Air valve pump automatic assembly production line and assembly method
By designing an automatic assembly production line for air valve pumps, using robot transfer and automated assembly equipment, combined with solenoid valve core energization testing, air tightness testing and NVH testing, the problems of difficult automated assembly and quality control of air valve pumps have been solved, and high efficiency has been achieved. Assembly and testing improve assembly efficiency and product qualification rate.
Patent Information
- Application Number
- CN202411008472.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The automated assembly of air valve pumps is difficult, and it is difficult to ensure the performance after assembly. It is difficult to achieve full automation and efficient quality control with existing technology.
An air valve pump automatic assembly production line is designed, including a valve pump body feeding unit, a robot transfer unit, an accessories assembly line, a pump body performance test unit and an NVH test unit. It uses robot transfer and automated assembly equipment, combined with solenoid valve core power detection , air tightness testing and NVH testing to achieve fully automated assembly and quality inspection.
It greatly improves the assembly efficiency and product qualification rate of air valve pumps, realizes automated assembly of multiple different assembly surfaces and simultaneous detection of special-shaped objects, ensuring assembly quality and performance.
Smart Images

Figure CN118559416B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of automated assembly, in particular to an automatic assembly production line and an assembly method for an air valve pump. Background Art
[0002] The air valve pump is an important part of the car, usually used in the vehicle's brake system. In the car's pneumatic or hydraulic brake system, the main function of the air valve pump is to maintain the air pressure in the system stable and ensure the normal operation of the brake system.
[0003] The air valve pump is a special-shaped part with many components, and involves different types of mechanical parts and electrical components. It is difficult to achieve fully automated assembly and it is difficult to guarantee the performance after assembly.
[0004] Therefore, it is urgent to design a kind of air valve pump automatic assembly production line to solve the above-mentioned technical problems. Summary of the invention
[0005] In order to solve the technical problem of overall automatic assembly of air valve pumps, the present invention provides an automatic assembly production line and assembly method for air valve pumps. The following technical solutions are adopted:
[0006] The automatic assembly production line of an air valve pump comprises a valve pump body feeding unit, a robot transfer unit, an accessory assembly line, a pump valve body performance test unit and an NVH test unit. The valve pump body feeding unit is used to store the air valve pump bodies to be assembled, and the accessory assembly line is used to assemble the various components of the air valve pump bodies to be assembled. The robot transfer unit is used to take out the air valve pump bodies to be assembled stored in the valve pump body feeding unit and transfer them between the various workstations of the accessory assembly line. The pump valve body performance test unit comprises an air valve pump positioning tool, a tightening stop mechanism, an electromagnetic valve core power-on detection module and an air tightness detection module. The air valve pump positioning tool, the tightening stop mechanism, the electromagnetic valve core power-on detection module and the air tightness detection module are respectively installed Installed on the performance test rack, the robot transfer unit takes the air valve pump to be tested that has been assembled on the accessories assembly line and places it on the air valve pump positioning fixture of the pump valve body performance test unit. After the air valve pump positioning fixture is locked, the tightening stop mechanism pushes out the air valve pump to be tested and tightens it. The solenoid valve core power-on detection module performs a solenoid valve core power-on test on the air valve pump to be tested. After the valve core detection is completed, the air tightness detection module performs an air tightness test on the air valve pump to be tested. The robot transfer unit transfers the air valve pump that has completed the air tightness test and passed the test to the NVH test unit. The NVH test unit performs an NVH test. The robot transfer unit transfers the air valve pump that has completed the NVH test and passed the test to the qualified product storage unit.
[0007] Optionally, the accessories assembly line includes a steel ball automatic pressing station, a valve pump body and cylinder liner pressing station, a motor assembly station, a motor detection unit, a connecting rod assembly and a motor connector pre-assembly station, a motor connector sub-assembly automatic pressing station, a connecting rod automatic detection unit, a cylinder liner O-ring and exhaust valve sub-assembly assembly station, a DC connector and safety valve assembly station, a plug pressing and connector pressure plate assembly station, a cylinder head riveting station, a housing automatic O-ring installation station, a solenoid valve core automatic pressing station, a pressure sensor riveting station and a PCB board and PCB board locking station.
[0008] By adopting the above technical solution, the valve pump body feeding unit of the automatic assembly of the air valve pump can provide the air valve pump body and various parts to be assembled. The robot transfer unit refers to the transfer conveyor, and a grabbing robot is set at each station, which can realize the automatic transfer of the entire assembly line. Different automatic assembly equipment is correspondingly set at each station of the accessory assembly line according to the assembly process requirements of the parts, which can realize the automatic assembly of different parts with multiple different assembly surfaces.
[0009] After the assembly is completed, in order to ensure the quality of the assembly, the air valve pump to be inspected needs to be quality inspected. The quality inspection mainly includes the pump valve body performance test unit and the NVH test unit. The pump valve body performance test unit can automatically complete the electromagnetic valve core power-on test and air tightness test of the special-shaped air valve pump to be inspected, and efficiently match the rhythm of the assembly line to achieve synchronous full inspection. Finally, the air valve pump to be inspected that has completed the electromagnetic valve core power-on test and air tightness test needs to be transferred to the NVH test unit to complete the NVH test. The NVH test is a comprehensive test of the noise, vibration and acoustic roughness of automotive parts. The air valve pumps that have completed all the above tests and passed the test are qualified products and are transferred and stored in the qualified product storage unit, which can be a shelf.
[0010] Optionally, the pump valve body performance testing unit also includes a translational lifting mechanism, which includes a linear slide and a lifting mechanism. The track of the linear slide can be detachably mounted on the performance testing frame. The lifting mechanism includes a lifting frame, a lifting cylinder and a lifting plate. The top two sides of the lifting frame are overlapped on the sliders of the linear slide. The lifting cylinder is installed in the lifting frame, and the piston rod is located outside the lifting frame. The bottom of the lifting plate can be detachably mounted on the end of the piston rod of the lifting cylinder, and the bottom of the air valve pump positioning tooling can be detachably mounted on the lifting plate.
[0011] By adopting the above technical scheme, the role of the translational lifting mechanism is to place the air valve pump positioning device above the air tightness detection module during the picking and placing process of the air valve pump to be tested, so as to realize automatic picking and placing of the robot. The action of the lifting cylinder of the power component can realize the lifting drive. The role of the linear slide is to realize floating positioning, which can avoid the components of the subsequent air tightness detection module during lifting and can facilitate the sealing and docking of the air tightness detection module.
[0012] Optionally, the air tightness detection module includes a fixed end base, a left sealing end cover, a right movable end cover assembly and an inflation and deflation assembly, the bottom of the fixed end base is installed on the performance test frame and is located on the left side of the translation lifting mechanism, the left sealing end cover is installed on the side of the fixed end base and faces the translation lifting mechanism, when the translation lifting mechanism descends, the left end face of the air valve pump to be tested fixed on the air valve pump positioning tooling corresponds to the position of the left sealing end cover, the right end cover assembly includes a right fixed end base, a right movable base, a clamping push cylinder, a connecting rod and a right contour sealing end cover, the right fixed end base is detachably installed on the performance test frame and is located on the right side of the translation lifting mechanism, the right movable base is installed on the slider on the linear slide and is located between the translation lifting mechanism and the right fixed end base, the right contour sealing end cover is detachably installed On the right mobile base, the cylinder body of the clamping push cylinder is installed on the right fixed end base, and the piston rod is connected to the non-sealing surface of the right contour sealing end cover through a connecting rod. When the piston rod of the clamping push cylinder is extended, the sealing surface of the right contour sealing end cover is driven to contact and seal with the right end face of the air valve pump to be tested. The charging and discharging assembly includes a pressure pump, a pressure valve, a pressure vessel, a charging and discharging pipeline and a vacuum assembly. The pressure pump is installed on the performance test frame and is connected to the pressure vessel through a pipeline and a pressure valve. The pressure vessel is connected to the left sealing end cover and the right contour sealing end cover respectively through the charging and discharging pipeline. The vacuum assembly includes a vacuum pump and a vacuum air path. The vacuum pump's exhaust port is connected to the right contour sealing end cover through the vacuum air path, and is connected to the inside of the PCB cover of the air valve pump to be tested when the right contour sealing end cover is in sealing contact with the right end of the air valve pump to be tested.
[0013] By adopting the above technical solution, the air tightness detection module needs to complete the air tightness test under the pressurized state, and the vacuum pumping component also needs to synchronously perform a sealing test on the inside of the PCB cover of the air valve pump to be tested. The lifting cylinder of the translation lifting mechanism lowers the air valve pump positioning tooling to align with the left sealing end cover and the right contour sealing end cover, and the pressing push cylinder presses the right contour sealing end cover against the right end face of the air valve pump to be tested, and continuously applies pressure to achieve the sealing contact between the left sealing end cover and the right contour sealing end cover and the left and right end faces of the air valve pump to be tested respectively, and the tightening stop cylinder drives the tightening stop plate to hold the side of the air valve pump positioning tooling; perform an air tightness test, open the inflation valve, and inflate the air valve pump to be tested through the charging and discharging pipelines of the pressure vessel. After the inflation is stable, the pressure increasing valve works again to increase the air pressure to 1Mpa, and then inflate the air valve pump to be tested to stabilize the pressure, and repeatedly step inflation until 1.8Mpa-1.9Mpa; the detection air pressure of the air valve pump to be tested reaches 1.8Mpa-1.9Mpa, and the safety valve of the air valve pump to be tested opens to release the pressure to 0.3Mpa-0.5Mpa and is closed;
[0014] At the same time, the vacuum pump starts working, and the vacuum pump evacuates the inside of the PCB cover of the air valve pump to be tested through the vacuum air circuit, and detects whether there is leakage through the pressure switch on the sealed air circuit, and detects the sealing level of the PCB cover.
[0015] Optionally, the solenoid valve core power-on detection module includes the power-on mechanism installed at the left sealing end cover and the right contour sealing end cover. When the left sealing end cover and the right contour sealing end cover are in sealing contact with the left and right ends of the air valve pump to be tested, the programmable power supply is electrically connected to the multiple solenoid valve cores of the air valve pump to be tested through the power-on mechanism. The PLC programmable controller controls the execution action of the programmable power supply to perform power-on detection on the multiple solenoid valve cores of the air valve pump to be tested, and outputs the detection results through the industrial touch screen.
[0016] By adopting the above technical solution, since there are multiple solenoid valve cores of the air valve pump to be tested with different models, the solenoid valve core power-on detection module is mainly implemented based on the multi-channel output of the programmable power supply. The PLC programmable controller controls the execution action of the programmable power supply to perform power-on detection on multiple solenoid valve cores of the air valve pump to be tested, and outputs the detection results through the industrial touch screen.
[0017] Optionally, the tightening stop mechanism includes a tightening stop cylinder, a cylinder connecting floating joint and a tightening stop plate, the cylinder body of the tightening stop cylinder is installed on the right fixed end base and is located below the clamping push cylinder, the piston rod of the tightening stop cylinder passes through the right movable base, and the right side of the tightening stop plate is connected to the end of the piston rod of the tightening stop cylinder through the cylinder connecting floating joint.
[0018] By adopting the above technical solution, the function of the tightening stop mechanism is to reduce the vibration of the air valve pump to be tested during the test, so as to ensure the smooth progress of the test.
[0019] Optionally, at least two sets of pump valve body performance testing units are provided.
[0020] By adopting the above technical solution, two sets of pump valve body performance test units are set up to match the assembly rhythm of the assembly line.
[0021] Optionally, the NVH test unit uses a double-station automotive parts NVH test equipment.
[0022] By adopting the above technical solution, the NVH test unit can use double-station automotive parts NVH test equipment to achieve double-station synchronous NVH testing to match the rhythm of the entire assembly line.
[0023] The assembly method of the air valve pump automatic assembly production line uses the air valve pump automatic assembly production line to complete automatic assembly and testing of the air valve pump body and parts to be assembled, including the following steps:
[0024] Step 1: The robot transfer unit takes out the air valve pump body to be assembled from the valve pump body feeding unit and transfers it to the positioning tooling of the accessory assembly line including the steel ball automatic pressing station. After the steel ball automatic pressing station completes the pressing, the robot transfer unit transfers it to the next station again until all accessories are assembled and become the air valve pump to be tested;
[0025] Step 2: The robot transfer unit transfers the air valve pump to be tested and places it on the air valve pump positioning tooling, and the air valve pump positioning tooling positions and clamps the air valve pump to be tested;
[0026] Step 3: The lifting cylinder of the translation lifting mechanism moves down the air valve pump positioning tooling to align with the left sealing end cover and the right contour sealing end cover. After the position sensor detects that it is in place, the pressing push cylinder moves to press the right contour sealing end cover against the right end face of the air valve pump to be tested, and continuously applies pressure to achieve sealing contact between the left sealing end cover and the right contour sealing end cover and the left and right end faces of the air valve pump to be tested, respectively. The tightening stop cylinder moves to drive the tightening stop plate to hold the side of the air valve pump positioning tooling;
[0027] The power-on mechanism powers on the air valve pump to be tested, and the PLC sends a signal to the upper computer program. The PLC programmable controller controls the execution of the programmable power supply to perform power-on detection on multiple solenoid valve cores of the air valve pump to be tested. If the PLC programmable controller outputs a qualified power-on detection result, the air tightness test continues, the inflation valve opens, and the pressure vessel inflates the air valve pump to be tested through the charging and discharging pipeline. After the inflation is stable, the pressurizing valve works again to increase the air pressure to 1Mpa, and then inflates the air valve pump to be tested to stabilize the pressure, and the step-by-step inflation is repeated until 1.8Mpa-1.9Mpa; the air pressure of the air valve pump to be tested reaches 1.8Mpa-1.9Mpa, and the safety valve of the air valve pump to be tested is opened to release the pressure to 0.3Mpa-0.5Mpa and then closed;
[0028] Step 4: while working in step 3, the vacuum pump starts working, and the inside of the PCB cover of the air valve pump to be tested is vacuumed through the vacuum air circuit, and the pressure switch on the sealed air circuit is used to detect whether there is leakage, and the sealing level of the PCB cover is detected;
[0029] Step 5, after the pressure of the air valve pump to be tested is released, the exhaust valve of the test gas circuit is opened, and the air pressure inside the pressure vessel and the air valve pump to be tested is reduced to normal pressure within 10 seconds according to the set flow rate;
[0030] Step 6: The pressure drops to normal pressure, all mechanisms are reset, the lifting cylinder is actuated to lift the air valve pump positioning fixture, and the air valve pump positioning fixture is released. If the test result is determined to be qualified, the robot transfer unit transfers the air valve pump to be tested to the test station of the NVH test unit;
[0031] Step 7: The NVH test unit performs NVH test on the air valve pump to be tested, and the robot transfer unit transfers the air valve pump that has completed the NVH test and passed the test to the qualified product storage unit.
[0032] Optionally, if the pump valve body performance test unit or the NVH test unit fails the test, the robot transfer unit transfers the failed air valve pump to a failed product storage unit.
[0033] In summary, the present invention includes at least one of the following beneficial technical effects:
[0034] The present invention can provide an automatic assembly production line and an assembly method for air valve pumps. Different automatic assembly equipment is correspondingly arranged at each workstation of the accessory assembly line according to the requirements of the component assembly process, so as to realize the automatic assembly of different components on multiple different assembly surfaces. After the assembly is completed, in order to ensure the quality of the assembly, the air valve pump to be inspected needs to be quality inspected. The quality inspection mainly includes a pump valve body performance test unit and an NVH test unit. The pump valve body performance test unit can automatically complete the electromagnetic valve core power-on test and the air tightness test of the special-shaped air valve pump to be inspected synchronously, and efficiently match the rhythm of the assembly line to realize synchronous full inspection. Finally, the air valve pump to be inspected that has completed the electromagnetic valve core power-on test and the air tightness test needs to be transferred to the NVH test unit to complete the NVH test. The NVH test is a comprehensive test of the noise, vibration and acoustic roughness of automobile components. The air valve pump that has completed all the above tests and passed them is a qualified product, which is transferred and stored in the qualified product storage unit, thereby greatly improving the assembly efficiency and product qualification rate of the air valve pump. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a schematic diagram of the layout of the automatic assembly production line of the air valve pump of the present invention;
[0036] Figure 2 It is a three-dimensional structural schematic diagram of a pump valve body performance test unit of an air valve pump automatic assembly production line of the present invention;
[0037] Figure 3 It is a three-dimensional structural diagram of the combined state of the air valve pump positioning tooling, translation lifting mechanism, tightening stop mechanism, and air tightness detection module of the pump valve body performance test unit of the air valve pump automatic assembly production line of the present invention;
[0038] Figure 4 It is a three-dimensional structural diagram of the air valve pump positioning tooling and the translation and lifting mechanism combination state of the pump valve body performance test unit of the air valve pump automatic assembly production line of the present invention;
[0039] Figure 5 It is a schematic diagram of the combined state structure of the air valve pump positioning tooling and the translation and lifting mechanism of the pump body performance test unit of the air valve pump automatic assembly production line of the present invention;
[0040] Figure 6 It is a schematic diagram of the layout of the charging and discharging components of the air valve pump automatic assembly production line of the present invention;
[0041] Figure 7 It is a schematic diagram of the three-dimensional structure of the air valve pump body to be assembled according to the present invention.
[0042] Explanation of the accompanying drawings: 1. Valve pump body feeding unit; 2. Air valve pump positioning tooling; 3. Translational lifting mechanism; 31. Linear slide; 32. Lifting mechanism; 321. Lifting frame; 322. Lifting cylinder; 323. Lifting plate; 41. Fixed end base; 42. Left sealing end cover; 43. Right fixed end base; 44. Right movable base; 45. Clamping push cylinder; 46. Connecting rod; 47. Right contour sealing end cover; 48. Inflating and discharging assembly; 481. Pressurizing pump; 482. Pressure vessel; 51. Clamping stop cylinder; 52. Cylinder connecting floating joint; 53. Clamping stop plate; 7. NVH test unit; 10. Accessory assembly line; 100. Air valve pump body to be assembled; 101. Performance test rack. DETAILED DESCRIPTION
[0043] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0044] The embodiment of the invention discloses an automatic assembly production line and an assembly method for an air valve pump.
[0045] Reference Figure 1 - Figure 7 Embodiment 1, an automatic assembly production line for an air valve pump, comprising a valve pump body feeding unit 1, a robot transfer unit, an accessory assembly line 10, a pump valve body performance test unit and an NVH test unit 7, wherein the valve pump body feeding unit 1 is used to store the air valve pump body 100 to be assembled, the accessory assembly line 10 is used to assemble the various components of the air valve pump body 100 to be assembled, the robot transfer unit is used to take out the air valve pump body 100 to be assembled stored in the valve pump body feeding unit 1 and transfer it between the various workstations of the accessory assembly line 10, the pump valve body performance test unit comprises an air valve pump positioning tool 2, a tightening stop mechanism, an electromagnetic valve core power-on detection module and an air tightness detection module, the air valve pump positioning tool 2, a tightening stop mechanism, an electromagnetic valve core power-on detection module and an air tightness detection module The modules are respectively installed on the performance test rack 101, and the robot transfer unit takes the air valve pump to be tested that has been assembled on the accessory assembly line 10 and places it on the air valve pump positioning fixture 2 of the pump valve body performance test unit. After the air valve pump positioning fixture 2 is locked, the tightening stop mechanism pushes out the air valve pump to be tested and tightens it. The solenoid valve core power-on detection module performs a solenoid valve core power-on test on the air valve pump to be tested. After the valve core detection is completed, the air tightness detection module performs an air tightness test on the air valve pump to be tested. The robot transfer unit transfers the air valve pump that has completed the air tightness test and passed the test to the NVH test unit 7. The NVH test unit 7 performs an NVH test. The robot transfer unit transfers the air valve pump that has completed the NVH test and passed the test to the qualified product storage unit.
[0046] Embodiment 2, the accessory assembly line 10 includes a steel ball automatic pressing station, a valve pump body cylinder sleeve pressing station, a motor assembly station, a motor detection unit, a connecting rod assembly and motor connector pre-assembly station, a motor connector sub-assembly automatic pressing station, a connecting rod automatic detection unit, a cylinder sleeve O-ring and exhaust valve sub-assembly assembly station, a DC connector and safety valve assembly station, a plug pressing and connector pressure plate assembly station, a cylinder head riveting station, a shell automatic O-ring installation station, a solenoid valve core automatic pressing station, a pressure sensor riveting station and a PCB board and PCB board locking station.
[0047] The valve pump body feeding unit 1 of the air valve pump automatic assembly can provide the air valve pump body 100 and various parts to be assembled. The robot transfer unit refers to a transfer conveyor. A grabbing robot is set at each station to realize the automatic transfer of the entire assembly line. Different automatic assembly equipment is set correspondingly at each station of the accessory assembly line 10 according to the requirements of the parts assembly process, which can realize the automatic assembly of different parts with multiple different assembly surfaces.
[0048] After the assembly is completed, in order to ensure the quality of the assembly, the air valve pump to be inspected needs to be quality inspected. The quality inspection mainly includes the pump valve body performance test unit and the NVH test unit 7. The pump valve body performance test unit can automatically complete the electromagnetic valve core power-on test and air tightness test of the special-shaped air valve pump to be inspected, and efficiently match the rhythm of the assembly line to achieve synchronous full inspection. Finally, the air valve pump to be inspected that has completed the electromagnetic valve core power-on test and air tightness test needs to be transferred to the NVH test unit 7 to complete the NVH test. The NVH test is a comprehensive test of the noise, vibration and acoustic roughness of automotive parts. The air valve pumps that have completed all the above tests and passed the test are qualified products and are transferred and stored in the qualified product storage unit. The qualified product storage unit can be a shelf.
[0049] Example 3, the pump valve body performance test unit also includes a translation and lifting mechanism 3, the translation and lifting mechanism 3 includes a linear slide 31 and a lifting mechanism 32, the track of the linear slide 31 is detachably mounted on the performance test frame 101, the lifting mechanism 32 includes a lifting frame 321, a lifting cylinder 322 and a lifting plate 323, the top two sides of the lifting frame 321 are overlapped on the slider of the linear slide 31, the lifting cylinder 322 is installed in the lifting frame 321, and the piston rod is located outside the lifting frame 321, the bottom of the lifting plate 323 is detachably mounted on the piston rod end of the lifting cylinder 322, and the bottom of the air valve pump positioning tooling 2 is detachably mounted on the lifting plate 323.
[0050] The function of the translational lifting mechanism 3 is to place the air valve pump positioning tooling 2 above the air tightness detection module during the picking and placing of the air valve pump to be tested, so as to realize automatic picking and placing of the robot. The action of the power component lifting cylinder 322 can realize the lifting drive. The function of the linear slide 31 is to realize floating positioning, which can avoid the components of the subsequent air tightness detection module during lifting and can facilitate the sealing and docking of the air tightness detection module.
[0051] Embodiment 4, the air tightness detection module includes a fixed end base 41, a left sealing end cover 42, a right movable end cover assembly and an inflation and deflation assembly 48, the bottom of the fixed end base 41 is installed on the performance test frame 101 and is located on the left side of the translation lifting mechanism 3, the left sealing end cover 42 is installed on the side of the fixed end base 41 and faces the translation lifting mechanism 3, when the translation lifting mechanism 3 descends, the left end face of the air valve pump to be tested fixed on the air valve pump positioning tooling 2 corresponds to the position of the left sealing end cover 42, the right end cover assembly includes a right fixed end base 43, a right movable base 44, a clamping push cylinder 45, a connecting rod 46 and a right contour sealing end cover 47, the right fixed end base 43 is detachably installed on the performance test frame 101 and is located on the right side of the translation lifting mechanism 3, the right movable base 44 is installed on the slider on the linear slide 31, and is located between the translation lifting mechanism 3 and the right fixed end base 43, the right contour sealing end cover 47 is detachably installed It is mounted on the right side mobile base 44, the cylinder body of the compression push cylinder 45 is mounted on the right side fixed end base 43, the piston rod is connected to the non-sealing surface of the right side contour sealing end cover 47 through the connecting rod 46, and when the piston rod of the compression push cylinder 45 is extended, the sealing surface of the right side contour sealing end cover 47 is driven to contact and seal with the right end face of the air valve pump to be tested, the charging and discharging assembly 48 includes a pressure pump 481, a pressure valve, a pressure vessel 482, a charging and discharging pipeline and a vacuum assembly, the pressure pump 481 is mounted on the performance test rack 101, and is connected to the pressure vessel 482 through a pipeline and a pressure valve, the pressure vessel 482 is connected to the left side sealing end cover 42 and the right side contour sealing end cover 47 through the charging and discharging pipeline, the vacuum assembly includes a vacuum pump and a vacuum air path, the air suction port of the vacuum pump is connected to the right side contour sealing end cover 47 through the vacuum air path, and is connected to the inside of the PCB cover of the air valve pump to be tested when the right side contour sealing end cover 47 is in sealing contact with the right end of the air valve pump to be tested.
[0052] The air tightness detection module needs to complete the air tightness test under the pressurized state, and the vacuum assembly also needs to synchronously perform a sealing test on the inside of the PCB cover of the air valve pump to be tested. The lifting cylinder 322 of the translation lifting mechanism 3 moves to lower the air valve pump positioning tooling 2 to align with the left sealing end cover 42 and the right contour sealing end cover 47, and the pressing push cylinder 45 moves to press the right contour sealing end cover 47 against the right end face of the air valve pump to be tested, and continuously applies pressure to achieve the sealing contact between the left sealing end cover 42 and the right contour sealing end cover 47 and the left and right end faces of the air valve pump to be tested, respectively, and the tightening stop cylinder 51 moves to drive the tightening stop plate 53 to hold the air valve pump positioning tooling 2 against the left sealing end cover 42 and the right contour sealing end cover 47. Install 2 side; conduct air tightness test, open the inflation valve, and inflate the air valve pump to be tested through the inflation and discharge pipeline of the pressure vessel 482. After the inflation is stable, the pressure increasing valve works again to increase the air pressure to 1Mpa, and then inflate the air valve pump to be tested to stabilize the pressure, and repeatedly inflate in steps until the pressure reaches 1.8Mpa-1.9Mpa; the air valve pump to be tested detects that the air pressure reaches 1.8Mpa-1.9Mpa, and the safety valve of the air valve pump to be tested opens to release the pressure to 0.3Mpa-0.5Mpa and closes;
[0053] At the same time, the vacuum pump starts working, and the vacuum pump evacuates the inside of the PCB cover of the air valve pump to be tested through the vacuum air circuit, and detects whether there is leakage through the pressure switch on the sealed air circuit, and detects the sealing level of the PCB cover.
[0054] Example 5, the solenoid valve core power-on detection module includes a power-on mechanism installed at the left sealing end cover 42 and the right contour sealing end cover 47. When the left sealing end cover 42 and the right contour sealing end cover 47 are in sealing contact with the left and right ends of the air valve pump to be tested, the programmable power supply is electrically connected to the multiple solenoid valve cores of the air valve pump to be tested through the power-on mechanism, and the PLC programmable controller controls the execution action of the programmable power supply to perform power-on detection on the multiple solenoid valve cores of the air valve pump to be tested, and outputs the detection results through the industrial touch screen.
[0055] Since there are multiple solenoid valve cores of different models in the air valve pump to be tested, the solenoid valve core power-on detection module is mainly based on the multi-channel output of the programmable power supply. The PLC programmable controller controls the execution of the programmable power supply to perform power-on detection on multiple solenoid valve cores of the air valve pump to be tested, and outputs the detection results through the industrial touch screen.
[0056] Embodiment 6, the tightening and stopping mechanism includes a tightening and stopping cylinder 51, a cylinder connecting floating joint 52 and a tightening and stopping plate 53, the cylinder body of the tightening and stopping cylinder 51 is installed on the right fixed end base 43 and is located below the clamping push cylinder 45, the piston rod of the tightening and stopping cylinder 51 passes through the right movable base 44, and the right side of the tightening and stopping plate 53 is connected to the end of the piston rod of the tightening and stopping cylinder 51 through the cylinder connecting floating joint 52.
[0057] The function of the tightening stop mechanism is to reduce the vibration of the air valve pump to be tested during the test to ensure smooth testing.
[0058] Embodiment 7: at least two sets of pump valve body performance testing units are provided.
[0059] Two sets of pump valve body performance test units are set up to match the assembly rhythm of the assembly line.
[0060] In Example 8, the NVH test unit 7 adopts a double-station automobile parts NVH test equipment.
[0061] The NVH test unit 7 can use a double-station automobile parts NVH test equipment to achieve double-station synchronous NVH testing to match the rhythm of the entire assembly line.
[0062] Embodiment 9, an assembly method of an air valve pump automatic assembly production line, using an air valve pump automatic assembly production line to complete automatic assembly and testing of an air valve pump body 100 and parts to be assembled, including the following steps:
[0063] Step 1, the robot transfer unit takes out the air valve pump body 100 to be assembled from the valve pump body feeding unit 1 and transfers it to the positioning tooling of the automatic steel ball pressing station on the accessory assembly line 10. After the automatic steel ball pressing station completes the pressing, the robot transfer unit transfers it to the next station again until all accessories are assembled to become the air valve pump to be tested;
[0064] Step 2, the robot transfer unit transfers the air valve pump to be tested and places it on the air valve pump positioning fixture 2, and the air valve pump positioning fixture 2 positions and clamps the air valve pump to be tested;
[0065] Step 3, the lifting cylinder 322 of the translation lifting mechanism 3 moves to lower the air valve pump positioning tooling 2 to align with the left sealing end cover 42 and the right contour sealing end cover 47. After the position sensor detects that it is in place, the pressing push cylinder 45 moves to press the right contour sealing end cover 47 against the right end face of the air valve pump to be tested, and continuously applies pressure to achieve sealing contact between the left sealing end cover 42 and the right contour sealing end cover 47 and the left and right end faces of the air valve pump to be tested, respectively. The tightening stop cylinder 51 moves to drive the tightening stop plate 53 to hold the side of the air valve pump positioning tooling 2;
[0066] The power-on mechanism powers on the air valve pump to be tested, the PLC sends a signal to the upper computer program, and the PLC programmable controller controls the execution of the programmable power supply to perform power-on detection on multiple electromagnetic valve cores of the air valve pump to be tested. If the PLC programmable controller outputs a qualified power-on detection result, the air tightness test continues, the inflation valve opens, and the pressure vessel 482 inflates the air valve pump to be tested through the charging and discharging pipeline. After the inflation is stable, the pressurizing valve works again to increase the air pressure to 1Mpa, and then inflates the air valve pump to be tested to stabilize the pressure, and the step-by-step inflation is repeated until 1.8Mpa-1.9Mpa; the air pressure of the air valve pump to be tested reaches 1.8Mpa-1.9Mpa, and the safety valve of the air valve pump to be tested is opened to release the pressure to 0.3Mpa-0.5Mpa and then closed;
[0067] Step 4: while working in step 3, the vacuum pump starts working, and the inside of the PCB cover of the air valve pump to be tested is vacuumed through the vacuum air circuit, and the pressure switch on the sealed air circuit is used to detect whether there is leakage, and the sealing level of the PCB cover is detected;
[0068] Step 5, after the pressure of the air valve pump to be tested is released, the exhaust valve of the detection gas circuit is opened, and the air pressure inside the pressure vessel 482 and the air valve pump to be tested is reduced to normal pressure within 10 seconds according to the set flow rate;
[0069] Step 6: The pressure drops to normal pressure, all mechanisms are reset, the lifting cylinder 322 is actuated to lift the air valve pump positioning fixture 2, and the air valve pump positioning fixture 2 is released. If the test result is determined to be qualified, the robot transfer unit transfers the air valve pump to be tested to the test station of the NVH test unit 7;
[0070] Step 7, the NVH test unit 7 performs NVH test on the air valve pump to be tested, and the robot transfer unit transfers the air valve pump that has completed the NVH test and passed the test to the qualified product storage unit.
[0071] In Example 10, if the pump valve body performance test unit or the NVH test unit 7 fails the test, the robot transfer unit transfers the unqualified air valve pump to the unqualified product storage unit.
[0072] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. Automatic assembly line of air valve pump, characterized by: The invention comprises a valve pump body feeding unit (1), a robot transfer unit, an accessory assembly line (10), a pump valve body performance test unit and an NVH test unit (7), wherein the valve pump body feeding unit (1) is used to store air valve pump bodies (100) to be assembled, the accessory assembly line (10) is used to assemble various components of the air valve pump bodies (100) to be assembled, the robot transfer unit is used to take out the air valve pump bodies (100) to be assembled stored in the valve pump body feeding unit (1) and transfer them between various workstations of the accessory assembly line (10), and the pump valve body performance test unit comprises an air valve pump positioning tool (2), a tightening stop mechanism, an electromagnetic valve core power-on detection module and an air tightness detection module, the air valve pump positioning tool (2), the tightening stop mechanism, the electromagnetic valve core power-on detection module and an air tightness detection module The test modules are respectively installed on the performance test rack (101), the robot transfer unit takes the air valve pump to be tested assembled by the accessory assembly line (10) and places it on the air valve pump positioning fixture (2) of the pump valve body performance test unit, after the air valve pump positioning fixture (2) is locked, the pressing stop mechanism pushes out the air valve pump to be tested and presses the pressing stop, the solenoid valve core power-on detection module performs a solenoid valve core power-on test on the air valve pump to be tested, after the valve core detection is completed, the air tightness detection module performs an air tightness test on the air valve pump to be tested, the robot transfer unit transfers the air valve pump that has completed the air tightness test and passed the test to the NVH test unit (7), the NVH test unit (7) performs the NVH test, and the robot transfer unit transfers the air valve pump that has completed the NVH test and passed the test to the qualified product storage unit; The air valve pump automatic assembly production line is used to automatically assemble and inspect the air valve pump body (100) and parts to be assembled, including the following steps: Step 1, the robot transfer unit takes out the air valve pump body (100) to be assembled from the valve pump body feeding unit (1) and transfers it to the positioning tooling of the parts assembly line (10) including the steel ball automatic pressing station. After the steel ball automatic pressing station completes the pressing, the robot transfer unit transfers it to the next station again until all parts are assembled to become the air valve pump to be tested; Step 2, the robot transfer unit transfers the air valve pump to be tested and places it on the air valve pump positioning tool (2), and the air valve pump positioning tool (2) positions and clamps the air valve pump to be tested; Step 3, the lifting cylinder (322) of the translation lifting mechanism (3) moves to lower the air valve pump positioning tooling (2) to align with the left sealing end cover (42) and the right contour sealing end cover (47). After the position sensor detects that they are in position, the pressing push cylinder (45) moves to press the right contour sealing end cover (47) against the right end face of the air valve pump to be tested, and continuously applies pressure to achieve sealing contact between the left sealing end cover (42) and the right contour sealing end cover (47) and the left and right end faces of the air valve pump to be tested, respectively. The tightening stop cylinder (51) moves to drive the tightening stop plate (53) to press against the side of the air valve pump positioning tooling (2); The power-on mechanism powers on the air valve pump to be tested, the PLC sends a signal to the upper computer program, and the PLC programmable controller controls the execution of the programmable power supply to perform power-on detection on multiple electromagnetic valve cores of the air valve pump to be tested. If the PLC programmable controller outputs a qualified power-on detection result, the air tightness test continues, the inflation valve is opened, and the pressure vessel (482) inflates the air valve pump to be tested through the inflation and discharge pipeline. After the inflation is stable, the pressurizing valve works again to increase the air pressure to 1Mpa, and then inflates the air valve pump to be tested to stabilize the pressure, and the step inflation is repeated until 1.8Mpa-1.9Mpa; the air pressure of the air valve pump to be tested reaches 1.8Mpa-1.9Mpa, and the safety valve of the air valve pump to be tested is opened to release the pressure to 0.3Mpa-0.5Mpa and is closed; Step 4: while working in step 3, the vacuum pump starts working, and the inside of the PCB cover of the air valve pump to be tested is vacuumed through the vacuum air circuit, and the pressure switch on the sealed air circuit is used to detect whether there is leakage, and the sealing level of the PCB cover is detected; Step 5, after the pressure of the air valve pump to be tested is released, the exhaust valve of the test air path is opened, and the air pressure inside the pressure vessel (482) and the air valve pump to be tested is reduced to normal pressure within 10 seconds according to the set flow rate; Step 6, the pressure is reduced to normal pressure, each mechanism is reset, the lifting cylinder (322) is actuated to lift the air valve pump positioning fixture (2), and the air valve pump positioning fixture (2) is released. If the test result is determined to be qualified, the robot transfer unit transfers the air valve pump to be tested to the test station of the NVH test unit (7); Step 7, the NVH test unit (7) performs NVH test on the air valve pump to be tested, and the robot transfer unit transfers the air valve pump that has completed the NVH test and passed the test to the qualified product storage unit.
2. The automatic assembly line of air valve pump according to claim 1 is characterized by: The accessory assembly line (10) includes a steel ball automatic pressing station, a valve pump body cylinder liner pressing station, a motor assembly station, a motor detection unit, a connecting rod assembly and motor connector pre-assembly station, a motor connector sub-assembly automatic pressing station, a connecting rod automatic detection unit, a cylinder liner O-ring and exhaust valve sub-assembly assembly station, a DC connector and safety valve assembly station, a plug pressing and connector pressure plate assembly station, a cylinder head riveting station, a housing automatic O-ring installation station, a solenoid valve core automatic pressing station, a pressure sensor riveting station and a PCB board and PCB board locking station.
3. The automatic assembly line of air valve pump according to claim 1 is characterized by: The pump valve body performance test unit also includes a translation lifting mechanism (3), the translation lifting mechanism (3) includes a linear slide (31) and a lifting mechanism (32), the track of the linear slide (31) is detachably mounted on the performance test frame (101), the lifting mechanism (32) includes a lifting frame (321), a lifting cylinder (322) and a lifting plate (323), the top two sides of the lifting frame (321) are overlapped on the sliders of the linear slide (31), the lifting cylinder (322) is installed in the lifting frame (321), and the piston rod is located outside the lifting frame (321), the bottom of the lifting plate (323) is detachably mounted on the end of the piston rod of the lifting cylinder (322), and the bottom of the air valve pump positioning tool (2) is detachably mounted on the lifting plate (323).
4. The automatic assembly line of air valve pump according to claim 3 is characterized by: The air tightness detection module comprises a fixed end base (41), a left sealing end cover (42), a right movable end cover assembly and an air filling and deflation assembly (48), wherein the bottom of the fixed end base (41) is mounted on a performance test frame (101) and is located on the left side of a translation lifting mechanism (3), and the left sealing end cover (42) is mounted on the side of the fixed end base (41) and faces the translation lifting mechanism (3), and when the translation lifting mechanism (3) descends, the left end surface of the air valve pump to be tested fixed on the air valve pump positioning fixture (2) and the left sealing end cover (48) are in contact with each other. 42), the right end cover assembly includes a right fixed end base (43), a right movable base (44), a pressing push cylinder (45), a connecting rod (46) and a right contour sealing end cover (47), wherein the right fixed end base (43) is detachably mounted on the performance test frame (101) and is located on the right side of the translation lifting mechanism (3), the right movable base (44) is mounted on a slider on the linear slide (31) and is located between the translation lifting mechanism (3) and the right fixed end base (43), and the right contour sealing end cover (47) is installed on the right side of the performance test frame (101). 7) is detachably mounted on the right side mobile base (44), the cylinder body of the pressing push cylinder (45) is mounted on the right side fixed end base (43), the piston rod is connected to the non-sealing surface of the right side profile sealing end cover (47) through the connecting rod (46), when the piston rod of the pressing push cylinder (45) is extended, the sealing surface of the right side profile sealing end cover (47) is driven to contact and seal with the right end face of the air valve pump to be tested, the charging and discharging assembly (48) includes a pressure pump (481), a pressure valve, a pressure container (482), a charging and discharging pipeline and a vacuum assembly, the pressure pump (481) is installed on the performance test frame (101), and is connected to the pressure container (482) through a pipeline and a pressure valve. The pressure container (482) is connected to the left sealing end cover (42) and the right contour sealing end cover (47) through the filling and discharging pipelines. The vacuum pump assembly includes a vacuum pump and a vacuum pumping air path. The vacuum pump's suction port is connected to the right contour sealing end cover (47) through the vacuum pumping air path, and is connected to the inside of the PCB cover of the air valve pump to be tested when the right contour sealing end cover (47) is in sealing contact with the right end of the air valve pump to be tested.
5. The automatic assembly line of air valve pump according to claim 4 is characterized by: The electromagnetic valve core power-on detection module comprises a power-on mechanism, which is mounted on a left sealing end cover (42) and a right contour sealing end cover (47). When the left sealing end cover (42) and the right contour sealing end cover (47) are in sealing contact with the left and right ends of the air valve pump to be tested, the programmable power supply is electrically connected to the multiple electromagnetic valve cores of the air valve pump to be tested through the power-on mechanism, and the PLC programmable controller controls the execution action of the programmable power supply to perform power-on detection on the multiple electromagnetic valve cores of the air valve pump to be tested, and outputs the detection result through the industrial touch screen.
6. The automatic assembly line of air valve pump according to claim 5, characterized in that: The tightening stop mechanism comprises a tightening stop cylinder (51), a cylinder connection floating joint (52) and a tightening stop plate (53). The cylinder body of the tightening stop cylinder (51) is mounted on the right fixed end base (43) and is located below the pressing push cylinder (45). The piston rod of the tightening stop cylinder (51) passes through the right movable base (44). The right side of the tightening stop plate (53) is connected to the end of the piston rod of the tightening stop cylinder (51) via the cylinder connection floating joint (52).
7. The automatic assembly line of air valve pump according to claim 6, characterized in that: At least two sets of pump valve body performance test units are provided.
8. The automatic assembly line of air valve pump according to claim 1, characterized in that: The NVH test unit (7) uses a double-station automotive parts NVH test equipment.
9. The automatic assembly line of air valve pump according to claim 1, characterized in that: If the pump valve body performance test unit or the NVH test unit (7) fails the test, the robot transfer unit transfers the failed air valve pump to the failed product storage unit.