Data processing method and device, non-volatile storage medium, and electronic device
By filtering and processing the minimum cut set in the fault tree analysis, calculating the probability of top events and the importance of basic events, the problem of large data processing volume in fault tree analysis is solved, the computing efficiency is improved and memory exhaustion is avoided. Effective fault tree analysis for larger systems is realized.
Patent Information
- Application Number
- CN202410998245.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-24
AI Technical Summary
In fault tree analysis, the existing technology has failed to effectively solve this problem due to the large amount of data processing, resulting in low computing efficiency and may lead to exhaustion of computing memory.
By obtaining the fault tree of the object to be evaluated, determining the minimum cut set set, and calculating the probability of the top event and the importance of the basic event based on these minimum cut set sets, filtering out the fault events that need to be processed, reducing the amount of data to be processed, thereby Improve data processing efficiency and avoid memory exhaustion.
It effectively reduces the amount of data processing during fault tree analysis, improves computing efficiency, avoids memory exhaustion, and improves the quantitative analysis capability of fault tree for larger systems.
Smart Images

Figure CN118567899B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular, to a data processing method and device, a non-volatile storage medium, and an electronic device. Background Art
[0002] Fault Tree Analysis (FTA) is a systematic fault analysis method that analyzes the causes of system failures and the possibility of potential failures by constructing a fault tree model, as well as evaluating the reliability and safety of the system. Fault tree analysis mainly uses qualitative and quantitative analysis methods. In the qualitative analysis stage, the fault tree is used to identify and analyze potential fault paths in the system and determine the basic events and combined events that may cause system failures. Qualitative analysis can help identify key failure modes and weaknesses in the system, providing a basis for further quantitative analysis. In the quantitative analysis stage, the fault tree is used to calculate the reliability and safety indicators of the system. Quantitative analysis can help evaluate the reliability level of the system, identify key failure paths and risk points in the system, and provide a basis for improving system design and maintenance strategies. In related technologies, computer equipment obtains the reliability index of the system by calculating the probability of the top event of the fault tree. However, since the events that make up the fault tree have the characteristics of explosive combinations, and all possible combinations must be considered when calculating the probability of the top event, there is a large amount of data to be processed, resulting in low calculation efficiency and even exhaustion of calculation memory.
[0003] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0004] The embodiments of the present application provide a data processing method and device, a non-volatile storage medium, and an electronic device to at least solve the technical problems of low data processing efficiency and computing memory exhaustion caused by the large amount of data processing when performing fault tree analysis in the related technology.
[0005] According to one aspect of an embodiment of the present application, a data processing method is provided, comprising: obtaining at least one fault tree of an object to be evaluated, wherein the fault tree is generated according to multiple fault events that occurred before the current moment of the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and a basic event that is associated with the top event, wherein the top event is the starting point of the fault tree, and the basic event is located at the bottom of the fault tree; determining multiple minimum cut sets in multiple event sets generated by combining multiple basic events, and obtaining a first type of minimum cut set set and a second type of minimum cut set set according to the multiple minimum cut sets, wherein a first probability of each minimum cut set included in the first type of minimum cut set set is less than or equal to a top event probability threshold, the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is obtained by screening the first type of minimum cut set set; determining a second probability of the top event according to the first type of minimum cut set set, and determining a first importance of each target basic event included in the second type of minimum cut set set according to the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the degree of influence of each target basic event on the top event; and determining the target basic event corresponding to the first importance greater than the preset threshold as a fault event to be processed.
[0006] Optionally, determining multiple minimum cut sets from multiple event sets generated by combining multiple basic events includes: determining the event set containing the least number of basic events as the minimum cut set, wherein the top event occurs when all the basic events contained in the minimum cut set occur.
[0007] Optionally, a first type of minimum cut set set is obtained based on multiple minimum cut sets, including: obtaining a basic event probability threshold, wherein the basic event probability threshold is a preset maximum basic event probability; determining a quantity threshold based on the basic event probability threshold and the top event probability threshold; deleting the first target minimum cut set from all minimum cut sets to obtain a first type of minimum cut set set, wherein the first target minimum cut set is a minimum cut set in which the number of basic events included is greater than the quantity threshold.
[0008] Optionally, the first probability of the minimum cut set is determined by the following method: for each minimum cut set, the product of the third probability of each basic event included in the minimum cut set is determined as the first probability.
[0009] Optionally, determining the second probability of the top event based on the first type of minimum cut set set includes: determining any minimum cut set in the first type of minimum cut set set as a second target minimum cut set, wherein the number of the second target minimum cut sets is one or more, and a first number of combinations generated by combining the second target small cut sets is equal to half of the second number of combinations generated by combining the minimum cut sets in the first type of minimum cut set set; inputting the first probability corresponding to the second target minimum cut set into the top event probability function to obtain a second probability, wherein the top event probability function determines the second probability based on the correlation between the first probability and the basic event.
[0010] Optionally, the second type of minimum cut set is generated by the following method: determining a first change relationship of the second probability relative to the third probability of each basic event included in the first type of minimum cut set, and determining a first numerical value corresponding to the first change relationship; deleting the minimum cut set corresponding to the first numerical value equal to the preset value in the first type of minimum cut set to obtain the second type of minimum cut set.
[0011] Optionally, the first importance of each target basic event included in the second type of minimum cut set set is determined according to the second type of minimum cut set set and the second probability, including: determining a second change relationship of the second probability relative to the probability of each target basic event, and determining a second numerical value corresponding to the second change relationship; determining the second numerical value corresponding to each target basic event as the first importance of each target basic event.
[0012] Optionally, after determining the pending fault event, the method also includes: sending an alarm message to the target object, wherein the alarm message is used to prompt the target object to process the pending fault event; after detecting that the pending fault event has been processed, re-determining the fourth probability of the pending fault event until the fourth probability is less than a preset probability value, and stopping sending the alarm message to the target object.
[0013] According to another aspect of an embodiment of the present application, a data processing device is also provided, including: an acquisition module, used to acquire at least one fault tree of an object to be evaluated, wherein the fault tree is generated based on multiple fault events that occurred before the current moment of the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and basic events that have an associated relationship with the top event, the top event is the starting point of the fault tree, and the basic event is located at the bottom of the fault tree; a generation module, used to determine multiple minimum cut sets in multiple event sets generated by combining multiple basic events, and obtain a first type of minimum cut set set and a second type of minimum cut set set based on the multiple minimum cut sets, wherein the first type of minimum cut set The first probability of each minimum cut set contained in the set is less than or equal to the top event probability threshold, the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is obtained by screening the first type of minimum cut set set; the first determination module is used to determine the second probability of the top event according to the first type of minimum cut set set, and determine the first importance of each target basic event contained in the second type of minimum cut set set according to the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the degree of influence of each target basic event on the top event; the second determination module is used to determine the target basic event corresponding to the first importance greater than the preset threshold as a fault event to be processed.
[0014] According to another aspect of an embodiment of the present application, a non-volatile storage medium is provided, in which a computer program is stored, wherein the above-mentioned data processing method is executed by running the computer program on a device where the non-volatile storage medium is located.
[0015] According to another aspect of an embodiment of the present application, an electronic device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to execute the above-mentioned data processing method through the computer program.
[0016] According to another aspect of an embodiment of the present application, a computer program product is also provided, including computer instructions, which implement the steps of the above-mentioned data processing method when executed by a processor.
[0017] In an embodiment of the present application, at least one fault tree of the object to be evaluated is obtained, wherein the fault tree is generated based on multiple fault events that occurred before the current moment of the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and basic events that are associated with the top event, the top event is the starting point of the fault tree, and the basic events are located at the bottom of the fault tree; multiple minimum cut sets are determined in multiple event sets generated by combining multiple basic events, and a first type of minimum cut set set and a second type of minimum cut set set are obtained based on the multiple minimum cut sets, wherein the first probability of each minimum cut set included in the first type of minimum cut set set is less than or equal to the top event probability threshold, the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is a minimum probability threshold of the first type. The method is as follows: the first type of minimum cut set is used to screen the data obtained by filtering the small cut set set; the second probability of the top event is determined according to the first type of minimum cut set set, and the first importance of each target basic event contained in the second type of minimum cut set set is determined according to the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the degree of influence of each target basic event on the top event; the target basic event corresponding to the first importance greater than the preset threshold is determined as the fault event to be processed. By screening the data used to calculate the probability of the top event, the purpose of reducing the amount of data to be processed is achieved, thereby achieving the technical effect of improving data processing efficiency and reducing the required computing memory, thereby solving the technical problems of low data processing efficiency and computing memory exhaustion caused by the large amount of data processing when performing fault tree analysis in the related technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0019] Figure 1 is a hardware structure block diagram of a computer terminal for implementing a data processing method according to an embodiment of the present application;
[0020] Figure 2 is a flowchart of a method for processing data according to an embodiment of the present application;
[0021] Figure 3 is a schematic diagram of a fault tree according to an embodiment of the present application;
[0022] Figure 4 is a structural diagram of a data processing device according to an embodiment of the present application;
[0023] Figure 5 is a schematic diagram of time-consuming comparison experimental results according to an embodiment of the present application;
[0024] Figure 6 is a schematic diagram of a data processing amount comparison experiment result according to an embodiment of the present application;
[0025] Figure 7 It is a schematic diagram of the ratio of an original combination quantity to the number of precision-controlled combinations according to an embodiment of the present application. DETAILED DESCRIPTION
[0026] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0027] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0028] In order to better understand the embodiments of the present application, the technical terms involved in the embodiments of the present application are explained as follows:
[0029] Minimum cut set: The minimum set of basic events required for the top event to occur.
[0030] In the related art, fault tree analysis is performed by Monte Carlo simulation. The results of Monte Carlo simulation are affected by randomness, and different simulation experiments may obtain different results. Therefore, a large number of simulations are required to reduce random errors, and there is a problem of large data processing volume. In addition, the results of Monte Carlo simulation are affected by parameter settings. The selection of parameter range and distribution needs to reasonably reflect the actual situation. Unreasonable settings may lead to deviations and inaccuracies in the results. Therefore, when the business scenario changes, it is necessary to adjust the set parameters, and there is a problem of poor application flexibility. In order to solve this problem, a relevant solution is provided in the embodiment of the present application, which is described in detail below.
[0031] According to an embodiment of the present application, a method embodiment of a data processing method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0032] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Figure 1 FIG. 1 shows a hardware structure block diagram of a computer terminal for implementing a data processing method. Figure 1 As shown, the computer terminal 10 may include one or more (102a, 102b, ..., 102n are used to illustrate) processors 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA), a memory 104 for storing data, and a transmission device 106 for communication functions. In addition, it may also include: a display, an input / output interface (I / O interface), a universal serial bus (USB) port (which may be included as one of the ports of the BUS bus), a network interface, a power supply and / or a camera. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the above electronic device. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations shown.
[0033] It should be noted that the one or more processors 102 and / or other data processing circuits described above may generally be referred to herein as "data processing circuits". The data processing circuits may be embodied in whole or in part as software, hardware, firmware, or any other combination thereof. In addition, the data processing circuit may be a single independent processing module, or may be incorporated in whole or in part into any of the other components in the computer terminal 10. As involved in the embodiments of the present application, the data processing circuit acts as a processor control (e.g., selection of a variable resistor terminal path connected to an interface).
[0034] The memory 104 can be used to store software programs and modules of application software, such as program instructions / data storage devices corresponding to the data processing method in the embodiment of the present application. The processor 102 executes various functional applications and data processing by running the software programs and modules stored in the memory 104, that is, realizing the above-mentioned data processing method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the computer terminal 10 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0035] The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the computer terminal 10. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 can be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0036] The display may be, for example, a touch screen liquid crystal display (LCD) that enables a user to interact with a user interface of the computer terminal 10 .
[0037] The present application embodiment provides a data processing method capable of running in the above-mentioned operating environment. Figure 2 is a flowchart of the steps of the data processing method provided in the embodiment of the present application, such as Figure 2 As shown, the method comprises the following steps:
[0038] Step S202, obtaining at least one fault tree of the object to be evaluated, wherein the fault tree is generated based on multiple fault events that occurred before the current moment in the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and basic events that are associated with the top event. The top event is the starting point of the fault tree, and the basic events are located at the bottom of the fault tree.
[0039] The method provided in the embodiment of the present application can be applied to different systems / equipment, and the root cause (basic event) of the top event in the fault tree is determined by analyzing the fault trees of different systems, wherein the top event is the fault phenomenon exhibited by the system / equipment when a fault occurs, and one system / equipment can correspond to multiple fault trees. For example, for a rocket system, the fault phenomenon is the failure of a rocket launch, and the events that lead to the failure of a rocket launch include: engine failure, sensor failure, etc. Then, among the multiple fault trees corresponding to the rocket system, there is a fault tree corresponding to the failure of a rocket launch, wherein the failure of a rocket launch is the top event in the fault tree, and the engine failure and the sensor failure are the basic events in the fault tree. As mentioned above, it is necessary to analyze the fault tree of the system. Therefore, in step S202, the fault tree corresponding to the object to be evaluated (system / equipment) is first obtained. Specifically, the number of fault trees obtained is determined by the preset focus fault events. If multiple fault phenomena occur in the system at the same time, and these multiple fault phenomena are respectively the same as multiple fault phenomena corresponding to multiple preset focus fault events, then multiple fault trees corresponding to these multiple fault events are obtained; if multiple fault phenomena occur in the system at the same time, but only one fault phenomenon is consistent with one of the multiple fault phenomena corresponding to the preset focus fault event, then only the fault tree corresponding to the fault phenomenon that is consistent with the fault phenomenon corresponding to the preset focus fault event is obtained. Each fault tree corresponding to the system's fault phenomenon is composed of a top event and multiple basic events, where the top event is the event corresponding to the fault phenomenon, which is the event that causes the object to be evaluated (equipment / system) to fail (i.e., stop running), and is located at the top of the fault tree, serving as the starting point of the fault tree; the basic event is the multiple minimum fault events that cause the top event to occur (such as loose screws, sensor failure, etc.), and is located at the bottom of the fault tree; in the fault tree, the top event and the basic event are connected together through logical relationships.
[0040] Step S204, determining multiple minimum cut sets in multiple event sets generated by combining multiple basic events, and obtaining a first type of minimum cut set set and a second type of minimum cut set set based on the multiple minimum cut sets, wherein the first probability of each minimum cut set included in the first type of minimum cut set set is less than or equal to a top event probability threshold, the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is obtained by screening the first type of minimum cut set set.
[0041] In step S204, when processing the acquired fault tree, first determine the minimum cut set generated by the combination of basic events in the fault tree, wherein each minimum cut set contains multiple basic events, and the minimum cut set is the minimum set of basic events required for the top event to occur. When the basic events contained in the minimum cut set occur at the same time, the top event will definitely occur. Figure 3 is a schematic diagram of the fault tree, such as Figure 3 As shown, T is the top event of the fault tree, X1, X2, X4, X5, and X6 are the basic events of the fault tree, and M11, M12, and M13 are the minimum cut sets of the fault tree, where: ; For Figure 3 For the fault tree shown as containing multiple minimum cut sets, the top event (T) occurs if and only if all the basic events contained in any of the cut sets M11, M12, and M13 occur. Next, after determining the multiple minimum cut sets contained in the fault tree, the minimum cut sets (i.e., the first type of cut set set) that need to be further processed are screened out from the minimum cut sets, wherein the screened first type of cut set set should satisfy: the probability of each minimum cut set contained therein (i.e., the first probability) is less than or equal to the top event probability threshold corresponding to the fault tree to which it belongs. Further, the second type of minimum cut set set is obtained by continuing to screen out the multiple minimum cut sets contained in the first type of cut set set; the above-mentioned top event probability threshold is the preset maximum top event probability value.
[0042] Optionally, determining multiple minimum cut sets from multiple event sets generated by combining multiple basic events includes: determining the event set containing the least number of basic events as the minimum cut set, wherein the top event occurs when all the basic events contained in the minimum cut set occur.
[0043] As mentioned in the above embodiment, the minimum cut set is a set consisting of multiple basic events. Figure 3 Taking the fault tree shown in the figure as an example, the basic events X1, X2, X4, X5, and X6 can be combined into M11, M12, and M13, and can also be combined into Therefore, in this embodiment, according to the number of basic events included in the set and the probability of each set affecting the occurrence of the top event, the minimum cut set of the fault tree is determined in the multiple sets generated by the combination of basic events. Specifically, the set with the least number of basic events included in the multiple sets generated by the combination of basic events is screened out; if the screened set with the least number of basic events also meets the condition of "the greatest probability of affecting the occurrence of the top event", it is determined as the minimum cut set; that is, the minimum cut set of each fault tree should meet the two conditions of 1) "the least number of basic events included" and 2) when the basic events included in the minimum cut set occur, the top event must occur.
[0044] According to an optional embodiment of the present application, a first type of minimum cut set set is obtained based on multiple minimum cut sets, including: obtaining a basic event probability threshold, wherein the basic event probability threshold is a preset maximum basic event probability; determining a quantity threshold based on the basic event probability threshold and the top event probability threshold; deleting the first target minimum cut set from all minimum cut sets to obtain a first type of minimum cut set set, wherein the first target minimum cut set is a minimum cut set in which the number of basic events included is greater than the quantity threshold.
[0045] In this embodiment, after determining the minimum cut set of the fault tree, the minimum cut set is further processed as follows: first, the maximum probability of the occurrence of an acceptable basic event (i.e., the basic event probability threshold) is obtained. The probability of any basic event contained in the fault tree obtained in step S202 is less than the above-mentioned basic event probability threshold. This is because the solution provided in the embodiment of the present application is used to analyze the business system / equipment that has been put online / put into use. The probability of occurrence of fault events in the business system / equipment that has been put online / put into use is often low, otherwise it will seriously affect the normal business operation. If it is found that there is a fault event with a probability of occurrence greater than the above-mentioned basic event probability threshold during the test of the business system before it goes online, the business system will not pass the test and cannot be put online / put into use. Next, according to the basic event probability threshold obtained and the top event probability threshold mentioned in step S204, it is determined how many basic events (i.e., the quantity threshold) should be included in each minimum cut set to ensure that even if all the basic events included in the minimum cut set occur, the top event will not occur. Specifically, the quantity threshold = . The system / device that executes the method provided by the embodiment of the present application determines the number of basic events contained in each minimum cut set in the first type of minimum cut set set, deletes the minimum cut set (i.e., the first target minimum cut set) that contains a number of basic events greater than the above-mentioned quantity threshold, and the remaining multiple minimum cut sets constitute the second type of minimum cut set set. After the second type of minimum cut set set is generated, the second type of minimum cut set set will be used as the object of continued analysis. The reason for deleting the minimum cut set (i.e., the first target minimum cut set) that contains a number of basic events greater than the quantity threshold is because the (first) probability of each minimum cut set (i.e., the probability of occurrence of all basic events contained in the minimum cut set) is the product of the probability of occurrence of each basic event contained therein. The more basic events contained in the minimum cut set, the lower the probability of its occurrence, and it will not cause the occurrence of the top event. For example, the top event probability threshold is set to 0.001%, and the basic event probability threshold is set to 10%, then the quantity threshold = , then the minimum cut set containing more than 6 basic events is the first target minimum cut set, and when the solution provided by the embodiment of the present application is used to analyze the root event that causes the business system to fail, the minimum cut set containing more than 6 basic events is ignored. In the above manner, the technical effect of reducing the amount of data processing in the fault tree analysis process is achieved.
[0046] It should be noted that before screening the minimum cut set according to the above-mentioned quantity threshold, a step of screening the minimum cut set according to the basic event probability threshold can be added, through which the accidental basic events with a probability greater than the basic event probability threshold are determined, and the minimum cut set containing such accidental basic events is excluded when performing fault tree analysis, wherein the probability of the basic event can be obtained by analyzing the historical data of the object to be evaluated; for example, if the top event of the fault tree is the failure of a rocket launch, then the data related to the failure of a rocket launch in the fault data (i.e., historical data) of the rocket system before the current moment is obtained, and the basic events related to the failure of a rocket launch and the probability of each basic event are predicted based on these data. Since the probability of a basic event is obtained based on the analysis of the historical data of the object to be evaluated, there may be data with large errors. Therefore, in this embodiment, the probability of each basic event analyzed can be compared with the basic event probability threshold, and the basic event with a probability greater than the basic event probability threshold is deleted.
[0047] Optionally, the first probability of the minimum cut set is determined by the following method: obtaining the third probability of each basic event; for each minimum cut set, determining the product of the third probability of each basic event included in the minimum cut set as the first probability.
[0048] In the embodiment of the present application, the (third) probability of the basic event is determined by analyzing the historical data of the object to be evaluated (device / system), and the (first) probability of each minimum cut set is determined by the basic events it contains. Specifically, in this embodiment, for each minimum cut set, the product of the probabilities of the basic events it contains (i.e., the third probability) is used as the (first) probability of the minimum cut set. For example, Figure 3 The probability of the minimum cut set M11 in is equal to the product of the probability of the basic event X1 and the probability of the basic event X2.
[0049] Step S206, determining the second probability of the top event according to the first type of minimum cut set set, and determining the first importance of each target basic event included in the second type of minimum cut set set according to the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the influence of each target basic event on the top event.
[0050] In step S206, after the first type of minimum cut set set is screened out from the multiple minimum cut sets corresponding to the fault tree in step S204, the probability (i.e., the second probability) of the top event of the fault tree to which the first type of minimum cut set set belongs can be determined, and the degree of influence (i.e., the first importance) of each basic event (i.e., the target basic event) in the second type of set screened from the first type of minimum cut set set on the top event of the fault tree can be further determined; wherein, the greater the (first) importance of the basic event, the greater its influence on the top event of the fault tree.
[0051] Optionally, determining the second probability of the top event based on the first type of minimum cut set set includes: determining any minimum cut set in the first type of minimum cut set set as a second target minimum cut set, wherein the number of the second target minimum cut sets is one or more, and a first number of combinations generated by combining the second target small cut sets is equal to half of the second number of combinations generated by combining the minimum cut sets in the first type of minimum cut set set; inputting the first probability corresponding to the second target minimum cut set into the top event probability function to obtain a second probability, wherein the top event probability function determines the second probability based on the correlation between the first probability and the basic event.
[0052] In order to further reduce the amount of data that needs to be processed during the fault tree analysis process, in this embodiment, the probability of the top event in the fault tree obtained in step S202 (i.e., the second probability) is determined by combining the symmetry of the number of event combinations and the mutual exclusivity of the event combinations. Specifically, the symmetry of the number of event combinations can be expressed as: It indicates that, represents the number of different combinations of k minimum cut sets selected arbitrarily from n minimum cut sets, It represents the number of different combinations consisting of (nk) minimum cut sets randomly selected from the n minimum cut sets. From the above formula, it can be seen that when performing fault tree analysis, the number of traversal combinations can be reduced to half of the total number of combinations. The mutual exclusivity of event combinations means that any combination consisting of k minimum cut sets randomly selected from the combination of n basic events (here events are general and can represent minimum cut sets) has a mutually exclusive combination consisting of (nk) minimum cut sets randomly selected from the n minimum cut sets. Therefore, when there are n minimum cut set combinations generated When the combination When combinations (minimum cut sets); that is, only the minimum cut sets can be analyzed Or just analyze the minimum cut set . In this embodiment, when determining the probability of the top event (i.e., the second probability) based on the first type of minimum cut set set, first, in the first type of minimum cut set set, follow the symmetry of the event combination and the mutual exclusivity of the time combination to determine any one or more minimum cut sets as data for fault tree analysis (i.e., the second target minimum cut set), wherein following the symmetry of the event combination means that the number of combinations (i.e., the first number) generated when the screened second target minimum cut sets are combined should be half of the total number of combinations generated by the first type of minimum cut set set, and the total number of combinations generated by the first type of minimum cut set set is the total number of combinations obtained when multiple minimum cut sets contained in the first type of minimum cut set set are combined. When combining, a single minimum cut set can also be regarded as a combination. The top event probability function is , where T represents the top event, represents the probability of the top event, f(.) is the probability function of the top event, Represents basic events The probability of occurrence. The top event probability function can also be expressed as: in, Represents each minimal cut set The probability of a single occurrence, Represents the minimum cut set and minimal cut sets The probability of simultaneous occurrence, Represents the minimum cut set , and The probability of simultaneous occurrence, represents the i-th minimum cut set, represents j minimum cut sets, represents the kth minimum cut set, It is obtained by combining logical operations with event probability calculation, such as, ,in, represents different basic events. This formula indicates that when the second objective minimum cut set is , and When the second objective minimum cut set is combined, there exists , and Combine the situations together and determine the probability of this situation occurring When considering , and Basic events in The relationship between The relationship between them can be " In case of occurrence, and Occurring simultaneously” (i.e. ), it can be seen from the formula that when using the top event probability function to determine the top event probability, the correlation between basic events also needs to be considered.
[0053] Through the method provided in the embodiment of the present application, a system that executes the data processing method provided in the embodiment of the present application can traverse a smaller number of minimum cut sets when analyzing a fault tree, thereby reducing the amount of data processing, saving computing resources, and improving the efficiency of data processing.
[0054] According to an optional embodiment of the present application, a second type of minimum cut set set is generated by the following method: determining a first change relationship of a second probability relative to a third probability of each basic event included in a first type of minimum cut set set, and determining a first numerical value corresponding to the first change relationship; deleting the minimum cut set corresponding to the first numerical value equal to a preset value in the first type of minimum cut set set to obtain a second type of minimum cut set set.
[0055] As mentioned in the above embodiment, when determining the (first) importance of the target basic event, it is necessary to screen the first type of minimum cut set set to generate the second type of minimum cut set set. Specifically, as mentioned in the above embodiment, the basic events and their probabilities are determined by analyzing the historical data of the object to be evaluated, and the analysis results may be wrong. Therefore, it is necessary to determine whether there is a minimum cut set in the first type of minimum cut set set that is irrelevant to the top event. If the basic event contained in the minimum cut set is irrelevant to the top event, the minimum cut set is deleted. In this embodiment, the first change relationship of the (second) probability of the top event of the fault tree relative to the probability of each basic event contained in the first type of cut set set (i.e., the third probability) is used to determine whether the first type of cut set set contains basic events that are irrelevant to the top event. Specifically, the derivative value can be used as the standard of the horizontal (first) change relationship. If the derivative value (i.e., the first value) is 0 (i.e., the preset value), it means that the basic event is irrelevant to the top event and will not cause the occurrence of the top event. The minimum cut set containing the top event is deleted. For example, for the top event T1, its probability of occurrence is , through the formula Determine the top event P(T1) relative to the event Probability If the rate of change , describing the event Will not lead to the occurrence of top event T1, event The minimum cut set where it is located will not lead to the occurrence of the top event T1. After deleting the minimum cut sets containing basic events irrelevant to the top event in the first type of set in the above manner, the remaining multiple minimum cut sets constitute the second type of minimum cut set set.
[0056] According to another optional embodiment of the present application, the first importance of each target basic event included in the second type of minimum cut set set is determined according to the second type of minimum cut set set and the second probability, including: determining a second change relationship of the second probability relative to the probability of each target basic event, and determining a second numerical value corresponding to the second change relationship; determining the second numerical value corresponding to each target basic event as the first importance of each target basic event.
[0057] In this embodiment, the basic events (i.e., target basic events) included in the second type of minimum cut set are determined as basic events that will cause the top event to occur, and the degree of influence of each target basic event on the top event is determined by determining the importance of each target basic event; in this embodiment, the degree of influence of each target basic event on the top event is determined by the (second) change relationship of the (second) probability of the top event of the fault tree relative to the probability of each (first type) basic event included in the second type of cut set; specifically, the derivative value can be used as the standard of the horizontal (second) change relationship. The larger the derivative value (i.e., the second value), the greater the influence of the (first type) basic event on the top event, which may be the root cause of the top event. For example, for the top event T2, its probability of occurrence is , through the formula Determine the top event P(T2) relative to any target basic event Probability Rate of change , That is, the (first) importance of each target elementary event, The larger the value (i.e. the second value) is, the more likely the event The greater the impact on the top event T2. .
[0058] In addition, in addition to following the principle that the larger the derivative value (i.e., the second value), the greater the influence of the (first type) basic event on the top event, the embodiment of the present application can also be based on the probability of the top event (i.e., the second probability), the probability of each target basic event ( ), the (first) importance of each target basic event , and the formula To further determine the critical importance of each target basic event ; and set the maximum critical importance The corresponding target basic event is the event that causes the top event to occur. In the above formula, represent The amount of change, represent The amount of change.
[0059] Step S208: Determine the target basic event corresponding to the first importance greater than the preset threshold as the fault event to be processed.
[0060] After determining the influence degree (ie, first importance) of each basic event related to the top event (ie, target basic event) on the top event, in step S208, the target basic event corresponding to the first importance greater than a preset threshold is determined as a fault event to be processed.
[0061] Optionally, after determining the pending fault event, the method also includes: sending an alarm message to the target object, wherein the alarm message is used to prompt the target object to process the pending fault event; after detecting that the pending fault event has been processed, re-determining the fourth probability of the pending fault event until the fourth probability is less than a preset probability value, and stopping sending the alarm message to the target object.
[0062] In this embodiment, after determining the basic events that may cause the top event to occur, an alarm message is sent to the manager / management platform of the object to be evaluated (system / equipment), notifying the manager / management platform of the object to be evaluated (system / equipment) to handle the basic events that may cause the top event to occur (i.e., the pending fault events), and after each processing of the event, the impact of the processed pending fault event on the top event (i.e., the second importance) is re-determined until the probability of occurrence of the event (i.e., the pending fault event) is less than the preset probability value, indicating that the probability of occurrence of the event is low enough, and the alarm message may no longer be sent to the manager / management platform of the object to be evaluated (system / equipment).
[0063] Through the above steps, the characteristics of event combinations (symmetry and mutual exclusivity) can be integrated into the fault tree analysis (FTA) process. Compared with the fault tree quantitative analysis method in related technologies, the amount of data that needs to be processed during the analysis process is reduced, and the problem of computing memory exhaustion caused by combination explosion is alleviated; the efficiency of fault tree combination calculation is improved, which is conducive to the quantitative analysis of fault trees for larger systems. In addition, since the amount of data that needs to be processed during the analysis process is reduced, the complexity of data processing is also reduced. For example, when processing a fault tree containing n basic events in related technologies, the complexity is , and the method provided in the embodiment of the present application reduces the complexity to , where k is the number of basic event combinations determined according to the preset maximum top event probability (i.e., top event probability threshold). Taking 10% basic event occurrence probability as an example, if the accuracy is controlled at one in one hundred thousand, then any 6 event combinations selected from the n basic event combinations can meet this requirement, and the number of combinations exceeding this probability can be omitted, that is, only the combinations generated by these 6 events are analyzed during data processing.
[0064] Figure 4 is a structural diagram of a data processing device provided according to an embodiment of the present application, such as Figure 4 As shown, the data processing device includes: an acquisition module 40, which is used to acquire at least one fault tree of the object to be evaluated, wherein the fault tree is generated according to multiple fault events that occurred before the current moment of the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and basic events that are associated with the top event, the top event is the starting point of the fault tree, and the basic event is located at the bottom of the fault tree; a generation module 42, which is used to determine multiple minimum cut sets in multiple event sets generated by combining multiple basic events, and obtain a first type of minimum cut set set and a second type of minimum cut set set according to the multiple minimum cut sets, wherein each minimum cut set contained in the first type of minimum cut set set The first probability of the small cut set is less than or equal to the top event probability threshold, the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is obtained by screening the first type of minimum cut set set; the first determination module 44 is used to determine the second probability of the top event according to the first type of minimum cut set set, and determine the first importance of each target basic event included in the second type of minimum cut set set according to the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the degree of influence of each target basic event on the top event; the second determination module 46 is used to determine the target basic event corresponding to the first importance greater than the preset threshold as a fault event to be processed.
[0065] It should be noted that Figure 4 The preferred implementation of the illustrated embodiment can be found in Figure 2 The relevant description of the illustrated embodiment will not be repeated here.
[0066] In addition, the fault tree is analyzed by using the method provided in the embodiment of the present application and other fault tree analysis methods in the related art to obtain Figure 5 , Figure 6 and Figure 7 The experimental results, Figure 5 is a schematic diagram of the time-consuming comparison experimental results, such as Figure 5 As shown, when the same number of basic events (even_num) are processed using the method provided in the embodiment of the present application (control) and other fault tree analysis methods in the related art (original), as the number of basic events increases, the time consumption (time_consuming) of the method provided in the embodiment of the present application is significantly less than that of other fault tree analysis methods, that is, the calculation efficiency is significantly improved. Figure 6 is a schematic diagram of the data processing volume comparison experiment results, such as Figure 6As shown, when the maximum probability of the top event (i.e., the preset accuracy) is the same, when the same number of basic events (even_num) are processed using the method provided in the embodiment of the present application and other fault tree analysis methods in the related art, as the number of basic events increases, the number of event combinations (combination_num) that need to be analyzed when the fault tree analysis is performed using the method provided in the embodiment of the present application (control) is significantly less than the number of event combinations (combination_num) that need to be analyzed when the fault tree analysis is performed using other fault tree analysis methods (original), that is, the amount of data processing is significantly reduced. Figure 7 It is a schematic diagram of the ratio of the original combination quantity to the number of precision-controlled combinations, such as Figure 7 As shown, under the same preset maximum probability of the top event (i.e., preset accuracy), when the same number of basic events (even_num) are processed using the method (control) provided in the embodiment of the present application and other fault tree analysis methods (original) in the related technology, as the number of basic events increases, the ratio of the original combination quantity to the precision-controlled combination quantity increases, that is, when other fault tree analysis methods (original) are used for fault tree analysis, the number of event combinations that need to be processed is greater than the number of event combinations that need to be analyzed when the method (control) provided in the embodiment of the present application is used for fault tree analysis; that is, when other fault tree analysis methods (original) are used for data processing, there is indeed a data explosion, and the memory pressure is greatly alleviated by the precision-controlled method (i.e., the method provided in the embodiment of the present application).
[0067] An embodiment of the present application further provides a non-volatile storage medium, in which a computer program is stored, wherein the above data processing method is executed by running the computer program on a device where the non-volatile storage medium is located.
[0068] The non-volatile storage medium is used to store a program that performs the following functions: obtaining at least one fault tree of an object to be evaluated, wherein the fault tree is generated based on multiple fault events that occurred before the current moment of the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and a basic event that is associated with the top event, wherein the top event is the starting point of the fault tree, and the basic event is located at the bottom of the fault tree; determining multiple minimum cut sets in multiple event sets generated by combining multiple basic events, and obtaining a first type of minimum cut set set and a second type of minimum cut set set based on the multiple minimum cut sets, wherein the first probability of each minimum cut set included in the first type of minimum cut set set is less than or equal to the top event probability threshold, the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is obtained by screening the first type of minimum cut set set; determining a second probability of the top event based on the first type of minimum cut set set, and determining a first importance of each target basic event included in the second type of minimum cut set set based on the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the degree of influence of each target basic event on the top event; and determining the target basic event corresponding to the first importance greater than the preset threshold as a fault event to be processed.
[0069] An embodiment of the present application further provides an electronic device, including a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to execute the above data processing method through the computer program.
[0070] The processor in the electronic device is used to run a program that performs the following functions: obtaining at least one fault tree of the object to be evaluated, wherein the fault tree is generated based on multiple fault events that occurred before the current moment of the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and a basic event that is associated with the top event, the top event is the starting point of the fault tree, and the basic event is located at the bottom of the fault tree; determining multiple minimum cut sets in multiple event sets generated by combining multiple basic events, and obtaining a first type of minimum cut set set and a second type of minimum cut set set according to the multiple minimum cut sets, wherein the first probability of each minimum cut set included in the first type of minimum cut set set is less than or equal to the top event probability threshold, the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is obtained by screening the first type of minimum cut set set; determining the second probability of the top event according to the first type of minimum cut set set, and determining the first importance of each target basic event included in the second type of minimum cut set set according to the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the degree of influence of each target basic event on the top event; determining the target basic event corresponding to the first importance greater than the preset threshold as the fault event to be processed.
[0071] The embodiment of the present application also provides a computer program product, including computer instructions, which implement the steps of the above data processing method when executed by a processor.
[0072] It should be noted that the various modules in the above-mentioned data processing device can be program modules (for example, a set of program instructions that implement a certain specific function) or hardware modules. For the latter, it can be expressed in the following forms, but is not limited to this: the expression form of each of the above-mentioned modules is a processor, or the functions of each of the above-mentioned modules are implemented by a processor.
[0073] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.
[0074] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.
[0075] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0076] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0077] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0078] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the relevant technology or all or part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk, etc. Various media that can store program codes.
[0079] The above is only a preferred embodiment of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A data processing method, It is characterized in that include: Acquire at least one fault tree of the object to be evaluated, wherein the fault tree is generated according to a plurality of fault events that occurred before the current moment of the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and basic events that are associated with the top event, wherein the top event is the starting point of the fault tree, and the basic events are located at the bottom layer of the fault tree; Determine multiple minimum cut sets in multiple event sets generated by combining multiple basic events, and obtain a first type of minimum cut set set and a second type of minimum cut set set according to the multiple minimum cut sets, wherein the first probability of each of the minimum cut sets contained in the first type of minimum cut set set is less than or equal to a top event probability threshold, and the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is obtained by screening the first type of minimum cut set set, including: determining the number of basic events contained in each of the minimum cut sets in the first type of minimum cut set set, deleting the minimum cut sets whose number of basic events is greater than the number threshold, and the remaining multiple minimum cut sets constitute the second type of minimum cut set set; the first probability of each of the minimum cut sets is determined by the basic events contained therein; Determine a second probability of the top event according to the first type of minimum cut set set, and determine a first importance of each target basic event included in the second type of minimum cut set set according to the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the influence degree of each of the target basic events on the top event; Determine the target basic event corresponding to the first importance greater than a preset threshold as a fault event to be processed; After determining the pending fault event, the method further includes: sending an alarm message to the manager or management platform of the object to be evaluated, notifying the manager or management platform of the object to be evaluated to handle the pending fault event, and re-determining the second importance of the processed pending fault event after each processing of the pending fault event, until the probability of occurrence of the pending fault event is less than a preset probability value, and no longer sending the alarm message to the manager or management platform of the object to be evaluated.
2. The method according to claim 1, It is characterized in that Determining a plurality of minimum cut sets from a plurality of event sets generated by combining a plurality of the basic events includes: The event set containing the least number of basic events is determined as the minimum cut set, wherein the top event occurs when all the basic events contained in the minimum cut set occur.
3. The method according to claim 1, It is characterized in that A first type of minimum cut set set is obtained according to the multiple minimum cut sets, including: Obtaining a basic event probability threshold, wherein the basic event probability threshold is a preset maximum basic event probability; Determine the quantity threshold according to the basic event probability threshold and the top event probability threshold; The first target minimum cut set is deleted from all the minimum cut sets to obtain the first type of minimum cut set set, wherein the first target minimum cut set is a minimum cut set including basic events whose number is greater than the number threshold.
4. The method according to claim 1, It is characterized in that The first probability of the minimum cut set is determined by the following method: For each of the minimum cut sets, the product of the third probabilities of each of the basic events included in the minimum cut set is determined as the first probability.
5. The method according to claim 1, It is characterized in that Determining a second probability of the top event according to the first type of minimum cut set set includes: Determine any of the minimum cut sets in the first type of minimum cut set set as a second target minimum cut set, wherein the number of the second target minimum cut sets is one or more, and a first number of combinations generated by combining the second target small cut sets is equal to one-half of a second number of combinations generated by combining the minimum cut sets in the first type of minimum cut set set; The first probability corresponding to the second target minimum cut set is input into the top event probability function to obtain the second probability, wherein the top event probability function determines the second probability according to the association relationship between the first probability and the basic event.
6. The method according to claim 1, It is characterized in that The second type of minimum cut set is generated by the following method: Determine a first change relationship of the second probability relative to a third probability of each of the basic events included in the first type of minimum cut set set, and determine a first value corresponding to the first change relationship; The minimum cut set corresponding to the first value equal to the preset value is deleted from the first type of minimum cut set set to obtain the second type of minimum cut set set.
7. The method according to claim 1, It is characterized in that Determining the first importance of each target elementary event included in the second type of minimum cut set set according to the second type of minimum cut set set and the second probability includes: Determine a second change relationship of the second probability relative to the probability of each of the target elementary events, and determine a second value corresponding to the second change relationship; The second numerical value corresponding to each of the target basic events is determined as the first importance of each of the target basic events.
8. The method according to claim 1, It is characterized in that After determining the to-be-processed fault event, the method further includes: After detecting that the pending fault event has been processed, the fourth probability of the pending fault event is re-determined until the fourth probability is less than a preset probability value, and the sending of the alarm information to the target object is stopped.
9. A data processing device, It is characterized in that include: An acquisition module is used to acquire at least one fault tree of the object to be evaluated, wherein the fault tree is generated according to multiple fault events that occurred before the current moment of the object to be evaluated, and the fault events include: a top event that causes the object to be evaluated to stop working, and basic events that are associated with the top event, the top event is the starting point of the fault tree, and the basic events are located at the bottom of the fault tree; A generating module, used for determining a plurality of minimum cut sets in a plurality of event sets generated by combining a plurality of the basic events, obtaining a first type of minimum cut set set and a second type of minimum cut set set according to the plurality of the minimum cut sets, wherein the first probability of each of the minimum cut sets contained in the first type of minimum cut set set is less than or equal to a top event probability threshold, the top event probability threshold is a preset maximum value of the top event probability, and the second type of minimum cut set set is obtained by screening the first type of minimum cut set set, including: determining the number of basic events contained in each of the minimum cut sets in the first type of minimum cut set set, deleting the minimum cut sets containing a number of basic events greater than the number threshold, and the remaining plurality of the minimum cut sets forming the second type of minimum cut set set; the first probability of each of the minimum cut sets is determined by the basic events contained therein, and the first probability of each of the minimum cut sets is determined by the basic events contained therein; A first determination module is used to determine a second probability of the top event according to the first type of minimum cut set set, and to determine a first importance of each target basic event included in the second type of minimum cut set set according to the second type of minimum cut set set and the second probability, wherein the first importance is used to indicate the influence degree of each of the target basic events on the top event; A second determination module, configured to determine the target basic event corresponding to the first importance greater than a preset threshold as a fault event to be processed; The processing device is also used to, after determining the pending fault event, also include: sending an alarm message to the manager or management platform of the object to be evaluated, notifying the manager or management platform of the object to be evaluated to handle the pending fault event, and re-determining the second importance of the processed pending fault event after each processing of the pending fault event, until the probability of occurrence of the pending fault event is less than a preset probability value, and no longer sending the alarm message to the manager or management platform of the object to be evaluated.
10. A non-volatile storage medium, It is characterized in that The non-volatile storage medium stores a computer program, wherein the data processing method according to any one of claims 1 to 8 is executed by running the computer program in the device where the non-volatile storage medium is located.
11. An electronic device comprising a memory and a processor, It is characterized in that The memory stores a computer program, and the processor is configured to execute the data processing method according to any one of claims 1 to 8 through the computer program.
12. A computer program product comprising computer instructions, It is characterized in that When the computer instructions are executed by a processor, the steps of the data processing method described in any one of claims 1 to 8 are implemented.
Citation Information
Patent Citations
Method for identifying and analyzing single-point failure mode of launch vehicle
CN103810383A
Data-driven fault-tree analysis method, data-driven fault-tree analysis device and data-driven fault-tree analysis equipment
CN108509290A
Approximate quantitative calculation method for estimated value of probabilistic security risk point
CN115169863A
Risk quantitative assessment method by computer supported top logic for nuclear power plant
JP2012008744A
