by actual application.

[0074] Step S3: According to the correlation characteristics of the target data vector to the target performance data vector, combined with the cumulative influence coefficient, the initial weight coefficient of the target data vector is obtained; according to all the initial weight coefficients corresponding to the target link, the sensitivity coefficient of the target link is obtained; according to the sensitivity coefficient, combined with the initial weight coefficient, the modified weight coefficient of the target data vector is obtained.

[0075] Taking into account that the stronger the correlation between the target data vector and the target performance data vector, the higher the cumulative impact coefficient, which means that the target data vector is more important, the initial weight coefficient of the target data vector is obtained based on the correlation characteristics of the target data vector to the target performance data vector and the cumulative impact coefficient, in order to prepare for the subsequent analysis of the overall characteristics of the target link and obtain a more accurate revised weight coefficient.

[0076] Preferably, in one embodiment of the present invention, considering that the modulus of a vector represents the size of the vector, and the impact accumulation coefficient characterizes the impact characteristics of the target data vector on the next adjacent production link, the associated parameters of the target data vector are obtained according to the modulus of the target data vector, the modulus of the target performance data vector, and the impact accumulation coefficient; the modulus of the target data vector is positively correlated with the associated parameters, the modulus of the target performance data vector is negatively correlated with the associated parameters, and the impact accumulation coefficient is positively correlated with the associated parameters;

[0077] Since the connection characteristics between the target data vector and the target performance data vector cannot be analyzed directly based on the modulus of the vector, the associated parameters need to be normalized, and the normalization range needs to be all associated parameters corresponding to all the same links. The relative size between the associated parameters can be used to reflect the influence of the target data vector on the target performance data vector. Therefore, the associated parameters are normalized using all the associated parameters corresponding to the target link and used as the initial weight coefficient of the target data vector.

[0078] In one embodiment of the present invention, the ratio of the modulus of the target data vector to the modulus of the target performance data vector and the product of the impact accumulation coefficient are used as association parameters; the association parameters are normalized using all association parameters corresponding to the target link and used as the initial weight coefficient of the target data vector.

[0079] In the calculation method of the initial weight coefficient, the larger the association parameter is, the more prominent the target data vector is compared with the target performance data vector; the larger the normalized result is, the more prominent the association parameter is compared with all association parameters of the same link; the greater the influence of the target data vector represented by the association parameter on the target performance data vector, the larger the initial weight coefficient is.

[0080] It should be noted that in other embodiments of the present invention, other basic mathematical operations or function mappings may also be used to implement relevant mappings, which are technical means well known to those skilled in the art and will not be elaborated herein.

[0081] In order to further correct the initial weight coefficient based on the overall data characteristics and make the weight of the target data vector more accurate, the sensitivity coefficient of the target link is obtained based on all the initial weight coefficients corresponding to the target link.

[0082] Preferably, in one embodiment of the present invention, considering that in all production batches, the larger the overall mean of all initial weight coefficients corresponding to a certain link is, the more important this production link is for the performance of the product, the greater the impact is, the stronger the sensitivity in production is, and the larger the sensitivity coefficient is, so the mean of the initial weight coefficients corresponding to the target link in all production batches is taken as the sensitivity coefficient of the target link.

[0083] In one embodiment of the present invention, statistical features such as mode, median and mean may be combined to perform weighted summation to obtain a sensitivity coefficient. For example, the mode, median and mean are given the same data weight to obtain the sensitivity coefficient.

[0084] Preferably, in one embodiment of the present invention, considering that the larger the sensitivity coefficient is, the higher the sensitivity of the target link is, the greater the impact of the target link on the product performance is, and the more important the data of the target link is when the timing prediction model is subsequently established; the larger the initial weight coefficient is, the greater the impact of the target data vector on the target performance data vector is, and the larger the data weight should be when the timing prediction model is subsequently established, so the sensitivity coefficient and the initial weight coefficient are both positively correlated with the modified weight coefficient.

[0085] In one embodiment of the present invention, the product of the initial weight coefficient of the target data vector and the sensitivity coefficient is used as the modified weight coefficient of the target data vector.

[0086] It should be noted that in other embodiments of the present invention, other basic mathematical operations or function mappings such as exponential functions may be used to achieve relevant mappings. These are technical means well known to those skilled in the art and will not be elaborated here.

[0087] Step S4: According to the modified weight coefficient of the monitoring data vector of each production link of each production batch, adjust the preset time series prediction algorithm to obtain the time series prediction model; monitor the high-strength protective coating automated production line according to the time series prediction model.

[0088] After obtaining the corrected weight coefficient corresponding to each production link of each production batch, the time series prediction algorithm can be adjusted to obtain an accurate time series prediction model.

[0089] Preferably, in one embodiment of the present invention, the trend items and seasonal items of the monitoring data vectors of all production links in all production batches are obtained based on a preset time series prediction algorithm, and the trend items and seasonal items are weighted using corresponding modified weight coefficients to obtain a time series prediction model.

[0090] It should be noted that, in one embodiment of the present invention, the preset time series prediction algorithm is the SARIMA (Seasonal Auto Regressive Integrated Moving Average) algorithm. In other embodiments of the present invention, other time series prediction algorithms such as the ETS (Error, Trend, Seasonal) algorithm and the Prophet algorithm may also be selected, and weighted adjustment is performed by modifying the weight coefficient to obtain a time series prediction model. These are all technical means well known to those skilled in the art and will not be elaborated here.

[0091] After obtaining the time series prediction model, the time series prediction model can be used to monitor the automated production line of high-strength protective coatings to discover production problems earlier, ensure product quality, improve production efficiency, and promote sustainable development of the enterprise.

[0092] The present invention also proposes a computer device for monitoring the operation of an automated production line of high-strength protective coatings. Figure 3 , which shows a schematic diagram of a computer device for monitoring the operation of an automated production line of high-strength protective coatings provided by an embodiment of the present invention, the computer device comprising: a memory 301, a processor 302, and a computer program 303 stored in the memory 301 and running on the processor 302, wherein when the processor 302 executes the computer program 303, the computer device can execute any of the aforementioned methods for monitoring the operation of an automated production line of high-strength protective coatings.

[0093] In addition, an embodiment of the present application also protects a device, which may include a memory and a processor, wherein the memory stores an executable program code, and the processor is used to call and execute the executable program code to execute an operation monitoring method for an automated production line of high-strength protective coatings provided in an embodiment of the present application.

[0094] In summary, in order to solve the technical problem that the existing time series prediction model cannot capture the impact of different production links on product performance and affect the production monitoring of high-strength protective coatings, the present invention proposes an operation monitoring method for an automated production line of high-strength protective coatings. The present invention first obtains the target data vector, the target performance data vector, and the target link; further obtains the preparation change parameter of the target data vector; further obtains the cumulative impact coefficient of the target data vector; further obtains the initial weight coefficient of the target data vector; further obtains the sensitivity coefficient of the target link; further obtains the corrected weight coefficient of the target data vector; further adjusts the preset time series prediction algorithm to obtain the time series prediction model; and finally monitors the automated production line of high-strength protective coatings according to the time series prediction model. The present invention analyzes the preparation changes of the production links, combines the cumulative impact characteristics in the production process, and analyzes the weight of each monitoring data vector from a local and overall perspective to obtain a time series prediction model suitable for the production monitoring of high-strength protective coatings, so as to discover production problems earlier and ensure product production.

[0095] It should be noted that the sequence of the above embodiments of the present invention is for description only and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0096] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

Claims

1. A method for monitoring the operation of an automated production line of a high-strength protective coating, characterized in that: The method comprises: In the preset sample set, the monitoring data vector of each production link in each production batch of the high-strength protective coating is obtained, and the performance data vector of each batch of the high-strength protective coating is obtained; the monitoring data vector of any production link in any production batch is selected as the target data vector, the corresponding target performance data vector, and the corresponding production link as the target link; According to the outlier characteristics of the target data vector in all monitoring data vectors in the same production link, the preparation change parameter of the target data vector is obtained; according to the distribution characteristics of the preparation change parameter of the monitoring data vector in the target link, combined with the change characteristics of the preparation change parameter of the monitoring data vector in the adjacent production links, the influence cumulative coefficient of the target data vector is obtained; According to the correlation characteristics of the target data vector to the target performance data vector, combined with the impact accumulation coefficient, the initial weight coefficient of the target data vector is obtained; according to all the initial weight coefficients corresponding to the target link, the sensitivity coefficient of the target link is obtained; according to the sensitivity coefficient, combined with the initial weight coefficient, the modified weight coefficient of the target data vector is obtained; According to the modified weight coefficient of the monitoring data vector of each production link of each production batch, the preset time series prediction algorithm is adjusted to obtain a time series prediction model; and the high-strength protective coating automated production line is monitored according to the time series prediction model; The method for obtaining the preparation variation parameters comprises: According to the difference characteristics between the target data vector and the average values ​​of all monitoring data vectors corresponding to the target link, the preparation change parameter of the target data vector is obtained; the calculation method of the preparation change parameter includes: Obtaining the average value of all monitoring data vectors in the target link as a comparison vector; obtaining the difference between the target data vector and the comparison vector as a difference vector; taking the ratio of the modulus of the difference vector to the modulus of the comparison vector as an outlier parameter; and obtaining the preparation change parameter of the target data vector after normalizing the outlier parameter; The calculation formula for the preparation variation parameters includes: ; in, Indicates the serial number of the production batch; Indicates the serial number of the production link; Indicates Production batch No. Preparation change parameters of the target data vector corresponding to each production link; Indicates Production batch No. The outlier parameter of the target data vector corresponding to the production link, , Indicates Production batch No. The target data vector corresponding to each production link, Indicates The mean of all monitoring data vectors corresponding to each production link is also the comparison vector; Indicates Production batch No. The difference vector corresponding to each production link, Represents the vector modulus operator; represents the standard normalization function, and the normalization range is the outlier parameters corresponding to all production links of all production batches; The method for obtaining the impact accumulation coefficient includes: Obtaining the skewness of the prepared change parameter of all monitoring data vectors corresponding to the target link, and obtaining the influence weight coefficient according to the skewness; Obtaining a difference between the preparation change parameter corresponding to the next production link adjacent to the target data vector and the preparation change parameter of the target data vector as an influencing factor; Taking the absolute value of the average value of all the influencing factors in the production batch to which the target data vector belongs as the influencing correction factor; According to the influence weight coefficient, the influence factor and the influence correction factor, the influence cumulative coefficient of the target data vector is obtained; the influence weight coefficient and the influence factor are both positively correlated with the influence cumulative coefficient; the influence correction factor is negatively correlated with the influence cumulative coefficient; The calculation method of the influence weight coefficient includes: The skewness is negatively correlated and normalized to obtain a corresponding influence weight coefficient; The calculation method of the impact accumulation coefficient includes: Taking the ratio of the product of the impact factor of the target data vector and the impact weight coefficient to the impact correction factor as the impact accumulation coefficient of the target data vector; The calculation formula for the impact accumulation coefficient includes: ; in, Indicates the serial number of the production batch; Indicates the serial number of the production link; Indicates Production batch No. The cumulative impact coefficient corresponding to each production link; Indicates Production batch No. The influencing factor of the target data vector corresponding to each production link, ; Indicates Production batch No. Preparation change parameters of the target data vector corresponding to each production link; Indicates Production batch No. Preparation change parameters of the target data vector corresponding to each production link; Represents the sigmoid function; Indicates The skewness of all brake variation parameters corresponding to each production link; Indicates The absolute value of the mean of all influencing factors corresponding to each production link; Indicates taking the absolute value; Indicates division by zero argument, .

2. The operation monitoring method of a high-strength protective coating automated production line according to claim 1 is characterized in that: The method for obtaining the initial weight coefficient includes: Acquire the associated parameter of the target data vector according to the modulus of the target data vector, the modulus of the target performance data vector, and the impact accumulation coefficient; the modulus of the target data vector is positively correlated with the associated parameter, the modulus of the target performance data vector is negatively correlated with the associated parameter, and the impact accumulation coefficient is positively correlated with the associated parameter; The associated parameters are normalized using all the associated parameters corresponding to the target link and used as the initial weight coefficient of the target data vector.

3. The operation monitoring method of a high-strength protective coating automated production line according to claim 1 is characterized in that: The method for obtaining the sensitivity coefficient includes: The average of the initial weight coefficients of the target link corresponding to all production batches is taken as the sensitivity coefficient of the target link.

4. The operation monitoring method of a high-strength protective coating automated production line according to claim 1 is characterized in that: The method for obtaining the time series prediction model includes: Based on the preset time series prediction algorithm, the trend item and the seasonal item of the monitoring data vector of all production links in all production batches are obtained, and the trend item and the seasonal item are weighted using the corresponding modified weight coefficient to obtain the time series prediction model.

5. The operation monitoring method of a high-strength protective coating automated production line according to claim 1 is characterized in that: The preset time series prediction algorithm is the SARIMA algorithm.

Citation Information

Patent Citations

  • Coating machine control method and coating machine system

    CN117930750A