A high-precision geodetic measurement method based on vacuum pipe

By conducting geodetic measurements in vacuum pipes and using the vacuum environment to reduce the influence of the atmosphere, high-precision level and azimuth measurements are achieved, solving the problem of low measurement accuracy in the atmospheric environment and establishing a high-precision geodetic control network.

CN118565438BActive Publication Date: 2024-10-25YANGEN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411053092.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-10-25
Estimated Expiration
2044-08-02

AI Technical Summary

Technical Problem

Existing geodetic technology is affected by atmospheric refraction, air disturbance and temperature fluctuations in the atmospheric environment, resulting in low measurement accuracy and difficulty in meeting high-precision requirements.

Method used

Using a high-precision geodetic survey method based on vacuum pipelines, the vacuum environment in the vacuum pipeline is used for leveling and azimuth measurements. Through airlock cabins, isolation doors, LED lighting, leveling base points, generation leveling base points, measuring trolleys, measuring instruments, Equipment such as rulers and vacuum suits enable high-precision measurements in vacuum environments.

Benefits of technology

In a vacuum environment, the effects of atmospheric refraction and temperature fluctuations are reduced, the accuracy of measurement data is improved, and a high-precision geodetic control network can be established.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118565438B_ABST
    Figure CN118565438B_ABST
Patent Text Reader

Abstract

The present invention provides a high-precision geodetic method based on a vacuum pipeline, which is characterized in that: leveling base points are set along the transportation line and at the terminal of the vacuum pipeline, substitute leveling base points are set in the vacuum pipeline, and a level, a theodolite, and a distance meter are used to measure in the vacuum pipeline, and data such as level, azimuth, and distance are recorded. The elevation and geodetic coordinates of the leveling base points are calculated by adjustment. Since there is no air in the vacuum pipeline, it is a vacuum environment, and there is no influence of atmospheric refraction on the measurement line of sight and electromagnetic waves, and the accuracy of the obtained measurement data is higher than the accuracy of geodetic data in the traditional atmospheric environment. At the same time, there is no wind in the vacuum pipeline, and the temperature fluctuation is small, which further reduces the influence of air disturbance and temperature difference in the atmospheric environment on the measurement accuracy. Therefore, according to the method of the present invention, after joint measurement with the geodetic origin and the national leveling base point, high-precision geodetic measurement is realized, and a geodetic control network based on high-precision geodetic elevation and geodetic coordinates is established.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of vacuum pipeline transportation and geodetic measurement, and in particular relates to a high-precision geodetic measurement method and arrangement based on a vacuum pipeline. Background Art

[0002] The task of geodesy is to establish a high-precision geodetic control network on the land on the surface of the earth and monitor the changes in data over time.

[0003] At present, the highest accuracy of satellite positioning (GPS) geodetic measurement is a horizontal error of ±1m, and the highest accuracy of inertial geodetic measurement (IPS) is a plane position error of ±25cm, neither of which meets the requirements of high-precision geodetic measurement. Therefore, high-precision geodetic measurement is mainly completed using a level and theodolite.

[0004] In the distance measurement of precision geodetic survey, the commonly used methods are Invar, steel tape measurement, and photoelectric distance measurement (light wave distance meter). There are many factors that affect the distance measurement error of steel tape, and temperature change is one of the factors. When the measurement accuracy is high, it is required to add the correction caused by temperature change, and avoid measuring the distance under the scorching sun and on ice and snow in severe cold. The accuracy of photoelectric distance measurement is greatly affected by atmospheric refraction and temperature and humidity.

[0005] When using a theodolite for plane measurement, temperature changes, air flow, sunlight, light brightness, wind speed, and lateral refraction all affect the measurement accuracy.

[0006] Atmospheric refraction is one of the factors that cause leveling errors. When using a level to perform leveling, the ruler is read with a horizontal line of sight. Due to atmospheric refraction, the line of sight is bent, and its bending direction is difficult to determine, so the reading contains refraction errors. In addition, when the instrument is under the blazing sun, the temperature of each part changes unevenly, causing the position of each axis to change. When the level is exposed to sunlight, the temperature of the liquid in the tube is uneven, and the bubble will be centered, which will cause errors.

[0007] Existing high-precision geodetic measurements are all conducted in an atmospheric environment. Whether it is plane control measurement or elevation control measurement, distance is measured by a steel ruler or photoelectric distance meter, level is measured by a level, and angle is measured by a theodolite. However, due to thermal expansion and contraction of steel rulers, the distance measurement accuracy is greatly affected by temperature changes; the accuracy of distance measurement by photoelectric distance meters, ruler reading by level meters, and angle measurement by theodolites is greatly affected by atmospheric refraction.

[0008] The ideal measurement environment is a vacuum environment with constant temperature, but this environment did not exist in previous geodetic measurements.

[0009] Vacuum tube high-speed maglev transportation is a new mode of transportation that is being researched and developed. When this mode of transportation becomes popular, the ground will be covered with vacuum tube lines, just like today's high-speed railways and highways. This will make it possible to complete high-precision geodetic measurements using vacuum tubes and their vacuum constant temperature environment. Summary of the invention

[0010] The object of the present invention is to provide a high-precision geodetic measurement method based on a vacuum pipeline, which includes relevant settings and is intended to overcome the influence of atmospheric refraction, air disturbance and temperature fluctuation on the measurement accuracy in existing geodetic measurement.

[0011] In order to achieve the above object, the present invention adopts the following technical solutions:

[0012] A high-precision geodetic measurement method based on a vacuum pipeline, wherein the relevant settings include a vacuum pipeline, an airlock, an isolation door, an LED lighting lamp, a leveling base point, a substitute leveling base point, a measuring trolley, a measuring instrument, a ruler, a measuring person, and a vacuum suit.

[0013] The airlock described is a transition device for vehicles and personnel in stations or vehicle depots to enter and exit the vacuum pipeline. It is an integral part of the vacuum pipeline transportation, including terminal airlocks and through-type airlocks. The terminal airlock is set at the end of the vacuum pipeline, including an airlock outer door and an airlock inner door. The terminal airlock can be set at the end of the station line pipeline, or at the end of the vacuum pipeline connecting the vehicle depot. The terminal airlock outer door (hereinafter referred to as the "airlock outer door") refers to the airlock door located on the side adjacent to the external atmospheric environment, and the terminal airlock inner door (hereinafter referred to as the "airlock inner door") refers to the airlock door located on the side adjacent to the vacuum pipeline. The through-type airlock is set at the station and is an integral part of the station branch pipeline. Its door is located on the side of the pipeline facing the platform. It is only for people to get on and off the vehicle. Vehicles cannot leave the vacuum pipeline from the through-type airlock.

[0014] The isolation doors are arranged along the vacuum pipeline and are airtight devices for isolating the vacuum pipeline in sections, with one being arranged at a certain interval.

[0015] The leveling base point is set near the outside of the terminal airlock and the outer door, near the hatch of the through-type airlock, and at an appropriate position beside the vacuum pipeline along the line, which is also used as a high-level leveling base point, such as the national first-level leveling base point. A glass observation window is set on the vacuum pipeline corresponding to the leveling base point along the line to facilitate the measurement instrument in the vacuum pipeline to aim at the leveling base point or its upper scale (target mark).

[0016] The substitute leveling base points are fixed feature points at regular intervals on the track in the vacuum tube, such as mileage marking points, 100-meter marking points on the roadbed, etc. The substitute leveling base points are required to maintain long-term stability, with clear and identifiable markings and high-precision point center positions, so as to facilitate the placement of measuring instruments and high-precision centering (alignment) of measuring instruments.

[0017] The inner wall of the vacuum pipe is provided with an LED lighting lamp for lighting during measurement, inspection and maintenance in the vacuum pipe. The LED lighting lamp is a light emitting diode and does not have a cavity like a conventional lighting lamp, which is conducive to avoiding the problem of the lamp tube bursting due to excessive pressure difference in a vacuum environment.

[0018] The measuring trolley is a small, light flatbed vehicle. After the measuring personnel get off the trolley, the height of the measuring trolley will not block the measuring sight line of the measuring instrument.

[0019] The measuring instruments include a level, a theodolite, a photoelectric distance meter, etc., and are required to be suitable for a vacuum low-pressure environment.

[0020] The scale includes a flower rod, a tower ruler, a sighting mark and the like.

[0021] The sealed pressure suit worn by the measurement personnel in the vacuum pipeline is a vacuum suit, similar to the space suit worn by astronauts when leaving the cabin. Because the vacuum degree in the vacuum pipeline is lower than the absolute vacuum degree, that is, the pressure is higher than the absolute pressure, the pressure resistance standard of the vacuum suit worn for measurement in the vacuum pipeline is lower than that of the space suit, and it only needs to withstand the lowest pressure in the vacuum pipeline. Therefore, the vacuum suit used for the vacuum pipeline has a low cost and is more convenient to wear.

[0022] The geodetic measurement is performed during the period when the vacuum pipeline is not in operation, such as during the period when the vacuum pipeline vehicle is not in operation at night, or during the period when the vacuum pipeline is not in operation for maintenance. During the measurement work, the LED lighting in the vacuum pipeline is turned on to provide lighting.

[0023] A high-precision geodetic measurement method based on a vacuum pipeline is specifically performed in the following steps:

[0024] Step 1: Open the terminal airlock outer door, and the measurement personnel take the measurement vehicle to enter the terminal airlock through the airlock outer door.

[0025] Step 2: The surveyor gets off the vehicle, places the surveying instrument, aims rearward at the leveling base point (ruler) set outside the terminal airlock, reads and records the leveling data of the spirit level and the azimuth data of the theodolite, measures the distance with an invar ruler, photoelectric rangefinder or steel tape measure and records the data.

[0026] Step 3: The surveyor puts on a vacuum suit and closes the airlock door.

[0027] Step 4: Evacuate the terminal airlock until the vacuum reaches the same level as the pressure in the vacuum pipe.

[0028] Step 5: Open the airlock door.

[0029] During steps 3 to 5 above, the measuring instrument must be kept stable without tilting and / or deflecting.

[0030] Step 6: Sight forward and aim at the substitute leveling base point (ruler) in the vacuum tube, read and record the level data of the spirit level and the azimuth data of the theodolite, measure the distance with an invar ruler, steel tape measure or photoelectric rangefinder and record the data.

[0031] Step 7: Disassemble the measuring instrument and load it onto the measuring cart. The surveyor gets on the measuring cart and temporarily moves the scale at the foresight leveling base point in step 6 to avoid the measuring cart. The measuring cart drives forward to a measuring station in front of the foresight leveling base point in step 6.

[0032] Step 8: The surveyor gets off the vehicle, places the surveying instrument, and walks forward with the ruler to the leveling base point in front, and erects the ruler as the new foresight ruler.

[0033] Step 9: Sight the front sight of the leveling base point (ruler) in step 6, read and record the level data of the spirit level and the azimuth data of the theodolite, measure the distance with an invar ruler, a steel tape measure or a photoelectric distance meter and record the data; Sight the front sight of the leveling base point (ruler) in step 8, read and record the level data of the spirit level and the azimuth data of the theodolite, measure the distance with an invar ruler, a steel tape measure or a photoelectric distance meter and record the data.

[0034] Step 10: Repeat steps 7 to 9 above until a leveling base point is set along the line outside the vacuum pipe in front, and install the measuring instrument at the position of the leveling base point in the vacuum pipe.

[0035] Step 11: Read and record the rear-sight and front-sight data according to the method in step 9 above, measure the rear-sight and front-sight distances with a photoelectric rangefinder or a steel tape measure and record the data; then aim at the leveling base point (scale) outside the vacuum pipe through the observation window, record the leveling data of the level instrument and the azimuth data of the theodolite, and use the photoelectric rangefinder to measure the distance between the substitute leveling base point inside the vacuum pipe and the leveling base point outside the vacuum pipe; before or after this measurement, use a combination of the external measurement method of the steel tape measure and the indirect measurement method to measure the distance between the substitute leveling base point inside the vacuum pipe and the leveling base point outside the vacuum pipe, which is used to verify the distance measurement result of the photoelectric rangefinder and perform adjustment calculations.

[0036] Step 12: Repeat steps 6 to 11 above until the measurement of this shift is completed.

[0037] Step 13: The measurement personnel, measuring instruments, and measuring vehicle return to the starting airlock, close the airlock door, and inflate the airlock until the pressure level reaches the external atmospheric pressure.

[0038] Step 14: Open the outer door of the airlock, and the measurement personnel, measuring instruments, and measuring carts are withdrawn to wait for the next shift to measure.

[0039] Step 15: After the whole line of vacuum pipeline is measured, internal calculation and adjustment are performed to obtain high-precision leveling (elevation) and coordinate data of the vacuum pipeline endpoints and leveling base points along the line.

[0040] Based on a vacuum pipeline transportation route, high-precision leveling base points can be established along the route, while improving the accuracy of existing leveling base points within the vacuum pipeline channel belt.

[0041] According to the above method, when the vacuum pipeline transportation lines cover a specific area and form a vacuum pipeline transportation network, and are jointly measured with the geodetic origin and elevation benchmark of the specific area, a geodetic control network based on high-precision elevation and coordinate points can be established through coordinate conversion and adjustment calculation.

[0042] Furthermore, during the measurement work, the LED lighting in the vacuum pipe is not turned on, and the lighting is not dependent on the LED lighting in the vacuum pipe. Instead, a local lighting method is used to provide lighting for the measurement work, that is, the instrument side is illuminated by a lighting lamp set on the measuring trolley or on the measuring instrument, and the scale side is illuminated by a lighting lamp set on the scale or a dedicated lighting lamp. The lighting lamp is required to be able to work in a vacuum (low pressure) environment.

[0043] Furthermore, an airtight observation window is provided on the outer door of the airlock, through which the measuring instrument can aim at the leveling base point (ruler) outside the airlock. At this time, the above step 2 becomes step 2a: the measuring personnel wear vacuum suits, the outer door of the airlock is closed, and the terminal airlock is evacuated until the vacuum degree is consistent with the pressure in the vacuum pipeline; the above step 3 becomes step 3a: the inner door of the airlock is opened; the above step 4 becomes step 4a: the measuring personnel get off the vehicle and place the measuring instrument; the above step 5 becomes step 5a: aim at the leveling base point (ruler) outside the terminal airlock through the airtight observation window provided on the outer door of the airlock, read and record the leveling data of the level instrument and the azimuth data of the theodolite, and measure the distance with a rangefinder and record the data. The advantage is that the rear sight reading is performed after closing the outer airlock door, evacuating the airlock door and opening the inner airlock door, and is performed in continuity with the forward sighting step of the subsequent step, avoiding the measurement instrument offset that may be caused during closing the outer airlock door, evacuating the airlock door and opening the inner airlock door.

[0044] Furthermore, the above-mentioned operation steps 13 and 14 are performed as follows: the measurement personnel, the measurement instrument, and the measurement vehicle leave the airlock cabin of the nearest station and wait for the next train to enter the airlock cabin of the station to perform the measurement work.

[0045] Furthermore, the substitute leveling base point is set on the track side, which can be a specially set mark point for measurement during construction, or a characteristic point of facilities inherently distributed along the track side. The advantage is that the substitute leveling base point and the scale erected on it during measurement are both on the track side, which does not affect the passage of the measuring trolley during the turning point. At this time, in the above step 7, there is no need to "temporarily move the scale at the forward substitute leveling base point in step 6" to keep the scale in place and stable.

[0046] Furthermore, by replacing the above-mentioned measurement personnel with a measurement robot to complete all measurement work in the vacuum pipeline, the use of vacuum suits can be omitted, the measurement cost can be reduced, and the workload of the measurement personnel can be reduced. The measurement robot is a fully intelligent measurement robot, or a remote control measurement robot remotely controlled by the measurement personnel outside the vacuum pipeline.

[0047] Furthermore, for the submarine vacuum pipeline serving as a cross-sea channel, wire measurement is carried out through the submarine vacuum pipeline, and the leveling base points on the islands farther away (greater than 10km) adjacent to the coast are determined, thereby realizing the joint measurement of the island leveling base points and the coastal leveling base points to obtain a high-precision geodetic coordinate benchmark that is unified with the land.

[0048] The present invention has the following beneficial effects:

[0049] The present invention provides a high-precision geodetic method based on vacuum pipeline transportation, which is characterized by: utilizing the characteristic that there is no air in the vacuum environment of the vacuum pipeline transportation, leveling and azimuth measurement are performed in the vacuum pipeline according to the wire measurement method to determine the elevation and coordinates of the leveling base points along the line. Since there is no influence of atmospheric refraction on the measurement line of sight and electromagnetic waves, the accuracy of the obtained measurement data is higher than the accuracy of geodetic data in the traditional atmospheric environment. At the same time, there is no wind in the vacuum pipeline and the temperature fluctuation is small, which further reduces the influence of air disturbance and temperature difference in the atmospheric environment on the measurement accuracy. According to the method of the present invention, after joint measurement with the geodetic origin and the national leveling base point, a geodetic control network based on high-precision geodetic elevation and geodetic coordinates can be established. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 This is a schematic diagram of a terminal airlock, leveling base point and beacon. The outer door of the airlock in the figure is an end cover type sealing door, and the inner door of the airlock is a vertically movable sealing door.

[0051] Figure 2This is the operation diagram of step 2. The status shown in the figure is that the inner door of the airlock is closed, the outer door of the airlock is open, and the measuring instrument is aiming at the target with its rear sight.

[0052] Figure 3 This is the operation diagram of step 3. The status shown in the figure is that the inner door of the airlock is open, the outer door of the airlock is closed, and the measuring instrument is aimed at the scale at the leveling base point from the front of the airlock.

[0053] Figure 4 This is a schematic diagram of the measurement process in a vacuum pipe, showing the scale at the leveling base point of the measuring instrument's rear sight.

[0054] Figure 5 This is a schematic diagram of the measurement process in a vacuum pipe, showing the scale of the measuring instrument at the leveling base point.

[0055] Figure 6 Schematic diagram of the location of the airtightness observation window on the vacuum pipeline.

[0056] Figure 7 Schematic diagram of the measuring instrument aiming at the leveling base points (target marks) along the vacuum pipeline through the airtight observation window from inside the vacuum pipeline.

[0057] In the figure, 1 is a vacuum pipe, 2 is an airlock, 21 is an outer door of the airlock, 22 is an inner door of the airlock, 23 is an airlock door room, 3 is a leveling base point, 31 is a substitute leveling base point, 40 is a measuring trolley, 41 is a ruler, 42 is a measuring instrument, 43 is a sighting mark, 5 is a track, and 6 is an airtight observation window. DETAILED DESCRIPTION

[0058] The present invention is described in detail below with reference to the accompanying drawings and embodiments.

[0059] like Figure 1-Figure 5 As shown, a high-precision geodetic measurement method based on a vacuum pipeline is provided, wherein the settings involved include a vacuum pipeline 1, an airlock cabin 2, an isolation door, a leveling base point 3, a substitute leveling base point 31, a measuring trolley 40, a measuring instrument 42, and a ruler 41.

[0060] The airlock 2 is a transition device for vehicles and personnel in a station or a vehicle depot to enter and exit the vacuum pipeline 1. It is an integral part of the vacuum pipeline transportation, including a terminal airlock and a through-type airlock. The terminal airlock is arranged at the end of the vacuum pipeline 1, including an airlock outer door 21 and an airlock inner door 22. The terminal airlock can be arranged at the end of the station line pipeline, or at the end of the vacuum pipeline 1 connecting the vehicle depot. The terminal airlock outer door (hereinafter referred to as "the airlock outer door") refers to the airlock door located on the side adjacent to the external atmospheric environment, and the terminal airlock inner door (hereinafter referred to as "the airlock inner door") refers to the airlock door located on the side adjacent to the vacuum pipeline 1. Figure 2The through-type airlock cabin is set at the station and is a component of the station branch pipeline. Its door is located on the side of the pipeline facing the platform and is only for people to get on and off. Vehicles cannot leave the vacuum pipeline 1 from the through-type airlock cabin.

[0061] The isolation doors are arranged along the vacuum pipeline 1 and are airtight devices for isolating the vacuum pipeline 1 in sections, with one being arranged at a certain interval.

[0062] The leveling base point 3 is set near the outside of the terminal airlock and the outer door, near the door of the through-type airlock, and at an appropriate position beside the vacuum pipe 1 along the line. It is also used as a high-level leveling base point, such as a national first-level leveling base point. A glass airtight observation window is set on the vacuum pipe 1 corresponding to the leveling base point 3 along the line to facilitate the measurement instrument 42 in the vacuum pipe 1 to aim at the leveling base point 3 or the scale on it, such as Figure 6 shown.

[0063] The substitute leveling base points 31 are fixed characteristic points existing at regular intervals on the track in the vacuum pipe 1, such as mileage marking points, hundred-meter markings on the roadbed, etc. It is required that the positions of the substitute leveling base points 31 can basically maintain long-term stability, the markings are clearly identifiable, the point center position is highly accurate, and the measuring instrument 42 is convenient for placement and high-precision centering (alignment) of the measuring instrument 42.

[0064] The inner wall of the vacuum pipe 1 is provided with an LED lamp for lighting during measurement, inspection and maintenance in the vacuum pipe 1. The LED lamp is a light emitting diode and does not have a cavity like a conventional lamp, which helps to avoid the problem of lamp tube bursting due to excessive pressure difference in a vacuum environment.

[0065] The measuring trolley 40 is a small, lightweight flatbed vehicle. After the measuring personnel get off the trolley 40, the height of the measuring trolley 40 will not block the measuring sight line of the measuring instrument 42.

[0066] The measuring instruments 42 include a level, a theodolite, a photoelectric distance meter, etc., and are required to be suitable for a vacuum low-pressure environment.

[0067] The scale 41 includes a flower rod, a tower ruler, etc.

[0068] The sealed pressure suit worn by the measuring personnel in the vacuum pipe 1 is a vacuum suit, similar to the space suit worn by astronauts when leaving the cabin. Because the vacuum degree in the vacuum pipe 1 is lower than the absolute vacuum degree, that is, the pressure is higher than the absolute pressure, the pressure resistance standard of the vacuum suit worn by the measuring personnel in the vacuum pipe 1 is lower than that of the space suit, and it only needs to withstand the lowest pressure in the vacuum pipe 1. Therefore, the vacuum suit used in the vacuum pipe 1 has a low cost and is more convenient to wear.

[0069] The geodetic measurement work is performed during the period when the vacuum pipeline 1 stops running, such as during the night when the vacuum pipeline vehicle stops running, or during the maintenance and shutdown day of the vacuum pipeline 1. During the measurement work, the LED lighting lamp in the vacuum pipeline 1 is turned on to provide lighting.

[0070] A high-precision geodetic measurement method based on a vacuum pipeline is specifically performed in the following steps:

[0071] Step 1: Open the terminal-type airlock outer door 21 , and the measurement personnel take the measurement vehicle 40 to enter the terminal-type airlock 2 through the airlock outer door 21 .

[0072] Step 2: If Figure 2 As shown, the surveying personnel get off the vehicle, place the surveying instrument 42, aim at the leveling base point 3 (target mark 43) set outside the terminal airlock cabin 2 with a rear view, read and record the leveling data of the spirit level and the azimuth data of the theodolite, measure the distance with an invar ruler, photoelectric rangefinder or steel tape measure and record the data.

[0073] Step 3: The measurement personnel wear vacuum suits and close the airlock door 21.

[0074] Step 4: Evacuate the terminal airlock 2 until the vacuum level reaches the same level as the pressure in the vacuum pipe 1.

[0075] Step 5: Open the airlock door 22.

[0076] During the above steps 3 to 5, the measuring instrument 42 should be kept stable without tilting and / or deflecting.

[0077] Step 6: Sight forward and aim at the leveling base point 31 (ruler) in the vacuum pipe 1, read and record the leveling data of the level instrument and the azimuth data of the theodolite, measure the distance with an invar ruler, a steel tape measure or an optical distance meter and record the data, such as Figure 3 shown.

[0078] Step 7: Disassemble the measuring instrument 42 and load it onto the measuring cart 40. The surveyor gets on the measuring cart 40 and temporarily moves the scale 41 at the foresight leveling base point 31 in step 6 to avoid the measuring cart 40. The measuring cart 40 drives forward to a measuring station in front of the foresight leveling base point 31 in step 6.

[0079] Step 8: The surveyor gets off the vehicle, places the surveying instrument 42, and walks forward with the ruler 41 to the front leveling base point 31, and sets up the ruler as the new foresight ruler 41.

[0080] Step 9: Figure 4As shown, the forward sight of step 6 of the backsight sight is used as the leveling base point 31 (scale 41), the leveling data of the level instrument and the azimuth data of the theodolite are read and recorded, and the distance is measured with a photoelectric rangefinder or a steel tape measure and the data is recorded; Figure 5 As shown, the forward leveling base point 31 (scale 41) of the forward sighting step 8 is read and recorded, the leveling data of the level instrument and the azimuth data of the theodolite are read and recorded, and the distance is measured and recorded using an invar ruler, a steel tape measure or an optoelectronic rangefinder.

[0081] Step 10: Repeat the above steps 7 to 9 until a leveling base point 3 is set outside the front vacuum pipe 1, and a measuring instrument 42 is installed at the position of the leveling base point 31 in the vacuum pipe 1. Figure 7 shown.

[0082] Step 11: Read and record the rear-sight and front-sight data according to the method in step 9 above, measure the rear-sight and front-sight distances with an Invar ruler, photoelectric rangefinder or steel tape measure and record the data; Figure 7 As shown, the external leveling base point (target mark 43) of the vacuum pipeline 1 is sighted through the observation window 6, the level data of the level instrument and the azimuth data of the theodolite are recorded, and the distance between the internal leveling base point 31 of the vacuum pipeline 1 and the external leveling base point 3 of the vacuum pipeline 1 is measured by the photoelectric distance meter; before or after this measurement, the distance between the internal leveling base point 31 of the vacuum pipeline and the external leveling base point 3 of the vacuum pipeline 1 is measured by a combination of the external measurement method of the steel tape measure and the indirect measurement method, which is used to verify the distance measurement result of the photoelectric distance meter and perform adjustment calculation.

[0083] Step 12: Repeat steps 6 to 11 above until the measurement of this shift is completed.

[0084] Step 13: The measurement personnel, the measurement instrument 42, and the measurement vehicle 40 return to the airlock cabin 2 from which they departed, close the airlock cabin inner door 22, and inflate the airlock cabin 2 until the pressure level reaches the external atmospheric pressure.

[0085] Step 14: Open the airlock door 21, and the measuring personnel, measuring instruments 42, and measuring cart 40 withdraw to wait for the next shift of measurement.

[0086] Step 15: After the full-line measurement of the vacuum pipeline 1 is completed, internal calculations and adjustments are performed to obtain high-precision leveling (elevation) and coordinate data of the vacuum pipeline endpoints and leveling base points 3 along the line.

[0087] Based on a vacuum pipeline transportation line, high-precision leveling base points 3 can be established along the line, while improving the accuracy of existing leveling base points within the vacuum pipeline channel belt.

[0088] According to the above method, when the vacuum pipeline transportation lines cover a specific area and form a vacuum pipeline transportation network, the leveling base points 3 along the vacuum pipeline 1 are jointly measured with the geodetic origin and elevation benchmark of the specific area. After coordinate conversion and adjustment calculation, a geodetic control network based on high-precision elevation and coordinate points can be established.

[0089] Furthermore, during the measurement work, the LED lighting lamp in the vacuum pipe 1 is not turned on, and the lighting does not rely on the LED lighting lamp in the vacuum pipe 1. Instead, a local lighting method is used to provide lighting for the measurement work, that is, the instrument side is illuminated by a lighting lamp arranged on the measuring trolley 40 or on the measuring instrument 42, and the scale 41 side is illuminated by a lighting lamp arranged on the scale 41 or a dedicated lighting lamp, and the lighting lamp is required to be able to work in a vacuum (low pressure) environment.

[0090] Furthermore, an airtight observation window is provided on the airlock outer door 21, through which the measuring instrument 42 can aim at the leveling base point 3 (ruler) outside the airlock 2. At this time, the above step 2 becomes step 2a: the measuring personnel wear vacuum suits, the airlock outer door 21 is closed, and the terminal airlock is evacuated until the vacuum degree is consistent with the pressure in the vacuum pipe 1; the above step 3 becomes step 3a: the airlock inner door 22 is opened; the above step 4 becomes step 4a: the measuring personnel get off the vehicle and place the measuring instrument 42; the above step 5 becomes step 5a: aim at the leveling base point 3 (ruler) outside the terminal airlock 2 through the airtight observation window provided on the airlock outer door 21, read and record the leveling data of the level instrument and the azimuth data of the theodolite, and measure the distance with a distance meter and record the data. The advantage is that the rear-sight reading is performed after closing the outer door 21 of the airlock, evacuating the airlock and opening the inner door 22 of the airlock, and is performed in conjunction with the forward sighting step of the subsequent step, avoiding the deviation of the measuring instrument 42 that may be caused during closing the outer door 21 of the airlock, evacuating the airlock and opening the inner door 22 of the airlock.

[0091] Furthermore, the above-mentioned operation steps 13 and 14 are performed as follows: the measurement personnel, the measuring instrument 42, and the measuring vehicle 40 leave the airlock cabin of the nearest station and wait for the next train to enter the airlock cabin of the station to perform the measurement work.

[0092] Furthermore, the substitute leveling base point 31 is set outside the track 5, which can be a specially set mark point for measurement during construction, or a characteristic point of facilities inherently distributed along the outside of the track 5. The advantage is that the substitute leveling base point 31 and the scale 41 erected on it during measurement are both outside the track, which does not affect the passage of the measuring trolley 40 during the turning point. At this time, in the above step 7, it is not necessary to "temporarily remove the scale 41 at the forward substitute leveling base point 31 in step 6" so that the scale 41 remains in place and stable.

[0093] Furthermore, by replacing the above-mentioned measurement personnel with a measurement robot to complete all measurement work in the vacuum pipe 1, the use of vacuum suits can be omitted, the measurement cost can be reduced, and the workload of the measurement personnel can be reduced. The measurement robot is a fully intelligent measurement robot, or a remote-controlled measurement robot remotely controlled by the measurement personnel outside the vacuum pipe 1.

[0094] Furthermore, for the submarine vacuum pipeline serving as a cross-sea channel, wire measurement is carried out through the submarine vacuum pipeline, and the leveling base points on the islands farther away (greater than 10km) adjacent to the coast are determined, thereby realizing the joint measurement of the island leveling base points and the coastal leveling base points to obtain a high-precision geodetic coordinate benchmark that is unified with the land.

[0095] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the above embodiments, it should be understood by those skilled in the art that the specific implementations of the present invention may still be modified or replaced by equivalents, and any modification or equivalent replacement that does not depart from the spirit and scope of the present invention shall be included in the scope of the present claims.

Claims

1. A high-precision geodetic method based on a vacuum pipe, Features: The method is implemented by using a high-precision geodetic measuring device based on a vacuum pipeline, the high-precision geodetic measuring device comprising a vacuum pipeline (1), an airlock cabin (2), an isolation door, a leveling base point (3), a substitute leveling base point (31), a measuring trolley (40), a measuring instrument (42), and a ruler (41); The airlock (2) is a transition device for vehicles and personnel at a station or a train depot to enter and exit the vacuum pipeline (1), and is a component of the vacuum pipeline transportation, including a terminal airlock and a through-type airlock; the terminal airlock is arranged at the end of the vacuum pipeline (1), and includes an airlock outer door (21) and an airlock inner door (22). The terminal airlock can be arranged at any one of the ends of the station line pipeline or the end of the vacuum pipeline (1) connecting the train depot; the terminal airlock outer door refers to the airlock door located on the side adjacent to the external atmospheric environment, and the terminal airlock inner door refers to the airlock door located on the side adjacent to the vacuum pipeline (1); the through-type airlock is arranged at the station and is a component of the station branch pipeline. Its door is located on the side of the pipeline facing the platform and is only for personnel to get on and off. Vehicles cannot leave the vacuum pipeline (1) from the through-type airlock; The isolation doors are arranged along the vacuum pipeline (1) and are airtight devices for isolating the vacuum pipeline (1) in sections, with one door being arranged at a certain interval; The leveling base point (3) can be set at any one of the positions outside the terminal airlock and near the outer door, near the hatch door of the through-type airlock, and at an appropriate position beside the vacuum pipe (1) along the line, or as a high-level leveling base point; a glass airtight observation window is provided on the vacuum pipe (1) corresponding to the leveling base point (3) along the line to facilitate the measurement instrument (42) in the vacuum pipe (1) to aim at the leveling base point (3) or the scale on it; The substitute leveling base points (31) are fixed characteristic points existing at regular intervals on the track inside the vacuum pipe (1), and the positions of the substitute leveling base points (31) are used for placing the measuring instrument (42) and for high-precision centering and alignment of the measuring instrument (42); The inner wall of the vacuum pipe (1) is provided with an LED lighting lamp, which is used for lighting during measurement, inspection and maintenance inside the vacuum pipe (1); the LED lighting lamp is a light emitting diode; The measuring trolley (40) is a flatbed vehicle, and after the measuring personnel get off the trolley (40), the height of the measuring trolley (40) will not block the measuring sight line of the measuring instrument (42); The measuring instrument (42) includes a level, a theodolite, and a photoelectric distance meter, and is suitable for use in a vacuum low-pressure environment; The scale (41) comprises a flower rod and a tower scale; The sealed pressure suit worn by the measuring personnel in the vacuum pipe (1) is a vacuum suit; the vacuum degree in the vacuum pipe (1) is lower than the absolute vacuum degree, that is, the pressure is higher than the absolute pressure; The geodetic measurement work is carried out during the period when the vacuum pipe (1) stops operating. During the measurement work, the LED lighting lamp in the vacuum pipe (1) is turned on to provide lighting; The high-precision geodetic method is specifically carried out in the following steps: Step 1: Open the terminal airlock door (21), and the measurement personnel take the measurement vehicle (40) to enter the terminal airlock (2) through the airlock door (21); Step 2: The surveyor gets off the vehicle, places the surveying instrument (42), aims at the leveling base point (3) outside the terminal-type airlock cabin (2) with a rear sight, reads and records the leveling data of the level instrument and the azimuth data of the theodolite, and measures the distance with an invar ruler, an optical distance meter or a steel tape measure and records the data; Step 3: The measurement personnel put on the vacuum suit and close the outer door of the airlock (21); Step 4: Evacuate the terminal airlock (2) until the vacuum reaches the same level as the pressure in the vacuum pipe (1); Step 5: Open the airlock door (22). During the above steps 3 to 5, the measuring instrument (42) should be kept stable without tilting and / or deflecting; Step 6: Sight forward and aim at the leveling base point (31) in the vacuum pipe (1), read and record the level data of the level instrument and the azimuth data of the theodolite, measure the distance with an invar ruler, a steel tape measure or an optoelectronic distance meter and record the data; Step 7: The measuring instrument (42) is disassembled and loaded onto the measuring trolley (40). The measuring personnel get on the measuring trolley (40), temporarily move the scale (41) at the forward-looking leveling base point (31) in step 6 away to avoid the measuring trolley (40), and the measuring trolley (40) moves forward to a measuring station in front of the forward-looking leveling base point (31) in step 6; Step 8: The surveyor gets off the vehicle, places the surveying instrument (42), and walks forward with the ruler (41) to the leveling base point (31) in front, and sets up the ruler as the new foresight ruler (41); Step 9: The back sight is aligned with the forward sight leveling base point (31) of step 6, and the level data of the level instrument and the azimuth data of the theodolite are read and recorded, and the distance is measured with an optical distance meter or a steel tape measure and the data are recorded; the forward sight is aligned with the forward sight leveling base point (31) of step 8, and the level data of the level instrument and the azimuth data of the theodolite are read and recorded, and the distance is measured with an invar ruler, a steel tape measure or a photoelectric distance meter and the data are recorded; Step 10: Repeat the above steps 7 to 9 until a leveling base point (3) is set outside the front vacuum pipe (1) and a measuring instrument (42) is installed at the position of the leveling base point (31) inside the vacuum pipe (1); Step 11: Read and record the rear sight and front sight data according to the method of step 9 above, measure the rear sight and front sight distances with an invar ruler, an optical distance meter or a steel tape measure and record the data; then aim at the external leveling base point scale of the vacuum pipe (1) through the observation window (6), record the level data of the level meter and the azimuth data of the theodolite, and measure the distance between the internal leveling base point (31) of the vacuum pipe (1) and the external leveling base point (3) of the vacuum pipe (1) with an optical distance meter; before or after the measurement, measure the distance between the internal leveling base point (31) of the vacuum pipe and the external leveling base point (3) of the vacuum pipe (1) with a combination of an external measurement method of a steel tape measure and an indirect measurement method, for verifying the distance measurement result of the optical distance meter and performing adjustment calculation; Step 12: Repeat steps 6 to 11 above until the shift measurement is completed; Step 13: The measurement personnel, the measurement instrument (42), and the measurement vehicle (40) return to the airlock cabin (2) from which they departed, close the airlock cabin inner door (22), and inflate the airlock cabin (2) until the pressure level reaches the external atmospheric pressure; Step 14: Open the airlock door (21), and the measuring personnel, measuring instruments (42), and measuring cart (40) withdraw to wait for the next shift of measurement; Step 15: After the whole line of the vacuum pipeline (1) is measured, internal calculation and adjustment are performed to obtain high-precision leveling elevation and coordinate data of the vacuum pipeline endpoints and leveling base points (3) along the line; Based on a vacuum pipeline transportation route, high-precision leveling base points (3) can be established along the route, while improving the accuracy of existing leveling base points within the vacuum pipeline channel belt; According to the above method, when the vacuum pipeline transportation lines cover a specific area and form a vacuum pipeline transportation network, the leveling base points (3) along the vacuum pipeline (1) are measured together with the geodetic origin and elevation benchmark of the specific area. After coordinate conversion and adjustment calculation, a geodetic control network based on high-precision elevation and coordinate points can be established.

2. A high-precision geodetic method based on a vacuum pipeline according to claim 1, Features: During the measurement work, the LED lighting lamp in the vacuum pipe (1) is not turned on, and the lighting does not rely on the LED lighting lamp in the vacuum pipe (1). Instead, a local lighting method is used to provide lighting for the measurement work, that is, the instrument side is illuminated by a lighting lamp arranged on the measuring trolley (40) or arranged on the measuring instrument (42), and the scale (41) side is illuminated by a lighting lamp arranged on the scale (41). The lighting lamp is required to be able to work in a vacuum low-pressure environment.

3. A high-precision geodetic method based on a vacuum pipeline according to claim 1, Features: An airtight observation window is provided on the airlock outer door (21) so that the measuring instrument (42) can aim at the leveling base point (3) outside the airlock (2) through the observation window; the above step 2 is changed to step 2a: the measuring personnel wear vacuum suits, the airlock outer door (21) is closed, and the terminal airlock is evacuated until the vacuum degree reaches the same as the pressure in the vacuum pipe (1); The above step 3 is changed into step 3a: opening the airlock door (22); the above step 4 is changed into step 4a: the surveyor gets off the vehicle and places the surveying instrument (42); the above step 5 is changed into step 5a: aiming at the leveling base point (3) scale arranged outside the terminal-type airlock (2) through the airtight observation window arranged on the airlock door (21), reading and recording the leveling data of the level instrument and the azimuth data of the theodolite, and measuring the distance with the distance meter and recording the data.

4. A high-precision geodetic method based on a vacuum pipeline according to claim 1, Features: The operations in step 13 and step 14 are performed as follows: the measuring personnel, the measuring instrument (42), and the measuring vehicle (40) leave the airlock cabin of the nearest station and wait for the next train to enter the airlock cabin of the station to perform the measuring work.

5. A high-precision geodetic method based on a vacuum pipeline according to claim 1, Features: The substitute leveling base point (31) is set outside the track (5). In the step 7, it is not necessary to "temporarily move the scale (41) at the forward substitute leveling base point (31) in step 6" so that the scale (41) remains in place and stable.

6. A high-precision geodetic method based on a vacuum pipeline according to claim 1, Features: A measuring robot is used to replace the measuring personnel to complete all the measuring work in the vacuum pipe (1); the measuring robot is a fully intelligent measuring robot, or a remote-controlled measuring robot that is remotely controlled by the measuring personnel outside the vacuum pipe (1).

7. A high-precision geodetic method based on a vacuum pipeline according to claim 1, Features: For submarine vacuum pipelines that serve as cross-sea passages, wire measurements are carried out through the submarine vacuum pipelines, and leveling base points on islands that are more than 10 km away from the coast are determined, thereby realizing joint measurement of island leveling base points and coastal leveling base points to obtain a high-precision geodetic coordinate benchmark that is unified with the land.