A multi-objective construction data sharing and transmission method and system based on BIM
By setting up information collection, calculation and real-time processing nodes on the data transmission path of the BIM project to monitor and process the data transmission process, the problems of data leakage, tampering and transmission delay are solved, and the security and efficiency of data transmission are improved.
Patent Information
- Application Number
- CN202411062747.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-05
AI Technical Summary
The problems of data leakage, tampering and transmission delay or interruption in BIM projects affect construction efficiency and cost.
Set up information collection nodes, computing nodes and real-time processing nodes on the data transmission path to monitor the data transmission process, judge and issue early warnings, and perform data compression and encryption processing to ensure the security and real-time nature of data transmission.
Effectively prevent data leakage and tampering, improve the security and efficiency of data transmission, promptly detect and resolve network failures, and ensure the stability and timeliness of data transmission.
Smart Images

Figure CN118573606B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction data sharing and transmission, and in particular to a BIM-based multi-target building construction data sharing and transmission method and system. Background Art
[0002] BIM technology is a technology for digital building design and construction management. It realizes unified collaboration and management of building information by integrating 3D models, data and documents into a unified platform. In BIM technology, buildings are regarded as a series of editable objects, including components, systems, equipment, etc. Each object can contain rich attribute information, such as size, material, structure, price, etc., and is related to other objects. These objects can be combined in 3D space to form a complete building model. Through BIM technology, architects, structural engineers, mechanical and electrical engineers, construction managers, equipment suppliers and other participants can share building information on the same platform, work together, optimize design and construction processes, reduce costs, improve efficiency, and reduce errors and loopholes.
[0003] In a Chinese invention application with application publication number CN115794759B, a BIM-based multi-target construction data sharing and transmission method is disclosed, including: using the construction data to be transmitted to obtain the construction BIM data to be transmitted; using the construction data to be transmitted and the construction BIM data to be transmitted to obtain the preliminary data to be transmitted; using the preliminary data to be transmitted for shared transmission, during the transmission of the construction data, the waste of resources caused by multiple transmission and sharing of duplicate data is avoided. At the same time, in each step of the transmission process, the data is reversely verified after the transmission is completed by utilizing the targeted association characteristics between the data, thereby improving the accuracy and efficiency of the transmission.
[0004] In view of the above invention, the prior art has the following deficiencies:
[0005] 1. Currently, BIM projects usually involve multiple parties, including architects, engineers, contractors, etc., who may need to share sensitive data and design information. If not properly protected, these data may be obtained by unauthorized persons, resulting in data leakage. And due to the large number of participants, there is a risk of data tampering. Malicious tampering with data may lead to design errors or construction quality problems, thus affecting the progress and cost of the entire project.
[0006] 2. BIM models usually contain a large amount of data, such as three-dimensional models, attribute information, documents, etc. The transmission of these large-capacity data may take a long time, affecting the efficiency and real-time performance of data transmission, and depends on the stability of the network connection. If the network fails or is unstable, it may cause data transmission interruption or delay, affecting the normal progress of data transmission. Summary of the invention
[0007] 1. Technical issues to be resolved
[0008] In view of the shortcomings of the prior art, the present invention provides a BIM-based multi-target construction data sharing and transmission method and system, which sets information collection nodes, calculation execution nodes and real-time processing nodes on the transmission path, and monitors the data transmission process through the above data processing nodes, aiming to at least solve one of the problems existing in the BIM technology in the process of data transmission, such as data leakage, tampering or loss, and data transmission interruption or delay, which affect the normal progress of data transmission.
[0009] (II) Technical solution
[0010] To achieve the above objectives, the present invention is implemented through the following technical solutions: A multi-objective construction data sharing and transmission method based on BIM, comprising the following steps:
[0011] Create a data platform so that data transmission paths exist between the data platform and multiple participants, and aggregate the different BIM data of each participant;
[0012] An information collection node is set up on the data transmission path between the data platform and each participant to collect data transmission information during the transmission process, and judge the data transmission status based on the data transmission information to determine whether to issue an early warning;
[0013] Computing nodes are set up on the data transmission path between the data platform and each participant to perform computing tasks such as compression status judgment, encryption, and decryption of data during transmission;
[0014] Set up real-time data processing nodes on the data transmission path between the data platform and each participant, conduct statistics and real-time analysis on the data during the transmission process, and determine whether there are any transmission problems during the data transmission process;
[0015] Choose whether to issue a warning to the participants based on the judgment results of the information collection node and the computing node; choose whether to issue an alarm to the participants based on the judgment results of the real-time data processing node.
[0016] Preferably, in the above-mentioned BIM-based multi-target construction data sharing and transmission method, when a participant uploads a data packet, the upload time of the data packet is recorded. And the time Tb for confirming successful upload, substitute into the formula , calculate the transmission delay time of each data packet ; Test and obtain the transmission distance value of each data transmission path through the test equipment , substitute into the formula , calculate the transmission delay time coefficient ;
[0017] Get the total delay time of all uploaded data packets , the formula is as follows:
[0018]
[0019] in: is the total number of data packets uploaded by the participants; i is the starting index of the summation, and the value of i is 1, 2, 3...n;
[0020] The preset standard delay time threshold is ;when When the packet is marked as a timeout packet ;when When the packet is marked as a normal packet , calculate the proportion of timeout packets in the total packets, and record the proportion of timeout packets .
[0021] Preferably, in the above-mentioned multi-objective construction data sharing and transmission method based on BIM, according to the normalized total delay time and the ratio of timeout packets , generate network latency health status , the formula is as follows:
[0022]
[0023] in: and Respectively represent the observations within the time period T The minimum and maximum values of and Respectively represent the proportion of timeout packets observed in time period T The minimum and maximum values of the time period T are 1 to 30 minutes;
[0024] The preset network delay health status coefficient threshold is , when the network delay of the packet is healthy Network delay health status coefficient threshold When the network delay of the data packet is healthy, a first-level warning is issued and a first-level prompt strategy is executed. The first-level prompt strategy is: prompt that the data transmission path needs to be maintained; when the network delay of the data packet is healthy When the network delay health status coefficient threshold Fa is reached, the data transmission path is determined to be a normal path.
[0025] Preferably, in the above-mentioned multi-objective construction data sharing and transmission method based on BIM, the total amount of data is , Packet Average and average data transfer value They are normalized and the obtained values are marked as , and , and based on , and , generating the initial transmission rate value , the formula is as follows:
[0026]
[0027] in: , for The weight factor, for The weight factor, for The weight factor of The value range is 0~0.5; The value range is 0~0.4; The value range of is 0~0.2;
[0028] The preset initial transmission rate value coefficient threshold is , when the initial transmission rate value Initial transmission rate value coefficient threshold , determining that the data transmission state is normal;
[0029] When the initial transmission rate value Initial transmission rate value coefficient threshold When the compression ratio and compression algorithm of the prompt data packet need to be adjusted, a second-level warning is issued and a second-level prompt strategy is executed.
[0030] Preferably, in the above-mentioned BIM-based multi-target construction data sharing and transmission method, when the data packet uploaded by the participant meets the initial transmission rate value Initial transmission rate value coefficient threshold ,When it is determined that the data transmission state is normal, the computing node uses the TLS protocol to encrypt the data packet from the participant uploading port to the data platform receiving port, and completes the transmission;
[0031] When the data packets uploaded by the participants meet the initial transmission rate value Initial transmission rate value coefficient threshold When the compression adjustment process makes the data packet meet the upload requirements or the user chooses to continue uploading, the computing node uses the TLS protocol to perform end-to-end encryption on the data packet to complete the transmission.
[0032] Preferably, in the above-mentioned BIM-based multi-target construction data sharing and transmission method, the total number of data packets uploaded by the participants on each transmission path is obtained. , Total number of packets received 2. Through the formula Count the number of unreceived packets , and by the formula , calculate the packet loss rate ;
[0033] Preset packet loss rate coefficient threshold , , , ,and ;
[0034] when When the data transmission process is judged to have a transmission problem, When , it is judged that the data transmission process is normal;
[0035] when When the data transmission status is judged as the first-level loss status, a first-level alarm is issued to the participating parties;
[0036] when When the data transmission status is judged as the second-level loss status, a second-level alarm is issued to the participating parties;
[0037] when When the data transmission status is judged as the third-level loss state, a third-level alarm is issued to the participating parties.
[0038] Preferably, in the above-mentioned BIM-based multi-objective construction data sharing and transmission method, the bandwidth data value of the data transmission path is obtained. ; Set the bandwidth data value , initial transmission rate value and network latency health status After dimensionless processing, the obtained values are marked as , and , and based on , and , generate data transmission health value , the formula is as follows:
[0039]
[0040] in: The weight factor of yes The weight factor of yes The weight factor of The value range is 0~0.5. The value range is 0~0.4, The value range is 0~0.4;
[0041] Preset data transmission health value coefficient threshold WP;
[0042] When data transmission health value When the data transmission health value coefficient threshold WP is reached, the network transmission status is judged to be healthy; when the data transmission health value When the data transmission health coefficient threshold WP is reached, the network transmission status is determined to be unhealthy and a warning is issued.
[0043] Preferably, in the above-mentioned BIM-based multi-objective construction data sharing and transmission method, the data transmission health coefficient threshold include , , , ,and ;
[0044] When data transmission health value When , the network transmission status is determined to be healthy;
[0045] When data transmission health value When the network transmission status is judged as a level 1 unhealthy state, a level 1 warning is issued;
[0046] When data transmission health value When the network transmission status is judged as a level 2 unhealthy state, a level 2 warning is issued;
[0047] When data transmission health value When the network transmission status is judged as a level 3 unhealthy state, a level 3 warning is issued.
[0048] On the other hand, the present invention also discloses a BIM-based multi-objective construction data sharing and transmission system, which is used to implement the above-mentioned multi-objective construction data sharing and transmission method, including a data platform creation module, an information collection module, a calculation module, a real-time processing module and an early warning module; wherein:
[0049] The data platform creation module is used to build a data platform, and the data platform and multiple participants establish data transmission paths. Multiple participants can upload BIM-related data from their respective data transmission paths and aggregate them to the data platform;
[0050] The information collection module is used to obtain the data transmission information of the data uploaded by the participants to the data platform, and to determine whether the transmission efficiency of the data transmission path is normal;
[0051] The calculation module is used to obtain whether the data transmission path can normally carry the normal transmission of the data packet in this state when the participant uploads the data packet. If it is judged to be normal, the TLS protocol is used to encrypt the data packet end-to-end, and then the data is transmitted; if it is judged to be abnormal, the staff is prompted to compress and adjust the data packet or continue to upload, and then the TLS protocol is used to encrypt the data packet end-to-end, and finally the data is transmitted;
[0052] The real-time processing module is used to perform status statistics on uploaded and received data packets to determine whether there are any transmission problems;
[0053] The early warning module is used to obtain the judgment results of the information collection node and the computing node to choose whether to issue an early warning to the participants, and to choose whether to issue an alarm to the participants based on the judgment results of the real-time data processing node.
[0054] (III) Beneficial effects
[0055] The present invention provides a method having the following beneficial effects:
[0056] (1) Through information collection and point addition, the network delay health status of each data transmission path can be calculated. A lower network delay health status usually indicates that the network is running well and the data transmission speed is fast, while a higher network delay health status may indicate network congestion or instability. This helps staff evaluate the performance of the network, understand whether the transmission status can be guaranteed, and ensure the timeliness of data transmission, so as to ensure that data can be transmitted and responded to in a timely manner and discover network failures or bottlenecks in a timely manner;
[0057] (2) By calculating the node, the initial transmission rate value is obtained and compared. A higher initial transmission rate value indicates that data can be transmitted from the source end to the target end faster, while a lower initial transmission rate value may result in a longer data transmission time. The present invention can preset the initial transmission rate value coefficient threshold through network bandwidth and network configuration planning, and compare the initial transmission rate value with the initial transmission rate value coefficient threshold, which can be used to assist the staff in determining whether the data transmission path can guarantee the high-efficiency transmission of data, thereby further ensuring the high efficiency of transmission;
[0058] (3) By using computing nodes to perform end-to-end encryption on data packets that meet transmission requirements, it can ensure that only the sender and receiver can decrypt and access the data, and third parties cannot spy on or tamper with the data content, effectively protecting the privacy and security of the data and preventing the data from being intercepted or tampered with by malicious attackers;
[0059] (4) The data packet loss rate is obtained by real-time processing of data nodes, and warnings are issued to staff based on the data packet loss rate, prompting staff that there may be problems with the transmission path, making it easier for staff to check and maintain the network status, and taking measures to improve the availability and stability of the transmission path, avoid data loss, and improve the timeliness of data upload. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 It is a schematic diagram of the steps of the multi-target construction data sharing and transmission method based on BIM of the present invention. DETAILED DESCRIPTION
[0061] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0062] See also Figure 1 The present invention provides a multi-objective construction data sharing and transmission method based on BIM, comprising the following steps:
[0063] Step 1: Create a data platform so that data transmission paths exist between the data platform and multiple participants, which is used to aggregate different BIM data of each participant;
[0064] Step 1 includes the following:
[0065] Step 101: Demand analysis, determine the needs and expectations of the participants, determine the type and content of the data that needs to be shared, determine the frequency and scale of data transmission, etc.
[0066] Step 102: Architecture design, design the overall architecture of the data platform, including data storage, transmission, processing and security, and determine the data transmission path and process, including data source, transmission channel, processing flow and target storage.
[0067] Step 103: Select a technical solution and choose appropriate technologies and tools to support the implementation of the data platform, such as databases, cloud services, communication protocols, etc.
[0068] Step 104: Data collection and integration: collect data from all participants, clean, convert and integrate them to ensure data consistency and accuracy; design data models and standards so that data from different data sources can be processed and analyzed uniformly.
[0069] Step 105: Establish a data transmission path, configure the data transmission channel and protocol, ensure that data can be stably transmitted from the data source to the target storage; design the data transmission process and scheduling tasks to ensure the timeliness and effectiveness of data transmission.
[0070] Step 106: Implementation and Deployment: Implement the various components and functions of the data platform according to the design and planning; configure and deploy data transmission paths and related technical components to ensure their normal operation and stability.
[0071] When in use, the contents of steps 101 to 106 are combined to establish a data transmission path connected to multiple parties.
[0072] Step 2: Set up information collection nodes on the data transmission path between the data platform and each participant to collect data transmission information during the transmission process, and determine the data transmission status based on the data transmission information to determine whether to issue an early warning;
[0073] Step 2 includes the following:
[0074] Step 201: When a participant uploads a data package, the upload time of the data package is recorded. And the time Tb for confirming successful upload;
[0075] Step 202: Upload time Substitute the time Tb for confirming successful upload into the formula , calculate the transmission delay time of each data packet ;
[0076] Step 203: Transmission distance value Refers to the maximum distance that a data signal can be stably and effectively transmitted on a data transmission path; the transmission distance value of each data transmission path is tested and obtained through test equipment , substitute into the formula , calculate the transmission delay time coefficient ;
[0077] It should be noted that the transmission distance value It can be obtained through the following steps: use a signal generator to generate a standard data signal and transmit it to the system under test through the transmission path; then, use an oscilloscope, spectrum analyzer and other equipment to measure and analyze the signal characteristics during the transmission process; finally, process and analyze the test data through a computer and software to obtain the test results of the data transmission distance.
[0078] Step 204: Delay the transmission time and transmission delay time coefficient Substituting into the formula,
[0079] Get the total delay time of all uploaded data packets , the formula is as follows:
[0080]
[0081] in: is the total number of data packets uploaded by the participants; i is the starting index of the summation, and the value of i is 1, 2, 3...n;
[0082] Step 205: Preset the standard delay time threshold as ;when When the packet is marked as a timeout packet ;when When the packet is marked as a normal packet ;
[0083] Step 206: Calculate the proportion of timeout packets in the total packets and record the proportion of timeout packets ;
[0084] Step 207: Based on the normalized total delay time and the ratio of timeout packets , generate network latency health status , the formula is as follows:
[0085]
[0086] in: and Respectively represent the observations within the time period T The minimum and maximum values of and Respectively represent the proportion of timeout packets observed in time period T The minimum and maximum values of the time period T are 1 to 30 minutes;
[0087] Step 208: Preset the network delay health status coefficient threshold to , delay the network health status Network delay health status coefficient threshold Compare and calculate; when the network delay of the data packet is healthy Network delay health status coefficient threshold When the network delay of the data packet is healthy, a first-level warning is issued and a first-level prompt strategy is executed. The first-level prompt strategy is: prompt that the data transmission path needs to be maintained; when the network delay of the data packet is healthy When the network delay health status coefficient threshold Fa is reached, the data transmission path is determined to be a normal path and no warning is issued.
[0088] It should be noted that the maintenance of transmission paths mainly includes the reasonable management of network bandwidth to ensure the stability of data transmission links; by monitoring network traffic, allocating and optimizing bandwidth to avoid network congestion and bandwidth bottlenecks; using load balancing technology to evenly distribute data traffic to multiple network channels to improve overall transmission efficiency and stability; and timely repairing faults to prevent potential problems from interfering with data transmission. This includes updating patches for network equipment, operating systems, and applications, as well as necessary hardware replacement and upgrades.
[0089] When using, combine the contents of steps 201-208:
[0090] By collecting information, we can calculate the network delay health status of each data transmission path. A lower network delay health status usually means that the network is running well and the data transmission speed is fast, while a higher network delay health status may indicate network congestion or instability. This helps staff evaluate the performance of the network, understand whether the transmission status can be guaranteed, and ensure the timeliness of data transmission, so as to ensure that data can be transmitted and responded to in a timely manner, and to promptly discover network failures or bottlenecks.
[0091] Step 3: Set up computing nodes on the data transmission path between the data platform and each participant to perform computing tasks such as compression status judgment, encryption, and decryption of data during transmission;
[0092] Step three includes the following:
[0093] Step 301: Get the byte size of each data packet , by dividing the byte size of each packet within the time period T by Add up and calculate the total amount of data that needs to be transmitted z;
[0094] Step 302: Obtain the number of data packets uploaded within time period T , the total amount of data in the periodic time period The number of packets uploaded during the periodic time period Substitute into the formula , get the average value of the byte size of each data packet in the time period T ;
[0095] Step 303: Obtain the duration within the time period T , the total amount of data in the periodic time period and the duration of the period Substitute into the formula , calculate the average data transmission value required for transmission in time period T ;
[0096] Step 304: Set the total amount of data , Packet Average and average data transfer value They are normalized and the obtained values are marked as , and , and based on , and , generating the initial transmission rate value , the formula is as follows:
[0097]
[0098] in: , for The weight factor, for The weight factor, for The weight factor of The value range is 0~0.5, preferably ; The value range is 0~0.4, preferably The value range is 0~0.2, preferably ;
[0099] Step 305: Preset the initial transmission rate coefficient threshold to , when the initial transmission rate value Initial transmission rate value coefficient threshold When the initial transmission rate value is Initial transmission rate value coefficient threshold When the packet is received, a second-level warning is issued and a second-level prompt strategy is executed. The second-level prompt strategy is: the compression ratio and compression algorithm of the prompt data packet need to be adjusted to improve the compression rate of the uploaded data packet to reduce the byte size of the data packet, which is more convenient to ensure the timeliness of transmission;
[0100] Step 306: When the data packet uploaded by the participant meets the initial transmission rate value Initial transmission rate value coefficient threshold When the condition is met and the data transmission status is determined to be normal, the computing node uses the TLS protocol to encrypt the data packet from the participant's upload port to the data platform's receiving port to complete the transmission;
[0101] When the data packets uploaded by the participants meet the initial transmission rate value Initial transmission rate value coefficient threshold When the conditions are met, a third-level warning is issued and a third-level prompt strategy is executed. The third-level prompt strategy is: prompt to compress and adjust the data packet or continue uploading. When the compression adjustment processing makes the data packet meet the upload requirements or choose to continue uploading, the computing node uses the TLS protocol to encrypt the data packet end-to-end and complete the transmission.
[0102] It should be noted that computing nodes can use a variety of compression algorithms, such as differential coding, Huffman coding, etc., and select the most appropriate algorithm based on the characteristics of the data and transmission requirements; differential coding uses the rate of change of data to transmit incremental data with smaller differences rather than complete data; Huffman coding is a lossless compression method that uses a predefined binary description to replace each symbol, and the length is determined by the frequency of the symbol's occurrence; in addition, computing nodes will also adjust the compressed data packets; this includes reorganizing the format of the data packet, adjusting the size of the data packet, or modifying the header information of the data packet; the purpose of the adjustment is to ensure that the data packet can be smoothly transmitted and parsed in different network environments and devices.
[0103] It should be noted that, in combination with the contents of step 301 to step 306:
[0104] By obtaining and comparing the initial transmission rate values through the calculation nodes, a higher initial transmission rate value indicates that data can be transmitted from the source end to the target end faster, while a lower initial transmission rate value may result in a longer data transmission time. The present invention can preset the initial transmission rate value coefficient threshold through network bandwidth and network configuration planning, and compare the initial transmission rate value with the initial transmission rate value coefficient threshold, which can be used to assist the staff in determining whether the data transmission path can guarantee the high-efficiency transmission of data, and further ensure the high efficiency of transmission;
[0105] By performing end-to-end encryption on data packets that meet transmission requirements through computing nodes, it can be ensured that only the sender and receiver can decrypt and access the data, and third parties cannot snoop or tamper with the data content, effectively protecting the privacy and security of the data and preventing the data from being intercepted or tampered with by malicious attackers.
[0106] Step 4: Set up a real-time data processing node on the data transmission path between the data platform and each participant to perform statistics and real-time analysis on the data during the transmission process and determine whether there are any transmission problems during the data transmission process;
[0107] Step 4 includes the following:
[0108] Step 401: Obtain the total number of data packets uploaded by the participants on each transmission path , Total number of packets received 2. Through the formula Count the number of unreceived packets , and by the formula , calculate the packet loss rate ;
[0109] It should be noted that the total number of data packets uploaded by the participants on each transmission path can be obtained using network monitoring tools. Total number of packets received and acknowledged 2, For example:
[0110] Select appropriate network monitoring tools, such as Wireshark, nload, etc., which can capture and analyze network traffic; configure the tools to capture data packets on the target transmission path; analyze the captured data packets and count the number of uploaded and confirmed received data packets.
[0111] Step 402: Preset packet loss rate coefficient threshold , , , ,and ;
[0112] Step 403: When When the data transmission process is judged to have transmission problems, an early warning is issued to the staff of the participating parties; When the data transmission process is judged to be normal, normal operation is performed.
[0113] Step 404: Obtaining the bandwidth data value of the data transmission path ; Set the bandwidth data value , initial transmission rate value and network latency health status They are dimensionless processed and the obtained values are marked as , and ;
[0114] Step 405: Based on , and , generate data transmission health value , the formula is as follows:
[0115]
[0116] in: The weight factor of yes The weight factor of yes The weight factor of The value range is 0~0.5, preferably ; The value range is 0~0.4, preferably ; The value range is 0~0.4, preferably ;
[0117] Preset data transmission health value coefficient threshold WP;
[0118] When data transmission health value When the data transmission health value coefficient threshold WP is reached, the network transmission status is judged to be healthy; when the data transmission health value When the data transmission health coefficient threshold WP is reached, the network transmission status is determined to be unhealthy and a warning is issued.
[0119] When used, combine the contents of step 401 to step 406:
[0120] The data packet loss rate is obtained by real-time processing of data nodes, and staff are warned based on the data packet loss rate, suggesting that there may be problems with the transmission path, making it convenient for staff to check and maintain the network status, and take measures to improve the availability and stability of the transmission path, avoid data loss, and improve the timeliness of data upload.
[0121] In step 403, a determination is made based on the data transmission status whether to issue an alarm to the participant, specifically:
[0122] when When the data transmission status is judged as the first-level loss status, a first-level alarm is issued to the participating parties;
[0123] when When the data transmission status is judged as the second-level loss status, a second-level alarm is issued to the participating parties;
[0124] when When the data transmission status is judged as the third-level loss state, a third-level alarm is issued to the participating parties.
[0125] It should be noted that the first-level alarm can be a message reminder, which sends early warning information to the operating platform of the participating staff, prompting the staff to pay attention to the problem, maintain the transmission path in time, and ensure the normal data transmission; the second-level alarm can add a warning light reminder function on the basis of the first-level alarm, further attracting the attention of the staff to the problem; the third-level alarm can add a sound alarm on the basis of the second-level alarm, further reminding the surrounding staff that they need to deal with the problems that arise. Different levels of early warnings are issued according to the severity of the problem, which is conducive to ensuring the timeliness of maintenance and avoiding delays.
[0126] In step 405, the data transmission health coefficient threshold include , , , ,and ;
[0127] When data transmission health value When , the network transmission status is determined to be healthy;
[0128] When data transmission health value When the network transmission status is judged as a level 1 unhealthy state, a level 1 warning is issued;
[0129] When data transmission health value When the network transmission status is judged as a level 2 unhealthy state, a level 2 warning is issued;
[0130] When data transmission health value When the network transmission status is judged as a level 3 unhealthy state, a level 3 warning is issued.
[0131] On the other hand, the present invention also discloses a BIM-based multi-objective construction data sharing and transmission system, which is used to implement the above-mentioned multi-objective construction data sharing and transmission method, including a data platform creation module, an information collection module, a calculation module, a real-time processing module and an early warning module; wherein:
[0132] The data platform creation module is used to build a data platform, and the data platform and multiple participants establish data transmission paths. Multiple participants can upload BIM-related data from their respective data transmission paths and aggregate them to the data platform;
[0133] The information collection module is used to obtain the data transmission information of the data uploaded by the participants to the data platform, and to determine whether the transmission efficiency of the data transmission path is normal;
[0134] The calculation module is used to obtain whether the data transmission path can normally carry the normal transmission of the data packet in this state when the participant uploads the data packet. If it is judged to be normal, the TLS protocol is used to encrypt the data packet end-to-end, and then the data is transmitted; if it is judged to be abnormal, the staff is prompted to compress and adjust the data packet or continue to upload, and then the TLS protocol is used to encrypt the data packet end-to-end, and finally the data is transmitted;
[0135] The real-time processing module is used to perform status statistics on uploaded and received data packets to determine whether there are any transmission problems;
[0136] The early warning module is used to obtain the judgment results of the information collection node and the computing node to choose whether to issue an early warning to the participants, and to choose whether to issue an alarm to the participants based on the judgment results of the real-time data processing node.
[0137] It should be noted that, since the target construction data sharing and transmission system can run and implement the multi-target construction data sharing and transmission method, it has all the advantages of the multi-target construction data sharing and transmission system.
[0138] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented using software, the above embodiments may be implemented in whole or in part in the form of a computer program product. A person of ordinary skill in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented in electronic hardware, or in a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution.
[0139] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0140] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.
Claims
1. A multi-objective construction data sharing and transmission method based on BIM, characterized by: include: Create a data platform so that data transmission paths exist between the data platform and multiple participants, and aggregate the different BIM data of each participant; An information collection node is set up on the data transmission path between the data platform and each participant to collect data transmission information during the transmission process, and judge the data transmission status based on the data transmission information to determine whether to issue an early warning; Specifically: When a participant uploads a data package, the upload time of the data package is recorded And the time Tb for confirming successful upload, substitute into the formula , calculate the transmission delay time of each data packet ; Use the test equipment to test and obtain the maximum distance that the data signal can be transmitted on the data transmission path and mark it as the transmission distance value , substitute into the formula , calculate the transmission delay time coefficient ; Get the total delay time of all uploaded data packets , the formula is as follows: in: is the total number of data packets uploaded by the participants; i is the starting index of the summation, and the value of i is 1, 2, 3...n; The preset standard delay time threshold is ;when When the packet is marked as a timeout packet ;when When the packet is marked as a normal packet , calculate the proportion of timeout packets in the total packets, and record the proportion of timeout packets ; Based on the normalized total delay time and the ratio of timeout packets , generate network latency health status , the formula is as follows: in: and Respectively represent the observations within the time period T The minimum and maximum values of and Respectively represent the proportion of timeout packets observed in time period T The minimum and maximum values of the time period T are 1 to 30 minutes; The preset network delay health status coefficient threshold is , when the network delay of the packet is healthy Network delay health status coefficient threshold When the network delay of the data packet is healthy, a first-level warning is issued and a first-level prompt strategy is executed. The first-level prompt strategy is: prompt that the data transmission path needs to be maintained; when the network delay of the data packet is healthy When the network delay health status coefficient threshold Fa is reached, the data transmission path is determined to be a normal path; Computing nodes are set up on the data transmission path between the data platform and each participant to perform computing tasks such as compression status judgment, encryption, and decryption of data during transmission; Set up real-time data processing nodes on the data transmission path between the data platform and each participant, conduct statistics and real-time analysis on the data during the transmission process, and determine whether there are any transmission problems during the data transmission process; Choose whether to issue a warning to the participants based on the judgment results of the information collection node and the computing node; choose whether to issue an alarm to the participants based on the judgment results of the real-time data processing node.
2. A multi-objective construction data sharing and transmission method based on BIM according to claim 1, characterized in that: Get the byte size of each packet , the total amount of data that needs to be transmitted within the time period T is obtained by summing up z; Get the number of data packets uploaded within the time period T , the total amount of data in the periodic time period The number of packets uploaded during the periodic time period Substitute into the formula , get the average value of the byte size of each data packet in the time period T ; Get the duration within the time period T , the total amount of data in the periodic time period and the duration of the period Substitute into the formula , calculate the average data transmission value required for transmission in time period T .
3. A multi-objective construction data sharing and transmission method based on BIM according to claim 2, characterized in that: The total amount of data , Packet Average and average data transfer value They are normalized and the obtained values are marked as , and , and based on , and , generating the initial transmission rate value , the formula is as follows: in: , for The weight factor, for The weight factor, for The weight factor of The value range is 0~0.5; The value range is 0~0.4, The value range is 0~0.2; the preset initial transmission rate coefficient threshold is , when the initial transmission rate value Initial transmission rate value coefficient threshold , determining that the data transmission state is normal; When the initial transmission rate value Initial transmission rate value coefficient threshold When the compression ratio and compression algorithm of the prompt data packet need to be adjusted, a second-level warning is issued and a second-level prompt strategy is executed.
4. The multi-objective construction data sharing and transmission method based on BIM according to claim 3 is characterized in that: When the data packets uploaded by the participants meet the initial transmission rate value Initial transmission rate value coefficient threshold When the condition is met and the data transmission status is determined to be normal, the computing node uses the TLS protocol to encrypt the data packet from the participant's upload port to the data platform's receiving port to complete the transmission; When the data packets uploaded by the participants meet the initial transmission rate value Initial transmission rate value coefficient threshold When the conditions are met, a third-level warning is issued and a third-level prompt strategy is executed. The third-level prompt strategy is: prompt to compress and adjust the data packet or continue uploading. When the compression adjustment processing makes the data packet meet the upload requirements or choose to continue uploading, the computing node uses the TLS protocol to encrypt the data packet end-to-end and complete the transmission.
5. The multi-objective construction data sharing and transmission method based on BIM according to claim 4 is characterized in that: Get the total number of data packets uploaded by participants on each transmission path , Total number of packets received 2. Through the formula Count the number of unreceived packets , and by the formula , calculate the packet loss rate ; Preset packet loss rate coefficient threshold , , , ,and ; when When the data transmission process is judged to have a transmission problem, When , it is judged that the data transmission process is normal; when When the data transmission status is judged as the first-level loss status, a first-level alarm is issued to the participating parties; when When the data transmission status is judged as the second-level loss status, a second-level alarm is issued to the participating parties; when When the data transmission status is judged as the third-level loss state, a third-level alarm is issued to the participating parties.
6. A multi-objective construction data sharing and transmission method based on BIM according to claim 5, characterized in that: Get the bandwidth data value of the data transmission path ; Set the bandwidth data value , initial transmission rate value and network latency health status After dimensionless processing, the obtained values are marked as , and , and based on , and , generate data transmission health value , the formula is as follows: in: The weight factor of yes The weight factor of yes The weight factor of The value range is 0~0.
5. The value range is 0~0.4, The value range of is 0~0.4; Preset data transmission health coefficient threshold WP; When data transmission health value When the data transmission health value coefficient threshold WP is reached, the network transmission status is judged to be healthy; when the data transmission health value When the data transmission health coefficient threshold WP is reached, the network transmission status is determined to be unhealthy and a warning is issued.
7. A multi-objective construction data sharing and transmission method based on BIM according to claim 6, characterized in that: Data transmission health coefficient threshold include , , , ,and ; When data transmission health value When , the network transmission status is determined to be healthy; When data transmission health value When the network transmission status is judged as a level 1 unhealthy state, a level 1 warning is issued; When data transmission health value When the network transmission status is judged as a level 2 unhealthy state, a level 2 warning is issued; When data transmission health value When the network transmission status is judged as a level 3 unhealthy state, a level 3 warning is issued.
8. A multi-objective construction data sharing and transmission system based on BIM, used to implement the multi-objective construction data sharing and transmission method according to any one of claims 1 to 7, characterized in that: It includes data platform creation module, information collection module, calculation module, real-time processing module and early warning module; among which: The data platform creation module is used to build a data platform, and the data platform and multiple participants establish data transmission paths. Multiple participants can upload BIM-related data from their respective data transmission paths and aggregate them to the data platform; The information collection module is used to obtain the data transmission information of the data uploaded by the participants to the data platform, and to determine whether the transmission efficiency of the data transmission path is normal; The calculation module is used to obtain whether the data transmission path can normally carry the normal transmission of the data packet in this state when the participant uploads the data packet. If it is judged to be normal, the TLS protocol is used to encrypt the data packet end-to-end, and then the data is transmitted; if it is judged to be abnormal, the staff is prompted to compress and adjust the data packet or continue to upload, and then the TLS protocol is used to encrypt the data packet end-to-end, and finally the data is transmitted; The real-time processing module is used to perform status statistics on uploaded and received data packets to determine whether there are any transmission problems; The early warning module is used to obtain the judgment results of the information collection node and the computing node to choose whether to issue an early warning to the participants, and to choose whether to issue an alarm to the participants based on the judgment results of the real-time data processing node.