Wind turbine tower concrete segment production management method and system based on data feedback
Through data feedback management methods, warehouse screening, raw material testing, and mixing ratio optimization, the problem of inconsistent quality and schedule impact in the production of concrete segments has been solved, and the rational distribution of raw materials and consistency of finished product strength have been achieved.
Patent Information
- Application Number
- CN202411025307.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-30
AI Technical Summary
In traditional concrete segment production, it is difficult to reasonably allocate based on raw material information, resulting in inconsistent molding quality, and raw material calls are not shared in a timely manner, affecting production progress and material quality.
Adopting a wind power tower concrete segment production management method based on data feedback, by obtaining production demand and resource information, selecting optimal warehouses, conducting raw material sampling inspection and mixing ratio optimization, combined with simulated environment and pouring parameters, to ensure the quality of concrete segment and intensity consistency.
It achieves the rational distribution and quality uniformity of raw materials, avoids excess raw materials and quality decline, and improves the stability of production progress and finished product strength.
Smart Images

Figure CN118552014B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of concrete segment production, and in particular to a method and system for managing the production of wind power tower concrete segments based on data feedback. Background Art
[0002] Wind turbine towers are the poles of wind power generation. They mainly play a supporting role in wind turbine generator sets and absorb vibrations of the sets. Concrete segments are usually used on the outer wall of wind turbine towers. They are prefabricated concrete ring segments installed on the outside of wind turbine towers to form the structural walls of the towers. These segments are stacked and fixed together layer by layer when building wind turbine towers to form a stable shell to protect the internal steel structure and equipment. The production of traditional concrete segments requires a large number of personnel to manage and has high labor intensity. Therefore, how to improve the level of intelligent management in the segment production process has become an urgent problem to be solved in the current field of wind turbine tower concrete segment production technology.
[0003] The existing production management method of wind turbine tower concrete segments is difficult to ensure the uniform quality standards of the same raw materials, which makes it difficult to reasonably allocate raw materials according to raw material information during production, resulting in different qualities of the formed concrete segments. At the same time, when calling for raw materials in the warehouse, it is easy to cause information to be difficult to share in a timely manner, resulting in excess raw materials being called. If the production cycle is long, it will affect the quality of the raw materials. It is difficult to determine the appropriate preset casting parameters and environmental information based on the raw material information, resulting in different strength development of the formed concrete segments, thereby affecting the production progress.
[0004] Therefore, it is necessary to provide a wind turbine tower concrete segment production management method and system based on data feedback to solve the above-mentioned problems. Summary of the invention
[0005] In order to solve the above technical problems, a wind turbine tower concrete segment production management method and system based on data feedback are provided. This technical solution solves the problem raised in the above background technology that it is difficult to reasonably allocate raw materials according to raw material information during production, resulting in different qualities of the formed concrete segments. At the same time, when calling for raw materials in the warehouse, it is easy to cause information to be difficult to share in time, resulting in excess raw materials called. If the production cycle is long, it will affect the quality of the raw materials. It is difficult to determine the appropriate preset casting parameters and environmental information based on the raw material information, resulting in different strength development of the formed concrete segments, thereby affecting the production progress.
[0006] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0007] The wind turbine tower concrete segment production management method based on data feedback includes:
[0008] Obtain production demand data, determine production demand information and production resource information;
[0009] The production demand information is used to describe the quantity of concrete segments that the manufacturer needs to produce, as well as the specifications of the concrete segments that need to be produced and the quantity of materials required, and the production resource information is used to describe the material types and material specifications required by the manufacturer when producing concrete segments;
[0010] Sending the production resource information to all warehouse management units to be selected, and screening the warehouse management units to be selected to obtain all preferred warehouse management units that meet the production demand information;
[0011] Based on the production demand information and production resource information, call information is sent to each preferred warehouse management unit and sampling and testing are performed on the called raw materials to obtain the raw material information of the concrete segment;
[0012] Determine raw material ratio information based on raw material information, wherein the raw material information includes raw material type information, raw material quality information and raw material quantity information;
[0013] Based on the raw material information, the raw materials are placed in a mixer and stirred according to the raw material ratio information to obtain a uniform mixture;
[0014] Obtaining mixture samples from different positions of the homogeneous mixture, and obtaining a sample quality index of each of the mixture samples, wherein the sample quality index is used to describe a comprehensive index of viscosity, moisture and density of the mixture;
[0015] Based on each of the mixture samples, a small casting template similar to the preset casting template is manufactured according to a first preset ratio, and each of the mixture samples is cast according to preset casting parameters to obtain a small concrete segment to be tested;
[0016] Wherein, the preset pouring parameters include pouring time, pouring speed, vibration frequency and vibration intensity;
[0017] Obtaining a sample casting quality index of each of the small concrete segments to be tested;
[0018] obtaining uniform mixture casting information of the uniform mixture based on the sample quality index and the sample casting quality index;
[0019] According to the uniform mixture pouring information, the uniform mixture is poured using a preset mold to obtain a concrete segment to be tested;
[0020] Obtaining comprehensive quality information of the concrete segment to be tested, wherein the comprehensive quality information of the concrete segment to be tested is used to describe the physical properties and durability of the concrete segment to be tested;
[0021] According to the comprehensive quality information, the concrete segments to be tested are processed to obtain concrete segments that meet the preset standards.
[0022] Preferably, the sending of the production resource information to all warehouse management units to be selected, and screening the warehouse management units to be selected to obtain all preferred warehouse management units that meet the production demand information specifically includes:
[0023] Based on the production demand data sent by the demander, confirm the detailed specifications and requirements of the concrete segments that the demander needs to produce, and obtain production resource information;
[0024] Confirm the quantity of concrete segments that the demander needs to produce and obtain production demand information;
[0025] According to the production resource information, all possible warehouse management units are listed, all possible warehouse management units are traversed, and the material storage data of each warehouse management unit is obtained;
[0026] According to the material storage data of each warehouse management unit, a storage quality score of each warehouse management unit is obtained;
[0027] Determine a storage quality score threshold based on the production demand data, and according to the storage quality score of each warehouse management unit, aggregate the warehouse management units whose storage quality scores are greater than the preset storage quality score threshold to obtain a warehouse management unit to be selected;
[0028] According to the storage quality score of each warehouse management unit to be selected, the warehouse management units to be selected are sorted, and production resource information is sent to the warehouse management units to be selected according to the sorting;
[0029] The warehouse management units to be selected receive the production resource information in turn and send their respective raw material inventory information;
[0030] According to the received raw material inventory information sent by each of the warehouse management units to be selected, determining whether the total raw material inventory of each of the warehouse management units to be selected exceeds the material quantity required in the production resource information;
[0031] If exceeded, stop sending production resource information to the candidate warehouse management unit, obtain the preferred warehouse management unit, and send call information to all the preferred warehouse management units;
[0032] If not, continue to send production resource information to the warehouse management unit to be selected.
[0033] Preferably, determining the raw material ratio information based on the raw material information specifically includes:
[0034] According to the production demand data, confirm the engineering design requirements of the demander and determine the design strength grade of the concrete segment;
[0035] According to the design strength grade of the concrete segment and the quality information of the raw materials, the raw materials are screened to obtain the raw materials that meet the preset parameters;
[0036] Adding raw materials meeting preset parameters into a mixer in a second preset ratio for stirring, and pouring the uniformly stirred mixture to obtain a concrete grade test embryo;
[0037] Performing a performance test on the concrete grade test embryo to obtain a strength grade parameter of the concrete grade test embryo;
[0038] Based on the design strength grade of the concrete segment, a design strength grade threshold is obtained;
[0039] Based on the design strength grade threshold, determine whether the strength grade parameters of the concrete grade test embryo meet the requirements. If not, add admixtures to the raw materials that meet the preset parameters. If so, determine the raw material ratio information.
[0040] Preferably, obtaining mixture samples from different positions of the homogeneous mixture and acquiring the sample quality index of each of the mixture samples specifically includes:
[0041] Taking the surface of the uniform mixture on the mixer as the reference plane, a plane coordinate system is established, and taking the edge contour of the uniform mixture as the edge line, a mixture area graph is constructed;
[0042] Create a circle in the plane coordinate system with the midpoint of the mixture area figure as the center and the maximum distance between the edge of the mixture area figure and the center as the radius;
[0043] Divide the circle in the plane coordinate system into n identical sectors, and take n portions of the mixture with the same volume from the centers of the n sector areas as mixture samples;
[0044] Using sensors to obtain a viscosity index, a moisture index, and a density index of each of the mixture samples;
[0045] Obtaining a sample quality index of each of the mixture samples based on the viscosity index, the moisture index and the density index;
[0046] The calculation formula of sample quality index is:
[0047] ; In the formula, represents the sample quality index of the i-th mixture sample, represents the viscosity index of the i-th mixture sample, represents the moisture index of the i-th mixture sample, Represents the density index of the i-th mixture sample.
[0048] Preferably, the step of obtaining the sample casting quality index of each of the small concrete segments to be tested specifically includes:
[0049] Acquiring simulated environmental information, wherein the simulated environmental information includes a simulated temperature index, a simulated humidity index, and a simulated wind speed parameter;
[0050] Based on the simulated environment information, simulating different environments when each of the mixture samples is poured with preset pouring parameters;
[0051] Divide each four samples of the mixture into one group, and use the control variable method to obtain the influence of the simulated environmental information and the preset pouring parameters on the pouring quality of the mixture samples;
[0052] Each of the small concrete segments to be tested is evaluated to obtain a sample casting quality index of each of the small concrete segments to be tested.
[0053] Preferably, the obtaining of the uniform mixture casting information of the uniform mixture based on the sample quality index and the sample casting quality index specifically includes:
[0054] Obtaining a sample quality index of each of the mixture samples, and using a median value of the sample quality index as a sample quality index threshold;
[0055] Obtain the sample casting quality index of the small concrete segment to be tested after casting and forming all mixture samples whose sample quality index exceeds the sample quality index threshold, and take the average value of the sample casting quality index as the sample casting quality index threshold;
[0056] The simulated environment information and preset casting parameters of all mixture samples whose sample casting quality index exceeds the sample casting quality index threshold are summarized and recorded to obtain the uniform mixture casting information of the uniform mixture.
[0057] Preferably, the concrete segments to be tested are processed according to the comprehensive quality information to obtain concrete segments that meet preset standards, specifically including:
[0058] Based on the comprehensive quality information, determine the physical performance quality index and durability quality index of the concrete segment to be tested;
[0059] The sum of the sample casting quality indexes of all small concrete segments to be tested is taken as the sample quality index;
[0060] The value output by dividing the sample quality index by n is set as the first factor;
[0061] The maximum value of the first factor multiplied by the first preset ratio is set as the second factor;
[0062] The output value of the second factor divided by 100 is used as the comprehensive quality index threshold;
[0063] A times the physical performance quality index of the concrete segment to be tested is taken as the first quality index, and b times the durability quality index of the concrete segment to be tested is taken as the second quality index, and the maximum value of the sum of a and b is 1;
[0064] The sum of the first quality index and the second quality index is taken as the comprehensive quality index;
[0065] Based on the comprehensive quality index threshold, determine whether the comprehensive quality index of the concrete segment to be tested meets the requirements. If so, based on the raw material information, place the raw materials in a mixer according to the raw material ratio information to obtain a uniform mixture. If not, obtain the historical environmental information and historical casting parameters of the concrete segment to be tested.
[0066] Obtain uniform mixture pouring information and simulated environment information, and compare them with historical environment information and historical pouring parameters of the concrete segment to be tested to obtain environment difference parameters and pouring difference parameters;
[0067] Based on the environmental difference parameters and the pouring difference parameters, the uniform mixture pouring information of the uniform mixture is optimized, and the concrete segments meeting the preset standards are obtained through pouring.
[0068] Furthermore, a wind turbine tower concrete segment production management system based on data feedback is proposed, which is used to implement any of the above management methods, including:
[0069] A main control module, the main control module is used to obtain production demand data, determine production demand information and production resource information, perform sampling inspection on the called raw materials, obtain raw material information of concrete segments, obtain sample quality index of each mixture sample according to the mixture sample, obtain material storage data of each warehouse management unit, send production resource information to all warehouse management units to be selected, and screen the warehouse management units to be selected, obtain all preferred warehouse management units that meet the production demand information, obtain storage quality scores of each warehouse management unit according to the material storage data of each warehouse management unit, send respective raw material inventory information after receiving the production resource information, judge whether the total raw material inventory of each warehouse management unit to be selected exceeds the material quantity required in the production resource information according to the raw material inventory information sent by each warehouse management unit to be selected, judge whether the strength grade parameter of the concrete grade test embryo meets the requirements based on the design strength grade threshold, and judge whether the comprehensive quality index of the concrete segment to be tested meets the requirements based on the comprehensive quality index threshold;
[0070] A transmission module, which is used to connect the main control module, the evaluation module and the display module, and transmit the data exchanged between the modules;
[0071] A production module, wherein the production module is used to place the raw materials in a mixer according to the raw material ratio information based on the raw material information and stir them to obtain a uniform mixture, obtain mixture samples from different positions of the uniform mixture, and make a small casting template similar to the preset casting template according to a first preset ratio based on each mixture sample, and cast each mixture sample with preset casting parameters to obtain a small concrete segment to be tested, and cast the uniform mixture with a preset mold according to the uniform mixture casting information to obtain the concrete segment to be tested;
[0072] The display module is used to display the processing results of the main control module, the information transmitted and received by the transmission module, and the evaluation results of the evaluation module.
[0073] Preferably, the main control module includes:
[0074] A data acquisition unit, the data acquisition unit is used to acquire production demand data, determine production demand information and production resource information, perform sampling inspection on the called raw materials, acquire raw material information of the concrete segments, acquire a sample quality index of each mixture sample based on the mixture sample, and acquire material storage data of each warehouse management unit;
[0075] A data processing unit, the data processing unit is used to send the production resource information to all warehouse management units to be selected, and screen the warehouse management units to be selected, obtain all preferred warehouse management units that meet the production demand information, and obtain the storage quality score of each warehouse management unit according to the material storage data of each warehouse management unit;
[0076] A warehouse management unit, the warehouse management unit is used to send respective raw material inventory information after receiving the production resource information;
[0077] A judgment unit, wherein the judgment unit is used to judge whether the total raw material inventory of each warehouse management unit to be selected exceeds the material quantity required in the production resource information based on the raw material inventory information received from each warehouse management unit to be selected, judge whether the strength grade parameters of the concrete grade test embryo meet the requirements based on the design strength grade threshold, and judge whether the comprehensive quality index of the concrete pipe segment to be tested meets the requirements based on the comprehensive quality index threshold.
[0078] Preferably, the production module comprises:
[0079] A first production unit, the first production unit is used to place the raw materials in a mixer according to the raw material ratio information based on the raw material information to obtain a uniform mixture, and obtain mixture samples from different positions of the uniform mixture;
[0080] The second production unit is used to make a small casting template similar to the preset casting template based on each mixture sample according to a first preset ratio, and cast each mixture sample with preset casting parameters to obtain a small concrete pipe segment to be tested, and cast the uniform mixture with a preset mold according to the uniform mixture casting information to obtain the concrete pipe segment to be tested.
[0081] Compared with the prior art, the present invention has the following beneficial effects:
[0082] The wind turbine tower concrete segment production management method and system based on data feedback proposed in this scheme receives production resource information in sequence through the warehouse management units to be selected and then sends their respective raw material inventory information. According to the raw material inventory information received from each warehouse management unit to be selected, it is determined whether the total raw material inventory of each warehouse management unit to be selected exceeds the material quantity required in the production resource information. If it exceeds, the production resource information is stopped from being sent to the warehouse management unit to be selected, the preferred warehouse management unit is obtained, and the call information is sent to all the preferred warehouse management units. If it does not exceed, the production resource information is continued to be sent to the warehouse management unit to be selected, so that when the raw materials of the warehouse are called, the raw materials called will not be in excess due to the lack of timely sharing of information, and in projects with a long production cycle, the accumulated raw materials will not be affected by time.
[0083] The wind turbine tower concrete segment production management method and system based on data feedback proposed in this scheme confirms the engineering design requirements of the demander according to the production demand data, and determines the design strength grade of the concrete segment. According to the design strength grade of the concrete segment and the quality information of the raw materials, the raw materials are screened to obtain the raw materials that meet the preset parameters. The raw materials that meet the preset parameters are added to the mixer in a second preset ratio for mixing, and the evenly mixed mixture is cast to obtain a concrete grade test embryo. The concrete grade test embryo is performance tested to obtain the strength grade parameters of the concrete grade test embryo. The appropriate raw material ratio information is determined through the strength grade parameters of the concrete grade test embryo and the second preset ratio. At the same time, it is also judged whether admixtures need to be added to the raw materials. Even if there is no uniform standard for the quality of the same raw materials, reasonable raw material allocation can be achieved according to the raw material information, so that the quality of the formed concrete segments is uniform.
[0084] The wind turbine tower concrete segment production management method and system based on data feedback proposed in this scheme obtains mixture samples from different positions of the uniform mixture, and obtains the sample quality index of each uniform mixture sample, divides every four mixture samples into a group, and uses the control variable method to obtain the influence of simulated environmental information and preset casting parameters on the casting quality of the mixture samples, and evaluates the performance of each small concrete segment to be tested, obtains the sample casting quality index of each small concrete segment to be tested, and finally obtains the uniform mixture casting information of the uniform mixture based on the sample quality index and the sample casting quality index, so that when producing concrete segments, appropriate preset casting parameters and environmental information can be determined to make the strength development of the formed concrete segments the same, which will not affect the production progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0085] Figure 1 It is a flow chart of the wind power tower concrete segment production management method based on data feedback proposed by the present invention;
[0086] Figure 2 A screening flow chart for the production supplier in the present invention;
[0087] Figure 3 It is a flow chart for determining the raw material ratio information in the present invention;
[0088] Figure 4 It is a flow chart for determining the raw material ratio information in the present invention;
[0089] Figure 5 This is a framework diagram of the wind turbine tower concrete segment production management system based on data feedback proposed in the present invention. DETAILED DESCRIPTION
[0090] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.
[0091] Reference Figure 1 - Figure 5 As shown, the wind turbine tower concrete segment production management method based on data feedback includes:
[0092] Obtain production demand data, determine production demand information and production resource information;
[0093] The production demand information is used to describe the quantity of concrete segments that the manufacturer needs to produce, as well as the specifications of the concrete segments and the quantity of materials required; the production resource information is used to describe the material types and material specifications required by the manufacturer when producing concrete segments;
[0094] Sending production resource information to all warehouse management units to be selected, screening the warehouse management units to be selected, and obtaining all preferred warehouse management units that meet the production demand information;
[0095] Based on the production demand information and production resource information, call information is sent to each preferred warehouse management unit and sampling and testing are performed on the called raw materials to obtain the raw material information of the concrete segment;
[0096] Determine raw material ratio information based on raw material information, where the raw material information includes raw material type information, raw material quality information and raw material quantity information;
[0097] Based on the raw material information, the raw materials are placed in a mixer and stirred according to the raw material ratio information to obtain a uniform mixture;
[0098] obtaining mixture samples from different positions of the homogeneous mixture and obtaining a sample quality index of each mixture sample, wherein the sample quality index is used to describe a comprehensive index of viscosity, moisture and density of the mixture;
[0099] Based on each mixture sample, a small casting template similar to the preset casting template is manufactured according to a first preset ratio, and each mixture sample is cast according to the preset casting parameters to obtain a small concrete segment to be tested;
[0100] Among them, the preset pouring parameters include pouring time, pouring speed, vibration frequency and vibration intensity;
[0101] Obtaining the sample casting quality index of each small concrete segment to be tested;
[0102] obtaining uniform mixture casting information of the uniform mixture based on the sample quality index and the sample casting quality index;
[0103] According to the uniform mixture pouring information, the uniform mixture is poured using a preset mold to obtain a concrete segment to be tested;
[0104] Obtaining comprehensive quality information of the concrete segment to be tested, where the comprehensive quality information of the concrete segment to be tested is used to describe the physical properties and durability of the concrete segment to be tested;
[0105] According to the comprehensive quality information, the concrete segments to be tested are processed to obtain concrete segments that meet the preset standards.
[0106] Specifically, the production demand data is the data required by the concrete segment production demand party, including the number of concrete segments to be produced and the specifications of the concrete segments, etc. The production demand information and production resource information can be determined by the production demand data. The preset pouring parameters include pouring time, pouring speed, vibration frequency and vibration intensity. The preset pouring parameters are obtained from historical pouring data, such as the pouring time, pouring speed, vibration frequency and vibration intensity required by the producer when producing concrete segments in the past. The preset pouring parameters are obtained based on the experience obtained from the historical pouring data. The small pouring template is a template scaled according to the size and shape of the concrete segments to be produced, with the original size and shape and the experimental size and shape being equal to 100:1. Therefore, the first preset ratio can be 100:1, and the small pouring template can also be made according to other ratios for experiment as needed. The preset pouring template is a mold made according to the size and shape of the concrete segments to be produced.
[0107] Further, the production resource information is sent to all warehouse management units to be selected, and the warehouse management units to be selected are screened to obtain all preferred warehouse management units that meet the production demand information, specifically including:
[0108] Based on the production demand data sent by the demander, confirm the detailed specifications and requirements of the concrete segments that the demander needs to produce, and obtain production resource information;
[0109] Confirm the quantity of concrete segments that the demander needs to produce and obtain production demand information;
[0110] According to the production resource information, all possible warehouse management units are listed, all possible warehouse management units are traversed, and the material storage data of each warehouse management unit is obtained;
[0111] According to the material storage data of each warehouse management unit, a storage quality score of each warehouse management unit is obtained;
[0112] Determine a storage quality score threshold based on the production demand data, and according to the storage quality score of each warehouse management unit, aggregate the warehouse management units whose storage quality scores are greater than the preset storage quality score threshold to obtain a warehouse management unit to be selected;
[0113] According to the storage quality score of each warehouse management unit, the warehouse management units to be selected are sorted, and production resource information is sent to the warehouse management units to be selected according to the sorting;
[0114] The warehouse management units to be selected receive the production resource information in turn and send their respective raw material inventory information;
[0115] According to the received raw material inventory information sent by each warehouse management unit to be selected, it is determined whether the total raw material inventory of each warehouse management unit to be selected exceeds the material quantity required in the production resource information;
[0116] If it exceeds, stop sending production resource information to the candidate warehouse management unit, obtain the preferred warehouse management unit, and send call information to all the preferred warehouse management units;
[0117] If not exceeded, continue to send production resource information to the warehouse management unit to be selected.
[0118] Furthermore, raw material ratio information is determined based on the raw material information, specifically including:
[0119] According to the production demand data, confirm the engineering design requirements of the demander and determine the design strength grade of the concrete segment;
[0120] According to the design strength grade of the concrete segment and the quality information of the raw materials, the raw materials are screened to obtain the raw materials that meet the preset parameters;
[0121] Adding raw materials meeting preset parameters into a mixer in a second preset ratio for stirring, and pouring the uniformly stirred mixture to obtain a concrete grade test embryo;
[0122] Performing performance tests on concrete grade test embryos to obtain strength grade parameters of the concrete grade test embryos;
[0123] Based on the design strength grade of the concrete segment, a design strength grade threshold is obtained;
[0124] Based on the design strength grade threshold, determine whether the strength grade parameters of the concrete grade test embryo meet the requirements. If not, add admixtures to the raw materials that meet the preset parameters. If so, determine the raw material ratio information.
[0125] Specifically, the preset parameters are the parameter thresholds of various raw materials determined according to the quality requirements of the concrete segments required by the demander, such as the particle size and mud content of sand, the type of cement and the cleanliness of water. The particles of sand need to meet specific particle size requirements, usually graded by sieves to ensure the particle size distribution in the concrete mix; the type and grade of cement need to meet the cement standards of the relevant regions, such as ordinary Portland cement; the content of the main durable components in cement needs to set parameter thresholds to ensure the strength and durability of cement. The second preset ratio is the water-cement ratio specified when making concrete segments, that is, the ratio of various raw materials required to produce concrete segments. The design strength grade of concrete segments is the compressive strength grade of concrete, also known as the design strength of concrete. This grade is determined based on the concrete strength design requirements and the use environment to ensure that the concrete structure has sufficient strength and durability within the design life. The design strength grade threshold refers to the minimum strength requirement determined during the design process based on the use environment and load-bearing requirements of concrete. This threshold is the minimum strength that must be achieved or exceeded in the design to ensure the safety and reliability of the structure.
[0126] Further, mixture samples are obtained from different positions of the homogeneous mixture, and a sample quality index of each mixture sample is obtained, specifically including:
[0127] Taking the surface of the uniform mixture on the mixer as the reference plane, a plane coordinate system is established, and taking the edge contour of the uniform mixture as the edge line, a mixture area graph is constructed;
[0128] Create a circle in the plane coordinate system with the midpoint of the mixture area figure as the center and the maximum distance between the edge of the mixture area figure and the center as the radius;
[0129] Divide the circle in the plane coordinate system into n identical sectors, and take n portions of the mixture with the same volume from the center of the n sector areas as mixture samples;
[0130] Using sensors to obtain the viscosity index, moisture index, and density index of each mixture sample;
[0131] Based on the viscosity index, the moisture index and the density index, a sample quality index of each mixture sample is obtained;
[0132] The calculation formula of sample quality index is:
[0133] ; In the formula, represents the sample quality index of the i-th mixture sample, represents the viscosity index of the i-th mixture sample, represents the moisture index of the i-th mixture sample, Represents the density index of the i-th mixture sample.
[0134] Furthermore, the sample casting quality index of each small concrete segment to be tested is obtained, including:
[0135] Acquire simulated environment information, which includes simulated temperature index, simulated humidity index and simulated wind speed parameter;
[0136] Based on the simulated environmental information, different environments are simulated when each mixture sample is poured with preset pouring parameters;
[0137] Divide each four mixture samples into a group, and use the control variable method to obtain the influence of the simulated environmental information and the preset pouring parameters on the pouring quality of the mixture samples. In the four mixture samples taken, it is necessary to ensure that the fan-shaped areas where they are located are symmetrical to each other. For example, if the four mixture samples taken are named A1, A2, A3 and A4, it is necessary to ensure that the fan-shaped areas where A1 and A3 are located are in a symmetrical relationship, the fan-shaped areas where A2 and A4 are located are in a symmetrical relationship, and the fan-shaped areas where A1 and A2 are located are not adjacent;
[0138] Each small concrete segment to be tested is evaluated to obtain a sample casting quality index of each small concrete segment to be tested.
[0139] Further, based on the sample quality index and the sample casting quality index, uniform mixture casting information of the uniform mixture is obtained, specifically including:
[0140] Obtaining a sample quality index of each mixture sample, and taking the median value of the sample quality index as a sample quality index threshold;
[0141] Obtain the sample casting quality index of the small concrete segment to be tested after casting and forming all mixture samples whose sample quality index exceeds the sample quality index threshold, and take the average value of the sample casting quality index as the sample casting quality index threshold;
[0142] The simulated environment information and preset casting parameters of all mixture samples whose sample casting quality index exceeds the sample casting quality index threshold are summarized and recorded to obtain the uniform mixture casting information of the uniform mixture.
[0143] Specifically, the sample quality index is a comprehensive indicator of the quality of each collected mixture sample, including the viscosity, humidity and density of the mixture sample. The sample casting quality index is a comprehensive indicator of the quality of the small concrete segment to be tested after each mixture sample is cast in a small casting template. It is obtained by various testing equipment and includes the physical properties and durability of the small concrete segment to be tested.
[0144] Furthermore, the concrete segments to be tested are processed according to the comprehensive quality information to obtain concrete segments that meet the preset standards, including:
[0145] Based on the comprehensive quality information, determine the physical performance quality index and durability quality index of the concrete segment to be tested;
[0146] The sum of the sample casting quality indexes of all small concrete segments to be tested is taken as the sample quality index;
[0147] The value output by dividing the sample quality index by n is set as the first factor;
[0148] The maximum value of the first factor multiplied by the first preset ratio is set as the second factor;
[0149] The output value of the second factor divided by 100 is used as the comprehensive quality index threshold;
[0150] A times the physical performance quality index of the concrete segment to be tested is taken as the first quality index, and b times the durability quality index of the concrete segment to be tested is taken as the second quality index, and the maximum value of the sum of a and b is 1;
[0151] The sum of the first quality index and the second quality index is taken as the comprehensive quality index;
[0152] Based on the comprehensive quality index threshold, determine whether the comprehensive quality index of the concrete segment to be tested meets the requirements. If so, based on the raw material information, place the raw materials in a mixer according to the raw material ratio information to obtain a uniform mixture. If not, obtain the historical environmental information and historical casting parameters of the concrete segment to be tested.
[0153] Obtain uniform mixture pouring information and simulated environment information, and compare them with historical environment information and historical pouring parameters of the concrete segment to be tested to obtain environment difference parameters and pouring difference parameters, wherein the environment difference parameter is the difference between the simulated environment index in the simulated environment information and the historical environment index in the historical environment information, the environment index is a comprehensive index of the temperature, humidity, wind speed, etc. of the environment in which the uniform mixture is placed during pouring, and the pouring difference parameter is the difference between the pouring parameters in the uniform mixture pouring information and the historical pouring parameters;
[0154] Based on the environmental difference parameters and the pouring difference parameters, the uniform mixture pouring information of the uniform mixture is optimized, and the concrete segments meeting the preset standards are obtained through pouring.
[0155] Specifically, the physical performance quality index of the concrete segment to be tested is a comprehensive indicator of the appearance characteristics, dimensional geometric characteristics and strength characteristics of the concrete segment to be tested. The appearance performance includes the surface flatness, smoothness, surface defects, etc. of the concrete segment to be tested. The dimensional geometric characteristics include diameter, length, wall thickness, wall thickness deviation, etc. The strength characteristics include compressive strength, flexural strength, etc. The durability performance of the concrete segment to be tested includes water tightness, durability, quality of the connection part, etc. The durability performance is the analysis of the durable components of the concrete material. The compressive strength is usually measured by applying pressure under standard conditions to measure the bearing capacity of the concrete. The flexural strength test usually involves applying a bending force on the specimen to measure its bearing capacity. Common test methods for durability performance include water pressure testing, water immersion testing, etc. to determine the water tightness of the concrete. The durability performance usually also requires testing of the alkali-aggregate reaction in the concrete to evaluate its potential destructive effects on the concrete structure.
[0156] Furthermore, a wind turbine tower concrete segment production management system based on data feedback is proposed, which is used to implement any of the above management methods, including:
[0157] A main control module, which is used to obtain production demand data, determine production demand information and production resource information, perform sampling inspection on the called raw materials, obtain raw material information of concrete segments, obtain the sample quality index of each mixture sample according to the mixture sample, obtain material storage data of each warehouse management unit, send the production resource information to all warehouse management units to be selected, and screen the warehouse management units to be selected, obtain all preferred warehouse management units that meet the production demand information, obtain the storage quality score of each warehouse management unit according to the material storage data of each warehouse management unit, send the respective raw material inventory information after receiving the production resource information, and judge whether the total raw material inventory of each warehouse management unit to be selected exceeds the required material quantity in the production resource information according to the raw material inventory information sent by each warehouse management unit to be selected, judge whether the strength grade parameters of the concrete grade test embryo meet the requirements based on the design strength grade threshold, and judge whether the comprehensive quality index of the concrete segment to be tested meets the requirements based on the comprehensive quality index threshold;
[0158] Transmission module, which is used to connect the main control module, the evaluation module and the display module, and transmit the data exchanged between the modules;
[0159] The production module is used to place the raw materials in a mixer according to the raw material ratio information based on the raw material information and stir them to obtain a uniform mixture, obtain mixture samples from different positions of the uniform mixture, and make a small casting template similar to the preset casting template according to a first preset ratio based on each mixture sample, and cast each mixture sample with preset casting parameters to obtain a small concrete segment to be tested, and cast the uniform mixture with a preset mold according to the uniform mixture casting information to obtain the concrete segment to be tested;
[0160] Display module, the display module is used to display the processing results of the main control module, the transmission and reception information of the transmission module, and the evaluation results of the evaluation module.
[0161] Furthermore, the main control module includes:
[0162] A data acquisition unit, the data acquisition unit is used to acquire production demand data, determine production demand information and production resource information, perform sampling inspection on the called raw materials, acquire raw material information of the concrete segments, acquire a sample quality index of each mixture sample according to the mixture sample, and acquire material storage data of each warehouse management unit;
[0163] A data processing unit, which is used to send production resource information to all warehouse management units to be selected, screen the warehouse management units to be selected, obtain all preferred warehouse management units that meet the production demand information, and obtain the storage quality score of each warehouse management unit according to the material storage data of each warehouse management unit;
[0164] The warehouse management unit is used to send respective raw material inventory information after receiving production resource information;
[0165] The judgment unit is used to judge whether the total raw material inventory of each warehouse management unit to be selected exceeds the material quantity required in the production resource information based on the raw material inventory information received from each warehouse management unit to be selected, judge whether the strength grade parameters of the concrete grade test embryo meet the requirements based on the design strength grade threshold, and judge whether the comprehensive quality index of the concrete pipe segment to be tested meets the requirements based on the comprehensive quality index threshold.
[0166] Furthermore, the production module includes:
[0167] The first production unit is used to place the raw materials in a mixer according to the raw material ratio information based on the raw material information to obtain a uniform mixture, and obtain mixture samples from different positions of the uniform mixture;
[0168] The second production unit is used to make a small casting template similar to the preset casting template based on each mixture sample according to the first preset ratio, and cast each mixture sample with the preset casting parameters to obtain a small concrete pipe segment to be tested, and cast the uniform mixture with a preset mold according to the uniform mixture casting information to obtain the concrete pipe segment to be tested.
[0169] In summary, the advantages of the present invention are: determining a storage quality score threshold based on production demand data, and according to the storage quality score of each warehouse management unit, summarizing the warehouse management units whose storage quality scores are greater than the preset storage quality score threshold to obtain a candidate warehouse management unit, sorting the candidate warehouse management units according to the storage quality score of each candidate warehouse management unit, and sending production resource information to the candidate warehouse management units according to the sorting, and sending the respective raw material inventory information of the candidate warehouse management units in sequence through the candidate warehouse management units, judging whether the sum of the raw material inventory of each candidate warehouse management unit exceeds the required material quantity in the production resource information, if exceeded, stopping sending the production resource information to the candidate warehouse management unit, obtaining the preferred warehouse management unit, and sending the call information to all the preferred warehouse management units, if not exceeded, continuing to send the production resource information to the candidate warehouse management unit, so as to achieve that when calling the raw materials of the warehouse, the called raw materials will not be excessive due to the failure to share the information in time, and in the project with a long production cycle, the accumulated raw materials will not be affected by time.
[0170] According to the production demand data, the engineering design requirements of the demander are confirmed, and the design strength grade of the concrete segment is determined. According to the design strength grade of the concrete segment and the quality information of the raw materials, the raw materials are screened to obtain the raw materials that meet the preset parameters. The raw materials that meet the preset parameters are added to the mixer in a second preset ratio for mixing, and the evenly mixed mixture is cast to obtain a concrete grade test embryo. The concrete grade test embryo is performance tested to obtain the strength grade parameters of the concrete grade test embryo. The appropriate raw material ratio information is determined based on the strength grade parameters of the concrete grade test embryo and the second preset ratio. At the same time, it is also judged whether admixtures need to be added to the raw materials. Even if there is no uniform standard for the quality of the same raw materials, reasonable distribution of the raw materials can be achieved based on the raw material information, so that the quality of the formed concrete segments is uniform.
[0171] Mixture samples are obtained from different positions of the uniform mixture, and the sample quality index of each uniform mixture sample is obtained. Every four mixture samples are divided into a group, and the control variable method is used to obtain the influence of simulated environmental information and preset casting parameters on the casting quality of the mixture samples. The performance of each small concrete segment to be tested is evaluated, and the sample casting quality index of each small concrete segment to be tested is obtained. Finally, based on the sample quality index and the sample casting quality index, the uniform mixture casting information of the uniform mixture is obtained. When producing concrete segments, appropriate preset casting parameters and environmental information can be determined to make the strength development of the formed concrete segments the same, which will not affect the production progress.
[0172] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A wind turbine tower concrete segment production management method based on data feedback, characterized in that: include: Obtain production demand data, determine production demand information and production resource information; The production demand information is used to describe the quantity of concrete segments that the manufacturer needs to produce, as well as the specifications of the concrete segments that need to be produced and the quantity of materials required, and the production resource information is used to describe the material types and material specifications required by the manufacturer when producing concrete segments; Sending the production resource information to all warehouse management units to be selected, and screening the warehouse management units to be selected to obtain all preferred warehouse management units that meet the production demand information; Based on the production demand information and production resource information, call information is sent to each preferred warehouse management unit and sampling and testing are performed on the called raw materials to obtain the raw material information of the concrete segment; Determine raw material ratio information based on raw material information, wherein the raw material information includes raw material type information, raw material quality information and raw material quantity information; Based on the raw material information, the raw materials are placed in a mixer and stirred according to the raw material ratio information to obtain a uniform mixture; Obtaining mixture samples from different positions of the homogeneous mixture, and obtaining a sample quality index of each of the mixture samples, wherein the sample quality index is used to describe a comprehensive index of viscosity, moisture and density of the mixture; Based on each of the mixture samples, a small casting template similar to the preset casting template is manufactured according to a first preset ratio, and each of the mixture samples is cast according to preset casting parameters to obtain a small concrete segment to be tested; Wherein, the preset pouring parameters include pouring time, pouring speed, vibration frequency and vibration intensity; Obtaining a sample casting quality index of each of the small concrete segments to be tested; obtaining uniform mixture casting information of the uniform mixture based on the sample quality index and the sample casting quality index; According to the uniform mixture pouring information, the uniform mixture is poured using a preset mold to obtain a concrete segment to be tested; Obtaining comprehensive quality information of the concrete segment to be tested, wherein the comprehensive quality information of the concrete segment to be tested is used to describe the physical properties and durability of the concrete segment to be tested; According to the comprehensive quality information, the concrete segments to be tested are processed to obtain concrete segments that meet the preset standards; The sending of the production resource information to all warehouse management units to be selected, and screening the warehouse management units to be selected to obtain all preferred warehouse management units that meet the production demand information specifically includes: Based on the production demand data sent by the demander, confirm the detailed specifications and requirements of the concrete segments that the demander needs to produce, and obtain production resource information; Confirm the quantity of concrete segments that the demander needs to produce and obtain production demand information; According to the production resource information, all possible warehouse management units are listed, all possible warehouse management units are traversed, and the material storage data of each warehouse management unit is obtained; According to the material storage data of each warehouse management unit, a storage quality score of each warehouse management unit is obtained; Determine a storage quality score threshold based on the production demand data, and according to the storage quality score of each warehouse management unit, aggregate the warehouse management units whose storage quality scores are greater than the preset storage quality score threshold to obtain a warehouse management unit to be selected; According to the storage quality score of each warehouse management unit to be selected, the warehouse management units to be selected are sorted, and production resource information is sent to the warehouse management units to be selected according to the sorting; The warehouse management units to be selected receive the production resource information in turn and send their respective raw material inventory information; According to the received raw material inventory information sent by each of the warehouse management units to be selected, determining whether the total raw material inventory of each of the warehouse management units to be selected exceeds the material quantity required in the production resource information; If exceeded, stop sending production resource information to the candidate warehouse management unit, obtain the preferred warehouse management unit, and send call information to all the preferred warehouse management units; If not, continue to send production resource information to the warehouse management unit to be selected; The step of obtaining mixture samples from different positions of the homogeneous mixture and acquiring a sample quality index of each mixture sample specifically includes: Taking the surface of the uniform mixture on the mixer as the reference plane, a plane coordinate system is established, and taking the edge contour of the uniform mixture as the edge line, a mixture area graph is constructed; Create a circle in the plane coordinate system with the midpoint of the mixture area figure as the center and the maximum distance between the edge of the mixture area figure and the center as the radius; Divide the circle in the plane coordinate system into n identical sectors, and take n portions of the mixture with the same volume from the centers of the n sector areas as mixture samples; Using sensors to obtain a viscosity index, a moisture index, and a density index of each of the mixture samples; Obtaining a sample quality index of each of the mixture samples based on the viscosity index, the moisture index and the density index; The calculation formula of sample quality index is: ; In the formula, represents the sample quality index of the i-th mixture sample, represents the viscosity index of the i-th mixture sample, represents the moisture index of the i-th mixture sample, represents the density index of the i-th mixture sample; The method of processing the concrete segments to be tested according to the comprehensive quality information to obtain concrete segments that meet the preset standards specifically includes: Based on the comprehensive quality information, determine the physical performance quality index and durability quality index of the concrete segment to be tested; The sum of the sample casting quality indexes of all small concrete segments to be tested is taken as the sample quality index; The value output by dividing the sample quality index by n is set as the first factor; The maximum value of the first factor multiplied by the first preset ratio is set as the second factor; The output value of the second factor divided by 100 is used as the comprehensive quality index threshold; A times the physical performance quality index of the concrete segment to be tested is taken as the first quality index, and b times the durability quality index of the concrete segment to be tested is taken as the second quality index, and the maximum value of the sum of a and b is 1; The sum of the first quality index and the second quality index is taken as the comprehensive quality index; Based on the comprehensive quality index threshold, determine whether the comprehensive quality index of the concrete segment to be tested meets the requirements. If so, based on the raw material information, place the raw materials in a mixer according to the raw material ratio information to obtain a uniform mixture. If not, obtain the historical environmental information and historical casting parameters of the concrete segment to be tested. Obtain uniform mixture pouring information and simulated environment information, and compare them with historical environment information and historical pouring parameters of the concrete segment to be tested to obtain environment difference parameters and pouring difference parameters; Based on the environmental difference parameter and the pouring difference parameter, the uniform mixture pouring information of the uniform mixture is optimized, and a concrete segment meeting the preset standard is obtained through pouring; Determining the raw material ratio information based on the raw material information specifically includes: According to the production demand data, confirm the engineering design requirements of the demander and determine the design strength grade of the concrete segment; According to the design strength grade of the concrete segment and the quality information of the raw materials, the raw materials are screened to obtain the raw materials that meet the preset parameters; Adding raw materials meeting preset parameters into a mixer in a second preset ratio for stirring, and pouring the uniformly stirred mixture to obtain a concrete grade test embryo; Performing a performance test on the concrete grade test embryo to obtain a strength grade parameter of the concrete grade test embryo; Based on the design strength grade of the concrete segment, a design strength grade threshold is obtained; Based on the design strength grade threshold, determine whether the strength grade parameters of the concrete grade test embryo meet the requirements. If not, add admixtures to the raw materials that meet the preset parameters. If so, determine the raw material ratio information.
2. The wind turbine tower concrete segment production management method based on data feedback according to claim 1 is characterized in that: The step of obtaining the sample casting quality index of each small concrete segment to be tested specifically includes: Acquiring simulated environmental information, wherein the simulated environmental information includes a simulated temperature index, a simulated humidity index, and a simulated wind speed parameter; Based on the simulated environment information, simulating different environments when each of the mixture samples is poured with preset pouring parameters; Divide each four samples of the mixture into one group, and use the control variable method to obtain the influence of the simulated environmental information and the preset pouring parameters on the pouring quality of the mixture samples; Each of the small concrete segments to be tested is evaluated to obtain a sample casting quality index of each of the small concrete segments to be tested.
3. The wind turbine tower concrete segment production management method based on data feedback according to claim 2 is characterized in that: The obtaining of uniform mixture casting information of the uniform mixture based on the sample quality index and the sample casting quality index specifically includes: Obtaining a sample quality index of each of the mixture samples, and using a median value of the sample quality index as a sample quality index threshold; Obtain the sample casting quality index of the small concrete segment to be tested after casting and forming all mixture samples whose sample quality index exceeds the sample quality index threshold, and take the average value of the sample casting quality index as the sample casting quality index threshold; The simulated environment information and preset casting parameters of all mixture samples whose sample casting quality index exceeds the sample casting quality index threshold are summarized and recorded to obtain the uniform mixture casting information of the uniform mixture.
4. A wind turbine tower concrete segment production management system based on data feedback, used to implement the management method according to any one of claims 1 to 3, characterized in that: include: A main control module, the main control module is used to obtain production demand data, determine production demand information and production resource information, perform sampling inspection on the called raw materials, obtain raw material information of concrete segments, obtain sample quality index of each mixture sample according to the mixture sample, obtain material storage data of each warehouse management unit, send production resource information to all warehouse management units to be selected, and screen the warehouse management units to be selected, obtain all preferred warehouse management units that meet the production demand information, obtain storage quality scores of each warehouse management unit according to the material storage data of each warehouse management unit, send respective raw material inventory information after receiving the production resource information, judge whether the total raw material inventory of each warehouse management unit to be selected exceeds the material quantity required in the production resource information according to the raw material inventory information sent by each warehouse management unit to be selected, judge whether the strength grade parameter of the concrete grade test embryo meets the requirements based on the design strength grade threshold, and judge whether the comprehensive quality index of the concrete segment to be tested meets the requirements based on the comprehensive quality index threshold; A transmission module, which is used to connect the main control module, the evaluation module and the display module, and transmit the data exchanged between the modules; A production module, wherein the production module is used to place the raw materials in a mixer according to the raw material ratio information based on the raw material information and stir them to obtain a uniform mixture, obtain mixture samples from different positions of the uniform mixture, and make a small casting template similar to the preset casting template according to a first preset ratio based on each mixture sample, and cast each mixture sample with preset casting parameters to obtain a small concrete segment to be tested, and cast the uniform mixture with a preset mold according to the uniform mixture casting information to obtain the concrete segment to be tested; The display module is used to display the processing results of the main control module, the information transmitted and received by the transmission module, and the evaluation results of the evaluation module.
5. The wind turbine tower concrete segment production management system based on data feedback according to claim 4 is characterized in that: The main control module comprises: A data acquisition unit, the data acquisition unit is used to acquire production demand data, determine production demand information and production resource information, perform sampling inspection on the called raw materials, acquire raw material information of the concrete segments, acquire a sample quality index of each mixture sample based on the mixture sample, and acquire material storage data of each warehouse management unit; A data processing unit, the data processing unit is used to send the production resource information to all warehouse management units to be selected, and screen the warehouse management units to be selected, obtain all preferred warehouse management units that meet the production demand information, and obtain the storage quality score of each warehouse management unit according to the material storage data of each warehouse management unit; A warehouse management unit, the warehouse management unit is used to send respective raw material inventory information after receiving the production resource information; A judgment unit, wherein the judgment unit is used to judge whether the total raw material inventory of each warehouse management unit to be selected exceeds the material quantity required in the production resource information based on the raw material inventory information received from each warehouse management unit to be selected, judge whether the strength grade parameters of the concrete grade test embryo meet the requirements based on the design strength grade threshold, and judge whether the comprehensive quality index of the concrete pipe segment to be tested meets the requirements based on the comprehensive quality index threshold.
6. The wind turbine tower concrete segment production management system based on data feedback according to claim 4, characterized in that: The production module includes: A first production unit, the first production unit is used to place the raw materials in a mixer according to the raw material ratio information based on the raw material information to obtain a uniform mixture, and obtain mixture samples from different positions of the uniform mixture; The second production unit is used to make a small casting template similar to the preset casting template based on each mixture sample according to a first preset ratio, and cast each mixture sample with preset casting parameters to obtain a small concrete pipe segment to be tested, and cast the uniform mixture with a preset mold according to the uniform mixture casting information to obtain the concrete pipe segment to be tested.