A method, device, storage medium and electronic equipment for controlling a crane
By switching the direction of the guide wheel when the current position of the Tianche coincides with the target node in advance, the problems of low control efficiency and collision risk in the traditional Tianche’s fork path are solved, and a more efficient production process is achieved.
Patent Information
- Application Number
- CN202411036120.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-07-31
AI Technical Summary
When traditional skycars encounter a fork path, they need to temporarily switch the direction of the guide wheel and detect the time of the guide wheel, resulting in low control efficiency and collision risk, affecting production efficiency.
By obtaining the current position of the skycar coincides with the target node, switch the direction of the guide wheel in advance, reduce the waiting time for switching directions at the divergence point, ensure smooth transition to the predetermined path, reduce the impact risk caused by the guide wheel not being able to finish, and improve the Overall operational efficiency.
The skycar switches the direction of the guide wheel in advance before the fork path, reduces waiting time, reduces impact risk, and improves production efficiency and control efficiency.
Smart Images

Figure CN118561174B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of automatic control technology, and in particular to an overhead crane control method, device, storage medium and electronic equipment. Background Art
[0002] With the continuous development of the semiconductor industry, manufacturers are faced with the challenge of improving production efficiency and reducing costs. Overhead Hoist Transport (OHT or overhead crane, also known as aerial transport device) is a device widely used in semiconductor production lines to automatically transport wafer boxes. Automatic transportation through this device can improve material transportation efficiency, reduce labor costs and reduce pollution risks, thereby greatly improving the overall production process. During the use of the overhead crane, the operating efficiency of the overhead crane directly affects the production efficiency of the factory, so it is particularly important to optimize any link in the overhead crane's travel process.
[0003] When a traditional overhead crane encounters a forked path, it usually needs to temporarily switch the direction of the guide wheel and detect how long the guide wheel has not switched before controlling the crane to alarm. This not only reduces the control efficiency, but also may lead to the risk of collision due to the guide wheel not switching direction in time and the crane not stopping in time. Summary of the invention
[0004] The object of the present invention is to provide an overhead crane control method, device, storage medium and electronic device to at least partially improve the above-mentioned problem.
[0005] In order to achieve the above purpose, the technical solution adopted by the embodiment of the present invention is as follows:
[0006] In a first aspect, an embodiment of the present invention provides a method for controlling an overhead traveling crane, the method comprising:
[0007] Get the current position of the overhead crane;
[0008] When the current position coincides with the target node, controlling the guide wheels of the overhead travelling vehicle to switch toward the target direction;
[0009] Among them, the target node is the starting point or the first type node of the task route, the first type node is the end point of the kth detection path in the task route, the path direction of the k+1th detection path is opposite to the path direction of the kth detection path, and the k+1th detection path is the path of the nearest detection path after the first type node in the task route. When the target node is the first type node, the target direction is the same as the path direction of the k+1th detection path. When the target node is the starting point of the task route, the target direction is the same as the path direction of the first detection path. The first detection path is the path of the nearest detection path after the starting point in the task route. When the overhead crane travels to the starting point of the detection path, it is necessary to detect the direction of the guide wheel.
[0010] In a second aspect, an embodiment of the present invention provides an overhead travelling crane control device, the device comprising:
[0011] The first processing unit is used to obtain the current position of the overhead travelling crane;
[0012] A second processing unit is used to control the guide wheel of the overhead travelling vehicle to switch to a target direction when the current position coincides with the target node;
[0013] Among them, the target node is the starting point or the first type node of the task route, the first type node is the end point of the kth detection path in the task route, the path direction of the k+1th detection path is opposite to the path direction of the kth detection path, and the k+1th detection path is the path of the nearest detection path after the first type node in the task route. When the target node is the first type node, the target direction is the same as the path direction of the k+1th detection path. When the target node is the starting point of the task route, the target direction is the same as the path direction of the first detection path. The first detection path is the path of the nearest detection path after the starting point in the task route. When the overhead crane travels to the starting point of the detection path, it is necessary to detect the direction of the guide wheel.
[0014] In a third aspect, an embodiment of the present invention provides a storage medium having a computer program stored thereon, and the computer program implements the above method when executed by a processor.
[0015] In a fourth aspect, an embodiment of the present invention provides an electronic device, comprising: a processor and a memory, wherein the memory is used to store one or more programs; when the one or more programs are executed by the processor, the above method is implemented.
[0016] Compared with the prior art, an overhead crane control method, device, storage medium and electronic device provided in an embodiment of the present invention include: obtaining the current position of the overhead crane; when the current position coincides with the target node, controlling the guide wheel of the overhead crane to switch to the target direction; wherein the target node is the starting point or the first-class node of the task route, the first-class node is the end point of the kth detection path in the task route, the path direction of the k+1th detection path is opposite to the path direction of the kth detection path, the k+1th detection path is the path of the nearest detection path after the first-class node in the task route, when the target node is the first-class node, the target direction is the same as the path direction of the k+1th detection path, when the target node is the starting point of the task route, the target direction is the same as the path direction of the first detection path, the first detection path is the path of the nearest detection path after the starting point in the task route, and when the overhead crane travels to the starting point of the detection path, it is necessary to detect the direction of the guide wheel. The guide wheels start switching to the target direction in advance at the target node, reducing the waiting time for switching directions at the detection point, allowing the overhead crane to switch to the required branch direction in advance, ensuring a smooth transition to the predetermined path, reducing the risk of collision caused by the guide wheels not having enough time to complete the movement, and improving overall operating efficiency.
[0017] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 This is a schematic structural diagram of an electronic device provided by the present invention.
[0020] Figure 2 This is one of the flow charts of the overhead crane control method provided by the present invention.
[0021] Figure 3 One of the task route schematic diagrams provided in an embodiment of the present invention.
[0022] Figure 4 The second task route diagram provided for the embodiment of the present invention.
[0023] Figure 5 The third task route diagram provided for the embodiment of the present invention.
[0024] Figure 6The second flowchart of the overhead crane control method provided by the present invention.
[0025] Figure 7 The third flow chart of the overhead crane control method provided by the present invention.
[0026] Figure 8 This is a unit schematic diagram of the overhead crane control device provided by the present invention.
[0027] In the figure: 10 - processor; 11 - memory; 12 - bus; 13 - communication interface; 201 - first processing unit; 202 - second processing unit. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0029] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0031] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0032] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0033] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "disposed" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] Some embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0035] When the overhead crane encounters a forked path or a turning path, it needs to temporarily switch the direction of the guide wheels and detect how long the guide wheels have not switched before controlling the overhead crane to alarm. After receiving the task route, the overhead crane starts to switch the direction of the guide wheels at the position in front of the divergence point, which may cause a risk of collision. When switching the direction of the guide wheels before the divergence point, the operating speed is generally limited in consideration of the risk, so that the guide wheels switch directions very slowly, which takes a lot of time and reduces the control efficiency. To solve this problem, an embodiment of the present invention provides an overhead crane control method, so that before the overhead crane reaches the path divergence point, based on the current task route, it calculates the position where the guide wheel direction can be switched in advance, thereby reducing the waiting time for switching directions at the divergence point, allowing the overhead crane to switch the required branch direction in advance, ensuring a smooth transition to the predetermined path, reducing the risk of collision caused by the guide wheels not being able to complete the rotation in time, and improving the overall operation efficiency.
[0036] The embodiment of the present invention provides an electronic device, which may be a main control unit of an overhead crane, or an overhead crane dispatching control system (OHT Control System, referred to as OCS) connected to the main control unit, or a mobile phone, computer or server connected to the main control unit and / or the overhead crane dispatching control system. Figure 1, a schematic diagram of the structure of an electronic device. The electronic device includes a processor 10, a memory 11, and a bus 12. The processor 10 and the memory 11 are connected via the bus 12, and the processor 10 is used to execute an executable module stored in the memory 11, such as a computer program.
[0037] The processor 10 may be an integrated circuit chip having the ability to process signals. In the implementation process, each step of the overhead crane control method may be completed by an integrated logic circuit of hardware in the processor 10 or by instructions in the form of software. The above-mentioned processor 10 may be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it may also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA), or other programmable logic devices, discrete gates or transistor logic devices, or discrete hardware components.
[0038] The memory 11 may include a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk memory.
[0039] The bus 12 may be an ISA (Industry Standard Architecture) bus, a PCI (Peripheral Component Interconnect) bus, or an EISA (Extended Industry Standard Architecture) bus. Figure 1 Although only one bidirectional arrow is used in the figure, it does not mean that there is only one bus 12 or only one type of bus 12 .
[0040] The memory 11 is used to store programs, such as programs corresponding to the overhead crane control device. The overhead crane control device includes at least one software function module that can be stored in the memory 11 in the form of software or firmware or fixed in the operating system (OS) of the electronic device. After receiving the execution instruction, the processor 10 executes the program to implement the overhead crane control method.
[0041] Possibly, the electronic device provided by the embodiment of the present invention further includes a communication interface 13. The communication interface 13 is connected to the processor 10 via a bus.
[0042] It should be understood that Figure 1 The structure shown is only a schematic diagram of a portion of the electronic device. The electronic device may also include Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown. Figure 1 Each component shown in the figure can be implemented by hardware, software or a combination thereof.
[0043] An overhead crane control method provided by an embodiment of the present invention can be applied to, but not limited to, Figure 1 For detailed procedures, please refer to the electronic equipment shown in Figure 2 , the overhead crane control method includes: S140 and S150, which are specifically described as follows.
[0044] S140 obtains the current position of the overhead travelling crane.
[0045] In an optional implementation, each section of the path of the overhead traveling track is provided with a path identifier, which may be, but is not limited to, a QR code, a barcode, a digital ID, a text name, etc. A scanning device is deployed on the overhead traveling track, and the scanning device is used to scan the path identifier of the overhead traveling track and send the scanning result to the main control unit. The scanning device (such as a scanning gun) is used to scan during the driving process, and the current position is determined based on the scanning result.
[0046] S150, when the current position coincides with the target node, control the guide wheels of the overhead travelling crane to switch to the target direction.
[0047] Among them, the target node is the starting point or the first-class node of the task route, the first-class node is the end point of the kth detection path in the task route, the path direction of the k+1th detection path is opposite to the path direction of the kth detection path, and the k+1th detection path is the path of the nearest detection path after the first-class node in the task route. When the target node is the first-class node, the target direction is the same as the path direction of the k+1th detection path. When the target node is the starting point of the task route, the target direction is the same as the path direction of the first detection path. The first detection path is the path of the nearest detection path after the starting point in the task route. When the vehicle travels to the starting point of the detection path, it is necessary to detect the direction of the guide wheel.
[0048] It should be noted that there are a total of m detection paths in the mission route, and the first m-1 detection paths can all be used as the first detection path, that is, 1≤k≤m-1. From the target node to the starting point of the k+1th detection path, the switching direction of the guide wheel of the overhead crane remains consistent.
[0049] When the overhead crane drives to the next detection point (i.e. the starting point of the detection path, which can be a divergence point or a turning point), the direction of the guide wheel is detected. At this time, the guide wheel has already switched to the target direction in advance, and the overhead crane can be directly controlled to switch the driving direction. The waiting time for switching directions at the divergence point is reduced, and the overhead crane switches to the required branch direction in advance, ensuring a smooth transition to the predetermined path, reducing the risk of collision caused by the guide wheel not being able to complete the rotation in time, and improving the overall operation efficiency.
[0050] It should be noted that the detection path includes forked paths and turning paths. Figure 3 , Figure 4 as well as Figure 5 , Figure 3 One of the task route schematic diagrams provided in the embodiment of the present invention, Figure 4 The second task route diagram provided by the embodiment of the present invention is as follows: Figure 5 The third task route diagram provided for an embodiment of the present invention, the numbers in the circles in the figure are node identifiers, and when the number is i, it represents the i-th node.
[0051] exist Figure 3 and Figure 4 In , subpaths ③>④ and ⑥>⑦ are turning paths, and the others are straight paths. The starting point of the turning path is the turning point. Figure 5 In the example, if the task route is ①>②>③>⑦>⑧>⑨, subpaths ③>⑦ and ⑧>⑨ are forked paths. The starting point of a forked path is a divergence point, which means that the node is the starting point of two paths at the same time. For example, subpaths ③>④ and subpaths ③>⑦, so node path ③ is a divergence point.
[0052] Please continue to refer to Figure 3 , the path direction of subpath ③>④ (to the left) is opposite to the path direction of subpath ⑥>⑦ (to the right), and node ④ is the target node. If you wait for the overhead crane to travel to the position in front of node ⑥ (detection point) before starting to switch the guide wheels, there may be problems of low efficiency and the risk of collision. In the present application scheme, when the current position of the overhead crane coincides with node ④ (target node), the guide wheels of the overhead crane can be controlled to switch to the path direction of subpath ⑥>⑦ (to the right), thereby solving the above problems. Similarly, when the target node is the starting point of the mission route, the guide wheels of the overhead crane can also be controlled to switch in advance, which will not be elaborated here.
[0053] Please continue to refer to Figure 4 , the path direction of subpath ③>④ (rightward) is the same as the path direction of subpath ⑥>⑦ (rightward). In this case, node ④ is not the target node. Figure 4 In the path shown, the target node is the starting point of the task route, and the guide wheels of the overhead crane can be controlled to switch in advance from the starting point.
[0054] Please continue to refer to Figure 5 , subpaths ③>⑦ and ⑧>⑨ are forked paths, and the path direction of subpath ③>⑦ (left) is opposite to the path direction of subpath ⑧>⑨ (right), and node ⑦ is the target node. Figure 5 In the example, the detection points are nodes ③ and ⑧. Taking node ⑧ as an example, if the overhead crane is waiting to move to the position in front of node ⑧ (detection point) before switching the guide wheels, there may be low efficiency and collision risks. In the present application, when the current position of the overhead crane coincides with node ⑦ (target node), the guide wheels of the overhead crane can be controlled to switch to the path direction (rightward) of subpath ⑧>⑨, thereby solving the above problems.
[0055] In order to more clearly demonstrate the improvements of the overhead crane control method provided by the embodiment of the present invention, the following is provided: Figure 5 The task routes shown correspond to Table 1 for reference.
[0056] Table 1:
[0057]
[0058] The distance in Table 1 refers to the length of the sub-path, for example, the length of sub-path ①>②, sub-path ②>③, sub-path ③>⑦, sub-path ⑦>⑧, and sub-path ⑧>⑨ are S1, S2, S3, S4, and S5 respectively. The speed refers to the planned driving speed on the corresponding sub-path, which are V1, V2, V3, V4, and V5 respectively.
[0059] exist Figure 2 On the basis of how to accurately obtain the target node and the target direction to ensure the control efficiency and safety of the overhead crane, the embodiment of the present invention also provides an optional implementation method, please refer to Figure 6 , the overhead crane control method also includes: S110 and S120, which are described in detail as follows.
[0060] S110, obtaining task route data.
[0061] The task route data includes n sub-paths in the task route. Optionally, n≥2.
[0062] For example, the task route data includes n sub-paths of the task route ①>②>③>⑦>⑧>⑨, which are sub-path ①>②, sub-path ②>③, sub-path ③>⑦, sub-path ⑦>⑧, and sub-path ⑧>⑨. In an optional implementation, the task route data also includes the length of each sub-path, as shown in Table 1 above.
[0063] S120, determining a target node and a target direction according to the task route data.
[0064] The target node is the starting point or the first-class node of the task route, and the target direction can be left or right.
[0065] exist Figure 6 On the basis of the content in S120, the embodiment of the present invention further provides an optional implementation, please refer to the following. S120, the step of determining the target node and the target direction according to the task route data, includes: S121 and S122, which are specifically described as follows.
[0066] S121, filter out all detection paths from the n sub-paths.
[0067] The detection path can be as follows: Figure 3 or Figure 4 The turning path shown can also be Figure 5 The forked paths are shown.
[0068] S122: Determine a target node and a target direction based on the detection path and the path direction of the detection path.
[0069] It should be noted that after the sub-path is determined, the main control unit can determine whether each sub-path is a detection path by looking up a table. If it is a detection path, the path direction of the sub-path can be further determined in the table. In an optional embodiment, the main control unit can determine whether it is a detection path by the end point and the starting point of the sub-path, and determine the path direction of the detection path.
[0070] Based on the above, regarding the content in S120, the embodiment of the present invention also provides an optional implementation, please refer to the following. S122, the step of determining the target node and the target direction based on the detection path and the path direction of the detection path, includes: S122A, S122B and S122C, which are specifically described as follows.
[0071] S122A, determine whether the path direction of the kth detection path is the same as the path direction of the (k+1)th detection path. If they are the same, execute S122B; if they are different, execute S122C.
[0072] Here, the initial value of k is 1.
[0073] S122B, let k=k+1, determine whether k≤m-1 holds; if not, end; if so, repeat S122A.
[0074] S122C, determine the end point of the kth detection path as the target node, and determine the path direction of the k+1th detection path as the target direction.
[0075] It should be noted that, when there is at least one detection path in the task route, the starting point of the task route can be directly determined as the target node.
[0076] exist Figure 6 On the basis of the content in S120, the embodiment of the present invention also provides an optional implementation, please refer to the following. S120, the step of determining the target node and the target direction according to the task route data, includes: S120A, S120B, S120C, S120D, S120E, S120F, S120G and S120H, which are specifically described as follows.
[0077] S120A, determine the ni th sub-path from the task route.
[0078] The initial value of i is 0. After S120A, S120B is executed.
[0079] S120B, determine whether the ni-th sub-path belongs to the detection path. If the ni-th sub-path does not belong to the detection path, execute S120C; if the ni-th sub-path belongs to the detection path, execute S120D.
[0080] S120C, let i=i+1, and determine whether ni≥1 holds. If not, end; if yes, repeat S120A to determine the ni-th sub-path from the task route.
[0081] S120D, determine the nijth sub-path from the task route.
[0082] The initial value of j is 1. After S120D, S120E is executed.
[0083] S120E, determine whether the nijth subpath satisfies the first condition and the second condition. If the nijth subpath does not satisfy the first condition or the second condition, execute S120F; if the nijth subpath satisfies both the first condition and the second condition, execute S120G.
[0084] The first condition is that the nij-th sub-path is a detection path, and the second condition is whether the path direction of the nij-th sub-path is opposite to the path direction of the ni-th sub-path.
[0085] S120F, let j=j+1, and determine whether nij≥1 holds. If not, end; if yes, repeat S120D to determine the nijth sub-path from the task route.
[0086] It should be noted that when the nijth sub-path does not meet the first condition or the second condition, the guide wheel switching direction of the nijth sub-path can be set to be consistent with the guide wheel switching direction of the nith sub-path. For example, the guide wheel switching direction of sub-path ②>③ in Table 1 is the same as the guide wheel switching direction of sub-path ③>⑦.
[0087] S120G, determine the end point of the nij-th sub-path as the target node, and determine the path direction of the ni-th sub-path as the target direction.
[0088] It should be noted that the end point of the nij-th sub-path is the first-type node. After S120G, S120H is executed.
[0089] S120H, let i=i+j, j=1, and determine whether ni≥1 holds. If not, end; if yes, repeat S120A to determine the ni-th sub-path from the task route.
[0090] It should be noted that, based on S120A, S120B, S120C, S120D, S120E, S120F, S120G and S120H, all first-category nodes in the task route can be found.
[0091] Since it takes a certain amount of time to switch the direction of the guide wheel, and the overhead crane is still in motion during the switching process, it is also necessary to limit the speed of the overhead crane from the beginning of switching the guide wheel to the position where the guide wheel must be successfully switched. Otherwise, the overhead crane may enter the detection point (divergence point or turning point) before the guide wheel of the overhead crane is switched, resulting in a jam. In order to solve this problem, the embodiment of the present invention also provides an optional implementation method, please refer to Figure 7 , after determining the target node and the target direction according to the task route data in S120, the overhead travelling crane control method further includes: S130, which is specifically described as follows.
[0092] S130, obtaining a maximum travel speed of the overhead travelling crane on the target path.
[0093] Among them, the task route data also includes the planned driving speed corresponding to each sub-path (for example, as shown in Table 1 above), the target path is the path between the target node and the target detection point, and the target detection point is the starting point of the nearest detection path after the target node in the task route.
[0094] It should be noted that when the vehicle is running at the maximum speed on the target path, there will be sufficient time to complete the switch to the guide wheel, thus avoiding jamming.
[0095] When the current position coincides with the target node or after the guide wheels of the overhead travelling crane are controlled to switch to the target direction, the overhead travelling crane control method further includes: S160 and S170, which are described in detail as follows.
[0096] S160: If the planned travel speed of the target sub-path is greater than the maximum travel speed, when the overhead travelling vehicle reaches the target sub-path, the overhead travelling vehicle is driven to operate based on the maximum travel speed.
[0097] The target sub-path is any sub-path in the target path.
[0098] By driving the overhead crane based on the maximum travel speed, sufficient time for the guide wheel switching is guaranteed to avoid jamming. Because unnecessary pauses are reduced, energy consumption is reduced, which meets the requirements of green production and can also achieve the effect of energy conservation and emission reduction.
[0099] S170: If the planned travel speed of the target sub-path is less than or equal to the maximum travel speed, when the overhead travelling vehicle travels to the target sub-path, the overhead travelling vehicle is driven to operate based on the planned travel speed of the target sub-path.
[0100] It should be emphasized that the embodiment of the present invention does not limit the execution order of S160 and S170, and either one of them can be executed.
[0101] exist Figure 7 On the basis of how to accurately obtain the maximum travel speed, the embodiment of the present invention also provides an optional implementation method, please refer to the following. S130, the step of obtaining the maximum travel speed of the overhead travelling vehicle on the target path includes: S131 and S132, which are specifically described as follows.
[0102] S131, obtaining the total length of the target path.
[0103] Among them, the target path is the path between the target node and the target detection point, and the total length of the target path is the sum of the lengths of all target sub-paths on the target path. As shown in Table 1 above, when the target node is the starting point of the task route, the target detection point is node ③, and the total length of the target path is the sum of S1+S2.
[0104] S132, determining the maximum driving speed based on the total length of the target path and the target duration required for the guide wheel switching.
[0105] Optionally, maximum driving speed = total length of target path ÷ target duration.
[0106] See also Figure 8 , Figure 8 An overhead crane control device is provided in an embodiment of the present invention. Optionally, the overhead crane control device is applied to the electronic device described above.
[0107] The overhead crane control device includes: a first processing unit 201 and a second processing unit 202 .
[0108] The first processing unit 201 is used to obtain the current position of the overhead travelling vehicle;
[0109] The second processing unit 202 is used to control the guide wheels of the overhead travelling vehicle to switch to the target direction when the current position coincides with the target node;
[0110] Among them, the target node is the starting point or the first-class node of the task route, the first-class node is the end point of the kth detection path in the task route, the path direction of the k+1th detection path is opposite to the path direction of the kth detection path, and the k+1th detection path is the path of the nearest detection path after the first-class node in the task route. When the target node is the first-class node, the target direction is the same as the path direction of the k+1th detection path. When the target node is the starting point of the task route, the target direction is the same as the path direction of the first detection path. The first detection path is the path of the nearest detection path after the starting point in the task route. When the vehicle travels to the starting point of the detection path, it is necessary to detect the direction of the guide wheel.
[0111] Optionally, the first processing unit 201 may execute S110 , S120 , S130 , and S140 , and the second processing unit 202 may execute S150 , S160 , and S170 .
[0112] It should be noted that the overhead crane control device provided in this embodiment can execute the method flow shown in the above method flow embodiment to achieve the corresponding technical effect. For the sake of brief description, for parts not mentioned in this embodiment, reference can be made to the corresponding contents in the above embodiment.
[0113] The embodiment of the present invention further provides a storage medium, which stores computer instructions and programs, and when the computer instructions and programs are read and run, the overhead crane control method of the above embodiment is executed. The storage medium may include a memory, a flash memory, a register, or a combination thereof.
[0114] The following provides an electronic device, which may be a main control unit of an overhead crane, or an overhead crane dispatching control system (OHT Control System, referred to as OCS) connected to the main control unit, or a mobile phone, computer or server connected to the main control unit and / or the overhead crane dispatching control system. Figure 1 As shown, the above-mentioned overhead crane control method can be implemented; specifically, the electronic device includes: a processor 10, a memory 11, and a bus 12. The processor 10 can be a CPU. The memory 11 is used to store one or more programs. When the one or more programs are executed by the processor 10, the overhead crane control method of the above-mentioned embodiment is executed.
[0115] In summary, an embodiment of the present invention provides an overhead crane control method, device, storage medium and electronic device, including: obtaining the current position of the overhead crane; when the current position coincides with the target node, controlling the guide wheel of the overhead crane to switch to the target direction; wherein the target node is the starting point or the first-class node of the task route, the first-class node is the end point of the kth detection path in the task route, the path direction of the k+1th detection path is opposite to the path direction of the kth detection path, the k+1th detection path is the path of the nearest detection path after the first-class node in the task route, when the target node is the first-class node, the target direction is the same as the path direction of the k+1th detection path, when the target node is the starting point of the task route, the target direction is the same as the path direction of the first detection path, the first detection path is the path of the nearest detection path after the starting point in the task route, and when the overhead crane travels to the starting point of the detection path, it is necessary to detect the direction of the guide wheel. The guide wheels start switching to the target direction in advance at the target node, reducing the waiting time for switching directions at the detection point, allowing the overhead crane to switch to the required branch direction in advance, ensuring a smooth transition to the predetermined path, reducing the risk of collision caused by the guide wheels not having enough time to complete the movement, and improving overall operating efficiency.
[0116] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
[0117] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A method for controlling an overhead crane, characterized in that: The method comprises: Get the current position of the overhead crane; When the current position coincides with the target node, controlling the guide wheels of the overhead travelling vehicle to switch toward the target direction; Among them, the target node is the starting point or the first type node of the task route, the first type node is the end point of the kth detection path in the task route, the path direction of the k+1th detection path is opposite to the path direction of the kth detection path, and the k+1th detection path is the path of the nearest detection path after the first type node in the task route. When the target node is the first type node, the target direction is the same as the path direction of the k+1th detection path. When the target node is the starting point of the task route, the target direction is the same as the path direction of the first detection path. The first detection path is the path of the nearest detection path after the starting point in the task route. When the overhead crane travels to the starting point of the detection path, it is necessary to detect the direction of the guide wheel. The detection path includes a forked path and a turning path.
2. The method for controlling an overhead crane according to claim 1, characterized in that: The method comprises: Acquire task route data, wherein the task route data includes n sub-paths in the task route; The target node and the target direction are determined according to the task route data.
3. The method for controlling an overhead crane according to claim 2, characterized in that: The step of determining the target node and the target direction according to the task route data comprises: Filter out all detection paths from the n sub-paths; The target node and the target direction are determined based on the detection path and the path direction of the detection path.
4. The method for controlling an overhead crane according to claim 3, characterized in that: The step of determining the target node and the target direction based on the detection path and the path direction of the detection path comprises: Determining whether a path direction of the k-th detection path is the same as a path direction of the k+1-th detection path; If they are different, the end point of the kth detection path is determined as the target node, and the path direction of the k+1th detection path is determined as the target direction.
5. The method for controlling an overhead crane according to claim 2, characterized in that: The step of determining the target node and the target direction according to the task route data comprises: Determine the ni-th subpath from the task route, where the initial value of i is 0; Determine whether the ni-th sub-path belongs to the detection path; If the ni-th sub-path does not belong to the detection path, let i=i+1 and determine whether ni≥1 holds; If so, repeat determining the ni-th sub-path from the task route; If the ni-th sub-path belongs to the detection path, then determine the nij-th sub-path from the task route, where the initial value of j is 1; Determine whether the nij-th subpath satisfies a first condition and a second condition, wherein the first condition is that the nij-th subpath is a detection path, and the second condition is whether a path direction of the nij-th subpath is opposite to a path direction of the ni-th subpath; If the nij-th subpath does not satisfy the first condition or the second condition, let j=j+1 and determine whether nij≥1 holds; If it is established, then repeat determining the nijth sub-path from the task route; If the nij-th sub-path satisfies the first condition and the second condition, the end point of the nij-th sub-path is determined as the target node, and the path direction of the nij-th sub-path is determined as the target direction; Let i=i+j, j=1, and determine whether ni≥1 holds; If so, the process of repeatedly determining the ni-th sub-path from the task route is repeated.
6. The method for controlling an overhead crane according to claim 2, characterized in that: The task route data also includes a planned driving speed corresponding to each sub-path. After determining the target node and the target direction according to the task route data, the method further includes: Obtaining the maximum travel speed of the overhead crane on a target path, wherein the target path is a path between the target node and a target detection point, and the target detection point is a starting point of the nearest detection path after the target node in the mission route; In the case where the current position coincides with the target node, the method further includes: If the planned travel speed of the target sub-path is greater than the maximum travel speed, when the overhead travelling vehicle travels to the target sub-path, the overhead travelling vehicle is driven to operate based on the maximum travel speed; Wherein, the target sub-path is any sub-path in the target path; If the planned travel speed of the target sub-path is less than or equal to the maximum travel speed, when the overhead travelling vehicle travels to the target sub-path, the overhead travelling vehicle is driven to operate based on the planned travel speed of the target sub-path.
7. The method for controlling an overhead crane according to claim 6, characterized in that: The step of obtaining the maximum travel speed of the overhead travelling vehicle on the target path comprises: Obtaining the total length of the target path; The maximum travel speed is determined based on the total length of the target path and the target time required for the guide wheel to switch.
8. A crane control device, characterized in that: The device comprises: The first processing unit is used to obtain the current position of the overhead travelling crane; A second processing unit is used to control the guide wheel of the overhead travelling vehicle to switch to a target direction when the current position coincides with the target node; Among them, the target node is the starting point or the first type node of the task route, the first type node is the end point of the kth detection path in the task route, the path direction of the k+1th detection path is opposite to the path direction of the kth detection path, and the k+1th detection path is the path of the nearest detection path after the first type node in the task route. When the target node is the first type node, the target direction is the same as the path direction of the k+1th detection path. When the target node is the starting point of the task route, the target direction is the same as the path direction of the first detection path. The first detection path is the path of the nearest detection path after the starting point in the task route. When the overhead crane travels to the starting point of the detection path, it is necessary to detect the direction of the guide wheel. The detection path includes a forked path and a turning path.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
10. An electronic device, characterized in that: include: A processor and a memory, the memory being used to store one or more programs; When the one or more programs are executed by the processor, the method according to any one of claims 1 to 7 is implemented.