A load management energy-saving control method, system and medium based on big data
By calculating the effective pressure transfer index, power correction index and air load data of the air compressor, combined with the effective power conversion index of the air compressor, the dynamic adjustment of the output power of the air compressor is realized, solving the problem of load changes of traditional air compressors. In case of low efficiency and high energy consumption problems, the operating efficiency is improved.
Patent Information
- Application Number
- CN202411046019.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-01
AI Technical Summary
Traditional air compressors cannot automatically adjust power when the load changes significantly, resulting in low operating efficiency and high energy consumption. It is difficult to effectively solve this problem with existing technology.
By obtaining the pressure data, pipeline data and physical parameter data of the gas pipeline, the effective pressure transfer index, power correction index and gas load data are calculated and combined with the effective power conversion index of the air compressor to calculate and adjust the output of the air compressor. Power data to achieve load management and energy-saving control based on big data.
It realizes dynamic adjustment of the output power of the air compressor motor, reduces energy consumption, improves operating efficiency, and solves the problems of low efficiency and high energy consumption of traditional air compressors under load changes.
Smart Images

Figure CN118564440B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy-saving control, and specifically, to a load management energy-saving control method, system and medium based on big data. Background Art
[0002] Air compressors, also known as air compressors, are one of the indispensable equipment in industrial automation systems, but they often have problems with high energy consumption and low efficiency during operation. Especially when the load changes greatly, the power of traditional air compressors cannot be automatically adjusted adaptively, which will lead to a significant reduction in operating efficiency and relatively high energy consumption. Therefore, how to dynamically adjust the load characteristics of the air compressor to achieve energy-saving operation has become a problem that needs to be solved in the current industrial automation field.
[0003] In view of the above problems, effective technical solutions are urgently needed. Summary of the invention
[0004] The purpose of this application is to provide a load management energy-saving control method, system and medium based on big data, which can achieve load management energy-saving control based on big data by calculating the effective pressure transfer index data, power correction index data and gas load data, and then combining the effective power conversion index to obtain the output power data of the air compressor motor.
[0005] The present application also provides a load management energy-saving control method based on big data, comprising the following steps:
[0006] Obtain pressure data, pipeline data and physical parameter data of gas pipelines;
[0007] Obtaining pressure transfer index data according to the pressure data processing, and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data;
[0008] The pipeline data and the effective pressure transfer index data are processed by a preset pipeline power correction index model to obtain power correction index data;
[0009] The pressure data, pipeline data and physical parameter data are processed by a preset gas load data model to obtain gas load data of the gas user end;
[0010] Obtaining an effective power conversion index of the air compressor, the effective power conversion index is combined with the power correction index data and the gas load data to calculate the output power data of the air compressor motor;
[0011] Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor;
[0012] The working parameters of the air compressor are adjusted according to the working level data.
[0013] Optionally, in the load management energy-saving control method based on big data described in the present application, the obtaining of pressure data, pipeline data and physical parameter data of the gas pipeline specifically includes:
[0014] Obtain the pressure data of the gas pipeline, including standard input pressure data and real-time pressure data;
[0015] Obtain pipeline data of the gas transmission pipeline, including pipeline cross-section data, pipeline roughness data, and pipeline length data;
[0016] Obtain pipeline physical parameter data, including ambient temperature data and flow rate data.
[0017] Optionally, in the load management energy-saving control method based on big data described in the present application, the pressure transmission index data is obtained according to the pressure data processing, and the pressure transmission index data is compared with a preset pressure transmission index threshold to obtain effective pressure transmission index data, specifically including:
[0018] Comparing the real-time pressure data with standard input pressure data to obtain pressure transmission index data;
[0019] Comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain pressure transfer state data, including effective pressure transfer index data and invalid pressure transfer index data;
[0020] If the pressure transmission index data is less than a preset pressure transmission index threshold, the pressure transmission state data is invalid pressure transmission index data;
[0021] If the pressure transmission index data is greater than or equal to a preset pressure transmission index threshold, the pressure transmission state data is valid pressure transmission index data;
[0022] The effective pressure transmission index data is stored.
[0023] Optionally, in the load management energy-saving control method based on big data described in the present application, the pipeline data and the effective pressure transfer index data are processed by a preset pipeline power correction index model to obtain the power correction index data, which specifically includes:
[0024] Inputting the pipeline cross-section data, pipeline roughness data, pipeline length data and effective pressure transfer index data into a preset pipeline power correction index model for processing to obtain power correction index data;
[0025] The calculation formula of the power correction index data in the pipeline power correction index model is: ;
[0026] in, is the power correction index data, is the effective pressure transfer index data, is the pipe cross-section data, is the pipeline roughness data, is the pipe length data, , , , , , , , is the preset characteristic coefficient.
[0027] Optionally, in the load management energy-saving control method based on big data described in the present application, the pressure data, pipeline data and physical parameter data are processed by a preset gas load data model to obtain the gas load data of the gas user end, specifically including:
[0028] The real-time pressure data, pipeline cross-section data, ambient temperature data and flow rate data are processed by a preset gas load data model to obtain gas load data of the gas user end;
[0029] The calculation formula of the gas load data in the gas load data model is: ;
[0030] in, For gas load data, For real-time pressure data, is the flow rate data, is the pipe cross-section data, T is the absolute temperature data, t is the ambient temperature data, , , , is the preset characteristic coefficient.
[0031] Optionally, in the load management energy-saving control method based on big data described in the present application, the effective power conversion index of the air compressor is obtained, and the effective power conversion index is combined with the power correction index data and the gas load data to calculate the output power data of the air compressor motor, which specifically includes:
[0032] Obtaining the effective power conversion index of the air compressor, and inputting the effective power conversion index, power correction index data and gas load data into a preset output power data model for processing to obtain output power data;
[0033] The calculation formula of the output power data in the output power data model is: ;
[0034] in, is the output power data, For gas load data, is the effective power conversion index, is the power correction index data, is the preset characteristic coefficient.
[0035] Optionally, in the load management energy-saving control method based on big data described in the present application, matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor specifically includes:
[0036] Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor;
[0037] The air compressor output power operation database includes output power data and corresponding working level data;
[0038] The working level data includes electrical parameter data of the air compressor and corresponding operating time regularity data.
[0039] Optionally, the load management energy-saving control method based on big data described in the present application further includes:
[0040] Obtain data on the time since the last maintenance, standby time, effective working time, and start and stop times of air compressors of the same specifications;
[0041] Input the time data from the last maintenance, the standby time data, the effective working time data, and the start-stop times data into a preset air compressor priority energy supply index model for processing to obtain an air compressor priority energy supply index;
[0042] The air compressor priority energy supply indexes are sorted according to their size, and the air compressor corresponding to the largest air compressor priority energy supply index is used as the energy supply air compressor;
[0043] The calculation formula of the air compressor priority energy supply index in the air compressor priority energy supply index model is: ;
[0044] in, It is the priority energy supply index of the air compressor. It is the time from the last maintenance. For standby time data, For effective working time data, is the start and stop times data, , , , , , , is the preset characteristic coefficient.
[0045] In a second aspect, the present application provides a load management energy-saving control system based on big data, the system comprising: a memory and a processor, the memory comprising a program of a load management energy-saving control method based on big data, and the program of the load management energy-saving control method based on big data is executed by the processor to implement the following steps:
[0046] Obtain key equipment status information and personnel status information of the preset construction phase of the project, and extract key equipment status data and personnel status data respectively;
[0047] Obtain pressure data, pipeline data and physical parameter data of gas pipelines;
[0048] Obtaining pressure transfer index data according to the pressure data processing, and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data;
[0049] The pipeline data and the effective pressure transfer index data are processed by a preset pipeline power correction index model to obtain power correction index data;
[0050] The pressure data, pipeline data and physical parameter data are processed by a preset gas load data model to obtain gas load data of the gas user end;
[0051] Obtaining an effective power conversion index of the air compressor, the effective power conversion index is combined with the power correction index data and the gas load data to calculate the output power data of the air compressor motor;
[0052] Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor;
[0053] The working parameters of the air compressor are adjusted according to the working level data.
[0054] In the third aspect, the present application also provides a readable storage medium, which includes a load management energy-saving control method program based on big data. When the load management energy-saving control method program based on big data is executed by a processor, the steps of the load management energy-saving control method based on big data as described in any one of the above items are implemented.
[0055] From the above, it can be seen that the load management energy-saving control method, system and medium based on big data provided by the present application. The method obtains the pressure data, pipeline data and physical parameter data of the gas transmission pipeline, and then processes and calculates to obtain the effective pressure transmission index data, power correction index data and gas load data of the gas-using end; obtains the effective power conversion index of the air compressor, and then calculates the output power data of the air compressor motor in combination with the power correction index data and the gas load data, and obtains the working gear data of the air compressor according to the matching of the output power data with the preset air compressor output power operation database, thereby realizing the adjustment of the air compressor parameters; thereby, by calculating the effective pressure transmission index data, the power correction index data and the gas load data, and then combining the effective power conversion index to obtain the output power data of the air compressor motor, load management energy-saving control based on big data is further realized.
[0056] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or understood by practicing the present application. The purpose and other advantages of the present application can be realized and obtained by the structures particularly pointed out in the written description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0058] Figure 1 A flow chart of a load management energy-saving control method based on big data provided in an embodiment of the present application;
[0059] Figure 2 A flow chart of obtaining pressure data, pipeline data and physical parameter data of a load management energy-saving control method based on big data provided in an embodiment of the present application;
[0060] Figure 3 A flow chart of obtaining effective pressure transfer index data for the load management energy-saving control method based on big data provided in an embodiment of the present application. DETAILED DESCRIPTION
[0061] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0062] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of this application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0063] Please refer to Figure 1 , Figure 1 1 is a flow chart of a load management energy-saving control method based on big data in some embodiments of the present application. The load management energy-saving control method based on big data is used in a terminal device, such as a computer. The load management energy-saving control method based on big data includes the following steps:
[0064] S11, obtaining pressure data, pipeline data and physical parameter data of the gas transmission pipeline;
[0065] S12, obtaining pressure transfer index data according to the pressure data processing, and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data;
[0066] S13, processing the pipeline data and the effective pressure transfer index data through a preset pipeline power correction index model to obtain power correction index data;
[0067] S14, obtaining gas load data of the gas user end by processing the pressure data, pipeline data and physical parameter data through a preset gas load data model;
[0068] S15, obtaining an effective power conversion index of the air compressor, the effective power conversion index is combined with the power correction index data and the gas load data to calculate the output power data of the air compressor motor;
[0069] S16, matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor;
[0070] S17, adjusting the working parameters of the air compressor according to the working level data.
[0071] Among them, the power output by the air compressor is finally converted into the gas load data used by the gas terminal. In this conversion process, many factors are involved, including the influence of pressure transmission in the pipeline, the influence of the pipeline itself on the transmission, and the influence of physical parameter data. Therefore, comprehensive consideration is needed to obtain pressure data, pipeline data and physical parameter data respectively. Through the processing and calculation of pressure data, pipeline data and physical parameter data, the effective pressure transmission index data, power correction index data and gas load data are obtained, and then the working level data of the air compressor is obtained through analysis and processing.
[0072] Please refer to Figure 2 , Figure 2 The flowchart of the load management energy-saving control method based on big data for obtaining pressure data, pipeline data and physical parameter data is provided in the embodiment of the present application. According to the embodiment of the present invention, the pressure data, pipeline data and physical parameter data of the gas pipeline are obtained, specifically including:
[0073] S21, obtaining pressure data of the gas pipeline, including standard input pressure data and real-time pressure data;
[0074] S22, obtaining pipeline data of the gas transmission pipeline, including pipeline cross-section data, pipeline roughness data, and pipeline length data;
[0075] S23. Obtain pipeline physical parameter data, including ambient temperature data and flow rate data.
[0076] Among them, there is power loss from the output of work power by the air compressor to the compression and transmission of air. In order to better calculate the amount of power loss in the process from air compression to the transportation of compressed air to the terminal, it is necessary to obtain the pressure data, pipeline data and physical parameter data of the gas pipeline. The pressure data includes standard input pressure data and real-time pressure data. The standard input pressure refers to the pressure data input at the starting end of the pipeline after the air is compressed. The real-time pressure data refers to the pressure data received by the gas terminal. The pipeline data refers to the specification parameter data of the gas pipeline. The physical parameter data includes ambient temperature data and flow rate data. The flow rate data refers to the flow rate of the compressed gas in the gas pipeline.
[0077] Please refer to Figure 3 , Figure 3The flowchart of the load management energy-saving control method based on big data provided by the embodiment of the present application is to obtain effective pressure transmission index data. According to the embodiment of the present invention, the pressure transmission index data is obtained according to the pressure data processing, and the pressure transmission index data is compared with the preset pressure transmission index threshold to obtain the effective pressure transmission index data, specifically including:
[0078] S31, comparing the real-time pressure data with standard input pressure data to obtain pressure transmission index data;
[0079] S32, comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain pressure transfer state data, including effective pressure transfer index data and invalid pressure transfer index data;
[0080] S33: if the pressure transmission index data is less than a preset pressure transmission index threshold, the pressure transmission state data is invalid pressure transmission index data;
[0081] S34, if the pressure transmission index data is greater than or equal to a preset pressure transmission index threshold, the pressure transmission state data is valid pressure transmission index data;
[0082] S35. Store the effective pressure transfer index data.
[0083] Among them, the pressure transfer index data is calculated based on the real-time pressure data and the standard input pressure data. It is a data that reflects the proportional relationship between the input end pressure and the user terminal pressure to a certain extent. During the pipeline transmission process, air leakage may sometimes be encountered. In order to determine whether the pipeline is normal, it can be determined through threshold comparison. Invalid pressure transfer index data refers to the presence of air leakage during the transmission process. After the threshold comparison determines that it is valid pressure transfer index data, it is stored for backup; in this embodiment, the pressure transfer index threshold is taken as 0.8. When the pressure transfer index data is less than or equal to 0.8, it means that the pressure transfer index data is invalid pressure transfer index data.
[0084] According to an embodiment of the present invention, the processing of the pipeline data and the effective pressure transfer index data by a preset pipeline power correction index model to obtain the power correction index data specifically includes:
[0085] Inputting the pipeline cross-section data, pipeline roughness data, pipeline length data and effective pressure transfer index data into a preset pipeline power correction index model for processing to obtain power correction index data;
[0086] The calculation formula of the power correction index data in the pipeline power correction index model is: ;
[0087] in, is the power correction index data, is the effective pressure transfer index data, is the pipe cross-section data, is the pipeline roughness data, is the pipe length data, , , , , , , , It is a preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset load management energy-saving control platform based on big data).
[0088] Among them, during the pipeline transportation of compressed gas, some specifications and parameters of the pipeline affect the transportation effect and power loss. The specifications and parameters of the pipeline include pipeline cross-sectional data, pipeline roughness data, and pipeline length data. Pipeline roughness data refers to data reflecting the roughness of the pipeline surface. The pipeline cross-sectional data, pipeline roughness data, and pipeline length data are combined with the effective pressure transfer index data to obtain power correction index data. The power correction index data refers to data that can reflect the power transmission efficiency to a certain extent; the preset pipeline power correction index model is a calculation model obtained by obtaining a large amount of historical pipeline cross-sectional data, pipeline roughness data, pipeline length data, and effective pressure transfer index data, and then training the model. The power correction index data can be calculated based on the pipeline data and the effective pressure transfer index data.
[0089] According to an embodiment of the present invention, the pressure data, pipeline data and physical parameter data are processed by a preset gas load data model to obtain the gas load data of the gas user end, specifically including:
[0090] The real-time pressure data, pipeline cross-section data, ambient temperature data and flow rate data are processed by a preset gas load data model to obtain gas load data of the gas user end;
[0091] The calculation formula of the gas load data in the gas load data model is: ;
[0092] in, For gas load data, For real-time pressure data, is the flow rate data, is the pipe cross-section data, T is the absolute temperature data, t is the ambient temperature data, , , , It is a preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset load management energy-saving control platform based on big data).
[0093] Among them, the gas load data refers to the power data used by the gas terminal, T is the absolute temperature data, and in this embodiment, it is taken as 273.15; the gas load data model is a calculation model obtained by training based on a large amount of real-time pressure data, pipeline cross-section data, ambient temperature data and flow rate data. The gas load data model can calculate the gas load data.
[0094] According to an embodiment of the present invention, the effective power conversion index of the air compressor is obtained, and the effective power conversion index is combined with the power correction index data and the air load data to calculate the output power data of the air compressor motor, specifically including:
[0095] Obtaining the effective power conversion index of the air compressor, and inputting the effective power conversion index, power correction index data and gas load data into a preset output power data model for processing to obtain output power data;
[0096] The calculation formula of the output power data in the output power data model is: ;
[0097] in, is the output power data, For gas load data, is the effective power conversion index, is the power correction index data, is the preset characteristic coefficient.
[0098] Among them, the effective power conversion index of the air compressor refers to the percentage of useful work consumed by compressed gas after the motor output power does work on the air when the air compressor is running. The effective power conversion index reflects the conversion efficiency of the air compressor to a certain extent. The output power data can be calculated based on the effective power conversion index, power correction index data and gas load data. The output power data refers to the power data output when the air compressor motor is running; the output power data model is a calculation model obtained by training a large amount of effective power conversion index, power correction index data and gas load data. The output power data model can calculate the output power data.
[0099] According to an embodiment of the present invention, matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor specifically includes:
[0100] Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor;
[0101] The air compressor output power operation database includes output power data and corresponding working level data;
[0102] The working level data includes electrical parameter data of the air compressor and corresponding operating time regularity data.
[0103] Among them, after the output power data is calculated, the output power data is matched with the preset air compressor output power operation database. The air compressor output power operation database contains different air compressor output power data, and also contains the working level data corresponding to the different air compressor output power data. The working level data contains electrical parameter data and operating time regularity data. The electrical parameter data includes current and voltage. The operating time regularity data refers to a variety of regular data of motor operation, including continuous operation, intermittent operation at fixed time intervals, or fixed standby time.
[0104] According to an embodiment of the present invention, it also includes:
[0105] Obtain data on the time since the last maintenance, standby time, effective working time, and start and stop times of air compressors of the same specifications;
[0106] Input the time data from the last maintenance, the standby time data, the effective working time data, and the start-stop times data into a preset air compressor priority energy supply index model for processing to obtain an air compressor priority energy supply index;
[0107] The air compressor priority energy supply indexes are sorted according to their size, and the air compressor corresponding to the largest air compressor priority energy supply index is used as the energy supply air compressor;
[0108] The calculation formula of the air compressor priority energy supply index in the air compressor priority energy supply index model is: ;
[0109] in, It is the priority energy supply index of the air compressor. It is the time from the last maintenance. For standby time data, For effective working time data, is the start and stop times data, , , , , , , It is a preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset load management energy-saving control platform based on big data).
[0110] Among them, after determining the working level data of the air compressor, the air compressor needs to be adjusted. Some air compression systems contain multiple air compressor equipment, and some equipment has the same specifications. If one of them is used frequently, it is easy to be damaged. The equipment that is on standby for a long time cannot be run-in or operated, which will also affect its life. Therefore, it is necessary to choose a suitable air compressor; obtain the air compressor's distance from the last maintenance data, standby time data, effective working time data, and start and stop times data, and then calculate the air compressor priority energy supply index. The air compressor priority energy supply index refers to data that can reflect the priority use function to a certain extent. The air compressor priority energy supply index The larger it is, the more priority it has. The time from the last maintenance data refers to the time from the time the index is calculated to the last maintenance. The effective working time data refers to the time data when the air compressor is working normally and outputting power. After sorting the air compressor priority energy supply index in order of size, the air compressor with the largest air compressor priority energy supply index is started first as the energy supply air compressor. The air compressor priority energy supply index model is a calculation model obtained by training a large amount of time from the last maintenance data, standby time data, effective working time data and start and stop times data. The air compressor priority energy supply index model can calculate the air compressor priority energy supply index.
[0111] The present invention also discloses a load management energy-saving control system based on big data, including a memory and a processor, wherein the memory includes a load management energy-saving control method program based on big data, and when the load management energy-saving control method program based on big data is executed by the processor, the following steps are implemented:
[0112] Obtain pressure data, pipeline data and physical parameter data of gas pipelines;
[0113] Obtaining pressure transfer index data according to the pressure data processing, and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data;
[0114] The pipeline data and the effective pressure transfer index data are processed by a preset pipeline power correction index model to obtain power correction index data;
[0115] The pressure data, pipeline data and physical parameter data are processed by a preset gas load data model to obtain gas load data of the gas user end;
[0116] Obtaining an effective power conversion index of the air compressor, the effective power conversion index is combined with the power correction index data and the gas load data to calculate the output power data of the air compressor motor;
[0117] Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor;
[0118] The working parameters of the air compressor are adjusted according to the working level data.
[0119] Among them, the power output by the air compressor is finally converted into the gas load data used by the gas terminal. In this conversion process, many factors are involved, including the influence of pressure transmission in the pipeline, the influence of the pipeline itself on the transmission, and the influence of physical parameter data. Therefore, comprehensive consideration is needed to obtain pressure data, pipeline data and physical parameter data respectively. Through the processing and calculation of pressure data, pipeline data and physical parameter data, the effective pressure transmission index data, power correction index data and gas load data are obtained, and then the working level data of the air compressor is obtained through analysis and processing.
[0120] According to an embodiment of the present invention, the obtaining of pressure data, pipeline data and physical parameter data of the gas pipeline specifically includes:
[0121] Obtain the pressure data of the gas pipeline, including standard input pressure data and real-time pressure data;
[0122] Obtain pipeline data of the gas transmission pipeline, including pipeline cross-section data, pipeline roughness data, and pipeline length data;
[0123] Obtain pipeline physical parameter data, including ambient temperature data and flow rate data.
[0124] Among them, there is power loss from the output of work power by the air compressor to the compression and transmission of air. In order to better calculate the amount of power loss in the process from air compression to the transportation of compressed air to the terminal, it is necessary to obtain the pressure data, pipeline data and physical parameter data of the gas pipeline. The pressure data includes standard input pressure data and real-time pressure data. The standard input pressure refers to the pressure data input at the starting end of the pipeline after the air is compressed. The real-time pressure data refers to the pressure data received by the gas terminal. The pipeline data refers to the specification parameter data of the gas pipeline. The physical parameter data includes ambient temperature data and flow rate data. The flow rate data refers to the flow rate of the compressed gas in the gas pipeline.
[0125] According to an embodiment of the present invention, obtaining pressure transfer index data according to the pressure data processing, and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data specifically includes:
[0126] Comparing the real-time pressure data with standard input pressure data to obtain pressure transmission index data;
[0127] Comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain pressure transfer state data, including effective pressure transfer index data and invalid pressure transfer index data;
[0128] If the pressure transmission index data is less than a preset pressure transmission index threshold, the pressure transmission state data is invalid pressure transmission index data;
[0129] If the pressure transmission index data is greater than or equal to a preset pressure transmission index threshold, the pressure transmission state data is valid pressure transmission index data;
[0130] The effective pressure transmission index data is stored.
[0131] Among them, the pressure transfer index data is calculated based on the real-time pressure data and the standard input pressure data. It is a data that reflects the proportional relationship between the input end pressure and the user terminal pressure to a certain extent. During the pipeline transmission process, air leakage may sometimes be encountered. In order to determine whether the pipeline is normal, it can be determined through threshold comparison. Invalid pressure transfer index data refers to the presence of air leakage during the transmission process. After the threshold comparison determines that it is valid pressure transfer index data, it is stored for backup; in this embodiment, the pressure transfer index threshold is taken as 0.8. When the pressure transfer index data is less than or equal to 0.8, it means that the pressure transfer index data is invalid pressure transfer index data.
[0132] According to an embodiment of the present invention, the processing of the pipeline data and the effective pressure transfer index data by a preset pipeline power correction index model to obtain the power correction index data specifically includes:
[0133] Inputting the pipeline cross-section data, pipeline roughness data, pipeline length data and effective pressure transfer index data into a preset pipeline power correction index model for processing to obtain power correction index data;
[0134] The calculation formula of the power correction index data in the pipeline power correction index model is: ;
[0135] in, is the power correction index data, is the effective pressure transfer index data, is the pipe cross-section data, is the pipeline roughness data, is the pipe length data, , , , , , , , It is a preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset load management energy-saving control platform based on big data).
[0136] Among them, during the pipeline transportation of compressed gas, some specifications and parameters of the pipeline affect the transportation effect and power loss. The specifications and parameters of the pipeline include pipeline cross-sectional data, pipeline roughness data, and pipeline length data. Pipeline roughness data refers to data reflecting the roughness of the pipeline surface. The pipeline cross-sectional data, pipeline roughness data, and pipeline length data are combined with the effective pressure transfer index data to obtain power correction index data. The power correction index data refers to data that can reflect the power transmission efficiency to a certain extent; the preset pipeline power correction index model is a calculation model obtained by obtaining a large amount of historical pipeline cross-sectional data, pipeline roughness data, pipeline length data, and effective pressure transfer index data, and then training the model. The power correction index data can be calculated based on the pipeline data and the effective pressure transfer index data.
[0137] According to an embodiment of the present invention, the pressure data, pipeline data and physical parameter data are processed by a preset gas load data model to obtain the gas load data of the gas user end, specifically including:
[0138] The real-time pressure data, pipeline cross-section data, ambient temperature data and flow rate data are processed by a preset gas load data model to obtain gas load data of the gas user end;
[0139] The calculation formula of the gas load data in the gas load data model is: ;
[0140] in, For gas load data, For real-time pressure data, is the flow rate data, is the pipe cross-section data, T is the absolute temperature data, t is the ambient temperature data, , , , It is a preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset load management energy-saving control platform based on big data).
[0141] Among them, the gas load data refers to the power data used by the gas terminal, T is the absolute temperature data, and in this embodiment, it is taken as 273.15; the gas load data model is a calculation model obtained by training based on a large amount of real-time pressure data, pipeline cross-section data, ambient temperature data and flow rate data. The gas load data model can calculate the gas load data.
[0142] According to an embodiment of the present invention, the effective power conversion index of the air compressor is obtained, and the effective power conversion index is combined with the power correction index data and the air load data to calculate the output power data of the air compressor motor, specifically including:
[0143] Obtaining the effective power conversion index of the air compressor, and inputting the effective power conversion index, power correction index data and gas load data into a preset output power data model for processing to obtain output power data;
[0144] The calculation formula of the output power data in the output power data model is: ;
[0145] in, is the output power data, For gas load data, is the effective power conversion index, is the power correction index data, is the preset characteristic coefficient.
[0146] Among them, the effective power conversion index of the air compressor refers to the percentage of useful work consumed by compressed gas after the motor output power does work on the air when the air compressor is running. The effective power conversion index reflects the conversion efficiency of the air compressor to a certain extent. The output power data can be calculated based on the effective power conversion index, power correction index data and gas load data. The output power data refers to the power data output when the air compressor motor is running; the output power data model is a calculation model obtained by training a large amount of effective power conversion index, power correction index data and gas load data. The output power data model can calculate the output power data.
[0147] According to an embodiment of the present invention, matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor specifically includes:
[0148] Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor;
[0149] The air compressor output power operation database includes output power data and corresponding working level data;
[0150] The working level data includes electrical parameter data of the air compressor and corresponding operating time regularity data.
[0151] Among them, after the output power data is calculated, the output power data is matched with the preset air compressor output power operation database. The air compressor output power operation database contains different air compressor output power data, and also contains the working level data corresponding to the different air compressor output power data. The working level data contains electrical parameter data and operating time regularity data. The electrical parameter data includes current and voltage. The operating time regularity data refers to a variety of regular data of motor operation, including continuous operation, intermittent operation at fixed time intervals, or fixed standby time.
[0152] According to an embodiment of the present invention, it also includes:
[0153] Obtain data on the time since the last maintenance, standby time, effective working time, and start and stop times of air compressors of the same specifications;
[0154] Input the time data from the last maintenance, the standby time data, the effective working time data, and the start-stop times data into a preset air compressor priority energy supply index model for processing to obtain an air compressor priority energy supply index;
[0155] The air compressor priority energy supply indexes are sorted according to their size, and the air compressor corresponding to the largest air compressor priority energy supply index is used as the energy supply air compressor;
[0156] The calculation formula of the air compressor priority energy supply index in the air compressor priority energy supply index model is: ;
[0157] in, It is the priority energy supply index of the air compressor. It is the time from the last maintenance. For standby time data, For effective working time data, is the start and stop times data, , , , , , , It is a preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset load management energy-saving control platform based on big data).
[0158] Among them, after determining the working level data of the air compressor, the air compressor needs to be adjusted. Some air compression systems contain multiple air compressor equipment, and some equipment has the same specifications. If one of them is used frequently, it is easy to be damaged. The equipment that is on standby for a long time cannot be run-in or operated, which will also affect its life. Therefore, it is necessary to choose a suitable air compressor; obtain the air compressor's distance from the last maintenance data, standby time data, effective working time data, and start and stop times data, and then calculate the air compressor priority energy supply index. The air compressor priority energy supply index refers to data that can reflect the priority use function to a certain extent. The air compressor priority energy supply index The larger it is, the more priority it has. The time from the last maintenance data refers to the time from the time the index is calculated to the last maintenance. The effective working time data refers to the time data when the air compressor is working normally and outputting power. After sorting the air compressor priority energy supply index in order of size, the air compressor with the largest air compressor priority energy supply index is started first as the energy supply air compressor. The air compressor priority energy supply index model is a calculation model obtained by training a large amount of time from the last maintenance data, standby time data, effective working time data and start and stop times data. The air compressor priority energy supply index model can calculate the air compressor priority energy supply index.
[0159] The third aspect of the present invention provides a readable storage medium, which includes a load management energy-saving control method program based on big data. When the load management energy-saving control method program based on big data is executed by a processor, the steps of the load management energy-saving control method based on big data as described in any one of the above items are implemented.
[0160] The load management energy-saving control method, system and medium based on big data disclosed in the present invention obtain pressure data, pipeline data and physical parameter data of the gas transmission pipeline, and then process and calculate to obtain effective pressure transmission index data, power correction index data and gas load data of the gas user end; obtain the effective power conversion index of the air compressor, and then calculate the output power data of the air compressor motor in combination with the power correction index data and the gas load data, and obtain the working gear data of the air compressor by matching the output power data with a preset air compressor output power operation database, thereby realizing the adjustment of air compressor parameters; thereby, by calculating the effective pressure transmission index data, the power correction index data and the gas load data, and then combining the effective power conversion index to obtain the output power data of the air compressor motor, load management energy-saving control based on big data is further realized.
[0161] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.
[0162] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units; they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0163] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0164] Those skilled in the art can understand that: all or part of the steps of implementing the above method embodiments can be completed by hardware related to program instructions, the aforementioned program can be stored in a readable storage medium, and when the program is executed, it executes the steps of the above method embodiments; and the aforementioned storage medium includes: mobile storage devices, read-only memories (ROM, Read-Only Memory), random access memories (RAM, Random Access Memory), disks or optical disks, and other media that can store program codes.
[0165] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.
Claims
1. A load management energy-saving control method based on big data, characterized in that: include: Obtain pressure data, pipeline data and physical parameter data of gas pipelines; Obtaining pressure transfer index data according to the pressure data processing, and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data; According to the pipeline data and the effective pressure transfer index data, a preset pipeline power correction index model is used to process the pipeline data and the effective pressure transfer index data to obtain power correction index data; The pressure data, pipeline data and physical parameter data are processed by a preset gas load data model to obtain gas load data of the gas user end; Obtaining an effective power conversion index of the air compressor, the effective power conversion index is combined with the power correction index data and the gas load data to calculate the output power data of the air compressor motor; Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor; Adjusting the working parameters of the air compressor according to the working level data; The obtaining of the pressure data, pipeline data and physical parameter data of the gas pipeline specifically includes: Obtain the pressure data of the gas pipeline, including standard input pressure data and real-time pressure data; Obtain pipeline data of the gas transmission pipeline, including pipeline cross-section data, pipeline roughness data, and pipeline length data; Obtain pipeline physical parameter data, including ambient temperature data and flow rate data; The step of obtaining pressure transfer index data according to the pressure data processing and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data specifically includes: Comparing the real-time pressure data with standard input pressure data to obtain pressure transmission index data; Comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain pressure transfer state data, including effective pressure transfer index data and invalid pressure transfer index data; If the pressure transmission index data is less than a preset pressure transmission index threshold, the pressure transmission state data is invalid pressure transmission index data; If the pressure transmission index data is greater than or equal to a preset pressure transmission index threshold, the pressure transmission state data is valid pressure transmission index data; Storing the effective pressure transfer index data; The processing of the pipeline data and the effective pressure transfer index data by a preset pipeline power correction index model to obtain the power correction index data specifically includes: Inputting the pipeline cross-section data, pipeline roughness data, pipeline length data and effective pressure transfer index data into a preset pipeline power correction index model for processing to obtain power correction index data; The calculation formula of the power correction index data in the pipeline power correction index model is: ; in, is the power correction index data, is the effective pressure transfer index data, is the pipe cross-section data, is the pipeline roughness data, is the pipe length data, , , , , , , , is the preset characteristic coefficient; The obtaining of the gas load data of the gas user end by processing the pressure data, the pipeline data and the physical parameter data through a preset gas load data model specifically includes: The real-time pressure data, pipeline cross-section data, ambient temperature data and flow rate data are processed by a preset gas load data model to obtain gas load data of the gas user end; The calculation formula of the gas load data in the gas load data model is: ; in, For gas load data, For real-time pressure data, is the flow rate data, is the pipe cross-section data, T is the absolute temperature data, t is the ambient temperature data, , , , is the preset characteristic coefficient.
2. The load management energy-saving control method based on big data according to claim 1 is characterized in that: The obtaining of the effective power conversion index of the air compressor, wherein the effective power conversion index is combined with the power correction index data and the gas load data to calculate the output power data of the air compressor motor, specifically includes: Obtaining the effective power conversion index of the air compressor, and inputting the effective power conversion index, power correction index data and gas load data into a preset output power data model for processing to obtain output power data; The calculation formula of the output power data in the output power data model is: ; in, is the output power data, For gas load data, is the effective power conversion index, is the power correction index data, is the preset characteristic coefficient.
3. The load management energy-saving control method based on big data according to claim 2 is characterized in that: The step of matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor specifically includes: Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor; The air compressor output power operation database includes output power data and corresponding working level data; The working level data includes electrical parameter data of the air compressor and corresponding operating time regularity data.
4. The load management energy-saving control method based on big data according to claim 3 is characterized in that: Also includes: Obtain data on the time since the last maintenance, standby time, effective working time, and start and stop times of air compressors of the same specifications; Input the time data from the last maintenance, the standby time data, the effective working time data, and the start-stop times data into a preset air compressor priority energy supply index model for processing to obtain an air compressor priority energy supply index; The air compressor priority energy supply indexes are sorted according to their size, and the air compressor corresponding to the largest air compressor priority energy supply index is used as the energy supply air compressor; The calculation formula of the air compressor priority energy supply index in the air compressor priority energy supply index model is: ; in, It is the priority energy supply index of the air compressor. It is the time from the last maintenance. For standby time data, For effective working time data, is the start and stop times data, , , , , , , is the preset characteristic coefficient.
5. A load management energy-saving control system based on big data, characterized in that: The invention comprises a memory and a processor, wherein the memory comprises a load management energy-saving control method program based on big data, and the load management energy-saving control method program based on big data is executed by the processor to implement the following steps: Obtain pressure data, pipeline data and physical parameter data of gas pipelines; Obtaining pressure transfer index data according to the pressure data processing, and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data; According to the pipeline data and the effective pressure transfer index data, a preset pipeline power correction index model is used to process the pipeline data and the effective pressure transfer index data to obtain power correction index data; The pressure data, pipeline data and physical parameter data are processed by a preset gas load data model to obtain gas load data of the gas user end; Obtaining an effective power conversion index of the air compressor, the effective power conversion index is combined with the power correction index data and the gas load data to calculate the output power data of the air compressor motor; Matching the output power data with a preset air compressor output power operation database to obtain the working level data of the air compressor; Adjusting the working parameters of the air compressor according to the working level data; The obtaining of the pressure data, pipeline data and physical parameter data of the gas pipeline specifically includes: Obtain the pressure data of the gas pipeline, including standard input pressure data and real-time pressure data; Obtain pipeline data of the gas transmission pipeline, including pipeline cross-section data, pipeline roughness data, and pipeline length data; Obtain pipeline physical parameter data, including ambient temperature data and flow rate data; The step of obtaining pressure transfer index data according to the pressure data processing and comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain effective pressure transfer index data specifically includes: Comparing the real-time pressure data with standard input pressure data to obtain pressure transmission index data; Comparing the pressure transfer index data with a preset pressure transfer index threshold to obtain pressure transfer state data, including effective pressure transfer index data and invalid pressure transfer index data; If the pressure transmission index data is less than a preset pressure transmission index threshold, the pressure transmission state data is invalid pressure transmission index data; If the pressure transmission index data is greater than or equal to a preset pressure transmission index threshold, the pressure transmission state data is valid pressure transmission index data; Storing the effective pressure transfer index data; The processing of the pipeline data and the effective pressure transfer index data by a preset pipeline power correction index model to obtain the power correction index data specifically includes: Inputting the pipeline cross-section data, pipeline roughness data, pipeline length data and effective pressure transfer index data into a preset pipeline power correction index model for processing to obtain power correction index data; The calculation formula of the power correction index data in the pipeline power correction index model is: ; in, is the power correction index data, is the effective pressure transfer index data, is the pipe cross-section data, is the pipeline roughness data, is the pipe length data, , , , , , , , is the preset characteristic coefficient; The obtaining of the gas load data of the gas user end by processing the pressure data, the pipeline data and the physical parameter data through a preset gas load data model specifically includes: The real-time pressure data, pipeline cross-section data, ambient temperature data and flow rate data are processed by a preset gas load data model to obtain gas load data of the gas user end; The calculation formula of the gas load data in the gas load data model is: ; in, For gas load data, For real-time pressure data, is the flow rate data, is the pipe cross-section data, T is the absolute temperature data, t is the ambient temperature data, , , , is the preset characteristic coefficient.
6. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a load management energy-saving control method program based on big data. When the load management energy-saving control method program based on big data is executed by a processor, the steps of a load management energy-saving control method based on big data as described in any one of claims 1 to 4 are implemented.
Citation Information
Patent Citations
Air compressor set with energy-saving device
CN105370547A
Dynamic power sensing system
US20180180340A1
